NEWLY CONSTRUCTED RESIDENTIAL HOUSE

(construction techniques)
Aashiqrasoool.sk

The building that I am going to appraise is road. That means how high their ground
Residential house is the sort of course that floor should be from the centre of the
I have taken. This house is located in B.V. road. Usually plinth level is kept 18" to
30". This height prevents water from
Nagar, Nellore, Andhra Pradesh, pin code
entering your house in case there is water
524004. This house has a site area of 2050.9 logging on the road. It also ensures an
square feet and a plinth area of 1330 easy flow of sewage from your house to
square feet and it’s an g+2 building . the main sewer line without back flow,
outside your house.
The client is a farmer who also happens to
be a businessman. He owns property on It's important to understand the building's
which he farms. He had papaya farming strengths and weaknesses, as well as its
property, watermelon farming land, and design planning and performance. The
reason of studying the background study
so on.
is to figure out how to approach the
conclusion. What can be learned from this
He was renting houses and struggled to
criticism is what are the merits and
make ends meet. As a result, he desired to
drawbacks of this building .The major
have his own home for his family, goal and purpose of this paper is to
prompting him to construct one. He met evaluate the construction techniques and
with a civil engineer to build their ideal strategies of building design, as well as
home for their family, so the engineer the owner's participation in the
gathered information from the client and construction.
then went to the site to assess their needs. The aim of the study is to construction
Made design requirements , planning, and house and building's requirement. Here
estimate planning. when the client was This house work started on May 30, 2021,
fine when the site was marked. On the 8th of
This study is done in order to June 2021, columns marking . The
understand about the building to making foundation of the columns will be laid on
on the ground at site. should be done June 9th, 2021. The plinth work on June
carefully so there is no mistake made. One 24, 2021. Sand filling is scheduled for the
small mistake can translate into a series of 4th of July, 2021. This is the period for
disasters, So Rechecking is done. right house construction and work. How the
angle have been checked perfect and be
construction strategies and understand the
checked again and again until it get them
right all the time. The brick pillars 9’x 9’ of building details, and how it is valuable to
roughly 3 feet height are made to mark the users and how it will benefit people.
positions of walls on them all these brick accordingly self-selection of materials,
piers have been parallel to the gird line work management, and consequences of a
and in perfect level of each other, workplace with a limited immediate effect
otherwise measurement markings won’t had to taken. When the construction time
be correct. gird lines are imaginary
workers, there are have gaps and
reference lines running through the enter
of the thickness of the walls or columns. misunderstandings. disturbance with the
they should also decide their plinth level material load and unavailable workers on
(ground floor level) in reference to the
time. This had been an problematic in the have a setback and the house is sitting
construction right on the plot line, start your layout
assuming this side to be your first grid
The construction work will gives the line.
structure its form, while the materials will
give its appearance, and when the
construction work is going on process,
managing the home will be the most
significant component. focusing on the
users' most fundamental requirements
was to be done according. It will be linked
to the user's safety, shelter, respect,
properties, and happiness. Home has a
central importance to quality of life with
considerable economic, social, cultural
(source: Author)
and personal significance. Home is basic
human demands for them. And when we
see construction time. Setback is to be in
the distance between the outside of your
boundary wall and the face of your house.
Basically you have to leave some space
between your house and boundary wall,
as per by-laws. They are measured at a
point where house is closest to the
boundary wall. First of all our aim is to get
all the four sides of our house fixed on the (source: Author)
plot.
EXCAVATION (DIGGING) :
Work out how the house will sit on the
Excavation is a manual process in a house
site based on architect's drawings.
without a basement Basements. are dug
parallel to the road in front or parallel to
with the help of JCB (digger) machines
the house next to yours .Layout is one of
and trucks are used to bring the excavated
the most important steps in making a
earth out.
house, as it determines how the house will
present itself, and also ensures good basic Excavation should be done in perfect line
structure and bottom should be in level, and never
in slope in any circumstances. If the
Most plots are not perfectly rectangular,
ground is in steep slope, one should
with all the sides at 90 degrees to each
excavate in steps Side walls of the
other. So you need to choose which side to
excavated pit should slightly be sloping
make the house parallel to. This is often
out and the bottom of the pit should not
one of the sides and not front or back,
be less than the required size. That means,
because your house would look good
you start digging more than the required
when it is parallel to the adjoining houses.
width, from top.
After you have chosen a side, discuss with
your contractor or architect/designer. If
one of the sides of your house doesn't
The excavated earth should be kept in dots should be marked on the trench bed
such a manner that it should not keep before starting P.C.C Also check that the
falling back in the trench, dry cement, sand and the aggregate are
uniformly mixed before mixing water
To see whether the bottom of the trench is
Don't add too much water.
in level, you should tie a thread tightly
across brick piers (which are made in one
level) and measure the depth of the
bottom from this thread at a few places
(Figure 3) It should be equal everywhere if
it is not, ask your contractor to cut the
bottom wherever required and make it
equal.

source:(www.yellowstonegreenhomes.com)

source:
(excavation in level)
(www.yellowstonegreenhomes.com)

PLAIN CEMENT CONCRETE (P.C.C.)


IN FOUNDATION

PCC stands for Plain Cement Concrete. A


layer of concrete is put inside the trenches
to provide a level and hard surface to the
foundation work This layer acts as a
separator between earth and concrete/
monture thickness and ratio of the PC.C source:(www.yellowstonegreenhomes.com)

in the foundation should be done as per


the recommendations of the structural
engineer Compact the fresh concrete with CHECKING CEMENT NEEDED
steel rammer nicely Curing of the PCC is
very important The ratio of the mix is  Colour of the cement should be
usually 1:5 10 or 1:4:8, as specified and the uniform and grey
thickness should be minimum 4" Mixing  Cement should feel smooth when
touched or rubbed in between the
of the PCC is generally a manual process.
fingers
Water the trench and ram it with a steel
 If it feels rough then there might be
rammer before starting the work Level
adulteration with sand or earth
 If you insert your hand in the bag it wet all the time with the help of
of the cement, it should feel cool a pipe.
 If you throw a small quantity of  Use a booster pump if water
cement in a bucket of water, it supply pressure is less Jute bags
should sink and not float on the should be tied around the columns
surface immediately after the removal of
 Reject cement which has lumps in their moulds and kept wet.
it. The lumps are formed by
CURING PERIODS:
absorption of moisture.
For concrete ---------------- minimum14days
FIELD TEST FOR BRICKS :
For brick masonry -------- minimum10days
 1 .Brick should be uniform in size.
Plaster ------------------------ minimum 7days
 2 .There should be no cracks or
holes.
 3 .There should be a metallic DESIGN:
sound when two bricks are struck
Designing the structure is very important
together.
and critical to construction. The
 4 .A brick should not break when construction of the house should not be
dropped on hard ground from a started without getting the structural
height of about 1 meter. design done by a qualified and approved
 5 .There should be no white structural/civil engineer it involves
deposits on the brick. calculating:

CURING TIME:  the load bearing capacity of the


soil, (If the engineer recommends a
Curing means watering your brickwork, soil bearing capacity test, get it
concrete, plaster etc constantly and done)
keeping them wet for a specified time.  Width and depth of the
It is the most important job to do on site If foundations
curing is not done properly, your concrete  Location and number of columns
and mortar will not attain desired strength  Sizes of different columns and
and will become very weak, no matter their footings
how much cement you have put in.  Sizes of all the beams
Cement needs water for its hydration (to  Diameter and number of steel bars
be kept wet) In the absence of water it will in columns, beams and roof slab
not hydrate properly, leading to less  Thickness and desired strength of
hardening and therefore less strength. the concrete etc.
 So as soon as your concrete or
mortar is set, you should start
curing. LAYOUT FRAMED STRUCTURE:
 RCC slabs should be cured by
pooling and flooding with water to  This are the planed drawings worked for th
keep it constantly wet. this are the planes worked on the site
 Brickwork and plaster surfaces are
vertical, so you have to keep
pouring water in intervals to keep
GROUND FLOOR PLANNING FIRST FLOOR PLANNING
source: Author source: Author

SECOND FLOOR PLANNING


source: Author
EXECUTED ON THE SITE :

BEFORE AFTER
source : Author
source : Author
(The site was cleaned before strating the
(The building was getting construction)
Construction)
according to the planning

source : Author source :Author

Process of foundation
The owner's and engineer's duties has been
influence on the building in their life while it is
being constructed. Engineers will use building
strategies to control difficulties and costs how
was this structure built.

REFERENCES:
1.www.yellowstonegreenhomes.com

2.www.helpmakingmyhouse.com

ABOUT THE AUTHOR:

Ar. Sk. Aashique rasool currently doing his IVth year ,


Batch:2021 -2022 in Kalasalingam school of Architecture, Virudhunagar.