REQUEST FOR INSPECTION/TESTING


Date: 02-August-2022 Request No.: Rev.: CA
BOQ Item No.: NA Drawing Ref.: Refer attached list Previous RFIT No.
ITP/Activity No.: Method Statement Ref.:
Discipline: Roads Structure Utilities M&E Geotechnical Survey Materials Others

Description: Final Inspection for the Installation of Completed Steel Bridge Structure (B5 Bridge) from Pier-1 to Pier-3
as per the attached Drawings.
Supplier:
Attachment: Drawing (s) :
Location/Chainage: Area/Volume. (Approx.):’-
Requested By: Inspection Date: Time: 8:30AM
Contractor’s QC Check:
Position Comments Signature / Date / Time

Inspector

Surveyor

Material Inspector

Materials Engineer

ARE /
Relevant Engineer

Senior Material Engineer:

Name: Signature: Date:


Resident Engineer: (A) Approved (B) Approved as Noted (W) Rejected Recommended
for cancellation

Contractor’s Representative
Signature for Cancelled RFIT

Name: Signature: Date:


Authority Comments: Approved Approved as Noted Rejected
(ASHGHAL / MMUP-PPD / KM-E / KM-W / QP / Qtel /…...)

Signature & Date: ……………………….…………………….….


Received by
Contractor’s Representative: Signature: Date:

ABN-PIL-FRM-Q001 Rev. 04