(2022) Dywidag Form Traveller - KAR - 110722

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 103

Local Presence

Global Competence

1996
PT CITRA DYWIDAG-SYSTEMS
Established in Jakarta 23rd April 1996 as J V Company

1868 with the name PT. Citra DYWIDAG-Systems

2002
PT DELTA SYSTECH INDONESIA
On 2002 change to be a officialy
company agent & licensee in Indonesia.
Local Presence
Global Competence

Our Presence

We combine global expertise with local presence—wherever you’re located


Local Presence
Global Competence

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Office & Workshop

Administration Office
Wisma Ritra 2nd Floor
Jl. Warung Buncit Raya No.6
Jakarta 12740

Operational Office

Graha DSI
Jl. Cendrawasih No.26 B
Bintaro, Tangerang Selatan

Post Tension Material


Warehouse DSI #1
Jl. Merpati Raya, Sawah Lama
Tangerang Selatan

Heavy Equipment Workshop


Warehouse DSI #2
Jl. Mad Nur, Jampang, Ciseeng
Bogor, Jawa Barat
Local Presence
Global Competence

Our Expertise

 Post-Tensioning Systems -
 Cable Stay Systems -
 Geotechnical Systems -
 Reinforcing Systems -
 Bridge Equipments -
 Structural Health Monitoring Systems (SHMS) -
 Bridge Bearings & Expansion Joints -
 Tunneling Specialized -
 Construction Engineering Services -
 Sound Proofing Wall -
Local Presence
Global Competence

Post Tensioning Systems

Multistrand Systems

Bar Systems

Equipment Certificate, Worker Certificate, Material Certificate


Local Presence
Global Competence

Bridge Equipments

Form Traveller Lifter Frame


Cast In Situ Balance Cantiliever Precast Balance Cantiliever

MRT Fatmawati FO Pancoran


Local Presence
Global Competence

Bridge Equipments

Launching Gantry Launching Gantry Erection Gantry


Girder Erection Launcher Span by span Precast Box Girder Cantilever Steel Girder

Rear Feeding
Side Feeding

Musi Pekanbaru BORR Bogor Siak IV Pekanbaru


Local Presence
Global Competence

Bridge Bearing & Expansion Joint

Pot Bearings Spherical Bearings Lead Rubber Bearings Sliding Pendulum Isolators Viscous Dampers

Strip Seal Modular Standart Modular Swivel Modular Fuse Transflex Finger
Expansion Joint Expansion Joint Expansion Joint Expansion Joint Expansion Joint Expansion Joint
Seismic Expansion Joint
Local Presence
Global Competence

Sound Proofing Wall


Local Presence
Global Competence

PROJECT REFERENCE

FORM TRAVELLER
Local Presence
Global Competence

Rail Bridge Sakalibel – Bumiayu (2011)


Balance Cantilever Cast In Situ – Single Cell Box
Contractor : PT Wijaya Karya
Span Length : 30m – 80m – 80m – 80m – 50m
Widht : 8,6m
Radius : -
Local Presence
Global Competence

FO Ahmad Yani Sumarecon – Bekasi (2012)


Balance Cantilever Cast In Situ – Double Cell Box
Contractor : PT Wijaya Karya
Span Length : 78m – 120m – 78m
Widht : 22m
Radius : -
Local Presence
Global Competence

Jembatan Lebah Ireng II – Semarang (2012)


Balance Cantilever Cast In Situ – Single Cell Box w/ Rib
Contractor : PT Waskita Karya
Span Length : 84m – 132m – 84m
Widht : 25,2 m
Radius : -
Local Presence
Global Competence

Jembatan Brantas – Mojokerto (2013)


Balance Cantilever Cast In Situ – Single Cell Box
Contractor : PT Adhi Karya
Span Length : 77m – 145m – 77m
Widht : 16,3 m
Radius : -
Local Presence
Global Competence

FO Kuningan – Jakarta (2015)


Balance Cantilever Cast In Situ – Single Cell Box
Contractor : PT Nindya Karya
Span Length : 45,5m 70m – 45,5m
Widht : 9m
Radius : -
Local Presence
Global Competence

MRT Fatmawati – Jakarta (2016)


Balance Cantilever Cast In Situ – Single Cell Box
Contractor : Tokyu-Wijaya Karya Joint Operation
Span Length : 48m – 77m – 49,5m
Widht : 12,6 m
Radius : 180 m
Local Presence
Global Competence

FO Simpang Jam – Batam (2017)


Balance Cantilever Cast In Situ – Single Cell Box
Contractor : PT Pembangunan Perumahan
Span Length : 50m – 65m – 50m
Widht : 16,1 m
Radius : -
Local Presence
Global Competence

Jembatan Siak II – Pekanbaru (2018)


Free Cantilever Cast In Situ – Single Cell Box
Contractor : PT Hutama Karya
Span Length : 50m – 100m – 50m
Widht : 10,6 m
Radius : -
Local Presence
Global Competence

Jembatan Musi IV – Palembang (2018)


Extradose Balance Cantilever Cast In Situ – Double Cell Box
Contractor : PT Adhi Karya
Span Length : 86m – 140m – 86m
Widht : 14 m
Radius : -
Local Presence
Global Competence

LRT Cililitan – Jakarta (2019)


Balance Cantilever Cast In Situ – Single Cell Box
Contractor : PT Adhi Karya
Span Length : 53,6m – 90m – 55m
Widht : 9,1 m
Radius : -
Local Presence
Global Competence

LRT Cikoko – Jakarta (2019)


Balance Cantilever Cast In Situ – Single Cell Box
Contractor : PT Adhi Karya
Span Length : 50m – 94m – 50m
Widht : 9,1 m
Radius : -
Local Presence
Global Competence

LRT Kuningan – Jakarta (2019)


Balance Cantilever Cast In Situ – Single Cell Box
Contractor : PT Adhi Karya
Span Length : 86,5m – 148m – 86,5m
Widht : 9,1 m
Radius : 131 m
Local Presence
Global Competence

LRT Kuningan – Jakarta (2019)


Balance Cantilever Cast In Situ – Single Cell Box
Contractor : PT Adhi Karya
Span Length : 86,5m – 148m – 86,5m
Widht : 9,1 m
Radius : 131 m
Local Presence
Global Competence

FO Martadinata – Bogor (2019)


Balance Cantilever Cast In Situ – Single Cell Box
Contractor : PT Brantas Abipraya
Span Length : 25m – 45m – 25m
Widht : 12.5 m
Radius : 65 m
Local Presence
Global Competence

FO Aksesibilitas Soeta – Jakarta (2019)


Free Cantilever Cast In Situ – Double Cell Box
Contractor : PT Wijaya Karya
Span Length : 40m – 70m – 40m
Widht : 21,5 m
Radius : -
Local Presence
Global Competence

High Speed Railway – Jakarta (2020) High Speed Railway – Jakarta (2020)
Free Cantilever Cast In Situ – Double Cell Box Free Cantilever Cast In Situ – Double Cell Box
Contractor : PT Wijaya Karya Contractor : PT Wijaya Karya
Span Length : 32,7m – 47,7m – 32,7m Span Length : 48,8m – 79,7m – 48,9m
Widht : 12,9 m Widht : 12,9 m
Radius : - P64-P67 Radius : - P81-P84
Local Presence
Global Competence

FO Cakung– Jakarta 2020


Balance Cantilever Cast In Situ – Double Cell Box
Contractor : PT Adhi Karya
Span Length : 50m – 80m – 50m
Widht : 18 m
Radius : 91 m
Local Presence
Global Competence

Jembatan Ciujung – Banten 2021


Balance Cantilever Cast In Situ – Single Cell Box
Contractor : PT Jaya Konstruksi
Span Length : 50m – 60m – 50m
Widht : 6,7 m
Radius :-
Local Presence
Global Competence

High Speed Railway DK43– Karawang (2021)


Balance Cantilever Cast In Situ – Single Cell Box
Contractor : PT Adhi Karya
Span Length : 48,8m – 79,7m – 48,9m
Widht : 12,9 m
Radius : -
Local Presence
Global Competence
Local Presence
Global Competence

Form Traveller Spesification

unit
Local Presence
Global Competence

Flexibilitas Form Traveller

2 Aframe FT 3 Aframe FT 4 Aframe FT

Single Cell Box Double Cell Box Triple Cell Box


<16m bridge width ±24m bridge width ±29m bridge width
Local Presence
Global Competence

2 Unit Form Traveller (Side View)

A-Framae

Front Truss Anchor w/


8 PT Bar

Bottom

B-B
A-A
Local Presence
Global Competence

Form Traveller Cross Section


Aframe Aframe Aframe Aframe

RearTruss

Front Truss

Cantilever Drivedeck & Inner Cantilever Cantilever Drivedeck & Inner Cantilever

Bottom Bottom

Potongan A-A Potongan B-B


Local Presence
Global Competence

6m 6.1 m

4.5 m

5m

0.5m
Local Presence
Global Competence

Form Traveller Certificate

Rekomendasi Teknis dan Pengujian Welding Conection Loading Test Project Bersama SIO (Surat Izin
Pengujian Oleh Disnakertrans Oleh Pihak ke3 kontraktor, konsultan dan PU Operator)
(SILO)
Local Presence
Global Competence

Form Traveller Struktural Analysis


Local Presence
Global Competence

Loading Test FT
Local Presence
Global Competence

Loading Test FT

X1
X2

G2 Rail Clamp

G2 Rail Clamp
B A

Potongan A-A
Front
Rear G1 Main Frame Front
X1
X2

Angkur Bintang

Angkur Bintang
B A

Potongan B-B
Rear
Local Presence
Global Competence

Weight List Form Traveller


AFrame
No Traveller Part Qty Weight ± (kg) Total ± (Kg) Remarks
1 Aframe 2 6000 12000 Total PreAssembly
2 Front Truss 1 4000 4000 Total PreAssembly
3 Rear Truss 1 2500 2500 Total PreAssembly
Rear Truss 4 Cantilever 2 4000 8000 Total PreAssembly
5 Drivedeck &Inner 1 7000 7000 Partial PreAssembly
6 Bottom 1 18000 18000 Partial PreAssembly
Anchor Front Truss 7 Rails 2 4000 8000 Total PreAssembly
8 Hydraulic System 1 4000 4000 Partial Lifitng
9 Stress Bar & Accessories 1 10000 10000 Partial Lifitng
TOTAL 73500
*Weight list form traveller dari setiap proyek memiliki beban yang berbeda
Rails beda, tergantung dari ukuran dan design penampang jembatan.

• Beban terberat saat erection adalah


Drivedeck, Aframe yaitu 6 Ton, dan Front Truss
Inner & 5 Ton dengan titik angkat jangkauan
Segmen 1 Segmen 1 Cantilever
yang paling jauh dari as piertable.
Side Span Main Span
PIERHEAD • Bottom dan safety panel dengan
beban kurang lebih 18 Ton, dapat di
assembly dan dierection secara
parsial tergantung dari areal yang
Bottom & Safety Panel tersedia.
Local Presence
Global Competence

Kondisi Awal saat FT berada pada pier table dengan panjang


minimum 9 m, Aframe terdiri dari 2 jenis, maka dapat
mengakomodir piertable yang kecil, karena Aframe dapat
bersilangan.

minimum 9 m

Anchor Detail
4 x 2 thread dywidag bar dia. 32 mm

Seg 1 Piertable Seg 1

1.2 m Embedded Anchor


Local Presence
Global Competence

Kondisi saat FT sudah launching utk mengerjakan segmen


selanjutnya, Aframe sudah tidak bersilangan. Dengan
kapasitas thread bar yang digunakan yaitu dywidag thread
bar 32mm dengan jumlah 4x2 yang tertanam atau tembus
pada box girder pada setiap set FT.

Anchor Detail
4 x 2 thread dywidag bar dia. 32 mm

Seg 2 Seg 1 Piertable Seg 1 Seg 2


Local Presence
Global Competence

Form Traveller Stages

Assembling Process Erection Process Construction Process

Work Order

Preparation,
Mobilization
Modification, Assembling Erection Construction Dismantling
to site
& Engineering
7 – 10 days / unit 7 – 10 days / 7 days / unit
± 2 months segmen
Demob to
Warehouse
Local Presence
Global Competence

Tahap 1
Tahapan Umum Pekerjaan Pekerjaan konstruksi pierhead

Form Traveller
Tahap 2
Pekerjaan Assembling & Erection
Form Traveller

Tahap 3
Pekerjaan Konstruksi Segmen

Tahap 4
Pekerjaan Closure

Tahap 5
Pekerjaan Closure

Tahap 6
Form Traveller Launching Mundur
untuk dismantling

Tahap 7
Selesai
Local Presence
Global Competence

Opsi 1, Opsi 2, Opsi 3,


Menggunakan 4 unit traveller (2 Aframe) dengan Menggunakan 8 unit traveller (2 Aframe) dengan Menggunakan 4 unit traveller (3 Aframe) dengan
pengerjaan secara BERGANTIAN antara dua jembatan pengerjaan secara BERSAMAAN antara dua jembatan penggabungan struktur antara dua jembatan

1 2 3 4 1 2 3 4
1 2 3 4

Pekerjaan dilakukan pada jembatan kanan (biru) dahulu


5 6 7 8
Pekerjaan dilakukan secara bersamaan antara jembatan Struktur jembatan kanan dan kiri yang semula terpisah
kanan (biru) dan jembatan kiri (hijau), membutuhkan gap dijadikan satu struktur (3 Cell box girder) dengan
yang besar antar jembatan untuk mengakomodir menggunakan FT 3 Aframe.
pergerakan FT.

1 2 3 4
Jika jembatan kanan (biru) sudah selesai maka FT
pindah ke sisi jembatan kiri (hijau)
Local Presence
Global Competence
Local Presence
Global Competence

Assembly dan Erection Work


A Frame = ±6 Ton
Front Truss = ± 5 Ton
Bottom = ± 15 Ton

1 pier 2 unit FT

Pier
1 Unit 1 Unit
Local Presence
Global Competence

Form Traveller Cycle Time

Before & During Setting & Survey Form


Launching collaborate with Before Concreting
Checklist Prechamber data Checklist

Survey Survey Survey

FORM SETTING INSTALLATION POURING CURING TENDON


TRAVELLER FORMWORK REBAR & OF CONCRETE STRESSING &
LAUNCHING TRAVELLER TENDON (DSI) CONCRETE GROUTING

Day 1 Day 2 - 6 Day -7

Stressing min 28 Mpa


Compression Test

7-10 Days Cycle Time / Segmen


Local Presence
Global Competence

Assembling Proccess
Local Presence
Global Competence

Erection Proccess
Local Presence
Global Competence

Erection Proccess
Local Presence
Global Competence
Local Presence
Global Competence

Pekerjaan Stressing
Local Presence
Global Competence

Pekerjaan Grouting
Local Presence
Global Competence

Pekerjaan Dsimantling
Local Presence
Global Competence

Pekerjaan Dsimantling
Local Presence
Global Competence

Pekerjaan Dsimantling
Local Presence
Global Competence

The process of mobilizing Form Traveler parts from the DSI warehouse
to the project location, this process requires good planning in order to
maximize the available movement area in the project.

Kahfi@delta-systech.co.id
Local Presence
Global Competence

The Process of Assembling Form Traveler.

in this process the capacity of the mobile


crane used is not too large, because its
function is only to assemble the Form
Traveler part, but this depends on the
conditions and the available land area.

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Start the erection work part of the


Traveler Form that has been
assembled.

But before carrying out the erection


process, the box girder location has
been marked for the position of the
Form Traveler in accordance with the
bridge centerline.

Kahfi@delta-systech.co.id
Local Presence
Global Competence

The A-Frame erection process which weighs 6 tons,


prioritizes the A-Frame position farthest from the
crane jacking location, so as not to interfere with
the A-Frame erection process next to it.

Kahfi@delta-systech.co.id
Local Presence
Global Competence

continued with the other A-Frame erection, The


thing to note is that the installation of the bracing
to stabilize the A-Frame must be installed correctly.

Kahfi@delta-systech.co.id
Local Presence
Global Competence

followed by the erection of Rear Truss,


the weight of this rear truss for each
bridge varies between 2.5 - 4 tons,
depending on the width of the bridge.

and then in parallel it is possible to


install the side beam suspension on
the rear truss.

Kahfi@delta-systech.co.id
Local Presence
Global Competence

then proceed with the erection of the Front


Truss, this section is a fairly long and heavy
section. The weight of the front truss ranges from
4-5 tons depending on the width of the bridge.

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Front Truss fixing position

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Afterrection front truss done, we


continue assembling & erection
‘kantilever’ / side formwork.

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Assembling bottom formwork is done after


the cantilever erection work is completed.
Kahfi@delta-systech.co.id
Local Presence
Global Competence

Erection Bottom Formwork

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Hanging Bottom Formwork


using PT Bar

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Assembling & Erection Safety


Panel

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Connecting Safety Panel with


bottom formwork

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Assembling & Erection Drivedeck


/ inner top formwork

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Installing plywood &


finishing work

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Kahfi@delta-systech.co.id
Local Presence
Global Competence

CONSTRUCTION ENGINEERING
Local Presence
Global Competence

CONSTRUCTION ENGINEERING SERVICE (CES)

To Check original design for constructability and


construction stage variations using Form Traveller.

To Ensure that work in the jobsite is in accordance with the


plan both in terms of quality and accuracy (Geometry
Control).

To Control / independent proof check compare to the


designer's calculations (Chamber Control).
Local Presence
Global Competence

Construction Engineering Scope : TOLERANCE DEVIATION


MAXIMUM 30 MM
2D & 3D modeling of the bridge

construction stage stress check

check all input loading and appropriate creep/shrinkage factors

precamber calculation

optimize post tensioning tendon layout

prestressing calculation
Local Presence
Global Competence

Sequence Pergerakan FT Geometry Monitoring

Pre Chamber Value

Geometry Control

Tahapan Prilaku Struktur


Local Presence
Global Competence

TOLERANCE DEVIATION MAXIMUM 30 MM


Local Presence
Global Competence

MRT Fatmawati – Melintasi Jakarta Outer Ring Road (R180 m)

LRT Kuningan – Melintasi Jakarta Inner Ring Road (R131 m)


Local Presence
Global Competence

Principles Of First Safety Application


Local Presence
Global Competence

Company Safety And Health Policy


Local Presence
Global Competence

Company Safety And Health Policy


Local Presence
Global Competence

Company Safety And Health Policy

SKP Ahli K3 Umum Ahli K3 Konstruksi Teknisi Prestressing Equipment


Local Presence
Global Competence

Company Safety And Health Policy

Ahli Teknik Jembatan Madya Ahli Teknik Jembatan Muda


Local Presence
Global Competence

Company Safety And Health Policy


Local Presence
Global Competence

IDENTIFIKASI BAHAYA, PENILAIAN RISIKO DAN PENGENDALIAN RISIKO


Pekerjaan Form Traveller
Risiko Awal Risiko Sisa
Kemung Kepa Total Kemung Kepa Total
NO AKTIVITAS LOKASI BAHAYA DESKRIPSI KONSEKUENSI Legal
kinan rahan
KONTROL AWAL kinan rahan
KONTROL TAMBAHAN
Ya/tdk a b aXb a b aXb
1 Assembly Operator / Helper / Administrasi (SOP, Regulasi) Lampirkan SIA SIO pastikan
1 4 4 Melakukan pengecekan SIA SIO 1 2 2
Supervisi kurang masih berlaku
Crane overload Crane jatuh, terguling, kematian Memastikan landasan crane aman dan Compact area landasan crane,
2 5 10 1 5 5
tidak amblas, tanah stabil sertakan dokumen pre lifting
Kondisi lifting gear tidak Sling putus menimpa pekerja, Lakukan inspeksi setiap 3 bulan sekali Terdapat lampiran dan
3 5 15 3 2 6
terawat dan rusak kematian dan sebelum bekerja dokumentasi inspeksi
Beban berlebih Hoock crane jatuh 1 5 5 Cek alat sebelum digunakan 1 3 3 Lakukan inspeksi
2 Erection Kondisi cuaca Obyek yang sedang di angkat Gunakan tagline pada kedua sisi ketika Lampirkan dokumen pre lifting
tidak stabil, menghantam lifting, hentikan pekerjaan sementara
1 5 5 1 3 3
pekerja, material jatuh, kematian jika kondisi cuaca dan angin tidak
memungkinkan
Operator / Helper / Rigger / Kegagalan lifting, material jatuh Safety Induction, pekerjaan dilakukan Dilarang bekerja sebelum safety
Supervisi kurang menimpa pekerja 2 5 10 hanya oleh orang yang sudah 1 4 4 induction
berpengalaman berpengalaman
Landasan crane Crane terguling, menyentuh Lampirkan bukti inspeksi
Pastikan crane sudah di inspeksi oleh
kabel listrik
2 5 10 petugas inspeksi, lakukan pengecekan 1 3 3
area kerja terlebih dahulu
Area kerja Alat dan material jatuh, pekerja Pastikan seluruh pekerja telah Training penanggulangan orang
terjatuh, tenggelam, terseret 3 4 12 mengikuti safety induction, training cara 2 2 4 tenggelam
arus, kematian penanggulangan orang tenggelam
Kondisi lifting gear rusak / Benda / material jatuh, sling Inspeksi sling sebelum digunakan dan Terdapat lampiran dan
3 5 15 2 4 8
sudah tidak layak pakai putus, kematian tagging setiap 3 bulan sekali dokumentasi inspeksi
Jarak pandang operator Swing crane mengenai pekerja, Pastikan rigger sudah berpengalaman Sertifikat rigger terlampir dan
luka berat 4 3 12 dan tersertifikasi, gunakan HT sebagai 1 3 3 masih berlaku
alat bantu komunikasi
Area swing crane Terkena swing crane, cedera Barikade area swing crane, pasang Sterilisasi area
sedang 4 3 12 rambu peringatan, flagman bertugas di 1 2 2
area lifting
Bekerja diketinggian Pekerja terjatuh, cidera berat, Training bekerja diketinggian, gunakan Full body harness memiliki
3 4 12 1 2 2
kematian APD full body harness dan cantolkan tagging
Benda / material jatuh Material jatuh menimpa pekerja, Simpan material di tempat yang aman Sediakan tempat penyimpanan
luka berat, kematian tidak berpotensi jatuh, lakukan material
3 5 15 1 5 5
pengecekan pada peralatan sebelum
digunakan, sterilisasi area kerja
Local Presence
Global Competence

IDENTIFIKASI BAHAYA, PENILAIAN RISIKO DAN PENGENDALIAN RISIKO


Pekerjaan Form Traveller

3 Stressing Dehidrasi Hilang konsentrasi, kelelahan 5 1 5 Sediakan air minum di area kerja 3 1 3
Instalasi strand, ujung Tertusuk, tergores strand yang Proteksi ujung strand menggunakan TBM, sosialisasi HIRARC
5 3 15 1 2 2
strand tajam tajam masking, gunakan sarung tangan
Penggunaan hydraulic jack Terkena tekanan dari hydraulic Memastikan hydraulic jack dalam Inspeksi dan tagging, lampirkan
jack, terjepit, tergores, luka berat kondisi baik dan terkalibrasi, tidak ada dokumen kalibrasi
5 2 10 1 2 2
pekerja yang berdiri di depan jack ketika
proses stressing berlangsung
Pemakaian power tim Tersengat arus listrik, kematian Cek instalasi listrik sebeum bekerja, Inspeksi oleh ME
5 2 10 1 2 2
gunakan double isolasi (socket)
Pemotongan kabel strand, Percikan bunga api masuk ke Gunakan pelindung pada gerinda dan Peralatan sudah di inspeksi dan
penggunaan disk tidak se - mata, tergores, mata gerinda 5 3 15 pastikan sudah terpasang dengan 2 3 6 memiliki tagging
suai, tidak ada pelindung patah, luka robek benar, gunakan face shield
4 Grouting Paparan debu dari semen Iritasi mata, iritasi kulit, kebutaan, Gunakan APD sesuai pekerjaan APD
4 4 16 2 2 4
dan gangguan saluran pernafasan (Kacamata, sarung tangan latex)
Penggunaan grout pump Tersengat arus listrik, terjepit, Cek instalasi listrik sebeum bekerja, Inspeksi dan tagging setiap
luka berat gunakan double isolasi (socket), peralatan
4 4 16 dilarang memasukan tangan ke dalam 2 2 4
grout pump, segera melapor kepada
ME jika alat mengalami masalah
5 Launching Pengoperasian FT Tidak sesuai prosedur Pengopersian hanya dilakukan oleh Lampirkan sertifikat operator
1 5 5 1 3 3
operator yang bersertifikasi
Bekerja diketinggian Pekerja terjatuh, cidera berat, Training bekerja diketinggian, gunakan Inspeksi dan tagging
3 5 15 1 2 2
kematian APD full body harness dan cantolkan
Chain block dan lever block Chain block putus, alat jatuh Selalu cek kondisi chain block dan lever Inspeksi dan tagging
rusak karena hentakan, pekerja 3 5 15 block,, barikade area bawah ketika 1 2 2
tertimpa, terjepit, kematian pekerjaan launching
Cuaca Terjatuh, tersambar petir, luka Tidak melakukan pekrjaan pada saat Stop work
1 5 5 1 1 1
berat, kematian cuaca buruk (hujan petir, hujan
6 Bekerja dalam kondisi Covid- Personil proyek pulang dari Dapat berakibat demam, batuk, Selalu menjaga jarak dengan orang lain Mengikuti vaksinasi
19 zona merah atau pilek, badan pegal-pegal, diare, minimal 1 meter, selalu mencuci
keramaian lainnya, terpapar hilang indra penciuman dan rasa. tangan dengan sabun dan air mengalir
Covid dari seseorang yang Menyebabkan gejala lainnya atau menggu nakan hand sanitzer,
5 5 25 3 3 12
positif Covid seperti pneumonia (infeksi paru- jangan menyentuh area wajah sebelum
paru), infeksi sekunder pada mencuci tangan, gunakan masker pada
organ lain, gagal ginjal, kematian saat beraktivitas di luar rumah atau
keramaian lainnya
Local Presence
Global Competence

Personal Protective Equipments

Safety Helmet

Safety Glasses

Face Mask

Reflective Vest

Body Harness

Safety Gloves

Safety Shoes
Local Presence
Global Competence

Routine Morning TBM


Local Presence
Global Competence

Our Commitment For Safety First


Local Presence
Global Competence

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Scope Of Work (1/4)


MAIN
NO PEKERJAAN DSI CATATAN
CONTRACTOR
I FORMTRAVELLER SUPPLY
1 Detail desain komponen struktur formtraveller √
2 Detail desain sistem formwork √
3 Detail desain sistem hydraulic launching √
4 Desain lokasi tiedown formtraveller √
5 Pengecekan superimpose antara gambar hole location, rebar dan Tendon √ √
6 Supply komponen struktur formtraveller √
Struktur utama Aframe included
Front dan rear truss included
Rel launching included
Tiedown angkur formtraveller included
Front dan rear carriage included
Beam utama penahan komponen formwork included
PT Bars dan accessories included
Chainblock & Leverblock untuk pendukung pekerjaan included
Sistem formwork termasuk C profile dan wailings included
Sistem hydraulic dan elektrikal formtraveller included
Rangka lantai kerja included
Rangka lantai kerja samping untuk finishing included
Alat penggantung jack stressing included
7 Komponen Formtraveller yang disediakan oleh main kontraktor √
Plywood √
tierod dan aksesoris √
Safety railings, safety net, papan lantai kerja, toe boards, dan sistem safety lainnya √
Conventional bekisting untuk blister, stopcor , blockout, diafragma, manhole dan closure √
Lampu kerja pada lokasi pekerjaan √
8 Selongsong galvanized duct untuk tiedown formtraveller √
9 Formtraveller assembly dan manual operation √
10 Custom clearance pada pelabuhan (jika import) √
11 Asuransi peralatan √
12 Transportasi dari workshop ke jobsite dan dari jobsite ke workshop √
13 Tempat area penyimpanan material di lokasi jobsite √
14 Loading dan unloading di lokasi pekerjaan termasuk crane √ under DSI supervision
15 Transportasi komponen antar lokasi jobsite (e.g. mobilisasi material antar pier) √ under DSI supervision

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Scope Of Work (2/4)

MAIN
NO PEKERJAAN DSI CATATAN
CONTRACTOR
II FORMTRAVELLER OPERATION
1 Tenaga kerja lapangan (Labour) √
2 Tenaga kerja Engineer, supervisor, dan foreman √
3 Pengadaan alat/tools yang dibutuhkan saat assembly dan operasional √
4 Radio komunikasi antar staff operator dilapangan √
5 Metode kerja assembly dan dismantling formtraveller √
Crane untuk loading unloading, Assembly dismantling, dan pengangkatan material keatas deck di
6 √
jobsite
9 Transport komponen traveller di lingkungan jobsite √
10 Supply genset dan panel untuk pelaksanaan pekerjaan dengan bahan bakarnya √
12 Maintenance formtraveller termasuk penggantian PT bar dan asesorisnya √
13 Maintenance peralatan hydraulic formtraveller termasuk penggantian oli jika diperlukan √
14 Membuat layout lubang tiedown traveller pada deck √
15 Pemasangan embedded duct untuk tiedown formtraveller √
Shimming Besi atau kayu untuk support perakitan, unloading, asembling diatas tanah dan operasional
16 √
formtraveller
17 Peralatan untuk adjustment closure jika diperlukan √
18 Mengisi kembali hole sementara yang digunakan saat pekerjaan segmen √

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Scope Of Work (3/4)

MAIN
NO PEKERJAAN DSI CATATAN
CONTRACTOR
III PEKERJAAN STRESSING & GROUTING
1 Pengadaan material prestressing: √
2 Ducting √
3 Angkur - Angkur sistem DYWIDAG √
4 non shrink additive untuk grouting √
5 Penyediaan peralatan untuk pekerjaan stressing & grouting √
6 Pekerjaan instalasi, stressing dan grouting √
7 Pembuatan gambar kerja pekerjaan prestressing √
8 Mob dan demob material dan peralatan stressing dan grouting √
9 Pengadaan dan pemasangan tulangan non prestress seperti pembesian box girder, brusting steel, dll √
Pengadaan kawat bendrat untuk support tendon serta semen dan air bersih untuk pekerjaan flusing,
10 √
grouting tendon dll dilokasi pekerjaan
V CONSTRUCTION ENGINEERING SERVICE
1 Chamber control dan kalkulasi stressing/jacking force √
2 Tim Survey lapangan √
3 Setting Formwork Traveller sesuai nilai CE √
4 Construction Engineering √

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Scope Of Work (4/4)

MAIN
NO PEKERJAAN DSI CATATAN
CONTRACTOR
IV GENERAL
1 Izin dan koordinasi dengan pihak ketiga terkait pekerjaan form traveller dan stressing √
pemindahan fasilitas umum seperti tiang listrik/telepon, pengalihan /penutupan lalu lintas selama
2 √
pekerjaan berikut segala biaya yang timbul karenanya
3 Pemasangan penerangan dan kebutuhan listrik pekerjaan √
4 Pengadaan dan pemasangan akses kerja seperti tangga, scafolding dll √
pekerjaan perkuatan/proping tambahan pada struktur permanen/sementara selama pelaksanaan
5 √
pekerjaan traveler jika diperlukan
6 Site Office container DSI dengan fasilitasnya √
7 Komputer dan peralatan ATK Site office √
8 Pengadaan mess pekerja dan staff DSI termasuk fasilitasnya √
9 Pengadaan mobil transportasi staff DSI √
10 Fasilitas jobsite seperti kantin, toilet, shelter dll (sesuai kebutuhan lapangan) √
11 CAR Insurance √
12 Asuransi pekerja, pihak ketiga & peralatan kerja √
13 Pajak Import √
14 VAT / PPN √
15 Pajak Retensi √

Kahfi@delta-systech.co.id
Local Presence
Global Competence

Terimakasih