DRY DOCKING - GENERAL BEST PRACTICES

These guidelines are general and should not replace any requirements given by classification
societies or authorities. For detailed measures and requirements, please contact Alandia.

Prior to dry docking: Dry docking:


• Submit the vessel’s docking plan to the shipyard for correct • Firefighting water connection
block arrangement and proper fendering • Shore power connection
• Agree on yard specification (all the work to be done by the • Yard safety briefing and communication plan
yard or their subcontractors) • Dry docking survey – bottom inspection – block alignment
• Check and ensure the access to yard for possible sub- • Two independent gangways for safe access to vessel
contractors ordered by owner • Fire and enclosed space entry watches and work permits to
• Check and ensure storage facilities at yard for possible be agreed with yard
owners’ deliveries of spare parts or equipment • Craneage to be agreed with yard
• Ensure that the liability, delayed delivery, and insurance clau- • Work site lights and ventilation to be agreed with yard
ses are clearly stated and mutually agreed and understood • Equipment and system protection for welding, blasting, and
• Supplier and service personnel coordination washing
• Prepare for possible crew change during dry-docking and • Disablements to be agreed with yard
access for crew to yard • Waste and scrap disposal to be agreed with yard

Vessel preparation: Pre-floating (flooding above high sea chest, but

• Drafts (min/max) arrival condition and prepare stability


vessel on blocks):
calculation. In most cases vessel should float on even keel. • Bottom plugs, manhole covers in place and inspected
• Record tank status • All sea-water valves and necessary piping in place and
• Gas free fuel tanks that have planned works checked
• Cargo tanks and cargo piping gas free including gas free • Sea chests and propeller shaft seals inspected
certificate • Ballast status and stability calculation
• Sludge, sewage and other discharges at yard • Inspect and verify hull integrity
• Yard safety and regulation briefing • Disconnect shore power
• Disconnect firefighting hoses from yard

Vessel arrival to yard:


Floating – departure:
• Waiting at anchorage or berthed at yard
• Mooring at yard prior to dry-docking • Note the time “off-blocks”
• Safe access to ship during waiting • Propeller shaft deflection and engine measurements
• Arrange for possible need for tug assistance • Enable all disabled equipment
• Arrange for possible tug assistance for floating and departure
Vessel docking in: • Verify the need and scope of possible sea-trials
• Arrange for possible need for tug assistance • Check availability and need for waiting berth after floating
• Propeller shaft deflection and engine measurements • Check mooring arrangements at waiting berth
• Note the time when “on-blocks” • Arrange and agree shore power availability and connection at
waiting berth