Datacenter Fundamental Rev1
Datacenter Fundamental Rev1
February 2016
• Data Center Design
• Physical Components
• Network Devices
Make it Robust
Make it Modular
Make it Flexible
Standardize
Promote Good Habits
Shoes Rack
FM 200
Up
Ramp
Operation
15.00m.
Up
Command Center
Room
42.00m.
9.00m. 33.00m.
Operation Command Electrical & UPS Room
Center Room
Fire Suppression Room
Server Room
Storage Room Staging Room
Finishing
Core
Edging
Backing
Raised Floor tipe Bare Panelnya terbuat dari bahan plat besi, dengan Warna Panel
Grey (Abu-abu),.
Raised Floor tipe HPL Panelnya telah dilapisi dengan bahan Vinyl Anti Statis atau
lebih dikenal dengan istilah HPL (High Pressure Laminated) berwarna White Grey
(Putih bercak abu-abu),
Environmental Monitoring System
optional : Alert :
To Monitor :
1. Email / SMS
1. Air Conditioner 1. Motion
2. UPS Status 2. SNMP
2. Rack Door Open / Close
3. Water Leakage 3. Alarm
4. Fire Suppression 3. Pressure / Air Flow 4. Voice Dialing
5. Temperature & Humidity
Structured Cabling and Rack System
• Cabling Systems
(Fiber Optic &
UTP)
• Centralize Data
Communication
• Perforated Rack
For airflow system
Uninterruptable Power Supply ( UPS)
1.Monitoring
Infrastructure
Data Center.
2.Capture
documentation
3.Security
Management
system
Air Condition and Humidifier
System
• Provide increased cooling system availability.
• Effectively remove the heat load from the computer room.
• Protection from equipment downtime or damage.
• Temperature degree of the ambient humidity and airflow
• Approximately 16-24 degrees Celsius
Cold and Hot Aisle
Pendinginan tanpa
Plenums/Exhaust Ducting
Pendinginan dengan saluran
melalui ceiling/loteng dengan jalur
kembali melalui Plenums ke CRAC
PRECISION AIR CONDITIONING & FIRE EXTINGUISHING
(CONTROL & INTEGRATION)
Ruang Server
Gas FM-200
Fire Panel
PRECISION
AIR
CONDITIONING
10 DETIK
NETWORK
PERIPHERALS
N
(Shutdown)
Air Grille
Raised Floor
Documentation
• Proper documentation is key to a managed
data center
• Data Centre documentation consists at least
out of :
– Design plan and layouts
– Equipment / asset lists
– Maintenance contract
– Policies, procedures and
work instructions
– Forms (request for change)
– Test plans, test results,
action plans