Lap. Progress Timbanuh M1-1
Lap. Progress Timbanuh M1-1
Lap. Progress Timbanuh M1-1
WAKTU PELAKSANAAN
B1 B2 B3
NO M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 % KET.
ITEM PEKERJAAN BOBOT DURASI BOBOT/
10-Nov-17
11-Nov-17
12-Nov-17
13-Nov-17
14-Nov-17
15-Nov-17
16-Nov-17
17-Nov-17
18-Nov-17
19-Nov-17
20-Nov-17
21-Nov-17
22-Nov-17
23-Nov-17
24-Nov-17
25-Nov-17
26-Nov-17
27-Nov-17
28-Nov-17
29-Nov-17
30-Nov-17
10-Dec-17
11-Dec-17
12-Dec-17
13-Dec-17
14-Dec-17
15-Dec-17
16-Dec-17
17-Dec-17
18-Dec-17
19-Dec-17
20-Dec-17
21-Dec-17
22-Dec-17
23-Dec-17
24-Dec-17
25-Dec-17
26-Dec-17
27-Dec-17
28-Dec-17
29-Dec-17
30-Dec-17
31-Dec-17
10-Jan-18
11-Jan-18
12-Jan-18
13-Jan-18
1-Dec-17
2-Dec-17
3-Dec-17
4-Dec-17
5-Dec-17
6-Dec-17
7-Dec-17
8-Dec-17
9-Dec-17
1-Jan-18
2-Jan-18
3-Jan-18
4-Jan-18
5-Jan-18
6-Jan-18
7-Jan-18
8-Jan-18
9-Jan-18
DURASI
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
1
9
A PEKERJAAN PERSIAPAN
Rencana 1 ls 0.43635 3 0.1455 0.15 0.15 0.15 100
1 Pek. Pembersihan lahan
Realisasi 1 ls 0.43635 2 0.2182
Rencana 72 m' 2.70504 5 0.5410 0.5 0.5 0.5 0.5 0.5
2 Pek. Pagar keliling site
Realisasi 72 m' 2.70504 3 0.9017 0.9 0.9
Rencana 20 m2 1.32069 5 0.2641 0.3 0.3 0.3 0.3 0.3
3 Pek. Gudang & bangsal
Realisasi 20 m2 1.32069 2 0.6603
Rencana 1 ls 0.06234 3 0.0208 0.0 0.0 0.0
4 Pek. Papan nama proyek
Realisasi 1 ls 0.06234 1 0.0623 0.06
Rencana 1 ls 1.32776 65 0.0204 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
5 Pek. Mobilisasi dan Demobilisasi
Realisasi 1 ls 1.32776 65 0.0204 0.02 0.02 0.02 0.02 0.02 0.02 0.02
Rencana 70 m' 0.92972 4 0.2324 0.2 0.2 0.2 0.2
6 Pek. Pengukuran dan bowplank
Realisasi 70 m' 0.92972 2 0.4649
Rencana 1 ls 0.06234 65 0.0010 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7 Pek. Pengadaan air kerja
Realisasi 1 ls 0.06234 65 0.0010 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Rencana 1 ls 0.37402 65 0.0058 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
8 Pek. Listrik kerja
Realisasi 1 ls 0.37402 65 0.0058 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Rencana 1 ls 0.06766 14 0.0048 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
9 Pek. SLO Instalasi Listrik
Realisasi 1 ls 0.06766
Rencana 1 ls 0.54731 65 0.0084 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10 Pek. Laporan & dokumentasi
Realisasi 1 ls 0.54731 65 0.0084 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Rencana 1 ls 0.68570 21 0.0327 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
11 Pek. Pengurusan Perizinan
Realisasi 1 ls 0.68570 30 0.0229
B PEKERJAAN SELF SUPPORT TOWER
1 Pekerjaan Pondasi Tower
Rencana 39.924 m3 0.34743 4 0.0869 0.09 0.09 0.09 0.09 90
a Pek. Galian tanah
Realisasi 39.924 m3 0.34743 4 0.0869
Rencana 3.025 m3 0.05411 3 0.0180 0.0 0.0 0.0
b Pek. Urugan pasir 10 cm
Realisasi 3.025 m3 0.05411 1 0.0541
Rencana 1.5125 m3 0.16443 4 0.0411 0.0 0.0 0.0 0.0
c Pek. Lantai kerja
Realisasi 1.5125 m3 0.16443 1 0.1644
d Pek. Pondasi Tower
Rencana 10.587 m3 1.41513 9 0.1572 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
d.1 Pek. Beton
Realisasi 10.587 m3 1.41513 3 0.4717
Rencana 888.976 kg 2.27705 8 0.2846 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
d.2 Pek. Pembesian
Realisasi 888.976 kg 2.27705 3 0.7590
Rencana 7.7 m2 0.12377 8 0.0155 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
d.3 Pek. Begisting
Realisasi 7.7 m2 0.12377 6 0.0206
e Pek. Kolom pedestal
Rencana 3.4848 m3 0.46580 9 0.0518 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
e.1 Pek. Beton
Realisasi 3.4848 m3 0.46580 2 0.2329
Rencana 440.2618 kg 1.12770 10 0.1128 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
e.2 Pek. Pembesian
Realisasi 440.2618 kg 1.12770 3 0.3759
Rencana 10.56 m2 0.69238 10 0.0692 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
e.3 Pek. Begisting
Realisasi 10.56 m2 0.69238 5 0.1385
Rencana 1 ls 0.43635 8 0.0545 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
e.4 Pek. Angkur tower Ø25 mm
Realisasi 1 ls 0.43635 1 0.4364
Rencana 0.081 m3 0.08490 2 0.0424 0.0 0.0
f Pek. Pondasi tangga tower 45/45/40 cm
Realisasi 0.081 m3 0.08490
Rencana 24.134 m3 0.06911 3 0.0230 0.0 0.0 0.0 80
g Pek. Urugan Kembali galian
Realisasi 24.134 m3 0.06911 1 0.0691
2 Pekerjaan Tower
Rencana 7343 kg 23.80226 37 0.6433 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6
a Pek. Pengadaan tower & accessories
Realisasi 7343 kg 23.80226 1 23.8023
Rencana 7343 kg 3.38724 14 0.2419 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
b Pek. Erection
Realisasi 7343 kg 3.38724
Rencana 7343 kg 2.31653 5 0.4633 0.5 0.5 0.5 0.5 0.5
c Pek. Pengecatan tower
Realisasi 7343 kg 2.31653
d Pek. Penangkal petir & grounding system
Pekerjaan penangkal petir (dari ujung atas sampai di ujung tapak tower pakai Rencana 1 set 2.10090 7 0.3001 0.3 0.3 0.3 0.3 0.3 0.3 0.3
d.1
kawat BC 50 mm) Realisasi 1 set 2.10090
Rencana 1 set 1.03139 7 0.1473 0.1 0.1 0.1 0.1 0.1 0.1 0.1
d.2 Pekerjaan pentanahan
Realisasi 1 set 1.03139
Rencana 1 set 0.76933 7 0.1099 0.1 0.1 0.1 0.1 0.1 0.1 0.1
d.3 Pekerjaan lampu tanda (automatic) + instalasi
Realisasi 1 set 0.76933
C PEKERJAAN SHELTER
1 Pekerjaan Tanah & Pondasi
Rencana 4.265 m3 0.03712 2 0.0186 0.0 0.0
a Pek. Galian pondasi
Realisasi 4.265 m3 0.03712 2 0.0186
Rencana 0.423 m3 0.00757 1 0.0076 0.0 70
b Pek. Urugan pasir, 5 cm
Realisasi 0.423 m3 0.00757 1 0.0076
Rencana 0.852 m3 0.04347 5 0.0087 0.0 0.0 0.0 0.0 0.0
c Pek. Pas. Batu kosong
Realisasi 0.852 m3 0.04347 1 0.0435
Rencana 2.035 m3 0.19510 5 0.0390 0.0 0.0 0.0 0.0 0.0
d Pek. Pondasi batu gunung camp 1:5
Realisasi 2.035 m3 0.19510 2 0.0976
Rencana 0.546 m3 0.04283 4 0.0107 0.0 0.0 0.0 0.0
e Pek. Pondasi rollag bata
Realisasi 0.546 m3 0.04283
Rencana 1.2795 m3 0.00366 1 0.0037 0.0
f Pek. Urugan kembali galian
Realisasi 1.2795 m3 0.00366 1 0.0037
2 Pek. Beton
Rencana 0.44 m3 0.31510 4 0.0788 0.1 0.1 0.1 0.1
a Pek. Sloef 15/20 cm, camp 1:2:3
Realisasi 0.44 m3 0.31510 2 0.1575
Rencana 0.879 m3 0.09556 3 0.0319 0.0 0.0 0.0
b Pek. Rabat beton teras 5 cm
Realisasi 0.879 m3 0.09556
Rencana 0.4725 m3 0.49522 4 0.1238 0.1 0.1 0.1 0.1
c Pek. Kolom 15/15 cm, camp 1:2:3
Realisasi 0.4725 m3 0.49522 2 0.2476
Rencana 0.44 m3 0.44620 3 0.1487 0.1 0.1 0.1
d Pek. Ringbalk 15/20 cm, camp 1:2:3
Realisasi 0.44 m3 0.44620
Rencana 0.44 m3 0.44620 6 0.0744 0.1 0.1 0.1 0.1 0.1 0.1
e Pek. Lisplank beton 10/25 cm, camp 1:2:3
Realisasi 0.44 m3 0.44620
Rencana 1.704 m3 1.85329 6 0.3089 0.3 0.3 0.3 0.3 0.3 0.3
f Pek. Plat dak atap, camp 1:2:3
Realisasi 1.704 m3 1.85329
3 Pek. Dinding & pintu
Rencana 66.36 m2 0.99179 6 0.1653 0.2 0.2 0.2 0.2 0.2 0.2 60
a Pek. Pas. Dinding batu bata, camp 1:5
Realisasi 66.36 m2 0.99179 4 0.2479
Rencana 132.72 m2 0.76655 3 0.2555 0.3 0.3 0.3
b Pek. Plesteran dinding batu bata, camp 1:5
Realisasi 132.72 m2 0.76655
Rencana 132.72 m2 0.53391 2 0.2670 0.3 0.3
c Pek. Acian dinding
Realisasi 132.72 m2 0.53391
Rencana 1 unit 0.45295 3 0.1510 0.2 0.2 0.2
d Pek. Pintu besi
Realisasi 1 unit 0.45295
Rencana 1 unit 0.02520 3 0.0084 0.0 0.0 0.0
e Pek. Pintu KM, Aluminium
Realisasi 1 unit 0.02520
4 Pek. Lantai
Rencana 2.973 m3 0.05255 5 0.0105 0.0 0.0 0.0 0.0 0.0
a Pek. Urugan tanah bawah lantai
Realisasi 2.973 m3 0.05255 2 0.0263
Rencana 0.6546 m3 0.01171 2 0.0059 0.0 0.0
b Pek. Urugan pasir bawah lantai
Realisasi 0.6546 m3 0.01171 1 0.0117
Rencana 5.42 m2 0.10465 2 0.0523 0.1 0.1
c Pek. Lantai keramik 30x30 cm
Realisasi 5.42 m2 0.10465
Rencana 1.927 m2 0.03721 2 0.0186 0.0 0.0
d Pek. Lantai keramik 30x30 cm KM
Realisasi 1.927 m2 0.03721
5 Pek. Pengecatan
Rencana 148.4 m2 0.65589 8 0.0820 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
a Pek. Pengecatan dinding bata & lisplank
Realisasi 148.4 m2 0.65589
Rencana 35.197 m2 0.26792 8 0.0335 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
b Pek. Waterprofing dak atap & lisplank
Realisasi 35.197 m2 0.26792
6 Pek. Elektrikal
Rencana 2 bh 0.04655 7 0.0067 0.0 0.0 0.0 0.0 0.0 0.0 0.0 50
a Pek. Lampu penerangan TL 2x18 Watt
Realisasi 2 bh 0.04655
Rencana 1 bh 0.01118 7 0.0016 0.0 0.0 0.0 0.0 0.0 0.0 0.0
b Pek. Lampu pijar 5 Watt
Realisasi 1 bh 0.01118
Rencana 1 bh 0.08194 7 0.0117 0.0 0.0 0.0 0.0 0.0 0.0 0.0
c Pek. Lampu kapsul automatic
Realisasi 1 bh 0.08194
Rencana 1 bh 0.00399 7 0.0006 0.0 0.0 0.0 0.0 0.0 0.0 0.0
d Pek. Saklar ganda
Realisasi 1 bh 0.00399
Rencana 1 bh 0.00278 7 0.0004 0.0 0.0 0.0 0.0 0.0 0.0 0.0
e Pek. Saklar tunggal
Realisasi 1 bh 0.00278
Rencana 6 bh 0.02913 7 0.0042 0.0 0.0 0.0 0.0 0.0 0.0 0.0
f Pek. Stop kontak biasa
Realisasi 6 bh 0.02913
Rencana 2 bh 0.04354 3 0.0145 0.0 0.0 0.0
g Pek. Terminal stop kuningan 6 lubang NYY 3x6 mm2
Realisasi 2 bh 0.04354
Rencana 2 unit 1.39244 7 0.1989 0.2 0.2 0.2 0.2 0.2 0.2 0.2
h Pek. AC Split wall 1/2 PK 220 VAC + timer + stop kontak
Realisasi 2 unit 1.39244
Rencana 2 unit 0.38701 7 0.0553 0.1 0.1 0.1 0.1 0.1 0.1 0.1
i Pek. Exhaust fan type wall mounted fan 30x30 cm + timer + stop kontak
Realisasi 2 unit 0.38701
Rencana 4 titik 0.17235 7 0.0246 0.0 0.0 0.0 0.0 0.0 0.0 0.0
j Pek. Instalasi titik lampu
Realisasi 4 titik 0.17235
Rencana 6 titik 0.26264 7 0.0375 0.0 0.0 0.0 0.0 0.0 0.0 0.0
k Pek. Instalasi titik stop kontak
Realisasi 6 titik 0.26264
l Pek. Tray indoor
Rencana 7 m' 0.11450 5 0.0229 0.0 0.0 0.0 0.0 0.0
l.1 Pek. Kabel tray 300x50 mm
Realisasi 7 m' 0.11450
Rencana 3 bh 0.01479 5 0.0030 0.0 0.0 0.0 0.0 0.0 40
l.2 Pek. Cross tray 300x50 mm
Realisasi 3 bh 0.01479
Rencana 2.4 m' 0.17200 5 0.0344 0.0 0.0 0.0 0.0 0.0
l.3 Pek. Tray ladder 300x50 mm
Realisasi 2.4 m' 0.17200
m Pek. Tray outdoor
Rencana 5.5 m' 0.08997 5 0.0180 0.0 0.0 0.0 0.0 0.0
m.1 Pek. Kabel tray outdoor 300x50 mm
Realisasi 5.5 m' 0.08997
Rencana 1 ls 0.06234 5 0.0125 0.0 0.0 0.0 0.0 0.0
m.2 Pek. Tiang penopang tray, pipa galvanis 3"
Realisasi 1 ls 0.06234
Rencana 1 set 1.63864 18 0.0910 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
n Pek. Panel listrik
Realisasi 1 set 1.63864
Rencana 1 set 0.72559 8 0.0907 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
o Pek. Rak panel indoor, custom
Realisasi 1 set 0.72559
Rencana 1 unit 0.05564 5 0.0111 0.0 0.0 0.0 0.0 0.0
p Pek. Bak kontrol
Realisasi 1 unit 0.05564
7 Pek. Mekanikal Plumbing
Rencana 1 ls 0.18701 4 0.0468 0.0 0.0 0.0 0.0
a Pek. Penyambungan air bersih ke jaringan desa
Realisasi 1 ls 0.18701
Rencana 4.5 m' 0.01217 6 0.0020 0.0 0.0 0.0 0.0 0.0 0.0
b Pek. Pipa PVC AW 3/4", air bersih
Realisasi 4.5 m' 0.01217
Rencana 6.3 m' 0.07932 6 0.0132 0.0 0.0 0.0 0.0 0.0 0.0
c Pek. Pipa PVC AW 3", air bekas & air kotor
Kurva Rencana
Kurva Rencana
c Pek. Pipa PVC AW 3", air bekas & air kotor
Realisasi 6.3 m' 0.07932
Rencana 1 bh 0.08204 6 0.0137 0.0 0.0 0.0 0.0 0.0 0.0
d Pek. Closed Jongkok
Realisasi 1 bh 0.08204
Rencana 1 bh 0.00444 6 0.0007 0.0 0.0 0.0 0.0 0.0 0.0
e Pek. Floor drain
Realisasi 1 bh 0.00444
Rencana 1 bh 0.00460 6 0.0008 0.0 0.0 0.0 0.0 0.0 0.0 30
f Pek. Kran air 3/4"
Realisasi 1 bh 0.00460
Rencana 1 bh 0.03023 2 0.0151 0.0 0.0
g Pek. Pegadaan bak air & gayung
Realisasi 1 bh 0.03023
Rencana 1 unit 0.62336 7 0.0891 0.1 0.1 0.1 0.1 0.1 0.1 0.1
h Pek. Septictank gorong-gorong Ø100 cm
Realisasi 1 unit 0.62336 1 0.6234
D PEKERJAAN PAGAR & SITE
1 Pekerjaan pagar keliling (BRC) tinggi 2 meter
Rencana 5.544 m3 0.04825 4 0.0121 0.0 0.0 0.0 0.0
a Pek. Galian pondasi
Realisasi 5.544 m3 0.04825 5 0.0096
Rencana 2.1 m3 0.03757 2 0.0188 0.0 0.0
b Pek. Urugan pasir bawah pondasi, 5 cm
Realisasi 2.1 m3 0.03757 3 0.0125
Rencana 4.263 m3 0.21749 7 0.0311 0.0 0.0 0.0 0.0 0.0 0.0 0.0
c Pek. Pas. Batu kosong
Realisasi 4.263 m3 0.21749 4 0.0544
Rencana 10.1845 m3 0.97643 7 0.1395 0.1 0.1 0.1 0.1 0.1 0.1 0.1
d Pek. Pondasi batu gunung, camp 1:5
Realisasi 10.1845 m3 0.97643 9 0.1085
Rencana 2.2176 m3 0.00635 4 0.0016 0.0 0.0 0.0 0.0
e Pek. Urugan kembali galian
Realisasi 2.2176 m3 0.00635 3 0.0021
Rencana 0.336 m3 0.03653 7 0.0052 0.0 0.0 0.0 0.0 0.0 0.0 0.0
f Pek. Beton kaki BRC, 20/20/30 cm
Realisasi 0.336 m3 0.03653
Rencana 127.3 m2 5.07171 20 0.2536 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
g Pek. Pagar BRC, t = 190 cm
Realisasi 127.3 m2 5.07171 5 1.0143
Rencana 1 ls 0.49869 7 0.0712 0.1 0.1 0.1 0.1 0.1 0.1 0.1 20
h Pek. Gerbang BRC
Realisasi 1 ls 0.49869
2 Pek. Site
Rencana 57.04 m3 1.00816 25 0.0403 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
a Pek. Urugan tanah site
Realisasi 57.04 m3 1.00816 15 0.0672
Rencana 14.3 m3 0.25581 7 0.0365 0.0 0.0 0.0 0.0 0.0 0.0 0.0
b Pek. Urugan pasir site 5 cm
Realisasi 14.3 m3 0.25581 3 0.0853
Rencana 14.03 m3 0.61809 7 0.0883 0.1 0.1 0.1 0.1 0.1 0.1 0.1
c Pek. Urugan gravel 5 cm
Realisasi 14.03 m3 0.61809 2 0.3090
Rencana 1 bh 0.33952 3 0.1132 0.1 0.1 0.1
d Pek. Lampu site LED, 50 watt, with photocell
Kurva Realisasi
Realisasi 1 bh 0.33952
Rencana 1 titik 0.04309 3 0.0144 0.0 0.0 0.0
e Pek. Instalasi titik lampu site
Realisasi 1 titik 0.04309
f Pek. CCTV
Rencana 1 set 2.38595 18 0.1326 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
f.1 Pek. Peralatan utama, DVR 4Ch w/HDD 2TB, network switch & rak metal
Realisasi 1 set 2.38595
Pek. Fixed Color camera dome type, 1/3” CMOS, Rencana 1 unit 0.64267 18 0.0357 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
f.2
1080p Realisasi 1 unit 0.64267
Pek. Fixed Color camera bullet type, 1/3” CMOS, Rencana 2 unit 1.25914 18 0.0700 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
f.3
1080p Realisasi 2 unit 1.25914
Pek. Instalasi CCTV menggunakan Coaxial cable RG5 in PVC HI conduit Rencana 3 titik 0.12758 18 0.0071 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
f.4
dia.20mm & NYY 2 x 2.5 mm untuk kabel daya ke tiap camera Realisasi 3 titik 0.12758
g Rumah genset
Rencana 0.6 m3 0.06523 7 0.0093 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10
g.1 Pek. Rabat beton 10 cm
Realisasi 0.6 m3 0.06523
Rencana 1 set 0.81037 7 0.1158 0.1 0.1 0.1 0.1 0.1 0.1 0.1
g.2 Pek. Rumah genset, atap + gembok, Fin. Cat
Realisasi 1 set 0.81037
Rencana 1 ls 0.09974 7 0.0142 0.0 0.0 0.0 0.0 0.0 0.0 0.0
g.3 Pek. Mobilisasi genset & instalasi
Realisasi 1 ls 0.09974
Rencana 0.3 m3 0.32628 12 0.0272 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
h Ramp jalan masuk, 10 cm
Realisasi 0.3 m3 0.32628 4 0.0816
Rencana 1 set 0.62336 14 0.0445 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
i Pek. Papan identitas tower, Fin. Cat & Letter huruf
Realisasi 1 set 0.62336
E PEKERJAAN JALAN AKSES LOKASI
Rencana 1 ls 0.37402 13 0.0288 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
1 Pek. Persiapan tanah jalan
Realisasi 1 ls 0.37402 4 0.0935
Rencana 12.83 m3 0.11165 13 0.0086 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2 Pek. Galian pondasi batu kali
Realisasi 12.83 m3 0.11165 4 0.0279
Rencana 4.115 m3 0.07361 13 0.0057 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
3 Pek. Urugan pasir, 5 cm
Realisasi 4.115 m3 0.07361
Rencana 8.692 m3 0.44344 13 0.0341 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4 Pek. Pas. batu kosong
Realisasi 8.692 m3 0.44344 4 0.1109
Rencana 18.03 m3 1.72861 13 0.1330 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
5 Pek. Pondasi batu gunung, camp 1:5
Realisasi 18.03 m3 1.72861 4 0.4322
Rencana 34.9344 m3 3.79785 37 0.1026 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
6 Pek. Lantai kerja 5 cm
Realisasi 34.9344 m3 3.79785 2 1.8989
Rencana 582.24 m2 14.57624 40 0.3644 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0
7 Pek. Paving block 8 cm
Realisasi 582.24 m2 14.57624
PROGRESS RENCANA 100.00 0.214 1.040 1.040 1.127 1.106 1.106 1.036 1.106 1.307 1.548 1.449 1.503 1.462 1.672 2.158 1.928 1.902 1.887 1.708 1.532 1.569 1.826 1.826 1.826 1.787 1.882 2.502 2.337 2.269 2.154 2.487 2.441 1.739 1.661 1.619 1.517 1.984 1.984 1.972 1.972 1.986 1.986 2.239 1.430 1.430 1.449 1.492 1.706 1.308 1.308 1.308 1.252 1.252 1.141 0.916 0.981 0.890 1.006 1.324 1.324 1.324 1.185 0.860 0.860 0.860
KUMULATIVE RENCANA 0.21 1.25 2.29 3.42 4.53 5.63 6.67 7.77 9.1 10.6 12.1 13.6 15.0 16.7 18.9 20.8 22.7 24.6 26.3 27.8 29.4 31.2 33.0 34.9 36.7 38.5 41.0 43.4 45.7 47.8 50.3 52.7 54.5 56.1 57.8 59.3 61.3 63.2 65.2 67.2 69.2 71.2 73.4 74.8 76.3 77.7 79.2 80.9 82.2 83.5 84.8 86.1 87.3 88.5 89.4 90.4 91.3 92.3 93.6 94.9 96.2 97.4 98.3 99.1 100
PROGRESS REALISASI 100.0 0.036 0.036 0.036 0.036 0.036 1.000 0.937 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
KUMULATIVE REALISASI 0.036 0.071 0.107 0.142 0.178 1.177 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.115 2.11
DEVIASI (0.18) -1.18213 -2.18616 -3.27717 -4.3474 -4.45361 -4.552 -5.65788 -6.96439 -8.51284 -9.9614 -11.4645 -12.9265 -14.599 -16.7563 -18.6847 -20.5869 -22.4737 -24.1815 -25.7137 -27.2829 -29.1085 -30.9342 -32.7598 -34.5464 -36.4288 -38.931 -41.2679 -43.5367 -45.6902 -48.177 -50.6182 -52.3575 -54.0189 -55.6379 -57.1551 -59.1386 -61.1222 -63.0946 -65.067 -67.0526 -69.0381 -71.2773 -72.7072 -74.1371 -75.5857 -77.0774 -78.7836 -80.0919 -81.4002 -82.7085 -83.9602 -85.212 -86.3535 -87.2699 -88.2507 -89.1408 -90.1464 -91.4708 -92.7952 -94.1196 -95.3047 -96.1649 -97.0251 -97.8854
KUMMULATIVE s.d MINGGU LALU TERCAPAI MINGGU INI KUMMULATIVE s.d MINGGU SAAT INI MINGGU 4
VOLUME
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
NO. ITEM PEKERJAAN SPESIFIKASI BOBOT PERSENTASE
REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL KUMMULATIVE
RENCANA KERJA
Sat. Vol. LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan ls 1.00 0.426 1.000 ls 1.00 ls 0.44 0.000 ls ls 1.000 ls 1.000 ls 0.44 0.00 100.00%
2 Pek. Pagar keliling site Seng bjls, 2 m m' 72.00 2.643 72.000 m' 72.00 m' 72.00 1.803 m' m' 72.000 m' 72.000 m' 72.00 1.80 100.00%
3 Pek. Gudang & bangsal m2 20.00 1.290 20.000 m2 20.00 m2 20.00 0.000 m2 m2 20.000 m2 20.000 m2 20.00 0.00 100.00%
4 Pek. Papan nama proyek ls 1.00 0.061 1.000 ls 1.00 ls 1.00 0.062 ls ls 1.000 ls 1.000 ls 1.00 0.06 100.00%
5 Pek. Mobilisasi dan Demobilisasi ls 1.00 1.297 0.358 ls 0.32 ls 0.32 0.143 0.108 ls 0.108 ls 0.143 0.000 0.466 ls 0.431 ls 0.47 0.14 43.08%
6 Pek. Pengukuran dan bowplank m' 70.00 0.908 70.000 m' 70.00 m' 70.00 0.000 m' m' 70.000 m' 70.000 m' 70.00 0.00 100.00%
7 Pek. Pengadaan air kerja ls 1.00 0.061 0.121 ls 0.22 ls 0.22 0.007 0.108 ls 0.108 ls 0.007 0.000 0.229 ls 0.330 ls 0.23 0.01 32.98%
8 Pek. Listrik kerja ls 1.00 0.365 0.188 ls 0.26 ls 0.26 0.040 0.108 ls 0.108 ls 0.040 0.000 0.296 ls 0.363 ls 0.30 0.04 36.34%
9 Pek. SLO Instalasi Listrik 4400 Va ls 1.00 0.066 0.534 ls 0.00 ls 0.00 0.000 ls ls 0.534 ls 0.000 ls 0.00 0.00 0.00%
10 Pek. Laporan & dokumentasi ls 1.00 0.535 0.226 ls 0.27 ls 0.27 0.059 0.108 ls 0.108 ls 0.059 0.000 0.333 ls 0.382 ls 0.33 0.06 38.20%
11 Pek. Pengurusan Perizinan ls 1.00 0.670 0.895 ls 0.43 ls 0.43 0.000 ls 0.233 ls 0.000 0.895 ls 0.667 ls 0.43 0.00 66.67%
C PEKERJAAN SHELTER
1 Pekerjaan Tanah & Pondasi
a Pek. Galian pondasi m3 4.27 0.036 4.265 m3 4.27 m3 4.27 0.000 m3 m3 4.265 m3 4.265 m3 4.27 0.00 100.00%
b Pek. Urugan pasir, 5 cm m3 0.42 0.007 0.423 m3 0.42 m3 0.42 0.000 m3 m3 0.423 m3 0.423 m3 0.42 0.00 100.00%
c Pek. Pas. Batu kosong m3 0.85 0.042 0.852 m3 0.85 m3 0.85 0.000 m3 m3 0.852 m3 0.852 m3 0.85 0.00 100.00%
d Pek. Pondasi batu gunung camp 1:5 m3 2.04 0.191 2.035 m3 2.04 m3 2.04 0.000 m3 m3 0.0000 2.035 m3 2.035 m3 2.04 0.00 100.00%
e Pek. Pondasi rollag bata m3 0.55 0.042 0.137 m3 0.00 m3 0.00 0.000 0.410 m3 m3 0.032 0.546 m3 0.000 m3 0.03 0.00 0.00%
f Pek. Urugan kembali galian m3 1.28 0.004 0.000 m3 0.00 m3 0.00 0.000 1.280 m3 1.280 m3 0.004 0.000 1.280 m3 1.280 m3 0.00 0.00 100.00%
2 Pek. Beton
a Pek. Sloef 15/20 cm, camp 1:2:3 m3 0.44 0.308 0.110 m3 0.00 m3 0.00 0.000 0.330 m3 0.44 m3 0.236 0.000 0.440 m3 0.440 m3 0.24 0.00 100.00%
b Pek. Rabat beton teras 5 cm m3 0.88 0.093 0.000 m3 0.00 m3 0.00 0.000 m3 m3 0.000 m3 0.000 m3 0.00 0.00 0.00%
c Pek. Kolom 15/15 cm, camp 1:2:3 m3 0.47 0.484 0.000 m3 0.00 m3 0.00 0.000 0.473 m3 0.4725 m3 0.495 0.000 0.473 m3 0.473 m3 0.50 0.00 100.00%
d Pek. Ringbalk 15/20 cm, camp 1:2:3 m3 0.44 0.436 0.000 m3 0.00 m3 0.00 0.000 0.293 m3 m3 0.297 0.293 m3 0.000 m3 0.30 0.00 0.00%
e Pek. Lisplank beton 10/25 cm, camp 1:2:3 m3 0.44 0.436 0.000 m3 0.00 m3 0.00 0.000 0.147 m3 m3 0.149 0.147 m3 0.000 m3 0.15 0.00 0.00%
f Pek. Plat dak atap, camp 1:2:3 m3 1.70 1.811 0.000 m3 0.00 m3 0.00 0.000 0.568 m3 m3 0.618 0.568 m3 0.000 m3 0.62 0.00 0.00%
3 Pek. Dinding & pintu
a Pek. Pas. Dinding batu bata, camp 1:5 m2 66.36 0.969 0.000 m2 0.00 m2 0.00 0.000 66.360 m2 66.36 m2 0.992 0.000 66.360 m2 66.360 m2 0.99 0.00 100.00%
b Pek. Plesteran dinding batu bata, camp 1:5 m2 132.72 0.749 0.000 m2 0.00 m2 0.00 0.000 88.480 m2 m2 0.511 88.480 m2 0.000 m2 0.51 0.00 0.00%
c Pek. Acian dinding m2 132.72 0.522 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2 0.00%
d Pek. Pintu besi + gembok unit 1.00 0.443 0.000 unit 0.00 unit 0.00 0.000 1.000 unit unit 0.453 1.000 unit 0.000 unit 0.45 0.00 0.00%
e Pek. Pintu KM, Aluminium unit 1.00 0.025 0.000 unit 0.00 unit 0.00 0.000 1.000 unit unit 0.025 1.000 unit 0.000 unit 0.03 0.00 0.00%
4 Pek. Lantai
a Pek. Urugan tanah bawah lantai m3 2.97 0.051 0.000 m3 0.00 m3 0.00 0.000 1.784 m3 m3 0.032 1.784 m3 0.000 m3 0.03 0.00 0.00%
b Pek. Urugan pasir bawah lantai m3 0.65 0.011 0.000 m3 0.00 m3 0.00 0.000 m3 m3 m3 m3
c Pek. Lantai keramik 30x30 cm unpolish m2 5.42 0.102 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2
d Pek. Lantai keramik 30x30 cm KM unpolish m2 1.93 0.036 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2
5 Pek. Pengecatan
a Pek. Pengecatan dinding bata & lisplank vinitex/setara m2 148.40 0.641 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2
b Pek. Waterprofing dak atap & lisplank No Drop/Aquaproff/setara m2 35.20 0.262 0.000 m2 0.00 m2 0.00 0.000 m2 m2 m2 m2
6 Pek. Elektrikal
a Pek. Lampu penerangan TL 2x18 Watt Philips/setara bh 2.00 0.045 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
b Pek. Lampu pijar 5 Watt Philips/setara bh 1.00 0.011 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
c Pek. Lampu kapsul automatic 18 Watt Philips/setara bh 1.00 0.080 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
d Pek. Saklar ganda Panasonic/setara bh 1.00 0.004 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
e Pek. Saklar tunggal Panasonic/setara bh 1.00 0.003 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
f Pek. Stop kontak biasa Panasonic/setara bh 6.00 0.028 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
g Pek. Terminal stop kuningan 6 lubang NYY 3x6 mm2 bh 2.00 0.043 0.000 bh 0.00 bh 0.00 0.000 bh bh bh bh
h Pek. AC Split wall 1/2 PK 220 VAC + timer + stop kontak Panasonic/setara unit 2.00 1.360 0.000 unit 0.00 unit 0.00 0.000 unit unit unit unit
KUMMULATIVE s.d MINGGU LALU TERCAPAI MINGGU INI KUMMULATIVE s.d MINGGU SAAT INI MINGGU 3
VOLUME
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
NO. ITEM PEKERJAAN SPESIFIKASI BOBOT PERSENTASE
REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL KUMMULATIVE
RENCANA KERJA
Sat. Vol. LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan ls 1.00 0.426 1.000 ls 1.000 ls 0.44 0.000 ls ls 1.000 ls 1.000 ls 0.44 0.00 100.00%
2 Pek. Pagar keliling site Seng bjls, 2 m m' 72.00 2.643 72.000 m' 72.000 m' 2.71 1.803 m' m' 72.000 m' 72.000 m' 2.71 1.80 100.00%
3 Pek. Gudang & bangsal m2 20.00 1.290 20.000 m2 20.000 m2 1.32 0.000 m2 m2 20.000 m2 20.000 m2 1.32 0.00 100.00%
4 Pek. Papan nama proyek ls 1.00 0.061 1.000 ls 1.000 ls 0.06 0.062 ls ls 1.000 ls 1.000 ls 0.06 0.06 100.00%
5 Pek. Mobilisasi dan Demobilisasi ls 1.00 1.297 0.251 ls 0.215 ls 0.14 0.143 0.108 ls 0.108 ls 0.143 - 0.358 ls 0.323 ls 0.29 0.14 32.31%
6 Pek. Pengukuran dan bowplank m' 70.00 0.908 70.000 m' 35.000 m' 0.93 0.000 m' 35.00 m' - 70.000 m' 70.000 m' 0.93 0.00 100.00%
7 Pek. Pengadaan air kerja ls 1.00 0.061 0.013 ls 0.114 ls 0.01 0.007 0.108 ls 0.108 ls 0.007 - 0.121 ls 0.222 ls 0.02 0.01 22.21%
8 Pek. Listrik kerja ls 1.00 0.365 0.081 ls 0.148 ls 0.08 0.040 0.108 ls 0.108 ls 0.040 - 0.188 ls 0.256 ls 0.12 0.04 25.57%
9 Pek. SLO Instalasi Listrik 4400 Va ls 1.00 0.066 0.105 ls 0.000 ls 0.04 0.000 0.429 ls ls 0.029 0.534 ls 0.000 ls 0.07 0.00 0.00%
10 Pek. Laporan & dokumentasi ls 1.00 0.535 0.118 ls 0.167 ls 0.12 0.059 0.108 ls 0.108 ls 0.059 - 0.226 ls 0.274 ls 0.18 0.06 27.43%
11 Pek. Pengurusan Perizinan ls 1.00 0.670 0.562 ls 0.200 ls 0.46 0.000 0.333 ls 0.233 ls 0.229 - 0.895 ls 0.433 ls 0.69 0.00 43.33%
C PEKERJAAN SHELTER
1 Pekerjaan Tanah & Pondasi
a Pek. Galian pondasi m3 4.27 0.036 0.000 m3 0 m3 0.00 0.00 4.265 m3 4.265 m3 0.037 0.00000 4.265 m3 4.265 m3 0.04 0.00 100.00%
b Pek. Urugan pasir, 5 cm m3 0.42 0.007 m3 m3 0.423 m3 0.423 m3 0.008 0.0000 0.423 m3 0.423 m3 0.01 0.00 100.00%
c Pek. Pas. Batu kosong m3 0.85 0.042 m3 m3 0.852 m3 0.852 m3 0.043 0.00 0.852 m3 0.852 m3 0.04 0.00 100.00%
d Pek. Pondasi batu gunung camp 1:5 m3 2.04 0.191 m3 m3 2.035 m3 2.035 m3 0.195 0.0000 2.035 m3 2.035 m3 0.20 0.00 100.00%
e Pek. Pondasi rollag bata m3 0.55 0.042 m3 m3 0.137 m3 m3 0.011 0.137 m3 0.000 m3 0.01 0.00 0.00%
f Pek. Urugan kembali galian m3 1.28 0.004 m3 m3 m3 m3 m3 m3
2 Pek. Beton
a Pek. Sloef 15/20 cm, camp 1:2:3 m3 0.44 0.308 m3 m3 0.110 m3 m3 0.079 0.110 m3 0.000 m3 0.08 0.00 0.00%
b Pek. Rabat beton teras 5 cm m3 0.88 0.093 m3 m3 m3 m3 m3 m3
c Pek. Kolom 15/15 cm, camp 1:2:3 m3 0.47 0.484 m3 m3 m3 m3 m3 m3
d Pek. Ringbalk 15/20 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
e Pek. Lisplank beton 10/25 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
f Pek. Plat dak atap, camp 1:2:3 m3 1.70 1.811 m3 m3 m3 m3 m3 m3
3 Pek. Dinding & pintu
a Pek. Pas. Dinding batu bata, camp 1:5 m2 66.36 0.969 m2 m2 m2 m2 m2 m2
b Pek. Plesteran dinding batu bata, camp 1:5 m2 132.72 0.749 m2 m2 m2 m2 m2 m2
c Pek. Acian dinding m2 132.72 0.522 m2 m2 m2 m2 m2 m2
d Pek. Pintu besi + gembok unit 1.00 0.443 unit unit unit unit unit unit
e Pek. Pintu KM, Aluminium unit 1.00 0.025 unit unit unit unit unit unit
4 Pek. Lantai
a Pek. Urugan tanah bawah lantai m3 2.97 0.051 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir bawah lantai m3 0.65 0.011 m3 m3 m3 m3 m3 m3
c Pek. Lantai keramik 30x30 cm unpolish m2 5.42 0.102 m2 m2 m2 m2 m2 m2
d Pek. Lantai keramik 30x30 cm KM unpolish m2 1.93 0.036 m2 m2 m2 m2 m2 m2
5 Pek. Pengecatan
a Pek. Pengecatan dinding bata & lisplank vinitex/setara m2 148.40 0.641 m2 m2 m2 m2 m2 m2
b Pek. Waterprofing dak atap & lisplank No Drop/Aquaproff/setara m2 35.20 0.262 m2 m2 m2 m2 m2 m2
6 Pek. Elektrikal
a Pek. Lampu penerangan TL 2x18 Watt Philips/setara bh 2.00 0.045 bh bh bh bh bh bh
b Pek. Lampu pijar 5 Watt Philips/setara bh 1.00 0.011 bh bh bh bh bh bh
c Pek. Lampu kapsul automatic 18 Watt Philips/setara bh 1.00 0.080 bh bh bh bh bh bh
d Pek. Saklar ganda Panasonic/setara bh 1.00 0.004 bh bh bh bh bh bh
e Pek. Saklar tunggal Panasonic/setara bh 1.00 0.003 bh bh bh bh bh bh
f Pek. Stop kontak biasa Panasonic/setara bh 6.00 0.028 bh bh bh bh bh bh
g Pek. Terminal stop kuningan 6 lubang NYY 3x6 mm2 bh 2.00 0.043 bh bh bh bh bh bh
h Pek. AC Split wall 1/2 PK 220 VAC + timer + stop kontak Panasonic/setara unit 2.00 1.360 unit unit unit unit
unit unit
Pek. Exhaust fan type wall mounted fan 30x30 cm + timer
i National, KDK, Setara unit 2.00 0.378 unit unit unit unit
+ stop kontak unit unit
j Pek. Instalasi titik lampu NYY 3 x 4 mm2 titik 4.00 0.168 titik titik titik titik titik titik
k Pek. Instalasi stop kontak NYY 3 x 6 mm2 in conduit titik 6.00 0.257 titik titik titik titik titik titik
l Pek. Tray indoor
l.1 Pek. Kabel tray 300x50 mm Ex. Lokal m' 7.00 0.112 m' m' m' m' m' m'
l.2 Pek. Cross tray 300x50 mm Ex. Lokal bh 3.00 0.014 bh bh bh bh bh bh
l.3 Pek. Tray ladder 300x50 mm Ex. Lokal m' 2.40 0.168 m' m' m' m' m' m'
m Pek. Tray outdoor
m.1 Pek. Kabel tray outdoor 300x50 mm Ex. Lokal m' 5.50 0.088 m' m' m' m' m' m'
m.2 Pek. Tiang penopang tray, pipa galvanis 3" Ex. Lokal ls 1.00 0.061 ls ls ls ls ls ls
n Pek. Panel listrik Schnider/setara set 1.00 1.601 set set 0.167 set set 0.273 0.167 set 0.000 set 0.27 0.00 0.00%
o Pek. Rak panel indoor, custom set 1.00 0.709 set set set set set set
p Pek. Bak kontrol unit 1.00 0.054 unit unit unit unit unit unit
7 Pek. Mekanikal Plumbing
a Pek. Penyambungan air bersih ke jaringan desa Wavin/setara ls 1.00 0.183 0.500 ls 0.000 ls 0.094 0.000 ls ls 0.500 ls 0.000 ls 0.09 0.00 0.00%
b Pek. Pipa PVC AW 3/4", air bersih Wavin/setara m' 4.50 0.012 m' m' m' m' m' m'
c Pek. Pipa PVC AW 3", air bekas & air kotor Wavin/setara m' 6.30 0.077 m' m' m' m' m' m'
d Pek. Closed Jongkok Toto/setara bh 1.00 0.080 bh bh bh bh bh bh
e Pek. Floor drain Stainlessteel bh 1.00 0.004 bh bh bh bh bh bh
f Pek. Kran air 3/4" Ex. Lokal bh 1.00 0.004 bh bh bh bh bh bh
g Pek. Pegadaan bak air & gayung Ex. Lokal bh 1.00 0.030 bh bh bh bh bh bh
h Pek. Septictank gorong-gorong Ø100 cm Ex. Lokal unit 1.00 0.609 unit unit unit unit unit unit
KUMMULATIVE s.d MINGGU LALU TERCAPAI MINGGU INI KUMMULATIVE s.d MINGGU SAAT INI MINGGU 2
VOLUME
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
NO. ITEM PEKERJAAN SPESIFIKASI BOBOT PERSENTASE
REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL KUMMULATIVE
RENCANA KERJA
Sat. Vol. LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan ls 1.00 0.426 1.000 ls 0.000 ls 0.44 0.000 ls 1.00 ls - 1.000 ls 1.000 ls 0.44 0.00 100.00%
2 Pek. Pagar keliling site Seng bjls, 2 m m' 72.00 2.643 72.000 m' 48.000 m' 2.71 1.803 m' 24.00 m' - 72.000 m' 72.000 m' 2.71 1.80 100.00%
3 Pek. Gudang & bangsal m2 20.00 1.290 20.000 m2 0.000 m2 1.32 0.000 m2 20.00 m2 - 20.000 m2 20.000 m2 1.32 0.00 100.00%
4 Pek. Papan nama proyek ls 1.00 0.061 1.000 ls 1.000 ls 0.06 0.062 ls ls 1.000 ls 1.000 ls 0.06 0.06 100.00%
5 Pek. Mobilisasi dan Demobilisasi ls 1.00 1.297 0.108 ls 0.108 ls 0.14 0.143 0.143 ls 0.108 ls - - 0.251 ls 0.215 ls 0.14 0.14 21.54%
6 Pek. Pengukuran dan bowplank m' 70.00 0.908 70.000 m' 0.000 m' 0.93 0.000 m' 35.00 m' - 70.000 m' 35.000 m' 0.93 0.00 50.00%
7 Pek. Pengadaan air kerja ls 1.00 0.061 0.007 ls 0.007 ls 0.01 0.007 0.007 ls 0.108 ls 0.007 - 0.013 ls 0.114 ls 0.01 0.01 11.44%
8 Pek. Listrik kerja ls 1.00 0.365 0.040 ls 0.040 ls 0.04 0.040 0.040 ls 0.108 ls 0.040 - 0.081 ls 0.148 ls 0.08 0.04 14.80%
9 Pek. SLO Instalasi Listrik 4400 Va ls 1.00 0.066 0.071 ls 0.000 ls 0.00 0.000 0.034 ls ls 0.034 0.105 ls 0.000 ls 0.04 0.00 0.00%
10 Pek. Laporan & dokumentasi ls 1.00 0.535 0.059 ls 0.059 ls 0.06 0.059 0.059 ls 0.108 ls 0.059 - 0.118 ls 0.167 ls 0.12 0.06 16.66%
11 Pek. Pengurusan Perizinan ls 1.00 0.670 0.229 ls 0.000 ls 0.23 0.000 0.333 ls 0.200 ls 0.229 - 0.562 ls 0.200 ls 0.46 0.00 20.00%
C PEKERJAAN SHELTER
1 Pekerjaan Tanah & Pondasi
a Pek. Galian pondasi m3 4.27 0.036 m3 m3 m3 m3 0.00000 0.000 m3 0.000 m3 0.00 0.00 0.00%
b Pek. Urugan pasir, 5 cm m3 0.42 0.007 m3 m3 m3 m3 m3 m3
c Pek. Pas. Batu kosong m3 0.85 0.042 m3 m3 m3 m3 m3 m3
d Pek. Pondasi batu gunung camp 1:5 m3 2.04 0.191 m3 m3 m3 m3 m3 m3
e Pek. Pondasi rollag bata m3 0.55 0.042 m3 m3 m3 m3 m3 m3
f Pek. Urugan kembali galian m3 1.28 0.004 m3 m3 m3 m3 m3 m3
2 Pek. Beton
a Pek. Sloef 15/20 cm, camp 1:2:3 m3 0.44 0.308 m3 m3 m3 m3 m3 m3
b Pek. Rabat beton teras 5 cm m3 0.88 0.093 m3 m3 m3 m3 m3 m3
c Pek. Kolom 15/15 cm, camp 1:2:3 m3 0.47 0.484 m3 m3 m3 m3 m3 m3
d Pek. Ringbalk 15/20 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
e Pek. Lisplank beton 10/25 cm, camp 1:2:3 m3 0.44 0.436 m3 m3 m3 m3 m3 m3
f Pek. Plat dak atap, camp 1:2:3 m3 1.70 1.811 m3 m3 m3 m3 m3 m3
3 Pek. Dinding & pintu
a Pek. Pas. Dinding batu bata, camp 1:5 m2 66.36 0.969 m2 m2 m2 m2 m2 m2
b Pek. Plesteran dinding batu bata, camp 1:5 m2 132.72 0.749 m2 m2 m2 m2 m2 m2
c Pek. Acian dinding m2 132.72 0.522 m2 m2 m2 m2 m2 m2
d Pek. Pintu besi + gembok unit 1.00 0.443 unit unit unit unit unit unit
e Pek. Pintu KM, Aluminium unit 1.00 0.025 unit unit unit unit unit unit
4 Pek. Lantai
a Pek. Urugan tanah bawah lantai m3 2.97 0.051 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir bawah lantai m3 0.65 0.011 m3 m3 m3 m3 m3 m3
c Pek. Lantai keramik 30x30 cm unpolish m2 5.42 0.102 m2 m2 m2 m2 m2 m2
d Pek. Lantai keramik 30x30 cm KM unpolish m2 1.93 0.036 m2 m2 m2 m2 m2 m2
5 Pek. Pengecatan
a Pek. Pengecatan dinding bata & lisplank vinitex/setara m2 148.40 0.641 m2 m2 m2 m2 m2 m2
b Pek. Waterprofing dak atap & lisplank No Drop/Aquaproff/setara m2 35.20 0.262 m2 m2 m2 m2 m2 m2
6 Pek. Elektrikal
a Pek. Lampu penerangan TL 2x18 Watt Philips/setara bh 2.00 0.045 bh bh bh bh bh bh
b Pek. Lampu pijar 5 Watt Philips/setara bh 1.00 0.011 bh bh bh bh bh bh
c Pek. Lampu kapsul automatic 18 Watt Philips/setara bh 1.00 0.080 bh bh bh bh bh bh
d Pek. Saklar ganda Panasonic/setara bh 1.00 0.004 bh bh bh bh bh bh
e Pek. Saklar tunggal Panasonic/setara bh 1.00 0.003 bh bh bh bh bh bh
f Pek. Stop kontak biasa Panasonic/setara bh 6.00 0.028 bh bh bh bh bh bh
g Pek. Terminal stop kuningan 6 lubang NYY 3x6 mm2 bh 2.00 0.043 bh bh bh bh bh bh
h Pek. AC Split wall 1/2 PK 220 VAC + timer + stop kontak Panasonic/setara unit 2.00 1.360 unit unit unit unit
unit unit
Pek. Exhaust fan type wall mounted fan 30x30 cm + timer
i National, KDK, Setara unit 2.00 0.378 unit unit unit unit
+ stop kontak unit unit
j Pek. Instalasi titik lampu NYY 3 x 4 mm2 titik 4.00 0.168 titik titik titik titik titik titik
k Pek. Instalasi stop kontak NYY 3 x 6 mm2 in conduit titik 6.00 0.257 titik titik titik titik titik titik
l Pek. Tray indoor
l.1 Pek. Kabel tray 300x50 mm Ex. Lokal m' 7.00 0.112 m' m' m' m' m' m'
l.2 Pek. Cross tray 300x50 mm Ex. Lokal bh 3.00 0.014 bh bh bh bh bh bh
l.3 Pek. Tray ladder 300x50 mm Ex. Lokal m' 2.40 0.168 m' m' m' m' m' m'
m Pek. Tray outdoor
m.1 Pek. Kabel tray outdoor 300x50 mm Ex. Lokal m' 5.50 0.088 m' m' m' m' m' m'
m.2 Pek. Tiang penopang tray, pipa galvanis 3" Ex. Lokal ls 1.00 0.061 ls ls ls ls ls ls
n Pek. Panel listrik Schnider/setara set 1.00 1.601 set set set set set set
o Pek. Rak panel indoor, custom set 1.00 0.709 set set set set set set
p Pek. Bak kontrol unit 1.00 0.054 unit unit unit unit unit unit
7 Pek. Mekanikal Plumbing
a Pek. Penyambungan air bersih ke jaringan desa Wavin/setara ls 1.00 0.183 ls ls 0.500 ls ls 0.094 0.500 ls 0.000 ls 0.09 0.00 0.00%
b Pek. Pipa PVC AW 3/4", air bersih Wavin/setara m' 4.50 0.012 m' m' m' m' m' m'
c Pek. Pipa PVC AW 3", air bekas & air kotor Wavin/setara m' 6.30 0.077 m' m' m' m' m' m'
d Pek. Closed Jongkok Toto/setara bh 1.00 0.080 bh bh bh bh bh bh
e Pek. Floor drain Stainlessteel bh 1.00 0.004 bh bh bh bh bh bh
f Pek. Kran air 3/4" Ex. Lokal bh 1.00 0.004 bh bh bh bh bh bh
g Pek. Pegadaan bak air & gayung Ex. Lokal bh 1.00 0.030 bh bh bh bh bh bh
h Pek. Septictank gorong-gorong Ø100 cm Ex. Lokal unit 1.00 0.609 unit unit unit unit unit unit
KUMMULATIVE s.d MINGGU LALU TERCAPAI MINGGU INI KUMMULATIVE s.d MINGGU SAAT INI MINGGU 1
VOLUME
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
NO. ITEM PEKERJAAN SPESIFIKASI BOBOT PERSENTASE
REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL RENCANA REAL KUMMULATIVE
RENCANA KERJA
Sat. Vol. LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN KERJA LAPANGAN
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan ls 1.00 0.436 ls ls 1.000 ls ls 0.436 1.000 ls 0.000 ls 0.436 0.000 0.000%
2 Pek. Pagar keliling site Seng bjls, 2 m m' 72.00 2.705 m' m' 72.000 m' 48 m' 2.705 1.803 72.000 m' 48.000 m' 2.705 1.803 66.667%
3 Pek. Gudang & bangsal m2 20.00 1.321 m2 m2 20.000 m2 m2 1.321 20.000 m2 0.000 m2 1.321 0.000 0.000%
4 Pek. Papan nama proyek ls 1.00 0.062 ls ls 1.000 ls 1.000 ls 0.062 0.062 1.000 ls 1.000 ls 0.062 0.062 100.000%
5 Pek. Mobilisasi dan Demobilisasi ls 1.00 1.328 ls ls 0.108 ls 0.108 ls 0.143 0.143 0.108 ls 0.108 ls 0.143 0.143 10.769%
6 Pek. Pengukuran dan bowplank m' 70.00 0.930 m' m' 70.000 m' m' 0.930 70.000 m' 0.000 m' 0.930 0.000 0.000%
7 Pek. Pengadaan air kerja ls 1.00 0.062 ls ls 0.007 ls 0.007 ls 0.007 0.007 0.007 ls 0.007 ls 0.007 0.007 0.671%
8 Pek. Listrik kerja ls 1.00 0.374 ls ls 0.040 ls 0.040 ls 0.040 0.040 0.040 ls 0.040 ls 0.040 0.040 4.028%
9 Pek. SLO Instalasi Listrik 4400 Va ls 1.00 0.068 ls ls 0.071 ls ls 0.005 0.071 ls 0.000 ls 0.005 0.000 0.000%
10 Pek. Laporan & dokumentasi ls 1.00 0.547 ls ls 0.059 ls 0.059 ls 0.059 0.059 0.059 ls 0.059 ls 0.059 0.059 5.894%
11 Pek. Pengurusan Perizinan ls 1.00 0.686 ls ls 0.229 ls ls 0.229 0.229 ls 0.000 ls 0.229 0.000 0.000%
C PEKERJAAN SHELTER
1 Pekerjaan Tanah & Pondasi
a Pek. Galian pondasi m3 4.27 0.037 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir, 5 cm m3 0.42 0.008 m3 m3 m3 m3 m3 m3
c Pek. Pas. Batu kosong m3 0.85 0.043 m3 m3 m3 m3 m3 m3
d Pek. Pondasi batu gunung camp 1:5 m3 2.04 0.195 m3 m3 m3 m3 m3 m3
e Pek. Pondasi rollag bata m3 0.55 0.043 m3 m3 m3 m3 m3 m3
f Pek. Urugan kembali galian m3 1.28 0.004 m3 m3 m3 m3 m3 m3
2 Pek. Beton
a Pek. Sloef 15/20 cm, camp 1:2:3 m3 0.44 0.315 m3 m3 m3 m3 m3 m3
b Pek. Rabat beton teras 5 cm m3 0.88 0.096 m3 m3 m3 m3 m3 m3
c Pek. Kolom 15/15 cm, camp 1:2:3 m3 0.47 0.495 m3 m3 m3 m3 m3 m3
d Pek. Ringbalk 15/20 cm, camp 1:2:3 m3 0.44 0.446 m3 m3 m3 m3 m3 m3
e Pek. Lisplank beton 10/25 cm, camp 1:2:3 m3 0.44 0.446 m3 m3 m3 m3 m3 m3
f Pek. Plat dak atap, camp 1:2:3 m3 1.70 1.853 m3 m3 m3 m3 m3 m3
3 Pek. Dinding & pintu
a Pek. Pas. Dinding batu bata, camp 1:5 m2 66.36 0.992 m2 m2 m2 m2 m2 m2
b Pek. Plesteran dinding batu bata, camp 1:5 m2 132.72 0.767 m2 m2 m2 m2 m2 m2
c Pek. Acian dinding m2 132.72 0.534 m2 m2 m2 m2 m2 m2
d Pek. Pintu besi + gembok unit 1.00 0.453 unit unit unit unit unit unit
e Pek. Pintu KM, Aluminium unit 1.00 0.025 unit unit unit unit unit unit
4 Pek. Lantai
a Pek. Urugan tanah bawah lantai m3 2.97 0.053 m3 m3 m3 m3 m3 m3
b Pek. Urugan pasir bawah lantai m3 0.65 0.012 m3 m3 m3 m3 m3 m3
c Pek. Lantai keramik 30x30 cm unpolish m2 5.42 0.105 m2 m2 m2 m2 m2 m2
d Pek. Lantai keramik 30x30 cm KM unpolish m2 1.93 0.037 m2 m2 m2 m2 m2 m2
5 Pek. Pengecatan
a Pek. Pengecatan dinding bata & lisplank vinitex/setara m2 148.40 0.656 m2 m2 m2 m2 m2 m2
b Pek. Waterprofing dak atap & lisplank No Drop/Aquaproff/setara m2 35.20 0.268 m2 m2 m2 m2 m2 m2
6 Pek. Elektrikal
a Pek. Lampu penerangan TL 2x18 Watt Philips/setara bh 2.00 0.047 bh bh bh bh bh bh
b Pek. Lampu pijar 5 Watt Philips/setara bh 1.00 0.011 bh bh bh bh bh bh
c Pek. Lampu kapsul automatic 18 Watt Philips/setara bh 1.00 0.082 bh bh bh bh bh bh
d Pek. Saklar ganda Panasonic/setara bh 1.00 0.004 bh bh bh bh bh bh
e Pek. Saklar tunggal Panasonic/setara bh 1.00 0.003 bh bh bh bh bh bh
f Pek. Stop kontak biasa Panasonic/setara bh 6.00 0.029 bh bh bh bh bh bh
g Pek. Terminal stop kuningan 6 lubang NYY 3x6 mm2 bh 2.00 0.044 bh bh bh bh bh bh
h Pek. AC Split wall 1/2 PK 220 VAC + timer + stop kontak Panasonic/setara unit 2.00 1.392 unit unit unit unit
unit unit
Pek. Exhaust fan type wall mounted fan 30x30 cm + timer
i National, KDK, Setara unit 2.00 0.387 unit unit unit unit
+ stop kontak unit unit
j Pek. Instalasi titik lampu NYY 3 x 4 mm2 titik 4.00 0.172 titik titik titik titik titik titik
k Pek. Instalasi stop kontak NYY 3 x 6 mm2 in conduit titik 6.00 0.263 titik titik titik titik titik titik
l Pek. Tray indoor
l.1 Pek. Kabel tray 300x50 mm Ex. Lokal m' 7.00 0.115 m' m' m' m' m' m'
l.2 Pek. Cross tray 300x50 mm Ex. Lokal bh 3.00 0.015 bh bh bh bh bh bh
l.3 Pek. Tray ladder 300x50 mm Ex. Lokal m' 2.40 0.172 m' m' m' m' m' m'
m Pek. Tray outdoor
m.1 Pek. Kabel tray outdoor 300x50 mm Ex. Lokal m' 5.50 0.090 m' m' m' m' m' m'
m.2 Pek. Tiang penopang tray, pipa galvanis 3" Ex. Lokal ls 1.00 0.062 ls ls ls ls ls ls
n Pek. Panel listrik Schnider/setara set 1.00 1.639 set set set set set set
o Pek. Rak panel indoor, custom set 1.00 0.726 set set set set set set
p Pek. Bak kontrol unit 1.00 0.056 unit unit unit unit unit unit
7 Pek. Mekanikal Plumbing
a Pek. Penyambungan air bersih ke jaringan desa Wavin/setara ls 1.00 0.187 ls ls ls ls ls ls
b Pek. Pipa PVC AW 3/4", air bersih Wavin/setara m' 4.50 0.012 m' m' m' m' m' m'
c Pek. Pipa PVC AW 3", air bekas & air kotor Wavin/setara m' 6.30 0.079 m' m' m' m' m' m'
d Pek. Closed Jongkok Toto/setara bh 1.00 0.082 bh bh bh bh bh bh
e Pek. Floor drain Stainlessteel bh 1.00 0.004 bh bh bh bh bh bh
f Pek. Kran air 3/4" Ex. Lokal bh 1.00 0.005 bh bh bh bh bh bh
g Pek. Pegadaan bak air & gayung Ex. Lokal bh 1.00 0.030 bh bh bh bh bh bh
h Pek. Septictank gorong-gorong Ø100 cm Ex. Lokal unit 1.00 0.623 unit unit unit unit unit unit