Professional Documents
Culture Documents
DPR Pipra To Gardi CH 3+100km
DPR Pipra To Gardi CH 3+100km
Year (2021-22)
State : Bihar
District : West Champaran
Block : Ramnagar
Span of Bridge : 11 X 18.5 M
Length Of Bridge : 220.00 M
Length Of Approch : 60.00 M
1
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY-III)
SUMMARY OF COST ESTIMATE FOR THE PROJECT
RWD (w) Division, Bagha - 1 RWD (w) Division, Bagha - 1 RWD (w) Division, Bagha - 1
S.E.
RWD (w) Circle, Purnea
2
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY-III)
SUMMARY OF COST ESTIMATE FOR THE PROJECT
RWD (w) Division, Bagha - 1 RWD (w) Division, Bagha - 1 RWD (w) Division, Bagha - 1
3
PROFORMA-A
4
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY-III)
DISTRICT WISE SUMMARY OF THE PROPOSALS FOR THE YEAR 2021-22
PACKAGE SUMMARY
NAME OF ROAD : PIPRA To GARDI
DISTRICT West Champaran
BLOCK Ramnagar
Cost of
Link Length of Average Cost Total Estimated Cost of Bridge Average cost per Mt. of
Name of Length of Bridge
Sl. No. Route Name of Road Approach per Mt. of including Approach Road Bridge with Approach Road
Block Bridge (Structure
No. Road Bridge (Rs. in Lakhs) (Rs. in Lakhs)
Only)
From To m m Rs. In Lakhs Rs. in Lakhs Construction Maintenance Construction Maintenance
1 2 3 4 5 6 7 8 9 12 13 14 15
1 Ramnagar MRL18 PIPRA To GARDI 220 60.000 973.237 4.424 1003.796 0.253 4.563 0.001
5
PRADHAN MANTRI GRAM SADAK YOJANA
Checklist for P.I.U. & S.T.A.
1 Location : State : Bihar District : West Champaran Block : Ramnagar
2 Package No : BR37SHYM02 -
5 Name of the Proposed Bridge (if any) : Construction Of RCC HL Bridge At Ch 3+100 KM in PIPRA To GARDI Road over River
Name of the benefitted Habitation (s) (to be cross checked with CN-VI) with
(ii) Sl. No. Habitation Population
population
1 Pipra 362
2 Gobrahia 914
3 Gardi 382
Total 1658
(i) If Yes, please mention the Phase, MoRD Sanction letter No and Date of Sanction :
(i) If Yes, please mention the Phase, MoRD Sanction letter No and Date of Sanction :
(iv) Whether the roadwork has been completed or in progress and likely date of completion :
(v) If not, How the connectivity and movement of traffic was ensured :
(v) Reasons for not proposing the Bridge at the time of Submission of Road proposal :
Total Cost
10 Estimated Cost ITEM Cost per Mt
(Rs. in Lakhs)
Approaches 17.565 0.0798
6
PRADHAN MANTRI GRAM SADAK YOJANA
Checklist for P.I.U. & S.T.A.
11 INDEX MAP (Not to Scale ) : Attached
GARDI
PIPRA
12 Typical Sketch of proposed bridge showing schematic arrangement of span (Attached with Drawing)
(ii) at of Bridge
7
PRADHAN MANTRI GRAM SADAK YOJANA
Checklist for P.I.U. & S.T.A.
14 Type of Proposed Bridge :
e. Catchment Area :
Basisc of Design Discharge:- 286.700 Manning, Dickens, Rotional formulae as per IRC Code
15 Cost Details
A. General Costs
B. Bridge Components
i) Foundation
Bored cast-in-situ M35 grade R.C.C. Pile (1000mm Dia) 1520.00 34162504.28 M35
1.00 150000.00
Initial Load Test on test pile for 2.5 times the design load specified in Drawings
1.00 125000.00
Routine pile load test on pile for 1.5 times the design load specified in Drawings
Horizontal pile load test on pile for 1.5 times the design load specified in Drawings 1.00 100000.00
8
PRADHAN MANTRI GRAM SADAK YOJANA
Checklist for P.I.U. & S.T.A.
ii) SubStructure
R.C.C. grade M-30 (From 5m upto 10m height) 373.75 3369364.63 M30
R.C.C. grade M-35 (From 5m upto 10m height) 33.50 304905.20 M35
Backfilling behind abutment, wing wall and return wall 192.83 151987.49
iii) Superstructure
13.58 66685.82
Providing and laying boulder pitching on slopes laid over prepared filter media
6.79 35767.75
Providing and laying filter material underneath pitching in slopes
C. Road Components (for Approach road/ Diversion)
Clearing and Grubbing 0.05 2617.87
229.50 55820.36
Premix Carpet
229.50 18988.34
Seal Coat
Providing and Fixing 'Logo' of PMGSY Project 1.00 10279.39
Diversion 992961.24
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface 12.00 8151.6
Total Cost of The Project (Rs.) 88674480.84
9
PRADHAN MANTRI GRAM SADAK YOJANA
Checklist for P.I.U. & S.T.A.
16 Five Year Routine Maintenance
I 0.028 0.003
II 0.038 0.004
IV 0.062 0.006
V 0.073 0.007
17 Whether the Bridge has Geometrics as per latest Circular of NRRDA : YES/ NO
18 Whether the Cost Estimates are as per standard data analysis an SSR
Lead
Material Source Material Source Lead Distance
Distance
1 Span details of bridge tallies with DPR & data uploaded on omms.nic.in & there is no deviation.
3 Total cost of the project, State share & MoRD share worked out by PIU is justified.
4 The proposal of bridge is missing bridge proposal on sanctioned road & in the same stretch as it was sanctioned in previous phase under PMGSY.
10
PRADHAN MANTRI GRAM SADAK YOJANA
Checklist for P.I.U. & S.T.A.
20 Is the proposed work is for CD/ Causeway of any length or bridge with span excluding approaches less than 15m. YES/ NO
c. Whether type of foundation & resting strata as per survey report justified to be safe YES/ NO
d. Whether Hydraulic design is checked & found to be adequate as per site requirements YES/ NO
e. Whether RCC designs are checked and found to be economical & safe. YES/ NO
f. Whether the provisions made by PIU are sufficient & essentia from economy point of view. YES/ NO
22 If the Proposal is for a Bridge for which Road was already Sanctioned
If Yes, Have you verified and satisfied yourself with all the items listed ar Sr. No. 7, by PIU Yes / No
Have you satisfied yourself that the road is a part of Core Network Yes / No
24 Is the design of the following elements as per relevant IS/ IRC codes
Does the Estimation Conform to Standard Rate Analysis and SoR generated for current Phase for PMGSY works and a
25 Yes / No
copy of SoR provided to STA
27 Whether STA and Superintendent Engineer have visited the site? If Yes, Date of Visit :
Kindly indicate whether the program of visit was informed to NRRDA for prior approval?
(Specific remarks of STA about the overall Bridge Project are necessary on each DPR)
29 Certificates :
Certified that the Design and Estimation for the Poroposed bridge are based on the data and SSR provided by PIU Engineers. The proposal after final Correction is entered on
the OMMS. The Proposal may be considered for clearance.
Technical Scrutiny at STA done by :
11
12
CROSS-SECTION
FLEXIBLE PAVEMENT
(ON EARTHEN ROAD)
7500
SHOULDER Proposed Carriageway SHOULDER
(1875) (3750) (1875)
3.5% 3.5%
4.5% 4.5%
2 2
1 Embankement 1
GL
Premix Carpet (OGPC)+Seal Coat(Type-B)
WBM 75 mm (GR-III)
WBM 150 mm (GR-II)
Existing Soling 2.5 m wide
GSB Gr-II 200 mm
SHOULDER
CONSULTANTS:
BIHAR RURAL ROADS
DEVELOPMENT AGENCY Scale : Not to be Scale
(GOVT. OF BIHAR) J.E. A.E. E.E.
PIPRA TO GARDI AT CH 3+100KM
13
PIPRA TO GARDI AT CH 3+100KM
14
Legend
Untitled Map
Write a description for your map. Feature 1
Pipra To Gardi
➤
N
Image © 2022 Maxar Technologies 200 m 15
DETAILED DESIGN REPORT
COST ESTIMATE
16
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY-III)
( Rural Works Department, Govt. of Bihar)
17
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY-III)
( Rural Works Department, Govt. of Bihar)
18
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY-III)
( Rural Works Department, Govt. of Bihar)
RWD (w) Division, RWD (w) Division, Bagha - 1 RWD (w) Division, Bagha - 1
Bagha - 1
19
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY-III)
( Rural Works Department, Govt. of Bihar)
NAME OF ROAD : PIPRA To GARDI LENGTH OF BRIDGE (M) : 220.00
BLOCK Ramnagar LENGTH OF APPROACH ROAD (M): 60.00
DISTRICT West Champaran
Sl. No. SDB MORD Amount
SL .NO Ref.No Item Description Unit Length Width Height Quantity Rate
(in Rs.)
SUB HEAD : PREPARATORY WORKS ,SITE CLEARANCE , DISMANTLING
1 2.2 201 Clearing and Grubbing Road Land ( By manual means) including
(I-A ) uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees
of girth upto 300mm , removals of stumps of such trees cut earlier &
disposal of unserviceable materials & stacking of serviceable
materials to be used or auctioned upto a lead of 1000 m including
removal and disposal of top organic soil not exeeding 150mm in
thickness as per technical specification - clause 201.1 and direction of
E/I Ha 60.00 8.000 - 0.05 54538.88 2617.87
2 3.4 301.5 Construction of Embankment with material obtained from borrow
pits with a lift upto 1.5 m , transporting to the site spreading , grading
to required slope and compacting to meet requirement of Tables
300.1 and 300.2 with a lead upto 1000 m as per Technical
Specification Clause 301.5 .
100% of Embankment Material Cum 4225 211.03 891583.58
3 3.14 303.1 Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved
material obtained from borrow pits with all lifts and leads,
transporting to site, spreading, grading to required slope and
compacted to meet requirement of Table 300.2 with lead upto 1000
m as per Technical Specification Clause 303.1.
i) Construction of subgrade (Full Width) 1 60.0 (7.25+8.45)/2 0.3 141.3
20
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY-III)
( Rural Works Department, Govt. of Bihar)
NAME OF ROAD : PIPRA To GARDI LENGTH OF BRIDGE (M) : 220.00
BLOCK Ramnagar LENGTH OF APPROACH ROAD (M): 60.00
DISTRICT West Champaran
Sl. No. SDB MORD Amount
SL .NO Ref.No Item Description Unit Length Width Height Quantity Rate
(in Rs.)
Sub Head : PAVEMENT LAYERS - GSB & WBM ITEMS
4 4.1 401 Granular Sub-base with Well Graded Material (Table 400.1)
(A) (By mix in place method)
(ii) For Grading II Material
Construction of granular sub-base by providing well graded material,
spreading in uniform layers with tractor mounted grader
arrangement on prepared surface, mixing by mix in place method
with rotavator at OMC, and compacting with smooth wheel roller to
achieve the desired density, complete as per Technical Specification
Clause 401. Cum 60.00 4.05 0.200 48.60
Add for Extra Widening @ 2% of total Vol. Cum 0.97
Cum 49.57 3397.90 168440.69
5 4.7 405 Water Bound Macadam with Stone Screening Type "B" Gr- II
(2-A) WBM Grading 2 (By Mechanical Means)
Providing, laying, spreading and compacting stone aggregates of
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with three
wheel 80-100 kN static roller in stages to proper grade and camber,
applying and brooming, crushable screening to fill-up the interstices
of coarse aggregate, watering and compacting to the required density
Grading 2 as per Technical Specification Clause 405. Cum 60.00 3.75 0.15 33.75
Add for Extra Widening @ 2% of total Vol. Cum 0.68
Cum 34.43 5966.71 205403.98
21
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY-III)
( Rural Works Department, Govt. of Bihar)
NAME OF ROAD : PIPRA To GARDI LENGTH OF BRIDGE (M) : 220.00
BLOCK Ramnagar LENGTH OF APPROACH ROAD (M): 60.00
DISTRICT West Champaran
Sl. No. SDB MORD Amount
SL .NO Ref.No Item Description Unit Length Width Height Quantity Rate
(in Rs.)
6 4.7 405 WBM Grading 3 (By Mechanical Means)
( 3-A ) Providing, laying, spreading and compacting stone aggregates of
specific sizes to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with three
wheel 80-100 kN static roller in stages to proper grade and camber,
applying and brooming, crushable screening to fill-up the interstices
of coarse aggregate, watering and compacting to the required density
Grading 3 as per Technical Specification Clause 405.
Cum 60.00 3.75 0.075 16.88
Add for Extra Widening @ 2% of total Vol. Cum 0.34
Cum 17.21 5910.42 101733.18
SUB HEAD : BITUMINOUS ITEMS
7 5.1 502 Prime Coat (Low porosity)
(I)
Providing and applying primer coat with Bitumen emulsion (SS-1)
on prepared surface of granular base including cleaning of road
surface and spraying primer at the rate of 0.70- 1.0 kg/sqm using
mechanical means as per Technical Specification Clause 502.
Sqm 60 3.75 - 225.00
Add for Extra Widening @ 2% of Total Area Sqm 4.50
Sqm 229.50 53.55 12289.85
8 5.2 503 Tack Coat
(I) Providing and applying tack coat with bitumen emulsion (RS ) using
emulsion distributor @ 0.2 to 0.25 kg per sq m on the prepared
bituminous surface cleaned with hydraulic broom as per technical
specification clause 503. Sqm 60.00 3.75 - 225.00
Add for Extra Widening @ 2% of Total Area Sqm 4.50
Sqm 229.50 18.54 4255.01
22
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY-III)
( Rural Works Department, Govt. of Bihar)
NAME OF ROAD : PIPRA To GARDI LENGTH OF BRIDGE (M) : 220.00
BLOCK Ramnagar LENGTH OF APPROACH ROAD (M): 60.00
DISTRICT West Champaran
Sl. No. SDB MORD Amount
SL .NO Ref.No Item Description Unit Length Width Height Quantity Rate
(in Rs.)
9 5.9 508 Premix Carpet (Waste Plastic)
(II ) Providing, laying and rolling of open-graded premix carpet of 20
mm thickness composed of 13.2 mm to 5.6 mm aggregates either
using penetration grade bitumen or emulsion to required line,
grade and level to serve as wearing course on a previously
prepared base, including mixing in a suitable plant, laying and
rolling with a three wheel 80-100 kN static roller capacity, finished
to required level and grades to be followed by seal coat of either
Type A or Type B or Type C as per Technical Specification Clause
508. Sqm 60 3.75 - 225.00
Add for Extra Widening @ 2% of Total Area Sqm 4.50
Sqm 229.50 243.23 55820.36
10 5.12 510 Seal Coat
( II ) Providing and laying seal coat sealing the voids in a bituminous
surface laid to the specified levels, grade and cross fall using Type B,
as per Technical Specification Clause 510 Sqm 60 3.75 - 225.00
Add for Extra Widening @ 2% of Total Area Sqm 4.50
Sqm 229.50 82.74 18988.34
23
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY-III)
( Rural Works Department, Govt. of Bihar)
NAME OF ROAD : PIPRA To GARDI LENGTH OF BRIDGE (M) : 220.00
BLOCK Ramnagar LENGTH OF APPROACH ROAD (M): 60.00
DISTRICT West Champaran
Sl. No. SDB MORD Amount
SL .NO Ref.No Item Description Unit Length Width Height Quantity Rate
(in Rs.)
11 10.2 1700 Informatiry Sign Board
300 Providing and Fixing 'Logo' of Project informayory sign board with
Logo as per MORD specifications and drawing. Three MS plates of
1.6mm thick, top and middle plate duly welded with MS flat iron
25mm x 5 m size on back on edges. The lower plate will be welded
with MS angle iron frame of 25mm x 25mm 5mm. The angle iron
frame of the lower most plate and flat iron frame of middle plate will
be welded to 2 Nos. 75mm x 75 mm of 12 SWG sheet tubes posts
duly embedded in cement concrete M-15 grade blocks of 450mm x
450mm x 600 mm,600 mm,600 below ground level. The top most
diamond plate will be welded to middle plate by 47mm x 47mm of
12SWG steel plate tube. All M.S will be stove enameled on both sides.
Lettering and printing arrows, border etc, will be painted with ready
mixed synthetic enamer paint of superior quality in required shade
and colour. All sections of framed posts and steel tube will be
painted with primer and two coats of epoxy paint as per drawing
Clause 1701 abd Annexure 1700.1.
Nos 3 10279.39 30838.18
Road Marking with Hot Applied Thermoplastic Compound with
Reflectorising Glass Beads on Bituminous Surface-Providing
and laying of hot applied thermoplastic compound 2.5 mm thick
including reflectorising glass beads @ 250 gms per sqm area,
thickness of 2.5 mm is exclusive of surface applied glass beads as
per IRC:35 .The finished surface to be level, uniform and free from
12 streaks and holes. Sqm 60 0.20 12.00 679.30 8151.60
TOTAL COST OF APPROACH ROAD = 1554384.51
24
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY-III)
( Rural Works Department, Govt. of Bihar)
NAME OF ROAD : PIPRA To GARDI LENGTH OF BRIDGE (M) : 220.00
BLOCK Ramnagar LENGTH OF APPROACH ROAD (M): 60.00
DISTRICT West Champaran
Sl. No. SDB MORD Amount
SL .NO Ref.No Item Description Unit Length Width Height Quantity Rate
(in Rs.)
Sub Head : Diversion
13 Construction of Diverson & Earthen Dam
Construction of Embankment with material obtained from borrow
pits with a lift upto 1.5 m , transporting to the site spreading , grading
(i) 2.2 201 (I-A ) to required slope and compacting to meet requirement of Tables Cum 125 (4.0 + 8)/2 2.0 1500 211.03 316538.55
300.1 and 300.2 with a lead upto 1000 m as per Technical
Specification Clause 301.5 .
Granular Sub-base with Well Graded Material (Table 400.1)
Grading II -Construction of granular sub-base by providing well
graded material, spreading in uniform layers with tractor mounted
14 4.1 401 (II) grader arrangement on prepared surface, mixing by mix in place Cum 125 3.75 0.15 70.3125 3397.90 238914.83
method with rotavator at OMC, and compacting with smooth wheel
roller to achieve the desired density, complete as per Technical
Specification Clause 401.
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per
15 1100 B m 60 7291.80 437507.86
design in Single Row
TOTAL COST OF DIVERSION = 992961.24
25
SUMMARY OF 5 YEARS MAINTENANCE COST
Amount in
Particulars Amount in Rs. (Lakh)
Multiplying Factor for Commercial Vehicle 15 to 45 per days = 1.25 {ref. – Annexure 14.4 operation Manual from Rural Road}
Yearly
%
Sl. No. SOR No. Description of Items Unit Estimated Rate (Rs.) Amount (Rs.)
Taken
Qty.
Restoration of Raincuts/Berms with soil.moorum
1 15.1 Cum 5 2.53 357.77 906.00
etc(Qty=L*Bs*0.3*%taken) X 1.25
Making up of Berms/shoulder, stripping excess soil
2 15.2 from the shoulder surfaces to achieve level etc. Sqm 8 13.50 54.92 741.00
(Qty=L*Br*%taken) X 1.25
Maintenance of WBM Road Maintenance of WBM road
including filling up of pot holes, ruts and rectifying
3 15.5 Sqm 0 0.00 537.89 0.00
corrugated surface, damaged edges and ravelling as per
technical specification Clause 1906.
Patch repair over bituminous surface with 20 mm
4 15.3(iii) Sqm 0.5 1.41 395.87 557.00
Premix Carpet (Qty=L*Br*%taken) X 1.25
Maintenance of RCC Railing
Repair of RCC railing to bring it to the original shape,
5 15.10 M 0.1 0.00 2455.96 0.00
cleaning and repainting as per drawings and technical
specification Clause 1911
26
Restoration of Raincuts/Berms with soil.moorum
1 15.1 Cum 6 3.04 357.77 1,087.00
etc(Qty=L*Bs*0.3*%taken) X 1.25
Making up of Berms/shoulder, stripping excess soil
2 15.2 from the shoulder surfaces to achieve level etc. Sqm 10 16.88 54.92 927.00
(Qty=L*Br*%taken) X 1.25
Maintenance of WBM Road Maintenance of WBM road
including filling up of pot holes, ruts and rectifying
3 15.5 Cum 0 0.00 537.89 0.00
corrugated surface, damaged edges and ravelling as per
technical specification Clause 1906.
Patch repair over bituminous surface with 20 mm
4 15.3(iii) Sqm 1 2.81 395.87 1,113.00
Premix Carpet (Qty=L*Br*%taken) X 1.25
Maintenance of RCC Railing
Repair of RCC railing to bring it to the original shape,
5 15.10 M 0.1 0.00 2455.96 0.00
cleaning and repainting as per drawings and technical
specification Clause 1911
Estimate For Second Year Maintenance Work Rs. 3,127.00
27
Restoration of Raincuts/Berms with soil.moorum
1 15.1 Cum 8 4.05 357.77 1,449.00
etc(Qty=L*Bs*0.3*%taken) X 1.25
Making up of Berms/shoulder, stripping excess soil
2 15.2 from the shoulder surfaces to achieve level etc. Sqm 14 23.63 54.92 1,298.00
(Qty=L*Br*%taken) X 1.25
Maintenance of WBM Road Maintenance of WBM road
including filling up of pot holes, ruts and rectifying
3 15.5 Cum 2 0.42 537.89 227.00
corrugated surface, damaged edges and ravelling as per
technical specification Clause 1906.
Patch repair over bituminous surface with 20 mm
4 15.3(iii) Sqm 2 5.63 395.87 2,227.00
Premix Carpet (Qty=L*Br*%taken) X 1.25
Maintenance of RCC Railing
Repair of RCC railing to bring it to the original shape,
5 15.10 M 0.1 0.00 2455.96 0.00
cleaning and repainting as per drawings and technical
specification Clause 1911
Estimate For Forth Year Maintenance Work Rs. 5,201.00
Restoration of Raincuts/Berms with soil.moorum
1 15.1 Cum 9 4.56 357.77 1,630.00
etc(Qty=L*Bs*0.3*%taken) X 1.25
Making up of Berms/shoulder, stripping excess soil
2 15.2 from the shoulder surfaces to achieve level etc. Sqm 16 27.00 54.92 1,483.00
(Qty=L*Br*%taken) X 1.25
Maintenance of WBM Road Maintenance of WBM road
including filling up of pot holes, ruts and rectifying
3 15.5 Cum 2.5 0.53 537.89 284.00
corrugated surface, damaged edges and ravelling as per
technical specification Clause 1906.
Patch repair over bituminous surface with 20 mm
4 15.3(iii) Sqm 2.5 7.03 395.87 2,783.00
Premix Carpet (Qty=L*Br*%taken) X 1.25
Maintenance of RCC Railing
Repair of RCC railing to bring it to the original shape,
5 15.10 M 0.1 0.00 2455.96 0.00
cleaning and repainting as per drawings and technical
specification Clause 1911
Estimate For Fifth Year Maintenance Work Rs. 6,180.00
28
SEIGNOIRAGE FEE
Total Add
Sl. SDB MORD Amount Material
Description Unit Quantity Rate Materia Seignoirage
No. Sl .NO Ref.No (In Rs.) Amount
l Fee 10%
EARTHWORK ( FOUNDATION)
1 3.4 301.5 Construction of Embankment with material obtained
from
Unit =borrow
cum pits with a lift upto 1.5 m , transporting to
Taking output = 100 cum
a) Material
Compensation For Earth Taken From Private Land Cum 60.00 34.82 2,089.20
Cost for 100 cum = a 2,089.20
Rate Per Cum = (a)/100= 20.89
Total Cost = Cum 20.89 4,225.00 88,268.70 8,826.87
APPROACH ROAD
2 4.1 401 Granular Sub-base with Well Graded Material (Table 400.1)
( By mix in place method )
(i) For Grading I Material
Construction of granular sub-base by providing well
graded material,
For Grading spreading in uniform layers with
II Material
Unit = cum
Taking output = 300 cum
a) Material
Well graded granular sub-base material as per Table 400.1
53 mm to 9.5 mm @ 50 per cent Cum 180.00 610.74 1,09,933.20
9.5 mm to 2.36 mm @ 20 per cent Cum 72.00 506.92 36,498.240
2.36 mm below @ 30 per cent (Course Sand) Cum 108.00 175.80 18,986.400
Cost for 300 cum = a 1,65,417.84
Rate Per Cum = (a)/300= Cum 551.39
Total Cost = Cum 551.39 49.57 27,333.64 2,733.36
3 4.7 405 WBM Grading 3
WBM Grading 3 (Mechanical means)
Providing, laying, spreading and compacting stone
aggregates
For WBM IIofMaterial
specific sizes to water bound macadam
Unit = cum
Taking output = 360 cum
a) Material
Aggregate
Grading-III 53 mm to 22.4 mm @ 0.91 cum per 10 sqm
for compacted thickness of 75 mm 435.60 503.85 2,19,477.06
Cum
Stone Screening
86.40 392.53 33,914.592
Type B 11.2 mm for Grading III @ 0.18 cum per 10 sqm Cum
Cost for 360 cum = a 2,53,391.65
Rate Per Cum = (a)/360= Cum 703.87
Total Cost = Cum 703.87 17.21 12,115.29 1,211.53
29
4 5.90 508 Premix Carpet (Waste Plastic)
II Providing, laying and rolling of open-graded premix
carpet of 20 mm thickness composed of 13.2 mm to 5.6
mm aggregates either using penetration grade bitumen
or emulsion to required line, grade and level to serve
as wearing course on a previously prepared base,
including mixing in a suitable plant, laying and rolling
with a three wheel 80-100 kN static roller capacity,
finished to required level and grades to be followed by
seal coat of either Type A or Type B or Type C as per
Technical Specification Clause 508.
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Material
Aggregate
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27
Cum 108.00 515.53 40,449.24
cum per 10 sqm
Cost for4000 Cum= a 40,449.24
Rate Per Cum = (a)/4000= Cum 10.11
Total Cost = Cum 10.11 229.50 2,320.78 232.08
FOUNDATION
11 12.39 1100 & Providing and laying of PCC M15 levelling course
Mort&H 1700 100mm thick below the pile cap.
(ii) P.C.C Grade M 15 In Pile Foundation
Unit = Cum
Taking output = 15 cum
a) Material
Coarse sand Cum 0.48 175.80 157.55
40 mm aggregate Cum 0.48 486.92 449.18
20 mm aggregate Cum 0.24 595.36 554.90
10 mm aggregate Cum 0.08 657.91 615.52
Rate Per Cum = (a)= Cum 1,777.15
Rate Per Cum = (a)/15=
Total Cost = Cum 118.48 58.12 6,885.75 688.57
12 1500,
1700 & R.C.C Grade M 30 In Foundation
2100
R.C.C. grade M 30 in Open Foundation complete as per Dwg & Tech Specification (Analysis using MoRT&H Data Book)
Unit = Cum
Taking ouput = 120 cum
a) Material
Coarse sand Cum 54.00 175.80 8,143.20
20 mm aggregate Cum 64.80 595.36 35,695.08
10 mm aggregate Cum 43.20 657.91 26,532.14
Rate Per Cum = (a)= 70,370.42
Rate Per Cum = (a)/120= 586.42
Total Cost = Cum 586.42 603.72 354033.60 35403.36
30
SUBSTRUCTURE
17 13.5(G) 1500,
R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification (Analysis using
1700 &
MoRT&H Data Book)
2100
R.C.C Grade M 30 In Substructure
Height 5m to 10m
Unit = Cum
Taking ouput = 120 cum
Material
Coarse sand Cum 54.00 175.80 8,143.20
20 mm aggregate Cum 64.80 595.36 35,695.08
10 mm aggregate Cum 43.20 657.91 26,532.14
Rate Per Cum = (a)= 70,370.42
Rate Per Cum = (a)/120= 586.42
Total Cost = Cum 586.42 373.75 2,19,174.93 21,917.49
18 13.5(H) 1500,
R.C.C. grade M-35 in Substructure complete as per Dwg & Tech Specification (Analysis using
1700 &
MoRT&H Data Book)
2100
R.C.C Grade M 35 In Substructure
Height 5m to 10m
Unit = Cum
Taking ouput = 15 cum
Material
Coarse sand Cum 54.00 175.80 8,143.20
20 mm aggregate Cum 64.80 595.36 35,695.08
10 mm aggregate Cum 43.20 657.91 26,532.14
Rate Per Cum = (a)= 70,370.42
Rate Per Cum = (a)/15= 4,691.36
Total Cost = Cum 4,691.36 33.50 1,57,161.79 15,716.18
7 12 1200
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wi
Unit = cum
Taking output = 10 cum
Material
Filter media as per specification Cum 12.00 3173.72 38084.6
Rate Per Cum = (a)= 38084.6
Rate Per Cum = (a)/10= 3808.464
Total Cost = Cum 3808.464 58.3258 2,22,131.79 22,213.18
8 14.5 1300 Providing and laying Boulder pitching on slopes laid over prepared filter media as per
drawing and technical specifications Clause 1302
Stone/Boulder
Unit = cum
Material
Stone boulder (25 kg minimum) Cum 1.00 351.36 351.36
Stone spalls of minimum 25 mm size Cum 0.20 351.36 70.27
Rate Per Cum = (a)= 421.63
Total Cost = 421.63 13.5836 5,727.30 572.73
8 12.10 1200 Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Unit = cum
Taking output = 10 cum
Granular material
Material
Coarse sand Cum 12 142 1702
Rate Per Cum = (a)= 1702
Rate Per Cum = (a)/10= 170.2
Total Cost = Cum 170.2 192.833 32823.95 3282.394815
31
SUPERSTRUCTURE
9 14.1 1500,
(C) 1600 & R.C.C. grade M 30 in Super Structure complete as per Dwg & Tech Specification (Analysis using MoRT&H Data Book)
1700
R.C.C Grade M 30 In Superstructure
Unit = cum (Height 5.0 m to 10.0m )
Taking ouput = 120 cum
Material
Coarse sand Cum 54.60 175.80 9,598.68
20 mm aggregate Cum 64.80 595.36 38,579.33
10 mm aggregate Cum 43.20 657.91 28,421.71
Rate Per Cum = (a)= 76,599.72
Rate Per Cum = (a)/120= 638.33
Total Cost = 638.331 884.829 5,64,813.97 56,481.40
10 13.11 800
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical
specifications Clauses 800 and 1211.
P.C.C grade M 15
Nominal mix (1:2.5:5)
Unit = cum
Material
Coarse sand Cum 0.48 175.8 84.38
40 mm aggregate Cum 0.48 486.92 233.72
20 mm aggregate Cum 0.24 595.36 142.89
10 mm aggregate Cum 0.08 657.91 52.63
Rate Per Cum = (a)= 513.62
Total Cost = 513.6248 8.82 4,530.17 453.02
11 14.4 800
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
Wearing M- 30 In Superstructure
Taking ouput = 1 cum
Material
Coarse sand Cum 0.45 175.80 79.11
20 mm aggregate Cum 0.54 595.36 321.49
10 mm aggregate Cum 0.36 657.91 236.85
Rate Per Cum = (a)= 637.45
Total Cost = 637.45 124.283 79,224.13 7,922.41
MAINTENANCE
12 15.1 1900 Restoration of Rain Cuts Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for
300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore
the original alignment, level and slopes as per drawings and technical specifications Clause 1902
Restoration of Rain Cuts
A. Manual Means
Unit = cum
Taking output = 10 cum
a) Material
Compensation For Earth Taken From Private Land Cum 7.50 34.82 261.15
Cost For 10 Cum = a 261.15
Rate Per Cum = (a)/10= Cum 26.12
Total Cost = Cum 26.12 417.72 10,908.73 1,090.87
13 15.2 1900 Maintenance of Earthen shoulder (filling with fresh selected soil) Making up loss of material/irregularities on shoulders to the design
level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per
technical specification Clause 1903
32
Maintenance Of Earthen Shoulder (Filling With
Fresh
Unit = Selected
sqm Soil)
Taking output = 100 sqm
Assuming average thickness of filling to be 150 mm
Quality of fresh material = 15 cum
a) Material
Compensation For Earth Taken From Private Land Cum 7.50 34.82 178.35
Cost For 100 Sqm = a 178.35
Rate Per Sqm = (a)/100= Cum 1.78
Total Cost = Cum 1.78 101.25 180.58 18.06
33
DETAILED DESIGN REPORT
QUANTITY ESTIMATE
34
ESTIMATE OF QUANTITY OF BRIDGE ONLY
PIPRA TO GARDI CH - 3+100KM (11x20)
Steel Reinforcement
Ton 133.358
Total= 133.358
SUBSTRUCTURE
RCC M30 upto 5 m
Abutment-1 cum 1 8.40 1.000 2.570 21.59
Abutment-2 cum 1 8.40 1.000 2.265 19.03
Abutment Cap -1,2 cum 2 8.40 1.335 0.800 17.94
Pier-1 cum 1 3.00 1.000 2.204 6.61
Pier-2 cum 1 3.00 1.000 2.198 6.59
Pier-3 cum 1 3.00 1.000 2.400 7.20
Pier-4 cum 1 3.00 1.000 2.091 6.27
Pier-5 cum 1 3.00 1.000 2.202 6.61
Pier-6 cum 1 3.00 1.000 2.293 6.88
5(i) Pier-7 cum 1 3.00 1.000 2.288 6.86
Pier-8 cum 1 3.00 1.000 2.356 7.07
Pier-9 cum 1 3.00 1.000 2.215 6.65
Pier-10 cum 1 3.00 1.000 2.344 7.03
Pier Cap-1,2,3,4,5,6,7,8,9,10
Trapezoidal Part V = cum 10 5.50 2.610 0.650 93.31
1/2(Base1+Base2)XHXB
Pier Cap-1,2,3,4,5,6,7,8,9,10
cum 10 8.00 2.610 0.600 125.28
Rectrangular Part
Dirt Wall cum 2 8.40 0.400 1.875 12.60
Return Wall cum 2 1.65 0.500 4.870 8.04
2 1.65 0.500 4.565 7.53
Bracket Tringular Portion cum 2 7.40 0.045 0.67
Bracket Rectangle Portion cum 2 7.40 0.300 0.525 2.33
Total= 373.75
36
RCC M35 upto 5 m for pedestal & reaction block
Pedestal cum 66 0.850 0.850 0.150 7.15
5(iii) RB1 cum 44 0.800 0.500 0.900 15.84
RB2 cum 20 0.300 0.700 0.900 3.78
RB3 cum 20 0.575 0.650 0.900 6.73
Total= 33.50
Steel Reinforcement
6
Ton As per BBS 59.190
Total= 59.190
Weep holes
Spacing for weep holes = 2 m in horizontal and 1 m in vertical direction
No of weep holes in horizontal direction per abutment = 8.4/2+1 = 6
No of weep holes in vertical direction per abutment = 3+1 = 4
7 No of weep holes in horizontal direction per return wall =3.5/2+1 = 3
No of weep holes in vertical direction per return wall =5.567/1+1 = 7
Total no of Weep holes per abutment = 6 x 4 24
Total no of Weep holes per return wall = 3 x 7 21
Total no of weep holes = 24 x 2 + 21 x 4 Total 132.00
Filter media
Behind Abutment-1 cum 1 7.400 0.60 4.870 21.62
9
Behind Abutment-2 1 7.400 0.60 4.565 20.27
Behind Return wall cum 2 1.650 0.60 4.870 9.64
cum 2 1.650 0.60 4.565 9.04
Total 51.53
37
SUPERSTRUCTURE
RCC M30 T Beam
Deck Slab
HYSD Bars
12
38
PROTECTION WORK
18 Boulder Pitching (cum)
cum 4 11.320 0.30 13.58
Total 13.58
39
Requirement of HYSD bar:
Quantity
Sl.No. Structure Name Category
(Ton)
1) Superstructure: Superstructure 193.682
Foundation 94.717
Substructure 30.588
2) Pier Pedestal 2.562
RB-1 2.602
RB-3 2.121
Foundation 38.640
Substructure 16.212
3) Abutment: Pedestal 1.281
RB-1 1.301
RB-2 2.522
TOTAL: 386.230
40
Reinforcement Calculation for the Bridge (11 x20.0)
Bar Unit
Bar Spacing Length No. of Total Length
Location Bar Description Dia. Shape a b c d e Nos. Wt. Weight (Kg)
Mark (mm) (mm) Elements (mm)
(mm) (Kg/m)
Pile 1 Main bar (Full length) 25 20925 22175 2 80 3548000 3.853 13671.39
b
Pile 2 Main bar (Full length) 25 20925 22175 2 80 3548000 3.853 13671.39
b
b
Pile 4 Ring 16 100 2669 2893 2 128 740608 1.578 1168.90
41
Top Bar-2nd Layer
Pile Cap 10 12 250 a b 900 10130 900 11882 2 18 418246.4 0.888 371.32
(Section B-B) c
a
Side Face
Pile Cap 12 12 0.3 10138 0.3 10091 2 16 322899.2 0.888 286.67
Reinforcement
c
c
Pile Cap 60 Chair bar 12 - a b e 1286 600 1286 350 350 3426 2 42 288623.37 0.888 256.24
d
Side Face
Pile Cap 12 12 0.3 4138 0.3 4091 2 16 130899.2 0.888 116.21
Reinforcement a b c
Main bar a
Abutment-1 Shaft 15 12 100 b 300 4715 300 5267 1 84 443481 0.888 393.72
(Section A-A)
c
a
Main bar b
Abutment-1 Shaft 14 16 100 300 4715 300 5251 1 84 442134 1.578 697.82
(Section A-A)
c
Distribution Bar b cc
a
Abutment-1 Shaft 16A (Section B-B/Plan at B- 16 100 613.3 8320 613 9483 1 42 398272 1.578 628.59
B) - Both faces
Distribution Bar b cc
Abutment-1 Shaft 16 (Section B-B/Plan at A- 12 100 a 613.3 8320 613 9499 1 35 336253 0.888 298.52
A) -Both faces
Distribution Bar a
Abutment-1 Shaft 18 (Section A-A/Plan at A- 12 8nos. b c 300 885 300 1437 1 16 22992 0.888 20.41
A,B-B) -Both faces
a
Master Ring/stirrups
Abutment-1 Shaft 17A 12 100 e 920 300 300 920 920 3672 1 589 2164277 0.888 1921.43
(Plan At B-B) c b
d
42
Tie/Link Ring/stirrups
Abutment-1 Shaft 17 10 300 b 920 1080 1 2910 3142670 0.617 1937.53
(Plan At A-A)
Main bar a
Abutment-2 Shaft 15 12 100 300 4410 300 4962 1 84 417800 0.888 370.92
(Section A-A) b
c
Main bar a
Abutment-2 Shaft 14 16 100 b 300 4410 300 4946 1 84 416453 1.578 657.29
(Section A-A)
c
Distribution Bar
Abutment-2 Shaft 16A (Section B-B/Plan at B- 16 100 b cc 613.3 8320 613 9483 1 42 398272 1.578 628.59
a
B) - Both faces
Distribution Bar
b cc
Abutment-2 Shaft 16 (Section B-B/Plan at A- 12 100 a 613.3 8320 613 9499 1 29 278311 0.888 247.08
A) -Both faces
Distribution Bar a
Abutment-2 Shaft 18 (Section A-A/Plan at A- 12 8nos. b c 300 885 300 1437 1 16 22992 0.888 20.41
A,B-B) -Both faces
a
Master Ring/stirrups e
Abutment-2 Shaft 17A 12 100 920 300 300 920 920 3672 1 589 2164277 0.888 1921.43
(Plan At B-B) c b
d
Tie/Link Ring/stirrups
Abutment-2 Shaft 17 10 300 b 920 1080 1 2408 2601137 0.617 1603.66
(Plan At A-A)
a
Master Ring/stirrups c
Abutment Cap 39 10 150 e 1610 920 320 797.6 720 4448 2 51 450686 0.617 277.86
(Section A-A/F-F)
d b
43
Dirt Wall and Dirt Wall Distribution
31 12 2 Nos. b 8320 8320 2 2 33280 0.888 29.55
Bracket Bar (Section F-F)
a
Dirt Wall and Dirt Wall vertical bar
32 12 100 b 213.3 3058 798 4020 2 84 677044 0.888 601.08
Bracket (Section F-F) c
a
Dirt Wall and Dirt Wall vertical bar b
33 10 100 213.3 3098 3291 2 84 554186 0.617 341.67
Bracket (Section F-F)
a
Bracket Main or c
Dirt Wall and
35 Haunch Bar (Section 12 100 b 600 250 300 715 300 2069 2 84 348420 0.888 309.32
Bracket d
F-F) e
b
Dirt Wall and a c
37 Ring(Section F-F) 10 620 8320 620 8320 17980 2 2 71920 0.617 44.34
Bracket d
e
b
a
Return Wall-1(Both Vertical Bar
19 12 b c 300 5230 300 5830 2 3 34980 0.888 31.05
Side Abutment-1) Bar(Section A-A) d
e
a
Return Wall-1(Both Vertical Bar
20 16 100 b c 300 6695 300 7295 2 17 248030 1.578 391.47
Side Abutment-1) Bar(Section A-A)
44
Return Wall-1(Both Horizontal Bar
21 16 100 a b c 300 2570 300 3170 2 26 164840 1.578 260.17
Side Abutment-1) Bar(Section A-A) d
e
a
Return Wall-1(Both Vertical Bar
22 10 100 b c 300 6695 300 7295 2 17 248030 0.617 152.92
Side Abutment-1) Bar(Section A-A)
de
a
Return Wall-2(Both Vertical Bar
19 12 b c 300 4925 300 5525 2 3 33150 0.888 29.43
Side Abutment-2) Bar(Section A-A) d
e
a
Return Wall-2(Both Vertical Bar
20 16 100 b c 300 6390 300 6990 2 17 237660 1.578 375.10
Side Abutment-2) Bar(Section A-A)
a
Return Wall-2(Both Vertical Bar
22 10 100 b c 300 6390 300 6990 2 17 237660 0.617 146.52
Side Abutment-2) Bar(Section A-A)
45
Return Wall-2(Both Horizontal Bar
25 12 200 a b c 300 1570 300 2170 2 14 60760 0.888 53.94
Side Abutment-2) Bar(Section A-A) d
Total Weight of the reinforcement for Pile & Pile Cap (HYSD bar) (Ton) 38.64
Total Weight of the reinforcement for Abutment Shaft & Cap & Return wall (HYSD bar) (Ton) 16.21
46
Reinforcement Calculation for the Bridge (11x20)
Bar Unit
Bar Spacing Length No. of Total Length
Location Bar Description Dia. Shape a b c d e Nos. Wt. Weight (Kg)
Mark (mm) (mm) Elements (mm)
(mm) (Kg/m)
Main bar
Pile 12 20 20925 21925 10 48 10524000 2.466 25953.14
(Full length) b
Main bar
Pile 12 20 20925 21925 10 48 10524000 2.466 25953.14
(Full length) b
b
Pile 11 Ring 16 100 2669 2893 10 96 2777280 1.578 4383.38
47
Side Face
Pile Cap 5 12 a b 0.3 7138 0.3 7091 10 16 1134496 0.888 1007.20
Reinforcement c
c
Pile Cap 16 Chair bar 12 - a b e 1286 600 1286 350 350 3426 10 30 1016579.85 0.888 902.51
d
a
Side Face
Pile Cap 5 12 0.3 4138 0.3 4091 10 16 654496 0.888 581.06
Reinforcement
c c
Main bar a
Pier-1 Shaft 8 20 b 300 4799 300 5319 1 20 106380 2.466 262.34
(Section A-A)
c
a
Main bar b
Pier-1 Shaft 9 20 300 4799 300 5319 1 6 31914 2.466 78.70
(Section A-A)
c
c aad b
Master Ring (Section
Pier-1 Shaft 7 16 100 c b 2920 920 920 2920 7840 1 23 180634 1.578 285.09
C-C) d
Main bar a
Pier-2 Shaft 8 20 300 4793 300 5313 1 20 106260 2.466 262.05
(Section A-A) b
c
a
Main bar b
Pier-2 Shaft 9 20 300 4793 300 5313 1 6 31878 2.466 78.61
(Section A-A) c
c aad b
Master Ring (Section
Pier-2 Shaft 7 16 100 b 2920 920 920 2920 7840 1 23 180163 1.578 284.35
C-C) c
d
48
Main bar a
Pier-3 Shaft 8 20 300 4995 300 5515 1 20 110300 2.466 272.01
(Section A-A) b
c
a
Main bar b
Pier-3 Shaft 9 20 c 300 4995 300 5515 1 6 33090 2.466 81.60
(Section A-A)
c aad b
Master Ring (Section
Pier-3 Shaft 7 16 100 2920 920 920 2920 7840 1 25 196000 1.578 309.35
C-C) c b
d
Main bar a
Pier-4 Shaft 8 20 300 4686 300 5206 1 20 104120 2.466 256.77
(Section A-A) b
c
a
Main bar b
Pier-4 Shaft 9 20 c 300 4686 300 5206 1 6 31236 2.466 77.03
(Section A-A)
c aad b
Master Ring (Section
Pier-4 Shaft 7 16 100 2920 920 920 2920 7840 1 22 171774 1.578 271.11
C-C) c b
d
Main bar a
Pier-5 Shaft 8 20 300 4797 300 5317 1 20 106340 2.466 262.24
(Section A-A) b
c
a
Main bar b
Pier-5 Shaft 9 20 c 300 4797 300 5317 1 6 31902 2.466 78.67
(Section A-A)
c aad b
Master Ring (Section
Pier-5 Shaft 7 16 100 2920 920 920 2920 7840 1 23 180477 1.578 284.85
C-C) c b
d
49
Main bar a
Pier-6 Shaft 8 20 300 4888 300 5408 1 20 108160 2.466 266.73
(Section A-A) b
c
a
Main bar b
Pier-6 Shaft 9 20 c 300 4888 300 5408 1 6 32448 2.466 80.02
(Section A-A)
c aad b
Master Ring (Section
Pier-6 Shaft 7 16 100 2920 920 920 2920 7840 1 24 187611 1.578 296.11
C-C) c b
d
Main bar a
Pier-7 Shaft 8 20 300 4883 300 5403 1 20 108060 2.466 266.49
(Section A-A) b
c
a
Main bar b
Pier-7 Shaft 9 20 c 300 4883 300 5403 1 6 32418 2.466 79.95
(Section A-A)
c aad b
Master Ring (Section
Pier-7 Shaft 7 16 100 2920 920 920 2920 7840 1 24 187219 1.578 295.49
C-C) c b
d
Main bar a
Pier-8 Shaft 8 20 300 4951 300 5471 1 20 109420 2.466 269.84
(Section A-A) b
c
a
Main bar b
Pier-8 Shaft 9 20 c 300 4951 300 5471 1 6 32826 2.466 80.95
(Section A-A)
c aad b
Master Ring (Section
Pier-8 Shaft 7 16 100 2920 920 920 2920 7840 1 25 192550 1.578 303.90
C-C) c b
d
50
Main bar a
Pier-9 Shaft 8 20 300 4810 300 5330 1 20 106600 2.466 262.89
(Section A-A) b
c
a
Main bar b
Pier-9 Shaft 9 20 c 300 4810 300 5330 1 6 31980 2.466 78.87
(Section A-A)
c aad b
Master Ring (Section
Pier-9 Shaft 7 16 100 2920 920 920 2920 7840 1 23 181496 1.578 286.45
C-C) c b
d
Main bar a
Pier-10 Shaft 8 20 300 4939 300 5459 1 20 109180 2.466 269.25
(Section A-A) b
c
a
Main bar b
Pier-10 Shaft 9 20 c 300 4939 300 5459 1 6 32754 2.466 80.77
(Section A-A)
c aad b
Master Ring (Section
Pier-10 Shaft 7 16 100 2920 920 920 2920 7840 1 24 191610 1.578 302.42
C-C) c b
d
Pier Cap-
1 Top Bar (Section A-A) 20 a b 300 7920 300 8440 10 26 2194400 2.466 5411.59
1,2,3,4,5,6,7,8,9,10 c
Pier Cap-
1a Top Bar (Section A-A) 20 a b 300 3950 4210 10 52 2189200 2.466 5398.77
1,2,3,4,5,6,7,8,9,10
a
Pier Cap- Master Ring (Section
2 16 200 b 2530 1170 1170 b2530 7560 10 13 982800 1.578 1551.15
1,2,3,4,5,6,7,8,9,10 A-A) c
d
a
Pier Cap-
2a Ring (Section A-A) 12 200 b 1265 1170 1170 1265 4990 10 13 648700 0.888 575.91
1,2,3,4,5,6,7,8,9,10 c
d
51
d
a
Pier Cap- Master Ring (Section
3 16 125 b 2530 845 845 b2530 6910 10 46 3164780 1.578 4994.97
1,2,3,4,5,6,7,8,9,10 A-A) c b
d
a
Pier Cap-
3a Ring (Section A-A) 12 200 b 520 845 845 520 2850 10 58 1653000 0.888 1467.52
1,2,3,4,5,6,7,8,9,10 c
d
a
Pier Cap-
4 Ring (Section A-A) 12 200 b 1040 845 845 1040 3890 10 29 1128100 0.888 1001.52
1,2,3,4,5,6,7,8,9,10 c
d
52
Reinforcement Calculation for the Bridge (11x20.0)
Bar Total
Spacin Length( No. of Uni Wt.
Location Bar Mark Bar Description Dia. Shape a b c d e f Nos. Length Weight (Kg)
g(mm) mm) Element (Kg/m)
(mm) (mm)
a
Vertical Main
Pedestal 48 16 b 270 810 1080 66 12 1.578 1350013 2130.724
Bar(Section H-H)
a
a
Vertical Main
Pedestal 49 12 b 270 810 1080 66 8 0.888 506255 449.450
Bar(Section H-H)
d c
Master Ring(Section H- b
Pedestal 50 12 100 540 620 540 620 2440 66 6 0.888 872118 774.260
H)
a a
b
Pedestal 51 Ring(Section H-H) 10 100 c a 180 620 180 620 1600 66 6 0.617 397139 244.845
d
c a
Pedestal 52 Ring(Section H-H) 10 100 540 207 540 207 1593 66 6 0.617 395485 243.825
b
For Pedestal (Kg): 3843.104
b Pedestal For Abudment (Ton): 1.281
b Pedestal For Pier (Ton) : 2.562
Vertical Bar b
RB-1 42 20 - 110 1560 1670 44 10 2.466 734800 1812.084
Bar(Section G-G)
a
Vertical Bar b
RB-1 43 16 - 110 1560 1670 44 10 1.578 734800 1159.734
Bar(Section G-G)
d
a c
RB-1 44 Horizontal Stirrup 12 150 360 420 360 420 1680 44 6 0.888 380629 337.919
b
a 53
a
Horizontal bar at
RB-1 46 opposite to bearing 12 - 360 420 900 44 2 0.888 70313 62.424
face b
a d
c
b
RB-1 47 Horizontal Stirrup 12 150 180 420 180 420 1320 44 12 0.888 598131 531.016
Master Ring(Trans. a c
RB-2 56 12 150 220 620 220 620 1800 20 21 0.888 683956 607.211
Seismic Stopper)
d
Ring(Trans. Seismic
RB-2 57 12 150 a c 220 124 220 124 808 20 21 0.888 307020 272.570
Stopper)
d
b
Ring(Trans. Seismic
RB-2 58 12 150 c 73 620 73 620 1507 20 21 0.888 572496 508.258
Stopper) a
d
54
a
a
Vertical bar (Section E-
RB-3 16 12 - b 248 1560 248 2055 20 6 0.888 246600 218.930
E)
c
a
Vertical bar (Section E- b
RB-3 17 12 - 248 1560 248 2055 20 9 0.888 369900 328.395
E)
a
Master Ring(Long. b
RB-3 18 12 150 d 495 570 495 570 2250 20 7 0.888 284982 253.005
Seismic Stopper)
c
b
a d c
Ring(Long. Seismic
RB-3 19 10 150 127 495 127 495 1343 20 14 0.617 236309 145.690
Stopper)
a
Ring(Long. Seismic b
RB-3 20 10 150 d 165 570 165 570 1570 20 7 0.617 138093 85.137
Stopper)
c
55
Structure Details: 20m T-Beam
No. of Span: 11
Location
a1 Girder main 25 - a b C 600 19870 600 1250 22320 22 5 2455200 3.853 9461
a2 Girder main 25 - a b c 600 19870 600 1250 22320 22 5 2455200 3.853 9461
a3 Girder main 25 - a b c 600 19870 600 1250 22320 22 5 2455200 3.853 9461
a4 Girder main 25 - b c 1850 14400 1850 1250 19350 22 3 1277100 3.853 4921
a
a5 Girder main 25 - b c 1850 9600 1850 1250 14550 22 2 640200 3.853 2467
a
a6 Girder main 16 - a b a 600 19870 600 800 21870 22 2 962280 1.578 1519
56
Long Gird
a9 2L Stirrups 12 175 b 520 1495 520 1495 4030 22 55 4863634 0.888 4318
a
a10 2L Stirrups 12 200 b 520 1495 520 1495 4030 22 24 2127840 0.888 1889
a
a11 2L Stirrups 10 200 b 260 1495 260 1495 3510 22 24 1853280 0.617 1143
a
a
a12 Link bar 10 - 100 520 100 720 22 82 1303406 0.617 804
a
a12 Link bar 10 - 100 220 100 420 22 216 1995840 0.617 1230
c
a13 Bulb stirrup 12 200 520 420 1572 2512 22 72 3979008 0.888 3533
b
a
b1 Girder main 25 - a b C 600 19870 600 1250 22320 11 5 1227600 3.853 4730
b2 Girder main 25 - a b c 600 19870 600 1250 22320 11 5 1227600 3.853 4730
b3 Girder main 25 - a b c 600 19870 600 1250 22320 11 3 736560 3.853 2838
b4 Girder main 25 - b c 1850 14400 1850 1250 19350 11 2 425700 3.853 1640
a
b5 Girder main 25 - b c 1850 9600 1850 1250 14550 11 3 480150 3.853 1850
a
57
b6 Girder main 25 - b c 1850 14400 1850 1250 19350 11 2 425700 3.853 1640
a
b6 Girder main Top 16 - b 600 19870 600 800 21870 11 2 481140 1.578 759
a a
b9 2L Stirrups 12 175 b 520 1495 520 1495 4030 11 55 2431817 0.888 2159
a
b10 2L Stirrups 12 200 b 520 1495 520 1495 4030 11 24 1063920 0.888 945
a
b11 2L Stirrups 10 200 b 260 1495 260 1495 3510 11 24 926640 0.617 571
a
a
b12 Link bar 10 - 100 520 100 720 11 82 651703 0.617 402
a
b12 Link bar 10 - 100 220 100 420 11 216 997920 0.617 615
58
c
b13 Bulb stirrup 12 200 520 420 1572 2512 11 72 1989504 0.888 1766
b
a
Bottom
s7 B-Longer 12 200 a b c 600 43000 600 600 44800 11 12 5913600 0.888 5250
S9 T-Short 16 200 a b c 300 8500 300 800 9900 11 100 10890000 1.578 17188
Deck Slab
59
Deck Slab
S10 T-Short 16 200 a b c 300 8500 300 800 9900 11 100 10890000 1.578 17188
S12 T-Longer 12 200 b a 600 21500 600 22700 11 29 7241300 0.888 6429
a
S15 T-Longer 12 200 b a 600 43000 600 44200 11 3 1458600 0.888 1295
a
S19 Haunch Bar 12 200 b a 1500 1500 11 215 3547500 0.888 3149
a
S20 Haunch Bar 12 200 b a 250 2000 250 2500 11 107.5 2956250 0.888 2625
a
CRASH
BARRIER
(20m)x6
Ring inner Face 16 120 B 320 800 1120 22 166.6666667 4106667 1.578 6482
a
c
Ring inner Face 16 120 b 320 1150 94 1564 22 166.6666667 5734667 1.578 9051
a
c
Ring outer Face 12 120 320 1050 94 1464 22 166.6666667 5368000 0.888 4766
b
a a
Hook 8 1000 b b 100 400 100 600 22 20 264000 0.395 104
CRASH BARRIER
CRASH
BARRIER
(3.5m)x4
Ring inner Face 16 120 B 320 800 1120 4 30 134400 1.578 212
a
c
61
a
c
Ring inner Face 16 120 b 320 1150 94 1564 4 30 187680 1.578 296
a
c
Ring outer Face 12 120 320 1050 94 1464 4 30 175680 0.888 156
b
a a
Hook 8 1000 b b 100 400 100 600 4 4 9600 0.395 4
62
DETAILED DESIGN REPORT
RATE ANALYSIS
63
QUARY CHART
PIPRA To GARDI
Stone Boulder
Place :- Sheikhpura
By Rail :- 220.00km
By Road :- 89.00km
Cement / Steel
Place :- Bettiah
By Rail :- 0.00km
By Road :- 10.00km
64
Analysis for Carriage by Road & Rail
Name of Road:-- PIPRA To GARDI
District:- West Champaran Block :- Ramnagar
Cost of Haulage Excluding Loading & Unloading as per SOR * Subjected to Verification of Lead
` Per Ton. Km by Tipper ` Per Ton. Km by
Type of Road
Truck
For Surface Road 11.80 7.25
Unsurface Gravel Road 14.20 8.72
Kachha Road 28.50 17.55
65
Analysis for Carriage by Road
Name of Road:-- PIPRA To GARDI
District:- West Champaran Block :- Ramnagar
Cost of Haulage Excluding Loading & Unloading as per SOR * Subjected to Verification of Lead
` Per Ton. Km by Tipper ` Per Ton. Km by
Type of Road
Truck
For Surface Road 11.80 7.25
Unsurface Gravel Road 14.20 8.72
Kachha Road 28.50 17.55
66
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY-III)
Block :- Ramnagar
District:- West Champaran
67
Analysis for Carrige Through Railway from Quarry Site to Work Site
Sheikhpura to Bettiah
Material -Stone Metal Gr-I & Gr-II
8.00
UnSurface x 14.20 x 1.00 Km = Rs 24.75
4.59
i) Loading Cost from Railway Yard to Railway Wegon = For 1 cum = Rs 128.18 = Rs 128.18
ii) Railway freight charge from Sheikhpura Railway station to = For 1 MT 220.00 Km = 388.1 = Rs 388.10
Busy Seasion charge 12% of Railway freight charge = For 1 MT = 12% = Rs 46.57
Carriage Cost from Quarry to Bettiah Railway Yard = For 1 Cum A+B+C+D = Rs 1464.53
68
Analysis for Carrige Through Railway from Quarry Site to Work Site
Sheikhpura to Bettiah
Material -Stone Metal Gr-III
8.00
UnSurface x 14.20 x 1.00 Km = Rs 22.77
4.99
i) Loading Cost from Railway Yard to Railway Wegon = For 1 cum = Rs 128.18 = Rs 128.18
Busy Seasion charge 12% of railway freight charge = For 1 MT = 12% = Rs 46.57
Carriage Cost from Quarry to Bettiah Railway Yard = For 1 Cum A+B+C+D = Rs 1372.00
69
Analysis for Carrige Through Railway from Quarry Site to Work Site
Mirzachowki to Bettiah
Material -Stone Aggregate / Chips
8.00
UnSurface x 14.20 x 1.00 Km = Rs 22.77
4.99
i) Loading Cost from Railway Yard to Railway Wegon = For 1 cum = Rs 128.18 = Rs 128.18
Busy Seasion charge 12% of Railway freight charge = For 1 MT = 12% = Rs 64.07
Carriage Cost from Quarry to Bettiah Railway Yard = For 1 Cum A+B+C+D = Rs 1679.67
70
Analysis for Carrige Through Railway from Quarry Site to Work Site
Sheikhpura to Bettiah
Material -Stone Boulder
8.00
UnSurface x 14.20 x 1.00 Km = Rs 23.67
4.80
i) Loading Cost from Railway Yard to Railway Wegon = For 1 cum = Rs 128.18 = Rs 128.18
ii) Railway freight charge from Sheikhpura Railway station to = For 1 MT 220.00 Km = Rs 388.10 = Rs 388.10
Busy Seasion charge 12% of Railway freight charge = For 1 MT = 12% = Rs 46.57
Carriage Cost from Quarry to Bettiah Railway Yard = For 1 Cum =A+B+C+D = Rs 1414.03
71
Analysis for Carrige Through Railway from Quarry Site to Work Site
Sheikhpura to Bettiah
Material -Binding Material / Moorum
8.00
UnSurface x 14.20 x 1.00 Km = Rs 18.93
6.00
i) Loading Cost from Railway Yard to Railway Wegon = For 1 cum = Rs 128.18 = Rs 128.18
iii) Railway freight charge from Sheikhpura Railway station to = For 1 MT 220.00 Km = Rs 388.10 = Rs 388.10
Busy Seasion charge 12% of Railway freight charge = For 1 MT = 12% = Rs 46.57
72
Summary of Carriage Cost
PIPRA To GARDI
Sl. Amount
Materials Unit
No. (Rs.)
1 Gr-III Cum 3481.39
73
BASIC RATES
(A) Labour
PIPRA To GARDI
74
BASIC RATES
(B) Material
Basic Rate Final Rate
Sl. No. Description Unit Exclusive Including
Royality Royality
M-002 Aggregate - For 37.5 mm Maximum size - 22.4 mm to 5.6 mm 572.92 572.92
cum
M-004 Aggregate - For 37.5 mm Maximum size - Below 5.6 mm 249.22 249.22
cum
M-011 Aggregate - Grading I (40 mm nominal Size) 5 mm and below 249.22 249.22
cum
M-014 Aggregate - Grading II (19 mm nominal Size) 5 mm and below 249.22 249.22
cum
75
BASIC RATES
(B) Material
Basic Rate Final Rate
Sl. No. Description Unit Exclusive Including
Royality Royality
M-024 Aggregates 22.4 mm to 2.36 mm for wet mix macadam 572.92 572.92
cum
M-037 Opc -43 grade Cement (Excluding Empty Cement Bag Cost 7.46) 5,006.40 5,006.40
t
M-039 Compensation for earth taken from private land 34.82 34.82
cum
76
BASIC RATES
(B) Material
Basic Rate Final Rate
Sl. No. Description Unit Exclusive Including
Royality Royality
77
BASIC RATES
(B) Material
Basic Rate Final Rate
Sl. No. Description Unit Exclusive Including
Royality Royality
78
BASIC RATES
(B) Material
Basic Rate Final Rate
Sl. No. Description Unit Exclusive Including
Royality Royality
M-085 Well graded Granular Base Material - Grading A 2.36 mm below 234.89
cum 234.89
Well graded Granular Base Material - Grading A 26.5 mm to
M-086 544.89
4.75 mm cum 544.89
Well graded Granular Base Material - Grading A 53 mm to 26.5
M-087 503.85
mm cum 503.85
M-088 Well graded Granular Base Material - Grading B 2.36 mm below 234.89
cum 234.89
Well graded Granular Base Material - Grading B 26.5 mm to
M-089 544.89
4.75 mm cum 544.89
M-090 Well graded Granular Base Material - Grading C 2.36 mm below 234.89
cum 234.89
Well graded Granular Base Material - Grading C 9.5 mm to 4.75
M-091 573.71
mm cum 573.71
M-092 Well Graded Material for Sub-Base - Grading I 2.36 mm below 234.89
cum 234.89
M-095 Well Graded Material for Sub-Base - Grading II 2.36 mm below 234.89
cum 234.89
Well Graded Material for Sub-Base - Grading II 26.5 mm to 9.5
M-096 647.19
mm cum 647.19
M-097 Well Graded Material for Sub-Base - Grading II 9.5 mm to 2.36 mm 506.92
cum 506.92
M-098 Well Graded Material for Sub-Base - Grading III 2.36 mm below 234.89
cum 234.89
M-099 Well Graded Material for Sub-Base - Grading III 4.75 mm to 2.36 mm 249.22
cum 249.22
M-100 Well Graded Material for Sub-Base - Grading III 9.5 mm to 4.75 mm 573.71
cum 573.71
79
BASIC RATES
(B) Material
Basic Rate Final Rate
Sl. No. Description Unit Exclusive Including
Royality Royality
M-159 Sand Bag (Cost of sand & Empty Cement Bag) Each 8.46
8.46
Bentonite 3.63
Kg 3.63
Admixture 152.14
Kg 152.14
15000 15,000.00
Waste Plastic Tonne
80
BASIC RATES
(C) USAGE RATES OF PLANT & MACHINERY
Sr. No.
Machine Activity Unit Output Unit Rate
Supplying compressed
PM-001 Air Compressor 210 cfm cfm 210 391.00
air per hour
Batching and mixing plant @ 30 cum
PM-002 Concrete Mixing Cum/h 20 2,981.00
capacity per hour
PM-002 Batch mix HMP 40-60 TPH BM, DBM, SDBC, PM t/h 50 18,776.00
per hour
PM-003 Batch type HMP 30/40 TPH BM, DBM, SDBC, PM t/h 35 18,776.00
per hour
PM-004 Bitumen boiler oil fired
PM-006 Concrete mixer 0.28/0.4 cum Mixing of ingradients cum/h 2.5 1,289.30
per hour
PM-009 Electric generator set, 125 KVA Electricity generation KVA 100 1,359.00
per hour
PM-001 Electric generator set, 100 KVA Electricity generation KVA 100 869.00
per hour
562.00
Electric generator set, 33 KVA Electricity generation per hour
PM-011 1,645.00
Emulsion Sprayer with Tractor Spraying of Emulsion per hour
Loading
Aggregates/Loading 1,594.00
Front end-loader 1 cum bucket capacity @Soil
45 cum/hour cum/h 45 per hour
PM-012 Hydraulic broom with tractor Surface cleaning sqm/h 1250 per hour 746.00
81
BASIC RATES
(C) USAGE RATES OF PLANT & MACHINERY
Sr. No.
Machine Activity Unit Output Unit Rate
82
BASIC RATES
(C) USAGE RATES OF PLANT & MACHINERY
Sr. No.
Machine Activity Unit Output Unit Rate
Surface Dressing
sqm/h 500 1,518.00
2ndCoat per hour
Ripping Pavements,
PM-029 Tractor with ripper @ 60 cum per hour cum/h 60 591.40
uprooting trees
per hour
Tractor with trolley/with Grading Transportation of
PM-030 t/trip 3 to 5 629.00
equipment materials per hour
83
BASIC RATES
(C) USAGE RATES OF PLANT & MACHINERY
Sr. No.
Machine Activity Unit Output Unit Rate
Transportation of Soil,
GSB, WMM, Hotmix Capacity 5.5 9.07
Tipper 5 Cum etc. in Cum Tonne.Km
Rolling of Aspalt
30 1,978.00
Tandem Road Roller Surface Cum/h per hour
84
SDB Sl. MORD Analysis of Rates ( FORMAT F8 ) Amount
Sl. No. DESCRIPTION Unit Quantity Rate
No. Ref No. (in Rs)
Haulage BY TIPPER
1 1.10 (i) Haulage excluding Loading & Unloading
Haulage of materials by tipper excluding cost of loading, unloading and
stacking.
Unit = t.km
Taking output 10 t load and lead 10 km = 100 t.km
Case-I : Surfaced Road
Speed with load: 25 km per hour
Speed while returning empty: 35 km per hour
a) Machinery
Tipper 10 t capacity
Haulage with load hour 0.40 1518.00 607.20
Empty return trip hour 0.29 1518.00 440.22
b) Over Heads & Contractors profit @ 12.5% on (a) 130.93
Cost for 100 t-km = a+b+c 1,178.35
Rate per cum = (a+b+c) /100 11.78
Rate Per Km. Cum 11.80
2 1.10 (ii) Haulage excluding Loading & Unloading
Haulage of materials by tipper excluding cost of loading, unloading and
stacking.
Unit = t.km
Taking output 10 t load and lead 10 km = 100 t.km
Case-II: Unsurfaced Gravel Road.
Speed with load: 20 km/hour
Speed for empty return trip: 30 km/hour
a) Machinery
Tipper 10 t capacity
Haulage with load hour 0.50 1518.00 759.00
Empty return trip hour 0.33 1518.00 500.94
b) Over Heads & Contractors profit @ 12.5% on (a) 157.49
Cost for 100 t-km = a+b+c 1,417.43
Rate per cum = (a+b+c) /100 14.17
Rate Per Km. Cum 14.20
3 1.10 (iii) Haulage excluding Loading & Unloading
Haulage of materials by tipper excluding cost of loading, unloading and
stacking.
Unit = t.km
Taking output 10 t load and lead 10 km = 100 t.km
Case-III : Katcha Track and Track in River Bed/Nallah Bed and Choe
Bed.
Speed with load: 10 km per hour
Speed while returning empty: 15 km per hour
a) Machinery
Tipper 10 t capacity
Haulage with load hour 1.00 1518.00 1,518.00
Empty return trip hour 0.67 1518.00 1,017.06
b) Over Heads & Contractors profit @ 12.5% on (a) 316.88
Cost for 100 t-km = a+b+c 2,851.94
Rate per cum = (a+b+c) /100 28.52
Rate Per Km. Cum 28.50
4 ( ii ) Loading of Earth, Sand, Moorum, Manure, Flyash by manual means
including a lead up to 30m
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate day 0.01 325.00 3.25
Mazdoor (Unskilled) day 0.25 306.00 76.50
b) Machinery
Truck 10 t capacity hour 0.25 934.30 233.58
c) Over Heads & Contractors profit @ 12.5% on (a+b) 39.17
Cost for 5.5 cum = a+b+c 352.49
Rate per cum = (a+b+c)/5.5 cum 64.09
5 ( iv ) Unoading of Earth, Sand, Moorum, Manure, Flyash by manual means
including a lead up to 30m
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate day 0.005 325.00 1.63
Mazdoor (Unskilled) day 0.125 306.00 38.25
b) Machinery
Truck 10 t capacity hour 0.166 934.30 155.09
c) Over Heads & Contractors profit @ 12.5% on (a+b) 24.37
Cost for 5.5 cum = a+b+c 219.34
Rate per cum = (a+b+c)/5.5 cum 39.88
6 1.2 Loading and Unloading Lime, Aggregate, Stone Boulder, Brick
85
SDB Sl. MORD Analysis of Rates ( FORMAT F8 ) Amount
Sl. No. DESCRIPTION Unit Quantity Rate
No. Ref No. (in Rs)
i Haulage
Loading of Lime, Aggregate, Stone Boulder, BrickBY TIPPER
Aggregate,
Unit = cum
Taking output = 5.5 cum
Time required for
i Positioning of tipper at loading point Min 1.000
ii Loading by front end loader 1 cum bucket capacity @ 45 cum per Min 7.330
iii Waiting time, unforeseen contingencies, etc. Min 2.000
Total Min 10.330
a) Machinery
Tipper 10 t capacity hour 0.172 1518.00 261.10
Front end-loader 1 cum bucket capacity @ 45 cum per hour hour 0.122 1594.00 194.47
b) Overheads & Contractor’s profit@ 12.5 % 56.95
C Contractors Profit @ 10.0 % 0.00
Cost for 5.5 cum = a+b+C 512.51
Rate per cum = (a+b)/5.5 93.18
Unloading of Earth, Sand, Lime, Moorum, Aggregate, Stone
Unit = cum
Taking output = 5.5 cum
Placing tipper at unloading point excluding time for haulage and
Time required for
i Positioning of tipper at loading point Min 1.000
ii Manoeuvering, reversing, dumping and turning for return Min 2.000
iii Waiting time, unforeseen contingencies, etc. Min 2.000
Total Min 5.000
a) Machinery
Tipper 10 t capacity hour 0.080 1518.00 121.44
b) Overheads & Contractor’s profit@ 12.5 % on (a) 15.18
Cost for 5.5 cum = a+b 136.62
Rate per cum = (a+b)/5.5 24.84
Total loading and unloading by mechanical means 118.02
7 (ii) Unloading of RCC Hume pipe by mechanical means including a
A. 1000/1200 mm dia RCC Hume pipes
Unit = per pipe
Taking output = 9 pipes
a) Labour
Mate day 0.02 325.00 6.50
Mazdoor (Unskilled) day 0.50 306.00 153.00
b) Machinery
Truck hour 0.20 934.30 186.86
Crane hour 0.20 2930.00 586.00
c) Overheads & Contractor’s profit@ 12.5 % on (a+b) 116.55
Cost for 9 pipes = a+b+c 1,048.91
Rate per pipe = (a+b+c)/9 116.55
Total Cost per p 116.55
Total Loding & Unloading of RCC Hume Pipe per Pipe = 179.34 + 116.55 = 295.89
Total Loding & Unloading of RCC Hume Pipe m = 295.89 / 2.50 = 118.36
8 1.3 Loading, Unloading and Stacking of Bricks by Manual Means
(i) Loading of Bricks by manual means including a lead upto 30 m
Unit = 1000 Nos.
Taking output = 2000 Nos.
a) Labour
Mate day 0.01 325.00 3.25
Mazdoor (Unskilled) day 0.25 306.00 76.50
b) Machinery
Truck 10 t capacity hour 0.33 934.30 308.32
c) Over Heads & Contractors profit @ 12.5% on (a+b) 48.51
Cost for 2000 Nos. = a+b+c 436.58
Rate for 1000 bricks = (a+b+c)/2 218.29
SAY no. 218.29
9 (ii) Unloading and Stacking of Bricks by manual means including a lead
upto 30 m
Unit = 1000 Nos.
Taking output = 2000 Nos.
a) Labour
Mate day 0.01 325.00 3.25
Mazdoor (Unskilled) day 0.25 306.00 76.50
b) Machinery
Truck 10 t capacity hour 0.33 934.30 308.32
86
SDB Sl. MORD Analysis of Rates ( FORMAT F8 ) Amount
Sl. No. DESCRIPTION Unit Quantity Rate
No. Ref No. (in Rs)
c) Haulage
Over Heads & Contractors profit @ 12.5% BY TIPPER
on (a+b) 48.51
Cost for 2000 Nos. = a+b+c 436.58
Rate for 1000 bricks = (a+b+c)/2 218.29
SAY no. 218.29
10 Loading and Unloading of Cement or steel by Manual Means and stacking
(i) Loading of Cement by manual means including a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate day 0.06 325.00 19.50
Mazdoor (Unskilled) day 1.50 306.00 459.00
b) Machinery
Truck 10 t capacity hour 1.00 934.30 934.30
c) Over Heads & Contractors profit @ 12.5% on (a+b) 176.60
Cost for 10 t = a+b+c 1,589.40
Rate per tonnes = (a+b+c)/10 158.94
SAY t 158.94
11 (ii) Unloading of Cement by manual means including a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate day 0.06 325.00 19.50
Mazdoor (Unskilled) day 1.50 306.00 459.00
b) Machinery
Truck 10 t capacity hour 1.00 934.30 934.30
c) Over Heads & Contractors profit @ 12.5% on (a+b) 176.60
Cost for 10 t = a+b+c 1,589.40
Rate per tonne = (a+b+c)/10 158.94
SAY t 158.94
12 1.5 Loading and Unloading of Structural Steel and Steel Bars by manual
means
(i) Loading of Structural Steel, Steel Bars by manual means including a lead
upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate day 0.07 325.00 22.75
Mazdoor (Unskilled) day 1.80 306.00 550.80
b) Machinery
Truck 10 t capacity hour 1.00 934.30 934.30
c) Over Heads & Contractors profit @ 12.5% on (a+b) 188.48
Cost for 10 t = a+b+c 1,696.33
Rate per tonnes = (a+b+c)/10 169.63
SAY t 169.63
13 (ii) Unloading of Structural Steel, Steel Bars by manual means including
a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate day 0.07 325.00 22.75
Mazdoor (Unskilled) day 1.80 306.00 550.80
b) Machinery
Truck 10 t capacity hour 1.00 934.30 934.30
c) Over Heads & Contractors profit @ 12.5% on (a+b) 188.48
Cost for 10 t = a+b+c 1,696.33
Rate per t = (a+b+c)/10 169.63
SAY t 169.63
14 1.6 Loading and Unloading of Bitumen Drums by Manual Means
(i) Loading of Bitumen Drums by manual means including a lead upto 30 m
Unit = t
Taking output = 10 t
a) Labour
Mate day 0.06 325.00 19.50
Mazdoor (Unskilled) day 1.60 306.00 489.60
b) Machinery
Truck 10 t capacity hour 1.25 934.30 1,167.88
87
SDB Sl. MORD Analysis of Rates ( FORMAT F8 ) Amount
Sl. No. DESCRIPTION Unit Quantity Rate
No. Ref No. (in Rs)
c) Haulage
Over Heads & Contractors profit @ 12.5% BY TIPPER
on (a+b) 209.62
Cost for 10 t = a+b+c 1,886.60
Rate per tonnes = (a+b+c)/10 188.66
SAY t 188.66
15 (ii) Unloading of Bitumen Drums by Manual Means including a lead upto
30 m
Unit = t
Taking output = 10 t
a) Labour
Mate day 0.05 325.00 16.25
Mazdoor (Unskilled) day 1.20 306.00 367.20
b) Machinery
Truck 10 t capacity hour 1.25 934.30 1,167.88
c) Over Heads & Contractors profit @ 12.5% on (a+b) 193.92
Cost for 10 t = a+b+c 1,745.24
Rate per t = (a+b+c)/10 174.52
Note :- The rate is inclusive of the self weight of drum
SAY t 174.52
16 1.10 Haulage excluding Loading & Unloading
Haulage of materials by tipper excluding cost of Loading, Unloading and
stacking
Unit = 1km
Taking output 10t load and lead 10km = 100t_km
Case - I Surfaced Road
Speed with load : 25km per hour
Speed while returning empty : 35km per hour
a) Machinery
Truck 10 t capacity Truck 10
Haulage with load hour 0.4 934.30 373.72
Empty return trip hour 0.29 934.30 270.95
b) Over Heads & Contractors profit @ 12.5% on (a) 80.58
Cost for 100t_km = a+b+c 725.25
Cost for 1 t_km = a+b+c/100 7.25
SAY 7.25
Case - II Unsurfaced Road
Speed with load : 20km per hour
Speed while returning empty : 30km per hour
a) Machinery
Truck 10 t capacity
Haulage with load hour 0.5 934.30 467.15
Empty return trip hour 0.33 934.30 308.32
b) Over Heads & Contractors profit @ 12.5% on (a+b) 96.93
Cost for 100t_km = a+b+c 872.40
Cost for 1 t_km = a+b+c/100 8.72
SAY 8.72
Case - III Kutcha Track and Track in River Bed / Nallah Bed and Choe
Bed
Speed with load : 10km per hour
Speed while returning empty : 15km per hour
a) Machinery
Truck 10 t capacity
Haulage with load hour 1 934.30 934.30
Empty return trip hour 0.67 934.30 625.98
b) Over Heads & Contractors profit @ 12.5% on (a+b) 195.04
Cost for 100t_km = a+b+c 1,755.32
Cost for 1 t_km = a+b+c/100 17.55
SAY 17.55
17 2.2 201 Clearing and Grubbing Road Land
(I) Clearing and Grubbing Road Land including uprooting wild vegetation , grass,bushes,shurbs,saplings and trees of
girth upto 300mm, removal of stumps of such trees cut earlier and unseviceable materials & stacking of serviceable
materials to be used or auctioned upto a lead of 1000m including removal and disposal of top organic soil not
exceeding
By Manual150mm
Means in thickness as per technical specification(clause201.1)
(A) In area of non-thorny jungle
a) Labour
Mate day 6.00 325.00 1,950.00
Mazdoor (Unskilled) day 150.00 306.00 45,900.00
b) Machinery
Tractor with trolley hour 1.00 629.00 629.00
c) Over Heads & Contractors profit @ 12.5% on (a+b) 6,059.88
Rate per hectare = a+b+c 54,538.88
SAY Ha. 54,538.88
18 2.5 202 Dismantling of Structures
88
SDB Sl. MORD Analysis of Rates ( FORMAT F8 ) Amount
Sl. No. DESCRIPTION Unit Quantity Rate
No. Ref No. (in Rs)
Haulage
Dismantling of existing structures like culverts, BY TIPPER
bridges, retaining walls and other structure comprising of masonry,
cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled
material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as
per Technical Specification Clause 202.
Unit = cum
Taking output = 1.25 cum
(I) By Manual Means
(C) Reinforced Cement Concrete
a) Labour
Mate day 0.15 325.00 48.75
BlackSmith day 0.25 413.00 103.25
Mazdoor (Unskilled) day 3.50 306.00 1,071.00
Machinery
b) Tractor with trolley hour 0.27 591.40 159.68
c) Over Heads & Contractors profit @ 12.5% on (a+b) 172.83
Cost for 1.25 cum = a+b+c+d 1,555.51
Rate per cum = (a+b+c)/1.25 1,244.41
SAY cum 1,244.41
19 2.6 202 Dismantling of existing structures, like culverts, bridge,retaining wall and other structures comprising of brick
masonary including unserviceable material and stacking the serviceable material with all lift and lead of 1000m as
per technical specification clause 202.
(D) Dry Brick Pitching or Brick Soling, Masonry work
a) Labour
Mate day 0.014 325.00 4.55
Mazdoor (Unskilled) day 0.35 306.00 107.10
b) Machinery
Tractor with trolley hour 0.27 591.40 159.68
c) Over Heads & Contractors profit @ 12.5% on (a+b) 33.92
Cost for 1.25 cum = a+b+c 305.24
Rate per cum = (a+b+c)/1.25= cum 244.20
20 2.13 202.1 Removing all types of Hume pipe and stacking
Removing all types of Hume pipes and stacking within a lead of 1000 m
including Earthwork and Dismantling of Masonry Works as per Technical
Specification Clause 202.
(A) Upto 600 mm dia Hume pipe
a) Labour
Mate day 0.02 325.00 6.50
Mazdoor (Unskilled) day 0.52 306.00 159.12
b) Over Heads & Contractors profit @ 12.5% on (a) 20.70
Rate per m = a+b m 186.32
(B) Above 600 mm to 900 mm dia Hume pipe
a) Labour
Mate day 0.03 325.00 9.75
Mazdoor (Unskilled) day 0.70 306.00 214.20
b) Over Heads & Contractors profit @ 12.5% on (a) 27.99
Rate per m = a+b 251.94
SAY m 251.94
EARTHWORK
21 3.4 301.5 Construction of Embankment with Material Obtained from Borrow Pits
(A) Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m,
transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables
300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Unit = cum
Taking output = 100 cum
a) Labour
Mate day 0.04 325.00 13.00
Mazdoor (Unskilled) day 1.00 306.00 306.00
b) Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum per hour hour 1.67 2202.00 3,677.34
Truck 10 t capacity hour 4.50 1,518.00 6,831.00
Add 10 % of the cost of carriage by tipper 683.10
Dozer D-50 for spreading @ 100 cum per hour hour 0.50 1,587.00 793.50
Tractar mounted grader arrangement for grading @ 100 cum per hour 1.00 573.20
573.20
hour
Water tanker 6 kl capacity hour 2.00 707.00 1,414.00
Three wheel 80-100 kN Static Roller @ 80 cum per hour hour 1.25 1,518.00 1,897.50
c) Material
Water kl 12.00 40.00 480.00
Royality & Compensation for earth taken from private land cum 60.00 34.82 2,089.20
Dozer D-50 for spreading @ 100 cum per hour hour 0.50 1587.00 793.50
Tractar mounted grader arrangement for grading @ 100 cum per hour 1.00 591.40 591.40
hour
Water tanker with 6 kl capacity hour 2.00 707.00 1,414.00
Three wheel 80-100 kN Static Roller @80 cum per hour hour 1.43 1,518.00 2,170.74
c) Material
Water kl 12.00 40.00 480.00
Royality & Compensation for earth taken from private land cum 60.00 34.82 2,089.20
Haulage BY TIPPER
Water tanker 6 kl capacity 1 trip per hour hour 0.50 707.00 353.50
c) Material
Bitumen emulsion (SS-1) @ 0.85 kg per sqm t 1.48 53,791.82 79,611.89
Water kl 3.00 40.00 120.00
d) Over Heads & Contractors profit @ 12.5% on (a+b+c) 10,284.90
e) CARRIAGE
Bitumen ton 1.48 776.57 1,149.32
Cost of 1750 sqm = a+b+c+d+e 93,713.42
Rate per sqm = (a+b+c+d+e)/1750 53.55
SAY sqm 53.55
26 5.2 503 Tack Coat
(I) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate
of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per
Technical Specification Clause 503.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day 0.04 325.00 13.00
Mazdoor (Unskilled) day 1.00 306.00 306.00
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.40 746.00 1,044.40
Air compressor 210 cfm hour 1.40 391.00 547.40
Emulsion pressure distributor @1750 sqm per hour hour 1.00 283.00 283.00
c) Material
Bitumen emulsion (RS-1) @ 0.225 kg per sqm t 0.48 54,823.82 26,315.43
d) Over Heads & Contractors profit @ 12.5% on (a+b+c) 3,563.65
e) CARRIAGE
Bitumen ton 0.48 776.57 372.75
Cost of 1750 sqm = a+b+c+d+e 32,445.64
Rate per sqm = (a+b+c+d+e)/1750 18.54
SAY sqm 18.54
27 5.3 504 Bituminous Macadam
Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes
per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over
RCD
apreviously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses
501.6 and 501.7 to achieve the desired compaction.
Unit = cum
Taking output = 205 cum (450 tonnes)
a) Labour
Mate day 0.84 325 273.00
Mazdoor (Unskilled) day 16 306 4,896.00
Mazdoor (Skilled) day 5 388 1,940.00
b) Machinery
Batch mix HMP 100-120 TPH @ 75 t per hour actual output hour 6 40270 2,41,620.00
Hydraulic broom @ 1250 sqm per hour hour 2.2 746 1,641.20
Air compressor 210 cfm hour 2.2 391 860.20
Paver finisher hour 6 2078 12,468.00
Generator 250 KVA hour 6 3034 18,204.00
Front end loader 1 cum bucket capacity hour 6 1594 9,564.00
Tipper 10 tonne capacity tonne.km 450 x L 9.07 4,081.50
Add 10 per cent of cost of carriage to cover cost of loading
408.15
and unloading
Three wheel 80-100 kN static roller for intial break down
5,920.20
rolling, final and finishing rolling hour 6.00x0.65* 1518
Vibratory roller 80-100 kN for intermediate rolling tonne.km 6.00x0.65* 1978 7,714.20
Finish rolling with 6-8 tonnes smooth wheeled tandem
5,920.20
roller hour 6.00x0.65* 1518
c) Material
i) Bitumen @ 3.3 per cent of mix (Weight of mix = 205.0 x
2.2 = 450 t) t 14.85 54206.82 8,04,971.28
ii) Aggregate
Total weight of mix = 225 t
Weight of bitumen = 7.425 t
Weight of aggregate = 225 – 7.425 = 217.575 t
Taking density of aggregate = 1.5 t/cum
Volume of aggregate = 145.05 cum
(19 mm nominal size)
92
SDB Sl. MORD Analysis of Rates ( FORMAT F8 ) Amount
Sl. No. DESCRIPTION Unit Quantity Rate
No. Ref No. (in Rs)
Case - I : Type A
(I) Bitumen (S-90)
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate day 0.85 325.00 276.25
Mazdoor (Unskilled) day 15 306.00 4,590.00
Mazdoor (Semi-Skilled) day 2 318.00 636.00
b) Machinery
Mixal 6/10 t capacity hour 2.5 3702.00 9,255.00
Bitumen boiler oil fired, capacity 1000 litre fitted with spray set hour 2.5 510.00 1,275.00
Three wheel 80-100 kN static roller hour 2.5 803.00 2,007.50
c) Material
Bitumen (S-90) @ 9.80 kg per 10 sqm t 0.85 53406.82 45,395.80
cum
Crushed stone chipping of 6.7 mm size 100 per cent passing 11.2 mm retained on234.89
sieve and 7.5 1,761.68
2.36 mm sieve applied @ 0.09 cu
d) Over Heads @ 12.5% on (a+b+c) 8,149.65
e) Contractors Profit @ 0% on (a+b+c+d) 0.00
Cost of 1250 sqm = a+b+c+d 73,346.87
Rate per sqm = (a+b+c+d)/1250 58.68
f) CARRIAGE
i) Bitumen t 0.00068 776.57 0.53
ii) Crushed stone chipping cum 0.006 3481.39 20.89
Rate per sqm = (a+b+c+d+e)/1250 80.09
Total Cost ) cum 80.09
SUB HEAD : ANALYSIS OF BRIDGES ITEMS
29 11.1 300 Excavation for Structures
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1
including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches
I. Ordinary soil
(i) Upto 3 m depth
Unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.32 325.00 104.00
Mazdoor (Unskilled) day 8.00 306.00 2,448.00
b) Overhead Charges & Contractor Profit @ 20% on (a) 510.40
Cost for 10 cum = a+b+c 3,062.40
Rate per cum = (a+b+c)/10 cum 306.24
(ii) Upto 3 m to 6m depth
a) Labour
Mate day 0.38 325.00 123.50
Mazdoor (Unskilled) day 9.50 306.00 2,907.00
b) Over Heads & Contractor Profit @ 20% on (a) 606.10
Cost for 10 cum = a+b+c 3,636.60
Rate per cum = (a+b+c)/10 cum 363.66
800 & Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and
30 11.4 1200 technical specifications Clause 802, 803, 1202 & 1203
II. P.C.C grade M 15
(i) Nominal mix (1:2.5:5)
Unit = cum
a) Material
Cement t 0.275 5,006.40 1,376.76
Coarse sand cum 0.48 175.80 84.38
40 mm aggregate cum 0.48 486.92 233.72
20 mm aggregate cum 0.24 595.36 142.89
10 mm aggregate cum 0.08 657.91 52.63
b) Labour
Mate day 0.08 325.00 26.00
Mason (1st Class) day 0.10 413.00 41.30
Mazdoor (Unskilled) day 1.63 306.00 498.78
Bhisti day 0.27 306.00 82.62
c) Machinery 94
SDB Sl. MORD Analysis of Rates ( FORMAT F8 ) Amount
Sl. No. DESCRIPTION Unit Quantity Rate
No. Ref No. (in Rs)
Concrete mixer 0.4/0.28 cum capacity Haulage BY TIPPER hour 0.40 1,289.30 515.72
d) Formwork @ 4% on cost of material, labour and machinery (a+b+c) 122.19
e) Overhead Charges & Contractor Profit @ 20% on (a+b+c+d) 635.40
f) CARRIAGE
Cement t 0.275 390.41 107.36
Coarse sand cum 0.48 3,092.18 1,484.25
Aggregate cum 0.80 3,481.39 2,785.11
Rate per cum = a+b+c+d+e+f cum 8,189.12
1500, R.C.C. grade M 30 in Open Foundation complete as per Dwg & Tech
12.8
33 1700 & Specification (Analysis using MoRT&H Data Book)
(G)
2100
Using Batching Plant, Transit Mixer and Concrete Pump
Case II Unit = cum
Taking ouput = 120 cum
a) Material
Cement t 48.80 5,006.40 2,44,312.32
Coarse sand cum 54.00 175.80 9,493.20
20 mm aggregate cum 64.80 595.36 38,579.33
10 mm aggregate cum 43.20 657.91 28,421.71
b) Labour
Mate day 0.84 325.00 273.00
Mason (1st Class) day 3.00 413.00 1,239.00
Mazdoor (Unskilled) day 18.00 306.00 5,508.00
c) Machinery
Batching Plant @20 cum/hour hour 6.00 2,981.00 17,886.00
Generator 100 KVA hour 6.00 869.00 5,214.00
Loader 1 cum capacity hour 6.00 1,594.00 9,564.00
Transit Mixer 4 cum capacity for lead up to 1.0 km hour 15.00 1,406.00 21,090.00
Concrete Pump hour 6.00 960.00 5,760.00
d) Formwork @ 3.5% on (a+b+c) 13,556.92
e) Overhead Charges & Contractor Profit @ 20% on (a+b+c+d) 80,179.50
g) CARRIAGE
Cement t 48.80 390.41 19,052.01
Coarse sand cum 54.00 3,092.18 1,66,977.72
Aggregate cum 108.00 3,481.39 3,75,990.12
Rate per cum = (a+b+c+d+e+f+g)/120 cum 8,692.47
(C)
Machinery Haulage BY TIPPER
Batching Plant @20 cum/hour hour 6.00 2,981.00 17,886.00
Generator 100 KVA hour 6.00 869.00 5,214.00
Loader 1 cum capacity hour 6.00 1,594.00 9,564.00
Transit Mixer 4 cum capacity for lead up to 1.0 km hour 15.00 1,406.00 21,090.00
Concrete Pump hour 6.00 960.00 5,760.00
d) CARRIAGE
Cement t 50.28 390.41 19,629.81
Coarse sand cum 54.00 3,092.18 1,66,977.72
Aggregate cum 108.00 3,481.39 3,75,990.12
Rate per cum = (a+b+c)/120 cum 8,197.09
1200, Sub-Analysis
12.11
34 1500 & PCC grade M-30 (Analysis using MoRT&H Data Book)
(C)
1700
Case-I Using Concrete Mixer
Unit = cum
Taking ouput = 15 cum
a) Material
Cement t 6.08 5,006.40 30,438.91
Coarse sand cum 6.75 175.80 1,186.65
40 mm aggregate cum 5.40 486.92 2,629.37
20 mm aggregate cum 5.40 595.36 3,214.94
10 mm aggregate cum 2.70 657.91 1,776.36
Admixture kg 21.60 100.00 2,160.00
b) Labour
Mate day 0.90 325.00 292.50
Mason (1st Class) day 1.50 413.00 619.50
Mazdoor (Unskilled) day 20.00 306.00 6,120.00
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 6.00 1,289.30 7,735.80
Generator 33 KVA hour 6.00 495.00 2,970.00
Light Crane of 3 tonnes capacity for handling tremie pipe hour 6.00 2,930.00 17,580.00
Rate per cum = (a+b+c+d+e+f+g)/15 cum 5,114.94
35 11.7 1000 & Supplying, fitting and placing HYSD bar reinforcement in foundation
1200 complete as per drawings and technical specifications Clauses 1000 and
1202
Unit = t
a) Material
HYSD bars including 5 per cent for overlaps and wastage t 1.05 54,809.75 57,550.24
Binding wire kg 6.00 58.95 353.70
b) Labour for cutting, bending, shifting to site, tying and placing in
Mate day 0.40 325.00 130.00
Blacksmith day 2.00 413.00 826.00
Mazdoor (Unskilled) day 6.00 306.00 1,836.00
c) Overhead Charges & Contractor Profit @ 20% on (a+b) 12,139.19
d) Contractors Profit @ 0% on (a+b+c) 0.00
e) CARRIAGE
Reinforcement t 1.05 411.80 432.39
Rate per t = a+b+c+d+e t 73,267.52
36 12.22 1200 Providing steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed
&1900 drawing
Unit = 1 MT
Taking Output = 1 MT
a) Material
i) Structural Steel including 5% Westage ton 1.05 46658.00 48,990.90
b) Labour
Mate Day 1.24 325.00 403.00
Fitter Day 6.00 420.00 2,520.00
Blacksmith Day 5.00 413.00 2,065.00
Welder Day 5.00 463.00 2,315.00
Mazdoor Day 10.00 306.00 3,060.00
Electrodes,Cutting Gas and Other Consumables @ 5 percent on cost a (a) 2,449.55
Overhead Charges & Contractor Profit @ 20% on (a+b) 12,360.69
Contractors Profit @ 0% on (a+b+c) 0.00
Rate per MT (a+b+c+d) 74,164.13
e) CARRIAGE
Structural Steel ton 1.1 614.87 645.61
Total Cost including 74,809.75
SUBSTRUCTURE
1500, R.C.C. grade M-30 in Substructure complete as per Dwg & Tech Specification (Analysis using MoRT&H
13.5 1700 & Data Book)
31 (G) 2100
(p) Height Upto 5m
Case-II Using Batching Plant, Transit Mixer and Concrete Pump 96
SDB Sl. MORD Analysis of Rates ( FORMAT F8 ) Amount
Sl. No. DESCRIPTION Unit Quantity Rate
No. Ref No. (in Rs)
I) Granular material
a) Material
Granular material cum 12.00 163.53 1,962.36
b) Labour
Mate day 0.28 325.00 91.00
Mazdoor (Unskilled) day 10.00 306.00 3,060.00
Bhisti day 0.40 306.00 122.40
c) Overhead Charges & Contractor Profit @ 20% on (a+b) 1,047.15
e) CARRIAGE
Granular Material cum 12.00 3,481.39 41,776.68
Cost for 10 cum of granular backfill = a+b+c+d+e 48,059.59
Rate per cum = (a+b+c+d+e)/10 4,805.96
II) Sandy material
Unit = cum
Taking output = 10 cum
a) Material
Sand cum 12.00 141.85 1,702.20
b) Labour
Mate day 0.40 325.00 130.00
Mazdoor (Unskilled) day 10.00 306.00 3,060.00
Bhisti day 0.40 306.00 122.40
c) Overhead Charges & Contractor Profit @ 20% on (a+b) 1,002.92
99
SDB Sl. MORD Analysis of Rates ( FORMAT F8 ) Amount
Sl. No. DESCRIPTION Unit Quantity Rate
No. Ref No. (in Rs)
SUPER STRUCTURE
37 14.1 1500,
(C) 1600 & R.C.C. grade M 30 in Super Structure complete as per Dwg & Tech Specification (Analysis using
1700 MoRT&H Data Book)
Using Batching Plant, Transit Mixer and Concrete Pump
(P) Case II Unit = cum (Height up to 5.0 m )
Taking ouput = 120 cum
a) Material
Cement t 48.79 5006.4 2,44,262.26
Coarse sand cum 54.6 175.8 9,598.68
20 mm aggregate cum 64.8 595.36 38,579.33
10 mm aggregate cum 43.2 657.91 28,421.71
b) Labour
Mate day 0.88 325 286.00
Mason (1st Class) day 3 413 1,239.00
Mazdoor (Unskilled) day 19 306 5,814.00
c) Machinery
Batching Plant @20 cum/hour hour 6 2981 17,886.00
Generator 100 KVA hour 6 869 5,214.00
Loader 1 cum capacity hour 6 1594 9,564.00
Transit Mixer 4 cum capacity for lead up to 1.0 km hour 15 1406 21,090.00
Concrete Pump hour 6 960 5,760.00
d) Formwork @ 25 % on (a+b+c) 96,928.74
e) Overhead Charges & Contractor Profit @ 20% on (a+b+c+d) 1,23,049.50
g) CARRIAGE
Cement t 48.79 390.41 19,048.10
Coarse sand cum 54.6 3092.18 1,68,833.03
Aggregate cum 108 3481.39 3,75,990.12
Rate per cum = (a+b+c+d+e+f+g)/120 cum 9,763.04
38 13.2 1000
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing
and technical specifications Clauses 1002, 1010 and 1202
a) Material
HYSD bars including 5 per cent for laps and wastage t 1.05 54,809.75 57,550.24
Binding wire kg 8.00 58.95 471.60
b) Labour for cutting, bending, tying and placing in position
Mate day 0.44 325.00 143.00
Blacksmith day 3.00 413.00 1,239.00
Mazdoor (Unskilled) day 8.00 306.00 2,448.00
c) Over Heads Overhead Charges & Contractor Profit @ 20% on (a+b) 12,370.37
e) CARRIAGE
Reinforcement t 1.05 411.80 432.39
Rate per t = a+b+c+d+e t 74,654.60
100
SDB Sl. MORD Analysis of Rates ( FORMAT F8 ) Amount
Sl. No. DESCRIPTION Unit Quantity Rate
No. Ref No. (in Rs)
Stone boulder (25 Kg minimum ) Haulage BY TIPPER cum 1.00 3282.38 3,282.38
Stone spalls cum 0.20 3282.38 656.48
Rate per cum = a+b+c+d+e cum 4,909.27
45 14.5 1300 Providing and laying boulder pitching on slopes laid over prepared filter media as per drawing and
technical specifications Clause 1302
I. Stone/Boulder
Unit = cum
a) Material
Stone boulder (25 kg minimum) cum 1.00 351.36 351.36
Stone spalls of minimum 25 mm size cum 0.20 351.36 70.27
b) Labour
Mate day 0.04 325.00 13.00
Mason 1st Class day 0.35 413.00 144.55
Mazdoor (Unskilled) day 0.75 306.00 229.50
c) Overhead Charges & Contractor Profit @ 20% on (a+b) 161.74
e) CARRIAGE
Stone boulder (25 Kg minimum ) Nos 1.00 3,282.38 3,282.38
Stone spalls cum 0.20 3,282.38 656.48
Rate per cum = (a+b+c+d+e) 4,909.27
SAY CUM 4,909.27
46 14.6 1300 Providing and laying filter material underneath pitching in slopes complete as per drawing and
technical specifications Clause 1302
Unit = cum
a) Material
Graded stone aggregate of required size cum 1.20 657.91 789.49
b) Labour
Mate day 0.05 325.00 16.25
Mazdoor (Skilled) day 0.25 388.00 97.00
Mazdoor (Unskilled) day 1.02 306.00 312.12
c) Overhead Charges & Contractor Profit @ 20% on (a+b) 242.97
e) CARRIAGE
Graded Stone Aggregate of required size cum 1.20 3,173.72 3,808.46
Rate per cum = (a+b+c+d+e) 5,266.30
SAY Cum 5,266.30
47 14.7 1300 Providing and laying flooring laid over cement concrete bedding complete as per drawing and
technical specification Clause 1303
(I) Rubble stone laid in cement mortar 1:3
Unit=cum
a) Material
Cement mortar (1:3) (Rate as in item 12.9) cum 0.15 6496.63 974.49
Cement concrete bedding (M10) cum 0.33 3015.49 995.11
b. Labour
Mate day 0.10 325.00 32.50
Mason 1st Class day 0.80 413.00 330.40
Mazdoor (Unskilled) day 1.60 306.00 489.60
Bhisti day 0.20 306.00 61.20
c) Overhead Charges & Contractor Profit @ 20% on (a+b) 576.66
e) CARRIAGE
Cement t 0.25 390.41 97.60
Coarse sand cum 0.48 3,092.18 1,484.25
Aggregate cum 0.96 3,481.39 3,342.13
Rate per cum = a+b+c+d+e 8,383.95
SAY cum 8,383.95
105
SDB Sl. MORD Analysis of Rates ( FORMAT F8 ) Amount
Sl. No. DESCRIPTION Unit Quantity Rate
No. Ref No. (in Rs)
108
CHAPTER-8
TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES
Ref. to
MoRT
Sr No Description Unit Quantity Rate Rs Cost Rs
H
Spec.
8.13 803 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass
Beads on Bituminous Surface
Providing and laying of hot applied thermoplastic
compound 2.5 mm thick including reflectorising
glass beads @ 250 gms per sqm area, thickness
of 2.5 mm is exclusive of surface applied glass
beads as per IRC:35 .The finished surface to be
level, uniform and free from streaks and holes.
Unit = sqm
Taking output = 640 sqm
a) Labour
Mate day 0.5 325 162.50
Mazdoor day 2 306 612.00
b) Machinery
Road marking machine @ 80 sqm per hour hour 8 141.8 1134.40
Tractor-trolley hour 8 629 5032.00
c) Material
Hot applied thermoplastic compound Litre 2000 183.25 366500.00
Reflectorising glass beads kg 200 65.04 13008.00
d) Overheads & Contractor’s profit@ 12.5 % on (a+b+c) 48306.1125
Cost for 640 sqm = a+b+c+d+e 434755.01
Rate per sqm = a+b+c+d+e)/640 679.304707
Total Cost say 679.30
Page 1 of 46
109
DETAILED DESIGN REPORT
GEOTECHNICAL REPORT
110
GEOTECHNICAL INVESTIGATION REPORT
FOR MINOR BRIDGE
PROJECT
CONSTRUCTION OF RCC BRIDGE AT PIPRA TO GARDI
CH:3+100Km
CLIENT
EXECUTIVE ENGINEER, PWD(WORKS)
DISTRICT- WEST CHAMPARAN
111
Geotechnical Investigation Report for MNB
CONTENTS
1 INTRODUCTION ......................................................................................................... 1
2 SCOPE OF WORK ...................................................................................................... 1
3 FIELD WORK .............................................................................................................. 1
4 LABORATORY TESTS ................................................................................................ 2
5 DESIGN METHODOLOGY .......................................................................................... 3
6 RECOMMENDATION .................................................................................................. 4
Annexure
112
Geotechnical Investigation Report for MNB
1 INTRODUCTION :-
CONSTRUCTION OF RCC BRIDGE AT PIPRA TO GARDI.
2 SCOPE OF WORK
The scope of work is conducting confirmatory geotechnical investigation for the proposed
construction of MNB as per the specifications and direction given by the client.
The detailed scope of work includes the following
Conducting Standard Penetration Test (SPT) at foundation level
Collecting UDS sample at foundation level
Conducting relevant laboratory tests.
Recommendations for the foundations.
3 FIELD WORK
Field investigations were carried out on 12 Feb to 15 Feb 22. Brief methodologies of standard
penetration test and sampling works are given below.
Standard Penetration Tests (SPT) was conducted at proposed foundation level in open pit as
per Indian Standard IS:2131-1981 and split spoon sampler used conformed to the Indian
Standard IS:9640-1980. These tests were performed by driving the sampler with 63.5kg
hammer falling from a height of 75cm. Number of blows required to effect each 15cm
penetration is recorded. The first 15cm penetration is considered to be the seating drive. The
sum of the total blows required for a second and third 15cm (total 30cm) penetration is termed
the penetration resistance SPT' N' value and the same is reported
113
Geotechnical Investigation Report for MNB
When the number of blows exceeded 50 to penetrate the first or second 15 cms length of the
sampler, the SPT N is regarded as more than 100 as described in IS 2131 - 1981. The test is
terminated in such case and a record of penetration of the sampler under 50 blows is made.
SPT refusal is recorded when there is no penetration of the sampler at any stage and also
when a rebound of the sounding system is recorded.
Disturbed soil collected in the SPT sampler was preserved in polythene covers and
transported to the laboratory.
SPT values obtained at the foundation level are tabulated below. Depth of Soil collected
at 22m.
Sl Foundation SPT ‘N’ Value
Location
No. RL 15cm 30cm 45cm N
1 SPT-1 76.703 11 16 19 35
3.2 Sampling
Disturbed soil samples were collected from SPT spoon and UDS samples collected at
proposed foundation level and subsequently sent to laboratory for visual examination and
laboratory tests.
4 LABORATORY TESTS
Laboratory tests were carried out on soil samples as per the relevant Indian Specifications.
Details of various tests conducted are presented below.
A) Tests on soil samples:
The following tests have been performed for soil samples:
Bulk Density and moisture contents;
Grain size analysis tests as per IS:2720 (Part -IV)
Atterberg’s limits-liquid limit and plastic limit as per IS: 2720 (Part-V)
Direct shear test as per IS:2720 (Part -XIII)
On sandy samples grain size distribution analysis test were conducted using both dry and wet
sieve analysis techniques. These tests are completed primarily to classify and to find out the
gradation characteristics.
In general on clayey samples Atterberg's Limit tests are conducted to derive the engineering
characteristic.
114
Geotechnical Investigation Report for MNB
Moisture Content
Strength
Classification
Limits Sand Silt & Parameters*
Sampling RL
Clay
Soil
ø(Degrees
SPT "N"
2)
Description
Sample
Gravel
c(kN/
IS
wL wP Coarse Medium Fine M C
(%)
)
SPT1 76.703 35 Sandy soil SC 17.2 25 12 0 35 26 29 9 0 31
*- conducted on remoulded sample
5 DESIGN METHODOLOGY
PILE FOUNDATION
The safe bearing capacity is arrived based on the shear failure criteria and settlement criteria.
The estimated safe bearing capacity is calculated as per IS: 6403-1981 code and IS: 8009
(Part-1)-1976 with available soil profile.
The intensity of loading at the base of the foundation, which would cause shear failure of the
soil support, is termed as ultimate bearing capacity (UBC).
Safe bearing capacity (SBC) is the maximum intensity of loading that the foundation will safely
carry without the risk of shear failure of soil irrespective of any settlement that may occur. Safe
bearing capacity can be obtained by dividing the UBC with suitable factor of safety (2.5).
SBC = UBC/2.5
115
Geotechnical Investigation Report for MNB
Settlement Criteria:
The intensity of loading that will cause a permissible settlement or specified settlement of the
structure is termed as allowable bearing pressure.
The elastic settlement of granular soil and consolidated settlement of cohesive soils are
calculated using SPT ‘N’ values and laboratory test results. Settlement is predicted using IS:
8009 (part-1)-1976.
6 RECOMMENDATION
PILE foundations are recommended in the form of isolated foundation or raft foundation as
follows,
116
Annexure – I
SBC Calculations
117
Bearing Capacity Based on Shear Criteria
(Based on IS: 6403-
1981)
Sandy soil with
Type of soil at founding level = Gravel
Ground water table location (Dw) = 6.0 m
3
Unit weight of soil () = 2.0 t/m
3
Submerged unit of soil (') = 1.0 t/m
Condition of soil = Medium (Relative Density 36%)
Type of footing: = Pile foundation
Dia. of footing (B) = 1.0 m
Length of footing(L) = 20.0 m
Depth of footing from basement (Df) = 1.5 m
Average Corrected 'N' value at base of footing = 39
Angle of internal friction () = 31 deg.
118
Bearing Capacity Based on Shear Criteria
(Based on IS: 6403-1981)
2
Ultimate bearing capacity (Local) = 17.33 t/m
Safe bearing capacity as per shear criteria,
(SBC) Local = UBC/F.S = 6.93 t/m2
Reporting of Results:
As per the design requirements of PILE Foundations we need to attain minimum
SAFE BEARING CAPACITY of Foundation Soil as 15T/M2. But, as per testing we are
achieving 27.22T/M2 at Abutment No-1. Hence results are satisfactory.
119
Site Photographs Pipra To Gardi Ch: 3+160Km
120
Site Photographs Pipra To Gardi Ch: 3+160Km
121
DETAILED DESIGN REPORT
HYDRAULICS
122
PMGSY (GOVT. OF BIHAR)
123
Detailed Hydraulic Calculations
Introduction:
The length of a bridge, its depth of foundation etc. are dependent on the maximum recorded quantum of
water or flood discharge which has passed through the river or the channel over which the bridge is
proposed and as such the design discharge is very important not only from economic consideration but also
from safety or stability consideration. Therefore, the design discharge, which might be the recorded
dischrge during the past 50-100 years, shall be ascertained very carefully.
There are various methods for the estimation of flood discharge like:
1. Catchment-Run-off Method from rainfall and other characteristics of the catchment by the use of
empirical formulae or by Rational Method.
2. By using Empirical Formulae.
3. From hydraulic characteristics of the stream such as the conveyance factor and slope of the stream.
4. From area of cross-section and velocity as observed on the stream at the bridge site.
5. From recorded flood discharge near the bridge site.
The use of a particular method depends upon (i) the desired objective, (ii) the available data and (iii) the
importance of the project. Further the Rational Method is found to be suitable for peak flow prediction in
small catchments upto 50 km2 in area. It finds considerable application in urban drainage designs and in the
design of small bridges and culverts.
Below, the flood discharge is estimated only by the first two methods written above. The third method
cannot be used for the hydraulic calculations as it is not possible to measure the velocity of the stream at the
bridge site as the stream is dry now. The fourth or last method is not used as the recorded flood discharge
near the bridge site is not available.
124
1.) Rational Method to calculate Peak Run-off from Catchment:
Hence, from curve 'f' for catchment area of 5000 hectares = 0.83
125
Step II - Estimating the Concentration time of a Catchment (t c ):-
The time of concentration is to be calculated by the formula given below:
tc = (0.87 x L3/H)0.385 = (0.87 x 5^3 /2.5 )^0.385 = 4.27 hr
126
Hydrological Calculation of Bridges
-0+043
-0+034
-0+031
0+000
0+019
0+022
0+024
0+024 101.233 101.233 101.233 0.000 0.614 2.796 1.716 1.227 3.054
C/S of Chainage 50.0m U/S H.F.L
Avg.depth 1.730 Total 147.287 68.169 2.161 2.63 387.654
-0+021
-0+016
-0+039
0+000
0+006
0+011
0+018
0+045
0+045 100.923 100.923 100.923 0.310 0.771 26.510 20.439 0.922 26.526
C/S of Chainage B/S H.F.L
Avg.depth 1.848 Total 129.630 84.399 1.536 2.10 271.755
PMGSY-Bihar
127
Hydrological Calculation of Bridges
-0+021
-0+016
-0+039
Longitudinal slope= 0.0062 HFL= 100.923 m Manning's coeff., n = 0.050
-0+015
-0+009
-0+038
0+000
0+014
0+020
0+026
0+037
0+037 101.23 101.233 101.233 0.000 0.581 10.771 6.258 1.162 10.834
C/S of Chainage 50.0m D/S H.F.L
Avg.depth 1.551 Total 103.097 74.976 1.375 1.95 200.765
Summery:
99.000
Long Slope
Bead Level, m
Velocity (V, Discharge (Q, Lowest Bed 98.800
S.No. Loaction Chainage Long Slope
m/s) cu.m) level 98.600
1 U/S 50 m 2.632 387.654 98.423 0.0000 98.400
2 B/S 0m 2.096 271.755 98.137 0.0057 98.200
3 D/S 50 m 1.947 200.765 98.781 0.0129 98.000
97.800
50 m 0m 50 m
Design HFL= 100.923 m
U/S B/S D/S
Maximum Velocity= 1.947 m/s
Average Discharge= 286.72 cu.m Say 287 cu.m Long Slope
PMGSY-Bihar
128
Hydrological Calculation of Bridges
3. Discharge by C/S
Dicken's Formula:
of Chainage 50.0m U/S
Bed Level
Dickens Formula:
Area of Catchment (A): = 5000.0 Ha Ánual Rail Fall: 1192.0 mm/hr
Dickens Constant, CD : = 14
3/4
Discharge = CD x (A) = 263 m3/s
PMGSY-Bihar
129
Hydrological Calculation of Bridges
HFL = 100.923 m
Q = 372.74 cumec
Le = 151.60 m
Db = 2.46 cumec/m
Ksf = 1.0 Considering silt factor 0.6 as per IRC 78:2014
S = 0.0062
2 1/3
dsm = 1.34*(Db /Ksf)^
2.441 m
For abutment, 1.27*dsm = 3.10 m
For Pier, 2*dsm = 4.88 m
PMGSY-Bihar
130
Hydrological Calculation of Bridge
PMGSY-Bihar
131
DETAILED DESIGN REPORT
BRIDGE DESIGN
132
CONTRUCTION OF RCC BRIDGE IN PIPRA TO
GARDI AT CH-3+100 Km
133
CONTENTS
INTRODUCTION
134
INTRODUCTION
State M
1. General
This design note pertains to the design of proposed abutment A1 & A2 of MNB Pipra To Gardi
The Super structure consists of RCC girder and deck slab of overall span 1X20m supported on bearing.
Skew angle is 0 degree. The substructure consists of RCC wall type abutment on pile foundation.
1 IRC : 6 2017
3 IRC : 78 2014
3. Loads
1 Dead load (Due to self weight of superstructurre, substructure, foundation and backfill weight)
2 Superimposed Dead Load (SIDL) excluding wearing course due to crash barrier, footpath and railing
(if present)
3 Superimposed Dead Load (SIDL) due to wearing course
4 Carriageway live load
i. 1 lane of 70R Wheeled
ii. 1 lane of Class A
5 Earth pressure due to backfill
6 Seismic force
7 Wind load is not considered as it is not governing
135
5. Design Philosophy
Design is done using limit state method
ULS and SLS strengths of abutment section is checked using Interaction diagram
Basic and seismic combination is used for checking ULS strength. Rare combination is used for checking
stress. Quasi-permanent combination is used for checking crack width.
136
BASIC DESIGN DATA
1 Basic Design Data
1.1 Span and Cross section Data
C/C of expansion gap = 20.00 m (Sq.)
C/C of bearing = 18.50 m (Sq.)
Distance of bearing to expansion gap = 0.75 m (Sq.)
Carriageway width = 7.50 m
Total width = 8.40 m
Column width for spill through abutment = 8.40 m
Column length parallel to traffic = 1.00 m
Column no = 1.00
Column spacing c/c = 0.00 m
Footpath Width (Left side) = 0.00 m
Footpath Width (Right side) = 0.00 m
Crash Barrier Width (Left side) = 0.45 m
Crash Barrier Width (Right side) = 0.45 m
Handrail kerb Width (Left side) = 0.00 m
Handrail kerb Width (Right side) = 0.00 m
o
Skew Angle = 0.0 0.000radians
Deck Cantilever 1.20 m
137
1.5 Soil Parameters
Angle of Shear resistance"f" = 30 o
3
Density of Dry Backfill "gd" = 2.00 t/m
3
Density of Submerged Backfill "gsub" = 1.00 t/m
Allowable Compressive load on piles (t) = 200.00 t
Dia of pile = 1.00 m
Allowable uplift (t) = 50.00 t
Horizontal capacity of pile (t) = 25.00 t
length below pile cap bottom (m) = 20.00 m
Live load surcharge = 1.20 m
Type of soil = Medium Soil
Coefficient of friction between = 0.50
(Soil/Rock and concrete)
CTL 101.570m
1.67 0.40
0.40
1.00
1.010 1.67-1.01-1 1.65
-0.34
6.81 1.65 diff b/w CG of pile to CG of stem= 0 HFL 100.923m
GL 98.703m
1.00
FTL 98.203m
1.50 1.50
96.703m
1.65 1.65
Scour level 97.823
20.000
4.30
FL 76.703m
138
4.30
10.300
10.30
Distance between bearing c/l and shaft c/l in longitudinal dirn. = 0.00 m
C/l of bearing is to the left of c/l of shaft
Seismic mass of substructure = 117.06 ton
1.7 Partial Safety Factors (As per Annex B of IRC:6-2010)
Also refer latest amendment, notification no 78, dated 28th July 2012
Partial safety factor for relevant loads are presented here
For Loads
Ultimate Limit State (For Verification of Equilibrium) (Table 3.1, Annex B, IRC:6-2010)
Basic Comb Seismic Comb
Load Overturning Overturning
Resisting Resisting
or Sliding or Sliding
Dead Load 1.05 0.95 1.05 0.95
SIDL (except surfacing) 1.05 0.95 1.05 0.95
SIDL (surfacing) 1.35 1 1.35 1.00
Live load and associated loads
1.5 0 - -
(Leading)
Live load and associated loads
1.15 0 0.2 0
(Accompanying)
Water Current - 0 1.0 -
Buoyancy 1.0 - 1.0 -
Earth Pressure 1.5 - 1.0 -
Live Load Surcharge 1.2 0 - -
Thermal Load (Leading) 1.5 0 - -
Thermal Load (Accompanying) 0.9 0 0.5 0
Seismic Effect (During service) - - 1.5 -
Seismic Effect (During
- - 0.75 -
construction)
Ultimate Limit State (For Verification of Structural Strength) (Table 3.2, Annex B, IRC:6-2010)
Seismic
Load Basic Comb
Comb
Dead Load 1.35 1.35
SIDL (except surfacing) 1.35 1.35
SIDL (surfacing) 1.75 1.75
Live load and associated loads
1.5 0.2 0.0
(Leading)
Live load and associated loads
1.15 0.2
(Accompanying)
Water Current 1 1
Buoyancy 0.15 0.15
Earth Pressure 1.5 1.5
Live Load Surcharge 1.2 0.2
Seismic Effect (During service) - 1.5
Seismic Effect (During
- 0.75
construction)
139
Serviceability Limit State
Quasi-
Load Rare Comb permanent Frequent
Comb
Dead Load 1 1 1
SIDL (except surfacing) 1 1 1
SIDL (surfacing) 1.2 1 1.2 (adding/for releiving 1.0 IRC 6, 2014, factor is 1.0)
Live load and associated loads
1 0 0.75
(Leading)
Live load and associated loads
0.75 0 0.2
(Accompanying)
Earth Pressure 1.0 1.0 1.0
Live Load Surcharge 0.8 0 0
Water Current 1.0 - 1.0
Buoyancy 0.15 0.15 0.15
Thermal Load (Leading) 1.0 - 0.6
Thermal Load (Accompanying) 0.6 0.5 0.5
Combination for Base Pressure and Design of Foundation (Table 3.4, Annex B, IRC:6-2010)
Seismic
Load Comb 1 Comb 2
Comb
Dead Load 1.35 1 1.35
SIDL (except surfacing) 1.35 1 1.35
SIDL (surfacing) 1.75 1 1.75
Live load and associated loads
1.5 1.3 0.2 0.0
(Leading)
Live load and associated loads
1.15 1 0.2
(Accompanying)
Water Current 1 1 1 or 0.0
Buoyancy (Base Pressure) 1 1 1 applicable for pile foundation
For Materials
Seismic
Material Basic Comb
Comb
Concrete 1.5 1.5
Reinforcing steel 1.15 1.15
140
1.8 Load Data
Dead Load
Total weight of superstructure = 200 t
Transverse eccentricity of DL from c/l of abutment = 0.00 m
SIDL
Excluding wearing course
Self weight of crash barrier = 1 t/m
Self weight of railing = 0 t/m
Transverse eccentricity of crash barrier (with bothside footpath case) = 0.00 m
Transverse eccentricity of crash barrier (with right side footpath case) = 0.00 m
Total weight of footpath/services 0.00 t
Wearing course
2
Load intensity due to wearing course = 0.22 t/m
Transverse eccentricity of wearing course (with both side footpath case) = 0 m
Transverse eccentricity of wearing course (with right side footpath only case) = 0.00 m
FPLL
2
Maximum intensity of footpath live load = 0 kg/m Cl. 206.1, IRC:6-2010
Live Load
% Reduction (in case of two lanes) = 0 % (Cl.205, IRC 6 2010)
Fraction of live load remaining in seismic case = 1
1 Lane 70R-Wheeled
Load = 100 t
Length of Load = 13.4 m
CG of load = 5.12 m
1 Lane Class A
Load = 55.4 t
Length of Load = 18.8 m
141
1.9 Bearing Data
Type of bearing = Elastomeric
Elastomeric Bearing :
1.10 Clear Cover
Dirt Wall = 40 mm
Abutment Cap = 40 mm
Abutment Stem = 75 mm
Foundation = 75 mm
1.11
Seismic Zone = IV
Importance Factor = 1.2
= 1 Table 9 of amendment (october2014) to
Response Reduction Factor
Maximum temperature = 45 = 3 IRC: 6-2014
o
Temperature variation Minimum Temperature = 0 = 32.5 C
142
LOAD CALCULATION FROM SUPERSTRUCTURE
2 Load Calculation from Superstructure
2.1 Dead Load of Superstructure
143
2.3 SIDL (wearing course)
2
Load intensity due to wearing course = 0.22 t/m
DL of wearing course = 33 t
Total reaction on abutment = 16.5 t
144
SEISMIC COEFFICIENT CALCULATION :
3 Seismic Coefficient Calculation
= 3.16E+06 t/m^2
145
Deflection at the top of the abutment (for transverse direction)
d2 = FL3/3EI = 0.000141 mm
146
CALCULATION OF ACTIVE & PASSIVE EARTH PRESSURE COEFFECIENTS
4 Earth Pressure Coefficient Calculation
ka 0.297 kp 6.105
(1+av)*cos(f-l-a) 1 2
X
cosl*cos2a*cos(d+a+l) 1+ sin(f+d)*sin(f-i-l) 0.5
cos(a-i)*cos(d+a+l)
(1-av)*cos(f-l-a) 1 2
X
cosl*cos2a*cos(d+a+l) 1+ sin(f+d)*sin(f-i-l) 0.5
cos(a-i)*cos(d+a+l)
= 0.766 x 0.411
Ca = 0.315
Horz. Active earth pressure coeff. in seismic case is taken as,Ca*cos20 0.423
Vert. Active earth pressure coeff. in seismic case is taken as,Ca*cos20 0.154
147
SHEAR RATING
5 Shear Rating
Bearing type is Elastomeric
Effective area of elastomeric bearing A = 150304 mm2
Shear Rating of Bearing (per bearing) G*A/heff 2505.07 KN/m
No. of Bearing over pier on support line on one side n = 6
Co efficient of friction at the movable bearing Teflon on stainless steel 0.03 For negative friction
0.05 For positive friction
Case 1 Seismic Case Fh-µ(Rg+Rq)
Case 2 Other than Seismic case Fh/2+µ(Rg+Rq)
Service Condition
At Bearing Level
ML MT HL HT
t-m t-m t t
Shear Rating 0 0 0.0 0
0.05*(100+0+16.5+76.36*0.2
At Abutment Shaft Bottom Level
ML MT HL HT
t-m t-m t t
Shear Rating 0.0 0.0 0.0 0
148
LIVE LOAD CALCULATION (NORMAL CASE)
6 Live Load Calculation
Transverse moment has been calculated for the most eccentric placement of live load
1 1 lane 70R-Wheeled
CG of 100 t
13.4
5.124
a b
0.75 18.50 0.75
20
79.4 t
C/L of deck
8.4 m
Eccentricity = 1.155 m
Transverse Moment MT = 91.7 t-m
149
2 1 lane Class A
CG of 55.4 t
18.8
9.091
a b
0.75 18.50 0.75
20
26.7 t
C/L of deck
8.4 m
Eccentricity = 2.45 m
Transverse Moment MT = 65.4 t-m
150
Summary
Pmax Pmin ML MT HL HT
Load Case
t t t-m t-m t t
1 lane 70R-W 79.4 73.3 0.0 91.7 10.0 0.0
1 lane Class A 26.7 23.3 0.0 65.4 5.5 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
At Bearing Level
Pmax Pmin ML MT HL HT
t t t-m t-m t t
At Bearing Level
Pmax Pmin ML MT HL HT
t t t-m t-m t t
LL1 79.4 73.3 0.0 91.7 10.0 0.0
LL2 79.4 73.3 0.0 91.7 10.0 0.0
151
7.0 Seismic Load from Superstructure (Seismic Case)
Following live load cases are considered
1 1 lane 70R-Wheeled
2 1 Lane Class A
3 3 Lane Class A
4 1 lane 70R-Wheeled + 1 Lane Class A
Load type Reaction from left span * Reaction from right span RL * Left span
(t ) (t ) is not
Superstr. Dead Load (Girder) 0 48 102.965 present in
Superstr. Dead Load (Slab) 0 53 103.338 abutment
SIDL (exl. w/c) 0 0 103.821 case and the
SIDL (w/c) 0 0 103.481 existing
span is
treated as
Right Span.
LL 70R 100.0 104.713
LL CLA 55.4 104.713
Reaction from DL of superstr. (right span) = 100 t
Reaction from SIDL (right span) = 0 t
Reaction from DL of superstr. (left span) = 0 t
Reaction from SIDL (left span) = 0 t
Horizontal seismic coefficient (long.) ahl = 0.120 = 0.120
Service Service
Horizontal seismic coefficient (trans.) aht = 0.360 = 0.360
condition condition
Vertical seismic coefficient av = 0.240 = 0.240
Only 20% of live load given in above table is considered in seismic force calculations.
r1 = Full seismic force in longitudinal direction = ahl*(DL+SIDL)
r2 = Full seismic force in transverse direction = aht*(DL+SIDL+Appropriate LL)
r3 = Full seismic force in vertical direction = av *(DL+SIDL+Appropriate LL)
152
7.2.a.2 Transverse Seismic Case
Seismic force in longitudinal direction (From left span) = 0.3r1 = 0.0 t
Seismic force in transverse direction (From left span) = r2 = 0.0 t
Seismic force in longitudinal direction (From right span) = 0.3r1 = 3.6 t
Seismic force in transverse direction (From right span) = r2 = 43.2 t
Vertical Seismic force at bearing level = 0.3*(r3 from left span + r3 from right span) = 8.6 t
Longitudinal moment = 0.0 t-m
Transverse moment = 1.3 t-m
8.4 m
7.2.b 1 lane Class A
153
7.2.b.2 Transverse Seismic Case
Seismic force in longitudinal direction (From left span) = 0.3r1 = 0.0 t
Seismic force in transverse direction (From left span) = r2 = 0.0 t
Seismic force in longitudinal direction (From right span) = 0.3r1 = 3.6 t
Seismic force in transverse direction (From right span) = r2 = 40.0 t
Vertical Seismic force at bearing level = 0.3*(r3 from left span + r3 from right span) = 8.0 t
Longitudinal moment = 0.0 t-m
Transverse moment = 0.9 t-m
Vertical Seismic force at bearing level = (r3 from left span + r3 from right span) = 26.7 t
Longitudinal moment = 0.0 t-m
Transverse moment = 3.1 t-m
8.4 m
154
Final Summary of seismic forces from superstructure
Bearing level
Longitudinal Seismic
Pmax Pmin ML MT HL HT RL of HT
t t t-m t-m t t m
SL1 9.4 -9.4 19.7 23.1 12.0 14.0 103.52
SL2 7.2 -7.2 15.5 16.2 12.0 10.8 103.16
12.00*(103.52-101.873)
Transverse Seismic 14.0*(103.518-101.873)+-0.029
Pmax Pmin ML MT HL HT RL of HT
t t t-m t-m t t m
SL1 9.4 -9.4 11.8 76.9 7.2 46.8 103.52
SL2 7.2 -7.2 9.3 48.7 7.2 36.0 103.16
7.20*(103.518-101.873)
Vertical Seismic
Pmax Pmin ML MT HL HT RL of HT
t t t-m t-m t t m
SL1 31.2 -31.2 11.8 23.0 7.2 14.0 103.52
SL2 24.0 -24.0 9.3 21.6 7.2 10.8 103.16
Vertical Seismic
Pmax Pmin ML MT HL HT RL of HT
t t t-m t-m t t m
SL1 31.2 -31.2 26.4 74.5 7.2 14.0 101.9
SL2 24.0 -24.0 26.4 61.2 7.2 10.8 101.9
155
Footing bottom level
Longitudinal Seismic
Pmax Pmin ML MT HL HT RL of HT
t t t-m t-m t t m
SL1 9.4 -9.4 62.0 95.6 12.0 14.0 101.9
SL2 7.2 -7.2 62.0 72.0 12.0 10.8 101.9
12*(101.873-96.703
Transverse Seismic 14.031*(101.873-96.703)+23.06
Pmax Pmin ML MT HL HT RL of HT
t t t-m t-m t t m
SL1 9.4 -9.4 37.2 318.7 7.2 46.8 101.9
SL2 7.2 -7.2 37.2 234.8 7.2 36.0 101.9
7.2*(101.873-96.703
Vertical Seismic 46.8*(101.873-96.703)+76.919
Pmax Pmin ML MT HL HT RL of HT
t t t-m t-m t t m
SL1 31.2 -31.2 37.2 95.5 7.2 14.0 101.9
SL2 24.0 -24.0 37.2 77.4 7.2 10.8 101.9
156
CALCULATION OF FORCES DUE TO EARTH PRESSURE
9 Calculation of Forces due to Earth Pressure
Provision of weep holes in abutment wall Yes No hydrostatic force needs to be applied
LWL CASE
101.57-0.4-0.4-0.5
Screen Wall bottom lvl
100.270m
6.81
3.80
12.94
161.74 FTL 98.203m
FL 96.703m
HFL CASE
E2
E4 E3
FTL 98.203m
FL 96.703m
157
Horizontal force due to earth pressure on abutment acts in L-L direction
Sesimic Case
LWL
Horizontal Force
Static Dynamic
Lever arm Lever arm
Component Increment
t m t m
66.1 1.77 34.2 2.655
0.5*0.144*2*(103.513-98.203)^2*8.4
Total horizontal force in long. Dirn. = 100.3 t
ML = 207.8 t-m
158
HFL
Horizontal Force
Static Dynamic
Lever arm Lever arm
Component Increment
t m t m
E1 15.7 3.8078 8.1 4.015
E2 33.0 1.36 17.1 1.36
E3 8.7 1.1424 4.5 1.36
E4 0.0 0 0 0
Normal Case
ML due to
HL
HL
t t-m
LWL 66.1 147.4
HFL 57.4 114.7
Seismic Case
ML due to
HL
HL
t t-m
LWL 100.3 207.8
HFL 87.1 176.7
HFL
Horizontal force Vertical force
E1 = 15.7 t 87.8 E1
Lever arm from foundation bottom = 5.31 m Lever arm from toe
E2 = 51.2 t E2
Lever arm from foundation bottom = 2.11 m Lever arm from toe
E3 = 20.9 t E3
Lever arm from foundation bottom = 1.7724 m Lever arm from toe
E4 = 0.0 t
Lever arm from foundation bottom = 0 m
Sesimic Case
LWL
Horizontal Force Vertical Force
159
Static
Static Dynamic Dynamic
Lever arm Lever arm Componen Lever arm
Component Increment Increment
t
t m t m t m t
108.7 2.27 56.3 3.405 39.6 4.30 20.4
HFL
Horizontal Force Vertical Force
Static
Static Dynamic Dynamic
Lever arm Lever arm Componen Lever arm
Component Increment Increment
t
t m t m t m t
E1 15.7 5.308 8.1 5.515 E1 5.7 4.30 3.0
E2 51.2 2.110 26.5 2.11 E2 18.7 4.30 9.6
E3 20.9 1.772 10.8 2.11 E3 7.6 4.30 3.9
E4 0.0 0 0 0
Normal Case
ML due to
P HL
HL
t t t-m
LWL 39.6 108.7 310.9
HFL 32.0 87.8 228.5
Seismic Case
ML due to
P HL
HL
t t t-m
LWL 60.0 165.0 438.4
HFL 48.5 133.3 352.2
160
Seismic Case
Horizontal force
Static Dynamic
Lever arm Lever arm
Component Increment
t m t m
29.9 2.66 15.5 2.66
Summary of forces due to Live Load Surcharge at Abutment Shaft bottom level
Normal Case
ML due to
HL
HL
t t-m
LWL 29.9 79.3
HFL 29.9 79.3
Seismic Case
ML due to
HL
HL
t t-m
LWL 45.3 120.4
HFL 45.3 120.4
Seismic Case
Horizontal force
Static Dynamic
Lever arm Lever arm
Component Increment
t m t m
38.3 3.41 19.8 3.41
Normal Case
ML due to
P HL
HL
t t t-m
LWL 0.0 38.3 130.4
HFL 0.0 38.3 130.4
Seismic Case
ML due to
P HL
HL
t t t-m
LWL 0.0 58.1 198.0
HFL 0.0 58.1 198.0
161
CALCULATION OF FORCES ON ABUTMENT AND FOUNDATION
10 Calculation of Forces on Abutment and Foundation
0.00 1.94
c 1.00 0.40
1.01
a
b
HFL
2.57
101.57-98.203-0.4-0.4
1.65
2.72
100.923-98.203
1.00
0.00 d
1.50
1.50
1.65 1.65
4.30
162
3
Volume of abutment shaft submerged in water = 22.8 m 0.5*(1+1)*2.720*8.400*1
Buoyancy on abutment shaft = -22.85 t
Seismic Case
Weight Full Design Seismic Forces
Component
t r1 r2 r3 0.24
Dirt Wall Bracket 2.8 0.3 0.3 0.7
Dirt Wall 16.3 2.0 2.0 3.9
Abutment Cap 25.2 3.0 3.0 6.1
Abutment Shaft 53.9 6.5 6.5 12.9
Return wall 16.9 2.0 2.0 4.1
Back fill 93.9 11.3 11.3 22.5
θ is skew angle
Longitudinal Seismic
Vert.
HL
HT Hor.Lever Arm Lever Arm
(r1*cosθ+0.3r2* V (0.3r3) ML due to HL ML due to V MT
Component (r1*sinθ+0.3r2*cosθ) from bearing c/l from shaft
sinθ)
bottom
163
Transverse Seismic
Vert.
HL
HT Hor.Lever Arm Lever Arm
(0.3r1*cosθ+r2* V (0.3r3) ML due to HL ML due to V MT
Component (0.3r1*sinθ+r2*cosθ) from bearing c/l from shaft
sinθ)
bottom
t t t m m t-m t-m t-m
Dirt Wall Bracket 0.1 0.3 0.2 1.65 5.3 0.5 0.3 1.8
Dirt Wall 0.6 2.0 1.2 1.32 4.3 2.5 1.6 8.5
Abutment Cap 0.9 3.0 1.8 0.69 3.0 2.7 1.2 9.0
Abutment Shaft 1.9 6.5 3.9 0.01 1.3 2.5 0.0 8.3
Return wall 0.6 2.0 1.2 1.79 3.4 2.1 2.2 6.9
Back fill 3.4 11.3 6.8 1.33 2.66 9.0 9.0 29.9
Total 7.5 25.1 15.1 19.3 14.3 64.4
Vertical Seismic
Vert.
HL HT
Hor.Lever Arm Lever Arm
(0.3r1*cosθ+0.3 (0.3r1*sinθ+0.3r2*cosθ V (r3) ML due to HL ML due to V MT
Component from bearing c/l from shaft
r2*sinθ) )
bottom
t t t m m t-m t-m t-m
Dirt Wall Bracket 0.1 0.1 0.7 1.65 5.3 0.5 1.1 0.5
Dirt Wall 0.6 0.6 3.9 1.32 4.3 2.5 5.2 2.5
Abutment Cap 0.9 0.9 6.1 0.69 3.0 2.7 4.1 2.7
Abutment Shaft 1.9 1.9 12.9 0.01 1.3 2.5 0.1 2.5
Return wall 0.6 0.6 4.1 1.79 3.4 2.1 7.3 2.1
Back fill 3.4 3.4 22.5 1.33 2.66 9.0 29.9 9.0
Total 7.5 7.5 50.2 19.3 47.7 19.3
164
Summary of Forces at Abutment Shaft Bottom Level
Normal Case
LWL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 115.2 115.2 74.3 0 0 0
HFL for eccentricity only
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 115.2 115.2 74.3 0 0 0
Buoyancy -22.85 -22.85 0 0 0 0
for eccentricity only
Seismic Case
Longitudinal Seismic
LWL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 115.2 115.2 74.3 0.0 0.0 0.0
Seismic Force on
15.1 -15.1 54.0 20.5 25.1 7.5
Substr.
HFL 68.32-14.31 (separate out backfill for load factor in seismic)
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 115.2 115.2 74.3 0.0 0.0 0.0
Buoyancy -22.8 -22.8 0.0 0.0 0.0 0.0
Seismic Force on
15.1 -15.1 54.0 20.5 25.1 7.5
Substr.
Transverse Seismic
LWL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 115.2 115.2 74.3 0.0 0.0 0.0
Seismic Force on
15.1 -15.1 5.0 64.4 7.5 25.1
Substr.
HFL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 115.2 115.2 74.3 0.0 0.0 0.0
Buoyancy -22.8 -22.8 0.0 0.0 0.0 0.0
Seismic Force on
15.1 -15.1 5.0 64.4 7.5 25.1
Substr.
Vertical Seismic
LWL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 115.2 115.2 74.3 0.0 0.0 0.0
Seismic Force on
50.2 -50.2 -28.4 19.3 7.5 7.5
Substr.
HFL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 115.2 115.2 74.3 0.0 0.0 0.0
Buoyancy -22.8 -22.8 0.0 0.0 0.0 0.0
Seismic Force on
50.2 -50.2 -28.4 19.3 7.5 7.5
Substr.
Trapezoidal Part
3
Volume = 0.0 m
Weight = 0 t
3
Total Volume of foundation = 66.435 m
Total Weight of foundation = 166.0875 t
165
Calculation for Return Wall
Vertical Lever
Horizontal Lever Arm ML about c/l
Weight Arm from c/l of
Portion from c/l of shaft of shaft
shaft
t m t-m m
Rectangular 9.96 1.90 18.9 0.00 0.75*(2.59+2.720)*0.5*2.5*2
Triangular 6.99 1.63 11.4 0.00
Submerged height of return wall in HFL case upto foundation top level = 0 m
Submerged volume of return wall = 0 m3
Buoyancy force on return wall = 0 t
Longitudinal moment due to buoyancy force on return wall = 0.0 t-m
Transverse moment due to buoyancy about centerline of footing = 0 t-m
HFL
Hor.Lever Arm from toe
Weight ML about toe
Portion in L-L dirn.
t m t-m
a 37.4 1.90 70.9 (1.65-1.01)*2.59*7.4*2.00+(1.65-1.01)*2.720*7.4*1
b 20.3 1.63 33.1
c 2.99 0.00 0.0
d 0.00 0.00 0.0
Total 60.7 104.0
Normal Case
LWL
ML due to HL
Pmax Pmin MT HL HT
Component (about toe)
t t t-m t-m t t
Weight of Substr. 115.2 115.2 0.0 0.0 0.0 0.0
Weight of fdn 166.1 166.1 0.0 0.0 0.0 0.0
Backfill Wt. 93.9 93.9 0.0 0.0 0.0 0.0
HFL
ML due to HL
Pmax Pmin MT HL HT
Component (about toe)
t t t-m t-m t t
Weight of Substr. 115.2 115.2 0.0 0.0 0.0 0.0
Buoyancy on
-22.85 -22.85 0.0 0.0 0.0 0.0
substr.
Weight of fdn 166.1 166.1 0.0 0.0 0.0 0.0
Buoyancy on fdn. -66.44 -66.44 0.0 0.0 0.0 0.0
Buoyancy on
0.0 0.0 0.0 0.0 0.0 0.0
Return wall.
Backfill Wt. 93.9 93.9 0.0 0.0 0.0 0.0
Seismic Case
Longitudinal Seismic
LWL
ML due to HL
Pmax Pmin MT HL HT
Component (about toe)
t t t-m t-m t t
Weight of Substr. 115.2 115.2 0.0 0.0 0.0 0.0
Seismic Force on
15.1 -15.1 106.0 31.8 25.1 7.5
Substr.
Weight of fdn 166.1 166.1 0.0 0.0 0.0 0.0
Backfill Wt. 93.9 93.9 0.0 0.0 0.0 0.0
HFL
166
ML due to HL
Pmax Pmin MT HL HT
Component (about toe)
t t t-m t-m t t
Weight of Substr. 115.2 115.2 0.0 0.0 0.0 0.0
Seismic Force on
15.1 -15.1 106.0 31.8 25.1 7.5
Substr.
Buoyancy on
-22.8 -22.8 0.0 0.0 0.0 0.0
substr.
Weight of fdn 166.1 166.1 0.0 0.0 0.0 0.0
Buoyancy on fdn. -66.44 -66.44 0 0 0 0
Buoyancy on
0.0 0.0 0.0 0.0 0.0 0.0
Return wall.
Backfill Wt. 93.9 93.9 0.0 0.0 0.0 0.0
Transverse Seismic
LWL
ML due to HL
Pmax Pmin MT HL HT
Component (about toe)
t t t-m t-m t t
Weight of Substr. 115.2 115.2 0.0 0.0 0.0 0.0
Seismic Force on
15.1 -15.1 31.8 106.0 7.5 25.1
Substr.
Weight of fdn 166.1 166.1 0.0 0.0 0.0 0.0
Backfill Wt. 93.9 93.9 0.0 0.0 0.0 0.0
HFL
ML due to HL
Pmax Pmin MT HL HT
Component (about toe)
t t t-m t-m t t
Weight of Substr. 115.2 115.2 0.0 0.0 0.0 0.0
Seismic Force on
15.1 -15.1 31.8 106.0 7.5 25.1
Substr.
Buoyancy on
-22.8 -22.8 0.0 0.0 0.0 0.0
substr.
Weight of fdn 166.1 166.1 0.0 0.0 0.0 0.0
Buoyancy on fdn. -66.44 -66.44 0 0 0 0
Buoyancy on
0.0 0.0 0.0 0.0 0.0 0.0
Return wall.
Backfill Wt. 93.9 93.9 0.0 0.0 0.0 0.0
Vertical Seismic
LWL
ML due to HL
Pmax Pmin MT HL HT
Component (about toe)
t t t-m t-m t t
Weight of Substr. 115.2 115.2 0.0 0.0 0.0 0.0
Seismic Force on
50.2 -50.2 -180.2 211.9 7.5 7.5
Substr.
Weight of fdn 166.1 166.1 0.0 0.0 0.0 0.0
Backfill Wt. 93.9 93.9 0.0 0.0 0.0 0.0
HFL
ML due to HL
Pmax Pmin MT HL HT
Component (about toe)
t t t-m t-m t t
Weight of Substr. 115.2 115.2 0.0 0.0 0.0 0.0
Seismic Force on
50.2 -50.2 -180.2 211.9 7.5 7.5
Substr.
Buoyancy on
-22.8 -22.8 0.0 0.0 0.0 0.0
substr.
Weight of fdn 166.1 166.1 0.0 0.0 0.0 0.0
Buoyancy on fdn. -66.435 -66.435 0 0 0 0
Buoyancy on
0.0 0.0 0.0 0.0 0.0 0.0
Return wall.
Backfill Wt. 93.9 93.9 0.0 0.0 0.0 0.0
167
11.LOAD COMBINATION (LIMIT STATE)
168
LOAD COMBINATION (LIMIT STATE)
Annex B, IRC:6-2010
Following Limit States are considered
169
11.A Ultimate Limit State (For verification of structural strength)
B-1 Basic Combination
1 LWL
1.1 Maximum Reaction Case
1.2 Maximum Moment Case
2 HFL
2.1 Maximum Reaction Case
2.2 Maximum Moment Case
At Abutment Shaft Bottom Level
LWL and HFL caseCase
B-1.1 and B-2.1 Service Condition
Maximum Reaction case
Unfactored Forces Factored Forces
Partial
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor
t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1.35 100.0 100.0 0.0 0.0 0.0 0.0 135.0 135.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (w/c) 1.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL1 (Leading) 1.5 79.4 73.3 36.7 91.7 10.0 0.0 119.1 109.9 55.1 137.6 15.0 0.0
LL1 (Accompanying) 1.15 79.4 73.3 36.7 91.7 10.0 0.0 91.3 84.3 42.2 105.5 11.5 0.0
FPLL1 1.15 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Earth pressure LWL 1.5 0.0 0.0 147.4 0.0 66.1 0.0 0.0 0.0 221.1 0.0 99.1 0.0
Earth pressure HFL 1.5 0.0 0.0 114.7 0.0 57.4 0.0 0.0 0.0 172.0 0.0 86.1 0.0
LL Surcharge 1.2 0.0 0.0 79.3 0.0 29.9 0.0 0.0 0.0 95.2 0.0 35.8 0.0
Substructure Weight 1.35 115.2 115.2 74.3 0.0 0.0 0.0 155.6 155.6 100.3 0.0 0.0 0.0
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
LL Leading 406.3 397.1 422.5 137.6 137.0 0.0
Total forces at HFL Condition
LL Accompanying 378.5 371.4 409.7 105.5 133.5 0.0
LL Leading 409.7 400.5 471.6 137.6 150.0 0.0
Total forces at LWL Condition
LL Accompanying 381.9 374.9 458.7 105.5 146.5 0.0
B-1.2 and B-2.2 Service Condition
Maximum Longitudinal Moment case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1.35 100.0 100.0 0.0 0.0 0.0 0.0 135.0 135.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 1.35 20.0 20.0 0.0 0.0 0.0 0.0 27.0 27.0 0.0 0.0 0.0 0.0
SIDL (w/c) 1.75 16.5 16.5 0.0 0.0 0.0 0.0 28.9 28.9 0.0 0.0 0.0 0.0
LL2 (Leading) 1.5 79.4 73.3 36.7 91.7 10.0 0.0 119.1 109.9 55.1 137.6 15.0 0.0
LL2 (Accompanying) 1.15 79.4 73.3 36.7 91.7 10.0 0.0 91.3 84.3 42.2 105.5 11.5 0.0
FPLL2 1.15 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Earth pressure LWL 1.5 0.0 0.0 147.4 0.0 66.1 0.0 0.0 0.0 221.1 0.0 99.1 0.0
Earth pressure HFL 1.5 0.0 0.0 114.7 0.0 57.4 0.0 0.0 0.0 172.0 0.0 86.1 0.0
LL Surcharge 1.2 0.0 0.0 79.3 0.0 29.9 0.0 0.0 0.0 95.2 0.0 35.8 0.0
Substructure Weight 1.35 115.2 115.2 74.3 0.0 0.0 0.0 155.6 155.6 100.3 0.0 0.0 0.0
Buyoyancy 0.15 -22.8 -22.85 0 0 0 0 -3.4 -3.4 0.0 0.0 0.0 0.0
LL Leading 462.2 453.0 422.5 137.6 137.0 0.0
Total forces at HFL Condition
LL Accompanying 434.4 427.3 409.7 105.5 133.5 0.0
LL Leading 465.6 456.4 471.6 137.6 150.0 0.0
Total forces at LWL Condition
LL Accompanying 437.8 430.7 458.7 105.5 146.5 0.0
170
B-1.3 and B-2.3
Maximum Transverse Moment case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1.35 100.0 100.0 0.0 0.0 0.0 0.0 135.0 135.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 1.35 20.0 20.0 0.0 0.0 0.0 0.0 27.0 27.0 0.0 0.0 0.0 0.0
SIDL (w/c) 1.75 16.5 16.5 0.0 0.0 0.0 0.0 28.9 28.9 0.0 0.0 0.0 0.0
LL2 (Leading) 1.5 79.4 73.3 36.7 91.7 10.0 0.0 119.1 109.9 55.1 137.6 15.0 0.0
LL2 (Accompanying) 1.15 79.4 73.3 36.7 91.7 10.0 0.0 91.3 84.3 42.2 105.5 11.5 0.0
FPLL2 1.15 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Earth pressure LWL 1.5 0.0 0.0 147.4 0.0 66.1 0.0 0.0 0.0 221.1 0.0 99.1 0.0
Earth pressure HFL 1.5 0.0 0.0 114.7 0.0 57.4 0.0 0.0 0.0 172.0 0.0 86.1 0.0
LL Surcharge 1.2 0.0 0.0 79.3 0.0 29.9 0.0 0.0 0.0 95.2 0.0 35.8 0.0
Substructure Weight 1.35 115.2 115.2 74.3 0.0 0.0 0.0 155.6 155.6 100.3 0.0 0.0 0.0
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
LL Leading 462.2 453.0 422.5 137.6 137.0 0.0
Total forces at HFL Condition
LL Accompanying 434.4 427.3 409.7 105.5 133.5 0.0
LL Leading 465.6 456.4 471.6 137.6 150.0 0.0
Total forces at LWL Condition
LL Accompanying 437.8 430.7 458.7 105.5 146.5 0.0
171
SUMMARY OF LOAD CASES FOR BASIC COMBINATION
HFL Condition
Live LL Pmax Pmin ML MT HL HT
Load Case No. load Leading/Accom
t t t-m t-m t t
case panying
BC1 LL1 LL Leading 406.3 397.1 422.5 137.6 137.0 0.0 Maximum reaction case
BC2 case LL Accompanying378.5 371.4 409.7 105.5 133.5 0.0
BC3 LL2 LL Leading 462.2 453.0 422.5 137.6 137.0 0.0 Maximum longitudinal moment case
BC4 case LL Accompanying434.4 427.3 409.7 105.5 133.5 0.0
BC5 LL2 LL Leading 465.6 456.4 471.6 137.6 150.0 0.0 Maximum transverse moment case
BC6 case LL Accompanying437.8 430.7 458.7 105.5 146.5 0.0
One Span Dislodged Condition
LL Pmax Pmin ML MT HL HT
Load Case No. Leading/Accom
panying t t t-m t-m t t
BC7 LL Leading 152.2 152.2 367.5 0.0 122.0 0.0 only substructure has been cast
BC8 LL Accompanying152.2 152.2 367.5 0.0 122.0 0.0
LWL Condition
Live LL Pmax Pmin ML MT HL HT
Load Case No. load Leading/Accom
t t t-m t-m t t
case panying
BC1 LL1 LL Leading 409.7 400.5 471.6 137.6 150.0 0.0 Maximum reaction case
BC2 case LL Accompanying381.9 374.9 458.7 105.5 146.5 0.0
BC3 LL2 LL Leading 465.6 456.4 471.6 137.6 150.0 0.0 Maximum longitudinal moment case
BC4 case LL Accompanying437.8 430.7 458.7 105.5 146.5 0.0
One Span Dislodged Condition
LL Pmax Pmin ML MT HL HT
Load Case No. Leading/Accom
panying t t t-m t-m t t
BC7 LL Leading 155.6 155.6 416.5 0.0 135.0 0.0 only substructure has been cast
BC8 LL Accompanying155.6 155.6 416.5 0.0 135.0 0.0
172
11.A-2 Seismic Combination
Abutment Bottom Level
A-2.1 Service Condition
Longitudinal Seismic Case
Maximum Reaction case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1.35 100.0 100.0 0.0 0.0 0.0 0.0 135.0 135.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (w/c) 1.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL1 (Accompanying) 0.2 79.4 73.3 36.7 91.7 10.0 0.0 15.9 14.7 7.3 18.3 2.0 0.0
FPLL1 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Seismic Force on
1.5 9.354 -9.354 44.04 74.55 12 14.03 14.0 -14.0 66.1 111.8 18.0 21.0
Superstr.
Earth pressure LWL 0.0 0.0 207.8 0.0 100.3 0.0 0.0 0.0 311.7 0.0 150.5 0.0
1.5
Earth pressure HFL 0.0 0.0 176.7 0.0 87.1 0.0 0.0 0.0 265.1 0.0 130.7 0.0
1.5
LL Surcharge 0.2 0.0 0.0 120.4 0.0 45.3 0.0 0.0 0.0 24.1 0.0 9.1 0.0
Substructure Weight 1.35 115.2 115.2 74.3 0.0 0.0 0.0 155.6 155.6 100.3 0.0 0.0 0.0
Seismic Force on
1.5 15.1 -15.1 54.0 20.5 25.1 7.5 22.6 -22.6 81.0 30.7 37.7 11.3
Substr.
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
Total forces at HFL Condition 339.7 265.2 543.9 160.9 197.4 32.3
Total forces at LWL Condition 343.1 268.6 590.5 160.9 217.2 32.3
173
Earth pressure HFL 0.0 0.0 176.7 0.0 87.1 0.0 0.0 0.0 265.1 0.0 130.7 0.0
1.5
LL Surcharge 0.2 0.0 0.0 120.4 0.0 45.3 0.0 0.0 0.0 24.1 0.0 9.1 0.0
Substructure Weight 1.35 115.2 115.2 74.3 0.0 0.0 0.0 155.6 155.6 100.3 0.0 0.0 0.0
Seismic Force on
1.5 15.06 -15.06 54.01 20.5 25.1 7.531 22.6 -22.6 81.0 30.7 37.7 11.3
Substr.
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
Total forces at HFL Condition 336.4 268.4 543.9 132.9 197.4 27.5
Total forces at LWL Condition 339.9 271.8 590.5 132.9 217.2 27.5
174
Transverse Seismic Case
Maximum Reaction case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1.35 100.0 100.0 0.0 0.0 0.0 0.0 135.0 135.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (w/c) 1.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL2 (Accompanying) 0.2 79.4 73.3 36.7 91.7 10.0 0.0 15.9 14.7 7.3 18.3 2.0 0.0
FPLL2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Seismic Force on
1.5 9.4 -9.4 26.4 248.6 7.2 46.8 14.0 -14.0 39.6 372.8 10.8 70.2
Superstr.
Earth pressure LWL 1.5 0.0 0.0 207.8 0.0 100.3 0.0 0.0 0.0 311.7 0.0 150.5 0.0
Earth pressure HFL 1.5 0.0 0.0 176.7 0.0 87.1 0.0 0.0 0.0 265.1 0.0 130.7 0.0
LL Surcharge 0.2 0.0 0.0 120.4 0.0 45.3 0.0 0.0 0.0 24.1 0.0 9.1 0.0
Substructure Weight 1.35 115.2 115.2 74.3 0.0 0.0 0.0 155.6 155.6 100.3 0.0 0.0 0.0
Seismic Force on
1.5 15.1 -15.1 5.0 64.4 7.5 25.1 22.6 -22.6 7.5 96.7 11.3 37.7
Substr.
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
Total forces at HFL Condition 339.7 265.2 444.0 487.9 163.9 107.8
Total forces at LWL Condition 343.1 268.6 490.6 487.9 183.6 107.8
Earth pressure HFL 0.0 0.0 176.7 0.0 87.1 0.0 0.0 0.0 265.1 0.0 130.7 0.0
1.5
LL Surcharge 0.2 0.0 0.0 120.4 0.0 45.3 0.0 0.0 0.0 24.1 0.0 9.1 0.0
Substructure Weight 1.35 115.2 115.2 74.3 0.0 0.0 0.0 155.6 155.6 100.3 0.0 0.0 0.0
Seismic Force on
1.5 15.1 -15.1 5.0 64.4 7.5 25.1 22.6 -22.6 7.5 96.7 11.3 37.7
Substr.
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
Total forces at HFL Condition 336.4 268.4 444.0 386.2 163.9 91.7
Total forces at LWL Condition 339.9 271.8 490.6 386.2 183.6 91.7
175
Maximum Transverse Moment case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1.35 100.0 100.0 0.0 0.0 0.0 0.0 135.0 135.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (w/c) 1.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL2 (Accompanying) 0.2 79.4 73.3 36.7 91.7 10.0 0.0 15.9 14.7 7.3 18.3 2.0 0.0
FPLL2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Seismic Force on
7.2 -7.2 26.4 180.8 7.2 36.0 10.8 -10.8 39.6 271.2 10.8 54.0
Superstr. 1.5
Earth pressure LWL 1.5 0.0 0.0 207.8 0.0 100.3 0.0 0.0 0.0 311.7 0.0 150.5 0.0
Earth pressure HFL 0.0 0.0 176.7 0.0 87.1 0.0 0.0 0.0 265.1 0.0 130.7 0.0
1.5
LL Surcharge 0.2 0.0 0.0 120.4 0.0 45.3 0.0 0.0 0.0 24.1 0.0 9.1 0.0
Substructure Weight 1.35 115.2 115.2 74.3 0.0 0.0 0.0 155.6 155.6 100.3 0.0 0.0 0.0
Seismic Force on
1.5 15.1 -15.1 5.0 64.4 7.5 25.1 22.6 -22.6 7.5 96.7 11.3 37.7
Substr.
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
Total forces at HFL Condition 336.4 268.4 444.0 386.2 163.9 91.7
Total forces at LWL Condition 339.9 271.8 490.6 386.2 183.6 91.7
LL Surcharge 0.2 0.0 0.0 120.4 0.0 45.3 0.0 0.0 0.0 24.1 0.0 9.1 0.0
Substructure Weight 1.35 115.2 115.2 74.3 0.0 0.0 0.0 155.6 155.6 100.3 0.0 0.0 0.0
Seismic Force on
1.5 50.2 -50.2 -28.4 19.3 7.5 7.5 75.3 -75.3 -42.6 29.0 11.3 11.3
Substr.
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
Total forces at HFL Condition 425.1 179.7 393.9 159.1 163.9 32.3
Total forces at LWL Condition 428.5 183.2 440.5 159.1 183.6 32.3
176
Maximum Longitudinal Moment case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1.35 100.0 100.0 0.0 0.0 0.0 0.0 135.0 135.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (w/c) 1.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL2 (Accompanying) 0.2 79.4 73.3 36.7 91.7 10.0 0.0 15.9 14.7 7.3 18.3 2.0 0.0
FPLL2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Seismic Force on
24.0 -24.0 26.4 61.2 7.2 10.8 36.0 -36.0 39.6 91.8 10.8 16.2
Superstr. 1.5
Earth pressure LWL 1.5 0.0 0.0 207.8 0.0 100.3 0.0 0.0 0.0 311.7 0.0 150.5 0.0
Earth pressure HFL 1.5 0.0 0.0 176.7 0.0 87.1 0.0 0.0 0.0 265.1 0.0 130.7 0.0
LL Surcharge 0.2 0.0 0.0 120.4 0.0 45.3 0.0 0.0 0.0 24.1 0.0 9.1 0.0
Substructure Weight 1.35 115.2 115.2 74.3 0.0 0.0 0.0 155.6 155.6 100.3 0.0 0.0 0.0
Seismic Force on
1.5 50.2 -50.2 -28.4 19.3 7.5 7.5 75.3 -75.3 -42.6 29.0 11.3 11.3
Substr.
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
Total forces at HFL Condition 414.4 190.5 393.9 139.2 163.9 27.5
Total forces at LWL Condition 417.8 193.9 440.5 139.2 183.6 27.5
177
A-2.2 One Span Dislodged Condition
Longitudinal Seismic Case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (w/c) 1.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL2 (Accompanying) 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FPLL2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Seismic Force on
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Superstr. 1.5
Earth pressure LWL 1.5 0.0 0.0 207.8 0.0 100.3 0.0 0.0 0.0 311.7 0.0 150.5 0.0
Earth pressure HFL 1.5 0.0 0.0 176.7 0.0 87.1 0.0 0.0 0.0 265.1 0.0 130.7 0.0
LL Surcharge 0.2 0.0 0.0 120.4 0.0 45.3 0.0 0.0 0.0 24.1 0.0 9.1 0.0
Substructure Weight 1.35 115.2 115.2 74.3 0.0 0.0 0.0 155.6 155.6 100.3 0.0 0.0 0.0
Seismic Force on
0.75 15.1 -15.1 54.0 20.5 25.1 7.5 11.3 -11.3 40.5 15.4 18.8 5.6
Substr.
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
Total forces at HFL Condition 163.5 140.9 430.0 15.4 158.6 5.6
Total forces at LWL Condition 166.9 144.3 476.6 15.4 178.3 5.6
Earth pressure LWL 0.0 0.0 207.8 0.0 100.3 0.0 0.0 0.0 311.7 0.0 150.5 0.0
1.5
Earth pressure HFL 0.0 0.0 176.7 0.0 87.1 0.0 0.0 0.0 265.1 0.0 130.7 0.0
1.5
LL Surcharge 0.2 0.0 0.0 120.4 0.0 45.3 0.0 0.0 0.0 24.1 0.0 9.1 0.0
Substructure Weight 1.35 115.2 115.2 74.3 0.0 0.0 0.0 155.6 155.6 100.3 0.0 0.0 0.0
Seismic Force on
0.75 15.1 -15.1 5.0 64.4 7.5 25.1 11.3 -11.3 3.8 48.3 5.6 18.8
Substr.
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
Total forces at HFL Condition 163.5 140.9 393.2 48.3 145.4 18.8
Total forces at LWL Condition 166.9 144.3 439.9 48.3 165.2 18.8
178
Vertical Seismic Case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (w/c) 1.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL2 (Accompanying) 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FPLL2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Seismic Force on
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Superstr. 1.5
Earth pressure LWL 0.0 0.0 207.8 0.0 100.3 0.0 0.0 0.0 311.7 0.0 150.5 0.0
1.5
Earth pressure HFL 0.0 0.0 176.7 0.0 87.1 0.0 0.0 0.0 265.1 0.0 130.7 0.0
1.5
LL Surcharge 0.2 0.0 0.0 120.4 0.0 45.3 0.0 0.0 0.0 24.1 0.0 9.1 0.0
Substructure Weight 1.35 115.2 115.2 74.3 0.0 0.0 0.0 155.6 155.6 100.3 0.0 0.0 0.0
Seismic Force on
0.75 50.2 -50.2 -28.4 19.3 7.5 7.5 37.7 -37.7 -21.3 14.5 5.6 5.6
Substr.
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
Total forces at HFL Condition 189.8 114.5 368.2 14.5 145.4 5.6
Total forces at LWL Condition 193.2 117.9 414.8 14.5 165.2 5.6
179
11.B Serviceability Limit State (For verification of structural strength)
B-1 Rare Combination
Abutment Bottom Level
B-1.1 Service Condition
Maximum Reaction case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor
t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1 100.0 100.0 0.0 0.0 0.0 0.0 100.0 100.0 0.0 0.0 0.0 0.0
SIDL (excluding
1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
w/c)
SIDL (w/c) 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL1 (Leading) 1 79.4 73.3 36.7 91.7 10.0 0.0 79.4 73.3 36.7 91.7 10.0 0.0
FPLL1 0.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shear Rating 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Earth pressure
0.0 0.0 147.4 0.0 66.1 0.0 0.0 0.0 147.4 0.0 66.1 0.0
(LWL) 1
Earth pressure
0.0 0.0 114.7 0.0 57.4 0.0 0.0 0.0 114.7 0.0 57.4 0.0
(HFL) 1
Live load
0.8 0.0 0.0 79.3 0.0 29.9 0.0 0.0 0.0 63.4 0.0 23.9 0.0
Surcharge
Weight of
115.2 115.2 74.3 0.0 0.0 0.0 115.2 115.2 74.3 0.0 0.0 0.0
substructure 1
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
HFL Condition Total Forces 291.2 285.1 289.1 91.7 91.3 0.0
LWL Condition Total Forces 294.7 288.5 321.8 91.7 100.0 0.0
180
Maximum Transverse Moment case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1 100.0 100.0 0.0 0.0 0.0 0.0 100.0 100.0 0.0 0.0 0.0 0.0
SIDL (excluding
1 20.0 20.0 0.0 0.0 0.0 0.0 20.0 20.0 0.0 0.0 0.0 0.0
w/c)
SIDL (w/c) 1.2 16.5 16.5 0.0 0.0 0.0 0.0 19.8 19.8 0.0 0.0 0.0 0.0
LL2(Leading) 1 79.4 73.3 36.7 91.7 10.0 0.0 79.4 73.3 36.7 91.7 10.0 0.0
FPLL2 0.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shear Rating 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Earth pressure
0.0 0.0 147.4 0.0 66.1 0.0 0.0 0.0 147.4 0.0 66.1 0.0
(LWL) 1
Earth pressure
0.0 0.0 114.7 0.0 57.4 0.0 0.0 0.0 114.7 0.0 57.4 0.0
(HFL) 1
Live load
0.0 0.0 79.3 0.0 29.9 0.0 0.0 0.0 63.4 0.0 23.9 0.0
Surcharge 0.8
Weight of
115.2 115.2 74.3 0.0 0.0 0.0 115.2 115.2 74.3 0.0 0.0 0.0
substructure 1
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
HFL Condition
Total Forces 331.0 324.9 289.1 91.7 91.3 0.0
LWL Condition Total Forces 334.5 328.3 321.8 91.7 100.0 0.0
181
SUMMARY OF LOAD CASES FOR RARE COMBINATION
HFL Condition
Live Pmax Pmin ML MT HL HT
Load Case No. load LL Leading
t t t-m t-m t t
case
LL1
R1 LL leading, thermal accompanying 291.2 285.1 289.1 91.7 91.3 0.0
case
LL2
R2 LL leading, thermal accompanying 331.0 324.9 289.1 91.7 91.3 0.0
case
LL3
R3 LL leading, thermal accompanying 331.0 324.9 289.1 91.7 91.3 0.0
case
One Span Dislodged Condition
Pmax Pmin ML MT HL HT
Load Case No. LL Leading
t t t-m t-m t t
R4 LL leading, thermal accompanying 111.8 111.8 252.4 0.0 81.3 0.0
LWL Condition
Live Pmax Pmin ML MT HL HT
Load Case No. load LL Leading
t t t-m t-m t t
case
LL1
R1 LL leading, thermal accompanying 294.7 288.5 321.8 91.7 100.0 0.0
case
LL2
R2 LL leading, thermal accompanying 334.5 328.3 321.8 91.7 100.0 0.0
case
LL3
R3 LL leading, thermal accompanying 334.5 328.3 321.8 91.7 100.0 0.0
case
One Span Dislodged Condition
Pmax Pmin ML MT HL HT
Load Case No. LL Leading
t t t-m t-m t t
R4 LL leading, thermal accompanying 115.2 115.2 285.1 0.0 90.0 0.0
182
11.C Serviceability Limit State (For checking crack width)
C-1 Quasi-permanent Combination
Abutment Bottom Level
C-1.1 Service Condition
Maximum Reaction case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor
t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1 100.0 100.0 0.0 0.0 0.0 0.0 100.0 100.0 0.0 0.0 0.0 0.0
SIDL (excluding
1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
w/c)
SIDL (w/c) 1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL1 (Leading) 0 79.4 73.3 36.7 91.7 10.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FPLL1 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shear Rating 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Earth pressure
0.0 0.0 147.4 0.0 66.1 0.0 0.0 0.0 147.4 0.0 66.1 0.0
(LWL) 1
Earth pressure
0.0 0.0 114.7 0.0 57.4 0.0 0.0 0.0 114.7 0.0 57.4 0.0
(HFL) 1
Live load
0.0 0.0 79.3 0.0 29.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Surcharge 0
Weight of
115.2 115.2 74.3 0.0 0.0 0.0 115.2 115.2 74.3 0.0 0.0 0.0
substructure 1
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
HFL Condition Total Forces 211.8 211.8 189.0 0.0 57.4 0.0
LWL Condition Total Forces 215.2 215.2 221.7 0.0 66.1 0.0
183
Maximum Transverse Moment case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1 100.0 100.0 0.0 0.0 0.0 0.0 100.0 100.0 0.0 0.0 0.0 0.0
SIDL (excluding
1 20.0 20.0 0.0 0.0 0.0 0.0 20.0 20.0 0.0 0.0 0.0 0.0
w/c)
SIDL (w/c) 1 16.5 16.5 0.0 0.0 0.0 0.0 16.5 16.5 0.0 0.0 0.0 0.0
LL2(Leading) 0 79.4 73.3 36.7 91.7 10.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FPLL2 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shear Rating 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Earth pressure
0.0 0.0 147.4 0.0 66.1 0.0 0.0 0.0 147.4 0.0 66.1 0.0
(LWL) 1
Earth pressure
0.0 0.0 114.7 0.0 57.4 0.0 0.0 0.0 114.7 0.0 57.4 0.0
(HFL) 1
Live load
0.0 0.0 79.3 0.0 29.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Surcharge 0
Weight of
115.2 115.2 74.3 0.0 0.0 0.0 115.2 115.2 74.3 0.0 0.0 0.0
substructure 1
Buyoyancy 0.15 -22.8 -22.8 0.0 0.0 0.0 0.0 -3.4 -3.4 0.0 0.0 0.0 0.0
HFL Condition
Total Forces 248.3 248.3 189.0 0.0 57.4 0.0
LWL Condition Total Forces 251.7 251.7 221.7 0.0 66.1 0.0
184
SUMMARY OF LOAD CASES FOR QUASI-PERMANENT COMBINATION
HFL Condition
Live Pmax Pmin ML MT HL HT
Load Case No. load LL Leading
t t t-m t-m t t
case
LL1
QP1 LL leading, thermal accompanying 211.8 211.8 189.0 0.0 57.4 0.0
case
LL2
QP2 LL leading, thermal accompanying 248.3 248.3 189.0 0.0 57.4 0.0
case
LL3
QP3 LL leading, thermal accompanying 248.3 248.3 189.0 0.0 57.4 0.0
case
One Span Dislodged Condition
Pmax Pmin ML MT HL HT
Load Case No. LL Leading
t t t-m t-m t t
QP4 LL leading, thermal accompanying 111.8 111.8 189.0 0.0 57.4 0.0
LWL Condition
Live Pmax Pmin ML MT HL HT
Load Case No. load LL Leading
t t t-m t-m t t
case
LL1
QP1 LL leading, thermal accompanying 215.2 215.2 221.7 0.0 66.1 0.0
case
LL2
QP2 LL leading, thermal accompanying 251.7 251.7 221.7 0.0 66.1 0.0
case
LL3
QP3 LL leading, thermal accompanying 251.7 251.7 221.7 0.0 66.1 0.0
case
One Span Dislodged Condition
Pmax Pmin ML MT HL HT
Load Case No. LL Leading
t t t-m t-m t t
QP4 LL leading, thermal accompanying 115.2 115.2 221.7 0.0 66.1 0.0
185
12.DESIGN OF ABUTMENT SHAFT
186
DESIGN OF ABUTMENT SHAFT
L-L
As'
ML
T-T
1.0m sk
MT
As
8.4m sk 5.33E-01
Provision of Reinforcement
L-L direction
2
Compression Face 83 No. 12 mm dia bar AsL' = 9364.5 mm
2
Tension Face 83 No. 20 mm dia bar AsL = 26012.4 mm
T-T direction
2
Compression Face 6 No. 12 mm dia bar AsL' = 663.5 mm
2
Tension Face 6 No. 12 mm dia bar AsL = 663.5 mm
0.08fck*Ag = 2352 t
187
ULS and SLS Checks of Abutment Section
ULS and SLS strengths of abutment section is checked using Function in VBA excel. The summary is attached below
Distribution Reinforcement
Distribution reinforcement = 0.2 % of gross area Designed as flexure member
2
Distribution reinforcement per meter height = 2000 mm /m
2
Distribution reinforcement per meter height on each face = 1000 mm /m
Minimum area of horizontal reinf. per meter = 25 % of Area of vertical reinf. or 0.001Ac whichever is greater
2
= 1000.00 mm /m Cl. 16.3.2, IRC:112-2011
2
Total area of horizontal reinf. provided per meter = 2261.9 mm /m OK
188
LOAD COMBINATION (LIMIT STATE)
13.CHECK FOR PILE CAPACITY
189
13 Combination for Foundation Design (unfactored)
A Normal Case
Distance between CG of Pile to CG of abutment stem = 0 m
Pile cap Bottom Level 0
A.1 Service Condition 0
0
Maximum Reaction case
Unactored Forces
Load Item Pmax Pmin ML MT HL HT
t t t-m t-m t t
DL (Superstr.) 100.0 100.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (w/c) 0.0 0.0 0.0 0.0 0.0 0.0 To be in
LL1 79.4 73.3 51.7 91.7 10.0 0.0 safer side
FPLL1 0.0 0.0 0.0 0.0 0.0 0.0 vertical
Earth Pressure 0.0 0.0 310.9 0.0 108.7 0.0 component
LL Surcharge 0.0 0.0 130.4 0.0 38.3 0.0 "P" of earth
Weight of Substr. 115.2 115.2 -77.6 0.0 0.0 0.0 and
Pile Cap Weight 166.1 166.1 0.0 0.0 0.0 0.0 surcharge is
Weight of soil on Pile cap 93.94 93.94 -124.48 0.00 0.00 0.00 not
considered.
Buyoyancy -82.20 -82.20 0.00 0.00 0.00 0.00
Total Forces at HFL 472.5 466.4 290.9 91.7 157.0 0.0
Total Forces at LWL 554.7 548.6 290.9 91.7 157.0 0.0
190
Maximum Transverse Moment case
Unactored Forces
Load Item Pmax Pmin ML MT HL HT
t t t-m t-m t t
DL (Superstr.) 100.0 100.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (w/c) 0.0 0.0 0.0 0.0 0.0 0.0 To be in
LL2 79.4 73.3 51.7 91.7 10.0 0.0 safer side
FPLL2 0.0 0.0 0.0 0.0 0.0 0.0 vertical
Earth Pressure 0.0 0.0 310.9 0.0 108.7 0.0 component
LL Surcharge 0.0 0.0 130.4 0.0 38.3 0.0 "P" of earth
Weight of Substr. 115.2 115.2 -77.6 0.0 0.0 0.0 and
Pile Cap Weight 166.1 166.1 0.0 0.0 0.0 0.0 surcharge is
Weight of soil on Pile cap 93.94 93.94 -124.48 0.00 0.00 0.00 not
Buyoyancy -82.20 -82.20 0.00 0.00 0.00 0.00 considered.
Total Forces at HFL 472.5 466.4 290.9 91.7 157.0 0.0
Total Forces at LWL 554.7 548.6 290.9 91.7 157.0 0.0
Unactored Forces
Load Item Pmax Pmin ML MT HL HT
t t t-m t-m t t
DL (Superstr.) 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (w/c) 0.0 0.0 0.0 0.0 0.0 0.0
LL1 0.0 0.0 0.0 0.0 0.0 0.0
FPLL1 0.0 0.0 0.0 0.0 0.0 0.0
191
SUMMARY OF LOAD CASES FOR BASIC COMBINATION
HFL Condition
Live load Pmax Pmin ML MT HL HT
Load Case No.
case t t t-m t-m t t
N1 LL1 case 472.5 466.4 290.9 91.7 157.0 0.0
N2 LL2 case 472.5 466.4 290.9 91.7 157.0 0.0
N3 LL3 case 472.5 466.4 290.9 91.7 157.0 0.0
One Span Dislodged Condition
Pmax Pmin ML MT HL HT
Load Case No.
t t t-m t-m t t
N4 293.1 293.1 239.2 0.0 147.0 0.0
LWL Condition
Live load Pmax Pmin ML MT HL HT
Load Case No.
case t t t-m t-m t t
N1 LL1 case 554.7 548.6 290.9 91.7 157.0 0.0
N2 LL2 case 554.7 548.6 290.9 91.7 157.0 0.0
N3 LL3 case 554.7 548.6 290.9 91.7 157.0 0.0
One Span Dislodged Condition
Pmax Pmin ML MT HL HT
Load Case No.
t t t-m t-m t t
N4 375.3 375.3 239.2 0.0 147.0 0.0
192
13 Combination for Foundation design (unfactored)
B Seismic Case
Pile cap Bottom Level
Distance between CG of Pile to CG of abutment stem = 0 m
Factor by which seismic force is increased for design of foundation = 1.35
Thermal force factor = 0.5
Weight of soil on
93.9 93.9 -124.5 0.0 0.0 0.0
Pile cap
Buyoyancy -82.20 -82.20 0.00 0.00 0.00 0.00
HFL Total 441.9 374.8 585.6 145.7 275.2 21.6
LWL total 524.1 457.0 585.6 145.7 275.2 21.6
193
Transverse Seismic Case
194
Vertical Seismic Case
195
B.2 One Span Dislodged Condition Seismic load factor 0.5
Longitudinal Seismic Case
Unactored Forces
Load Item Pmax Pmin ML MT HL HT
t t t-m t-m t t
DL (Superstr.) 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (excluding
0.0 0.0 0.0 0.0 0.0 0.0
w/c)
SIDL (w/c) 0.0 0.0 0.0 0.0 0.0 0.0
LL2 0.0 0.0 0.0 0.0 0.0 0.0
FPLL2 0.0 0.0 0.0 0.0 0.0 0.0
Shear Rating 0.0 0.0 0.0 0.0 0.0 0.0
To be in safer
Earth Pressure 0.0 0.0 438.4 0.0 165.0 0.0 side vertical
component
LL Surcharge 0.0 0.0 198.0 0.0 58.1 0.0 "P" of earth
and surcharge
Seismic forces on
0.0 0.0 0.0 0.0 0.0 0.0 is not
Superstr.
considered.
Weight of Substr. 115.2 115.2 -77.6 0.0 0.0 0.0
Seismic forces on
7.5 -7.5 21.2 15.9 12.6 3.8
Substr.
Pile Cap Weight 166.1 166.1 0.0 0.0 0.0 0.0
Weight of soil on
93.9 93.9 -124.5 0.0 0.0 0.0
Pile cap
Buyoyancy -82.2 -82.2 0.0 0.0 0.0 0.0
HFL Total 300.6 285.6 455.5 15.9 235.7 3.8
196
Transverse Seismic Case
Unactored Forces
Load Item Pmax Pmin ML MT HL HT
t t t-m t-m t t
DL (Superstr.) 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (excluding
0.0 0.0 0.0 0.0 0.0 0.0
w/c)
SIDL (w/c) 0.0 0.0 0.0 0.0 0.0 0.0
LL2 0.0 0.0 0.0 0.0 0.0 0.0
FPLL2 0.0 0.0 0.0 0.0 0.0 0.0
Shear Rating 0.0 0.0 0.0 0.0 0.0 0.0 To be in safer
side vertical
Earth Pressure 0.0 0.0 438.4 0.0 165.0 0.0
component
LL Surcharge 0.0 0.0 198.0 0.0 58.1 0.0
"P" of earth
Seismic forces on
0.0 0.0 0.0 0.0 0.0 0.0 and surcharge
Superstr.
is not
Weight of Substr. 115.2 115.2 -77.6 0.0 0.0 0.0 considered.
Seismic forces on
7.5 -7.5 -15.9 53.0 3.8 12.6
Substr.
Pile Cap Weight 166.1 166.1 0.0 0.0 0.0 0.0
Weight of soil on
93.9 93.9 -124.5 0.0 0.0 0.0
Pile cap
Buyoyancy -82.2 -82.2 0.0 0.0 0.0 0.0
HFL Total 300.6 285.6 418.4 53.0 226.9 12.6
Unactored Forces
Load Item Pmax Pmin ML MT HL HT
t t t-m t-m t t
DL (Superstr.) 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (excluding
0.0 0.0 0.0 0.0 0.0 0.0
w/c)
SIDL (w/c) 0.0 0.0 0.0 0.0 0.0 0.0
LL2 0.0 0.0 0.0 0.0 0.0 0.0
FPLL2 0.0 0.0 0.0 0.0 0.0 0.0
To be in safer
Shear Rating 0.0 0.0 0.0 0.0 0.0 0.0
side vertical
Earth Pressure 0.0 0.0 438.4 0.0 165.0 0.0
component
LL Surcharge 0.0 0.0 198.0 0.0 58.1 0.0
"P" of earth
Seismic forces on
0.0 0.0 0.0 0.0 0.0 0.0 and surcharge
Superstr.
is not
Weight of Substr. 115.2 115.2 -77.6 0.0 0.0 0.0
considered.
Seismic forces on
25.1 -25.1 -90.1 106.0 3.8 3.8
Substr.
Pile Cap Weight 166.1 166.1 0.0 0.0 0.0 0.0
Weight of soil on
93.9 93.9 -124.5 0.0 0.0 0.0
Pile cap
Buyoyancy -82.2 -82.2 0.0 0.0 0.0 0.0
HFL Total 318.2 268.0 344.2 106.0 226.9 3.8
197
SUMMARY OF LOAD CASES FOR SEISMIC COMBINATION FOR FOUNDATION
HFL Condition
Longitudinal Seismic
Pmax Pmin ML MT HL HT
Load Case No. Live load case
t t t-m t-m t t
S1 LL1 Case 441.9 374.8 585.6 145.7 275.2 21.6
S2 LL2 Case 439.0 377.7 585.6 122.2 275.2 18.3
Transverse Seismic
Pmax Pmin ML MT HL HT
Load Case No. Live load case
t t t-m t-m t t
S3 LL1 Case 429.2 363.1 443.7 428.4 243.4 71.9
S4 LL2 Case 439.0 377.7 452.0 359.1 245.0 61.1
Vertical Seismic
Pmax Pmin ML MT HL HT
Load Case No. Live load case
t t t-m t-m t t
S5 LL1 Case 518.8 297.9 251.7 325.8 245.0 21.6
S6 LL2 Case 509.1 307.6 251.7 307.7 245.0 18.3
198
13a. Pile CHECK unfactored
8 18 90 Plan of footing
13.a.1 Normal
HFL Condition
Both Span present condition
Forces/Moments For Pmax For Pmin Horizontal
Pmax Pmin ML MT 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 HL HT HR/pile
t t t-m t-m t t t t t t t t t t t t t t t t t t t t t t t t t t t
N1 473 466 291 92 39 36 33 30 88 85 82 79 59 59 59 59 39 36 33 29 87 84 81 78 58 58 58 58 157.0 0.0 19.6
N2 473 466 291 92 39 36 33 30 88 85 82 79 59 59 59 59 39 36 33 29 87 84 81 78 58 58 58 58 157.0 0.0 19.6
N3 473 466 291 92 39 36 33 30 88 85 82 79 59 59 59 59 39 36 33 29 87 84 81 78 58 58 58 58 157.0 0.0 19.6
One span dislodged condition
N4 293 293 239 0 17 17 17 17 57 57 57 57 37 37 37 37 17 17 17 17 57 57 57 57 37 37 37 37 147.0 0.0 18.4
LWL Condition
Both Span present condition
N1 555 549 291 92 50 47 44 41 98 95 92 89 69 69 69 69 49 46 43 40 97 94 91 88 69 69 69 69 157.0 0.0 19.6
N2 555 549 291 92 50 47 44 41 98 95 92 89 69 69 69 69 49 46 43 40 97 94 91 88 69 69 69 69 157.0 0.0 19.6
N3 555 549 291 92 50 47 44 41 98 95 92 89 69 69 69 69 49 46 43 40 97 94 91 88 69 69 69 69 157.0 0.0 19.6
One span dislodged condition
N4 375 375 239 0 27 27 27 27 67 67 67 67 47 47 47 47 27 27 27 27 67 67 67 67 47 47 47 47 147.0 0.0 18.4
199
13.a.2 Seismic
HFL Service Condition
Forces/Moments For Pmax For Pmin Horizontal
Pmax Pmin ML MT 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 HL HT R
t t t-m t-m t t t t t t t t t t t t t t t t t t t t t t t t t t t
S1 442 375 586 146 14 9 4 -1 111 106 102 97 55 55 55 55 5 0 -4 -9 103 98 93 88 47 47 47 47 275.2 21.6 34.5
S2 439 378 586 122 12 8 4 0 110 106 102 98 55 55 55 55 5 0 -4 -8 102 98 94 90 47 47 47 47 275.2 18.3 34.5
S3 429 363 444 428 38 24 10 -5 112 98 83 69 54 54 54 54 30 16 1 -13 104 89 75 61 45 45 45 45 243.4 71.9 31.7
S4 439 378 452 359 35 23 11 -1 110 99 87 75 55 55 55 55 28 16 4 -8 103 91 79 67 47 47 47 47 245 61.1 31.6
S5 519 298 252 326 60 49 38 28 102 91 80 70 65 65 65 65 33 22 11 0 74 64 53 42 37 37 37 37 245 21.6 30.7
S6 509 308 252 308 58 48 38 27 100 90 79 69 64 64 64 64 33 23 12 2 75 65 54 44 38 38 38 38 245 18.3 30.7
Normal
Maximum Axial Force Condition Normal(Pmax) Minimum Axial Force Condition Normal(Pmin)
Maximum Axial force = 98 t Maximum Axial force = 97 t
Minimum Axial force = 17 t Minimum Axial force = 17 t
200
HORIZONTAL CAPACITY OF PILES (GRANULAR SOIL)
M = m * ( MF )
or
M = m * Q ( L1 + LF)/2
Where
m = Reduction Factor (from Fig. 3A of Append. C,
corresponding to L1/R or LF/T)
for L1/T = 0.14 and piles in sands & normally loaded clays
m = 0.85 (from Fig. 3 of Append. C)
Therefore
M = Maximum Moment in Pile
M = m * Q ( L1 + LF)/2
= 0.85 * Q * ( 0.5 + 7.96 )/2
= 3.60 * Q
Therefore
Maximum Moment in Pile = 3.60 * Q
where Q is Lateral load in tons
201
LOAD COMBINATION (LIMIT STATE)
14.DESIGN OF PILE
202
14 Combination for Pile stress check (factored)
C-1 BASIC
Footing Bottom Level
Weight of Substr. 1.35 115.2 115.2 -77.6 0.0 0.0 0.0 155.6 155.6 -104.7 0.0 0.0 0.0
Seismic forces on
0 20.3 -20.3 57.2 31.8 33.9 7.5 0.0 0.0 0.0 0.0 0.0 0.0
Substr.
Pile Cap Weight 1.35 166.1 166.1 0.0 0.0 0.0 0.0 224.2 224.2 0.0 0.0 0.0 0.0
Weight of soil on Pile
1.35 93.9 93.9 -124.5 0.0 0.0 0.0 126.8 126.8 -168.0 0.0 0.0 0.0
cap
Buyoyancy 0.15 -82.2 -82.2 0.0 0.0 0.0 0.0 -12.3 -12.3 0.0 0.0 0.0 0.0
Total Forces at HFL Condition LL Leading 653.1 651.3 637.9 27.5 320.2 0.0
LL Accompanying
423.3 266.4 739.0 21.1 319.5 0.0
Total Forces at LWL Condition LL Leading 538.6 536.8 805.9 27.5 320.2 0.0
LL Accompanying
308.9 307.4 802.3 21.1 319.5 0.0
Weight of Substr. 1.35 115.2 115.2 -77.6 0.0 0.0 0.0 155.6 155.6 -104.7 0.0 0.0 0.0
Seismic forces on
0 20.3 -20.3 57.2 31.8 33.9 7.5 0.0 0.0 0.0 0.0 0.0 0.0
Substr.
Pile Cap Weight 1.35 166.1 166.1 0.0 0.0 0.0 0.0 224.2 224.2 0.0 0.0 0.0 0.0
Weight of soil on Pile
1.35 93.9 93.9 -124.5 0.0 0.0 0.0 126.8 126.8 -168.0 0.0 0.0 0.0
cap
Buyoyancy 0.15 -82.2 -82.2 0.0 0.0 0.0 0.0 -12.3 -12.3 0.0 0.0 0.0 0.0
Total Forces at HFL Condition LL Leading 653.1 651.3 637.9 27.5 320.2 0.0
LL Accompanying
423.3 421.9 634.3 21.1 319.5 0.0
Total Forces at LWL Condition LL Leading 538.6 536.8 805.9 27.5 320.2 0.0
LL Accompanying
308.9 307.4 802.3 21.1 319.5 0.0
203
C.1.b One Span Dislodged Condition
Weight of Substr. 1.35 115.2 115.2 -77.6 0.0 0.0 0.0 155.6 155.6 -104.7 0.0 0.0 0.0
Seismic forces on
0 7.5 -7.5 21.2 15.9 12.6 3.8 0.0 0.0 0.0 0.0 0.0 0.0
Substr.
Pile Cap Weight 1.35 166.1 166.1 0.0 0.0 0.0 0.0 224.2 224.2 0.0 0.0 0.0 0.0
Weight of soil on Pile
1.35 93.9 93.9 -124.5 0.0 0.0 0.0 126.8 126.8 -168.0 0.0 0.0 0.0
cap
Buyoyancy 0.15 -82.2 -82.2 0.0 0.0 0.0 0.0 -12.3 -12.3 0.0 0.0 0.0 0.0
Total Forces at HFL Condition LL Leading 494.3 494.3 622.4 0.0 317.2 0.0
LL Accompanying
270.1 270.1 622.4 0.0 317.2 0.0
Total Forces at LWL Condition LL Leading 379.8 379.8 790.4 0.0 317.2 0.0
LL Accompanying
155.6 155.6 790.4 0.0 317.2 0.0
204
14 Combination for Pile stress check (factored)
C-2 RARE
Footing Bottom Level
Weight of Substr. 1 115.2 115.2 -77.6 0.0 0.0 0.0 115.2 115.2 -77.6 0.0 0.0 0.0
Seismic forces on Substr. 0 20.3 -20.3 57.2 31.8 33.9 7.5 0.0 0.0 0.0 0.0 0.0 0.0
Pile Cap Weight 1 166.1 166.1 0.0 0.0 0.0 0.0 166.1 166.1 0.0 0.0 0.0 0.0
Weight of soil on Pile cap 1 93.9 93.9 -124.5 0.0 0.0 0.0 93.9 93.9 -124.5 0.0 0.0 0.0
Buyoyancy 0.15 -82.2 -82.2 0.0 0.0 0.0 0.0 -12.3 -12.3 0.0 0.0 0.0 0.0
Total Forces at HFL Condition LL Leading 483.6 482.0 579.2 23.9 275.2 0.0
LL Accompanying 312.7 311.5 576.1 18.3 274.6 0.0
Total Forces at LWL Condition LL Leading 402.0 400.4 703.7 23.9 275.2 0.0
LL Accompanying 231.1 229.9 700.6 18.3 274.6 0.0
Weight of Substr. 1 115.2 115.2 -77.6 0.0 0.0 0.0 115.2 115.2 -77.6 0.0 0.0 0.0
Seismic forces on Substr. 0 20.3 -20.3 57.2 31.8 33.9 7.5 0.0 0.0 0.0 0.0 0.0 0.0
Pile Cap Weight 1 166.1 166.1 0.0 0.0 0.0 0.0 166.1 166.1 0.0 0.0 0.0 0.0
Weight of soil on Pile cap 1 93.9 93.9 -124.5 0.0 0.0 0.0 93.9 93.9 -124.5 0.0 0.0 0.0
Buyoyancy 0.15 -82.2 -82.2 0.0 0.0 0.0 0.0 -12.3 -12.3 0.0 0.0 0.0 0.0
Total Forces at HFL Condition LL Leading 483.6 482.0 579.2 23.9 275.2 0.0
LL Accompanying 312.7 311.5 576.1 18.3 274.6 0.0
Total Forces at LWL Condition LL Leading 402.0 400.4 703.7 23.9 275.2 0.0
LL Accompanying 231.1 229.9 700.6 18.3 274.6 0.0
205
C.2.b. One Span Dislodged Condition
Weight of Substr. 1 115.2 115.2 -77.6 0.0 0.0 0.0 115.2 115.2 -77.6 0.0 0.0 0.0
Seismic forces on Substr. 0 7.5 -7.5 21.2 15.9 12.6 3.8 0.0 0.0 0.0 0.0 0.0 0.0
Pile Cap Weight 1 166.1 166.1 0.0 0.0 0.0 0.0 166.1 166.1 0.0 0.0 0.0 0.0
Weight of soil on Pile cap 1 93.9 93.9 -124.5 0.0 0.0 0.0 93.9 93.9 -124.5 0.0 0.0 0.0
Buyoyancy 0.15 -82.2 -82.2 0.0 0.0 0.0 0.0 -12.3 -12.3 0.0 0.0 0.0 0.0
Total Forces at HFL Condition LL Leading 363.0 363.0 565.8 0.0 272.6 0.0
LL Accompanying 196.9 196.9 565.8 0.0 272.6 0.0
Total Forces at LWL Condition LL Leading 281.3 281.3 690.3 0.0 272.6 0.0
LL Accompanying 115.2 115.2 690.3 0.0 272.6 0.0
HFL
Live LL Pmax Pmin ML MT HL HT
Load Case No. load Leading/Accompa
case nying t t t-m t-m t t
(C-2)1 LL1 LL Leading 483.6 482.0 579.2 23.9 275.2 0.0
(C-2)2 case LL Accompanying 312.7 311.5 576.1 18.3 274.6 0.0
(C-2)3 LL2 LL Leading 483.6 482.0 579.2 23.9 275.2 0.0
(C-2)4 case LL Accompanying 312.7 311.5 576.1 18.3 274.6 0.0
One Span Dislodged Condition
LL Pmax Pmin ML MT HL HT
Load Case No. Leading/Accomp
anying t t t-m t-m t t
(C-2)7 LL Leading 363.0 363.0 565.8 0.0 272.6 0.0
(C-2)8 LL Accompanying 196.9 196.9 565.8 0.0 272.6 0.0
LWL
Live LL Pmax Pmin ML MT HL HT
Load Case No. load Leading/Accompa
case nying t t t-m t-m t t
(C-2)1 LL1 LL Leading 402.0 400.4 703.7 23.9 275.2 0.0
(C-2)2 case LL Accompanying 231.1 229.9 700.6 18.3 274.6 0.0
(C-2)3 LL2 LL Leading 402.0 400.4 703.7 23.9 275.2 0.0
(C-2)4 case LL Accompanying 231.1 229.9 700.6 18.3 274.6 0.0
One Span Dislodged Condition
LL Pmax Pmin ML MT HL HT
Load Case No.
Leading/Accomp t t t-m t-m t t
(C-2)7 LL Leading 281.3 281.3 690.3 0.0 272.6 0.0
(C-2)8 LL Accompanying 115.2 115.2 690.3 0.0 272.6 0.0
206
14 Combination for Pile stress check (factored)
C-3 SISMIC
Footing Bottom Level
Pile Cap Weight 1.35 166.1 166.1 0.0 0.0 0.0 0.0 224.2 224.2 0.0 0.0 0.0 0.0
207
C.3.b Transverse Seismic Case
Maximum Reaction case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1.35 100.0 100.0 0.0 0.0 0.0 0.0 135.0 135.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (w/c) 1.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL1 0.2 3.2 2.9 2.1 3.7 0.4 0.0 0.6 0.6 0.4 0.7 0.1 0.0
FPLL1 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shear Rating 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Earth Pressure 1 0.0 0.0 438.4 0.0 165.0 0.0 0.0 0.0 438.4 0.0 165.0 0.0
LL Surcharge 0.2 0.0 0.0 198.0 0.0 58.1 0.0 0.0 0.0 39.6 0.0 11.6 0.0
Seismic forces on
1.5 12.6 -12.6 50.3 318.7 9.7 46.8 18.9 -18.9 75.4 478.1 14.6 70.2
Superstr.
Weight of Substr. 1.35 115.2 115.2 -77.6 0.0 0.0 0.0 155.6 155.6 -104.7 0.0 0.0 0.0
Seismic forces on
1.5 20.3 -20.3 -42.9 106.0 10.2 25.1 30.5 -30.5 -64.4 159.0 15.3 37.7
Substr.
Pile Cap Weight 1.35 166.1 166.1 0.0 0.0 0.0 0.0 224.2 224.2 0.0 0.0 0.0 0.0
Weight of soil on Pile
1.35 93.9 93.9 -124.5 0.0 0.0 0.0 126.8 126.8 -168.0 0.0 0.0 0.0
cap
Buyoyancy 0.15 -82.2 -82.2 0.0 0.0 0.0 0.0 -12.3 -12.3 0.0 0.0 0.0 0.0
Total Forces at HFL Condition 679.4 580.4 216.6 637.8 206.5 107.8
Total Forces at LWL Condition 564.9 465.9 384.7 637.8 206.5 107.8
208
C.3.c Vertical Seismic Case
Maximum Reaction case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1.35 100.0 100.0 0.0 0.0 0.0 0.0 135.0 135.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (w/c) 1.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL1 0.2 15.9 14.7 10.3 18.3 2.0 0.0 3.2 2.9 2.1 3.7 0.4 0.0
FPLL1 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shear Rating 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Earth Pressure 1 0.0 0.0 438.4 0.0 165.0 0.0 0.0 0.0 438.4 0.0 165.0 0.0
LL Surcharge 0.2 0.0 0.0 198.0 0.0 58.1 0.0 0.0 0.0 39.6 0.0 11.6 0.0
Seismic forces on
1.5 42.1 -42.1 50.3 95.5 9.7 14.0 63.1 -63.1 75.4 143.3 14.6 21.0
Superstr.
Weight of Substr. 1.35 115.2 115.2 -77.6 0.0 0.0 0.0 155.6 155.6 -104.7 0.0 0.0 0.0
Seismic forces on
1.5 67.8 -67.8 -243.2 211.9 10.2 7.5 101.7 -101.7 -364.8 317.9 15.3 11.3
Substr.
Pile Cap Weight 1.35 166.1 166.1 0.0 0.0 0.0 0.0 224.2 224.2 0.0 0.0 0.0 0.0
Weight of soil on Pile
1.35 93.9 93.9 -124.5 0.0 0.0 0.0 126.8 126.8 -168.0 0.0 0.0 0.0
cap
Buyoyancy 0.15 -82.2 -82.2 0.0 0.0 0.0 0.0 -12.3 -12.3 0.0 0.0 0.0 0.0
Total Forces at HFL Condition 797.3 467.4 -82.2 464.9 206.8 32.3
Total Forces at LWL Condition 682.8 352.9 85.9 464.9 206.8 32.3
209
C-3.2 One Span Dislodged Condition
a Longitudinal Seismic Case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (w/c) 1.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL1 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FPLL1 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shear Rating 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Earth Pressure 1 0.0 0.0 438.4 0.0 165.0 0.0 0.0 0.0 438.4 0.0 165.0 0.0
LL Surcharge 0.2 0.0 0.0 198.0 0.0 58.1 0.0 0.0 0.0 39.6 0.0 11.6 0.0
Seismic forces on
0.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Superstr.
Weight of Substr. 1.35 115.2 115.2 -77.6 0.0 0.0 0.0 155.6 155.6 -104.7 0.0 0.0 0.0
Seismic forces on
0.75 7.5 -7.5 21.2 15.9 12.6 3.8 5.6 -5.6 15.9 11.9 9.4 2.8
Substr.
Pile Cap Weight 1.35 166.1 166.1 0.0 0.0 0.0 0.0 224.2 224.2 0.0 0.0 0.0 0.0
Weight of soil on Pile
1.35 93.9 93.9 -124.5 0.0 0.0 0.0 126.8 126.8 -168.0 0.0 0.0 0.0
cap
Buyoyancy 0.15 -82.2 -82.2 0.0 0.0 0.0 0.0 -12.3 -12.3 0.0 0.0 0.0 0.0
Total Forces at HFL Condition 499.9 488.7 221.1 11.9 186.0 2.8
Total Forces at LWL Condition 385.5 374.2 389.1 11.9 186.0 2.8
210
c Vertical Seismic Case
Partial Unactored Forces Factored Forces
Load Item Safety Pmax Pmin ML MT HL HT Pmax Pmin ML MT HL HT
Factor t t t-m t-m t t t t t-m t-m t t
DL (Superstr.) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (excluding w/c) 1.35 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SIDL (w/c) 1.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LL1 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FPLL1 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shear Rating 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Earth Pressure 1 0.0 0.0 438.4 0.0 165.0 0.0 0.0 0.0 438.4 0.0 165.0 0.0
LL Surcharge 0.2 0.0 0.0 198.0 0.0 58.1 0.0 0.0 0.0 39.6 0.0 11.6 0.0
Seismic forces on
0.75 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Superstr.
Weight of Substr. 1.35 115.2 115.2 -77.6 0.0 0.0 0.0 155.6 155.6 -104.7 0.0 0.0 0.0
Seismic forces on
0.75 25.1 -25.1 -90.1 106.0 3.8 3.8 18.8 -18.8 -67.6 79.5 2.8 2.8
Substr.
Pile Cap Weight 1.35 166.1 166.1 0.0 0.0 0.0 0.0 224.2 224.2 0.0 0.0 0.0 0.0
Weight of soil on Pile
1.35 93.9 93.9 -124.5 0.0 0.0 0.0 126.8 126.8 -168.0 0.0 0.0 0.0
cap
Buyoyancy 0.15 -82.2 -82.2 0.0 0.0 0.0 0.0 -12.3 -12.3 0.0 0.0 0.0 0.0
Total Forces at HFL Condition 513.1 475.5 137.6 79.5 179.4 2.8
Total Forces at LWL Condition 398.6 361.0 305.7 79.5 179.4 2.8
211
14.a Calculation of factored reaction to obtain reinforcement in pile
212
LWL
Span present condition
Forces/Moments For Pmax For Pmin Horizontal
Load HL HT
Pmax Pmin ML MT 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 tot tot HR/pile
Case
t t t-m t-m t t t t t t t t t t t t t t t t t t t
(C-1)1 539 537 806 28 2 1 0 -1 136 135 134 133 1 0 -1 -1 136 135 86 133 320 0 40
(C-1)2 309 307 802 21 -27 -28 -29 -29 107 106 105 104 -27 -28 -29 -29 106 106 0 104 320 0 40
(C-1)3 539 537 806 28 2 1 0 -1 136 135 134 133 1 0 -1 -1 136 135 0 133 320 0 40
(C-1)4 309 307 802 21 -27 -28 -29 -29 107 106 105 104 -27 -28 -29 -29 106 106 0 104 320 0 40
One Span Dislodged Condition
(C-1)7 380 380 790 0 -18 -18 -18 -18 113 113 113 113 -18 -18 -18 -18 113 113 134 113 317 0 40
(C-1)8 156 156 790 0 -46 -46 -46 -46 85 85 85 85 -46 -46 -46 -46 85 85 105 85 317 0 40
C-2 RARE
HFL
Span present condition
Forces/Moments For Pmax For Pmin Horizontal
Load
Pmax Pmin ML MT 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 HL HT HR/pile
Case
t t t-m t-m t t t t t t t t t t t t t t t t t t t
(C-2)1 484 482 579 24 13 13 12 11 110 109 108 108 13 12 12 11 110 109 108 107 275 0 34
(C-2)2 313 312 576 18 -8 -9 -9 -10 88 87 87 86 -8 -9 -9 -10 88 87 87 86 275 0 34
(C-2)3 484 482 579 24 13 13 12 11 110 109 108 108 13 12 12 11 110 109 108 107 275 0 34
(C-2)4 313 312 576 18 -8 -9 -9 -10 88 87 87 86 -8 -9 -9 -10 88 87 87 86 275 0 34
(C-2)5 484 482 579 24 13 13 12 11 110 109 108 108 13 12 12 11 110 109 108 107 275 0 34
(C-2)6 313 312 576 18 -8 -9 -9 -10 88 87 87 86 -8 -9 -9 -10 88 87 87 86 275 0 34
0 0 0 0
One Span Dislodged Condition
(C-2)7 363 363 566 0 -2 -2 -2 -2 93 93 93 93 -2 -2 -2 -2 93 93 93 93 273 0 34
(C-2)8 197 197 566 0 -23 -23 -23 -23 72 72 72 72 -23 -23 -23 -23 72 72 72 72 273 0 34
LWL
Span present condition
Forces/Moments For Pmax For Pmin Horizontal
Load
HL HT HR/pile
Case Pmax Pmin ML MT 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
t t t-m t-m t t t t t t t t t t t t t t t t t t t
(C-2)1 402 400 704 24 -7 -8 -9 -10 110 109 108 108 -7 -8 -9 -10 110 109 109 108 275 0 34
(C-2)2 231 230 701 18 -29 -29 -30 -30 88 88 87 86 -29 -29 -30 -31 88 87 87 86 275 0 34
(C-2)3 402 400 704 24 -7 -8 -9 -10 110 109 108 108 -7 -8 -9 -10 110 109 109 108 275 0 34
(C-2)4 231 230 701 18 -29 -29 -30 -30 88 88 87 86 -29 -29 -30 -31 88 87 87 86 275 0 34
(C-2)5 402 400 704 24 -7 -8 -9 -10 110 109 108 108 -7 -8 -9 -10 110 109 108 108 275 0 34
(C-2)6 231 230 701 18 -29 -29 -30 -30 88 88 87 86 -29 -29 -30 -31 88 87 87 86 275 0 34
0 0
One Span Dislodged Condition
(C-2)7 281 281 690 0 -22 -22 -22 -22 93 93 93 93 -22 -22 -22 -22 93 93 93 93 273 0 34
(C-2)8 115 115 690 0 -43 -43 -43 -43 72 72 72 72 -43 -43 -43 -43 72 72 72 72 273 0 34
213
C-3 SEISMIC
HFL
Span present condition
Forces/Moments For Pmax For Pmin Horizontal
Load HL HT
Pmax Pmin ML MT 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 tot tot HR/pile
Case
t t t-m t-m t t t t t t t t t t t t t t t t t t t
SCF1 682 583 419 195 60 54 47 41 130 123 117 110 48 41 35 28 117 111 117 110 252 32 32
SCF2 678 587 419 159 58 52 47 42 128 122 117 112 46 41 36 31 116 111 117 112 252 27 32
SCF4 679 580 217 638 99 78 56 35 135 114 92 71 86 65 44 23 122 101 92 71 207 108 29
SCF5 678 587 218 515 92 75 58 41 129 111 94 77 81 64 47 29 117 100 94 77 207 92 28
SCF6 678 587 218 515 92 75 58 41 129 111 94 77 81 64 47 29 117 100 94 77 207 92 28
SCF7 797 467 -82 465 130 114 99 83 116 101 85 70 89 73 58 42 75 59 85 70 207 32 26
SCF8 783 482 -82 438 127 112 97 83 113 98 84 69 89 74 60 45 75 61 84 69 207 27 26
SCF9 783 482 -82 438 127 112 97 83 113 98 84 69 89 74 60 45 75 61 84 69 207 27 26
214
15.a Circular Pile Moment capacity check (ULS) case
No of bars = 10
Diameter of bars = 0.0250 m
Area =3.14×0.025^2/4×10 = 0.00491 m2
Grade of Concrete = 35
gm = 1.5
215
15.b Analysis of Pile for SLS case
MY
X
Diameter "D"
Radius 0.500 m
Effective Cover 0.0995 m
No of bars 10 Nos.
Diameter of bar 0.025 m
2
A concrete 785398 mm
2
Area of Steel 4909 mm
Percentage of Steel 0.63 %
216
MOMENT OF RESISTANCE OF RECTANGULAR CONCRETE SECTION
As per IRC:112-2011
0.0035 fcd
0.87fy/Es Tu = 0.87fy*Ast
xu,lim/d 0.617 pt A f R
= = st = 0.973 cd 1 - 1 - 2.055
100 bd f yd f cd
Rlim = Mu,Lim/bd2 = 4.97
It is not necessary to check maximum strain limit as ideal plastic branch is used
Clause 8.2.1 (f), IRC:112-2011
Calculation of Reinforcement
where, R = Mu/bd2
217
DESIGN OF PILE CAP
T-T
0
fcd = 13.40 MPa
fyd = 434.8 MPa
Rlim = 4.97 MPa
P1
Clear cover = 99.5 mm
P1
Overall depth of pile cap = 1.5 m 4.3
Depth of soil over pile cap = 0.0 m
10.3 L-L
Width of abutment = 1.00 m
Dimension in other direction = 10.30 m 4.3
Longitudinal distance of CG of each pile 8.4
from face of equivalent square = 1.00 m
Weight of soil above GL on pile cap = 0 t/m Not taken being in safer side 4.3
218
Longitudinal Direction
Design for Flexure
Critical section for moment is at the face of equivalent square
2
Ast, required = 2681.8 mm /m
2
Minimum Ast, required per meter width = 1781.7 mm /m (max. Of 0.26fctm/fyk*bt*d and 0.0013bt*d)
2
Governing Ast, required per meter width = 2681.8 mm /m
Provide
Bar Dia 20 mm 20 mm at bottom
+
Spacing c/c 200 mm 200 mm
2
Ast, provided = 3141.6 mm /m
OK
Maximum Ast per m width Ast,max = 34262.5 mm2/m (0.025Ac)
2
Minimum Ast, required per meter width = 1781.7 mm /m (max. Of 0.26fctm/fyk*bt*d and 0.0013bt*d)
2
Governing Ast, required per meter width = 1781.7 mm /m
Provide
Bar Dia 20 mm 20 mm at bottom
+
Spacing c/c 200 mm 200 mm
2
Ast, provided = 3141.6 mm /m
OK
2
Maximum Ast per m width Ast,max = 34262.5 mm /m (0.025Ac)
Critical section for shear is shown in figure Critical section for shear
β = 0.250
Where av=or <0.5*d
Shear due to piles (P1, P2, P3,P4) and (P5, P6,p6,p7) = 52.9 t/m
Shear due to self weight and weight of soil on pile cap upto GL = 3.5 t/m
Shear due to weight of soil on pile cap above GL = 0.0 t/m
Shear due to weight of RE wall = 0.0 t/m
Net Shear VEd = 28.4 t/m
219
2
Tensile Reinforcement Asl = 2513.3 mm
Width of beam bw = 1000 mm
Effective Depth d = 1370.5 mm
Ac = 1.37E+06 mm2
NEd = 0 kN
K = 1+ 200 ≤ 2 = 1.38
d
220
PUNCHING SHEAR CHECK
As per Clause 10.4.5, IRC:112-2011
Punching shear should be verified at the face of the column and at control perimeters within 2d from the face of the column
Cl. 10.4.5 (1), IRC:112-2011
Punching shear is checked for Pile P1 (corner pile) as maximum load comed on this pile
-0.25m
P1
a
0.35m
V Ed = 129.8 t
2
v Ed = V Ed = 47.35 t/m = 0.47 MPa OK
ud
V Ed = 129.8 t
2
v Ed = V Ed = 13.12 t/m = 0.13 MPa OK
ud
K = 1+ √(200/d) ≤ 2 d is in mm
= 1.38
ρl = √(ρ ly ρ lz ) ≤ 0.02
ρ ly = 0.00059
ρ lz = 0.001807
ρl = 0.001033
v Rd = 0.62 MPa
221
DESIGN OF ABUTMENT CAP
The Abutment cap shall be reinforced with a total minimum of 1% steel distributed equally at both faces
and in both directions.
222
DESIGN OF DIRTWALL
17 Design of Dirt Wall
1.67
Design values :
height of
1.943 m
dirtwall,h =
= 0.670 t/m2
= 1.084 t/m2
Bending moment at the base of dirtwall due to earth pressure (1) = ka *g*1.2*h2/2
= 1.264 t-m/m
Bending moment at the base of dirtwall due to earth pressure (1) = ka *g*h3*0.42/2
= 0.860 t-m/m
Calculation of force and moment due to the effect of braking :(considering 40t bogie loading)
2.79m
1.943
Bending moment at the base of dirtwall due to effect of braking = 1.75 t-m/m
223
Bending Moment at the bottom of dirt wall for Basic Combination
Unfactored Factored
Partial
Load Item Safety B. M B. M
Factor
t-m/m t-m/m
LL
1.2 1.26 1.52
Surcharge
Earth
1.5 0.86 1.29
Pressure
Braking 1.5 1.75 2.62
Total Factored B.M 5.43
Design
Design factored moment at the base of dirtwall (t-m) = 5.43 t-m/m
Overall Depth Provided = 400 mm
Clear cover = 40 mm
2
Ast, required = 369.3 mm
2
Minimum Ast, required per meter width = 447.2 mm (max. Of 0.26fctm/fyk*bt*d and 0.0013bt*d)
2
Governing Ast, required per meter width = 447.2 mm
Distribution Reinforcement
2
Secondary reinforcement required per meter = 89.4 mm
(20% of main reinforcement, Cl. 16.6.6.1, IRC:112-2011)
224
DESIGN OF END RETURN WALL
ka = 0.279
g = 2.0m
b = 5.310
(SHt)
Q1=ka*g*SHt Q2=ka*g*b
The end return wall has been designed as a plate fixed on its two faces i.e. at the base and on one of its vertical sides.
( Refer Table 26 of Formula of Stress & Strain by Roark & Young ).
225
Uniform load due to live load surcharge over entire plate
Height of Length of
Unfactored Factored
S.NO. return wall return wall "a/b"
Q1 (t/m2) b1 b2 g1 g2 (at x=a & z=0) Mb1 (at x=0 & z=0.8b) Ma1 (t-
(m) "b" (m) "a" Mb1 Ma1
(t-m/m) m/m)
1 5.31 1.65 0.311 0.670 0.265 0.290 0.620 0.336 -0.83 -0.91 -1.0 -1.1
Ast provided (vertical) = 2010.6 mm2/m Ast provided (horizontal) = 565.5 mm2/m
2
Minimum reinforcement required at outer face = 574.6 mm /m (max. Of 0.26fctm/fyk*bt*d and 0.0013bt*d)
226
CHECK FOR SHEAR
227
DESIGN OF SEISMIC RESTRAINER
Seismic combinatiom
Design moment = 3.90 t-m
Design shear = 6.00 t
2
Tensile Reinforcement Asl = 3141.6 mm
Width of beam bw = 575 mm
Effective Depth d = 730.0 mm
2
Ac = 4.20E+05 mm
NEd = 0 kN
K = 1+ 200 ≤ 2
d
= 1.52
2
Asw = 452.4 mm >min shear reinforcement - OK
s = 150 mm
z = 0.9d 657.0 mm
fywd = 0.8fyk/γm 347.8 MPa
cotθ 2.5
αcw 1 For σcp = 0
bw 575 mm
ν1 0.6 For fck ≤ 80MPa
VRd.max = αcw*bw*z*ν1*fcd/(cotθ+tanθ)
= 104.7 t
228
DESIGN OF SEISMIC RESTRAINER
3*46.76976
Seismic combinatiom
Design moment = 15.20 t-m
Design shear = 23.38 t
2
Tensile Reinforcement Asl = 3141.6 mm
Width of beam bw = 800 mm
Effective Depth d = 830.0 mm
2
Ac = 6.64E+05 mm
NEd = 0 kN
K = 1+ 200 ≤ 2
d
= 1.49
2
Asw = 678.6 mm >min shear reinforcement - OK
s = 150 mm
z = 0.9d 747.0 mm
fywd = 0.8fyk/γm 347.8 MPa
cotθ 2.5
αcw 1 For σcp = 0
bw 800 mm
ν1 0.6 For fck ≤ 80MPa
VRd.max = αcw*bw*z*ν1*fcd/(cotθ+tanθ)
= 165.7 t
229
Pipra To Gardi
230
1 : INTRODUCTION
Design of Substructure for minor bridge is presented here with. The structure consists of
RCC Girder supported by RCC Wall type abutments & rectangular Piers resting on
Pile Foundation
Superstructure Type : RCC Girder
Substructure : RCC RECTANGULAR Type Pier
Foundation : Pile Foundation
231
Reference Codes
232
INDEX
1 : INTRODUCTION
233
2 : GENERAL DETAILS OF Minor Bridge
General Level details LHS RHS
Structure Width, m 8.400 (SQ) 8.400 (SK) Finished Road Level = 103.513 103.513 m
Skew Angle = 0.00 º deg Ground Level = 98.423 98.423 m
Expansion Gap = 0.020 m Pier Cap Bottom Level(Uniform Portion ) = 100.970 100.970 m
Wearing coat thk. Total = 0.065 m Pier Cap Bottom Level(Tapered Portion) = 100.320 100.320 m
Fill on deck due to transition = 0.000 m Footing top level = 97.923 97.923 m
Coffecient of friction( µ ) = 0.05 Foundation Level = 96.423 96.423 m
scour level at pier = 96.043 96.043 m
Camber/superelevation = 2.00% 2.00%
Superstructure Details
Superstructure Details LHS RHS
No of Girders = 3 SQ 3 SQ
C/C Span (Exp Gap to Exp Gap) = 20.00 20.000 m 20.00 20.000 m
C/C distance Brg to Exp (Long.) = 0.75 0.750 m 0.75 0.750 m
Proj. of beyond bearing = 0.730 m 0.730 m
Proj. of slab Transverse dir. = 1.20 m 1.20 m
C/C span (Brg to Brg) = 18.50 m 18.50 m
Girder proj beyond cl of brg = 0.350 m 0.350 m
Soffit Level = 101.873 m 101.873 m
Girder Details
Girder spacing = 3.000 m 3.000 m
Deck slab thk. = 0.225 m 0.225 m
Depth of girder = 1.35 m 1.35 m
Bearing Nos = 3 3
Type = Fixed Free
5
234
Pedestal (brg. +pedestal) = 0.300 m 0.300
Long. = 0.850 m 0.850 m
Transv. = 0.850 m 0.850 m
Pier Cap Long. = 2.61 m (3-1)*3+0.85+2*.0.125)
Transv. = 7.99 m Crash Barrier Height = 1.000 m
Projection beyond pedestal = 0.125 m at side from pier cap Width = 0.450 m
Proj. beyond pedestal = 0.125 m at Ends Hand rail Width of hand rail on LHS = 0.000 m
Pier Cap Top Level = 101.570 m Width of hand rail on RHS = 0.000 m
Thk. of Pier cap at tip = 0.60 m Footpath Width of footpath on LHS = 0.000 m
Width of footpath on RHS = 0.000 m
Crash Barrier
Thk. of Pier cap Taper = 0.65 m
Pier Longitudinal = 2.79 m
Tranverse = 1.00 m
Eccentricity wrt Bearing Center = 0.00
Wind Data
Basic Wind speed = 47.0 m/s Cd for single girder
Drag cofficient for Single Girder = 1.30 Cd shall not be < 1.3 b/d >= 6 1.3
Drag cofficient for Multiple Girder = 1.95 b/d = 2 1.5
Gust Factor = 2.0 b/d = 5.33 1.30
Soil Properties
Type of Soil = Sandy f for soil = 30 deg
Dry unit weight of soil = 2.0 t/m3 c for soil = 0.0
Submerged unit weight of soil = 1.0 t/m3
Design Constants
Grade of concrete = M 30 Unit wt. of concrete = 2.5 t/m3 E = 2.0E+05 mpa
Grade of steel = Fe 500 Unit wt.of Wearing coat = 2.2 t/m3
Modular Ratio = 10 Permissible Stress in Steel = 240.0 Mpa
PILE Data Permissible Stress in concrete = 10.00 Mpa
Total Pile depth = 20.0 m Pile net safe Cpacity = 300 Ton
Horizontal Pile capacity = 20.0 Ton Dia of piles = 1.00 m
Spacing of piles in transverse = 3.00 m Spacing of piles in longitudinal = 3.00 m
Total no of piles = 6.00 Nos Number of Rows of Piles LL = 2.00 Nos
Number of Rows of PilesTT = 2.00 Nos Edge Distance = 0.65 m
Thickness of pile cap = 1.50 m Length of Pile Cap (m) TT = 7.300 m
Length of Pile Cap (m) LL = 4.300 m
6
235
SupStr. Loads P Left P Right MT Left MT Right MT(tm) ML(tm)
DL (Girder + Slab + Diaphragm) = 100.6 100.6 0.0 0.0 0.00 0.00
SIDL Reaction = 19.0 19.0 0.0 0.0 0.00 0.00
Wearing Coat = 10.6 10.6 0.0 0.0 0.00 0.00
FPLL Reaction = 0.0 0.0 0.0 0.0 0.00 0.00
1.500
Founding Level 96.423
6.000
C/L of Footing
Pile
7
236
3 : CALCUALTION OF GOVERNING LIVE LOAD REACTION
a : Class A 1 Lane near Crash Barrier e : Class 70R Wheel 1 Lane near Crash Barrier i : Class 70R Track 1 Lane near Crash Barrier
b : Class A 1 Lane at 7.25m f : Class 70R Wheel 1 Lane at 7.25m from CB j : Class 70R Track 1 Lane at 7.25m from CB
c : ClassA 3 Lane near Crash Barrier g: e+b k: i+b
d : ClassA 3 Lane at concentric at center h: a+f l: a+j
c: 31.69 60.31 59.32 40.68 119.63 0.74 18.40 2.400 287.11 26.76 106.46 287.11 Class A - 1 Lane
Reactions
d: 8.71 59.29 27.51 4.49 86.80 23.83 13.60 2.400 208.33 21.62 109.25 208.33
e: 19.41 33.29 27.54 27.86 60.83 4.31 10.54 1.105 67.21 20.65 85.87 67.21 Class 70R -1 Lane
Reactions
f: 3.91 16.49 26.76 8.24 43.26 7.70 4.08 2.155 93.22 16.59 73.22 93.22
8
237
Design Live Load Values for Normal Case
LL -1 31.69 60.31 59.32 40.68 119.63 0.74 18.40 2.40 287.11 26.76 106.46 287.11 Pmax
LL -2 8.71 59.29 27.51 4.49 86.80 23.83 13.60 2.40 208.33 21.62 109.25 208.33 ML max
LL -3 31.69 60.31 59.32 40.68 119.63 0.74 18.40 2.40 287.11 26.76 106.46 287.11 MT max
LL -4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pmin
9
238
4 : CALCULATION OF SEISMIC COEFFICIENT
Rocky (I) N>30 Sa/g= 2.500 0.0<= T <=0.40
12.690 0.40<= T <=4.0
Medium Soil (II) 10<n<30 Sa/g= 2.500 0.0<= T <=0.55
17.258 0.550<= T <=4.0
Soft Soil (III) N<10 Sa/g= 2.500 0.0<= T <=0.670
21.192 0.670<= T <=4.0
Transversel 2.786 m Long 1.00
Height of Pier including Pier cap = 3.65 m (101.570-97.923) LL % 20%
Grade of Concrete = 30 DL Reactions = 329.1 t
fcm= 40 LL Reactions = 23.9 t
Ecm= 31186.6 N/mm2
Modulus of elasticity Ec = 31186.6 N/mm2
Moment of Inertia IT = 1.802E+12 (for Transverse Seismic co-efficient)
Moment of Inertia IL = 2.322E+11 (for Longitudnal Seismic co-efficient)
Response Reduction Factor Long. Direction= 3
Response Reduction Factor Trans dirxn = 3
Importance Factor = 1.2 ZONE FACTOR
Zone No = IV As per
Zone Factor = 0.24 IRC: 6 - 2014
D.L & L.L of Super Structure = 3530.7 KN Zone No a
II 0.10
F = Horizontal force in KN required to be applied at center of mass of super- III 0.16
structure for 1 mm deflection at the top of pier/abutment along the IV 0.24
considered direction of horizontal force. V 0.36
for 1 mm deflection at x
L = 3647.0 mm
Force in transverse direction acting at dist. of = 0.984 + 0.30 1.28 m
Force in longitudinal direction acting at dist. of = 0.30 = 0.06 m
Force required Transv. PT= 2274 kN
Force required Long. PL= 437.0 kN
Period (T) = 0.079 sec
Period (L) = 0.180 sec
Type of Soil = II
Sa/g T= = 2.500
Sa/g L= = 2.500
Horizontal Coefficients Transv. = = 0.1200
Horizontal Coefficients Long. = = 0.1200
239
5 : LOAD CALCULATION ON PIER AND FOUNDATION Skew = 0º
Cos 0º 1.000
8.40 m Sin 0º 0.000
2.610 0.45
GL= 98.423
97.923 Pile cap top lvl97.923
Sectional View of Pier
Span - LHS Y
Traffic
X
ML
Span - RHS
Elevation of Pier MT
Plan At Base of Pier
Density of Concrete = 2.50 t/m3
Density of Soil = 2.00 t/m3
a) Dead Loads
Superstructure Loads at pier base
Particulars Description P e ML
(t) (m) (tm)
Superstructure Loads
LHS Span Girder + Diaphragm 50.45 0.75 37.84
Deck Slab 50.11 0.75 37.58
RHS Span Girder + Diaphragm 50.45 -0.75 -37.84
Deck Slab 50.11 -0.75 -37.58 Trapezium volume
Pier Cap (h/3)*(a1+a2+sqrt(a1*a2))
Rectangular 2.5x7.985x2.61x0.6 31.3 0.00 0.00 a1= 20.84
Trapezoidal 15.86 0.00 0.00 a2= 1.9969
DL Additional weight of pier cap 0.00 0.91 0.00 Sqrt(a1*a2)= 6.45
Pedestal Nos Long Transv. Ht. h/3= 0.2166667
Self weight LHS Span 3 0.85 0.85 0.3 1.63 0.75 1.22 Volume = 6.35
RHS Span 3 0.85 0.85 0.3 1.63 -0.75 -1.22 weight = 15.86
Addi. Weight
LHS Span 0.000 0.00 0.00
RHS Span
Seismic Arrester LD TD VD LD - Longitudinal diamension
1 0.50 0.80 0.90 0.90 0.91 0.81 TD- Transverse dimension
1 0.50 0.80 0.90 0.90 0.91 0.81 VD - Vertical dimension
Pier
Self weight (1.9969*1+2*PI()*0.5^2/2)*2.4*2.5 16.69 0.00 0.00
SIDL SIDL
Crash Barriers, H/r & FPDL LHS Span 19.01 0.75 14.25
Crash Barriers, H/r & FPDL RHS Span 19.01 -0.75 -14.25
WC Wearing Coat
LHS Span 10.57 0.75 7.93
RHS Span 10.57 -0.75 -7.93
240
Straight span Skew span
Loads P (t) HL (t) HT (t) ML(tm) MT (tm) ML(tm) MT (tm)
Dead Load (Supstr, Substr.) 270.0 0.00 0.00 0.00 0.0 0.00 0.0
SIDL(CB,FPLL) 38.0 0.00 0.00 0.00 0.0 0.00 0.0
Wearing coat 21.1 0.00 0.00 0.00 0.0 0.00 0.0
Total Dead Load at base 270.0 0.00 0.00 0.00 0.0 0.00 0.0
Span Dislodge Condn 199.0 0.00 0.00 99.23 0.0 99.23 0.0
Friction force 0.00 6.51 0.00 25.70 0.0 25.70 0.0
b) Live Loads
LHS(m) RHS(m)
Eff. Span 18.50 18.50
Impact at Pier Base 0.000 0.000
Impact at Pier Top 1.184 1.184
Case Description P (t) HL (t) HT (t) ML(tm) MT (tm)
1 Pmax 119.6 0.00 0.00 0.7 287.1
Pmax (Skew) 119.6 0.00 0.00 0.7 287.1
2 MLmax 86.8 0.00 0.00 23.8 208.3
MLmax (Skew) 86.8 0.00 0.00 23.8 208.3
3 MT max 119.6 0.00 0.00 23.8 287.1
MT max(Skew) 119.6 0.00 0.00 23.8 287.1
4 Pmin 0.0 0.00 0.00 0.0 0.0
Pmin(Skew) 0.0 0.00 0.00 0.0 0.0
241
c) Wind Loads
Wind Loads on LL
Height above the roadway surface = 3.0 m IRC:6 - 2014, 209.3.6
CG of deck above GL = 5.77 m
Wind Velocity on Live Loads = 39.6 Km/hr ( From Table 5, of IRC:6-2010)
Velocity is >36 m/s, hence No live load is considered on the bridge 209.3.7 of IRC:6-2014
On Highway bridges at 1.5m above road level, 209.3.6 of IRC:6-2014
Wind force on Live load = P* A* G* Cd 209.3.6 of IRC:6-2014
In this case, the length of Live Load on Bridge
Length of Superstructure = 18.5 m
Gust Factor G = 2.0 as per clause 209.3.3 of IRC 6:2014
Drag Coefficient Cd = 1.20 209.3.6 of IRC:6-2014
Wind pressure = 846.5 N/m2
Leverarm = 7.09 m
HT = 0.0 t At mid height
HL = 0.0 t 5.89 m
MT = 0.0 t-m 0.0 t-m At Pier Base
ML 0.0 t-m 0.0 t-m
Wind Load on Suprestructure
Wind force on superstructure = P *A *G *Cd IRC:6 - 2014, 209.3.3
Cd for Single Girder Drag Coefficient, Cd = 2.02 209.3.3 of IRC:6-2014
b/d Cd Wind Pressure on Supertructure = 846.5 N/m2 From Table 5, of IRC:6-2014
2 1.5 Ht. of supersturcture = 2.64 m 1.64+1
6 1.3 Length of Supersturucture = 18.5 m
5.12 1.34 HT = 16.67 t (2.64*18.5)*846.540*2.01585365853659*2/10000
25% HL = 4.17 t At mid height (25% of Transverse wind force)
Leverarm = 4.77 m 3.57 m
MT = 79.5 t-m 59.5 t-m
ML = 19.9 t-m 14.9 t-m
242
Summary
Total Wind Loads at Pier Base (With LL)
P HL HT ML MT ML-mid MT -mid
t t t t-m t-m t-m t-m
-19.7 5.14 17.37 22.62 81.22 16.45 60.38 Straight
-19.7 5.14 17.37 22.62 81.22 16.45 60.38 Skew
Total Wind Loads at Pier Base(Without LL)
P HL HT ML MT ML-mid MT -mid
t t t t-m t-m t-m t-m
-19.7 5.14 17.37 22.62 81.22 16.45 60.38 without LL
-19.7 5.14 17.4 22.62 81.22 16.45 60.38 With Skew
d) Braking & friction forces
Normal Case - Straight Span Lever Arm 3.950 m 2.75 m
Braking and Frictional Force At Pier base At Mid height
Case P HL HT ML MT ML MT
t t t tm tm tm tm
Pmax 3.13 26.76 0.00 105.72 0.00 73.60 0.00
ML max 2.31 21.62 0.00 85.42 0.00 59.47 0.00
MT max 3.13 26.76 0.00 105.72 0.00 73.60 0.00
Pmin 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Span dislodge 0.00 6.51 0.00 23.75 0.00 15.94 0.00
Normal Case - Skew Span
Braking and Frictional Force At Pier base At Mid height
Case P HL HT ML MT ML MT
t t t t-m t-m tm tm
Pmax 3.13 26.76 0.00 105.72 0.00 73.60 0.00
ML max 2.31 21.62 0.00 85.42 0.00 59.47 0.00
MT max 3.13 26.76 0.00 105.72 0.00 73.60 0.00
Pmin 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Span dislodge 0.00 6.51 0.00 23.75 0.00 15.94 0.00
243
Seismic Case - Straight Span
Braking and Frictional Force At Pier base At Mid height
Case P HL HT ML MT ML MT
t t t t-m t-m tm tm
Pmax 0.63 0.00 7.79 0.00 52.88 0.00 43.54
ML max 0.46 0.00 7.25 0.00 37.35 0.00 40.54
MT max 0.63 0.00 7.79 0.00 42.45 0.00 43.54
Pmin 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Seismic Case - Skew Span
Braking and Frictional Force At Pier base At Mid height
Case P HL HT ML MT ML MT
t t t t-m t-m tm tm
Pmax 0.63 0.00 7.79 0.00 52.88 0.00 43.54
ML max 0.46 0.00 7.25 0.00 37.35 0.00 40.54
MT max 0.63 0.00 7.79 0.00 42.45 0.00 43.54
Pmin 0.00 0.00 0.00 0.00 0.00 0.00 0.00
244
E) Seismic forces
Superstructure (0.3+0.6+0.65+2.40)+0.984
Pier Base At Mid ht
Lever arm Super Structure = 4.93m 3.73m CG of Superstructure from Soffit = 0.98 m
Lever arm Sub Structure = 1.83m 0.63m
a) Transverse direction
Dead Load 20% Live Load Values for Seismic Case
Description P (t) HT (t) P-LHS(t) P-RHS(t) Total Load HT(t) MT(tm)
0.00 Superstructure 260.3 31.2 LL -1 12.06 11.86 23.93 2.87 14.17
LL -2 11.86 5.50 17.36 2.08 10.28
260.3 31.2 LL -3 12.06 11.86 23.93 2.87 14.17
LL -4 0.00 0.00 0.00 0.00 0.00
b) Longitudinal direction
Description P (t) HL (t) Seismic Forces in Vertical Direction
Superstructure 260.3 31.2
Description Fv (t)
260.3 31.2 Superstructure 20.82
Sub-Structure -Pier cap & pier Substructure 5.51
a) Transverse Direction Live Load Case LL-1 1.91
Location P (t) HT (t) Fv (t) Live Load Case LL-2 1.39
Pier base 68.9 8.3 5.51 Live Load Case LL-2 1.91
Mid height 60.5 7.3 4.84 Live Load Case LL-2 0.000
SEISMIC FORCES BY VIVEK
b) Longitudinal Direction
Location P (t) HL (t) Fv (t) r1+0.3r2+0.3r3
Seismic Combinations
Seismic Combinations P HL HT ML MT Mlmid Mtmid
1 0.3r1 + r2 + 0.3r3 8.47 11.85 42.37 50.76 183.35 36.54 132.51 Transv +ve
2 -0.3r1 - r2 -0.3r3 -8.47 -11.85 -42.37 -50.76 -183.35 -36.54 -132.51
3 r1 + 0.3r2 + 0.3r3 8.47 39.50 12.71 169.18 55.00 121.79 39.75 Long +ve
4 -r1 - 0.3r2 -0.3r3 -8.47 -39.50 -12.71 -169.18 -55.00 -121.79 -39.75
5 0.3r1 + 0.3r2 + r3 28.25 11.85 12.71 50.76 55.00 10.96 39.75 Vert +ve
6 -0.3r1 - 0.3r2 - r3 -28.25 -11.85 -12.71 -50.76 -55.00 -10.96 -39.75
245
Seismic Combinations skew
Seismic Combinations P HL HT ML MT MLlmid MTmid
1 0.3r1 + r2 + 0.3r3 8.47 11.85 42.37 50.76 183.35 36.54 132.51
2 -0.3r1 - r2 -0.3r3 -8.47 -11.85 -42.37 -50.76 -183.35 -36.54 -132.51
3 r1 + 0.3r2 + 0.3r3 8.47 39.50 12.71 169.18 55.00 121.79 39.75
4 -r1 - 0.3r2 -0.3r3 -8.47 -39.50 -12.71 -169.18 -55.00 -121.79 -39.75
5 0.3r1 + 0.3r2 + r3 28.25 11.85 12.71 50.76 55.00 10.96 39.75
6 -0.3r1 - 0.3r2 - r3 -28.25 -11.85 -12.71 -50.76 -55.00 -10.96 -39.75
F) Centrifugal force
V = 0km/hr
R = 0m
Lever arm at Pier base = 6.79 m
Lever arm at Pier mid height = 5.59 m
At Pier base At Mid height
Case P HL HT ML MT ML MT
t t t tm tm tm tm
Normal
LL-1 119.6 0.00 0.00 0.00 0.00 0.00 0.00
LL-2 86.8 0.00 0.00 0.00 0.00 0.00 0.00
LL-3 119.6 0.00 0.00 0.00 0.00 0.00 0.00
LL-4 0.0 0.00 0.00 0.00 0.00 0.00 0.00
Seismic
LL-1 23.9 0.00 0.00 0.00 0.00 0.00 0.00
LL-2 17.4 0.00 0.00 0.00 0.00 0.00 0.00
LL-3 23.9 0.00 0.00 0.00 0.00 0.00 0.00
LL-4 0.0 0.00 0.00 0.00 0.00 0.00 0.00
246
F) Water current forces (Cl. 210 of IRC: 6 - 2014)
P = 52 K V2 and V2 varies linearly with height, zero being at scour depth, and P in Kg/m 2
Z
Normal Current
20 º
Skew Current
7.985 m 2.61 m RL
2.61 m
101.570 HFL P
2
100.970 RL 100.923 0.189 t/m
100.320 0.60 m
0.189 t/m2 for pier cap
1.2 m
HFL 0.073 t/m2 for pier start
1.2 m
7.3 m
2
Pile cap top 0.032 t/m for pier shaft bottom
WATER CURRENT FORCES FOR PILE CAP FOR SKEW CURRENT Skew = 21 º
Transverse Force at Base = 0.265 t Longitudinal Force at Base = 0.164 t
Transverse Moment at pile cap base = 0.242 t-m Longitudinal Moment at pile cap base = 0.150 t-m
WATER CURRENT FORCES ON PILES AT SCOUR FOR NORMAL CURRENT
TRANSVERSE FORCES Width of pile = 2 m
Force = 0.00558201 t Length of pile group = 3 m
Transverse Moment at scour level = 0.01767846 t-m
LONGITUDINAL FORCES
Force = 0 t
Longitudinal Moment at scour level = 0 t-m
WATER CURRENT FORCES ON PILES FOR SKEW CURRENT
TRANSVERSE FORCES
Force = 0.0052454 t
Transverse Moment at scour level = 0.0169445 t-m
247
LONGITUDINAL FORCES
Force = 0.0030242 t
Longitudinal Moment at scour level = 0.009251 t-m
BOUYANCY FORCES
Pier Cap = 8.47 t
Pier Shaft = 6.68 t 2.400*2.782*1
Pile cap = 47.09 t 1.5*7.3*4.3
Pile = 1.79 t
Total Loads at base of Pile cap Total Loads at base of Pile cap
Case P HL HT ML MT Case P HL HT ML MT
t t t t-m t-m t t t t-m t-m
Normal -62.24 0.00 0.70 0.00 1.23 Normal -62.24 0.00 0.70 0.00 1.23
Skew -62.24 0.63 0.87 1.09 1.44 Skew -62.24 0.63 0.87 1.09 1.44
248
6 : LOAD COMBINATIONS FOR DESIGN OF PIER SHAFT - ULTIMATE LIMIT STATE
S.N Description P HL HT ML MT
t t t tm tm
Basic Loads
0 No Loads 0 0 0 0 0
1 Dead Loads
1a DL 270.0 0.0 0.0 0.0 0.0
1b SIDL 38.0 0.0 0.0 0.0 0.0
1c Wearing Coat 21.1 0.0 0.0 0.0 0.0
1d One span dislodged 199.0 0.0 0.0 99.2 0.0
2 Live Load
2a LL1 - Max. Vertical Load 119.6 0.00 0.00 0.74 287.11
2b LL2 - Max. Long. Moment 86.8 0.00 0.00 23.83 208.33
2c LL3 - Max. Transv. Moment 119.6 0.00 0.00 23.83 287.11
2d LL4 - Min. Vertical Load 0.0 0.00 0.00 0.00 0.00
3 Seismic Loads
3a Transverse Seismic - +v direction 8.47 11.85 42.37 50.76 183.35
3b Transverse Seismic - -v direction -8.47 -11.85 -42.37 -50.76 -183.35
3c Longitudinal Seismic +v direction 8.47 39.50 12.71 169.18 55.00
3d Longitudinal Seismic -v direction -8.47 -39.50 -12.71 -169.18 -55.00
3e Vertical EQ +v direction 28.25 11.85 12.71 50.76 55.00
3f Vertical EQ -v direction -28.25 -11.85 -12.71 -50.76 -55.00
4 Wind Loads
4a Loaded Condition -19.73 5.14 17.37 22.62 81.22
4b Unloaded Condition -19.73 5.14 17.37 22.62 81.22
5 Centrifugal forces
5a CF1 - Max. Vertical Load 0.00 0.00 0.00 0.00 0.00
5b CF2 - Max. Long. Moment 0.00 0.00 0.00 0.00 0.00
5c CF3 - Max. Transv. Moment 0.00 0.00 0.00 0.00 0.00
5d CF4 - Min. Vertical Load 0.00 0.00 0.00 0.00 0.00
5e CF1 - Max.Vertical Load (seismic) 0.00 0.00 0.00 0.00 0.00
5f CF2 - Max.Long. Moment (seismic) 0.00 0.00 0.00 0.00 0.00
5g CF3 - Max.Transv.Moment (seismic) 0.00 0.00 0.00 0.00 0.00
5h CF4 - Min. Vertical Load (seismic) 0.00 0.00 0.00 0.00 0.00
6 Forces Due to Friction / Braking (DL & LL)
6a Friction, Braking - LL-1 3.13 26.76 0.00 105.72 0.00
6b Friction, Braking - LL-2 2.31 21.62 0.00 85.42 0.00
6c Friction, Braking - LL-3 3.13 26.76 0.00 105.72 0.00
6d Friction, Braking - LL-4 0.00 0.00 0.00 0.00 0.00
6e Friction, Braking - LL-1 (Seismic) 0.63 0.00 7.79 0.00 43.54
6f Friction, Braking - LL-2 (Seismic) 0.46 0.00 7.25 0.00 40.54
6g Friction, Braking - LL-3 (Seismic) 0.63 0.00 7.79 0.00 43.54
6h Friction, Braking - LL-4 (Seismic) 0.00 0.00 0.00 0.00 0.00
6i Friction, Braking - Span dislodge 0.00 0.00 0.00 23.75 0.00
249
S.N Description P HL HT ML MT
t t t tm tm
7 Water Current Forces
7a Normal Current -15.15 0.00 0.42 0.00 0.97
7b Skew Current -15.15 0.46 0.61 0.94 1.20
Loads Combination
1 9 3 4 5 6 7
Basic Combination (Normal Case)
DL + SIDL + WC + LL-1 + CF-1 + FF/BF
1 636.9 40.1 0.0 159.7 430.7
LL-1
DL + SIDL + WC + LL-2 + CF-2 + FF/BF
2 586.5 32.4 0.0 163.9 312.5
LL-2
DL + SIDL + WC + LL-3 + CF-3 + FF/BF
3 636.9 40.1 0.0 194.3 430.7
LL-3
DL + SIDL + WC + LL-4 + CF-4 + FF/BF
4 452.8 0.0 0.0 0.0 0.0
LL-4
250
S.N Description P HL HT ML MT
t t t tm tm
Basic Combination (Wind Case)
LL Load -Leading Load, Wind Load -Accompanying Loads
251
S.N Description P HL HT ML MT
t t t tm tm
DL + SIDL + WC + LL-1 + Wind Force +
31 CF-1 + FF/BF LL-1 + Water Current 549.2 38.5 26.5 156.4 453.0
(Normal)
DL + SIDL + WC + LL-2 + Wind Force +
32 CF-2 + FF/BF LL-2 + Water Current 510.5 32.6 26.5 159.6 362.4
(Normal)
DL + SIDL + WC + LL-3 + Wind Force +
33 CF-3 + FF/BF LL-3 + Water Current 549.2 38.5 26.5 182.9 453.0
(Normal)
DL + SIDL + WC + LL-4 + Wind Force +
34 CF-4 + FF/BF LL-4 + Water Current 408.0 7.7 26.5 33.9 122.8
(Normal)
DL + SIDL + WC + LL-1 + Wind Force +
35 CF-1 + FF/BF LL-1 + Water Current 549.2 39.0 26.7 157.3 453.2
(Skew)
DL + SIDL + WC + LL-2 + Wind Force +
36 CF-2 + FF/BF LL-2 + Water Current 510.5 33.0 26.7 160.5 362.6
(Skew)
DL + SIDL + WC + LL-3 + Wind Force +
37 CF-3 + FF/BF LL-3 + Water Current 549.2 39.0 26.7 183.9 453.2
(Skew)
DL + SIDL + WC + LL-4 + Wind Force +
38 CF-4 + FF/BF LL-4 + Water Current 408.0 8.2 26.7 34.9 123.0
(Skew)
252
S.N Description P HL HT ML MT
t t t tm tm
253
S.N Description P HL HT ML MT
t t t tm tm
254
S.N Description P HL HT ML MT
t t t tm tm
255
S.N Description P HL HT ML MT
t t t tm tm
256
S.N Description P HL HT ML MT
t t t tm tm
257
S.N Description P HL HT ML MT
t t t tm tm
DL + SIDL + WC + LL-4 + EQV (+ve) + CF-
112 4 (Seismic) + FF/BF LL-4 (Seismic) + 480.0 18.2 19.7 77.1 83.7
Water Current (Skew)
DL + SIDL + WC + LL-4 + EQV (-ve) + CF-
113 4 (Seismic) + FF/BF LL-4 (Seismic) + 395.3 -17.3 -18.5 -75.2 -81.3
Water Current (Skew)
90 Max. Axial load case 519.2 17.8 20.6 76.3 148.6
105 Min. Axial Load case 395.3 -17.8 -18.6 -76.1 -81.5
258
S.N Description P HL HT ML MT
t t t tm tm
Summary of Forces
Load Case Vertical Hzl. - X Hzl. - Z ML MT
t t t t-m t-m
Governing Values for Basic Combinations
1 Max. Axial load case 636.93 40.15 0.00 159.68 430.66
11 Max. Long. Moment case 621.78 40.61 0.61 195.27 431.86
9 Max. Trans. Moment case 621.78 40.61 0.61 160.63 431.86
14 Min. Axial Load case 253.51 0.00 0.42 169.59 0.97
Governing Values for Basic Combinations (Wind Case)
15 Max. Axial load case 619.17 44.77 15.63 180.04 503.76
25 Max. Long. Moment case 604.02 45.23 16.24 215.63 504.96
23 Max. Trans. Moment case 604.02 45.23 16.24 180.98 504.96
34 Min. Axial Load case 408.05 7.71 26.47 33.93 122.80
Governing Values for Seismic Combinations
90 Max. Axial load case 519.22 17.77 20.62 76.28 148.64
84 Max. Long. Moment case 467.81 59.71 21.12 259.48 133.48
58 Max. Trans. Moment case 474.41 18.24 65.72 77.23 342.35
105 Min. Axial Load case 395.28 17.77 18.64 76.13 81.53
Governing Values for Accidental Combinations
98 Max. Axial load case 0.00 0.00 0.00 0.00 0.00
98 Max. Long. Moment case 0.00 0.00 0.00 0.00 0.00
98 Max. Trans. Moment case 0.00 0.00 0.00 0.00 0.00
98 Min. Axial Load case 0.00 0.00 0.00 0.00 0.00
Governing Values for Ultimate Limit State
1 Governing Max. Axial load case 636.93 40.15 0.00 159.68 430.66
2 Governing Max. Long. Moment case 467.81 59.71 21.12 259.48 133.48
3 Governing Max. Trans. Moment case 604.02 45.23 16.24 215.63 504.96
4 Governing Max. Trans. Moment case 0.00 0.00 0.00 0.00 0.00
259
7 : LOAD COMBINATIONS FOR DESIGN OF PIER SHAFT - SERVICIBILITY LIMIT STATE
S.N Description P HL HT ML MT
t t t tm tm
Basic Loads
0 No Loads 0 0 0 0 0
1 Dead Loads
1a DL 270.0 0.0 0.0 0.0 0.0
1b SIDL 38.0 0.0 0.0 0.0 0.0
1c Wearing Coat 21.1 0.0 0.0 0.0 0.0
1d Span Dislodged 199.0 0.0 0.0 99.2 0.0
2 Live Load
2a LL1 - Max. Vertical Load 119.6 0.00 0.00 0.74 287.11
2b LL2 - Max. Long. Moment 86.8 0.00 0.00 23.83 208.33
2c LL3 - Max. Transv. Moment 119.6 0.00 0.00 23.83 287.11
4 Wind Loads
4a Loaded Condition -19.73 5.14 17.37 22.62 81.22
4b Unloaded Condition -19.73 5.14 17.37 22.62 81.22
5 Centrifugal forces
5a CF1 - Max. Vertical Load 0.00 0.00 0.00 0.00 0.00
5b CF2 - Max. Long. Moment 0.00 0.00 0.00 0.00 0.00
5c CF3 - Max. Transv. Moment 0.00 0.00 0.00 0.00 0.00
5d CF4 - Min. Vertical Load 0.00 0.00 0.00 0.00 0.00
6 Longitudinal Forces Due to Friction / Braking (DL & LL)
6a Friction, Braking - LL-1 3.13 26.76 0.00 105.72 0.00
6b Friction, Braking - LL-2 2.31 21.62 0.00 85.42 0.00
6c Friction, Braking - LL-3 3.13 26.76 0.00 105.72 0.00
6d Friction, Braking - LL-4 0.00 0.00 0.00 0.00 0.00
6i Friction, Braking - Span dislodge 0.00 0.00 0.00 23.75 0.00
260
S.N Description P HL HT ML MT
t t t tm tm
7 Temperature and Shrinkage
7a Thermal Loads 0.00 0.00 0.00 0.00 0.00
7b Shrinkage 0.00 0.00 0.00 0.00 0.00
8 Water Current Forces
8a Normal Current -15.15 0.00 0.42 0.00 0.97
8b Skew Current -15.15 0.46 0.61 0.94 1.20
Load Combinations
1 9 3 4 5 6 7
Rare Combination (Normal Case)
DL + SIDL + WC + LL-1 + CF-1 + FF/BF
1 456.1 26.8 0.0 106.5 287.1
LL-1
261
S.N Description P HL HT ML MT
t t t tm tm
1 Max. Axial load case 456.1 26.8 0.0 106.5 287.1
11 Max. Long. Moment case 441.0 27.2 0.6 130.5 288.3
9 Max. Trans. Moment case 441.0 27.2 0.6 107.4 288.3
4 Min Axial Load case 183.9 0.0 0.4 123.0 1.0
Rare Combination (Wind Case)
LL Load -Leading Load, Wind Load -Accompanying Loads
262
S.N Description P HL HT ML MT
t t t tm tm
WL Load -Leading Load, Live Load -Accompanying Loads
263
S.N Description P HL HT ML MT
t t t tm tm
1 9 3 4 5 6 7
Quasi Permanent Combination
(Normal Case)
264
8 : SLENDERNESS CHECK AND CHECK FOR SECOND ORDER EFFECTS
2.0 Design Cases Case-1 Case-2 Case-3 Case-4 from eq 8.2 IRC 112
ex = 250.71 314.05 258.33 668.96
ey = 676.1555 694.56 694.56 3.84
265
Check for Second Order Effect
Second order effect may be ignored og the slenderness ratio is less than l lim
A = 1/(1+0.2Ф eff )
Ф eff = Ф(∞,t 0 ) M 0Eqp M 0Eqp = First Order BM in Quasi Permanent Combinations
= 1.87 M 0Ed M 0Ed = First Order BM in Design Load Combinations
As per Cl. 11.2.1 IRC-112-2011 initial dimensioning A, B C can be taken as 0.7, 1.1 and 0.7 respectively
266
INTERACTION DIAGRAM : (P : MLL) SECTION AT SHAFT BOTTOM
267
Formula Used In Construction of Intraction Diagram :
Pu = Cc+ Cs
Mu = Mc + Ms
Cc = 0.361*fck*xu*b xu ≤ D
0.447*fck*(1 - 4*g/21)*b *D xu > D
g = 16 / ( 7xu / D - 3 )2
fci = 0 esi ≤ 0
0.447fck esi ≥ 0.002
2
0.447fck [ 2 * (esi / 0.002) -(esi / 0.002) ] otherwise
Mc = Cc * ( 0.5D - x )
Ms = S Csi * yi
x = 0.416 xu xu ≤ D
(0.5 - 8*g /49)*{D/ (1-4*g/21)} xu > D
0.0035 * xu - D/ 2 + yi xu ≤ D
xu
esi =
0.002* 1+ yi - D/14 xu > D
xu -3D/7
268
INTERACTION DIAGRAM : (P : MTT) SECTION AT SHAFT BOTTOM
269
Formula Used In Construction of Intraction Diagram :
Pu = Cc+ Cs
Mu = Mc + Ms
Cc = 0.361*fck*xu*b xu ≤ D
0.447*fck*(1 - 4*g/21)*b *D xu > D
g = 16 / ( 7xu / D - 3 )2
fci = 0 esi ≤ 0
0.447fck esi ≥ 0.002
2
0.447fck [ 2 * (esi / 0.002) -(esi / 0.002) ] otherwise
Mc = Cc * ( 0.5D - x )
Ms = S Csi * yi
x = 0.416 xu xu ≤ D
(0.5 - 8*g /49)*{D/ (1-4*g/21)} xu > D
0.0035 * xu - D/ 2 + yi xu ≤ D
xu
esi =
0.002* 1+ yi - D/14 xu > D
xu -3D/7
270
Check for Moment of Resistance and Biaxial Bending
271
10 : DESIGN OF PIER SHAFT - SERVICIBILITY LIMIT STATE
Combinations
Max. Axial Load 1.00 456.1 106.5 287.1
Grade of Concrete = M 30
Grade of steel = Fe 500
f cm = 40
Secant Modulus of Elasticity of Conc. E cm = 31.19 GPa
= 31186.6 MPa
Modulus of Elasticity of steel = 2.0E+05 MPa
272
273
Calculation of Stress for Servicibility Limit State
Length Thicnkess Eff. Cover Bar Nos Bar Dia Eff. Cover Bar Nos Bar Dia
274
Horizontal reinforcement (Cl. 16.2.3 IRC:112-2011)
8 mm dia 200 c/c
Transverse Reinforcement (Cl. 16.3.3 IRC:112-2011)
2
Area of Vertical Reinforcement on two face 16965 mm
2
0.02Ac 55646 mm
<0.02Ac, Transverse Reinforcement is not required
Diameter of Transverse Reinforcement 10 mm OK
Spacing of Transverse Reinforcement shall be minimum of followng
240 mm
1000 mm
200 mm
Spacing of Main Reinforcement 148 mm
Provide 10 dia @ 200 mm OK
275
11 : DESIGN PIER CAP - ULTIMATE LIMIT STATE Skew angle 0.00
Impact Factor 1.184
1.45 1.55 cosq sinq
3.00 0.00 0.00 3.00 1.000 0.000
LHS Concrete Density 2.5 t/m3
B3 B2 B1
2.61
A3 A2 A1
RHS
Plan of Pier Cap 3.00 0.00 0.00 3.00
0.85 RHS Inner Brg. RHS Outer Brg Arrester width = 0.50
0.85
0.3
1.13 0.65
0.00 Critical Section for Shear
2.78 m
Critical section for Bending C/S Area of Pier = 2.782 mm2
CL of Pier
276
Total Bearing Reactions Eccentricity LHS = 0.750 RHS = -0.750
Inner Brg LHS(t) RHS(t) Torsion Outer Brg. LHS(t) RHS(t) Torsion
Total Load - 1 96.8 96.2 0.4 Total Load - 1 130.8 121.4 0.4
Total Load - 2 96.2 77.4 14.1 Total Load - 2 122.1 98.0 14.1
Total Load - 3 96.8 96.2 0.4 Total Load - 3 135.7 121.4 0.4
Total Load - 4 61.1 61.1 0.0 Total Load - 4 66.4 61.1 0.0
Torsion due to BR force
BF (t) T (tm)
Case 1 40.1 62.2
Case 2 32.4 50.3
Case 3 40.1 62.2
Case 4 0.0 0.0
Torsion due to Int. Girder + Ext. Girder + BR Force
LL case Torsion
Case 1 62.7
Case 2 64.4
Case 3 62.7
Case 4 0.0
Case MT Ext MT Int. Torsion Mteq Total MT ML(tm) MT (tm) ML(tm) MT (tm) MT Equiv. Total MT
Case 1 391.3 0.0 62.7 49.925 468.754 62.7 418.8 62.7 418.8 49.9 496.3
Case 2 341.4 0.0 64.4 51.294 420.284 64.4 369.0 64.4 369.0 51.3 447.9
Case 3 398.8 0.0 62.7 49.925 476.33 62.7 426.4 62.7 426.4 49.9 503.9
Case 4 197.9 0.0 0.0 0 225.429 0.0 225.4 0.0 225.4 0.0 253.0
Reference
Design for Moment ULS Case 1 Case 2 Case 3 Case 4 IRC 112-2011
Characteristic Comp. Cube Strength, mpa f ck 30 30 30 30
Characteristic yield strength of steel,mpa f yk 500 500 500 500
Modulus of Elasticity of Steel, mpa Es 2E+05 2E+05 2E+05 2E+05
Mean value of Conc.
f A
Cube Comp. Strength
f cm 40.0 40.0 40.0 40.0 Eq. A2- 1
d 1 −
yd s
2hof bd
Secant Modulus
f Elasticity
cd of Conc., mpa E cm 31186.6 31186.6 31186.6 31186.6 Eq. A2- 5
Modulus of Elasticity of conc(with creep) E c, eff 10868.4 10868.4 10868.4 10868.4 Cl. 12.4.2 (2)
Effective Modular ratio a e = E s / E c,eff 18.40 18.40 18.40 18.40 Eq. 12.15
Creep coefficient f 1.87 1.87 1.87 1.87 Cl. 6.4.2.7
Material factor Steel gs 1.15 1.15 1.15 1.15 Cl. 6.2.2. Notes(1)
Concrete gm 1.50 1.50 1.50 1.50 Cl. 6.4.2.8
Coeff. to consider influence of conc. Strength,alpha a 0.67 0.67 0.67 0.67 Cl. 6.2.2
Effective ht. factor of comp. zone, l 0.80 0.80 0.80 0.80 Cl. 6.4.2.8
Effective strength factor, h 1.00 1.00 1.00 1.00 Cl. 6.4.2.8
Ultimate compressive strain Concrete e cu3 0.0035 0.0035 0.0035 0.0035 (Eq.A2-33)
Steel es 0.00217 0.00217 0.00217 0.00217 (Eq.A2-35)
Design comp strength, mpa f cd = α f ck / g m 13.40 13.40 13.40 13.40 Cl. 6.4.2.2
Design strength of steel, mpa f yd = f yk / g s 434.78 434.78 434.78 434.78
Factored design Moment, tm Mu 418.8 369.0 426.4 225.4
T ED 62.7 64.4 62.7 0.0
Width of the cap, mm b 2610 2610 2610 2610
Depth of cap, mm D 1250 1250 1250 1250
Area of Cross Section Ac 3262500 3262500 3262500 3262500
Outer Permeter u 7720 7720 7720 7720 Cl. 10.5.2.1
Effective Wall Thickness t ef 423 423 423 423 Cl. 10.5.2.1
Area enclosed by centerlines of connecting walls Ak 1809844 1809844 1809844 1809844 Cl. 10.5.2.1
Perimeter of Area Ak uk 6030 6030 6030 6030 Cl. 10.5.2.1
Longitudinal Reinf required to resist Torsion T ED .uk.cotθ / (2A k f yd ) A sl 6002 6167 6002 0 (Eq. 10.49)
2
Ast Required A st = 0.5f ck bd/f yk (1-(sqrt(1-4.6M/f ck bd ) A s req 8773 7681 8941 4611
Total Area of Steel Required A st req 14776 13848 14943 4611
277
Tension Reinforcement No. of Layers of Reinforcement 2 2 2 2
No. of bars in each layer 26 26 26 26
Dia. of Rebars, mm f 20 20 20 20
Area of Steel provided, mm2 A sl 16336 16336 16336 16336
Safe Safe Safe Safe
Clear cover, mm C 50 50 50 50
Effective depth, mm deff 1154.0 1154.0 1154.0 1154.0
X umax / d = 0.0035 / (0.0055 + 0.87 fy / Es) 0.456 0.456 0.456 0.456
Design for Shear ULS at face of pedestal Case 1 Case 2 Case 3 Case 4
Shear force due to superstructure, t V 262.4 230.3 267.3 137.7
Torsion, tm T ED 62.7 64.4 62.7 0.0
Shear Stress due to Torsional Momen T ED / (2A k t ef ) tt 0.41 0.42 0.41 0.00 Cl. 10.5.2.1
Design Torsional Shear Force V EDi 21.6 22.2 21.6 0.0 Cl. 10.5.2.1
Total Design Shear Force, t V ED 284.0 252.5 288.9 137.7
Shear Resistance WithoutShear Reinforcement, t V Rd.c 104.3 104.3 104.3 104.3
Shear Resistance With Shear Reinforcement, t V Rd.s 489.1 489.1 489.1 489.1
Safe Safe Safe Safe
Shear Resistance of Concrete, t Area of Steel, mm2 A sl 16336.3 16336.3 16336.3 16336.3
Width of the cap, mm bw 2610.0 2610.0 2610.0 2610.0
Effective depth, mm d 889 889 889 889
f ck 30 30 30 30
f yk 500 500 500 500
K =1 + √(200/d) < = 2 1.47 1.47 1.47 1.47 Eq. 10.2
Strength reduction factor shear n min = 0.031 k 3/2 f ck 1/2 0.304 0.304 0.304 0.304 Eq. 10.3
Axial force in structure, t N ED 0.00 0.00 0.00 0.00 Cl.10.3.2
Conc.comp.stress at CG axis s cp =N ED / A c < 0.2 f cd 0.000 0.000 0.000 0.000 Cl.10.3.2
0.2 f cd 2.680 2.680 2.680 2.680
Reinforcement ratio ρ1 =A sl / b w d < 0.02 0.0070 0.0070 0.0070 0.0070 Cl.10.3.1, fig 10.5
V Rd.c =[0.12 K (80 ρ 1 f ck ) 0.33 +0.15 σ cp ] b w d 104.3 104.3 104.3 104.3 Cl.10.3.2(2)
V Rd.Cmin =(v min + 0.15 σ cp ) b w d 70.5 70.5 70.5 70.5 Eq. 10.1
V Rd,C 104.3 104.3 104.3 104.3
Shear Strriup requirement Yes Yes Yes Yes
278
Shear Resistance With Vertical Shear Reinforcement Cl.10.3.3
Dia of Shear Reinforcement, mm 12 12 12 12
Number of Legs 4 4 4 4
+ Dia of Shear Reinforcement(Outer Ring), mm 16 16 16 16
Number of Legs 2 2 2 2
Area of Shear reinforcement, mm2 A sw 854.5 854.5 854.5 854.5
Lever arm, mm z 1052.5 1052.5 1052.5 1052.5
Case 1 Case 2 Case 3 Case 4
Design yield strength of shear reinforcement f ywd 435.0 435.0 435.0 435.0
Angle of Inclinations of conc. Comp. truss with axis of reinf. q 21.8 21.8 21.8 21.8 Cl 10.2.2.2(1), fig. 10.2(a)
cot q 2.50 2.50 2.50 2.50
tan q 0.40 0.40 0.40 0.40
Spacing of Stirrups s 200 200 200 200
Coeff. for state of stress in comp. chord. a cw 1.0 1.0 1.0 1.0
Strength reduction factor for conc.cracked in shear n1 0.60 0.60 0.60 0.60
Eq. 10.7
V Rd.S = A sw z f ywd Cot q / S 489.1 489.1 489.1 489.1 Eq. 10.8
V Rd,Max =a cw b w z n 1 f cd / (cot q +tan q ) 762 762 762 762
Shear Resistance with Shear Reinforcement V Rd,S 489.1 489.05 489.05 489.05 Cl 10.3.3.5
Check, Minimum Shear Reinforcement ratio Cl 10.2.2.2(1), fig. 10.2(a)
a 90 90 90 90 Cl 10.3.1,
rW 0.00164 0.00164 0.00164 0.00164 Eq. 10.20
r min 0.00079 0.00079 0.00079 0.00079
safe safe safe safe
279
12 : DESIGN PIER CAP - SERVICIBILITY LIMIT STATE Skew angle 0.00
Impact Factor 1.184
1.45 1.55 cosq sinq
1.000 0.000
3.00 0.00 0.00 3.00 Concrete Density 2.5
LHS
B3 B2 B1
2.61
A3 A2 A1
RHS
3.00 0.00 0.00 3.00
Plan of Pier Cap
RHS Inner Brg. RHS Outer Brg Arrester = 0.50
0.85 0.85
0.3
1.13 0.65
0.00 Critical Section for Shear
2.78 m
Critical section for Bending
CL of Pier
280
Rare combination Eccentricity LHS = 0.75 RHS = -0.75
Inner Brg LHS(t) RHS(t) Torsion Outer Brg. LHS(t) RHS(t) Torsion
Total Load - 1 68.7 68.3 0.3 Total Load - 1 91.4 85.1 4.7
Total Load - 2 68.3 55.8 9.4 Total Load - 2 85.6 69.5 12.1
Total Load - 3 68.7 68.3 0.3 Total Load - 3 94.6 85.1 7.1
Total Load - 4 44.9 44.9 0.0 Total Load - 4 44.9 44.9 0.0
Torsion Mom due to braking
BR (t) T (tm)
Case1 26.8 41.5
Case2 21.6 33.5
Case3 26.8 41.5
Case4 0.0 0.0
Total Torsion - INT Girder + Ext. Girder +Braking
LL case Torsion
Case 1 46.5
Case 2 55.0
Case 3 48.9
Case 4 0.0
M(RARE)
Summary Straight span Skew span
Case MT Ext MT Int. Torsion Mteq Total MT ML(tm) MT (tm) ML(tm) MT (tm) MT Equiv. Total MT
Case 1 273.8 0.0 46.5 40.414 332.275 46.5 291.9 46.5 291.9 37.0 328.9
Case 2 240.6 0.0 55.0 47.833 306.468 55.0 258.6 55.0 258.6 43.8 302.4
Case 3 278.9 0.0 48.9 42.538 339.45 48.9 296.9 48.9 296.9 39.0 335.9
Case 4 139.4 0.0 0.0 0 157.419 0.0 157.4 0.0 157.4 0.0 157.4
Calculation of Stresses for Short Term Loading Case 1 Case 2 Case 3 Case 4
Design Constants Characteristic Comp. Cube Strength, mpa f ck 30 30 30 30
Characteristic yield strength of steel,mpa f yk 500 500 500 500
Modulus of Elasticity of Steel, mpa Es 2E+05 2E+05 2E+05 2E+05
Mean value of Conc. Cube Comp. Strength f cm 40 40 40 40
Secant Modulus of Elasticity of Conc., mpa E cm 31186.6 31186.6 31186.6 31186.6
Modulus of Elasticity of conc(with creep) E c, eff 11367.6 11367.6 11367.6 11367.6
Effective Modular ratio a e = E s / E c,eff 17.59 17.59 17.59 17.59
Creep coefficient f 1.74 1.74 1.74 1.74
Material factor Steel gs 1.15 1.15 1.15 1.15
Concrete gm 1.50 1.50 1.50 1.50
Coeff. to consider influence of conc. Strength,alpha a 0.67 0.67 0.67 0.67
Effective ht. factor of comp. zone, l 0.80 0.80 0.80 0.80
Effective strength factor, h 1.00 1.00 1.00 1.00
Ultimate compressive strain Concrete e cu3 0.0035 0.0035 0.0035 0.0035
Steel es 0.00217 0.00217 0.00217 0.00217
Design comp strength, mpa f cd = α f ck / g m 13.4 13.4 13.4 13.4
Design strength of steel, mpa f yd = f yk / g s 434.8 434.8 434.8 434.8
Factored design Moment SLS, tm M(ST) = M(RARE)-M(QP) M 134.4 101.2 139.5 0.0
Width of the cap, mm b or bw 2610.0 2610.0 2610.0 2610.0
Depth of cap, mm D 1250.0 1250.0 1250.0 1250.0
Tension Reinforcement No. of Layers of Bars 2 2 2 2
No. of bars 26 26 26 26
Dia. of Rebars, mm f 20 20 20 20
Area of Steel, mm2 A sl 16336 16336 16336 16336
Clear cover, mm C 50 50 50 50
Effective depth, mm deff 1154.0 1154.0 1154.0 1154.0
281
Case 1 Case 2 Case 3 Case 4
Depth of Neutral axis, mm, ytop x =(A sl f yd )/( l η b f cd ) 253.9 253.9 253.9 253.9
Compression Reinforcement No. of bars 26 26 26 26
Dia. of Rebars, mm f 12 12 12 12
Area of Steel, mm2 Asc 2941 2941 2941 2941
Effective cover, mm d' 56.0 56.0 56.0 56.0
Depth of Extreme Fibre Tension Reinforcement, mm, ybot Ybot 900.14 900.14 900.14 900.14
Moment of inertia of Uncracked section, mm4 I uncracked 4.2E+11 4.2E+11 4.2E+11 4.2E+11
Tensile Stress in concrete fctm 1.98 1.49 2.05 0.00
Permissible tensile stress of concrete fctm, p 2.50 2.50 2.50 2.50
Uncraked Uncraked Uncraked Uncraked
Check of Stresses Assuming Short Term Creep and Elastic Modulus
Depth of concrete compression
dc = (( - AsEs) + sqrt((AsEs)^2 + 2 b As Es Eceff d )) / b Eceff 266.9 266.9 266.9 266.9
Icr = As(d-dc) 2 + bdc 3 Eceff/3Es 1.54E+10 1.54E+10 1.54E+10 1.54E+10
Section Modulus, mm3 Ztop 5.78E+07 5.78E+07 5.78E+07 5.78E+07
Section Modulus, mm3 Zbot 1.74E+07 1.74E+07 1.74E+07 1.74E+07
Compressive Stresses at top s c top 3.62 2.73 3.76 0.00
Permissible stress 0.48*fck 14.40 14.40 14.40 14.40
safe safe safe safe
Tensile Stress at level of Steel 77.27 58.17 80.17 0.00
Permissible stress 0.6*fyk 300.0 300.0 300.0 300.0
safe safe safe safe
Case 4 0.0
The Critical Section for Bending is at the face of pier
Factored DL of piercap = 15.70 t
Factored BM- DL of piercap = 18.03 tm
M(QP) bavg. = 2610 D= 925
Summary Straight span Skew span
Case MT Ext MT Int. Torsion Mteq Total MT ML(tm) MT (tm) ML(tm) MT (tm) MT Equiv. Total MT
Case 1 139.4 0.0 0.0 0 157.419 0.0 157.4 0.0 157.4 0.0 157.4
Case 2 139.4 0.0 0.0 0 157.419 0.0 157.4 0.0 157.4 0.0 157.4
Case 3 139.4 0.0 0.0 0 157.419 0.0 157.4 0.0 157.4 0.0 157.4
Case 4 139.4 0.0 0.0 0 157.419 0.0 157.4 0.0 157.4 0.0 157.4
282
Calculation of Stresses for Quasipermanent Loading Case 1 Case 2 Case 3 Case 4
Factored design Moment, tm M(QP) M 157.4 157.4 157.4 157.4
Width of the cap, mm b or bw 2610.0 2610.0 2610.0 2610.0
Depth of cap, mm D 1250.0 1250.0 1250.0 1250.0
Tension Reinforcement No. of bars 26 26 26 26
Dia. of Rebars, mm f 20 20 20 20
Area of Steel, mm2 A sl 16336.3 16336.3 16336.3 16336.3
Clear cover, mm C 50.0 50.0 50.0 50.0
d eff 1154.0 1154.0 1154.0 1154.0
Depth of Neutral axis, mm, ytop x =(A sl f yd )/( l η b f cd ) 253.9 253.9 253.9 253.9
Compression Reinforcement No. of bars 26 26 26 26
Dia. of Rebars, mm f 12 12 12 12
Area of Steel, mm2 A sc 2940.5 2940.5 2940.5 2940.5
Effective cover, mm d' 56.0 56.0 56.0 56.0
Moment of inertia of Uncracked section, mm4 I uncracked 4.2E+11 4.2E+11 4.2E+11 4.2E+11
Tensile Stress in concrete f ctm 2.22 2.22 2.22 2.22
Permissible tensile stress of concrete f ctm, n 2.50 2.50 2.50 2.50
Cracked Status Uncraked Uncraked Uncraked Uncraked
dc = (( - AsEs) + sqrt((AsEs)^2 + 2 b As Es Eceff d )) / b Eceff 405.9 405.9 405.9 405.9
Icr = As(d-dc) 2 + bdc 3 Eceff/3Es 1.24E+10 1.24E+10 1.24E+10 1.24E+10
Depth of Extreme Fibre Tension Reinforcement, mm, ybot 748.09 748.09 748.09 748.09
Section Modulus, mm3 Z top 3.07E+07 30670763 30670763 30670763
Section Modulus, mm3 Z bot 16641723 16641723 16641723 16641723
Compressive Stresses at top s c top 2.92 2.92 2.92 2.92
Permissible stress in Concrete 0.36*f ck 10.8 10.8 10.8 10.8
safe safe safe safe
Tensile Stress at level of Steel ss 94.6 94.6 94.6 94.6
Permissible stress in Steel 0.6f yk 300.0 300.0 300.0 300.0
safe safe safe safe
283
14 : LOAD COMBINATIONS FOR DESIGN OF FOOTING - ULTIMATE LIMIT STATE
S.N Description P HL HT ML MT
t t t tm tm
Basic Loads
0 No Loads 0 0 0 0 0
1 Dead Loads
1a DL -(incld.footing, soil ) 416.30 0.00 0.00 0.00 0.00
1b SIDL 38.01 0.00 0.00 0.00 0.00
1c Wearing coat 21.14 0.00 0.00 0.00 0.00
1d One span dislodged 345.32 0.00 0.00 99.23 0.00
2 Live Load
2a LL1 - Max. Vertical Load 119.63 0.00 0.00 0.74 287.11
2b LL2 - Max. Long. Moment 86.80 0.00 0.00 23.83 208.33
2c LL3 - Max. Transv. Moment 119.63 0.00 0.00 23.83 287.11
2d LL4 - Min. Vertical Load 0.00 0.00 0.00 0.00 0.00
3 Seismic Loads (35% Higher as per Ammendment 2, August 2014)
3a Transverse Seismic - +v direction 11.44 16.00 57.20 100.92 363.35
3b Transverse Seismic - -v direction -11.44 -16.00 -57.20 -100.92 -363.35
3c Longitudinal Seismic +v direction 11.44 53.32 17.16 336.37 109.00
3d Longitudinal Seismic -v direction -11.44 -53.32 -17.16 -336.37 -109.00
3e Vertical EQ +v direction 38.13 16.00 17.16 100.91 109.00
3f Vertical EQ -v direction -38.13 -16.00 -17.16 -100.91 -109.00
4 Wind Loads
4a Loaded Condition -19.73 5.14 17.37 30.33 107.27
4b Unloaded Condition -19.73 5.14 17.37 30.33 107.27
5 Centrifugal forces
5a CF1 - Max. Vertical Load 0.00 0.00 0.00 0.00 0.00
5b CF2 - Max. Long. Moment 0.00 0.00 0.00 0.00 0.00
5c CF3 - Max. Transv. Moment 0.00 0.00 0.00 0.00 0.00
5d CF4 - Min. Vertical Load 0.00 0.00 0.00 0.00 0.00
5e CF1 - Max.Vertical Load (seismic) 0.00 0.00 0.00 0.00 0.00
5f CF2 - Max.Long. Moment (seismic) 0.00 0.00 0.00 0.00 0.00
5g CF3 - Max.Transv.Moment (seismic) 0.00 0.00 0.00 0.00 0.00
5h CF4 - Min. Vertical Load (seismic) 0.00 0.00 0.00 0.00 0.00
6 Longitudinal Forces Due to Friction / Braking (DL & LL)
6a Friction, Braking - LL-1 3.13 26.76 0.00 145.87 0.00
6b Friction, Braking - LL-2 2.31 21.62 0.00 117.85 0.00
6c Friction, Braking - LL-3 3.13 26.76 0.00 145.87 0.00
6d Friction, Braking - LL-4 0.00 0.00 0.00 0.00 0.00
6e Friction, Braking - LL-1 (Seismic) 0.63 0.00 7.79 0.00 55.22
6f Friction, Braking - LL-2 (Seismic) 0.46 0.00 7.25 0.00 51.42
6g Friction, Braking - LL-3 (Seismic) 0.63 0.00 7.79 0.00 55.22
6h Friction, Braking - LL-4 (Seismic) 0.00 0.00 0.00 0.00 0.00
6i Friction, Braking - Span dislodge 0.00 0.00 0.00 23.75 0.00
7 Water Current Forces
7a Normal Current -62.24 0.00 0.70 0.00 1.25
7b Skew Current -62.24 0.63 0.87 1.09 1.46
284
S.N Description P HL HT ML MT
t t t tm tm
Combination of Loads as per table 3.4 IRC 6 - 2014
1 9 3 4 5 6 7
Combination (2) (Normal Case) as per table 3.4 IRC 6 -2014
DL + SIDL + WC + LL-1 + CF-1 + FF/BF
1 834.5 40.1 0.0 219.9 430.7
LL-1
285
S.N Description P HL HT ML MT
t t t tm tm
286
S.N Description P HL HT ML MT
t t t tm tm
DL + SIDL + WC + LL-3 + Wind Force +
34 CF-3 + FF/BF LL-3 + Water Current 699.7 38.5 26.8 240.6 492.3
(Normal)
DL + SIDL + WC + LL-4 + Wind Force +
35 CF-4 + FF/BF LL-4 + Water Current 558.5 7.7 26.8 45.5 162.2
(Normal)
DL + SIDL + WC + LL-1 + Wind Force +
36 CF-1 + FF/BF LL-1 + Water Current 699.7 39.1 26.9 215.2 492.5
(Skew)
DL + SIDL + WC + LL-2 + Wind Force +
37 CF-2 + FF/BF LL-2 + Water Current 661.0 33.2 26.9 209.5 401.9
(Skew)
DL + SIDL + WC + LL-3 + Wind Force +
38 CF-3 + FF/BF LL-3 + Water Current 699.7 39.1 26.9 241.7 492.5
(Skew)
DL + SIDL + WC + LL-4 + Wind Force +
39 CF-4 + FF/BF LL-4 + Water Current 558.5 8.3 26.9 46.6 162.4
(Skew)
287
S.N Description P HL HT ML MT
t t t tm tm
288
S.N Description P HL HT ML MT
t t t tm tm
DL + SIDL + WC + LL-3 + EQT (+ve) + CF-
55 3 (Seismic) + FF/BF LL-3 (Seismic) + 629.3 24.0 88.1 156.1 614.7
Water Current (Normal)
289
S.N Description P HL HT ML MT
t t t tm tm
290
S.N Description P HL HT ML MT
t t t tm tm
291
S.N Description P HL HT ML MT
t t t tm tm
292
S.N Description P HL HT ML MT
t t t tm tm
Summary of Governing forces
Load Case Vertical Hzl. - X Hzl. - Z ML MT
t t t t-m t-m
Governing Values for Basic Combinations
1 Governing - Max. Axial Load 834.5 40.1 0.0 219.9 430.7
11 Governing - Max. Long. Moment 772.2 40.8 0.9 255.6 432.1
9 Governing - Max. Trans. Moment 772.2 40.8 0.9 221.0 432.1
4 Governing - Min. Axial Load 404.0 0.0 0.7 169.6 1.2
Governing Values for Basic Combinations (Wind Case)
16 Governing - Max. Axial Load 816.7 44.8 15.6 247.2 527.2
26 Governing - Max. Long. Moment 754.5 45.4 16.5 282.9 528.7
24 Governing - Max. Trans. Moment 754.5 45.4 16.5 248.3 528.7
4 Governing - Min. Axial Load 558.5 7.7 26.8 45.5 162.2
Governing Values for Seismic Combinations
91 Governing - Max. Axial Load 731.6 24.0 27.3 151.5 232.0
85 Governing - Max. Long. Moment 622.7 80.6 28.1 510.4 216.9
59 Governing - Max. Trans. Moment 629.3 24.6 88.2 152.6 614.9
106 Governing - Min. Axial Load 530.9 24.0 25.0 151.4 162.3
293
15 : LOAD COMBINATIONS FOR DESIGN OF FOOTING - SERVICIBILITY LIMIT STATE
S.N Description P HL HT ML MT
t t t tm tm
Basic Loads
0 No Loads 0 0 0 0 0
1 Dead Loads
1a DL -(incld.footing, soil ) 416.3 0.0 0.0 0.00 0.00
1b SIDL 38.0 0.0 0.0 0.00 0.00
1c Wearing coat 21.1 0.0 0.0 0.00 0.00
1d One span dislodged 345.3 0.0 0.0 99.23 0.00
2 Live Load
2a LL1 - Max. Vertical Load 119.6 0.00 0.00 0.74 287.11
2b LL2 - Max. Long. Moment 86.8 0.00 0.00 23.83 208.33
2c LL3 - Max. Transv. Moment 119.6 0.00 0.00 23.83 287.11
2d LL4 - Min. Vertical Load 0.0 0.00 0.00 0.00 0.00
4 Wind Loads
4a Loaded Condition -19.73 5.14 17.37 30.33 107.27
4b Unloaded Condition -19.73 5.14 17.37 30.33 107.27
5 Centrifugal forces
5a CF1 - Max. Vertical Load 0.00 0.00 0.00 0.00 0.00
5b CF2 - Max. Long. Moment 0.00 0.00 0.00 0.00 0.00
5c CF3 - Max. Transv. Moment 0.00 0.00 0.00 0.00 0.00
5d CF4 - Min. Vertical Load 0.00 0.00 0.00 0.00 0.00
6 Longitudinal Forces Due to Friction / Braking (DL & LL)
6a Friction, Braking - LL-1 3.13 26.76 0.00 145.87 0.00
6b Friction, Braking - LL-2 2.31 21.62 0.00 117.85 0.00
6c Friction, Braking - LL-3 3.13 26.76 0.00 145.87 0.00
6d Friction, Braking - LL-4 0.00 0.00 0.00 0.00 0.00
6i Friction, Braking - Span dislodge 0.00 0.00 0.00 23.75 0.00
294
S.N Description P HL HT ML MT
t t t tm tm
7 Water Current Forces
7a Normal Current -62.24 0.00 0.70 0.00 1.25
7b Skew Current -62.24 0.63 0.87 1.09 1.46
Combination of Loads as per table 3.4 IRC 6 - 2014
1 9 3 4 5 6 7
Combination (2) (Normal Case) as per table 3.4 IRC 6 -2014
DL + SIDL + WC + LL-1 + CF-1 + FF/BF
1 635.0 34.8 0.0 190.6 373.2
LL-1
295
S.N Description P HL HT ML MT
t t t tm tm
14 Governing - Min. Axial Load 283.1 0.0 0.7 130.1 1.2
Combination (2) (Normal Case) -QUASI PERMANENT
296
S.N Description P HL HT ML MT
t t t tm tm
297
S.N Description P HL HT ML MT
t t t tm tm
298
S.N Description P HL HT ML MT
t t t tm tm
Summary of forces
Governing Values for Basic Combinations
1 Governing - Max. Axial load 635.0 34.8 0.0 190.6 373.2
11 Governing - Max. Long. Moment 572.8 35.4 0.9 221.7 374.7
9 Governing - Max. Trans. moment 572.8 35.4 0.9 191.7 374.7
4 Governing - Min. Axial Load 283.1 0.0 0.7 130.1 1.2
Governing Values for Basic Combinations (QUASI)
16 Governing - Max. Axial load 479.7 0.0 0.0 0.0 0.0
17 Governing - Max. Long. Moment 283.1 0.6 0.9 100.3 1.5
18 Governing - Max. Trans. moment 417.5 0.6 0.9 1.1 1.5
4 Governing - Min. Axial Load 283.1 0.0 0.7 99.2 1.2
Governing Values for Basic Combinations (Wind Case)
21 Governing - Max. Axial load 619.3 38.9 13.9 214.8 459.1
31 Governing - Max. Long. Moment 557.0 39.5 14.8 246.0 460.5
29 Governing - Max. Trans. moment 557.0 39.5 14.8 215.9 460.5
4 Governing - Min. Axial Load 387.6 6.7 23.3 39.4 140.7
299
13 : LOAD COMBINATIONS FOR CHECKING BASE PRESSURE
S.N Description P HL HT ML MT
t t t tm tm
Basic Loads
0 No Loads 0 0 0 0 0
1 Dead Loads
1a DL -(incld.footing, soil ) 416.3 0.0 0.0 0.00 0.00
1b SIDL 38.0 0.0 0.0 0.00 0.00
1c Wearing coat 21.1 0.0 0.0 0.00 0.00
1d One span dislodged 345.3 0.0 0.0 99.23 0.00
2 Live Load
2a LL1 - Max. Vertical Load 119.6 0.00 0.00 0.74 287.11
2b LL2 - Max. Long. Moment 86.8 0.00 0.00 23.83 208.33
2c LL3 - Max. Transv. Moment 119.6 0.00 0.00 23.83 287.11
2d LL4 - Min. Vertical Load 0.0 0.00 0.00 0.00 0.00
3 Seismic Loads
3a Transverse Seismic - +v direction 8.47 11.85 42.37 68.53 246.90
3b Transverse Seismic - -v direction -8.47 -11.85 -42.37 -68.53 -246.90
3c Longitudinal Seismic +v direction 8.47 39.50 12.71 228.43 74.07
3d Longitudinal Seismic -v direction -8.47 -39.50 -12.71 -228.43 -74.07
3e Vertical EQ +v direction 28.25 11.85 12.71 68.53 74.07
3f Vertical EQ -v direction -28.25 -11.85 -12.71 -68.53 -74.07
4 Wind Loads
4a Loaded Condition -19.73 5.14 17.37 30.33 107.27
4b Unloaded Condition -19.73 5.14 17.37 30.33 107.27
5 Centrifugal forces
5a CF1 - Max. Vertical Load 0.00 0.00 0.00 0.00 0.00
5b CF2 - Max. Long. Moment 0.00 0.00 0.00 0.00 0.00
5c CF3 - Max. Transv. Moment 0.00 0.00 0.00 0.00 0.00
5d CF4 - Min. Vertical Load 0.00 0.00 0.00 0.00 0.00
5e CF1 - Max.Vertical Load (seismic) 0.00 0.00 0.00 0.00 0.00
5f CF2 - Max.Long. Moment (seismic) 0.00 0.00 0.00 0.00 0.00
5g CF3 - Max.Transv.Moment (seismic) 0.00 0.00 0.00 0.00 0.00
5h CF4 - Min. Vertical Load (seismic) 0.00 0.00 0.00 0.00 0.00
6 Forces Due to Friction / Braking (DL & LL)
6a Friction, Braking - LL-1 3.13 26.76 0.00 145.87 0.00
6b Friction, Braking - LL-2 2.31 21.62 0.00 117.85 0.00
6c Friction, Braking - LL-3 3.13 26.76 0.00 145.87 0.00
6d Friction, Braking - LL-4 0.00 0.00 0.00 0.00 0.00
6e Friction, Braking - LL-1 (Seismic) 0.63 0.00 7.79 0.00 55.22
6f Friction, Braking - LL-2 (Seismic) 0.46 0.00 7.25 0.00 51.42
6g Friction, Braking - LL-3 (Seismic) 0.63 0.00 7.79 0.00 55.22
6h Friction, Braking - LL-4 (Seismic) 0.00 0.00 0.00 0.00 0.00
6i Friction, Braking - Span dislodge 0.00 0.00 0.00 23.75 0.00
300
S.N Description P HL HT ML MT
t t t tm tm
7 Water Current Forces
7a Normal Current -62.24 0.00 0.70 0.00 1.25
7b Skew Current -62.24 0.63 0.87 1.09 1.46
Load Combinations for Unfactored Values
1 9 3 4 5 6 7
Basic Combinations
301
S.N Description P HL HT ML MT
t t t tm tm
12 Governing - Max. Long. Moment 536.0 27.4 0.9 170.8 288.6
10 Governing - Max. Trans. moment 536.0 27.4 0.9 147.7 288.6
7 Governing - Min. Axial Load 283.1 0.0 0.7 123.0 1.2
Wind Combinations
302
S.N Description P HL HT ML MT
t t t tm tm
303
S.N Description P HL HT ML MT
t t t tm tm
Seismic Combinations
304
S.N Description P HL HT ML MT
t t t tm tm
305
S.N Description P HL HT ML MT
t t t tm tm
DL + SIDL + WC + LL-2 + EQL (+ve) +
75 CF-2 (Seismic) + FF/BF LL-2 (Seismic) + 439.1 39.5 14.9 233.2 127.3
Water Current (Normal)
DL + SIDL + WC + LL-2 + EQL (-ve) + CF-
76 2 (Seismic) + FF/BF LL-2 (Seismic) + 422.2 -39.5 -10.6 -223.7 -20.9
Water Current (Normal)
DL + SIDL + WC + LL-3 + EQL (+ve) +
77 CF-3 (Seismic) + FF/BF LL-3 (Seismic) + 445.7 39.5 15.0 233.2 143.8
Water Current (Normal)
DL + SIDL + WC + LL-3 + EQL (-ve) + CF-
78 3 (Seismic) + FF/BF LL-3 (Seismic) + 428.8 -39.5 -10.4 -223.7 -4.4
Water Current (Normal)
DL + SIDL + WC + LL-4 + EQL (+ve) +
79 CF-4 (Seismic) + FF/BF LL-4 (Seismic) + 421.7 39.5 13.4 228.4 75.3
Water Current (Normal)
DL + SIDL + WC + LL-4 + EQL (-ve) + CF-
80 4 (Seismic) + FF/BF LL-4 (Seismic) + 404.7 -39.5 -12.0 -228.4 -72.8
Water Current (Normal)
DL + SIDL + WC + LL-1 + EQL (+ve) +
81 CF-1 (Seismic) + FF/BF LL-1 (Seismic) + 445.7 40.1 15.1 229.7 144.0
Water Current (Skew)
DL + SIDL + WC + LL-1 + EQL (-ve) + CF-
82 1 (Seismic) + FF/BF LL-1 (Seismic) + 428.8 -38.9 -10.3 -227.2 -4.1
Water Current (Skew)
DL + SIDL + WC + LL-2 + EQL (+ve) +
83 CF-2 (Seismic) + FF/BF LL-2 (Seismic) + 439.1 40.1 15.0 234.3 127.5
Water Current (Skew)
DL + SIDL + WC + LL-2 + EQL (-ve) + CF-
84 2 (Seismic) + FF/BF LL-2 (Seismic) + 422.2 -38.9 -10.4 -222.6 -20.7
Water Current (Skew)
DL + SIDL + WC + LL-3 + EQL (+ve) +
85 CF-3 (Seismic) + FF/BF LL-3 (Seismic) + 445.7 40.1 15.1 234.3 144.0
Water Current (Skew)
DL + SIDL + WC + LL-3 + EQL (-ve) + CF-
86 3 (Seismic) + FF/BF LL-3 (Seismic) + 428.8 -38.9 -10.3 -222.6 -4.1
Water Current (Skew)
DL + SIDL + WC + LL-4 + EQL (+ve) +
87 CF-4 (Seismic) + FF/BF LL-4 (Seismic) + 421.7 40.1 13.6 229.5 75.5
Water Current (Skew)
DL + SIDL + WC + LL-4 + EQL (-ve) + CF-
88 4 (Seismic) + FF/BF LL-4 (Seismic) + 404.7 -38.9 -11.8 -227.3 -72.6
Water Current (Skew)
306
S.N Description P HL HT ML MT
t t t tm tm
Vertical Seismic Combination
307
S.N Description P HL HT ML MT
t t t tm tm
DL + SIDL + WC + LL-1 + EQV (+ve) +
105 CF-1 (Seismic) + FF/BF LL-1 (Seismic) + 465.5 12.5 15.1 69.8 144.0
Water Current (Skew)
Summary of forces
Governing Values for Basic Combinations
1 Governing - Max. Axial load 598.2 26.8 0.0 146.6 287.1
12 Governing - Max. Long. Moment 536.0 27.4 0.9 170.8 288.6
10 Governing - Max. Trans. moment 536.0 27.4 0.9 147.7 288.6
4 Governing - Min. Axial Load 283.1 0.0 0.7 123.0 1.2
Governing Values for Wind Combinations
14 Governing - Max. Axial load 578.5 31.9 17.4 176.9 394.4
24 Governing - Max. Long. Moment 516.2 32.5 18.2 201.1 395.8
22 Governing - Max. Trans. moment 516.2 32.5 18.2 178.0 395.8
4 Governing - Min. Axial Load 393.5 5.1 18.1 30.3 108.5
Governing Values for Seismic Combinations
89 Governing - Max. Axial Load 527.8 11.8 14.3 68.7 142.5
83 Governing - Max. Long. Moment 439.1 40.1 15.0 234.3 127.5
57 Governing - Max. Trans. Moment 445.7 12.5 44.8 69.8 316.8
104 Governing - Max. Moment 385.0 11.8 12.0 68.5 72.8
308
13 Calculation for Maximum Load on Pile
Pile length = 20 m
Free length of pile above soil = 0.2 m
Description Weight (t) LA (m) ML (tm)
Pilecap weight = 117.7 0.0 0.0
Uniform Soil on pile Cap = 28.6 0.0 0.0
Approach fill on pile cap = 0.00 0.00 0.00
RE wall weight = 0.00 0.00 0.00
Summary of final loads at base of pilecap including pile cap weight
S No Load Case P (t) HL (t) HT (t) ML (tm) MT (tm) Resultant, H
309
no of spacing 2
4.30
Compression
0.65
1 Transv. 4
3 6
0.65
Tension 3.00
Materials
Concrete Grade for pile = 35
Steel Grade = Fe500
Calculation of Depth of Fixity
Free length of pile above soil = L1 = 19.00 cm
4
I = moment of inertia of pile = = 4908739 cm
2
E= = 311866 Kg/cm
Table 3, As per IS:2911 - 2010
K1-Dry K1-Submer
Soil type N Value
kN/m3 kN/m3
3
Value of K1 = = 1 kg/cm
Hence T = = 273.52 cm
L1 / T = = 0.069 L1 / R =
From fig. 4, values of Lf / T or Lf / R
Lf / T or Lf / R = = 2.20
Lf = = 6.02 m
Min Embedded Length of Pile = 10.94 m
Min Length of Pile 11.13 m
Actual pile length = 20.00 m OK
Lf considered = 6.02 m
310
From fig. 5B, values of reduction factor
m = 0.85 Consider fixed head pile
Moments in each pile
Load Case Load MT ML Resultant
1 Normal 0.00 11.77 11.77
2 Normal 0.38 12.04 12.05
3 Normal 0.38 12.04 12.05
4 Wind 7.64 14.03 15.97
5 Wind 8.02 14.30 16.40
6 Wind 8.02 14.30 16.40
7 Seismic 6.27 5.21 8.15
8 Seismic 6.61 17.64 18.84
9 Seismic 19.70 5.48 20.45
Pile No X Y
1 -1.50 3.00
2 -1.50 0.00
3 -1.50 -3.00
4 1.50 3.00
5 1.50 0.00
6 1.50 -3.00
Sx 2
13.50
Sy2 36.00
Vertical Loads on each pile
Load no Pile 1 Pile 2 Pile 3 Pile 4 Pile 5 Pile 6
1 107.3 83.4 59.5 139.9 116.0 92.1
2 94.4 70.4 46.3 132.4 108.3 84.3
3 97.0 72.9 48.9 129.8 105.7 81.7
4 109.6 76.8 43.9 148.9 116.1 83.2
5 96.7 63.7 30.7 141.4 108.4 75.4
6 99.2 66.3 33.3 138.8 105.8 72.8
7 92.2 80.3 68.5 107.5 95.6 83.7
8 57.8 47.2 36.5 109.8 99.2 88.6
9 92.9 66.5 40.1 108.4 82.0 55.6
311
Maximum & Minimum Pile Loads
Selfweight of pile excluding buoyancy = 39.270 t
Axial Load With Self Weight
Max. reqd. Min. reqd.
pile capacity pile capacity
MAX. MIN. Moment Factor
with self with self
weight weight
312
10 Design of Pile & Pile Cap - ULS
Pile Details Materials
Dia of piles = 1.00 m Grade of Concrete, fck pile cap = M 30
No. of piles = 6 Nos Grade of Steel, fyk = Fe 500
Spacing of piles = 3.00 m c/c
Pile length = 20 m
Free length of pile above soil = 0.2 m Particular Load (t) LA (m) ML (tm)
Pile Cap Details Pilecap weight 117.7
Pilecap Projection, beyond pile = 150 mm Soil wt. on pile Cap 28.6 0.00 0.00
Min. Spacing for clayey Soil, 3 x Dia = 3.00 m c/c Approach fill 0.00 2.15 0.00
Min Spacing in sandy soil, 2.5 X Dia = 2.50 m c/c RE wall weight 0.0 0.00 0.00
K1-Dry K1-Submer
Soil type N Value
kN/m3 kN/m3
Transv.
Very Loose Sand 0-4 <0.4 <0.2
Loos Sand 4-10 0.4-2.5 0.2-1.4
5
Medium Sand 10-35 2.5-7.5 1.4-5.0 2 1.50
>35 7.5-20 5.0-12.0
Dense Sand
Long
3
Value of K1 = 1.00 kg/cm 7.30
313
Moments in each pile
Load Case Load MT ML Resultant Pile No X Y
314
1.00
1.415
Net Bending moment at the face of pier = 425.54 tm Pier face to pile outer dist= 1.5
Total Shear Force at critical section = 41.7 t Section from abutment face = 1.415
Shear force per m at crtical section = 5.7 t/m diff for linear interpolation= 0.085
315
Design for Moment ULS Case 1-ML Case 2MT Reference
Design Constants Characteristic Comp. Cube Strength, mpa f ck 30 30 IRC 112-2011
Characteristic yield strength of steel,mpa f yk 500 500
Modulus of Elasticity of Steel, mpa Es 2.0E+05 2.0E+05
Mean value of Conc. Cube Comp. Strength f cm 40 40 Eq. A2- 1
Secant Modulus of Elasticity of Conc., mpa E cm 31186.6 31186.6 Eq. A2- 5
Modulus of Elasticity of conc(with creep) E c, eff 10868.4 10868.4
Effective Modular ratio ae= E s / E c,eff 18.4 18.4 Cl. 12.4.2 (2), Eq. 12.15
Creep coefficient f 1.87 1.87 Cl. 6.4.2.7
Material factor Steel gs 1.15 1.15 Cl. 6.2.2. Notes(1)
Concrete gm 1.50 1.50 Cl. 6.4.2.8
Coeff. to consider influence of conc. Strength,alpha a 0.67 0.67 Cl. 6.4.2.8
Effective ht. factor of comp. zone, l 0.80 0.80 A2.9, Eq A2-33
Effective strength factor, h 1.00 1.00 A2.9, Eq A2-35
Ultimate compressive strain Concrete e cu3 0.0035 0.0035 Table 6.5
Steel es 0.00217 0.00217 cl.6.2.2
Design comp strength, mpa f cd = α f ck / g m 13.40 13.40 Cl. 6.4.2.8
Design strength of steel, mpa f yd = f yk / g s 434.78 434.78 cl.6.2.2
Factored design Moment, tm Mu 425.5 507.36
Width of the cap, mm b 7300.0 4300
Depth of cap, mm D 1500.0 1500.0
Tension Reinforcement Spacing of Bars 100 100
Dia. of Rebars, mm f 20 20
Area of Steel, mm2 A sl 22934 13509
Clear cover, mm C 75 75
Effective depth, mm deff 1415.0 1415.0
X umax / d = 0.0035 / (0.0055 + 0.87 fy / Es) 0.456 0.456
316
Design for Shear ULS Case 1-ML Case 2-MT Shear as per -Cl.10.3.2
Shear force due to superstructure, t V 15.2 115.4
Torsion, tm T 0.0 0.0
Total Design Shear Force, t V ED 15.2 115.4
Shear Resistance WithoutShear Reinforcement., t V Rd.c 296.2 174.5
Shear Resistance With Shear Reinforcement., t V Rd.s 657.9 328.9
Shear Resistance of Concrete, t Safe Safe
Area of Steel, mm2 A sl 22933.6 13508.8
Width of the cap, mm bw 7300 4300
Effective depth, mm d 1415.0 1415.0
f ck 30 30
f yk 500 500
K =1 + √(200/d) < = 2 1.38 1.38 Eq. 10.2
Strength reduction factor shear n min = 0.031 k3/2 f ck 1/2 0.27 0.27 Eq. 10.3
Axial force in structure, t N ED 0.00 0.00
Conc.comp.stress at CG axis s cp =N ED / A c < 0.2 f cd 0.000 0.000
0.2 f cd 2.680 2.680
Reinforcement ratio ρ1 =A sl / b w d < 0.02 0.00222 0.00222 Cl.10.3.1, fig 10.5
V Rd.c =[0.12 K (80 ρ1 f ck )0.33+0.15 σ cp ] b w d 296.2 174.5 Eq. 10.1
V Rd.Cmin =(v min + 0.15 σ cp ) b w d 283.1 166.7
V Rd,C 296.2 174.5
Shear Strriup requirement No No
Shear Resistance With Vertical Shear Reinforcement Cl.10.3.3
Dia of Shear Reinforcement, mm 12 12
Number of Legs 16 16
Area of Shear reinforcement, mm2 A sw 1808.6 1808.6
Lever arm, mm z 1364.0 1364.0
317
Punching Shear Check (As per cl. 10.4.5 IRC 112-2011) At Distance d/2 from Face
VED,red
Punching Shear Stress ved =
ud
Punching Shear 2d 2d
Reistance
vRd = 0.12K(80ρ 1 f ck ) 1/3 ≥ v min
a a
318
11 Design of Pile & Pile Cap -SLS
Pile Details Materials
Dia of piles = 1.00 m Grade of Concrete, fck = M 30
No. of piles = 6 Nos Grade of Steel, fyk = Fe500
Spacing of piles = 3.00 m c/c
Pile length = 20 m Particular Weight (t) LA (m) ML (tm)
Free length of pile above soil = 0.2 m Pilecap weight 117.7 0.0 0.0
Pile Cap Details Soil wt. on pile Cap 28.6 0.0 0.0
Pilecap Projection, beyond pile = 150 mm Approach fill 0.00 2.15 0.00
Min. Spacing for clayey Soil, 3 x Dia = 3.00 m c/c RE wall weight 0.00 2.05 0.00
Min Spacing in sandy soil, 2.5 X Dia = 2.50 m c/c
K1-Dry K1-Submer
Soil type N Value
kN/m3 kN/m3
319
Moments in each pile Pile No X Y
Load Case Load MT ML Resultant 1 -1.50 3.00
1 Normal 1.5 16.4 16.5 2 -1.50 0.00
2 Normal 1.8 16.7 16.8 3 -1.50 -3.00
3 Normal 1.8 16.7 16.8 4 1.50 3.00
4 Normal 0.0 0.0 0.0 5 1.50 0.00
4 Wind 7.6 18.2 19.7 6 1.50 -3.00
5 Wind 8.0 18.5 20.1 7 0.00 0.00
6 Wind 8.0 18.5 20.1 8 0.00 0.00
7 Wind 0.0 0.0 0.0 Sx2 13.50
7 Quasi 1.5 1.1 1.8 Sy2 36.00
8 Quasi 1.8 1.4 2.3
9 Quasi 1.8 1.4 2.3
10 Quasi 0.0 0.0 0.0
Vertical Loads on each pile
Load no Pile 1 Pile 2 Pile 3 Pile 4 Pile 5 Pile 6 Pile 7 Pile 8
1 115.8 84.7 53.6 158.1 127.0 95.9 0.0 0.0
2 102.1 70.8 39.6 151.3 120.1 88.9 0.0 0.0
3 105.4 74.2 42.9 148.0 116.8 85.5 0.0 0.0
4 117.6 79.3 41.1 165.3 127.1 88.8 0.0 0.0
5 103.9 65.5 27.1 158.5 120.2 81.8 0.0 0.0
6 107.2 68.8 30.5 155.2 116.8 78.5 0.0 0.0
7 79.9 79.9 79.9 79.9 79.9 79.9 0.0 0.0
8 36.2 36.0 35.9 58.4 58.3 58.2 0.0 0.0
9 69.6 69.5 69.3 69.8 69.7 69.6 0.0 0.0
320
1.00
1.415
321
Shear force per m at crtical section = 0.0 t/m
Design for Stress Lvl., Check - SLS Case 1-ML Case 2MT Reference
Design Constants Characteristic Comp. Cube Strength, mpa f ck 30 30 IRC 112-2011
Characteristic yield strength of steel,mpa f yk 500 500
Modulus of Elasticity of Steel, mpa Es 2.0E+05 2.0E+05
Mean value of Conc. Cube Comp. Strength f cm 40 40 Eq. A2- 1
Secant Modulus of Elasticity of Conc., mpa E cm 31186.6 31186.6 Eq. A2- 5
Modulus of Elasticity of conc(with creep) E c, eff 10868.4 10868.4
Effective Modular ratio a e = E s / E c,eff 18.4 18.4 Cl. 12.4.2 (2), Eq. 12.15
Creep coefficient f 1.87 1.87 Cl. 6.4.2.7
Material factor Steel gs 1.15 1.15 Cl. 6.2.2. Notes(1)
Concrete gm 1.50 1.50 Cl. 6.4.2.8
Coeff. to consider influence of conc. Strength,alpha a 0.67 0.67 Cl. 6.4.2.8
Effective ht. factor of comp. zone, l 0.80 0.80 A2.9, Eq A2-33
Effective strength factor, h 1.00 1.00 A2.9, Eq A2-35
Ultimate compressive strain Concrete e cu3 0.0035 0.0035 Table 6.5
Steel es 0.00217 0.00217 cl.6.2.2
Design comp strength, mpa f cd = α f ck / g m 13.4 13.4 Cl. 6.4.2.8
Design strength of steel, mpa f yd = f yk / g s 434.8 434.8 cl.6.2.2
Factored design Moment, tm Mu 334.0 403.1
Width of the cap, mm b or bw 7300 4300
Depth of cap, mm D 1500 1500
Tension Reinforcement Spacing of Bars 100 100
Dia. of Rebars, mm f 20 20
Area of Steel, mm2 A sl 22934 13509
Clear cover, mm C 75 75
Effective depth, mm deff 1415.0 1415.0
322
Quasipermanent Combinations
Case 1-ML Case 2MT
Factored design Moment, tm Mu 192.6 107.8
Check of Stresses Assuming Long Term Creep and Elastic Modulus
Depth of concrete compression
dc = (( - AsEs) + sqrt((AsEs)^2 + 2 b As Es Eceff d )) / b Eceff 350.8 350.8
Icr (cracked) = As (d- dc)^2 +Eceff b dc^3/3 Es 3.42E+10 2.01E+10
Section Modulus, mm3 Ztop 9.7E+07 5.7E+07
Section Modulus, mm3 Zbot 3.2E+07 1.9E+07
Compressive Stresses at top s c top 1.07 1.02
Permissible stress 0.48*fck 14.40 14.40
safe safe
Tensile Stress at level of Steel 59.99 56.98
Permissible stress 0.6*fyk 300.0 300.0
safe safe
Design for Crack Width, Check - SLS Case 1-ML Case 2MT Crack width as per Cl. 12.3.4
Cracked Status Uncraked Uncraked
Factor depending on duration of load Kt 0.50 0.50
h 1500 1500
hc,eff 212.5 212.5
Ac,eff 1551250.0 913750.0
r P,eff 0.015 0.015
fct, eff 2.50 2.50
[ s sc -K t *f ct,eff / r p,eff (1+ a e r p , eff )] / E s >=[0.6* s sc / E S ] -0.0002 -0.0003 Eq .12.6
[0.6* s sc /E S ] 0.0002 0.0002 Eq .12.6
(esm-ecm) 0.0002 0.0002 Eq .12.6
Max crack spacing Sr,Max 484.98 484.98 Eq .12.8
Crack width WK = Sr,max*(ξ sm –ξ cm) 0.087 0.083
Crack width permissible WK,PER 0.30 0.30
safe safe
323
PILE Interaction Diagram
600
1.1 1237.074 46.795474 1.1
1.2 1281.944 34.605888 1.2 400
1.3 1314.893 25.358693 1.3 200
1.4 1339.647 18.1077 1.4
1.5 1358.152 12.304238 1.5 0
1.6 1372.254 7.6820339 1.6 -50 0 50 100 150 200
-200
1.7 1382.914 4.01627 1.7
1.8 1390.871 1.152846 1.8 -400
Mu (T-m)
1.9 1396.699 -1.029607 1.9
2 1400.855 -2.634906 2
2.1 1403.709 -3.753946 2.1
NED = 207.518 T
2
Ac = 0.785 m ACC
2
fck = 35 N/mm
324
A sp r w D sp
=
SL
ωwd = 4 Confining reinforcement expressed as ratio
fyd = 434.7826 Mpa
fcd = 15.61 Mpa
ρw = Volumetric ratio of tranverse reinforcement defined as
Dsp = 0.850 m
The Minimum confining reinforcement is as given by
ACC = Confined (core) concrete area of the section within the outside
dia of the hoop
2
= 0.567 m
wwreq = 0.02489
1.4ww.req = 0.0348
wwd.c = Max
0.18
wwd.c = 0.18
ρw = 0.006463
2
= 0.00137 m /m
2
= 1373.29 mm /m
2
Provide 16 @ 110 = 1827.8 mm
SAFE
325
ULS, CHECK FOR PILE MOMENT CAPACITY :
1.00
Effective length of column along y-y axis leT = 1.5 * Lo Table 11.1 of IRC;112-2011
= 9.0261273 m
Slenderness ratio along L-L axis lyy = leT/iT
= 30.1
326
Check
required
eL =MEDL / eT =MEDT eL/T / for
Sr. No. NED(ton) MEDL(tm) MEDT(tm) eL/L eT/T
NED / NED eT/L Limiting
slendern
ess ratio
1 199.40 17.93 0.38 0.09 0.002 0.08991 0.002 0.021 No
2 207.52 19.96 11.76 0.10 0.057 0.09619 0.057 0.589 Yes
3 178.57 35.44 38.79 0.20 0.217 0.19847 0.217 1.095 Yes
2
llim = 20 *A*B*C / n Ac = 785398 mm
2
A = 1 /( 1+0.2fef ) As = 5026.55 mm
fef = f ( a , to) * MoEqp / MoEd , Effective creep ratio. fcd = 13.40 Mpa
MoEqp = First order BM in quasi-permanent load combination in SLS. fyd = 434.78 Mpa
MoEd = First order BM in design load combination in ULS.
f ( a , to) = creep for pier
= 1.87
B = 1 + 2w
w = Asfyd/(Acfcd) Mechanical reinforcement ratio. 0.20766
Hence , B = 1.190
C = 1.7 - rm
rm = Mo1/Mo2
= 0.00 In the case case of pile
Hence , C = 1.70
n = NEd / ( Ac fcd ) relative normal force.
Summary of forces
ULS FORCES SLS FORCES (QP) Check for second order effect in long. Direction
Second order
Sr. No. effect, l<llim,
NED(ton) MEDL(tm) MEDT(tm) MEDL(tm) MEDT(tm) MoEqp / MoEd fef A n llim
Ignore ; l>llim,
consider
1 199.40 17.93 0.38 1.37 1.84 0.077 0.1433133 0.97214 0.189 90.34 ignore
2 207.52 19.96 11.76 1.37 1.84 0.069 0.1287083 0.9749 0.197 88.80 ignore
3 178.57 35.44 38.79 1.37 1.84 0.039 0.0724896 0.98571 0.170 96.79 ignore
327
9 : DESIGN OF Pile - SERVICIBILITY LIMIT STATE
Load Case P M
Rare - Normal 158.12 16.77
Rare - Wind 165.34 20.12
Quasipermanent 79.95 2.30
Grade of Concrete = M 35
Grade of steel = Fe 500
f cm = 45
Secant Modulus of Elasticity of Conc. E cm = 32.31 GPa
= 32308.2 MPa
Modulus of Elasticity of steel = 2.0E+05 MPa
Modular Ratio = 6.19
Creep Coefficient = 1.00 (Refer Separate Calculations)
Modulus of Elasticity of concrete, Effective Ec eff= 16154.1 Gpa Eq.12.15, IRC 112
Modular Ratio considering long term creep = 12.38
Permissible Stresses
Rare Combinations Concrete 0.48fck = 16.80
Steel 0.6Fy = 300.00
Quasipermanent Combinations Concrete 0.36fck = 12.60
Steel 0.6Fy = 300.00
Force Modular
Load Comb
P, t M, t-m Ratio
328
Calculation of Creep Coeffiecient (As per Annexure A2, A2.5, IRC:112-2011)
329
For Pier Cap
Ф(t,t 0 ) = β c (t,t 0 ).Ф 0 = 1.74
Where,
Ф0 = Ф RH β(f cm ) β(t 0 ). = 1.77
t = Age of concrete in days at time the time considered = = 25550 days
t0 = is the age of Concrete in days at time of loading = 90 days
1/3
Ф RH = 1+(1-RH/100)/(0.1*h 0 ) for fcm <= 45 = 1.53
RH = Relative Humidity
Relative Humidity = 50 %
fck = Characteristic Compressive Strength = 30 MPa
fcm = Mean Compressive Strength = 40 MPa
β(f cm ) = 18.78/√f cm = 2.97
β(t 0 ). = 1/(0.1+t 0 0.2 ) = 0.39
h0 = Notional side of Member 2Ac/u = 845.2 mm
w = Width of Section = 2610 mm
h = Depth of Section = 1250 mm
Ac = Cross Sectional Area, mm2 = 3262500 mm2
u = Perimeter in Contact with atmosphere = 7720 mm
β c (t,t 0 ) = [(t-t 0 ) / (βH + t - t 0 )] 0.3 = 0.983
(t-t 0 ) = Actual duration of loading = 25460 days
18
βH = 1.5(1+(1.2 RH/RH 0 ) )h 0 + 250 <= 1500 fcm = 45 = 1500.0
RH 0 = = 100 %
Modular Ratio for pier shaft
330
Design of pedestal
331
H V P v (Km/Hr) P ( Kg/m2) v(m/s) P (N/m2)
0 39.594 940.600 100.08 47.257014 27.8 463.7
2 39.594 940.600 100.08 47.257014 27.8 463.7
4 39.594 940.600 100.08 47.257014 27.8 463.7
6 39.594 940.600 100.08 47.257014 27.8 463.7
8 39.594 940.600 100.08 47.257014 27.8 463.7
10 39.594 940.600 100.08 47.257014 27.8 463.7
15 41.588 1039.589 105.12 52.230364 29.2 512.5
20 43.155 1116.874 109.08 56.113246 30.3 550.6
30 44.721 1197.201 113.04 60.148997 31.4 590.2
50 47.142 1337.165 119.16 67.180987 33.1 659.2
60 47.855 1371.852 120.96 68.923698 33.6 676.3
70 48.424 1406.944 122.40 70.686791 34 693.6
80 48.994 1442.645 123.84 72.480458 34.4 711.2
90 49.706 1478.752 125.64 74.294508 34.9 729
100 50.276 1515.264 127.08 76.12894 35.3 747
332
Design Philosophy for Deck Slab
Transverse Analysis: The deck slab has been analysed transversely as a continuous one way slab, supported
on longitudinal girders with cantilever overhangs beyond the outer girders on either side, by taking unit width
of deck along the span. The analysis has been carried out for various loads i.e. dead load, SIDL & CWLL. Live
load effects are taken based on the effective width method as per IRC : 112-2011. Temperature rise and fall
cases are compensated with extra reinforcement. Various design sections have been identified and designed
for worst combination of above loads. The analysis has been carried out by STAAD PRO. The representative
section of slab taken for transvesre analysis is taken at mid span. Same design shall hold good for other
sections also.
The Grade of concrete for deck slab and diaphragm is M30 , whereas, the steel grade is Fe-500D.
333
DESIGN OF DECK SLAB
RCC -T GIRDER
INPUTS
Angle of skew = 0.000 degree cosq 1
Total Width of Superstructure = 8.400 m
Width of Carriageway = 7.500 m
Width of Crash barrier = 0.450 m
Width of Footpath = 0.000 m
Width of RCC Railing = 0.000 m
Thickness of Deck slab at centre = 0.225 m
Thickness of Deck slab at cant end = 0.225 m
Nos. of Longitudinal Girders = 3
Width of Girder Flange at top = 0.900 m
Width of Girder Flange at bottom = 0.800 m
Square Skew
C/C spacing of Longitudinal girders = 3.000 m 0.000 m
Transverse Ovehang of Deck slab = 1.200 m 0.000 m
Longitudinal Ovehang of Deck slab = 0.500 m 0.000 m
Self weight of Deck Slab would be calculated by the program itself using command SELFWEIGHT Y -1
For the maximum span moment different load cases have been considered and presented in a tabular form.
70R(W), 70R(T) and Class A loading are considered. Critical live load cases have been considered for the purpose of
design.
As per IRC:112-2011
beff = a.a(1-a/L) + b1 For Continuous span
beff = 1.2 . a + b1 For Cantilever portion
For Continuous Span:
L= 3.00 m
a= Distance of the concentrated load from C/L of nearest support
b1 = Width of the load parallel to support+2x thk of WC
For cantilever span
L= 1.200m
a= Distance of the concentrated load from face of the support
b1 = Width of the load parallel to support+2x thk of WC
Impact Factor :
a) for Continuous span,
Class A =1.5
70R (w & T)
=1.25
b) For cantilever span
Class A =1.5
70R (w & T)
=1.25
334
3.0 DESIGN OF DECK SLAB
Depth of Deck Slab in between Girders = 0.225 m
Depth of Deck Slab at Cantilever junction = 0.150 m
Depth of Deck Slab at Cantilever tip = 0.225 m
Grade of Concrete = M30
Grade of steel ("m" for Mild Steel & "t" for HYSD) = t
Clear Cover = 40 mm
Cosine of Skew angle = 1.000
3 4
1 2
SECTION I 1 2 3 4
1 2 3 4
Hogging Moment kN-m 21.50 22.50 93.628 46.96
Sagging Moment kN-m 75.60 62.80 27.90 6.00
1 2 3 4
Hogging Moment kN-m 14 15 61.79 31.38
Sagging Moment kN-m 50.5 41.67 18.6 4
1 2 3 4
Hogging Moment kN-m 2 0 15.69 3.58
Sagging Moment kN-m 1 6.27 0 0
335
DESIGN OF DECK SLAB AS PER IRC : 112 - 2011
Type Sections 1 2 3 4
Load Data
Moment From Staad output kN-m 22 23 94 47
Material Data
Grade of Steel Fe 500 Fe 500 Fe 500 Fe 500
Charecteristic strength of reinforcement ( fyk ) Table 18.1, IRC 112 MPa 500 500 500 500
partial factor for steel ( gs ) Cl 6.2.2, IRC 112 1.15 1.15 1.15 1.15
Design value for tensile strength ( fyd = fyk/gs ) Cl 6.2.2, IRC 112 MPa 434.78 434.78 434.78 434.78
Modulus of Elasticity of Steel ( Es ) Cl 6.2.2, IRC 112 GPa 200 200 200 200
Grade of Concrete M 30 M 30 M 30 M 30
Charecteristics compressive strength ( fck ) Table 6.5, IRC 112 MPa 30 30 30 30
a Cl 6.4.2.8, IRC 112 0.67 0.67 0.67 0.67
Concrete material factor ( gm ) Cl 6.4.2.8, IRC 112 1.5 1.5 1.5 1.5
Design value for concrete compressive strength ( fcd = afck/gm ) Cl 6.4.2.8, IRC 112 MPa 13.40 13.40 13.40 13.40
Geometric Data
Width of Slab / Beam ( b ) mm 1000 1000 1000 1000
Total Depth of Slab/Beam ( D ) mm 225 225 225 225
Cover to Reinforcement ( c ) mm 40 40 40 40
Dia of Reinforcement ( f ) mm 12 12 16 12
Specing of Reinforcement ( s ) or mm 150 150 125 150
Number of Bar ( n ) Nos 0 0 0 0
Area of Reinforcement ( At ) mm2 754 754 1608 754
Reinforcement ( % ) 0.335 0.335 0.715 0.335
Dia of Shear Reinforcement ( f ) mm 10 10 10 10
Spacing of Reinforcement ( s ) or mm 200 200 200 200
Number of leg 0 0 0 0
Reinforcement ( % ) 0.000 0.000 0.000 0.000
336
Strength of the section
Moment Resistance
Effective depth of section ( d = D - c - f/2 ) mm 179 179 177 179
Depth of neutral axis from compression flange ( x ) mm 31 31 65 31
l Eq A2-33 & 34, IRC 112 0.8 0.8 0.8 0.8
h Eq A2-35 & 36, IRC 112 1 1 1 1
Depth of stress block ( lx ) mm 24 24 52 24
Stress on stress block ( hfcd ) MPa 13.40 13.40 13.40 13.40
Total Compression Force ( Fc = lx hfcd b) kN 328 328 699 328
Total Tension Force ( Fs = fyd At or fs At) kN 328 328 699 328
Diff ( Fc - Fs ) kN 0 0 0 0
Depth of lever arm ( z = d - lx/2) mm 167 167 151 167
Moment of Resistance ( Fc z ) kN-m 55 55 106 55
Usage 0.39 0.41 0.89 0.86
Status O.K. O.K. O.K. O.K.
Max Strain on concrete in compression ( ecu3 ) Table 6.5, IRC 112 0.0035 0.0035 0.0035 0.0035
Max Strain on reinforcement in tension ( es = ecu3*(d-x)/x ) 0.0170 0.0170 0.0060 0.0170
Stress in Reinforcement ( fs ) MPa 434.78 434.78 434.78 434.78
Status Under Reinf Under Reinf Under Reinf Under Reinf
Min Reinf As min = 0.26fctm/fyk btd or 0.0013btd Eq 16.1, IRC 112 mm2 233 233 230 233
fctm = Table 6.5, IRC 112 MPa 2.5 2.5 2.5 2.5
Status OK OK OK OK
Minimum Distribution Reinforcement (20% of Main Reinf.) mm2 151 151 322 151
Dia of Shear Reinforcement ( f ) mm 12 12 12 12
Spacing of Reinforcement ( s ) or mm 200 200 200 200
Reinforcement Provided mm2 565 565 565 565
Status OK OK OK OK
337
DESIGN OF DECK SLAB AS PER IRC : 112 - 2011
Sections
Type 1 2 3 4
Load Data
Moment From Staad output kN-m 76 63 28 6
Material Data
Grade of Steel Fe 500 Fe 500 Fe 500 Fe 500
Charecteristic strength of reinforcement ( fyk ) Table 18.1, IRC 112 MPa 500 500 500 500
partial factor for steel ( gs ) Cl 6.2.2, IRC 112 1.15 1.15 1.15 1.15
Design value for tensile strength ( fyd = fyk/gs ) Cl 6.2.2, IRC 112 MPa 434.78 434.78 434.78 434.78
Modulus of Elasticity of Steel ( Es ) Cl 6.2.2, IRC 112 GPa 200 200 200 200
Grade of Concrete M 30 M 30 M 30 M 30
Charecteristics compressive strength ( fck ) Table 6.5, IRC 112 MPa 30 30 30 30
a Cl 6.4.2.8, IRC 112 0.67 0.67 0.67 0.67
Concrete material factor ( gm ) Cl 6.4.2.8, IRC 112 1.5 1.5 1.5 1.5
Design value for concrete compressive strength ( fcd = afck/gm ) Cl 6.4.2.8, IRC 112 MPa 13.40 13.40 13.40 13.40
Geometric Data
Width of Slab / Beam ( b ) mm 1000 1000 1000 1000
Total Depth of Slab/Beam ( D ) mm 225 225 225 225
Cover to Reinforcement ( c ) mm 40 40 40 40
Dia of Reinforcement ( f ) mm 16 16 12 12
Spacing of Reinforcement ( s ) or mm 150 150 150 150
Number of Bar ( n ) Nos 0 0 0 0
Area of Reinforcement ( At ) mm2 1340 1340 754 754
Reinforcement ( % ) 0.596 0.596 0.335 0.335
Dia of Shear Reinforcement ( f ) mm 10 10 10 10
Spacing of Reinforcement ( s ) or mm 200 200 200 200
Number of leg 0 0 0 0
Reinforcement ( % ) 0 0 0 0
338
Strength of the section
Moment Resistance
Effective depth of section ( d = D - c - f/2 ) mm 177 177 179 179
Depth of neutral axis from compression flange ( x ) mm 54 54 31 31
l Eq A2-33 & 34, IRC 112 0.8 0.8 0.8 0.8
h Eq A2-35 & 36, IRC 112 1 1 1 1
Depth of stress block ( lx ) mm 43 43 24 24
Stress on stress block ( hfcd ) MPa 13.40 13.40 13.40 13.40
Total Compression Force ( Fc = lx hfcd b) kN 583 583 328 328
Total Tension Force ( Fs = fyd At or fs At) kN 583 583 328 328
Diff ( Fc - Fs ) kN 0 0 0 0
Depth of lever arm ( z = d - lx/2) mm 155 155 167 167
Moment of Resistance ( Fc z ) kN-m 90 90 55 55
Usage 0.84 0.69 0.51 0.11
Status O.K. O.K. O.K. O.K.
Max Strain on concrete in compression ( ecu3 ) Table 6.5, IRC 112 0.0035 0.0035 0.0035 0.0035
Max Strain on reinforcement in tension ( es = ecu3*(d-x)/x ) 0.0079 0.0079 0.0170 0.0170
Stress in Reinforcement ( fs ) MPa 434.78 434.78 434.78 434.78
Status Under Reinf Under Reinf Under Reinf Under Reinf
Min Reinf As min = 0.26fctm/fyk btd or 0.0013btd Eq 16.1, IRC 112 mm2 276 276 279 279
fctm = Table 6.5, IRC 112 MPa 3.0 3.0 3.0 3.0
Status OK OK OK OK
Minimum Distribution Reinforcement (20% of Main Reinf.) mm2 268 268 151 151
Dia of Shear Reinforcement ( f ) mm 12 12 12 12
Spacing of Reinforcement ( s ) or mm 200 200 200 200
Reinforcement Provided mm2 565 565 565 565
Status OK OK OK OK
339
STRESS CHECK AS PER IRC : 112 - 2011
Type
Type of element ( B for Beam & S for Slab ) Referance Unit S S S S
Sections
Load Data 1 2 3 4
Moment kN-m 50.50 41.67 61.79 31.38
Material Data
Grade of Steel Fe 500 Fe 500 Fe 500 Fe 500
Charecteristic strength of reinforcement ( fyk ) Table 18.1, IRC 112 MPa 500 500 500 500
partial factor for steel ( gs ) Cl 6.2.2, IRC 112 1.15 1.15 1.15 1.15
Design value for tensile strength ( fyd = fyk/gs ) Cl 6.2.2, IRC 112 MPa 434.78 434.78 434.78 434.78
Modulus of Elasticity of Steel ( Es ) Cl 6.2.2, IRC 112 GPa 200 200 200 200
Grade of Concrete M 30 M 30 M 30 M 30
Charecteristics compressive strength ( fck ) Table 6.5, IRC 112 MPa 30 30 30 30
a Cl 6.4.2.8, IRC 112 0.67 0.67 0.67 0.67
Concrete material factor ( gm ) Cl 6.4.2.8, IRC 112 1.5 1.5 1.5 1.5
Design value for concrete compressive strength ( fcd = afck/gm ) Cl 6.4.2.8, IRC 112 MPa 13.40 13.40 13.40 13.40
Modulus of Elasticity of Concrete ( Ecm ) Table 6.5, IRC 112 GPa 33 33 33 33
Geometric Data
Width of Slab / Beam ( b ) mm 1000 1000 1000 1000
Total Depth of Beam ( D ) mm 225 225 225 225
Cover to Reinforcement ( c ) mm 40 40 40 40
Dia of Reinforcement ( f ) mm 16 16 16 12
Effective depth of beam / Slab ( d ) mm 177 177 177 179
Spacing of Reinforcement ( s ) or mm 150 150 125 150
Number of Bar ( n ) Nos 0 0 0 0
Area of Reinforcement ( At ) mm2 1340 1340 1608 754
Reinforcement ( % ) 0.596 0.596 0.715 0.335
Stress Check
340
CRACKWIDTH CHECK AS PER IRC : 112 - 2011
Load Data 1 2 3 4
Moment kN-m 1.00 6 16 4
Material Data
Grade of Steel Fe 500 Fe 500 Fe 500 Fe 500
Charecteristic strength of reinforcement ( fyk ) Table 18.1, IRC 112 MPa 500 500 500 500
partial factor for steel ( gs ) Cl 6.2.2, IRC 112 1.15 1.15 1.15 1.15
Design value for tensile strength ( fyd = fyk/gs ) Cl 6.2.2, IRC 112 MPa 434.78 434.78 434.78 434.78
Modulus of Elasticity of Steel ( Es ) Cl 6.2.2, IRC 112 GPa 200 200 200 200
Grade of Concrete M 30 M 30 M 30 M 30
Charecteristics compressive strength ( fck ) Table 6.5, IRC 112 MPa 30 30 30 30
a Cl 6.4.2.8, IRC 112 0.67 0.67 0.67 0.67
Concrete material factor ( gm ) Cl 6.4.2.8, IRC 112 1.5 1.5 1.5 1.5
Design value for concrete compressive strength ( fcd = afck/gm ) Cl 6.4.2.8, IRC 112 MPa 13.40 13.40 13.40 13.40
Modulus of Elasticity of Concrete ( Ecm ) Table 6.5, IRC 112 GPa 33 33 33 33
Geometric Data
Width of Slab / Beam ( b ) mm 1000 1000 1000 1000
Total Depth of Beam ( D ) mm 225 225 225 225
Cover to Reinforcement ( c ) mm 40 40 40 40
Dia of Reinforcement ( f ) mm 16 16 16 12
Effective depth of beam / Slab ( d ) mm 177 177 177 179
Spacing of Reinforcement ( s ) or mm 150 150 125 150
Number of Bar ( n ) Nos 0 0 0 0
2
Area of Reinforcement ( At ) mm 1340 1340 1608 754
Reinforcement ( % ) 0.596 0.596 0.715 0.335
Minimum Area of Reinforcement for Crack Control (as per Cl. 12.3.3 of IRC:112 - 2011)
341
342
DESIGN OF RCC SUPERSTRUCTURE
( STANDARD 20M SPAN )
343
INTRODUCTION
The following calculations pertain to the design of single span RCC precast T-beam with Cast in
situ slab. The span arrangement is as shown in the attached sketch.
Design has been done as per limit state method of design and following checks has been done:
Moment of resistance has been calculated in this particular check and has been compared with
the ultimate moment acting on the structure at different sections.
Stress calculations in different stages of construction has been done in this check along with
checking for crack width.Differential shrinkage checks and temperature checks are also
presented.
344
BASIC DESIGN DATA
345
2.0 Partial Safety Factor for Verification of Structural Strength As per IRC:6-2010 Table 3.2
Surfacing
Adding to the effect of variable loads 1.75 1.00 1.75
Relieving the effect of variable loads 1.00 1.00 1.00
Variable Loads
Carriageway Live Load and associated loads (braking,
tractive and centrifugal forces) and
Pedestrain Live load :
a) Leading load 1.50 0.75 0.00
b) Accompany load 1.15 0.20 0.20
c) Construction Live Load 1.35 1.00 1.00
Accidental Effects:
i) Vehicle Collision (or)
ii) Barge Impact (or) - 1.00 -
iii) Impact due to floating bodies
Seismic Effect
a) During Service - - 1.50
b) During Construction - - 0.75
346
3.0 Partial Safety Factor for Verification of Servicibility Limit State As per IRC:6-2010 Table 3.3
Dead load,Snow load if present , SIDL including surfacing 1.00 1.00 1.00
Variable loads:
Carriageway Live Load and associated loads (braking,
tractive and centrifugal forces) and
Pedestrain Live load :
a) Leading load 1.00 0.75 -
b) Accompany load 0.75 0.20 0.00
Thermal Loads
a)Leading Load 1.00 0.60 -
b) Accompanying Load 0.60 0.50 0.50
Wind
a)Leading Load 1.00 0.60 -
b) Accompanying Load 0.60 0.50 0.00
347
The analysis and design of RCC-T girder Superstructure consists of design of following parts of superstructure :
1. Design of Longitudinal Girders : BM, SF are obtained from excel sheets & grillage analysis.
2. Design of Intermediate Cross Girder : BM,SF are obtained from grillage analysis.
3. Design of End Cross Girder : BM,SF are obtained from grillage analysis.
4. Transverse analysis of superstructure : Forces are obtained from STAAD analysis and excel sheets
The structural Modelling of the Cast in situ RCC T Girder superstructure is carried out by using grillage. The analysis has been
carried out using STAAD PRO. The structural model with beam & node no is presented Below.
348
Grillage Model with Node Number
349
Following sheets presents calculation of section properties for INPUT in STAAD grillage model
1.350 0.300
2 2
SL.No. A y Ay Ay Io Io + Ay
1. Deck Slab 0.6750 1.4625 0.9872 1.4438 0.0028 1.4466
2. Rctangular top Flange 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
3. Triangular top Flange 0.0450 1.3000 0.0585 0.0761 0.0001 0.0761
4. Web + top & bottom rec. Haunch 0.4050 0.6750 0.2734 0.1845 0.0615 0.2460
5. Bottom Bulb, Triangle 0.0225 0.3000 0.0068 0.0020 0.0000 0.0021
6. Bottom Bulb, Rectangle 0.0750 0.1250 0.0094 0.0012 0.0004 0.0016
Composite Section S 1.2225 1.3352 1.7075 0.0648 1.7724
Girder Only S 0.5475 0.3480 0.2638 0.0620 0.3258
SA SAy SAy2 S Io S (Io + Ay2)
350
B) Longitudinal Inner Girder-Support Section
1.350 m 0.600 m
2
SL.No. A y Ay Ay Io Io + Ay2
1. Deck Slab 0.6750 1.4625 0.9872 1.4438 0.0028 1.4466
2. Rctangular top Flange 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
3. Triangular top Flange 0.0113 1.3250 0.0149 0.0198 0.0000 0.0198
4. Web + top & bottom rec. Haunch 0.8100 0.6750 0.5468 0.3691 0.1230 0.4921
5. Bottom Bulb, Triangle 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
6. Bottom Bulb, Rectangle 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Composite Section S 1.4963 1.5488 1.8326 0.1259 1.9584
Girder Only S 0.8213 0.5617 0.3888 0.1230 0.5118
SA SAy SAy2 S Io S (Io + Ay2)
351
C) Longitudinal Outer Girder-Midspan Section
beff = ∑beff i+bw<b
2.700 m beff i= 0.2b1+0.1Lo<= 0.2Lo
0.900 m b1= 1.05
0.225 b2= 1.35
0.000 m 0.150 beff1 = 2.11 [ Cl. 7.6.1.2 IRC 112 ]
Beff2= 2.17
∑Beff 4.580 m
1.350 0.300 m OR 2.700 m
2 2
SL.No. A y Ay Ay Io Io + Ay
1. Deck Slab 0.60750 1.46250 0.88847 1.2994 0.00256 1.3019
2. Rctangular top Flange 0.00000 0.00000 0.00000 0.0000 0.00000 0.0000
3. Triangular top Flange 0.04500 1.30000 0.05850 0.0761 0.00006 0.0761
4. Web + top & bottom rec. Haunch 0.40500 0.67500 0.27338 0.1845 0.06151 0.2460
5. Bottom Bulb, Triangle 0.02250 0.30000 0.00675 0.0020 0.00003 0.0021
6. Bottom Bulb, Rectangle 0.07500 0.12500 0.00938 0.0012 0.00039 0.0016
Composite Section S 1.15500 1.23647 1.5632 0.065 1.6277
Girder Only S 0.54750 0.34800 0.2638 0.062 0.32576
2
SA SAy SAy S Io S (Io + Ay2)
352
D) Longitudinal Outer Girder-Support Section
beff = ∑beff i+bw<b
2.700 m beff i= 0.2b1+0.1Lo<= 0.2Lo
0.900 m b1= 0.9
0.225 b2= 1.2
0.000 m 0.075 beff1 = 2.08 [ Cl. 7.6.1.2 IRC 112 ]
Beff2= 2.14
∑Beff 4.820 m
1.350 0.600 m Actual flange width 2.700 m
2 2
SL.No. A y Ay Ay Io Io + Ay
1. Deck Slab 0.60750 1.46250 0.88847 1.29939 0.002563 1.30195
2. Rctangular top Flange 0.00000 0.00000 0.00000 0.00000 0.000000 0.00000
3. Triangular top Flange 0.01125 1.32500 0.01491 0.01975 0.000004 0.01975
4. Web + top & bottom rec. Haunch 0.81000 0.67500 0.54675 0.36906 0.123019 0.49208
5. Bottom Bulb, Triangle 0.00000 0.00000 0.00000 0.00000 0.000000 0.00000
6. Bottom Bulb, Rectangle 0.00000 0.00000 0.00000 0.00000 0.000000 0.00000
Composite Section S 1.42875 1.45013 1.6882 0.126 1.814
Girder Only S 0.82125 0.56166 0.3888 0.123 0.51183
SA SAy SAy2 S Io S (Io + Ay2)
353
E) End Cross Girder Section:
2
SL.No. A y Ay Ay Io Io + Ay2
354
F) Intermediate Cross Girder Section:
lo= = 9.000
0.671 m beff = ∑beff i+bw<b
0.000 m beff i= 0.2b1+0.1Lo<= 0.2Lo
0.225 b1= 1.35
0.000 0 beff = 2.64 [ Cl. 7.6.1.2 IRC 112 ]
Actual provided 3.000 m
1.325 0.30
SL.No. A y Ay Ay2 Io Io + Ay
2
355
F) Summary of Member Properties:
Longitudinal Members
Properties
Member Description
Ax Ix Iy** Iz
*Longitudinal Members along Outer Girder
At Support 1.4288 0.0001 0.379 0.3420
In Tapered Portion 1.2919 0.0001 0.371 0.3230
In Span 1.1550 0.0001 0.362 0.3040
*Longitudinal Members along Inner Girder
At Support 1.4963 0.0001 0.505 0.3552
In Tapered Portion 1.3594 0.0001 0.4975 0.3346
In Span 1.2225 0.0001 0.490 0.3141
** IY is assumed higher since deck slab will produce higher IY value.
356
Calculation of Loads for Application in Grillage Analysis
A. Dead Load
WC
Load on Member 201 to 223 = -0.440 t/m
Load on end Member 400 to 423 = 0.440 t/m
Load on intermediate Member 300 to 323 = 0.600 t/m
Crash barrier
Load on End Member 200 to 223 = 1.000 t/m
Load on Member 400 to 423 = 1.000 t/m
357
Summary of BM and SF for different load cases (Unfactored)
Summary of B.M & SF due to Dead Load ( Forces due to Self weight of girder) kN-m
Summary of B.M & SF per girder due to Dead Load ( Forces due to Self weight of girder including
Deck slab concrete )
Web
1/8th 1/4th 3/8th Mid
Girder No Components Support widening
span span span span
end
G1 ( Staad BM in kNm 241.0 487.0 525.0 910.0 1095.0 1148.0
Long Member ) SF in kN 250.0 219.0 177.0 135.0 119.0 0.0
G2 ( Staad BM in kNm 250.0 508.0 535.0 951.0 1099.0 1200.0
Long Member ) SF in Kn 267.0 229.0 185.0 148.0 125.0 0.0
Web
1/8th 1/4th 3/8th Mid
Girder No Components Support widening
span span span span
end
G1 ( Staad BM in Knm 39.9 93.8 148.0 181.0 221.0 246.0
Long Member ) SF in Kn 55.4 48.0 39.5 22.0 13.1 0.0
G2 ( Staad BM in Knm 24.0 35.3 48.1 62.5 67.5 71.2
Long Member ) SF in Kn 9.2 8.5 4.2 2.4 2.0 0.0
Summary of B.M & SF per girder due to Live Load Impact Factor = 1.180
A) Girder G1 ( Staad Long Member B) **10% reduction is considered forLL4, LL5 & LL6 for 3Lane loading
Web
1/8th 1/4th 3/8th Mid
Load Case Components Support widening
span span span span
end
BM in Knm 275.0 550.0 700.0 1005.0 1200.0 1259.0
LL1(70 RW)
SF in Kn 286.0 235.0 219.0 156.0 125.0 93.9
BM in Knm 0.0 0.0 0.0 0.0 0.0 0.0
LL2(2LCA)
SF in Kn 0.0 0.0 0.0 0.0 0.0 0.0
BM in Knm 162.0 332.0 492.0 635.0 830.0 875.00
LL3(1 CLA)
SF in Kn 187.0 146.0 129.0 110.0 68.9 68.9
Design Live BM in Knm 324.5 649.0 826.0 1185.9 1416.0 1485.6
Load with
SF in Kn 337.5 277.3 258.4 184.1 147.5 110.8
impact
**10% reduction is considered forLL4, LL5 & LL6 for 3Lane loading
B) Girder G2 ( Staad Long Member C) Impact Factor = 1.180
Web
1/8th 1/4th 3/8th Mid
Load Case Components Support widening
span span span span
end
BM in Knm 283.0 594.0 889.0 1100.0 1247.0 1383.0
LL1(70 RW)
SF in Kn 382.0 296.0 258.0 223.0 192.0 129.0
BM in Knm 0.0 0.0 0.0 0.0 0.0 0.0
LL2(2LCA)
SF in Kn 0.0 0.0 0.0 0.0 0.0 0.0
BM in Knm 0.0 0.0 0.0 0.0 0.0 0.0
LL3(1 CLA)
SF in Kn 0.0 0.0 0.0 0.0 0.0 0.0
Design Live BM in Knm 283.0 594.0 889.0 1100.0 1247.0 1631.9
Load with SF in Kn 450.8 349.3 304.4 263.1 226.6 152.2
358
Final Bending Moments & Shear Forces (Unfactored)
A) For Girder G1
Web
1/8th 1/4th 3/8th Mid
Load Case Components Support widening
span span span span
end
BM in Knm 241.0 487.0 525.0 910.0 1095.0 1148.0
DL
SF in Kn 250.0 219.0 177.0 135.0 119.0 0.0
SIDL(crash BM in Knm 39.9 93.8 148.0 181.0 221.0 246.0
barrier) SF in Kn 55.4 48.0 39.5 22.0 13.1 0.0
SIDL(Wearing BM in Knm 26.1 30.5 60.8 113.0 129.0 142.0
coat) SF in Kn 30.1 26.3 20.6 16.0 11.4 2.3
BM in Knm 324.5 649.0 826.0 1185.9 1416.0 1485.6
Live Load
SF in Kn 337.5 277.3 258.4 184.1 147.5 110.8
BM in Knm 631.5 1260.3 1559.8 2389.9 2861.0 3021.6
DL+SIDL+LL
SF in Kn 673.0 570.6 495.5 357.1 291.0 113.1
Maximum BM in Knm 631.5 1260.3 1559.8 2389.9 2861.0 3021.6
Forces SF in Kn 673.0 570.6 495.5 357.1 291.0 113.1
B) For Girder G2
Web
1/8th 1/4th 3/8th Mid
Load Case Components Support widening
span span span span
end
BM in Knm 250.0 508.0 535.0 951.0 1099.0 1200.0
DL
SF in Kn 267.0 229.0 185.0 148.0 125.0 0.0
SIDL(crash BM in Knm 24.0 35.3 48.1 62.5 67.5 71.2
barrier) SF in Kn 9.2 8.5 4.2 2.4 2.0 0.0
SIDL(Wearing BM in Knm 28.1 32.1 68.6 132.0 153.0 148.0
coat) SF in Kn 36.8 31.9 25.7 20.0 14.2 2.8
BM in Knm 283.0 594.0 889.0 1100.0 1247.0 1631.9
Live Load
SF in Kn 450.8 349.3 304.4 263.1 226.6 152.2
BM in Knm 585.1 1169.4 1540.7 2245.5 2566.5 3051.1
DL+SIDL+LL
SF in Kn 763.8 618.6 519.3 433.5 367.8 155.1
Maximum BM in Knm 585.1 1169.4 1540.7 2245.5 2566.5 3051.1
Forces SF in Kn 763.8 618.6 519.3 433.5 367.8 155.1
Since design have to be done for the worst forces on all the four girders and reinforcement required from the
worst BM & SF will be provided for all girders.
E) Final Design Forces Among all the Girders
Web
1/8th 1/4th 3/8th Mid
Load Case Components Support widening
span span span span
end
Maximum BM in Knm 631.5 1260.3 1559.8 2389.9 2861.0 3051.1
Forces SF in Kn 763.8 618.6 519.3 433.5 367.8 155.1
The design has been done with properties of inner girder since properties of inner girder is less than outer girder.
359
Summary of BM and SF for different load cases ( Factored - ULS Case)
Summary of B.M & SF per girder due to Dead Load ( Forces due to Self weight of girder,Deck slab )
Web
Mid
Girder No Components Support widening 1/8th span 1/4th span 3/8th span
span
end
G1 ( Staad BM in Knm 325.4 657.5 708.8 1228.5 1478.3 1549.8
Long Member ) SF in Kn 337.5 295.7 239.0 182.3 160.7 0.0
G2 ( Staad BM in Knm 337.5 685.8 722.3 1283.9 1483.7 1620.0
Long Member ) SF in Kn 360.5 309.2 249.8 199.8 168.8 0.0
Summary of Factored B.M & SF per girder due to SIDL (Includes crash barrier and wearing coat load )
Web
Mid
Girder No Components Support widening 1/8th span 1/4th span 3/8th span
span
end
G1 ( Staad BM in Knm 99.5 180.0 306.2 442.1 524.1 580.6
Long Member SF in Kn 127.5 110.8 89.4 57.7 37.6 4.0
G2 ( Staad BM in Knm 81.6 103.8 185.0 315.4 358.9 355.1
Long Member SF in Kn 76.8 67.2 50.6 38.2 27.6 5.0
360
B) Girder G2 - Inner
Web
Mid
Load Case Components Support widening 1/8th span 1/4th span 3/8th span
span
end
BM in Knm 424.5 891.0 1333.5 1650.0 1870.5 2074.5
LL1
SF in Kn 573.0 444.0 387.0 334.5 288.0 193.5
BM in Knm 0.0 0.0 0.0 0.0 0.0 0.0
LL2
SF in Kn 0.0 0.0 0.0 0.0 0.0 0.0
BM in Knm 0.0 0.0 0.0 0.0 0.0 0.0
LL3
SF in Kn 0.0 0.0 0.0 0.0 0.0 0.0
Design Live BM in Knm 424.5 891.0 1333.5 1650.0 1870.5 2074.5
Load with
SF in Kn 573.0 444.0 387.0 334.5 288.0 193.5
impact
A) For Girder G1
Web
Mid
Load Case Components Support widening 1/8th span 1/4th span 3/8th span
span
end
BM in Knm 325.4 657.5 708.8 1228.5 1478.3 1549.8
DL
SF in Kn 337.5 295.7 239.0 182.3 160.7 0.0
BM in Knm 99.5 180.0 306.2 442.1 524.1 580.6
SIDL
SF in Kn 127.5 110.8 89.4 57.7 37.6 4.0
BM in Knm 412.5 825.0 1050.0 1507.5 1800.0 1888.5
Live Load
SF in Kn 429.0 352.5 328.5 234.0 187.5 140.9
BM in Knm 837.4 1662.5 2065.0 3178.1 3802.4 4018.9
DL+SIDL+LL
SF in Kn 894.0 759.0 656.8 474.0 385.8 144.9
Design BM in Knm 837.4 1662.5 2065.0 3178.1 3802.4 4018.9
Forcees SF in Kn 894.0 759.0 656.8 474.0 385.8 144.9
B) For Girder G2
Web
Mid
Load Case Components Support widening 1/8th span 1/4th span 3/8th span
span
end
BM in Knm 337.5 685.8 722.3 1283.9 1483.7 1620.0
DL
SF in Kn 360.5 309.2 249.8 199.8 168.8 0.0
BM in Knm 81.6 103.8 185.0 315.4 358.9 355.1
SIDL
SF in Kn 76.8 67.2 50.6 38.2 27.6 5.0
BM in Knm 424.5 891.0 1333.5 1650.0 1870.5 2074.5
Live Load
SF in Kn 573.0 444.0 387.0 334.5 288.0 193.5
BM in Knm 843.6 1680.6 2240.7 3249.2 3713.0 4049.6
DL+SIDL+LL
SF in Kn 1010.3 820.4 687.3 572.5 484.3 198.5
Design BM in Knm 843.6 1680.6 2240.7 3249.2 3713.0 4049.6
Forcees SF in Kn 1010.3 820.4 687.3 572.5 484.3 198.5
Web
Mid
Load Case Components Support widening 1/8th span 1/4th span 3/8th span
span
end
Design BM in Knm 843.6 1680.6 2240.7 3249.2 3802.4 4049.6
Forcees SF in Kn 1010.3 820.4 687.3 572.5 484.3 198.5
The design has been done with properties of inner girder since properties of inner girder is less than outer girder.
361
Summary of BM and SF for different load cases ( Factored - SLS Case)
Summary of Factored B.M & SF per girder due to Dead Load ( Forces due to Self weight of girder,Deck slab )
Web
Girder No Components Support widening 1/8th span 1/4th span 3/8th span Mid span
end
G1 ( Staad BM in Knm 241.0 487.0 525.0 910.0 1095.0 1148.0
Long Member SF in Kn 250.0 219.0 177.0 135.0 119.0 0.0
G2 ( Staad BM in Knm 250.0 508.0 535.0 951.0 1099.0 1200.0
Long Member SF in Kn 267.0 229.0 185.0 148.0 125.0 0.0
362
B) Girder G2
Web
Load Case Components Support widening 1/8th span 1/4th span 3/8th span Mid span
end
BM in Knm 283.00 594.00 889.00 1100.00 1247.00 1383.00
LL1
SF in Kn 382.00 296.00 258.00 223.00 192.00 129.00
BM in Knm 0.00 0.00 0.00 0.00 0.00 0.00
LL2
SF in Kn 0.00 0.00 0.00 0.00 0.00 0.00
BM in Knm 0.00 0.00 0.00 0.00 0.00 0.00
LL3
SF in Kn 0.00 0.00 0.00 0.00 0.00 0.00
Design Live BM in Knm 283.0 594.0 889.0 1100.0 1247.0 1383.0
Load with SF in Kn 382.0 296.0 258.0 223.0 192.0 129.0
Final Bending Moments & Shear Forces
A) For Girder G1
Web
Load Case Components Support widening 1/8th span 1/4th span 3/8th span Mid span
end
BM in Knm 241.0 487.0 525.0 910.0 1095.0 1148.0
DL
SF in Kn 250.0 219.0 177.0 135.0 119.0 0.0
BM in Knm 66.0 124.3 208.8 294.0 350.0 388.0
SIDL
SF in Kn 85.5 74.3 60.1 38.0 24.5 2.3
BM in Knm 275.0 550.0 700.0 1005.0 1200.0 1259.0
Live Load
SF in Kn 286.0 235.0 219.0 156.0 125.0 93.9
BM in Knm 582.0 1161.3 1433.8 2209.0 2645.0 2795.0
DL+SIDL+LL
SF in Kn 621.5 528.3 456.1 329.0 268.5 96.2
Design BM in Knm 582.0 1161.3 1433.8 2209.0 2645.0 2795.0
Forcees SF in Kn 621.5 528.3 456.1 329.0 268.5 96.2
B) For Girder G2
Web
Load Case Components Support widening 1/8th span 1/4th span 3/8th span Mid span
end
BM in Knm 250.0 508.0 535.0 951.0 1099.0 1200.0
DL
SF in Kn 267.0 229.0 185.0 148.0 125.0 0.0
BM in Knm 52.1 67.4 116.7 194.5 220.5 219.2
SIDL
SF in Kn 46.0 40.4 29.9 22.4 16.2 2.8
BM in Knm 283.0 594.0 889.0 1100.0 1247.0 1383.0
Live Load
SF in Kn 382.0 296.0 258.0 223.0 192.0 129.0
BM in Knm 585.1 1169.4 1540.7 2245.5 2566.5 2802.2
DL+SIDL+LL
SF in Kn 695.0 565.4 472.9 393.4 333.2 131.8
Design BM in Knm 585.1 1169.4 1540.7 2245.5 2566.5 2802.2
Forcees SF in Kn 695.0 565.4 472.9 393.4 333.2 131.8
Since design have to be done for the worst forces on all the four girders and reinforcement required from the worst
BM & SF will be provided for all girders.
E) Final Design Forces Among all the Girders
Web
Load Case Components Support widening 1/8th span 1/4th span 3/8th span Mid span
end
Design BM in Knm 585.1 1169.4 1540.7 2245.5 2645.0 2802.2
Forcees SF in Kn 695.0 565.4 472.9 393.4 333.2 131.8
363
Calculation of Stresses Due to Temperature Gradient at Mid Span of Inner Girder
17.8 3.000 m
0.15 Stress 0.900 m
1 6408.0 0.225
2 4.0 0.25 1440.0 0.000 0.15
1.575 1.425
1.03
Y
0.20
3 0.15 756.0 0.25
2.1 0.6
26 364
Temperature Fall Case
27 365
Design Check for Longitudinal Girder (Ultimate Limit State ) at L/2 Section
Input for steel to be provided
Layer Dia of Bar No.of Bars CGfrom bot.
1st 25 5 69 mm
2nd 25 5 119 mm
3rd 25 5 169 mm
4th 25 5 219 mm
5th 25 0 269 mm
6th 25 0 319 mm
7th 25 0 369 mm
Total 20 144 mm
Area of bottom steel = 9817.48 mm^2
7.1.2 STRESS CHECK FOR RCC GIRDER WITH RCC SLAB (Ultimate Load case)
(DL ,SIDL, Live load )
D1
bf Bending Moment = 4049.62 KN-m
D2
Width of Slab W = 2700mm
N N Depth of slab T = 225mm
Width of top flange bf = 900mm
bw d Width of bottom flange bwf = 600mm
Width of web bw = 300mm
Thickness of top flange D1 = 0mm
D3 Thickness of top haunch D2 = 150mm
Thickness of bottom haunch D3 = 150mm
D4
Thickness of bottom flange D4 = 250mm
366
Calculations of force and moment capacity of concrete
Section Area(mm^2) Cg from top(mm) Fc=ɳFcd*A(Kn) Moment=Fcd*Cg(KN-m)
deck slab 314794.851 60.627 4268.468 258.785 0.8*2700**145.738357015597
Top flange (D1) 0.000 148.295 0 0 0.8*2700**225
Haunch(D2) 0.00 0 0 0
Web 0.00 0.00 0 0
Total 314794.85 4268.468 258.785
V ED is ultimate design shear force in the section considered resulting from external loading = 198.5 KN
V Rd,c is the design shear reinforcement of the member without shear reinforcement
(0.12k (80r l f ck )1/3+ k 1 s cp)b w d [ Clause 10.3.2]
subject to a minimum of (ν min + 0.15 s cp )b w d ved = VED/(b*0.9d) 0.51
Where
r = A sl /b w d <=0.02 = 0.02000
Asl is the area of longitudinal tensile reinforcement which extends a minimum of design = 9817.5 mm2
anchorage length and an effective depth beyond the section considered
bw is the smallest width of cross-section in the tensile zone = 300.00 mm
d effective depth of tensile reinforcement = 1431.5 mm
s cp N ED /A c (in MPA) = 0
N ED is the axial forcein the cross-section from the loading = 0
Ac is the gross concrete cross-section area = NA
a cw is a co-efficient taking in to account of the state of the stress in the compressive chord = 1.000
where scp = 0
scp = is the mean compressive stress, measured positive in the concrete
due to the design axial force
V1 is the strength reduction factor for concrete cracked in shear = 0.600
V 1 = 0.6 for f ck <= 80MPa
V 1 = 0.9-f ck /250 for f ck => 80MPa
Z lever arm can be taken as 0.9d for R.C . Section and to be calculated for PSC section = 1288.4 mm
367
f cd 0.135fck (1- fck/310) 3.66 = 13.400 Mpa
q = 21.80 0.0924fck (1- fck/310) 2.50 cot q = 2.50
Max allowble shear in onc strut 45 tan q = 0.40
bw = 300 mm
V RD.max design value of maximum shear force a cw b w z v 1 f cd / (cot q +tan q ) = 1071.5 KN
Hence Ok
Checking of shear reinforcement Clause 10.3.3.2
Asw >= V Rd,s
s zf ywd cot q
V RD.s design value of the shear force which can be sustained by the yielding reinforcement = 198.5
f ywd is the design yeild strength of the shear reinforcement = 0.8*f ywk = 347.8 Mpa
A sw / s = 0.7854 mm2/mm
Hence OK
Interface Shear Clause 10.3.4
b is the retio of the longitudinal force in the new concrete and the = 1.0000
total logitudinal force
V ED is the vertical shear force (DL of Slab + SIDL + LL) = 144.86 KN
sn Stress per unit area caused by the munimum external force across the interface = 0.0000
that can act simultaneously with the shear force, < 0.6*fcd
Can be irnored for conservative design
r= As/Aj where As is the area of reinforcement crossing the joint Aj is the = 0.00087
interface area of the joint
368
Design Check for Longitudinal Girder (Ultimate Limit State ) at 3L/8
Input for steel to be provided
Layer Dia of Bar No.of Bars CGfrom bot.
1st 25 5 69 mm
2nd 25 5 119 mm
3rd 25 5 169 mm
4th 25 5 219 mm
5th 25 0 269 mm
6th 25 0 319 mm
7th 25 0 369 mm
Total 20 144 mm
Area of bottom steel = 9817.48 mm^2
7.1.2 STRESS CHECK FOR RCC GIRDER WITH RCC SLAB (Ultimate Load case)
(DL ,SIDL, Live load )
D1
bf Bending Moment = 3802.35 KN-m
D2
Width of Slab W = 2700mm
N N Depth of slab T = 225mm
Width of top flange bf = 900mm
bw d Width of bottom flange bwf = 600mm
Width of web bw = 300mm
Thickness of top flange D1 = 0mm
D3 Thickness of top haunch D2 = 150mm
Thickness of bottom haunch D3 = 150mm
D4
Thickness of bottom flange D4 = 250mm
369
Calculations of force and moment capacity of concrete
Section Area(mm^2) Cg from top(mm) Fc=ɳFcd*A(Kn) Moment=Fcd*Cg(KN-m)
deck slab 314794.85 60.62715652 4268.468279 258.7850945
Top flange (D1) 0.00 148.2953428 0 0
Haunch(D2) 0.00 0 0 0
Web 0.00 0.00 0 0
Total 314794.85 4268.468279 258.7850945
V ED is ultimate design shear force in the section considered resulting from external loading = 484.3 KN
V Rd,c is the design shear reinforcement of the member without shear reinforcement
(0.12k (80r l f ck )1/3+ k 1 s cp)b w d [ Clause 10.3.2]
subject to a minimum of (ν min + 0.15 s cp )b w d
Where
r = A sl /b w d <=0.02 = 0.02000
Asl is the area of longitudinal tensile reinforcement which extends a minimum of design = 13672.2 mm2
anchorage length and an effective depth beyond the section considered
bw is the smallest width of cross-section in the tensile zone = 300.00 mm
d effective depth of tensile reinforcement = 1431.5 mm
s cp N ED /A c (in MPA) = 0
N ED is the axial forcein the cross-section from the loading = 0
Ac is the gross concrete cross-section area = NA
a cw is a co-efficient taking in to account of the state of the stress in the compressive chord = 1.000
where scp = 0
s cp = is the mean compressive stress, measured positive in the concrete
due to the design axial force
V1 is the strength reduction factor for concrete cracked in shear = 0.600
V 1 = 0.6 for f ck <= 80MPa
V 1 = 0.9-f ck /250 for f ck => 80MPa
Z lever arm can be taken as 0.9d for R.C . Section and to be calculated for PSC section = 1288.4 mm
370
f cd = 13.400 Mpa
o
q = 45.00 cot q = 1.00
tan q = 1.00
bw = 300 mm
V RD.max design value of maximum shear force a cw b w z v 1 f cd / (cot q +tan q ) = 1553.8 KN
Hence Ok
Checking of shear reinforcement Clause
Asw >= V Rd,s
s zf ywd cot q
V RD.s design value of the shear force which can be sustained by the yielding reinforcement = 484.3
f ywd is the design yeild strength of the shear reinforcement = 0.8*f ywk = 347.8 Mpa
A sw / s = 1.1310 mm2/mm
Hence OK
Interface Shear Clause 10.3.4
b is the retio of the longitudinal force in the new concrete and the = 1.0000
total logitudinal force
V ED is the vertical shear force (DL of Slab + SIDL + LL) = 279.94 KN
sn Stress per unit area caused by the munimum external force across the interface = 0.0000
that can act simultaneously with the shear force, < 0.6*fcd
Can be irnored for conservative design
r = As/Aj where As is the area of reinforcement crossing the joint Aj is the = 0.00126
interface area of the joint
371
Design Check for Longitudinal Girder (Ultimate Limit State ) at L/4
Input for steel to be provided
Layer Dia of Bar No.of Bars CGfrom bot.
1st 25 5 69 mm
2nd 25 5 119 mm
3rd 25 5 169 mm
4th 25 0 219 mm
5th 25 0 269 mm
6th 25 0 319 mm
7th 25 0 369 mm
Total 15 119 mm
Area of bottom steel = 7363.11 mm^2
7.1.2 STRESS CHECK FOR PRECAST RCC GIRDER WITH RCC SLAB (Ultimate Load case)
(Self weight beam, deck slab ,SIDL, Live load )
D1
bf Bending Moment = 3249.23 KN-m
D2
Width of Slab W = 2700mm
N N Depth of slab T = 225mm
Width of top flange bf = 900mm
bw d Width of bottom flange bwf = 600mm
Width of web bw = 300mm
Thickness of top flange D1 = 0mm
D3 Thickness of top haunch D2 = 150mm
Thickness of bottom haunch D3 = 150mm
D4
Thickness of bottom flange D4 = 250mm
372
Calculations of force and moment capacity of concrete
Section Area(mm^2) Cg from top(mm) Fc=ɳFcd*A(Kn) Moment=Fcd*Cg(KN-m)
deck slab 238906.81 44.24200124 3201.35121 141.6341842
Top flange (D1) 0.00 134.2420012 0 0
Haunch(D2) 0.00 0 0 0
Web 0.00 0.00 0 0
Total 238906.81 3201.35121 141.6341842
V ED is ultimate design shear force in the section considered resulting from external loading = 572.5 KN
V Rd,c is the design shear reinforcement of the member without shear reinforcement
(0.12k (80r l f ck )1/3+ k 1 s cp)b w d [ Clause 10.3.2]
subject to a minimum of (ν min + 0.15 s cp )b w d
Where
r = A sl /b w d <=0.02 = 0.02000
Asl is the area of longitudinal tensile reinforcement which extends a minimum of design = 13672.2 mm2
anchorage length and an effective depth beyond the section considered
bw is the smallest width of cross-section in the tensile zone = 300.00 mm
d effective depth of tensile reinforcement = 1456.5 mm
s cp N ED /A c (in MPA) = 0
N ED is the axial forcein the cross-section from the loading = 0
Ac is the gross concrete cross-section area = NA
a cw is a co-efficient taking in to account of the state of the stress in the compressive chord = 1.000
where scp = 0
s cp = is the mean compressive stress, measured positive in the concrete
due to the design axial force
V1 is the strength reduction factor for concrete cracked in shear = 0.600
V 1 = 0.6 for f ck <= 80MPa
V 1 = 0.9-f ck /250 for f ck => 80MPa
Z lever arm can be taken as 0.9d for R.C . Section and to be calculated for PSC section = 1310.9 mm
373
f cd = 13.400 Mpa
o
q = 45.00 cot q = 1.00
tan q = 1.00
bw = 300 mm
V RD.max design value of maximum shear force a cw b w z v 1 f cd / (cot q +tan q ) = 1580.9 KN
Hence Ok
Checking of shear reinforcement Clause 10.3.3.2
Asw >= V Rd,s
s zf ywd cot q
V RD.s design value of the shear force which can be sustained by the yielding reinforcement = 572.5
f ywd is the design yeild strength of the shear reinforcement = 0.8*f ywk = 347.8 Mpa
A sw / s = 1.2925 mm2/mm
Hence OK
Interface Shear Clause 10.3.4
b is the retio of the longitudinal force in the new concrete and the = 1.0000
total logitudinal force
V ED is the vertical shear force (DL of Slab + SIDL + LL) = 394.28 KN
sn Stress per unit area caused by the munimum external force across the interface = 0.0000
that can act simultaneously with the shear force, < 0.6*fcd
Can be irnored for conservative design
r = As/Aj where As is the area of reinforcement crossing the joint Aj is the = 0.00144
interface area of the joint
374
Design Check for Longitudinal Girder (Ultimate Limit State ) at L/8
Input for steel to be provided
Layer Dia of Bar No.of Bars CGfrom bot.
1st 25 5 69 mm
2nd 25 5 119 mm
3rd 25 5 169 mm
4th 25 0 219 mm
5th 25 0 269 mm
6th 25 0 319 mm
7th 25 0 369 mm
Total 15 119 mm
Area of bottom steel = 7363.11 mm^2
7.1.2 STRESS CHECK FOR PRECAST RCC GIRDER WITH RCC SLAB (Ultimate Load case)
(Self weight beam, deck slab ,SIDL, Live load )
D1
bf Bending Moment = 2240.74 KN-m
D2
Width of Slab W = 2700mm
N N Depth of slab T = 225mm
Width of top flange bf = 900mm
bw d Width of bottom flange bwf = 600mm
Width of web bw = 300mm
Thickness of top flange D1 = 0mm
D3 Thickness of top haunch D2 = 150mm
Thickness of bottom haunch D3 = 150mm
D4
Thickness of bottom flange D4 = 250mm
375
Calculations of force and moment capacity of concrete
Section Area(mm^2) Cg from top(mm) Fc=ɳFcd*A(Kn) Moment=Fcd*Cg(KN-m)
deck slab 238906.81 44.24200124 3201.35121 141.6341842
Top flange (D1) 0.00 134.2420012 0 0
Haunch(D2) 0.00 0 0 0
Web 0.00 0.00 0 0
Total 238906.81 3201.35121 141.6341842
V ED is ultimate design shear force in the section considered resulting from external loading = 687.3 KN
V Rd,c is the design shear reinforcement of the member without shear reinforcement
(0.12k (80r l f ck )1/3+ k 1 s cp)b w d [ Clause 10.3.2]
subject to a minimum of (ν min + 0.15 s cp )b w d
Where
r = A sl /b w d <=0.02 = 0.02000
Asl is the area of longitudinal tensile reinforcement which extends a minimum of design = 13672.2 mm2
anchorage length and an effective depth beyond the section considered
bw is the smallest width of cross-section in the tensile zone = 300.00 mm
d effective depth of tensile reinforcement = 1456.5 mm
s cp N ED /A c (in MPA) = 0
N ED is the axial forcein the cross-section from the loading = 0
Ac is the gross concrete cross-section area = NA
a cw is a co-efficient taking in to account of the state of the stress in the compressive chord = 1.000
where scp = 0
s cp = is the mean compressive stress, measured positive in the concrete
due to the design axial force
V1 is the strength reduction factor for concrete cracked in shear = 0.600
V 1 = 0.6 for f ck <= 80MPa
V 1 = 0.9-f ck /250 for f ck => 80MPa
Z lever arm can be taken as 0.9d for R.C . Section and to be calculated for PSC section = 1310.9 mm
376
f cd = 13.400 Mpa
o
q = 45.00 cot q = 1.00
tan q = 1.00
bw = 300 mm
V RD.max design value of maximum shear force a cw b w z v 1 f cd / (cot q +tan q ) = 1580.9 KN
Hence Ok
Checking of shear reinforcement Clause 10.3.3.2
Asw >= V Rd,s
s zf ywd cot q
V RD.s design value of the shear force which can be sustained by the yielding reinforcement = 687.3
f ywd is the design yeild strength of the shear reinforcement = 0.8*f ywk = 347.8 Mpa
A sw / s = 1.5080 mm2/mm
Hence OK
Interface Shear Clause 10.3.4
b is the retio of the longitudinal force in the new concrete and the = 1.0000
total logitudinal force
V ED is the vertical shear force (DL of Slab + SIDL + LL) = 557.66 KN
sn Stress per unit area caused by the munimum external force across the interface = 0.0000
that can act simultaneously with the shear force, < 0.6*fcd
Can be irnored for conservative design
r = As/Aj where As is the area of reinforcement crossing the joint Aj is the = 0.00201
interface area of the joint
377
Design Check for Longitudinal Girder (Ultimate Limit State ) near support location
Input for steel to be provided
Layer Dia of Bar No.of Bars CGfrom bot.
1st 25 5 69 mm
2nd 25 5 119 mm
3rd 25 5 169 mm
4th 25 0 219 mm
5th 25 0 269 mm
6th 25 0 319 mm
7th 25 0 369 mm
Total 15 119 mm
Area of bottom steel = 7363.11 mm^2
7.1.2 STRESS CHECK FOR PRECAST RCC GIRDER WITH RCC SLAB (Ultimate Load case)
(Self weight beam, deck slab ,SIDL, Live load )
D1
bf Bending Moment = 843.58 KN-m
D2
Width of Slab W = 2700mm
N N Depth of slab T = 225mm
Width of top flange bf = 900mm
bw d Width of bottom flange bwf = 600mm
Width of web bw = 600mm
Thickness of top flange D1 = 0mm
D3 Thickness of top haunch D2 = 150mm
Thickness of bottom haunch D3 = 150mm
D4
Thickness of bottom flange D4 = 250mm
378
Calculations of force and moment capacity of concrete
Section Area(mm^2) Cg from top(mm) Fc=ɳFcd*A(Kn) Moment=Fcd*Cg(KN-m)
deck slab 238906.81 44.24200124 3201.35121 141.6341842
Top flange (D1) 0.00 134.2 0 0
Haunch(D2) 0.00 0.0 0 0
Web 0.00 0.0 0 0
Total 238906.81 3201.35121 141.6341842
V ED is ultimate design shear force in the section considered resulting from external loading = 1010.3 KN
V Rd,c is the design shear reinforcement of the member without shear reinforcement
(0.12k (80r l f ck )1/3+ k 1 s cp)b w d [ Clause 10.3.2]
subject to a minimum of (ν min + 0.15 s cp )b w d
Where
r = A sl /b w d <=0.02 = 0.01850
Asl is the area of longitudinal tensile reinforcement which extends a minimum of design = 13672.2 mm2
anchorage length and an effective depth beyond the section considered
bw is the smallest width of cross-section in the tensile zone = 600.00 mm
d effective depth of tensile reinforcement = 1231.5 mm
s cp N ED /A c (in MPA) = 0
N ED is the axial forcein the cross-section from the loading = 0
Ac is the gross concrete cross-section area = NA
a cw is a co-efficient taking in to account of the state of the stress in the compressive chord = 1.000
where scp = 0
s cp = is the mean compressive stress, measured positive in the concrete
due to the design axial force
V1 is the strength reduction factor for concrete cracked in shear = 0.600
V 1 = 0.6 for f ck <= 80MPa
V 1 = 0.9-f ck /250 for f ck => 80MPa
Z lever arm can be taken as 0.9d for R.C . Section and to be calculated for PSC section = 1108.4 mm
379
f cd = 13.400 Mpa
o
q = 45.00 cot q = 1.00
tan q = 1.00
bw = 600 mm
V RD.max design value of maximum shear force a cw b w z v 1 f cd / (cot q +tan q ) = 2673.3 KN
Hence Ok
Checking of shear reinforcement Clause 10.3.3.2
Asw >= V Rd,s
s zf ywd cot q
V RD.s design value of the shear force which can be sustained by the yielding reinforcement = 1010.3
f ywd is the design yeild strength of the shear reinforcement = 0.8*f ywk = 347.8 Mpa
A sw / s = 3.2170 mm2/mm
Hence OK
Interface Shear Clause 10.3.4
b is the retio of the longitudinal force in the new concrete and the = 1.0000
total logitudinal force
V ED is the vertical shear force (DL of Slab + SIDL + LL) = 754.58 KN
sn Stress per unit area caused by the munimum external force across the interface = 0.0000
that can act simultaneously with the shear force, < 0.6*fcd
Can be irnored for conservative design
r = As/Aj where As is the area of reinforcement crossing the joint Aj is the = 0.00357
interface area of the joint
380
Design Check for Longitudinal Girder at 9.500 m
Design BM at Midspan due to Selfweight of girder = 415.25 Kn-M
Design BM at Midspan due to Deck Slab & Cross Girder = 760.45 Kn-M
Design BM at Midspan due to Deck Slab&Cross Girder (green concrete)+shuttering = 670.72 Kn-M
Design BM at Midspan due to SIDL = 388.00 Kn-M
Design BM at Midspan due to Live Load = 1259.00 Kn-M
Service stage moment = 1543.20 Kn-M
2
Area of bottom steel = 9817 mm
3
Cover = 40 mm Top Section Modulus at top of deck ZT = 4.33E+08 mm
Dia of shear stirrup = 16 mm
3
Grade of Concrete = M30 Bottom Section Modulus ZB = 8.58E+07 mm
Reinforcement = Fe500
Permissible stresses Stress in concrete at top of deck slab = 5.35 Mpa
In concrete = 14.40 Mpa
In steel = 300.00 Mpa Stress in concrete at girder top = 3.11 Mpa
381
Age of girder at the time of casting of deck slab = 28 days
Age of deck slab = 0 days
Differential shrinkage coeffi 2.00E-04 - 2.00E-04 = 0.00000
Reduction Factor = 0.43
Modulus of elasticity of concrete = 3050000.00 t/m2
Force due to Differntial shrinkage(P) = (0*0.43*3050000*2700*225)
= 0.00 ton
Tensile stress in deck slab = 0.00 t/m2
Eccentricity(e) = ((1575+225*0.5)/1000-1.0922)
= 0.60 m
Moment due to above force = 0.00 tm
Stress due to Loads & Moments
Stress at top of slab = 0.00 t/m2 Compression
Stress at top of girder = 0.000 t/m2 Compression
Stress at bottom = 0.00 t/m2 Tension
Final Stress due to differential shrinkage
Stress at top of slab = 0.00 t/m2 Tension
Stress at bottom of slab = 0.00 t/m2 Tension
Stress at top of girder = 0.00 t/m2 Compression
Stress at bottom of girder = 0.00 t/m2 Tension
Final Stress in concrete and steel
Stress in concrete at top of slab = 1.10 Mpa = 109.94512 t/m2
Stress in concrete at top of girder = 3.46 Mpa = 345.52806 t/m2
Stress in Steel at CG = 73.14 Mpa = 7313.9457 t/m2
Stress in Steel at bottom fibre = 82.37 Mpa = 8237.1442 t/m2
Summary of Stresses
Rise Fall
Flexural concrete Stress at Concrete (Top of Deck) due to temperature = 392.7 -95.9
Flexural concrete Stress at Concrete (Top of beam) due to temperature = -111.2 55.5
Stress at Steel (Bottom of beam) due to temperature = 169.3 -115.8
Deck slab +
DL Differential
Shuttering DL+SIDL+LL SIDL LL Temp RISE Temp Fall
Shrinkage Final Stresses
382
Crack width checking during SLS condition under Quasi-permanent Load combination IRC-112 Clause-12.3.4
2
Layer Dia of Bar No.of Bars CGfrom bot. Area of beam above neutral axis = 607500 mm
1st 25 5 69 mm CG of beam above neutral axis = 0.0 mm
2nd 25 5 119 mm
3rd 25 5 169 mm Comparing moment of area about neutral axis
4th 25 5 219 mm W*T+WTF*T1*(N-T1*0.5)+WTF*T2*(N-2*T2*2/3)+(N-T1-T2)^2/2*WW
5th 25 0 269 mm = m*Ast*(d-N)
6th 25 0 319 mm
4
7th 25 0 369 mm Cracked Moment of Inertia = 1.13E+11 mm
Total 20 144 mm
2
Area of bottom steel = 9817 mm
3
Cover = 40 mm Top Section Modulus at top of deck ZT = 1.00E+09 mm
Dia of shear stirrup = 16 mm
3
Grade of Concrete = M30 Bottom Section Modulus ZB = 8.55E+07 mm
Reinforcement = 500
Permissible stresses Stress in concrete at top of deck slab = 1.13 Mpa
In concrete = 14.40 Mpa
In steel = 300.0 Mpa Stress in Steel at CG = 132.83 Mpa
s sc = is the stress in the tension reinforcement assuming a cracked section ( stress increased) = 220.91 Mpa
A c.eff = is the effective area of concrete in tension surrounding the reinforcement = 167142.9 mm2
of depth h c.eff , where h c.eff is the lesser of following
b = 300 mm
1 One third of the tension zone depth of the cracked section,(h-x)/3, h = 1800 mm
with x negative when whole section is in tension d = 1432 mm
x = 129 mm
2 half of section depth,h/2, or
3 2.5*(h-d)
f ct.eff = is the mean value of the tensile strength of the concrete effective at the = 3.000 Mpa
time when the cracks may first be expected to occur f ct.eff = f ctm
383
Design Check for Longitudinal Girder at 7.125 m
Design BM at Midspan due to Selfweight of girder = 389.69 Kn-M
Design BM at Midspan due to Deck Slab & Cross Girder = 712.86 Kn-M
Design BM at Midspan due to Deck Slab&Cross Girder (green concrete)+shuttering = 628.74 Kn-M
Design BM at Midspan due to SIDL = 350.000 Kn-M
Design BM at Midspan due to Live Load = 1200.00 Kn-M
Service stage moment = 1445.00 Kn-M
7.1.4 STRESS CHECK FOR PRECAST RCC GIRDER WITH RCC SLAB
(DL+SIDL+ Live load)
W
2
Layer Dia of Bar No.of Bars CGfrom bot. Area of beam above neutral axis = 607500 mm
1st 25 5 69 mm CG of beam above neutral axis = 125 mm
2nd 25 5 119 mm
3rd 25 5 169 mm Comparing moment of area about neutral axis
4th 25 5 219 mm W*T+WTF*T1*(N-T1*0.5)+WTF*T2*(N-2*T2*2/3)+(N-T1-T2)^2/2*WW
5th 25 0 269 mm = m*Ast*(d-N)
6th 25 0 319 mm
4
7th 25 0 369 mm Cracked Moment of Inertia = 1.02E+11 mm
Total 20 144 mm
2
Area of bottom steel = 9817 mm
3
Cover = 40 mm Top Section Modulus at top of deck ZT = 4.32E+08 mm
Dia of shear stirrup = 16 mm
3
Grade of Concrete = M30 Bottom Section Modulus ZB = 8.58E+07 mm
Reinforcement = Fe500
Permissible stresses Stress in concrete at top of deck slab = 2.78 Mpa
In concrete = 14.40 Mpa
In steel = 300.00 Mpa Stress in concrete at girder top = 1.61 Mpa
384
Stress Due to Differential Shrinkage
Rise Fall
Flexural concrete Stress at Concrete (Top of DEck) due to temperature = 392.7 -95.9
Flexural concrete Stress at Concrete (Top of beam) due to temperature = -111.2 55.5
Stress at Steel (Bottom of beam) due to temperature = 169.3 -115.8
385
Summary of stresses including temperature case
DL DL Differential
DL+SIDL+LL SIDL LL Temp RISE Temp Fall
Shrinkage Final Stresses
Crack width checking during SLS condition under Quasi-permanent Load combination IRC-112 Clause-12.3.4
2
Layer Dia of Bar No.of Bars CGfrom bot. Area of beam above neutral axis = 607500 mm
1st 25 5 69 mm CG of beam above neutral axis = 0.0 mm
2nd 25 5 119 mm
3rd 25 5 169 mm Comparing moment of area about neutral axis
4th 25 5 219 mm W*T+WTF*T1*(N-T1*0.5)+WTF*T2*(N-2*T2*2/3)+(N-T1-T2)^2/2*WW
5th 25 0 269 mm = m*Ast*(d-N)
6th 25 0 319 mm
4
7th 25 0 369 mm Cracked Moment of Inertia = 1.13E+11 mm
Total 20 144 mm
2
Area of bottom steel = 9817 mm
3
Cover = 40 mm Top Section Modulus at top of deck ZT = 1.00E+09 mm
Dia of shear stirrup = 16 mm
3
Grade of Concrete = M30 Bottom Section Modulus ZB = 8.55E+07 mm
Reinforcement = 500
Permissible stresses Stress in concrete at top of deck slab = 1.05 Mpa
In concrete = 14.40 Mpa
In steel = 300.0 Mpa Stress in Steel at CG = 122.59 Mpa
386
Maximum crack width
s sc = is the stress in the tension reinforcement assuming a cracked section = 203.89 Mpa
A c.eff = is the effective area of concrete in tension surrounding the reinforcement = 167142.86 mm2
of depth h c.eff , where h c.eff is the lesser of following
b = 300 mm
1 One third of the tension zone depth of the cracked section,(h-x)/3, h = 1800 mm
with x negative when whole section is in tension d = 1432 mm
x = 129 mm
2 half of section depth,h/2, or
3 2.5*(h-d)
f ct.eff = is the mean value of the tensile strength of the concrete effective at the = 3.000 Mpa
time when the cracks may first be expected to occur f ct.eff = f ctm
387
Design Check for Longitudinal Girder at 4.750 m
Design BM at Midspan due to Selfweight of girder = 311.53 Kn-M
Design BM at Midspan due to Deck Slab & Cross Girder = 570.08 Kn-M
Design BM at Midspan due to Deck Slab&Cross Girder (green concrete)+shuttering = 502.81 Kn-M
Design BM at Midspan due to SIDL = 294.000 Kn-M
Design BM at Midspan due to Live Load = 1005.00 Kn-M
Service stage moment = 1240.50 Kn-M
7.1.4 STRESS CHECK FOR PRECAST RCC GIRDER WITH RCC SLAB
(DL+SIDL+ Live load)
W
2
Layer Dia of Bar No.of Bars CGfrom bot. Area of beam above neutral axis = 607500 mm
1st 25 5 69 mm CG of beam above neutral axis = 97 mm
2nd 25 5 119 mm
3rd 25 5 169 mm Comparing moment of area about neutral axis
4th 25 0 219 mm W*T+WTF*T1*(N-T1*0.5)+WTF*T2*(N-2*T2*2/3)+(N-T1-T2)^2/2*WW
5th 25 0 269 mm = m*Ast*(d-N)
6th 25 0 319 mm
4
7th 25 0 369 mm Cracked Moment of Inertia = 8.22E+10 mm
Total 15 119 mm
2
Area of bottom steel = 7363 mm
3
Cover = 40 mm Top Section Modulus at top of deck ZT = 3.92E+08 mm
Dia of shear stirrup = 16 mm
3
Grade of Concrete = M30 Bottom Section Modulus ZB = 6.60E+07 mm
Reinforcement = Fe500
Permissible stresses Stress in concrete at top of deck slab = 2.57 Mpa
In concrete = 14.40 Mpa
In steel = 300.00 Mpa Stress in concrete at girder top = 1.67 Mpa
388
Age of precast girder at the time of casting of deck slab = 28 days
Age of deck slab = 0 days
Differential shrinkage coeffi 2.00E-04 - 2.00E-04 = 0.00000
Reduction Factor = 0.43
Modulus of elasticity of concrete = 3050000.00 t/m2
Force due to Differntial shrinkage(P) = (0*0.43*3050000*2700*225)
= 0.00 ton
Tensile stress in deck slab = 0.00 t/m2
Eccentricity(e) = ((1575+225*0.5)/1000-1.0922)
= 0.60 m
Moment due to above force = 0.00 tm
Stress due to Loads & Moments
Stress at top of slab = 0.00 t/m2 Compression
Stress at top of girder = 0.000 t/m2 Compression
Stress at bottom = 0.00 t/m2 Tension
Final Stress due to differential shrinkage
Stress at top of slab = 0.00 t/m2 Tension
Stress at bottom of slab = 0.00 t/m2 Tension
Stress at top of girder = 0.00 t/m2 Compression
Stress at bottom of girder = 0.00 t/m2 Tension
Final Stress in concrete and steel
Stress in concrete at top of slab = 0.92 Mpa = 91.55553 t/m2
Stress in concrete at top of girder = 8.86 Mpa = 885.9943 t/m2
Stress in Steel at CG = 107.06 Mpa = 10706.48 t/m2
Stress in Steel at bottom fibre = 118.71 Mpa = 11870.72 t/m2
Rise Fall
Flexural concrete Stress at Concrete (Top of DEck) due to temperature = 392.7 -95.9
Flexural concrete Stress at Concrete (Top of beam) due to temperature = -111.2 55.5
Stress at Steel (Bottom of beam) due to temperature = 169.3 -115.8
Deck slab +
DL Differential
Shuttering DL+SIDL+LL SIDL LL Temp RISE Temp Fall
Shrinkage Final Stresses
389
Crack width checking during SLS condition under Quasi-permanent Load combination IRC-112 Clause-12.3.4
2
Area of bottom steel = 7363 mm
3
Cover = 40 mm Top Section Modulus at top of deck ZT = 3.92E+08 mm
Dia of shear stirrup = 16 mm
3
Grade of Concrete = M30 Bottom Section Modulus ZB = 6.60E+07 mm
Reinforcement = 500
Permissible stresses Stress in concrete at top of deck slab = 2.18 Mpa
In concrete = 14.40 Mpa
In steel = 300.0 Mpa Stress in Steel at CG = 129.69 Mpa
s sc = is the stress in the tension reinforcement assuming a cracked section = 213.03 Mpa
A c.eff = is the effective area of concrete in tension surrounding the reinforcement = 156003.07 mm2
of depth h c.eff , where h c.eff is the lesser of following
b = 300 mm
1 One third of the tension zone depth of the cracked section,(h-x)/3, h = 1800 mm
with x negative when whole section is in tension d = 1457 mm
x = 240 mm
2 half of section depth,h/2, or
3 2.5*(h-d)
f ct.eff = is the mean value of the tensile strength of the concrete effective at the = 3.000 Mpa
time when the cracks may first be expected to occur f ct.eff = f ctm
390
Design Check for Longitudinal Girder at 2.375 m
Design BM at Midspan due to Selfweight of girder = 193.17 Kn-M
Design BM at Midspan due to Deck Slab & Cross Girder = 352.90 Kn-M
Design BM at Midspan due to Deck Slab&Cross Girder (green concrete)+shuttering = 311.26 Kn-M
Design BM at Midspan due to SIDL = 208.800 Kn-M
Design BM at Midspan due to Live Load = 700.00 Kn-M
Service stage moment = 840.70 Kn-M
7.1.4 STRESS CHECK FOR PRECAST RCC GIRDER WITH RCC SLAB
(DL+SIDL+ Live load)
W
2
Layer Dia of Bar No.of Bars CGfrom bot. Area of beam above neutral axis = 742500 mm
1st 25 5 69 mm CG of beam above neutral axis = 191 mm
2nd 25 5 119 mm
3rd 25 5 169 mm Comparing moment of area about neutral axis
4th 25 0 219 mm W*T+WTF*T1*(N-T1*0.5)+WTF*T2*(N-2*T2*2/3)+(N-T1-T2)^2/2*WW
5th 25 0 269 mm = m*Ast*(d-N)
6th 25 0 319 mm
4
7th 25 0 369 mm Cracked Moment of Inertia = 9.27E+10 mm
Total 15 119 mm
2
Area of bottom steel = 7363 mm
3
Cover = 40 mm Top Section Modulus at top of deck ZT = 2.79E+08 mm
Dia of shear stirrup = 16 mm
3
Grade of Concrete = M30 Bottom Section Modulus ZB = 8.25E+07 mm
Reinforcement = Fe500
Permissible stresses Stress in concrete at top of deck slab = 2.51 Mpa
In concrete = 14.40 Mpa
In steel = 300.00 Mpa Stress in concrete at girder top = 1.07 Mpa
391
Stress Due to Differential Shrinkage
Rise Fall
Flexural concrete Stress at Concrete (Top of DEck) due to temperature = 392.7 -95.9
Flexural concrete Stress at Concrete (Top of beam) due to temperature = -111.2 55.5
Stress at Steel (Bottom of beam) due to temperature = 169.3 -115.8
Deck slab +
DL Differential
Shuttering DL+SIDL+LL SIDL LL Temp RISE Temp Fall
Shrinkage Final Stresses
392
Crack width checking during SLS condition under Quasi-permanent Load combination IRC-112 Clause-12.3.4
2
Area of bottom steel = 7363 mm
3
Cover = 40 mm Top Section Modulus at top of deck ZT = 3.92E+08 mm
Dia of shear stirrup = 16 mm
3
Grade of Concrete = M30 Bottom Section Modulus ZB = 6.60E+07 mm
Reinforcement = 500
Permissible stresses Stress in concrete at top of deck slab = 1.43 Mpa
In concrete = 14.40 Mpa
In steel = 300.0 Mpa Stress in Steel at CG = 85.16 Mpa
s sc = is the stress in the tension reinforcement assuming a cracked section = 93.25 Mpa
A c.eff = is the effective area of concrete in tension surrounding the reinforcement = 156003.07 mm2
of depth h c.eff , where h c.eff is the lesser of following
b = 300 mm
1 One third of the tension zone depth of the cracked section,(h-x)/3, h = 1800 mm
with x negative when whole section is in tension d = 1457 mm
x = 240 mm
2 half of section depth,h/2, or
3 2.5*(h-d)
f ct.eff = is the mean value of the tensile strength of the concrete effective at the = 3.000 Mpa
time when the cracks may first be expected to occur f ct.eff = f ctm
393
Creep coefficient for Girder
fck = 30 Mpa
fcm = 40 Mpa
t (70years) = 25550 days
to = 365 days
Ac = cross-sectional area in mm2 = 1155000 mm2 Outer Girder - Mid Span
u = perimeter in contact with atmosphere in mm = 8295 mm Outer Girder - Mid Span
ho = notional size = 2Ac/u = 278 mm
RH = 50.00 %
Φ(t,to) = fo bc (t,to)
ΦRH = 1 - RH/100
1 + for fcm ≤ 45Mpa
0.1 (ho) (1/3)
1 - RH/100
[1 + a1 ] x a2 for fcm > 45Mpa
0.1 (ho) (1/3)
0.7
α1 = [ 43.75 / fcm ] = 1.06474
0.2
α2 = [ 43.75 / fcm ] = 1.01808
ΦRH = 1.77
β (to) = 0.30
β (fcm) = 2.97
Φo = 1.56
α3 = 1.046
βH = 667.76
Φ (t,to) = 1.55
394
12.0 CHECK FOR DEFLECTION:
Deflection checking during SLS condition under Frequent Load combination
(As per Cl:12.4 of IRC:112-2011)
As per Cl:12.4.2 of IRC 112-2011: cracking moment considered as
i) 70% of uncracked moment of inertia in DL & SIDL analysis
ii) 100% of uncracked moment of inertia in LL analysis
395
Input File
STAAD FLOOR
START JOB INFORMATION
ENGINEER DATE 22-Jul-06
END JOB INFORMATION
INPUT WIDTH 79
***********************************************
* STAAD.Pro Generated Comment *
***********************************************
*1 0 0 0 5 1 0 0
*6 1.6 0 0 7 2.2 0 0
*8 3.61 0 0 17 16.3 0 0
*18 16.9 0 0 19 17.5 0 0
*20 17.75 0 0 23 18.5 0 0
*R A 1 0.000 0 1.2
*R 2 0.000 0 3
*R 1 0.000 0 1.2
***********************************************
UNIT METER MTON
JOINT COORDINATES
1 0 0 0; 2 0.25 0 0; 3 0.5 0 0; 4 0.75 0 0; 5 1 0 0; 6 1.6 0 0; 7 2.2 0 0;
8 3.61 0 0; 9 5.02 0 0; 10 6.43 0 0; 11 7.84 0 0; 12 9.25 0 0; 13 10.66 0 0;
14 12.07 0 0; 15 13.48 0 0; 16 14.89 0 0; 17 16.3 0 0; 18 16.9 0 0;
19 17.5 0 0; 20 17.75 0 0; 21 18 0 0; 22 18.25 0 0; 23 18.5 0 0; 24 0 0 1.2;
25 0.25 0 1.2; 26 0.5 0 1.2; 27 0.75 0 1.2; 28 1 0 1.2; 29 1.6 0 1.2;
30 2.2 0 1.2; 31 3.61 0 1.2; 32 5.02 0 1.2; 33 6.43 0 1.2; 34 7.84 0 1.2;
35 9.25 0 1.2; 36 10.66 0 1.2; 37 12.07 0 1.2; 38 13.48 0 1.2; 39 14.89 0 1.2;
40 16.3 0 1.2; 41 16.9 0 1.2; 42 17.5 0 1.2; 43 17.75 0 1.2; 44 18 0 1.2;
45 18.25 0 1.2; 46 18.5 0 1.2; 47 0 0 4.2; 48 0.25 0 4.2; 49 0.5 0 4.2;
50 0.75 0 4.2; 51 1 0 4.2; 52 1.6 0 4.2; 53 2.2 0 4.2; 54 3.61 0 4.2;
55 5.02 0 4.2; 56 6.43 0 4.2; 57 7.84 0 4.2; 58 9.25 0 4.2; 59 10.66 0 4.2;
60 12.07 0 4.2; 61 13.48 0 4.2; 62 14.89 0 4.2; 63 16.3 0 4.2; 64 16.9 0 4.2;
65 17.5 0 4.2; 66 17.75 0 4.2; 67 18 0 4.2; 68 18.25 0 4.2; 69 18.5 0 4.2;
70 0 0 7.2; 71 0.25 0 7.2; 72 0.5 0 7.2; 73 0.75 0 7.2; 74 1 0 7.2;
75 1.6 0 7.2; 76 2.2 0 7.2; 77 3.61 0 7.2; 78 5.02 0 7.2; 79 6.43 0 7.2;
80 7.84 0 7.2; 81 9.25 0 7.2; 82 10.66 0 7.2; 83 12.07 0 7.2; 84 13.48 0 7.2;
85 14.89 0 7.2; 86 16.3 0 7.2; 87 16.9 0 7.2; 88 17.5 0 7.2; 89 17.75 0 7.2;
90 18 0 7.2; 91 18.25 0 7.2; 92 18.5 0 7.2; 93 0 0 8.4; 94 0.25 0 8.4;
95 0.5 0 8.4; 96 0.75 0 8.4; 97 1 0 8.4; 98 1.6 0 8.4; 99 2.2 0 8.4;
100 3.61 0 8.4; 101 5.02 0 8.4; 102 6.43 0 8.4; 103 7.84 0 8.4; 104 9.25 0 8.4;
105 10.66 0 8.4; 106 12.07 0 8.4; 107 13.48 0 8.4; 108 14.89 0 8.4;
109 16.3 0 8.4; 110 16.9 0 8.4; 111 17.5 0 8.4; 112 17.75 0 8.4; 113 18 0 8.4;
114 18.25 0 8.4; 115 18.5 0 8.4; 116 0 0 2.7; 117 0 0 5.7; 118 18.5 0 2.7;
119 18.5 0 5.7;
***********************************************
* STAAD.Pro Generated Comment *
***********************************************
*1 1 2 22
*R A 4 22 23
*111 1 24 133
*142 25 48 162
*163 48 71 183
*184 70 93 206
************************************************
396
MEMBER INCIDENCES
1 1 2; 2 2 3; 3 3 4; 4 4 5; 5 5 6; 6 6 7; 7 7 8; 8 8 9; 9 9 10; 10 10 11;
11 11 12; 12 12 13; 13 13 14; 14 14 15; 15 15 16; 16 16 17; 17 17 18; 18 18 19;
19 19 20; 20 20 21; 21 21 22; 22 22 23; 23 24 25; 24 25 26; 25 26 27; 26 27 28;
27 28 29; 28 29 30; 29 30 31; 30 31 32; 31 32 33; 32 33 34; 33 34 35; 34 35 36;
35 36 37; 36 37 38; 37 38 39; 38 39 40; 39 40 41; 40 41 42; 41 42 43; 42 43 44;
43 44 45; 44 45 46; 45 47 48; 46 48 49; 47 49 50; 48 50 51; 49 51 52; 50 52 53;
51 53 54; 52 54 55; 53 55 56; 54 56 57; 55 57 58; 56 58 59; 57 59 60; 58 60 61;
59 61 62; 60 62 63; 61 63 64; 62 64 65; 63 65 66; 64 66 67; 65 67 68; 66 68 69;
67 70 71; 68 71 72; 69 72 73; 70 73 74; 71 74 75; 72 75 76; 73 76 77; 74 77 78;
75 78 79; 76 79 80; 77 80 81; 78 81 82; 79 82 83; 80 83 84; 81 84 85; 82 85 86;
83 86 87; 84 87 88; 85 88 89; 86 89 90; 87 90 91; 88 91 92; 89 93 94; 90 94 95;
91 95 96; 92 96 97; 93 97 98; 94 98 99; 95 99 100; 96 100 101; 97 101 102;
98 102 103; 99 103 104; 100 104 105; 101 105 106; 102 106 107; 103 107 108;
104 108 109; 105 109 110; 106 110 111; 107 111 112; 108 112 113; 109 113 114;
110 114 115; 111 1 24; 112 2 25; 113 3 26; 114 4 27; 115 5 28; 116 6 29;
117 7 30; 118 8 31; 119 9 32; 120 10 33; 121 11 34; 122 12 35; 123 13 36;
124 14 37; 125 15 38; 126 16 39; 127 17 40; 128 18 41; 129 19 42; 130 20 43;
131 21 44; 132 22 45; 133 23 46; 134 24 116; 135 116 47; 136 47 117;
137 117 70; 138 46 118; 139 118 69; 140 69 119; 141 119 92; 142 25 48;
143 26 49; 144 27 50; 145 28 51; 146 29 52; 147 30 53; 148 31 54; 149 32 55;
150 33 56; 151 34 57; 152 35 58; 153 36 59; 154 37 60; 155 38 61; 156 39 62;
157 40 63; 158 41 64; 159 42 65; 160 43 66; 161 44 67; 162 45 68; 163 48 71;
164 49 72; 165 50 73; 166 51 74; 167 52 75; 168 53 76; 169 54 77; 170 55 78;
171 56 79; 172 57 80; 173 58 81; 174 59 82; 175 60 83; 176 61 84; 177 62 85;
178 63 86; 179 64 87; 180 65 88; 181 66 89; 182 67 90; 183 68 91; 184 70 93;
185 71 94; 186 72 95; 187 73 96; 188 74 97; 189 75 98; 190 76 99; 191 77 100;
192 78 101; 193 79 102; 194 80 103; 195 81 104; 196 82 105; 197 83 106;
198 84 107; 199 85 108; 200 86 109; 201 87 110; 202 88 111; 203 89 112;
204 90 113; 205 91 114; 206 92 115;
MEMBER PROPERTY AMERICAN
******outer support
23 TO 26 41 TO 44 PRIS AX 1.4288 IX 0.085 IY 0.379 IZ 0.342
67 TO 70 85 TO 88 PRIS AX 1.4288 IX 0.085 IY 0.379 IZ 0.342
****outer varying
27 28 39 40 PRIS AX 1.2919 IX 0.051 IY 0.371 IZ 0.323
71 72 83 84 PRIS AX 1.2919 IX 0.051 IY 0.371 IZ 0.323
********outer mid******
29 TO 38 73 TO 82 PRIS AX 1.155 IX 0.018 IY 0.362 IZ 0.304
******inner support****
45 TO 48 63 TO 66 PRIS AX 1.4963 IX 0.086 IY 0.505 IZ 0.3552
******inner varying
49 50 61 62 PRIS AX 1.3594 IX 0.052 IY 0.497 IZ 0.3346
******inner mid***********
51 TO 60 PRIS AX 1.2225 IX 0.018 IY 0.490 IZ 0.3141
********end cross girder******
134 TO 137 PRIS AX 0.647 IX 0.025 IY 0.024 IZ 0.103
138 TO 141 PRIS AX 0.647 IX 0.025 IY 0.024 IZ 0.103
***********nul********
1 TO 22 89 TO 110 PRIS YD 0.01 ZD 0.01
397
********slab properties*******
111 133 184 206 PRIS AX 0.02813 IX 7e-005 IY 4e-005 IZ 0.00012
112 TO 114 130 TO 132 PRIS AX 0.05625 IX 0.00047 IY 0.00029 IZ 0.00024
163 TO 165 181 TO 183 PRIS AX 0.05625 IX 0.00047 IY 0.00029 IZ 0.00024
142 TO 144 160 TO 162 PRIS AX 0.05625 IX 0.00047 IY 0.00029 IZ 0.00024
185 TO 187 203 TO 205 PRIS AX 0.05625 IX 0.00047 IY 0.00029 IZ 0.00024
115 129 PRIS AX 0.09563 IX 0.00081 IY 0.00144 IZ 0.0004
166 180 PRIS AX 0.09563 IX 0.00081 IY 0.00144 IZ 0.0004
145 159 PRIS AX 0.09563 IX 0.00081 IY 0.00144 IZ 0.0004
188 202 PRIS AX 0.09563 IX 0.00081 IY 0.00144 IZ 0.0004
116 117 127 128 PRIS AX 0.22613 IX 0.00191 IY 0.01903 IZ 0.00095
167 168 178 179 PRIS AX 0.22613 IX 0.00191 IY 0.01903 IZ 0.00095
146 147 157 158 PRIS AX 0.22613 IX 0.00191 IY 0.01903 IZ 0.00095
189 190 200 201 PRIS AX 0.22613 IX 0.00191 IY 0.01903 IZ 0.00095
118 TO 126 PRIS AX 0.31725 IX 0.00268 IY 0.05256 IZ 0.00134
169 TO 177 PRIS AX 0.31725 IX 0.00268 IY 0.05256 IZ 0.00134
148 TO 156 PRIS AX 0.31725 IX 0.00268 IY 0.05256 IZ 0.00134
191 TO 199 PRIS AX 0.31725 IX 0.00268 IY 0.05256 IZ 0.00134
************************
SUPPORTS
24 PINNED
47 70 FIXED BUT FZ MX MY MZ
46 FIXED BUT FX MX MY MZ
69 92 FIXED BUT FX FZ MX MY MZ
DEFINE MATERIAL START
ISOTROPIC MATERIAL1
E 3.05e+006
POISSON 0.17
END DEFINE MATERIAL
CONSTANTS
MATERIAL MATERIAL1 ALL
*********************************
DEFINE MOVING LOAD
TYPE 1 LOAD 3.4 3.4 3.4 3.4 5.7 5.7 1.35 1.35
DIST 3 3 3 4.3 1.2 3.2 1.1 WID 1.8
TYPE 2 LOAD 1.35 1.35 5.7 5.7 3.4 3.4 3.4 3.4
DIST 1.1 3.2 1.2 4.3 3 3 3 WID 1.8
TYPE 3 LOAD 8.5 8.5 8.5 8.5 6 6 4
DIST 1.37 3.05 1.37 2.13 1.52 3.96 WID 1.93
TYPE 4 LOAD 4 6 6 8.5 8.5 8.5 8.5
DIST 3.96 1.52 2.13 1.37 3.05 1.37 WID 1.93
TYPE 5 LOAD 3.5 7 7 7 7 3.5
DIST 0.914 0.914 0.914 0.914 0.914 WID 2.06
*************************************
398
LOAD 1 WEIGHT OF SLAB AND BEAMS
MEMBER LOAD
* GIRDER LOADS
23 TO 26 41 TO 44 UNI GY -1.907
67 TO 70 85 TO 88 UNI GY -1.907
27 28 39 40 UNI GY -1.576
71 72 83 84 UNI GY -1.576
29 TO 38 73 TO 82 UNI GY -1.244
* INTERNAL GIRDERS
45 TO 48 63 TO 66 UNI GY -1.907
49 50 61 62 UNI GY -1.576
51 TO 60 UNI GY -1.244
* DIAPHRAGM LOADS
134 TO 137 UNI GY -1.027
138 TO 141 UNI GY -1.027
LOAD 2 SLAB LOADS
MEMBER LOAD
* SLAB LOADS
134 TO 137 UNI GY -0.338
138 TO 141 UNI GY -0.338
111 133 184 206 UNI GY -0.068
112 TO 114 130 TO 132 UNI GY -0.135
163 TO 165 181 TO 183 UNI GY -0.135
142 TO 144 160 TO 162 UNI GY -0.135
185 TO 187 203 TO 205 UNI GY -0.135
115 129 UNI GY -0.23
166 180 UNI GY -0.23
145 159 UNI GY -0.23
188 202 UNI GY -0.23
116 128 UNI GY -0.324
167 179 UNI GY -0.324
146 158 UNI GY -0.324
189 201 UNI GY -0.324
117 127 UNI GY -0.543
168 178 UNI GY -0.543
147 157 UNI GY -0.543
190 200 UNI GY -0.543
118 TO 126 UNI GY -0.761
169 TO 177 UNI GY -0.761
148 TO 156 UNI GY -0.761
191 TO 199 UNI GY -0.761
LOAD 3 WEIGHT OF CRASH BARRIER AND HANDRAIL
MEMBER LOAD
111 133 CON GY -0.084 0.225
184 206 CON GY -0.084 0.975
112 TO 114 CON GY -0.168 0.225
185 TO 187 CON GY -0.168 0.975
130 TO 132 CON GY -0.168 0.225
203 TO 205 CON GY -0.168 0.975
115 129 CON GY -0.285 0.225
188 202 CON GY -0.285 0.975
116 CON GY -0.402 0.225
117 CON GY -0.673 0.225
189 CON GY -0.402 0.975
190 CON GY -0.673 0.975
128 CON GY -0.402 0.225
127 CON GY -0.673 0.225
200 CON GY -0.673 0.975
201 CON GY -0.402 0.975
118 TO 126 CON GY -0.945 0.225
191 TO 199 CON GY -0.945 0.975
399
** Load for hand rail
*111 133 CON GY -0 0
*184 206 CON GY -0 0
*112 TO 114 CON GY -0 0
*185 TO 187 CON GY -0 0
*130 TO 132 CON GY -0 0
*203 TO 205 CON GY -0 0
*115 129 CON GY -0 0
*188 202 CON GY -0 0
*116 CON GY -0 0
*117 CON GY -0 0
*189 190 CON GY -0 0
*128 CON GY -0 0
*127 CON GY -0 0
*200 201 CON GY -0 0
*118 TO 126 CON GY -0 0
*191 TO 199 CON GY -0 0
LOAD 4 WEARING COAT LOADS AND FOOTPATH DL
MEMBER LOAD
* WEARING COAT ON ALL MEMBERS
134 TO 137 UNI GY -0.089
138 TO 141 UNI GY -0.089
115 129 UNI GY -0.061 0.45 1.2
166 180 UNI GY -0.061 0 3
145 159 UNI GY -0.061 0 3
188 202 UNI GY -0.061 0 0.75
116 UNI GY -0.144 0.45 1.2
117 UNI GY -0.144 0.45 1.2
167 179 UNI GY -0.086 0 3
168 178 UNI GY -0.144 0 3
146 158 UNI GY -0.086 0 3
189 UNI GY -0.086 0 0.75
190 UNI GY -0.144 0 0.75
127 UNI GY -0.144 0.45 1.2
128 UNI GY -0.144 0.45 1.2
147 157 UNI GY -0.144 0 3
200 UNI GY -0.144 0 0.75
201 UNI GY -0.086 0 0.75
118 TO 126 UNI GY -0.202 0.45 1.2
169 TO 177 UNI GY -0.202 0 3
148 TO 156 UNI GY -0.202 0 3
191 TO 199 UNI GY -0.202 0 0.75
***************************************
*LOAD COMBINATION 100
*1 1.0 2 1.0
*************************************
*LOAD GENERATION 300
*TYPE 3 -13.4 0 4.01 XINC 0.2
***************** 1 L CLASS A *********
******************** 0.45+0.15+0.5/2+1.8 = 2.65
*LOAD GENERATION 300
*TYPE 1 -18.80 0 2.65 XINC 0.2
******INNER GIRDER
*LOAD GENERATION 300
*TYPE 3 -13.4 0 4.2 XINC 0.2
PERFORM ANALYSIS
FINISH
400
13.0 CURTAILMENT DETAILS OF REINFORCEMENT:
Curtailment of reinforcement shall be done as per fig 16.2 of IRC 112:2011
Summary of shear for find the shift of the tensile force diagram
Web
Compon 1/8th 1/4th 3/8th
Load Case Support widenin Mid span
ents span span span
g end
BM in
843.6 1680.6 2240.7 3249.2 3802.4 4049.6
Design Forces Knm
SF in Kn 1010.3 820.4 687.3 572.5 484.3 198.5
401
End Cross Girder (at abutment )
402
End Cross Girder
BM diagram
SF Diagram
403
Concrete M 30
Charactristic strength in concrete, fck = 30 Mpa
1.5 For Basic and Seismic combination
1.2 For Accidental combination
Bottom reinforcement
As ≥ Mγs/fyk*z
624 mm2/m
1570.8 mm2/m ok
404
Design of Hogging Moment
Top reinforcement
As ≥ Mγs/fyk*z
1219 mm2/m
0.1 % of web area on either face with spacing not more then 450 mm.
405
Check for Shear strength:-
Design verification for shear is carried out at ultimate limit state
VRd.c = The design shear resistance of the member without shear reinforcement.
VΕd = The design shear force at a cross-section resulting from external loading
Vрd = Shear component in prestressing tendon.
406
Calculation of Vertical Shear Reinforcement
For members with vertical Shear Reinforcement, Shear resistance, V Rd is the smaller value of:
ok
pw = Asw/b.s.sinα
0.025
I = As.(d-dc)^2+1/3*Eceff/Es*bdc^3
2.34E+09
Now the service moment MED = 41.84 T-m
407
Crack width calculation at mid span
408
Intermediate Cross Girder
409
End Cross Girder
+ bottom
Item BM (t-m) SF (t)
+ -
1.00 1.35 DL 2.21 0 2.97
1.00 1.35 SIDL(CB) 0 -18.13 5.677
1.00 1.75 SIDL(WC) 2.98 0 0.77
1.00 1.5 LL 24 -14.4 10
1.00 1.5 CLA 19.36 -15.2 7
1.00 1 SV 0 0
410
Concrete M 30
Charactristic strength in concrete, fck = 30 Mpa
1.5 For Basic and Seismic combination
1.2 For Accidental combination
Bottom reinforcement
As ≥ Mγs/fyk*z
1577 mm2/m
2199.1 mm2/m ok
411
Design of Hogging Moment
Top reinforcement
As ≥ Mγs/fyk*z
1308 mm2/m
0.1 % of web area on either face with spacing not more then 450 mm.
412
Check for Shear strength:-
Design verification for shear is carried out at ultimate limit state
VRd.c = The design shear resistance of the member without shear reinforcement.
VΕd = The design shear force at a cross-section resulting from external loading
Vрd = Shear component in prestressing tendon.
413
Calculation of Vertical Shear Reinforcement
For members with vertical Shear Reinforcement, Shear resistance, V Rd is the smaller value of:
ok
pw = Asw/b.s.sinα
0.048
I = As.(d-dc)^2+1/3*Eceff/Es*bdc^3
1.72E+09
Now the service moment MED = 44.1985 T-m
414
Crack width calculation at mid span
415
BEARING DESIGN
416
Over all span (center to center of Exp joint) 20.00 m
Effective span (center to center brg) 18.50 m
No. of bearings for one span 6 nos.
Seismic Zone IV
Zone factor 'Z' 0.24
Sa/g 2.50
R (Trans) 1.00
R (Long) 3.00
I 1.20
Hor seismic coefficient trans (0.24/2)*2.5*1.2/1 0.360 refer seismic coe. Calculation
Hor seismic coefficient long 0.120
Vertical Seismic Coeff. 0.36*2/3 0.24
1.1 Load Data
1.1.1 Loads
Braking Force (1000*0.2+554*0.05)*1.5 341.6 kN
VMAX HL HT
Dead Load 318 KN
SIDL (wc+c/b) 106 KN
Live Load 481 KN
Fh/2+Vr*Ltc 37.37 KN
Seismic vert -102 KN
Seismic Long 51 KN
Seismic trans 187 KN
LOAD FACTORS
NORMAL 1 SEISMIC L SEISMIC T
DL 1.35 1.35 1.35
SIDL (avg of
1.55 1.55 1.55
1.35 + 1.75)
FACTORED LOADS
V HL HT
COMB1 1315.15535 56.0536875 0
COMB2 644.06281 83.794725 84.27321
COMB3 644.06281 30.370095 280.9107
1.1.2 Translation
For values moment/force tabulated below refer design of superstructure sheet.
Loads Basic Accidental Seismic
Permanent Loads
DL 1.35 1 1
1.35
SIDL except Surfacing 1 1
SIDL - Surfacing1.75 1 1
Variable Loads
Leading Load 1.5 0.75 0
1.15
Accompanying Load 0.2 0.2
1.35
Construction Live Load 1 1
417
shrinkage 1.91E-04 * 18.50 */2 = 0.002 m
Temp 32.50 * 18.50 */2 * 1.20E-05 = 0.004 m
total 0.005 m
5.370 mm
Adopted value as per cl 5.2.3 of IRC:83 PART II (2011) =MAX(0.00537*1000,10) 10.00mm
1.1.3 Rotation Permissible longitudinal movement =
E= 32000 mpa = 9.00E+08 mm4
R for permanent loads 400*1946*18.5/(32000/2*900000000)*0.001*1000000000 0.0010 rad
R for Live loads 400*2903*18.5/(32000*900000000)*0.001*1000000000 0.0007 rad.
Total Normal 0.0017 rad
Total Seismic =0.00100003+0.0007459*.2 0.0011 rad.
Adopted value of rotation as per cl 5.2.3 of IRC:83 PART II (2011)
Normal case =MAX(0.00174593,.003) 0.0030 rad.
Seismic case =MAX(0.00114921,.003) 0.0030 rad.
418
1.3 DESIGN OF BEARING
Overall width of the bearing a 300 mm a' 290 mm
Overall length of the bearing b 400 mm b' 390 mm
Overall height of bearing h0 72 mm A1 113100 mm2
Thickness of internal layer ti 12 mm Ip 1360 mm
Total thickness of elastomer h/Te 48 mm
Thickness of steel laminates hs 6 mm
No of steel laminates n 4
Thickness of outer layer of elastomer he 6 mm
Side cover c 5 mm
Shear modulus G 1 N/sqmm
Design strain due to angular rotation (εαd) (As per cl 5.2.3.4 of IRC-83 part-II)
εαd (a'2*αad + b'2*αbd)*t1/(2*Σ(t1^3))
αad 0.0030 rad.
αbd 0 rad.
εαd =(290^2*0.003+390^2*0)*12/(2*(4-1)*12^3) 0.292
Total strain =2.61+0.14+0.292 3.042 <7
ok
419
Buckling stability
Fzd/Ar < 2*a'*G*S1/(3*Te)
Te 48 mm
Fzd/Ar =1315.15535*10^3/109200 12.044 Mpa
2*a'*G*S1/(3*Te) =*2*290*1*6.93/(3*48) 27.913 >12.044
ok
Non sliding condition
Fxyd ≤ μe*Fzdmin
Fxyd 56.1 Kn
μe 0.1 + 1.5*Kf/σm
Kf 0.6
Fzdmin 1315.1554 Kn
σm Fzdmin/A1 11.628 N/mm^2
μe =0.1 + 1.5*0.6/11.628 0.177
μe*Fzdmin =0.177*1315.15535 232.7825 >56.0536875
ok
Under permanent loads
σcdmin = Fzdmin/Ar ≥ 3
Fzdmin/Ar =1315.15535*10^3/109200 12.044 >3
ok
1.3.2 SEISMIC CASE
Design strain due to compressive load (εcd) (As per cl 5.2.3.2 of IRC-83 part-II)
εcd = 1.5*Fzd/(G*Ar*S)
Ar = A1*(1-Vxd/a'-Vyd/b')
Vxd (long displacement) 10.00mm
Vyd (*trans displacement ) 0
Ar =113100*(1-10/290-0/390) 109200 mm2
Fzd = vertical design load 644.06281 Kn
εcd =1.5*644.06281*10^3/(1*109200*6.93) 1.28
Design strain due to angular rotation (εαd) (As per cl 5.2.3.4 of IRC-83 part-II)
εαd (a'2*αad + b'2*αbd)*t1/(2*Σ(t1^3))
αad 0.0030 rad
αbd 0 rad
εαd =(290^2*0.003+390^2*0)*12/(2*(4-1)*12^3) 0.292
(290^2*0.003 + 390^2*0)*12/(2*(4-1)*12^3
Total strain =1.28+0.14+0.292 1.712 <7
ok
420
Limiting conditions (As per cl 5.2.3.6 of IRC-83 part-II)
Rotational limitation condition
ΣVzd - (a'*αad + b'*αbd)/(Krd) > 0
ΣVzd Σ(Fzd*t1/A1)*(1/(5*G*S1^2)+1/Eb)
Eb 2000 Mpa
ΣVzd =644.06281*10^3*(4-1)*12/113100*(1/(5*1*6.93^2) + 1/2000) 0.956 mm
Krd 3
ΣVzd - (a'*αad + b'*αbd)/(Krd)
=0.956-(290*0.003+390*0)/3 0.666 >0
ok
Buckling stability
Fzd/Ar < 2*a'*G*S1/(3*Te)
Te 48 mm
Fzd/Ar =644.06281*10^3/109200 5.898 Mpa
2*a'*G*S1/(3*Te) =*2*290*1*6.93/(3*48) 27.913 >5.898
ok
Non sliding condition
Fxyd ≤ μe*Fzdmin
Fxyd =MAX(SQRT(280.9107^2+30.370095^2),SQRT(84.27^2+83.79^2) 118.8 KN
μe 0.1 + 1.5*Kf/σm
Kf 0.6
Fzdmin 644.06281 Kn
σm Fzdmin/A1 =644.06281*10^3/113100 5.695 N/mm^2
μe =0.1 + 1.5*0.6/5.695 0.258
μe*Fzdmin =0.258*644.06281 166.168 >118.842
ok
Under permanent loads
σcdmin = Fzdmin/Ar ≥ 3
Fzdmin/Ar =644.06281*10^3/109200 5.898 >3
ok
421
DETAILED DESIGN REPORT
DRAWINGS
422
GENERAL NOTES:-
A. ALL DIMENSIONS ARE IN MILLIMETERS (MM) AND LEVELS
ARE IN METERS (M),UNLESS OTHERWISE MENTIONED. ONLY
WRITTEN DIMENSIONS SHALL BE FOLLOWED.
B.THIS DRAWING MAY BE RED IN CONJUNCTION WITH NOTES
OF DRG NO 2022-23/GAD/01 AND OTHER CONNECTED
DRAWING.
C.MATERIALS SPECIFICATIONS :-
1.CONCRETE :
A) GRADE OF CONCRETE USED :-
(I) SUPERSTRUCTURE = M30, (II) RETURN WALL = M30, (III)
ABUTMENT & PIER = M30, (IV) ABUTMENT & PIER CAP = M30,
(V) PILE CAP = M30 (VI) PILE = M35 (VII) DIRT WALL = M30,
(VIII) APPROACH SLAB = M30 IX) P.C.C. BELOW APPROACH
SLAB = M15, (X) R.C.C. KERB & RAILING = M30 (XI)
PEDESTAL = M30 (XII) REACTION BLOCK = M30
2) CONCRETE SHALL BE OF DESIGN MIX AND SHALL HAVE TO
P1 P2 P3 P4
A1 ACHIEVE 28 DAYS CHARACTERISTICS STRENGTH ON 150MM
CUBES FOR MODERATE CONDITION OF EXPOSURE.
3) 43 GRADE PORTLAND POZZOLANA CEMENT CONFORMING
TO IS : 1489/1991,PART 1 OR PORTLAND SLAG CEMENT
20000 20000 20000 20000 CONFORMING TO IS. 455 CAPABLE OF ACHIEVING THE
REQUIRED DESIGN CONCRETE STRENGTH SHALL ONLY BE
18500 18500 18500 18500 USED.
4) TO IMPROVE WORKABILITY OF CONCRETE, ADMIXTURES
CONFORMING TO IS : 9103 MAY BE USED SUBJECT TO
. SATISFACTORY PROVEN USE.
5) MAXIMUM WATER CEMENT RATIO SHALL BE AS PER TABLE -
1500
14.2, IRC-112-2011.
ALL REINFORCING STEEL U(II) REINFORCEMENT : SHALL BE
OF HIGH YIELD STRENGTH DEFORMED BARS (GRADE
FINISHED ROAD LEVEL
DESIGNATION Fe 500D) CONFORMING TO IS : 1786 (EXCEPT
FOR MESH REINFORCEMENT WHICH SHALL BE MS BARS
300 GRADE DESIGNATION Fe 240 CONFORMING TO IS : 432 PART
(III) WATER:
1000 1000 1000 1000 BE USED IN CONCRETING AND CURING SHALL WATER TO
CONFORM TO TABLE -14.2, IRC - 112-2011.
1500
RECTANGULAR PIER RECTANGULAR PIER RECTANGULAR PIER RECTANGULAR PIER D.WORKMANSHIP / DETAILING
1. MINIMUM CLEAR COVER FOR SLAB=25MM SUBSTRUCTURE
= 40MM FOUNDATION = 75mm.
2. FOR ENSURING PROPER COVER OF CONCRETE TO
650 3000 650 REINFORCEMENT SPECIALLY MADE POLYMER COVER BLOCKS
4300 SHALL ONLY BE USED.
3. BENDING OF REINFORCEMENT BARS SHALL BE AS PER IS :
2502.
4. LAP LENGTH & DEVELOPMENT LENGTH (LD)OF
REINFORCING BARS SHALL BE DONE IN ACCORDANCE WITH
RELEVANT CLAUSE 15.2.5.1 &15.2.3.3 OF IRC :112-2011
FINISHED 5. PROPER COMPACTION OF CONCRETE SHALL BE ENSURED
LEVEL
BY USE OF FORM VIBRATOR OR NEEDLE VIBRATOR USE OF
(M)
FULL WIDTH SCREED VIBRATOR FOR COMPACTION OF
CONCRETE IN TOP SLAB BE ENSURED.
GROUND
6. SHUTTERING PLATES SHALL SUITABLY BE STIFFENED TO
LEVEL
(M)
ENABLE THE COMPACTION BY FORM VIBRATORS.
7. SHARP EDGES OF CONCRETE SHALL BE CHAMFERED.
8. THE WEEP HOLES SHALL BE WITH 100MM DIA AC PIPE IN
1:20 SLOPE @1M C/C STAGGERED HORIZONTALLY &
A1 P1 A2 VERTICALLY AT SIDE WALL &RETURN WALLS.
9. CONSTRUCTION JOINT SHOULD BE PROVIDED AT
FLOW D/S LOCATION OF ZERO MOMENT AS FAR AS PRACTICABLE &
SHOULD BE PRE-APPROVED BY ENGINEER IN
650 3000 650
CHARGE.CONCRETING NEAR CONSTRUCTION JOINT SHALL
650 650 3000 650 BE DONE AS SPECIFIED IN MORTH/MOST
650
3000 650
3000 650
10. THE SOIL BELOW FOUNDING LEVEL OF RETAINING WALL
3000
SHOULD BE WALL COMPACTION TO ACHIEVE MINIMUM
3500 BEARING CAPACITY OF 15 T/SQM.
11. STRIP SEAL TYPE EXPANSION JOINTS OF PROVEN QUALITY
10300
8400
3000
SHALL BE PROVIDED FOR FULL WIDTH.
12. BACK FILLING BEHIND ABUTMENTS SHALL BE
650 3000
650 3000
BRACKET OF SELECTED EARTH CONFORMING OF APPENDEX 6 OF I
3000
C =1.76-1.8T/CUM.
650
4300 13. 65MM THICK WEARING COAT COMPRISING OF UNDER
LAYER OF 6MM THICK WATER PROOFING LAYER OVER LAID
FLOW U/S 4300 WITH 50MM THICK ASPHALTIC CONCRETE.
DETAILS OF LEVELS
1. HFL 100.923M
3. L.W.L 98.467M
PROJECT: DISTRICT: WEST CHAMPARAN DRAWING TITLE: CONSULTANTS: R.W.D Works Division,
BIHAR RURAL ROADS CONSTRUCTION OF RCC GENERAL ARRANGEMENT PLAN Shyam Designers & Consultants Pvt.Ltd
DEVELOPMENT AGENCY BRIDGE AT CH 3+100 KM IN
DIVISION: BAGHA-1
C-28 Lower GF, Housing Society, South
(GOVT. OF BIHAR) PIPRA TO GARDI DRG No:2022-23/GAD/01 REVISION SCALE : NTS Extension,Part-1 New Delhi -110049 J.E. A.E. E.E.
BLOCK: RAMNAGAR DATE
423
P5 P6 P7 P8 P9 P10
A2
(III) WATER:
C.WORKMANSHIP / DETAILING
1000 1000 1000 1000 1000 1000
RECTANGULAR PIER RECTANGULAR PIER RECTANGULAR PIER RECTANGULAR PIER RECTANGULAR PIER RECTANGULAR PIER
PROJECT: DISTRICT: WEST CHAMPARAN DRAWING TITLE: CONSULTANTS: R.W.D Works Division,
BIHAR RURAL ROADS CONSTRUCTION OF RCC GENERAL ARRANGEMENT PLAN Shyam Designers & Consultants Pvt.Ltd
DEVELOPMENT AGENCY BRIDGE AT CH 3+100 KM IN
DIVISION: BAGHA-1
C-28 Lower GF, Housing Society, South
(GOVT. OF BIHAR) PIPRA TO GARDI DRG No:2022-23/GAD/02 REVISION SCALE : NTS Extension,Part-1 New Delhi -110049 J.E. A.E. E.E.
BLOCK: RAMNAGAR DATE
424
A NOTES :
A1 8400
7500 1. ALL DIMENSIONS ARE IN MILLIMETERS (MM) AND LEVELS
CL OF BEARING / ABUTMENT / CROSS GIRDER 450 450
CARRIAGEWAY ARE IN M. UNLESS OTHERWISE NOTED.
3500MM APPROACH
SLAB CRASH BARRIER
1100
CONSTRUCTION JOINT SECTION ST SUPPORT SECTION IN MID
20MM STRIP SEAL EXP.
JOINT
400MM THK DIRT
DRAINAGE SPOUT 65MM THK. CEMENT
WALL CONCRETE WEARING
225
COAT
50 175 50
1575
150MM THK PCC (M15)
HAUNCH (150X75)
150
1575
300
150
ELASTOMERIC BEARING ==
ARRESTER BLOCK 175
500
ABUTMENT CAP
SEISMIC (RB1)
R=250
INDEPENDENT RETAINING WALL 3000 3000
E
900
800
600MM THK. FILTER MEDIA
3670
R=50
250
1000 WEEP HOLES 100 DIA
WITH AC PIPE IN 1:20
PVC PIPE
SLOPE @1000 C/C
STAGGERED
VERTICALLY &
WEARING COAT
150
175
500 HORIZONTALLY
TOP OF 500
PILE CAP
50
DECK SLAB 450
1500
BOTTOM OF
PILE CAP
CRASH BARRIER
(N.T.S.)
20000
1500
650 3000 650
4300
A
SECTIONAL ELEVATION OF ABUTMENT
20MM THK STRIP SEAL CL OF EXP. JOINT
650 3000 650 EXP. JOINT CL OF BEARING / ABUTMENT /
750 CROSS GIRDER
730
650
300
650 3000 3000 3000 650 400 350
10300
525
700
SECTION ON A-A
DEPTH OF
3000
GIRDER
300
300
1575
CL OF CARRIAGEWAY/BRIDGE
300
150
(RB2)
10300
3000
300
1670
ELASTOMETRIC BEARING
B3(TYP.)
800
PEDESTAL
800
C
B1
500
1200 3000 3000 1200
3000
PROJECT: DISTRICT: WEST CHAMPARAN DRAWING TITLE: CONSULTANTS: R.W.D Works Division,
BIHAR RURAL ROADS CONSTRUCTION OF RCC Shyam Designers & Consultants Pvt.Ltd
DIVISION: BAGHA-1 GENERAL ARRANGEMENT DRAWING OF ABUTMENT
DEVELOPMENT AGENCY BRIDGE AT CH 3+100 KM IN C-28 Lower GF, Housing Society, South
(GOVT. OF BIHAR) PIPRA TO GARDI DRG No:2022-23/GAD/03 SCALE : NTS Extension,Part-1 New Delhi -110049 J.E. A.E. E.E.
BLOCK: RAMNAGAR DATE REVISION
425
8400 NOTES :
7500 C
L OF EXP. JOINT / PIER 1. ALL DIMENSIONS ARE IN MILLIMETERS (MM) AND LEVELS
450 450 ARE IN M. UNLESS OTHERWISE NOTED.
CARRIAGEWAY
CL OF BEARING / CROSS GIRDER
CRASH BARRIER SECTION AT SUPPORT SECTION IN MID SPAN
1100
1500
300
CONSTRUCTION JOINT
225
150
DRAINAGE SPOUT
450
1575
150
DEPTH OF
300 650 300
GIRDER
1575
1200 3000 3000 1200 RB3
600
700(TYP.)
900
650
300
8000
2550 3000 2550 PEDESTAL
600
650
PIER CAP
RECTANGULAR PIER
1000
TOP OF 2610
PILE CAP
DETAIL - F
1500
(FOND.
800
LEV.)
575
2610
RB3
650
B2 (TYP.)
B1
4300
3000
500
B2(TYP.) ELASTOMERIC BEARING PEDESTAL (PTFE)
650
PROJECT: DISTRICT: WEST CHAMPARAN DRAWING TITLE: CONSULTANTS: R.W.D Works Division,
BIHAR RURAL ROADS CONSTRUCTION OF RCC Shyam Designers & Consultants Pvt.Ltd
DEVELOPMENT AGENCY DIVISION: BAGHA-1 GENERAL ARRANGEMENT DRAWING OF PIER C-28 Lower GF, Housing Society,
BRIDGE AT CH 3+100 KM IN South Extension,Part-1
(GOVT. OF BIHAR) PIPRA TO GARDI BLOCK: RAMNAGAR Drg No :2022-23/GAD/04 DATE SCALE : NTS NEW DELHI-110049 J.E. A.E. E.E.
REVISION
426
CL OF EXP.JOINT C
L OF EXP.JOINT
NOTES:
20000 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE
IN METERS UNLESS OTHERWISE SPECIFIED.
RECESS FOR 18500 2. DIMENSIONS ARE NOT TO BE SCALED, ONLY WRITTEN
CL BRG CL BRG
EXP.JOINT DIMENSIONS ARE TO BE FOLLOWED
(TYP) 3. GRADE OF CONCRETE FOR VARIOUS COMPONENTS SHALL
750 750
BE AS FOLLOWS:
350
DECK SLAB-----------------------M30
LONGITUDINAL GIRDER-----------------M30
CROSS GIRDER---------------------M30
225
CRASH BARRIER --------------------M30
1575
500
2375 2375
CL EXP. GAP CBRG
1200
L
DECK SLAB
L BRG
20 750
C
225
350
1000 1200
300
3000
CROSS GIRDER
300
300
350
350
L BRG
8400
7500
8500
600
600
400
C
SECTION E-E
300
3000
400 400
L BRG
C
1200
500
5000(TYP)
750 20000 750 CL EXP. GAP CBRG
L
PLAN POCKET FOR EXPANSION JOINT
8400
750
8400
350
450 7500 450 450 7500 450
680 600
300
SECTION D-D
CROSS GIRDER
225
225
150X300 75X150
1100
600 HAUNCH (TYP)
HAUNCH (TYP)
1575
300
DRAINAGE (TYP)
150
DRAINAGE (TYP)
250
250
CONSTRUCTION JOINT
CONSTRUCTION JOINT
(TYP)
(TYP)
250
250
PROJECT: DISTRICT : WEST CHAMPARAN DRAWING TITLE: CONSULTANTS: R.W.D Works Division,
BIHAR RURAL ROADS CONSTRUCTION OF RCC Shyam Designers & Consultants Pvt.Ltd
DIVISION : BAGHA-1 DETAILS OF SUPERSTRUCTURE
DEVELOPMENT AGENCY BRIDGE AT CH 3+100 KM IN C-28 Lower GF, Housing Society, South
(GOVT. OF BIHAR) PIPRA TO GARDI DRG No:2022-23/GAD/05 REVISION SCALE : NTS Extension,Part-1 New Delhi -110049 J.E. A.E. E.E.
BLOCK : RAMNAGAR DATE
427
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS
75X7=525
CL OTHERWISE SPECIFIED.
BRG
2. DIMENSIONS ARE NOT TO BE SCALED, ONLY WRITTEN
DIMENSIONS ARE TO BE FOLLOWED.
(a7)
(a7)
3. ALL REINFORCEMENT SHOWN IN THIS DRAWING ARE TMT
(a6) BARS CONFORMING TO I.S:1786 GRADE Fe 500D
4. BOND LENGTH SHALL BE AS PER IRC:112. MINIMUM BOND
LENGTH SHALL BE 58 TIMES DIA OF BAR. NOT MORE THAN
50% OF THE BARS SHALL BE LAPPED AT ANY SECTION.
950 MINIMUM LAP LENGTH SHALL BE 1.4 TIMES BOND LENGTH
(a6)
(a6)
(FOR LAP LENGTH SMALLER DIAMETER TO BE CONSODERED).
(a7)
5. CLEAR COVER TO ANY REINFORCEMENT SHALL BE 40mm.
(a6)+(a7) CL OF SYMMETRY
2-16 (a7) 175 175
950
(TYP)
400
(a9) (a11)
(EQUALLY SPACED)
(a8) ON EACH FACE
(EQUALLY SPACED)
(a8a) ON EACH FACE
10 LINKS 3 NOS 10 LINKS 3 NOS
950
(a12) (a12)
WITH EVERY 3rd STP. WITH EVERY
(STAGGERED) (STAGGERED)
(TYP)
1600
(a4) (a5)
1850
950
(TYP)
400
(b9) (b11)
950
(EQUALLY SPACED)
(b8a) ON EACH FACE
10 LINKS 3 NOS (b12) 10 LINKS 3 NOS
(EQUALLY SPACED)
(b8) ON EACH FACE
WITH EVERY 3rd STP. WITH EVERY
(TYP)
1600
(STAGGERED) (STAGGERED)
(b6) (b5) 1850
(b4)
PROJECT: DISTRICT: WEST CHAMPARAN DRAWING TITLE: CONSULTANTS: R.W.D Works Division,
BIHAR RURAL ROADS CONSTRUCTION OF RCC Shyam Designers & Consultants Pvt.Ltd
DIVISION: BAGHA-1 DETAILS OF LONGITUDINAL GIRDER
DEVELOPMENT AGENCY BRIDGE AT CH 3+100 KM IN C-28 Lower GF, Housing Society, South
(GOVT. OF BIHAR) PIPRA TO GARDI DRG No:2022-23/RCC/01 REVISION SCALE : NTS Extension,Part-1 New Delhi -110049 J.E. A.E. E.E.
BLOCK: RAMNAGAR DATE
428
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETRES
UNLESS OTHERWISE SPECIFIED.
2. DIMENSIONS ARE NOT TO BE SCALED,
ONLY WRITTEN DIMENSIONS ARE TO BE
FOLLOWED.
3. ALL REINFORCEMENT SHOWN IN THIS
DRAWING ARE TMT BARS CONFORMING TO
I.S:1786 GRADE Fe 500D
4. CLEAR COVER TO ANY REINFORCEMENT
SHALL BE 40mm.
5. THE LOCATION OF JACKS FOR LIFTING OF
THE SUPERSTRUCTURE TO REPLACE THE
BEARINGS IS SHOWN. THIS SHALL BE
DISTINCTLY ETCHED FOR EASY
IDENTIFICATION ON THE END CROSS
GIRDERS AND PIER/ABUTMENT CAPS
6. DURING THE LIFTING OPERATION, ALL
THE SIX JACKS PLACED UNDER THE END
CROSS GIRDERS IN LINE WITH THE
BEARINGS SHALL BE OPERATED
SIMULTANEOUSLY USING SINGLE
OPERATING CONSOLEE, GROUPING THE
PUMP AND CONTROL SYSTEM, SO AS TO
ENSURE THAT THE REACTIONS
7. ON ALL THE SIX JACK ARE EQUAL AT ALL
TIMES. BOND LENGTH SHALL BE AS PER
ICR:112. MINIMUM BOND LENGTH SHALL
BE 58 TIMES DIA OF BAR. NOT MORE THAN
50% OF THE BARS SHALL BE LAPPED AT
ANY SECTION. MINIMUM LAP LENGTH
SHALL BE 1.4 TIMES BOND LENGTH SHALL
BE 1.4 TIMES BOND LENGTH (FOR LAP
LENGTH SMALLER DIAMETER TO BE
CONSIDERED).
PROJECT: DISTRICT: WEST CHAMPARAN DRAWING TITLE: CONSULTANTS: R.W.D Works Division,
BIHAR RURAL ROADS CONSTRUCTION OF RCC Shyam Designers & Consultants Pvt.Ltd
DIVISION: BAGHA-1 DETAILS OF CROSS GIRDER
DEVELOPMENT AGENCY BRIDGE AT CH 3+100 KM IN C-28 Lower GF, Housing Society, South
(GOVT. OF BIHAR) PIPRA TO GARDI DRG No:2022-23/RCC/03 REVISION SCALE : NTS Extension,Part-1 New Delhi -110049 J.E. A.E. E.E.
BLOCK: RAMNAGAR DATE
429
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETRES
UNLESS OTHERWISE SPECIFIED.
2. DIMENSIONS ARE NOT TO BE SCALED,
ONLY WRITTEN DIMENSIONS ARE TO BE
FOLLOWED.
3. ALL REINFORCEMENT SHOWN IN THIS
DRAWING ARE TMT BARS CONFORMING TO
I.S:1786 GRADE Fe 500D
4. BOND LENGTH SHALL BE AS PER
IRC:112. MINIMUM BOND LENGTH SHALL
BE 58 TIMES DIA OF BAR. NOT MORE THAN
50% OF THE BARS SHALL BE LAPPED AT
ANY SECTION. MINIMUM LAP LENGTH
SHALL BE 1.4 TIMES BOND LENGTH (FOR
LAP LENGTH SMALLER DIAMETER TO BE
CONSIDERED).
5. CLEAR COVER TO ANY REINFORCEMENT
SHALL BE 40mm.
LEGEND
TOP FACE
BOTTOM FACE
PROJECT: DISTRICT: WEST CHAMPARAN DRAWING TITLE: CONSULTANTS: R.W.D Works Division,
BIHAR RURAL ROADS CONSTRUCTION OF RCC Shyam Designers & Consultants Pvt.Ltd
DIVISION: BAGHA-1 DETAILS OF DECK SLAB
DEVELOPMENT AGENCY BRIDGE AT CH 3+100 KM IN C-28 Lower GF, Housing Society, South
(GOVT. OF BIHAR) PIPRA TO GARDI DRG No:2022-23/RCC/04 REVISION SCALE : NTS Extension,Part-1 New Delhi -110049 J.E. A.E. E.E.
BLOCK: RAMNAGAR DATE
430
NOTES-
1. ALL DIMENSIONS ARE IN MM, & LEVELS
ARE IN METERS UNLESS OTHERWISE
SPECIFIED
2. DIMENSIONS ARE NOT TO BE SCALED.
ONLY WRITTEN DIMENSIONS SHALL BE
FOLLOWED
3. THIS DRG. SHALL BE READ IN
CONJUNCTION WITH OTHER RELEVANT
DRGS.
4. ALL REINFORCING STEEL SHALL BE HIGH
YIELD STRENGTH DEFORMED (TMT) BARS
(GRADE-Fe 500D). CONFORMING IS:1786
5. MINIMUM LAP LENGTH WHEREVER
REQUIRED SHALL BE 76xDIAMETRE OF BAR
6. NOT MORE THAN 50% OF
REINFORCEMENT SHALL BE LAPPED AT ANY
LOCATION
7. ALL LAPS SHALL BE SUITABLY
STAGGERED AND MINIMUM CLEAR
DISTANCE BETWEEN LAPS SHALL BE 0.33
TIMES THE LAP LENGTHS
8. CLEAR COVER TO OUTER MOST REINF.
SHALL BE AS FOLLOWS:-
SECTION A-A SECTION B-B a) PILE&PILE CAP : 75mm
b) SUBSTRUCTURE : 40mm
9. ANCHORAGE OF SPIRAL REINF. SHALL
BE PROVIDED BY ONE AND HALF EXTRA
TURNS OF SPIRAL BAR AT EACH END OF A
SPIRAL UNIT.
D D
SECTION D-D
E E
SECTION E-E
PROJECT: DISTRICT: WEST CHAMPARAN DRAWING TITLE: CONSULTANTS: R.W.D Works Division,
BIHAR RURAL ROADS CONSTRUCTION OF RCC REINFORCEMENT DETAILS OF PIER SHAFT & PILE Shyam Designers & Consultants Pvt.Ltd
DEVELOPMENT AGENCY BRIDGE AT CH 3+100 KM IN DIVISION: BAGHA-1
C-28 Lower GF, Housing Society, South
(GOVT. OF BIHAR) PIPRA TO GARDI DRG No:2022-23/RCC/05 REVISION SCALE : NTS Extension,Part-1 New Delhi -110049 J.E. A.E. E.E.
BLOCK: RAMNAGAR DATE
431
NOTES-
1. ALL DIMENSIONS ARE IN MM, & LEVELS
ARE IN METERS UNLESS OTHERWISE
SPECIFIED
2. DIMENSIONS ARE NOT TO BE SCALED.
ONLY WRITTEN DIMENSIONS SHALL BE
E FOLLOWED
3. THIS DRG. SHALL BE READ IN
CONJUNCTION WITH OTHER RELEVANT
C B
DRGS.
4. ALL REINFORCING STEEL SHALL BE HIGH
YIELD STRENGTH DEFORMED (TMT) BARS
(GRADE-Fe 500D). CONFORMING IS:1786
5. MINIMUM LAP LENGTH WHEREVER
REQUIRED SHALL BE 76xDIAMETRE OF BAR
6. NOT MORE THAN 50% OF
REINFORCEMENT SHALL BE LAPPED AT ANY
LOCATION.
7. ALL LAPS SHALL BE SUITABLY
1 STAGGERED AND MINIMUM CLEAR
E B DISTANCE BETWEEN LAPS SHALL BE 0.33
TIMES THE LAP LENGTHS.
8. CLEAR COVER TO OUTER MOST REINF.
SHALL BE AS FOLLOWS:-
a) SUBSTRUCTURE : 40mm
9. PEDESTAL SHALL BE CAST ONLY AFTER
C SECTION A-A FIXING OF BEARING ANCHOR SLEEVES,
ALTERNATIVELY POCKET MAY BE LEFT FOR
A TYP. DETAIL INDICATING
BEARING SLEEVES.
ANCHORAGE OF STIRRUP
LEGEND:
BAR ON TOP FACE
BAR ON BOTTOM FACE
DIA FOR BAR 'D'
TRAFFIC
DIRECTION
TRAFFIC
DIRECTION
T 8 MESH REINF.
DETAIL-1 PLAN SHOWING REINF. PLAN SHOWING REINF. T 8 MESH REINF. AT JACK LOCATION AND
A IN PEDESTAL TEMP. BEARING
SHOWING REINF. IN IN LONGITUDINAL TYPE- I
SEISMIC STOPPER (TYP.) BEARING TYPE-II
PLAN SHOWING REINF. IN PIER CAP TRANSVERSE SEISMIC STOPPER (TYP.)
SECTION F-F
PROJECT: DISTRICT: WEST CHAMPARAN DRAWING TITLE: CONSULTANTS: R.W.D Works Division,
BIHAR RURAL ROADS CONSTRUCTION OF RCC REINFORCEMENT DETAILS OF PIER, PIER CAP ETC Shyam Designers & Consultants Pvt.Ltd
DEVELOPMENT AGENCY DIVISION: BAGHA-1
BRIDGE AT CH 3+100 KM IN C-28 Lower GF, Housing Society, South
(GOVT. OF BIHAR) PIPRA TO GARDI DRG No:2022-23/RCC/06 REVISION SCALE : NTS Extension,Part-1 New Delhi -110049 J.E. A.E. E.E.
BLOCK: RAMNAGAR DATE
432
D
OF CARRIAGEWAY
NOTES-
24 25 29 34 34 32
31 33 1. ALL DIMENSIONS ARE IN MM, & LEVELS
19 29
ARE IN METERS UNLESS OTHERWISE
29 SPECIFIED.
2. DIMENSIONS ARE NOT TO BE SCALED.
ONLY WRITTEN DIMENSIONS SHALL BE
12 Nos. 10 FOLLOWED.
60
1 (DISTRIBUTION)
19 12 3 Nos.
2000
17A
10 + 11 8 / 8a + 9 26 12 2 Nos.
8 + 9 10 + 11 8a + 9
2000
27 NOT USED
28 NOT USED
29 16 3 Nos.
300
5 8a 8 5
13 13
DECK SLAB REINFORCEMENT 30 NOT USED
12 8+9 8a+9 12
31 12 2 Nos.
CRASH BARRIER
REINFORCEMENT DETAILS 32 12 @100/c
DIRT WALL
5 6 6 5 33 10 @100/c
D SECTION A-A
(STIRRUPS TO BE AVOIDED UNDER ABUTMENT) VIEW B-B 34 10 @200/c ON BOTH FACE
(ELEVATION SHOWING REINF. IN ABUTMENT WALL AND DIRT WALL) 35 @100/c
TRAFFIC DIRECTION 12
(STIRRUPS TO BE AVOIDED UNDER ABUTMENT)
13
OF AUTMENT 18 18A
36 12 5 Nos.
2L-400/c
37 10 IN 3 LAYERS
BAR BAR
SPACING/NOS. SHAPE REMARKS 38 16 10 Nos.
17A MARK DIA
ABUTMENT CAP
1200
1 25 10 Nos. ALT. WITH 2
39 10 2L@150/c
PILE
PILE CUT OFF
LEVEL. 2 25 10 Nos. ALT. WITH 1
300
40 12 8 Nos.
16 16A 3 10 @150c/c
6
41 12 8 Nos.
4 4 16 @100c/c
1200
9 16 16A
1000
500 C C 5 42 20 10 Nos.
20 @125/c
PILE CAP
EARTH FACE
EARTH FACE
NEAR FACE
12 12 46 12 2 Nos. ON BOTH FACE
9 12 @250/c ALT. WITH 8&8a
47 12 4L@150/c
10 12 @250/c ALT. WITH 11
OF ABUTMENT CAP/
PEDESTAL(FREE BRG.)
48 16 12 Nos. ON BOTH FACE
ABUTMENT/CARRIAGEWAY 11 12 @250/c ALT. WITH 10
5
49 12 8 Nos. ON BOTH FACE
12 12 8 Nos.
13 12 8 Nos.
3 50 12 2L@100/c
17
14 16 100/c
A A 51 10 2L@100/c
14A NOT USED
52 10 2L@100/c
15 12 100/c
53 20 10 Nos.
PROJECT: DISTRICT: WEST CHAMPARAN DRAWING TITLE: CONSULTANTS: R.W.D Works Division,
BIHAR RURAL ROADS CONSTRUCTION OF RCC REINFORCEMENT DETAILS OF ABUTMENT Shyam Designers & Consultants Pvt.Ltd
DEVELOPMENT AGENCY BRIDGE AT CH 3+160 KM IN
DIVISION: BAGHA-1
C-28 Lower GF, Housing Society, South
(GOVT. OF BIHAR) PIPRA TO GARDI DRG No:2022-23/RCC/07 REVISION SCALE : NTS Extension,Part-1 New Delhi -110049 J.E. A.E. E.E.
BLOCK: RAMNAGAR DATE
433
NOTES-
1. ALL DIMENSIONS ARE IN MM, & LEVELS
D
ARE IN METERS UNLESS OTHERWISE
10x70=700 SPECIFIED.
31 4x75=300 70
75
2. DIMENSIONS ARE NOT TO BE SCALED.
ONLY WRITTEN DIMENSIONS SHALL BE
4x75=300
75
70
FOLLOWED.
10x70=700
3. THIS DRG. SHALL BE READ IN
CONJUNCTION WITH OTHER RELEVANT
300
DRGS.
T 8 MESH REINF. 4. ALL REINFORCING STEEL SHALL BE HIGH
36 AT JACK LOCATION AND YIELD STRENGTH DEFORMED (TMT) BARS
37 AND GRADE (Fe 500D) CONFORMING TO
35 TEMP. BEARING T 8 MESH REINF. THESE BARS TO BE BENT
TYP. DETAIL INDICATING IS: 1786
TYPE-II TYPE- I AFTER THE PLACEMENT OF
ANCHORAGE OF STIRRUP 5. CLEAR COVER TO OUTER MOST
300
300
43 42 LOCATION
8. ALL LAPS SHALL BE SUITABLY
300
STAGGERED AND MINIMUM CLEAR
300
39 49 53
DISTANCE BETWEEN LAPS SHALL BE 0.33
600
48 1200 TIMES THE LAP LENGTHS.
33 9. ANCHORAGE OF SPIRAL REINF. SHALL
55
41 41 BE PROVIDED BY ONE AND HALF EXTRA
TURNS OF SPIRAL BAR AT EACH END OF A
1500
32
SPIRAL UNIT.
52 10. THIS DRAWING SHALL BE READ IN
CONJUNCTION WITH DRAWING NO.
2022-23/RCC/07
40
LEGEND:-
600
TOP / NEAR FACE REINF.
ABUTMENT REINF. BOTTOM / EARTH FACE REINF.
46 HITTING SIDE
47
TRAFFIC 53
DIRECTION
4 58
CURVED
49
HITTING FACE
42
600
43 2
44 52 10d
55
(TYP.) 55
45 48 48
MESH (TYP.)
56 57
46 51 50
54
49
PROJECT: DISTRICT: WEST CHAMPARAN DRAWING TITLE: CONSULTANTS: R.W.D Works Division,
BIHAR RURAL ROADS CONSTRUCTION OF RCC Shyam Designers & Consultants Pvt.Ltd
DIVISION: BAGHA-1 REINFORCEMENT DETAILS OF ABUTMENT CAP, PILE ETC
DEVELOPMENT AGENCY BRIDGE AT CH 3+100 Km IN C-28 Lower GF, Housing Society, South
(GOVT. OF BIHAR) PIPRA TO GARDI DRG No:2022-23/RCC/08 SCALE : NTS Extension,Part-1 New Delhi -110049 J.E. A.E. E.E.
BLOCK: RAMNAGAR DATE REVISION
434