Job Order Form

JO No.: 1280 OFM Amt.: 0.00


JO Date: 10/05/2021 Down Payment: 1,041,901.81
Contractor: EIRISH BUILDERS & SUPPLY INC.,
Project: Villa Grande Subdivision

Item No. Item Desc. Contract Amt.

1 PARTIAL LAND DEVT. VGS2 ( 4,159 sqmts) partial main road, RL17, RL18 0.00

2 Site Preparation - Clearing and Grubbing 64,523.00

3 Site Preaparation - Spreading, leveling 67,749.00

4 ROAD NETWORKS 0.00

5 Road Preparations 0.00

6 Subgrade Preparation - 500mm ave. 34,413.00

7 Sub-base course - 250mm thk 307,785.00

8 Base course 100mm thk 171,537.00

9 3000 psi concrete pavement - 150mm thk 1,156,830.00

10 2500 psi concrete sidewalk, - 100mm thk 149,744.00

11 2500 psi concrete curb and gutter 251,351.00

12 OCM / Profit including siltation tank, main road drainage 761,998.60

13 VAT 507,075.43

13 Total 3,473,006.03

Remarks:

NOTE ; CHARGE TO VGS2

Prepared by: Noted by: Approved by: Conformed by:

Ar Jason V. Hernandez EIRISH BUILDERS & SUPPLY INC.,


JOHN PAUL T. DY
President Contractor
A&E Department

**IMPORTANT**
1. This J.O. will expire on ___________________ and accomplishment should be made on or before ___________________.
2. Perform the aforementioned scope of work in accordance with the approved plans and specifications; and the terms and conditions of the above mentioned
Labor Contract Agreement (LCA).
3. As agreed upon , supply labor, equipment, tools, etc. needed to complete the work.
4. Prominence reserves the right to cancel or reject any of all of the items covered by this J.O. if the terms and conditions contained in the corresponding
quotation(s) submitted by you and those contained herein are not followed or properly complied with.
5. Strict compliance of procedures and guidelines must be observed.
6. No payment will be made on your billing unless this J.O. is attached thereto.
7. contractor shall inform the authorized company representative of any delay in the accomplishment.
8. A penalty equivalent to 1/10 of 1% of the remaining balance shall be imposed for every day of delay in the accomplishment of work.

May 04, 2022 10:34 am Page 1 of 1