Logon India Infrastructure Pvt.

Limited
(Km.820+000 to Km.845+000)
SIX LANING OF PUNE-SATARA SECTION OF NH-4 FROM KM. 820.00 TO KM.865.35 (LENGTH- KM 45.35) IN THE STATE OF
MAHARASHTRA TO BE EXECUTED AS BOT (TOLL) ON DBFOT PATTERN UNDER NHDP PHASE V.
Authority : National Highway Authority of India
Independent Engineer : Aarvee Associates
Concessionaire : PS Toll Road Pvt. Ltd.
EPC Contractor : Reliance infrastructure Ltd

Summary of Mix Design (JMF)


Bulk
Sr. Proportion Max. Dry
Items Description Size of Materials Density OMC Remarks
no (%) Density
g/cc
2 GSB JMF - - 1.880 2.301 g/cc 6.90%

40 mm 35%
20 mm 15%
3 WMM JMF 2.495 2.340 g/cc 6.62%
10 mm 20%
Dust 30%

40 mm 25%
20 mm 35%
4 Filter Media JMF
10 mm 35%
Dust 5%

40 - 22 mm 18.21% 1.661 g/cc


22 - 14 mm 11.50% 1.627 g/cc Binder
5 DBM Gr-I JMF 2.58 g/cc Content
14 - 6.3 mm 31.62% 1.614 g/cc 4.17%
6.3 - 0 mm 34.50% 1.912 g/cc

28 - 22 mm 9.55% 1.627 g/cc


22 - 14 mm 21.01% 1.627 g/cc Binder
6 DBM Gr-II JMF 2.563 g/cc Content
14 - 6.3 mm 30.56% 1.614 g/cc 4.50%
6.3 - 0 mm 34.38% 1.912 g/cc

22 - 14 mm 27.55% 1.627 g/cc


7 14 - 6.3 mm 28.50% 1.614 g/cc
6.3 - 0 mm 38.95% 1.912 g/cc

22 - 14 mm 28.46% 1.627 g/cc


14 - 6.3 mm 27.51% 1.614 g/cc Binder
8 BC Gr-I(HPCL) JMF 2.509 g/cc Content
6.3 - 0 mm 37.00% 1.912 g/cc 5.13%
Filler 1.90%

22 - 14 mm 28.43% 1.627 g/cc


BC Gr-I 14 - 6.3 mm 27.48% 1.614 g/cc Binder
9 (Shalimar) JMF 2.500 g/cc Content
CRMB -60 6.3 - 0 mm 36.95% 1.912 g/cc 5.25%
Filler 1.90%

Contractor's Representative Concessionaire's Representative's I.E's Representative