Weekly Report 11
Weekly Report 11
WEEKLY REPORT 11
The followings are works completed and those that are in progress during the reporting period
1. General painting
2. Application of wall putty (smoothing of wall)
3. Installation of aluminum sliding windows, and frame and Doors
Table 1: The table included a summary of the project highlights for the reporting period
Status of mobilization
Outline of applicable project control measures
The Quality Assurance Plan
Comments of the review of drawings
4.0 Materials
The materials on site include:
a. Steel
b. Galvanize pipe
c. Welding rod
d. Cutting disc for concrete
e. PVC pipes (4’’, 2’’, ½ “)
f. PVC reducer, PCV Glue, PVC TEE
g. Plywood
h. Ceiling strip
i. PVC ceiling
j. Putty
k. Floor board
l. Chain link wire
m. Tiles
n. Aluminum accessories
o. Primer
p. Paints (Briton)
5.0 Photo Gallery
Figure 3. application of primer on ceiling and partition Figure 4. applicarion of primer and paint on ceiling