RELOCATION OF FIRE HOSE CABINET

METHODOLOGY

Prepared by:

ENGR. MARK JUN CABALLO /


ENGR. CHRISTOPHER CABALUNA
Project-in-charge Date

Checked by:

ENGR. BRYAN FERNANDEZ


Leader/ED Date

Reviewed by:

ENGR. GERALD TUMALE


Chief/ED Date

Noted by:

MR. TSUBASA YASHIRO


Approved by:
Technical Manager/TS Date

Noted by:

MR. MICHEAL MENDOZA MR. SHOJI TANAKA


PROJECT OWNER Date Date
Division Manager

TOYOTA MOTOR PHILS. CORP.


EXECUTION PLAN
* Execution plan should be approved one week prior to commencement of activity.
* Any activity should not be commence before approval.
* Proposal of execution plan should be prepared two weeks before commencement of activity.

A. Description:
RELOCATION OF FIRE HOSE CABINET

B. Schedule of accomplishment:
FEBRUARY 23, 2020
C. Scope of works:
1. Draining of Water - By Client
2. Cutting of Existing Pipe
3. End Cap Installation
4. Fire Hose Cabinet Relocation
5. Piping Works
6. Leak Testing
7. Testing

D. Necessary Equipment and Tools, etc. ( To clarify capacity,Specification & no.,etc)

1. Caution Tape 6. Welding Machine


2. Mechanical Handy Tools 7. Grinder
3. Electric Drill 8. Speed Cutter
4. Wrenches 9. Threading Machine
5. Barricade

E. Procedure
1. Secure working permit before work 4. Fabrication and Installation of Bracket and Support.
2. Toolbox meeting must be done before and after work 5. Drilling and Cutting Works.
3. Preparation of working area 6. Installation of pipes.
7. Relocation of Fire hose Cabinet.
a. Layout and Marking
8. Restoration works.
b. Secure barricade with caution tape
9. Painting works.
c. Provide fire extinguisher, bucket of water
10. Leak Testing.
every welding units. 11. Housekeeping.

F. Safety Measurement
G. Organization H. Emergency Communication Flow Chart
SHOJI TANAKA
Division Manager
POTENTIAL HAZARD COUNTER MEASURES TO ELIMINATE HAZARDS 0920-910-2249 CLIENT SITE OMTPI OFFICE

TSUBASA YASHIRO
1 Ergonomics Body-body system Technical Manager
0999-225-0401
2 Exposure on Dust / Dirt Wear mask / Face shield R GERALD TUMALE SHOJI TANAKA
E
Leader/ED Project Leader Chief/ED Manager, TS
ENGR. GERALD JOB TUMALE MR. MICHAEL MENDOZA C Technical Manager
3 Sharp and Pointed Edge Wear gloves and other PPE's Chief/ED E 0998-592-9401 0919-065-7106 0998-966-8092 0999-225-0401 0920-910-2249
PROJECT OWNER
I
0998-966-8092 049-541-3020 V
4 Insulation of Fumes Wear Mask E
D
5 Eye Injury Must wear safety goggles and proper for welding works ENGR.BRYAN FERNANDEZ
I
Leader/ED
N
0919-065-7106 F
6 Behavior and workmanship Orient workers, remind for proper behavior and execution of work O
R
M
7 Fire/Burn Fire extinguisher, a bucket of water and a pail of sand must be present A
Project In-charge/ED
T ARIANNE ULEP ERLIENITA CRUZ HIDEYUKI TANAKA
Failure of tools / equipment 0950-461-6826 / 0998-592-9401 I
8 Proper inspection of tool / equipment, do not use substandard and defective tools O
Project In-Charge/ED Safety Officer Leader-SAFETY Manager, SAFETY General Manager
0950-461-6826 0920-126-7665 0947-803-8573 0920-910-2248 -
N
9 Repetitive Works Rest for a while after repetitive movement, if needed provide a reliever

ARRIANE ULEP
Safety Officer
0947-803-8573
ILLUSTRATION 1 : CUTTING OF EXISTING PIPE ILLUSTRATION 2 : END CAP INSTALLATION

Check Drawing Client


Box Type Approval
Design drawing
Execution drawing
Fabrication drawing
ILLUSTRATION 3 : FIRE HOSE CABINET RELOCATION
As-built drawing

METHODOLOGY
RELOCATION OF FIRE HOSE CABINET
W021-I01-0 01
BRYAN FERNANDEZ MR.GJ TUMALE MR. T YASHIRO MR. S TANAKA
Project In- charge/ED
03
00
ILLUSTRATION 4 : PIPING WORKS ILLUSTRATION 5 : LEAK TESTING AND RESTORATION

Check Drawing Client


Box Type Approval
Design drawing
Execution drawing
Fabrication drawing
ILLUSTRATION 6 : TESTING As-built drawing

METHODOLOGY
RELOCATION OF FIRE HOSE CABINET
W021-I01-0 02
BRYAN FERNANDEZ MR.GJ TUMALE MR. T YASHIRO MR. S TANAKA
Project In- charge/ED
03
00