Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 46

H/W Information

DRAM

End customer Sampl


Product Density Part No
e Qty

Thi Thien DDR4 32GB/3200 M393A4K40DB3-CWE 300


Svtech DDR4 64GB/2933 M393A8G40MB2-CVF 20
Saz Pm883 480Gb Pm883/480gb 300
CMC DDR5 RDIMM 16g,32g, 64g RDIMM 16g,32g, 64g
NMS Pm893 480Gb Pm893/480gb 50
Thi Thien Pm883 480gb,960gb,1.92t Pm883- 489g,960g, 1.92t 170

Illegear DDR5 SODIMM 16GB M425R2GA3BB0-CQK 20

Illegear DDR5 SODIMM 32GB M425R4GA3BB0-CQK 20

Illegear DDR5 SODIMM 8GB M425R1GB4BB0-CQK 7

Illegear DDR5 SODIMM 16GB M425R2GA3BB0-CQK 17

Illegear DDR5 SODIMM 32GB M425R4GA3BB0-CQK 14

Viettel server PM1643a 1.92tb Pm1643a- 1.92tb 25

VNPT server DDR4 32gb RDIMM 32g/3200 50

Viettel server Ram DDR4 32GB RDIMM 32g/3200 50

Thi Thien Ram DDR4 64GB M393A8G40AB2-CWE 100

NMS Pm9A3 1.92tb PM9A3/1.92t 40

CMC Ram DDR4 32gb M393A4K40DB2-CVFCO 110

CMC PM1733 1.92tb MZWLJ1T9HBJR 50

Viettel server Pm883 3.84TB MZ7lh3T8HMLT 74

Viettel server Pm883 1.92TB MZLH1T9HMLT 50

NMS DDR4 64GB M393A8G40AB2-CWE 50

Viettel server Pm983 960GB Pm983/960g 20


Thi Thien Pm883 3.84TB PM883 3.84TB 50

Viettel server Ent SSD 480GB MZ7LH480HAHQ-00005 1500

NMS Server Ram DDR4 32GB RDIMM 32g/3200--> Use M393A4K40DB2-CVFBY 50

NMS Ram DDR4 64GB RDIMM 64g/3200- M393A8G40AB2-CWE 50

Exalit PM893 1.92TB MZ7L31T9HBLT-00A07 50

NMS Server PM893 480GB MZ7L3480HCHQ-00A07 50

NMS Server PM893 960GB MZ7L3960HCJR-00A07 50

Serveron PM893 480GB MZ7L3480HCHQ-00A07 50

Serveron PM893 960GB MZ7L3960HCJR-00A07 50

Thi Thien PM893 480GB MZ7L3480HCHQ-00A07 50


Thi Thien PM893 960GB MZ7L3960HCJR-00A07 50

SVTech PM9A3 960GB MZQL2960HCJR-00A07 50

SVTech PM9A3 1.92TB MZQL21T9HCJR-00A07 50

SVTech PM9A3 3.84TB MZQL23T8HCLS-00A07 50

SVTech PM9A3 960GB MZ1L2960HCJR-00A07 50

SVTech PM9A3 1.92TB MZ1L21T9HCLS-00A07 50

SVTech PM9A3 3.84TB MZ1L23T8HBLA-00A07 50

CMC Vietnam Te PM9A3 960GB MZQL2960HCJR-00A07 50

CMC Vietnam Te PM9A3 1.92TB MZQL21T9HCJR-00A07 50


CMC Vietnam Te PM9A3 3.84TB MZQL23T8HCLS-00A07 50

CMC Vietnam Te PM9A3 960GB MZ1L2960HCJR-00A07 50

CMC Vietnam Te PM9A3 1.92TB MZ1L21T9HCLS-00A07 50

CMC Vietnam Te PM9A3 3.84TB MZ1L23T8HBLA-00A07 50

CMC Vietnam Te RDIMM 256G M386ABG40M51-CAEZQ 50

Thi Thien SSD 3,84T PM883 3.84TB 50

CMC TS SSD/Ram SSD/Ram

Thi Thien DDR4 32GB M393A4K40CB2-CVF 326

Thi Thien DDR4 16GB M393A2K43CB2-CVF 88

Thi Thien 960gb/1.92t/3.84t 960gb/1.92t/3.84t PM883 42

Thi Thien 960gb/ 3.84t Pm1643A 5


CMC telecom SSD 960GB MZ1LB960HAJQ-00007 68

SSD Pm883/960g- MZ7LH960HAJR 30

SAZ SSD Pm883/960g- MZ7LH960HAJR 66

SVTech Ram DDR4 RDIMM 32g-2933 100

Svtech SSD 240Gb/960/ 3.84tb 240Gb/960/ 3.84tb PM883

NMS SSD 480gb MZ7LH480HAHQ 150

Gold Reach DDR4 16/32/64Gb 16/32/64Gb RDIMM

Maychuhanoi DDR4 32gb M393A4K40CB2-CVF

SAZ DDR4 16gb/32gb/ M393A4K40CB2-CVF 300


Thi Thien SSD 1.92tb MZILT1T9HBJR 100

Thi Thien DDR4 32gb M393A4K40CB2-CVF 200

SAZ DDR4 32gb M393A4K40CB2-CVF 250

SAZ SSD 480/960gb MZ7LH480HAHQ/MZ7LH960HAJR 200

CMC telecom SSD 960gb/1.92t/3.84t 960gb/1.92t/3.84t 50-100

SVTech SSD 1.92T MZILT1T9HBJR-00007 1

HPT SSD 1.92T MZILT1T9HBJR-00007 1

DTS SSD 1.92T MZILT1T9HBJR-00007 1

Illegear PM9A1 1TB MZVL21T0HCLR-00B00 10

Illegear PM9A1 2TB MZVL22T0HBLB-00B00 10

Celturan PM9A1 256GB MZVL2256HCHQ-00B00 10


Celturan PM9A1 512GB MZVL2512HCJQ-00B00 10

Celturan PM9A1 1TB MZVL21T0HCLR-00B00 10

Celturan PM9A1 2TB MZVL22T0HBLB-00B00 10

Serveron SSD 960GB MZILT960HAHQ-00007 40

Serveron SSD 7.6TB MZ7LH7T6HMLA-00005 10

MZVLB256HBHQ-00000

Celturan SSD 256GB 150

MZVLB512HBJQ-00007

Celturan SSD 512GB 150

MZVLB1T0HBLR-00007

Celturan SSD 1TB 50

MZVLB2T0HMLB-00000

Celturan SSD 2TB 25

MZVLB256HBHQ-00000

Celturan SSD 256GB 150

MZVLB512HBJQ-00007

Celturan SSD 512GB 150

MZVLB1T0HBLR-00007

Celturan SSD 1TB 50

MZVLB2T0HMLB-00000

Celturan SSD 2TB 25


Serveron PM1733 7.6TB MZWLJ7T6HALA-00007 41

Serveron PM1735 6.4TB MZPLJ6T4HALA-00007 10

Serveron PM1735 12TB MZPLJ12THALA-00007 10

Serveron PM983 1.9TB MZ1LB1T9HALS-00007 10

Serveron PM983 3.8TB MZ1LB3T8HMLA-00007 10

Serveron PM1735 1.6TB MZPLJ1T6HBJR-00007 10

Serveron PM1735 3.2TB MZPLJ3T2HBJR-00007 10

Illegear PCDIMM 32GB M471A4G43AB1-CWE 75


Illegear PCDIMM 8GB M471A1G44AB0-CWE 48

Illegear PCDIMM 16GB M471A2G43AB2-CWE 48

Illegear PCDIMM 32GB M471A4G43AB1-CWE 48

Illegear SSD 1TB MZVLB1T0HBLR-00A00 30

Illegear SSD 2TB MZVLB2T0HMLB-00A00 10

Illegear SSD 128GB MZVLQ128HBHQ-00000 2

Illegear SSD 256GB MZVLQ256HAJD-00000 2

Illegear SSD 512GB MZVLQ512HALU-00000 2

Illegear SSD 1024GB MZVLQ1T0HALB-00000 2

UBC eMMC 8G KLM8G1GETF-B041005 4

UBC eMMC 8G KLM8G1GETF-B041006 2

UBC eMMC 8G KLM8G1GETF-B041006 2

UBC eMMC 8G KLM8G1GETF-B041006 2

SVTech SSD 1.92T MZILT1T9HBJR-00007 1

FPT- FIS DDR4 64GB M393A8G40MB2-CTD 1


Thi Thien DDR4 32GB M393A4G43AB3-CWE TBC
Thi Thien DDR4 256GB M386ABG40M5B-CYFCO- 18pcs

CMC SSD 3.84T MZQLB3T8HALS-00007


NMS DDR4 128GB M393AAG40M32-CAE 18

FPT- FIS DDR4 64GB M393A8G40MB2-CTD 1

ICT DDR4 8GB M393A1G43EB1-CTD 2

DDR4 16GB M393A2K40BB2-CTD 2


Remark

Qualification results
Sample ETD
(On-Going/Blank/
Qualified/Design Win/
KIV/Drop)

[7 Dec 21] Customer waiting for allocation On- going


[7 Dec 21] Customer waiting for price and allocation On- going
[7 Dec 21] Customer waiting for allocation On-going
[04 Dec 21] Waiting customer fix suffix On-going
[5 Dec 21] Shipment done Design- Win
[7 Dec 21] Shipment done Design- Win
[2Nov2021] Sample PO sent, AVS0441/11/21
[26Oct21] Finalizing sample quantity
On-going
[2Nov2021] Sample PO sent, AVS0441/11/21
[26Oct21] Finalizing sample quantity On-going
[2Nov2021] Sample PO sent, AVS0441/11/21
[26Oct21] Finalizing sample quantity On-going
[2Nov2021] Sample PO sent, AVS0441/11/21
[26Oct21] Finalizing sample quantity On-going
[2Nov2021] Sample PO sent, AVS0441/11/21
[26Oct21] Finalizing sample quantity On-going
[19 Oct 21] Cust cf, waiting allocation
[14 Sep 21] Wating cust cf
[06 Sep 21] Quote price to customer
On-going
[13 Oct 21] Switch to support 2933 RDIMM to fulfill the
project, project completed, PO AVS0382/09/21
[14 Sep 21] Quote Sep price, waiting customer confirm
Design-Win
[13 Oct 21] Switch to support 2933 RDIMM to fulfill the
project, project completed, PO AVS0382/09/21
[14 Sep 21] Cust cf, can not shipment this time due to full
lockdown
[07 Sep 21] Waiting Sep Price release
Design-Win
[19 Oct 21] Shipment to customer
Design- Win
[23 Aug 21] Shipment to cust done
[16 Aug 21} Waiting allocation.
[10 Aug 21] Quote price, waiting Samsung check allocation.
Design- Win
[18 Oct 21] Quote price, Waiitng cust cf

On-going
[23 Aug 21] Shipment to cust done using internal
allocation, case close Design- Win
[14 sep 21] delay delivery due to full lock down
[06 Sep 21] Customer confirm
[16 Aug 21} Waiting allocation.
Design- Win
[14 Sept 21] Customer cf, delay delivery due to full
lock down.
[10 Aug 21] Quote price, waiting Samsung check
allocation.
Design- Win
[31 Aug 21] Shipment done.
[24 Aug 21] Customer sent PO, arranging shipment
[16 Aug 21] Quote price. Waiting cust confirm
Design- Win
[24 Aug 21]Bidding delay Due to outbreak Covid-19
[10 Aug 21] Quote price to customer On-going
[3 Aug 21] Shipment done
[13 July 21] Waiting for biding confirmation
[ 6 July 21] Quoting Q3 price to customer.
Design-Win
[24 Aug 21] Bidding still delay till end of Sep
[10 Aug 21] Bidding delay due to Covid-19
[13 July 21] Waiting for biding confirmation
On-Going
[13 Oct 21] Switch to support 2933 RDIMM to fulfill the
project, project completed, PO AVS0382/09/21
[ 13 Sept 21] Customer cf, delay delivery due to full lockdown
[10 Aug 21] Waiting allocation
[ 6 July 21] Quoting Q3 price to customer.
Design-Win
[3 Aug 21] Shipment done.
[26 July 21] Quote price, checking with Samsung
allocation
Design-Win
[20Oct21] Fully Certified, waiting customer PO
[21 Sept21] Sample shipped to customer, in qual
[27July21] Sample PO sent, PO AVS0310/7/21
[21July21] finalising request will send in sample PO this week
Qualified
[19 Oct 21] Cust certified in their system
[21Sept21] Shiped to customer, item held in custom,
customer will proceed with qual after received.
[14Sept21] Informed arrival, Checking pick up time from
customer
[7Sept21] Sample incoming this week, once received will ship
immediately
[27July21] Sample PO sent, PO AVS0313/7/21
[21July21] finalising request will send in sample PO this week

Qualified
[19 Oct 21] Cust certified in their system
[21Sept21] Shiped to customer, item held in custom,
customer will proceed with qual after received.
[14Sept21] Informed arrival, Checking pick up time from
customer
[7Sept21] Sample incoming this week, once received will ship
immediately
[27July21] Sample PO sent, PO AVS0313/7/21
[21July21] finalising request will send in sample PO this week

Qualified
[17Nov21] PO loaded AVS0454/11/21
[2Nov2021] SSDs are qualfied, waiting for project
[20Oct2021] Item received and ship to customer
[27July21] Sample PO sent, PO AVS0312/7/21
[21July21] finalising request will send in sample PO this week
Design-win
[17Nov21] PO loaded AVS0454/11/21
[2Nov2021] SSDs are qualfied, waiting for project
[20Oct2021] Item received and ship to customer
[27July21] Sample PO sent, PO AVS0312/7/21
[21July21] finalising request will send in sample PO this week
Design-win
[19 Oct 21] Cust certified in their system
[21Sept21] Shiped to customer, item held in custom,
customer will proceed with qual after received.
[7Sept21] Sample incoming this week, once received will ship
immediately
[27July21] Sample PO sent, PO AVS0311/7/21
[21July21] finalising request will send in sample PO this week

Qualified
[19 Oct 21] Cust certified in their system
[21Sept21] Shiped to customer, item held in custom,
customer will proceed with qual after received.
[14Sept21] Informed arrival, Checking pick up time from
customer
[7Sept21] Sample incoming this week, once received will ship
immediately
[27July21] Sample PO sent, PO AVS0311/7/21
[21July21] finalising request will send in sample PO this week

Qualified
[19 Oct 21] Cust certified in their system
[21Sept21] Shiped to customer, item held in custom,
customer will proceed with qual after received.
[14Sept21] Informed arrival, Checking pick up time
from customer
[7Sept21] Sample incoming this week, once received
will ship immediately
[27July21] Sample PO sent, PO AVS0311/7/21
[21July21] finalising request will send in sample PO
this week

Qualified
[6July21]Design-win, Quoted Q3 price checking new
project demand
[28June21] Sample received, ship to customer
[15June21] waiting for allocation
[12May21] Sample PO AVS0218/05/21
Design-Win
[6July21]Design-win, Quoted Q3 price checking new
project demand
[28June21] Sample received, ship to customer
[15June21] waiting for allocation
[12May21] Sample PO AVS0218/05/21
Design-Win
[6July21]Design-win, Quoted Q3 price checking new
project demand
[28June21] Sample received, ship to customer
[15June21] waiting for allocation
[12May21] Sample PO AVS0218/05/21
Design-Win
[13July21] Design Win, using allocation from PO
AVS0294/07/21
[6July21]Quoted Q3 price checking new project
demand
[22 June 21] Cust received sample,certified
[15June21] Ship for certification
[2June21] Sample received, will ship to customer after
Vietnam reopen, currently Vietnam fully lockdown
[12May21] Sample PO AVS0218/05/21

Design-Win
[13July21] Design Win, using allocation from PO
AVS0294/07/21
[6July21]Quoted Q3 price checking new project
demand
[28June21] Sample received, ship to customer
[15June21] waiting for allocation
[12May21] Sample PO AVS0218/05/21
Design-Win
[6July21]Quoted Q3 price checking new project
demand
[28June21] Sample received, ship to customer
[15June21] waiting for allocation
[12May21] Sample PO AVS0218/05/21 Design-Win
[6July21]Quoted Q3 price checking new project
demand
[28June21] Sample received, ship to customer
[15June21] waiting for allocation
[12May21] Sample PO AVS0218/05/21 Design-Win
[13July] Design Win, using allocation from PO
AVS0294/07/21
[6July21]Quoted Q3 price checking new project
demand
[28June21] Sample received, ship to customer
[30April21] Sample PO AVS0205/04/21
Design-Win
[6July21]Quoted Q3 price checking new project
demand
[28June21] Sample received, ship to customer
[30April21] Sample PO AVS0205/04/21
Design-Win
[6July21]Quoted Q3 price checking new project
demand
[28June21] Sample received, ship to customer
[2June21] Sample received, will ship to customer after
Vietnam reopen, currently Vietnam fully lockdown
[30April21] Sample PO AVS0205/04/21
Design-Win
[6July21]Quoted Q3 price checking new project
demand
[28June21] Sample received, allocating to customer
[15June21] waiting for allocation
[30April21] Sample PO AVS0205/04/21 Design-Win
[5May21] Sample PJT form Sent, PO AVS0054/01/21

Design-win
[27 Apr 21] PO done,AVS0292/07/21
[30 Mar 21] Waiting bidding result
[16 Mar 21] Starting bidding, Waiting end cust reply
[23 Feb 21] Starting bidding, Waiting end cust reply
Design-win
[6July21] Ho Chi Minh full lock down so project delay.
[8 June21] Bidding delay due to Covid-19
[27Apr21] Request Cust send PO sample
[23Feb21] Provide cust Samsung P/N compatible with their
server
On-going
[19May21] Design win, PO AVS0244/05/21
[11 May 21] Customer wait too long so buy from China
channel.
[24 Mar 21] Starting bidding, Waiting end user reply
[9 Mar 21] Waiting Mar price
Design-Win
[27 May 21] Allocated using 32GB M393A4K40CB2-
CVF since 16GB not available, Design win, PO
AVS0244/05/21
[11 May 21] Waiting for allocation
[30 Mar 21] Starting bidding, Waiting end user reply
[24 Mar 21] Discuss with End user
[9 Mar 21] Waiting Mar price
Design-Win
[29 June 21] Final discussed use PM883 480GB and 3.8TB to
fulfill, Arranging shipment to cust, PO AVS0275/06/21, and
AVS0253/06/21
[27 May 21] Allocated using internal allocation.
[11 May 21] Very urgent to support projects. They keep
waiting
[4 May 21] Waiting for allocation
[30 Mar 21] Starting bidding, Wating end user reply
[16 Mar 21] Discuss with End user

Qualified
[21July21] Sample 5pcs shipped to customer using allocation
from PO AVS0295/07/21
[2 June 21] Waiting allocation

On-going
[27 May 21] Allocated using internal allocation, PO PO
AVS0169/04/21
[11 May 21] Keep waiting for allocation.
[ 4 May 21] Waiting for allocation
[16Mar 21] Discuss with customer, Project will start in June
[9 Mar 21] Waiting Mar price

On-going
[28July21] Waiting for qual result
[14July21] Ship sample to customer using allocation fromPO
AVS0290/07/21
[29 June 21] Waiting for allocation

On-going
[28July21] shipped 26pcs sample to customer from PO
AVS0290/07/21
[13 July 21] Waiting for bidding confirmation
[6 July 21] Quoting Q3 price to customer

On-going
[27July21] Design-win without qual, PO
AVS0304/07/21
[ 6 July 21] Bidding on progress

Design-win
[29 June 21] Final discussed use PM883 480GB and
3.8TB to fulfill, Arranging shipment to cust, PO
AVS0275/06/21, and AVS0253/06/21
[ 22 June 21] PO loaded to Samsung
[ 8 June 21] Waiting for allocation
[16 Mar 21] Discuss with End user

Design-win
[ 27 May 21] Shipment done, project completed, PO
AVS0275/06/21
[4 May 21] Waiting for allocation

Design-Win
[4 May 21] Project estimmate MP in Q4
[ 27 Apr 21] Support a tablet project in Vietnam, follow up
information
[24 Mar 21} Quoted Mar price for cust reference
[16Mar21] in discussion with Customer
[9 Mar 21] Cust is a local SI support for some Bank End User
and government- Demand 10k in coming 6 month.

On-going
[2 June 21] Using allocation from PO AVS0275/06/21
[24 Mar 21] Waiting allocation
[31 Mar 21] Cust send RFQ- Waiting Apr Price

Design-win
[8 June 21] Using allocation from PO AVS0275/06/21
[ 27 May 21] Cust keep waiting for allocation
[4 May 21] Waiting for allocation

Design-win
[5July21] Design win, PO AVS0275/06/21
[29 June 21] Arranging shipment to cust
[22 June 21] PO loaded to Samsung
[15 June 21] Waiting for allocation

Design-win
[5July21] Design Win, PO AVS0275/06/21,waiting new
project launch and PO
[29 June 21] Arranging shipment to cust
[22 June 21] PO loaded to Samsung
[15 June 21] Waiting for allocation

Design-win
[5July21] Design Win, PO AVS0275/06/21, waiting new
project launch and PO
[29 June 21] Bidding will open early July
[ 15 June 21] Quote price, waiting bidding open

Design-win
[5July21] Design Win, fulfill using 480GB, Using
allocation from PO AVS0275/06/21
[29 June 21] Cust load PO to AV
[ 8 June 21] Cust keep waiting for allocation
[4 May 21] Waiting for allocation

Design-win
[29 June 21] Design win, PO AVS0253/06/21

Design-win
[21July21] Design-Win, PO AVS0275/07/21
[29June21] ship sample to customer
[8 June 21] Project keep delay due to Covid 19
[27Jan21] no update yet
[5May20]Approved, pending project to confirm.
Design-win
[21July21] Design-Win, PO AVS0275/07/21
[29June21] ship sample to customer
[17Feb21] no update
[1 Feb 21] In discussion, waiting customer PO
Design-win
[21July21] Design-Win, PO AVS0275/07/21
[29June21] ship sample to customer
[17Feb21] no update
[1 Feb 21] In discussion, waiting customer PO
Design-win
[24Feb21] Design Win, use AV Buffer PO
AVS0051/01/21
[9Feb21] In Qual
[3Feb21]Will ship to customer this week
[27Jan21] Sample incoming
[13Oct20]Waiting delivery from Samsung/Pending

Design-win
[24Feb21] Design Win, use AV Buffer PO
AVS0051/01/21
[9Feb21] In Qual
[3Feb21]Will ship to customer this week
[27Jan21] Sample incoming
[13Oct20]Waiting delivery from Samsung/Pending

Design-win
[10Mar21]Design-Win, use AV Buffer PO
AVS0051/01/21
[3Mar21] Received, ship to customer this week
[13Oct20]Waiting delivery from Samsung/Pending
Design-win
[10Mar21]Design-Win, use AV Buffer PO
AVS0051/01/21
[3Mar21] Received, ship to customer this week
[13Oct20]Waiting delivery from Samsung/Pending
Design-win
[10Mar21]Design-Win, use AV Buffer PO
AVS0051/01/21
[3Mar21] Received, ship to customer this week
[13Oct20]Waiting delivery from Samsung/Pending
Design-win
[10Mar21]Design Win, use AV Buffer PO
AVS0051/01/21
[13Oct20]Waiting delivery from Samsung/Pending
Design-win
[3Dec20]Design Win, AVS0574/11/20
[30Nov20] Design Win, waiting customer PO
[24Nov20] will ship out to customer this week
[17Nov20] in transit to warehouse
Nov Design-win
[30Nov20] Design Win, AVS0596/11/20
[24Nov20] will ship out to customer this week
[17Nov20] in transit to warehouse
Nov Design-win
[15Dec20]Design Win. AVS0503/11/20
[24Nov20] will ship out to customer this week
[6Oct20]Waiting delivery from Samsung

Nov Design-win
[15Dec20]Design Win. AVS0503/11/20
[24Nov20] will ship out to customer this week
[17Nov20] Revised to -00007- available P/N for now
[6Oct20]Waiting delivery from Samsung

Nov Design-win
[15Dec20]Design Win. AVS0503/11/20
[17Nov20] Revised to -00007- available P/N for now
[10Nov20] Sample received, waiting pick up together
[6Oct20]Waiting delivery from Samsung

Nov Design-win
[15Dec20]Design Win,will use existing allocation
[6Oct20]Waiting delivery from Samsung

Oct Design-win
[15Dec20]Design Win,will use existing allocation
[6Oct20]Waiting delivery from Samsung

Nov Design-win
[2Dec21]Design Win PO AVS0503/11/20
[24Nov20] will ship out to customer this week
[17Nov20] Revised to -00007- available P/N for now
[6Oct20]Waiting delivery from Samsung

Nov Design-win
[15Dec20]Design Win. PO AVS0503/11/20
[17Nov20] Revised to -00007- available P/N for now
[10Nov20] Sample received, waiting pick up together
[6Oct20]Waiting delivery from Samsung

Nov Design-win
[15Dec20]Design Win, waiting customer new demand
and PO
[20Oct]In qual
[6Oct20]Waiting delivery from Samsung

Oct Design-win
[30April21] Project dropped. Follow up with new project.
[21Jan20] No update yet.
[21Dec20] Qual Completed, waiting end customer
confirmation and wating for PO
[27Oct] Customer received sample and proceed with Qual
[20Oct]sample arrived, will ship to customer this week
[13Oct20] in transit to warehouse

Oct Drop
[3Mar21]Project finalise with 1.6TB and 3.2TB instead,
design win PO-AVS0124/03/21
[21Jan20] No update yet.
[21Dec20] Qual Completed, waiting end customer
confirmation and wating for PO
[27Oct] Customer received sample and proceed with
Qual
[20Oct]sample arrived, will ship to customer this week
[13Oct20] in transit to warehouse

Oct Design-Win
[3Mar21]Project finalise with 1.6TB and 3.2TB instead,
design win PO-AVS0124/03/21
[21Jan20] No update yet.
[21Dec20] Qual Completed, waiting end customer
confirmation and wating for PO
[27Oct] Customer received sample and proceed with
Qual
[20Oct]sample arrived, will ship to customer this week
[13Oct20] in transit to warehouse

Nov Design-Win
[30April21] Project dropped, customer switch to use Intel
part, follow up with new project
[21Jan20] No update yet.
[15Dec] Qual Completed, waiting PO
[27Oct] Customer received sample and proceed with Qual
[20Oct]sample arrived, will ship to customer this week
[13Oct20] in transit to warehouse

Oct Drop
[30April21] Project dropped, customer switch to use Intel
part, follow up with new project
[21Jan20] No update yet.
[15Dec] Qual Completed, waiting PO
[27Oct] Customer received sample and proceed with Qual
[20Oct]sample arrived, will ship to customer this week
[13Oct20] in transit to warehouse

Oct Drop
[3Nov20] Design Win PO AVS487/10/30
[27Oct] Customer received sample and proceed with
Qual
[20Oct]sample arrived, will ship to customer this week
[13Oct20] in transit to warehouse
Oct Design-win
[3Nov20] Design Win PO AVS487/10/30
[27Oct] Customer received sample and proceed with
Qual
[20Oct]sample arrived, will ship to customer this week
[13Oct20] in transit to warehouse
Oct Design-win
[13Oct20]Design Win--PO AVS0406/09/20
[30July20]Sample ship out together with delivery
[22July20]Ship sample next week
July Design-win
[13Oct20]Design Win--PO AVS0435/09/20
[26Aug20]In-Qual
[19Aug20]item caught in custom,customer est receive
nx week
[12Aug20]SSD have not reach our warehouse, will ship
together
[6Aug20] PO sent and sample received, waiting to ship
together with SSD

Aug Design-win
[13Oct20]Design Win--PO AVS0435/09/20
[26Aug20]In-Qual
[19Aug20]item caught in custom,customer est receive
nx week
[12Aug20]SSD have not reach our warehouse, will ship
together
[6Aug20] PO sent and sample received, waiting to ship
together with SSD

Aug Design-win
[16Sept20]Design Win-PO AVS0366/09/20
[26Aug20]In-Qual
[19Aug20]item caught in custom,customer est receive
nx week
[12Aug20]SSD have not reach our warehouse, will ship
together
[6Aug20] PO sent and sample received, waiting to ship
together with SSD

Aug Design-win
[22July20]Mass production, PO AVS0239/07/20

March Design-win
[30July20]Product delivered, PO AVS0139/03/20
[22July20]DesignWin- PO loading project waiting
delivery from Samsung
March Design-win
[2Oct20]Drop project as no sample of 512GB/1TBsupport
from samsung, sample waited too long, customer don’t want
to wait anymore
[22July20]still Waiting 512GB/1TB to ship together
Mar/Apr Drop
[2Oct20]Drop project as no sample of 512GB/1TBsupport
from samsung, sample waited too long, customer don’t want
to wait anymore
[22July20]still Waiting 512GB/1TB to ship together
Mar/Apr Drop
[2Oct20]Drop project as no sample of 512GB/1TBsupport
from samsung, sample waited too long, customer don’t want
to wait anymore
[22July20]Waiting Samples from SAPL
Mar/Apr Drop
[2Oct20]Drop project as no sample of 512GB/1TBsupport
from samsung, sample waited too long, customer don’t want
to wait anymore
[22July20]Waiting Samples from SAPL
Mar/Apr Drop
[22July20]Software problem not able to solve
Mar/Apr KIV
[22July20]Software problem not able to solve
Mar/Apr KIV
[22July20]Software problem not able to solve
Mar/Apr KIV
[22July20]Software problem not able to solve
Mar/Apr KIV
[30Jly20]Discussing for following demand
Mar/Apr
[22July20]DesignWin-PO AVS0228/07/20 Design-win
(July 20) Project done, can not support bcz SAPL can not send
Drop
(July 20) Supported project; PO done shipped to custom Design-win
(Jan 21) PO done shipped to customer Design-win
[10Mar21]Design Win, PO AVS0137/03/21
[3Mar21] Customer waited too long, bought from
channel, Certified
[21Jan20]Seeking Sample
Design-win
(OCT 20) Support project; PO done shipped to customer Design-win
(July 20) Project done, can not support bcz SAPL can not send

Drop
[23 Feb 21] Cust used Ram Micron
[9 Feb 21] Discussing cust to change P/N
Drop
[23 Feb 21] Cust used Ram Micron
[9 Feb 21] Discussing cust to change P/N
Drop
Competitor Part Number

Intel,WD,Seagate

Micron/Hynix/ Intel

Micron/Hynix/ Intel

Micron/Hynix/ Intel

Intel,WD,Seagate

Intel,WD,Seagate, Hynix, Micron

Intel,WD,Seagate

Intel,WD,Seagate

Intel,WD,Seagate, Hynix

Intel,WD,Seagate

Intel,WD,Seagate
Intel,WD,Seagate

Intel,WD,Seagate

Micron/Hynix

Micron/Hynix

Intel, Phison

Intel, Toshiba

Intel, Toshiba

Intel, Phison

Intel, Phison

Intel
Intel

Intel/Micron/Hynix

Intel/Micron/Hynix

Intel/Micron/Hynix

Intel/Micron/Hynix

Intel/Micron/Hynix

Intel/Micron/Hynix

Intel

Intel
Intel

Intel

Intel

Intel

Intel

Intel,WD,Seagate

Intel,WD,Seagate

Intel,WD,Seagate

Intel,WD,Seagate

Intel,WD,Seagate
Intel,WD,Seagate

Intel,WD,Seagate

Intel,WD,Seagate

Micron/Hynix

Intel,WD,Seagate, Hynix

Intel,WD,Seagate, Hynix

Intel,WD,Seagate, Hynix

Intel,WD,Seagate, Hynix, Micron

Intel,WD,Seagate, Hynix, Micron


Intel,WD,Seagate

Micron/Hynix

Micron/Hynix

Intel,WD,Seagate, Hynix

Intel,WD,Seagate

Intel,WD,Seagate

Intel,WD,Seagate

Intel,WD,Seagate

Phison, Crucial,Adata

Phison, Crucial,Adata

Phison, Crucial,Adata
Phison, Crucial,Adata

Phison, Crucial,Adata

Phison, Crucial,Adata

Intel,WD

Intel,WD

Phison, Crucial,Adata

Phison, Crucial,Adata

Phison, Crucial,Adata

Phison, Crucial,Adata

Phison, Crucial,Adata

Phison, Crucial,Adata

Phison, Crucial,Adata

Phison, Crucial,Adata
Intel,WD

Intel,WD

Intel,WD

Intel,WD

Intel,WD

Intel,WD

Intel,WD

G.Skill,Crucial, Corsair
G.Skill,Crucial, Corsair

G.Skill,Crucial, Corsair

G.Skill,Crucial, Corsair

Phison 1TB SSD

Phison 2TB SSD

Phison 128GB

Phison 256GB

Phison 512GB/Seagate Baracuda 500GB

Phison 1TB/Seagate Baracuda 1TB

Toshiba

Toshiba

Toshiba

Toshiba

Intel

Hynix, Micron
Hynix, Micron
Hynix, Micron

Hynix, Micron
Hynix, Micron

Hynix, Micron

Hynix, Micron

Hynix, Micron
Customer Information Project Information
Customer Schedule
Agent ODM/ End Sample Project EVT DVT PVT
Application Project Life
Country customer Purpose Name (Est Sample (Est Sample (Est Sample
Qty) Qty) Qty)

AV CVTE/China UBC Main Board Design-In Sanco Smart 1years May-21 May-21 Jun-21

AV CVTE/China UBC Main Board Design-In Sanco Smart 1years May-21 May-21 Jun-21

AV CVTE/China UBC Main Board Design-In Sanco Smart 1years May-21 May-21 Jun-21

AV CVTE/China UBC Main Board Design-In Sanco Smart 1years Jun-21 Jun-21 Jul-21

AV CVTE/China UBC Main Board Design-In Sanco Smart 1years Jun-21 Jun-21 Jul-21

AV Philippines Digilab Main Board Design-In Pensonic 3251years May-21 May-21 Jun-21

AV Philippines Digilab Main Board Design-In Pensonic 4251years May-21 May-21 Jun-21

AV Philippines Digilab Main Board Design-In Pensonic 4551years May-21 May-21 Jun-21

AV Philippines Digilab Main Board Design-In Pensonic 5251years Jun-21 Jun-21 Jul-21

AV Philippines Digilab Main Board Design-In Pensonic 5851years Jun-21 Jun-21 Jul-21
Volume Information H/W Information
r Schedule Total Chipset DRAM
Volume
Project (Quantity of TAM/mth SAM/mth
MP status Set over the Vendor Model Product Density
whole
project life)

Jul-21 On-going 180000 30000 22500 Samsung eMMC eMMC 4G/8G

Jul-21 On-going 120000 20000 15000 Samsung eMMC eMMC 8G

Jul-21 On-going 120000 20000 15000 Samsung eMMC eMMC 8G

Aug-21 On-going 60000 10000 7500 Samsung eMMC eMMC 8G

Aug-21 On-going 24000 4000 3000 Samsung eMMC eMMC 8G

Jul-21 On-going 1080000 180000 90000 Samsung eMMC eMMC 4G/8G

Jul-21 On-going 240000 40000 20000 Samsung eMMC eMMC 8G

Jul-21 On-going 240000 40000 20000 Samsung eMMC eMMC 8G

Aug-21 On-going 120000 20000 10000 Samsung eMMC eMMC 8G

Aug-21 On-going 60000 10000 5000 Samsung eMMC eMMC 8G


H/W Information
DRAM
Sample Status Sample ETD
Part No #/Sys Sample Qty

KLM4G1FETE-B041001
KLM8G1GETF-B041006 10 Sample PO AVS0164/03/21, AVS0165/03/21 Mar/Apr

KLM8G1GETF-B041006 10 Sample PO AVS0165/03/21 Mar/Apr

KLM8G1GETF-B041006 10 Sample PO AVS0165/03/21 Mar/Apr

KLM8G1GETF-B041006 10 Sample PO AVS0165/03/21 Mar/Apr

KLM8G1GETF-B041006 10 Sample PO AVS0165/03/21 Mar/Apr

KLM4G1FETE-B041001 Sample PO AVS0164/03/21,


KLM8G1GETF-B041006 10 AVS0165/03/21 Mar/Apr

KLM8G1GETF-B041006 10 Sample PO AVS0165/03/21 Mar/Apr

KLM8G1GETF-B041006 10 Sample PO AVS0165/03/21 Mar/Apr

KLM8G1GETF-B041006 10 Sample PO AVS0165/03/21 Mar/Apr

KLM8G1GETF-B041006 10 Sample PO AVS0165/03/21 Mar/Apr


Qualificatio
n results
(On-
Going/
Remark Blank/ Competitor Part Number
Qualified/
Design
Win/
KIV/Drop)
[9Jun21]Approved
[5May21]Samples shipped
[21Apr21] Waiting sample
[29Mar21]Sample PO sent Qualified Toshiba + Hynix

[9Jun21]Approved
[5May21]Samples shipped
[21Apr21] Waiting sample
[29Mar21]Sample PO sent Qualified Toshiba + Hynix

[9Jun21]Approved
[5May21]Samples shipped
[21Apr21] Waiting sample
[29Mar21]Sample PO sent Qualified Toshiba + Hynix

[9Jun21]Approved
[5May21]Samples shipped
[21Apr21] Waiting sample
[29Mar21]Sample PO sent Qualified Toshiba + Hynix

[9Jun21]Approved
[5May21]Samples shipped
[21Apr21] Waiting sample
[29Mar21]Sample PO sent Qualified Toshiba + Hynix

[9Jun21]Approved
[5May21]Samples shipped
[21Apr21] Waiting sample
[29Mar21]Sample PO sent Qualified Toshiba + Hynix

[9Jun21]Approved
[5May21]Samples shipped
[21Apr21] Waiting sample
[29Mar21]Sample PO sent Qualified Toshiba + Hynix

[9Jun21]Approved
[5May21]Samples shipped
[21Apr21] Waiting sample
[29Mar21]Sample PO sent Qualified Toshiba + Hynix

[9Jun21]Approved
[5May21]Samples shipped
[21Apr21] Waiting sample
[29Mar21]Sample PO sent Qualified Toshiba + Hynix

[9Jun21]Approved
[5May21]Samples shipped
[21Apr21] Waiting sample
[29Mar21]Sample PO sent Qualified Toshiba + Hynix
Customer Information

Agent Key Person


Customer/ Country Business Nature Designation Phone
Name
Current Server

Email F2F Meet? Qty (#) Vendor Qty (#)


Next Server

Preferred Vendor, Open to Other Bidding Result


Bidding Open Date Bidding Open Freq
Why? Vendor? by?
Memory Requirement

Promotion Status
SSD PN SSD QTY/Sys DRAM PN DRAM/Sys
Qualification results
Remark/ Project (On-Going/Blank/
tracking Qualified/Design Win/
KIV/Drop)
Customer Information Project Information
Customer Schedule
Agent ODM/ End Sample Project EVT DVT PVT
Application Project Life
Country customer Purpose Name (Est Sample (Est Sample (Est Sample
Qty) Qty) Qty)

AV CVTE/China UBC Main Board Design-In Sanco Smart 1years May-21 May-21 Jun-21

AV CVTE/China UBC Main Board Design-In Sanco Smart 1years May-21 May-21 Jun-21

AV CVTE/China UBC Main Board Design-In Sanco Smart 1years May-21 May-21 Jun-21

AV CVTE/China UBC Main Board Design-In Sanco Smart 1years Jun-21 Jun-21 Jul-21

AV CVTE/China UBC Main Board Design-In Sanco Smart 1years Jun-21 Jun-21 Jul-21

AV Philippines Digilab Main Board Design-In Pensonic 3251years May-21 May-21 Jun-21

AV Philippines Digilab Main Board Design-In Pensonic 4251years May-21 May-21 Jun-21
AV Philippines Digilab Main Board Design-In Pensonic 4551years May-21 May-21 Jun-21

AV Philippines Digilab Main Board Design-In Pensonic 5251years Jun-21 Jun-21 Jul-21

AV Philippines Digilab Main Board Design-In Pensonic 5851years Jun-21 Jun-21 Jul-21
Volume Information H/W Information
r Schedule Total Chipset DRAM
Volume
Project (Quantity of
TAM/mth SAM/mth
MP status Set over the Vendor Model Product Density Part No
whole
project life)

KLM4G1FET
E-B041001
KLM8G1GE
Jul-21 On-going 180000 30000 22500 Samsung eMMC eMMC 4G/8G TF-B041006

Jul-21 On-going 120000 20000 15000 Samsung eMMC eMMC 8G KLM8G1GETF-B041006

Jul-21 On-going 120000 20000 15000 Samsung eMMC eMMC 8G KLM8G1GETF-B041006

Aug-21 On-going 60000 10000 7500 Samsung eMMC eMMC 8G KLM8G1GETF-B041006

Aug-21 On-going 24000 4000 3000 Samsung eMMC eMMC 8G KLM8G1GETF-B041006

KLM4G1FET
E-B041001
KLM8G1GE
Jul-21 On-going 1080000 180000 90000 Samsung eMMC eMMC 4G/8G TF-B041006

Jul-21 On-going 240000 40000 20000 Samsung eMMC eMMC 8G KLM8G1GETF-B041006


Jul-21 On-going 240000 40000 20000 Samsung eMMC eMMC 8G KLM8G1GETF-B041006

Aug-21 On-going 120000 20000 10000 Samsung eMMC eMMC 8G KLM8G1GETF-B041006

Aug-21 On-going 60000 10000 5000 Samsung eMMC eMMC 8G KLM8G1GETF-B041006


Qualificatio
on n results
(On-
DRAM Going/ Competitor
Sample StatusSample ETD Remark Blank/ Part
#/Sys Sample Qty Qualified/ Number
Design
Win/
KIV/Drop)

[21Apr21]
Waiting
sample
[29Mar21]S
ample PO
10 Sample PO A Mar/Apr sent On-going Toshiba + Hynix

[21Apr21]
Waiting
sample
[29Mar21]S
ample PO
KLM8G1GETF-B041006 10 Sample PO A Mar/Apr sent On-going Toshiba + Hynix

[21Apr21]
Waiting
sample
[29Mar21]S
ample PO
KLM8G1GETF-B041006 10 Sample PO A Mar/Apr sent On-going Toshiba + Hynix

[21Apr21]
Waiting
sample
[29Mar21]S
ample PO
KLM8G1GETF-B041006 10 Sample PO A Mar/Apr sent On-going Toshiba + Hynix

[21Apr21]
Waiting
sample
[29Mar21]S
ample PO
KLM8G1GETF-B041006 10 Sample PO A Mar/Apr sent On-going Toshiba + Hynix

Sample PO [21Apr21]
AVS0164/0 Waiting
3/21, sample
[29Mar21]S
AVS0165/0 ample PO
10 3/21 Mar/Apr sent On-going Toshiba + Hynix

[21Apr21]
Waiting
sample
[29Mar21]S
ample PO
KLM8G1GETF-B041006 10 Sample PO A Mar/Apr sent On-going Toshiba + Hynix
[21Apr21]
Waiting
sample
[29Mar21]S
ample PO
KLM8G1GETF-B041006 10 Sample PO A Mar/Apr sent On-going Toshiba + Hynix

[21Apr21]
Waiting
sample
[29Mar21]S
ample PO
KLM8G1GETF-B041006 10 Sample PO A Mar/Apr sent On-going Toshiba + Hynix

[21Apr21]
Waiting
sample
[29Mar21]S
ample PO
KLM8G1GETF-B041006 10 Sample PO A Mar/Apr sent On-going Toshiba + Hynix
Qualification results Remarks
On-going Ongoing qualification (with sample submitted)
Blank Potential projects (without sample submission)
Qualified Part approved in AVL, awaiting 1st MP PO
Design Win Qualified and MP PO awarded
KIV Halted projects (potential)
Drop Cancelled/ Drop

You might also like