GTPs 33kv - Bses
GTPs 33kv - Bses
4Uo AC voltage withstand test for 4 To be conducted on Installed AC voltage withstand test
5.2 conducted in type test /acceptance
hours joint at works
test
Continuous operating
6 90 deg. C 90 deg. C
temperature
7 Functional Requirements
Method of Insulation build-up and Red insulating tube, dual wall tube.
7.2
screening
Method of earth bond 2 Nos. tinned copper braid 35sqmm
for 33Kv
7.3 a) Size and no. of braids Backup ring and 4 nos. worm drive
b) Size of Armour support clips.
c) No. of hose clips
Method of mechanical protection Strength through joint only
7.4
a) for 3-core Cable
b) for 1-core Cable
Method of protection against Strength through joint only
7.5 corrosion (type & coating thickness of
protective layer on steel mat)
Crimping connector/mechanical
Method of conductor continuity
7.6 connector
a) For crimping connector
b) For mechanical connector
Description of items in the Stress control tubing for 33kV from
8 Kit, which are imported /sourced From Hongshang/Sumitomo
Principal /Sub-suppliers
Names of items in the Kit and their 5 Years for Heat Shrink components
9 respective shelf life (months and hardware’s
I years)
Kit Content Table (KCT) enclosed? (Refer Yes
10 Yes / No
Annexure — B)
Yes / No
11 Drawing for connector (ferrule) enclosed
(If yes, mention the document Yes
reference)
Yes / No
14 Installation Procedure enclosed? (If yes, mention the Yes
document reference)
19
OFC kit Yes/No
As per specifications.