33'
421"
31'-6" 421"
9"
421" 421" FOOTING SIZE
S.No. Footing Nos. Size
1 9"
1
9"
1'-6"
1 F1 2 7'-0"x6'-0"x9'-4"
C1 18" LATAK BEAM [B4] C2 2 F2 7 8'-0"x6'-0"x9'-4"
L3
9'-9" 8'-9" 9'-9" CAMBER SCHEDULE 3 F3 1 14'-0"x6'-0"x9'-4"
1' 1' 1' 1'
4 F4 2 10'-0"x6'-0"x9'-4"
18'-10"
17'-4"
Bottom of slab @ Bottom of slab @ Bottom of slab @
7 F7 1 12'-7"x12'-0"x14'-6" [LIFT PIT]
12'-6" from floor
finish level
12'-6" from floor
finish level
12'-6" from floor
finish level
8 F8 1 14'-6"x13'-0"x14'-6" [PIT]
L3 10Ø@6"C/C L3
COLUMN SIZE
10Ø@6"C/C S.No. Column Nos. Size
L3
18" LATAK BEAM [B3] C1, C2, C3, C4, C5, C6, C7, C8, C9,
1 13 2'-0"X1'-6"
2 2 C10, C11, C12, C13
1'-6"
C3 C4 2 C14 3 1'-0"X1'-6"
L3
1'-6" 1'-6"
1' 9'-9" 1' 8'-9" 1' 9'-9" 1'
12" LATAK BEAM [B6]
L3 L3 L3 L3
3 C20
1'
1'-6"
8Ø@7"C/C 8Ø@7"C/C
FLAT BEAM [B8]
FLAT BEAM[B8]
4-20Ø
4-20Ø Ring-8Ø@8"CC 6-16Ø Ring-8Ø@8"CC 4 C26, C27 3 1'-3"X1'-6"
18'-10"
18'-10"
Bottom of slab @ Bottom of slab @ Bottom of slab @ 8-16Ø
17'-4"
L3 10Ø@6"C/C L3
1' 1'-6"
6 C15, C16,C18, C19, C21 5 0'-9"X0'-9"
9"
9"
10Ø@6"C/C
7 1 0'-9"X1'-6"
L3
4-20Ø 4-20Ø
C17
18" LATAK BEAM [B3] Ring-8Ø@8"CC Ring-8Ø@8"CC
2-16Ø 4-16Ø
3 3
1'-6"
C5 C6 C22
C17
L3
12" LATAK BEAM [B6]
9"
FLAT BEAM [B8]
1'-3"
8Ø@7"C/C 8Ø@7"C/C
FLAT BEAM [B8]
4-20Ø
Bottom of slab @ Bottom of slab @ Bottom of slab @ Basement Roof Lvl
18'-10"
18'-10"
4-20Ø
6"
17'-4"
12'-6" from floor 12'-6" from floor 12'-6" from floor 6-16Ø Ring-8Ø@8"CC Ring-8Ø@8"CC
finish level finish level finish level
1'-6"
L3 10Ø@6"C/C L3 C25, C26, C27 C15, C16,C18, C19, C21
Dim.as/plan
A 30'-3"
9" Thick
L3
Expansion joint
C7 18" LATAK BEAM [B3]
C8 Brick wall
4 4
121"
1'-6" 1'-6"
1'-721"
1'-721"
12'-6"
5 18" LATAK BEAM [B3] 5
C9 C10
1' 9'-9" 1' 8'-9" 1' 9'-9" 1'
12" LATAK BEAM [B6]
12" LATAK BEAM [B6]
16'-934"
15'-4"
138'
8Ø@7"C/C
L3 L3
12" LATAK BEAM [B6]
C15
9" LATAK BEAM [B7] C16
Bottom of slab @
12'-6" from floor
Bottom of slab @
12'-6" from floor 7'
9" LATAK BEAM [B7]
9" LATAK BEAM [B7]
CUT-OUT
6'-9"
Shaft
Passenger lift
6'-0"X6'-0"
C13 1021"
staircase detail
UP
staircase
8'-10"x20'-2"
18" LATAK BEAM [B6]
21'-9"
L3 10Ø@6"C/C L3
L3 L3
8Ø@7"C/C
8'-9"
CUT-OUT
Good lift
9'-9"X8'-0"
C29 C28
9 9 TITLE : S
C21 C22 E
FIRST FLOOR ROOF : W
SHUTTERING / SLAB DETAILS
E A R T H
N
CHECKED BY :-
14'-721"
14'-721"
DRAWN BY :-
9"
Note:- ARCHITECT :
421" 421"
Front slab height as/ 9'-9" 1' 11'-2" 6'-9" 2'-10" 1. All footing dimensions/drawing
elevation details 32'-3" 2. All Steel bar length & weight will be change ONCEPT lNTERIORS