FICHTNER Consulting Engineers (India)

Private Limited, (FI) Chennai.


VENDOR DRAWING REVIEW STATUS

† Action - 1 Approved
† Action - 2 Approved except as noted on drawing. Revise
drawing and resubmit for records.
† Action - 3 Returned with Comments. Resubmit for approval.
† Action - 4 Not Approved. Resubmit for review
† Information noted. Retained for reference and records.
This document has been reviewed as noted with regard to general
conformity with the Contract specifications and requirements. The
Vendor / Contractor is responsible for correctness of design calculation
and details. Approval of this document does not relieve the Vendor /
Contractor of his responsibility in carrying out the work correctly and
fulfilling the complete requirements of the contract nor does it limit the
purchaser's rights under the contract.

FI Letter Ref. No. Date: 21/04/2011


CNT 6725/PM-6.7/422/2285

Signature Initials: TAI

By Sayan Roy at 11:57 am, Mar 28, 2011

Revised as Per Fichtner Transmittal No:CNT6725/PM-


1 25/03/2011
6.7/8178/2035 DATED 23/02/2011 RB AB MK SK
0 ISSUED FOR APPROVAL 27/1/2011 RB AB MK SK
REV. Description Date Prepared Checked Approved PM
REVISION
ONGC-Tripura Power Company Limited
2 X 363.3 MW CCPP PALLATANA, TRIPURA, INDIA

FICHTNER Consulting Engineers (India) Pvt. Limited


Chennai

BHARAT HEAVY ELECTRICALS LTD.


POWER SECTOR, PROJECT ENGINEERING MANAGEMENT, NEW DELHI.

NTPC BHEL Power Projects Private Limited


(A Joint Venture company of NTPC & BHEL)

BHEL DOC. NO. PE-VO-319-552-A011 REV. 1


KIDDE INDIA LIMITED O/C NO.
EL-205, TTC INDUSTRIAL AREA,
MAHAPE, NAVI MUMBAI - 400 710 201090308
INDIA
TITLE
WRITEUP ON DIESEL ENGINE CONTROL PANEL REV. 1
SHEET(S) 4
KIDDE DOC. NO. 201090308-DOC-11 PAGE 1 OF 4
WRITEUP ON DIESEL ENGINE CONTROL PANEL
PROJECT: EPC SUB-CONTRACTOR :
2 X 363.3 MW COMBINED CYCLE POWER NTPC BHEL POWER PROJECTS PRIVATE LIMITED
PLANT,PALLATANA, TRIPURA, INDIA

FIRE FIGHTING SYSTEM CONTRACTOR : CONSULTING ENGINEERS :


KIDDE INDIA LIMITED FICHTNER CONSULTING ENGINEERS (INDIA) PRIVATE
LIMITED CHENNAI
SHEET :
2 OF 4
BHEL DOC. NO. PE-VO-319-552-A011 REV. 1

2 X 363.3 MW CCPP
FOR
OTPC, TRIPURA

WRITE-UP ON DIESEL ENGINE CONTROL PANEL

BHEL DOC NO. : PE-VO-319-552-A011

KIDDE DOC. NO. : 201090308-DOC-11


WRITEUP ON DIESEL ENGINE CONTROL PANEL
PROJECT: EPC SUB-CONTRACTOR :
2 X 363.3 MW COMBINED CYCLE POWER NTPC BHEL POWER PROJECTS PRIVATE LIMITED
PLANT,PALLATANA, TRIPURA, INDIA

FIRE FIGHTING SYSTEM CONTRACTOR : CONSULTING ENGINEERS :


KIDDE INDIA LIMITED FICHTNER CONSULTING ENGINEERS (INDIA) PRIVATE
LIMITED CHENNAI
SHEET :
3 OF 4
BHEL DOC. NO. PE-VO-319-552-A011 REV. 1

GENERAL DESCRIPTION OF DIESEL ENGINE CONTROL PANEL

The Diesel Engine Control Panel is designed to provide the starting current for diesel engine by charging
the batteries as well as monitor and control the diesel engine. The panel shall be floor-mounting type and
shall have IP-42 degree of protection, suitable for bottom cable entry. Lockable-hinged doors are provided
to give access to the internal equipment. Diesel engine control panel shall have two voltmeters (AC/DC),
two ammeters (AC/DC), auto manual selecting switch, indicating lamps, push buttons for start, stop and
reset, relays etc.

Working:

The closing of SW1 turns the Diesel Engine Panel ON . The lamp L1 indicates this.
The closing of SW2 turns the engine heater on. The lamp L2 indicates this.

STARTING POWER:
Uninterrupted starting DC power is made available to the engine by two sets of storage batteries associated
with battery chargers.

BATTERY CHARGING SYSTEM:


The battery chargers operate on 230V, 50 Hz, AC supply stepped down to 12 V and feeding to the rectifier
bridge. Filtered 12 V DC supply is then available for battery charging. Selector switches facilitate selecting
the charging mode viz trickle/boost charging separately for two batteries. When the engine is in running
condition the battery will get charged by the engine dynamo. Individual ammeter and voltmeter are
provided for monitoring the condition of each battery. When the battery-1 is at under voltage condition,
manually the control circuit can be switch over to battery-2 by the selector switch.

The closing of switch SW3 makes the 12V DC supply available to the control circuit. The lamp L3 glows,
thus indicating ‘control supply on’. The panel can be set to auto mode or manual mode by the auto-manual
selector switch AMS1. In auto mode, the relay RL1 energises after getting the ‘start signal’ from PLC.
Thus the lamp L4 glows, indicating ‘pump on demand’ and the pump gets started. In manual mode, the
relay RL1 will get energised only after the start push button PB1 is pressed.

PB2 is the manual stop button provided for the engine. However auto trip is provided on conditions such as
‘engine fail to start’ and ‘engine over speed’ and are indicated by lamps L9 and L10 respectively.
After RL1 was getting energised, the fuel solenoid valve gets activated. Initially the lube oil pressure is
very low. Hence the lube oil pressure switch (LOPS) operates and the relay RL3 gets energised. Lamp L6
indicates the condition “low lube oil”. As RL3 gets energised, Timers CR & SR get set. Timer CR is used
to set the on and off time of the cranking pulses. Timer SR is used to set the total time for 12 cranking
pulses. If the engine does not get started even after providing 12 cranking pulses, the Timer SR will get
activated. This will energise relay RL5 and the engine will be automatically tripped off. The lamp L9
indicates this condition.
WRITEUP ON DIESEL ENGINE CONTROL PANEL
PROJECT: EPC SUB-CONTRACTOR :
2 X 363.3 MW COMBINED CYCLE POWER NTPC BHEL POWER PROJECTS PRIVATE LIMITED
PLANT,PALLATANA, TRIPURA, INDIA

FIRE FIGHTING SYSTEM CONTRACTOR : CONSULTING ENGINEERS :


KIDDE INDIA LIMITED FICHTNER CONSULTING ENGINEERS (INDIA) PRIVATE
LIMITED CHENNAI
SHEET :
4 OF 4
BHEL DOC. NO. PE-VO-319-552-A011 REV. 1

If the engine gets started within 12 cranking pulses, the lube oil pressure will be built up. Hence the relay
RL3 will get de-energised. This will energise the relay RL2 and the lamp L5 will glow indicating “Engine
running”.

RESET REQUIRED AFTER STOP:


The reset push button PB3 shall be pressed after tripping the engine to keep the engine control panel ready
for further operation. This de-energises any latched relays.

ENGINE OVERSPEED:
The over speed switch senses the speed of the engine. When the speed of the engine exceeds a certain limit,
the relay RL6 will get energised which will automatically trip of the engine. This condition is indicated by
lamp L10.

HIGH ENGINE TEMPERATURE:


The jacket water temperature is continuously sensed by built in temperature sensor. The lamp L7 gives an
indication when the temperature goes above the reference level.

DIESEL ENGINE LEVEL LOW:


The in-built level switch continuously senses the diesel level in the tank. When the level of diesel falls
below the reference level, the lamp L8 provides an indication.

The Hooter can be set on or off by using the selector switch SW4. Lamp L11 indicates the off condition of
the hooter.
In on condition the hooter sounds in any one of the following conditions:
1) Engine fail to start
2) Engine over speed

Lamp L12 indicates ‘Battery 1or 2 low’.


Lamp L13 indicates ‘Charger 1 or 2 Fail’.
Lamp L13 indicates ‘Mains fail’.

************