FRESH WATER GENERATOR

STARTING PROCEDURE

( AT FRESH WATER GENERATOR SIDE)

1. CLOSE DRAIN VALVE ( EVAPORATOR SIDE )

( AT LOWER FLOOR )

2. OPEN OVERBOARD VALVE No. 133 V.

3. OPEN EJECTOR PUMP SUCTION AND DISCHARGE VALVE

4. START EJECTOR PUMP.

( AT FRESH WATER GENERATOR SIDE )

5. CLOSE VACUUM BREAKER.

6. SWITCH ON SALINITY INDICATOR POWER. CONFIRM ALARM CUT.

( WATCH FOR SHELL VACUUM DROPS AT ABOUT NEG. .09 MPa )

7. OPEN FEEDING VALVE. 1 ½ TURN OPEN.

8. SWITCH ON CHEMICAL INJECTION PUMP.

9. OPEN HEATING OUTLET VALVE No. 12 V

11. SLOWLY OPEN ~ TO FULL HEATING INLET VALVE No. 11 V.

12. START DISTILLATE PUMP. OPEN DELIVERY VALVE. 3/4 TURN OPEN.

13. SLOWLY CLOSE BYPASS VALVE ( UNTILL MARK ). VALVE No. 13 V.

14. ADJUST VACUUM ADJUST VALVE . OBSERVE SALINITY (PPM) .

15. IF SALINITY INDICATES NORMALLY ( 3.0 PPM BELOW ) THEN PUT


BACK TO NORMAL ALARM CUT BUTTON OF SALINITY INDICATOR.

NOTE: * NORMAL OPERATING SALINITY 2.0 PPM & BELOW.

-----0--- FINISH ---0------