Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

B S Abdur Rahman Crescent Institute of Science and Technology

Department of Mechanical Engineering


Instructions to be followed by the students
1. The final year project “MEB4211 Project” shall comprise of and not limited to
(a) Experimental work,
(b) Theoritical & simulation,
(c) Fabrication & demo (allowed only for new and innovative ideas)
2. At the end of the semester a protype/ working model (Dynamic/Static) has to be
made by the students which has societal importance by applying scientific
principles.
3. The electronics & programming component for project shall not exceed 15% of
the total work.
4. The project may be done indegenious or industrial.
5. Industrial project with only process optimization and similar work will not be
accepted.
6. Students should ensure that the industry WILL NOT restrict sharing of datas
(related to project done by studentss) citing confidentiality of the information.
7. Students shall produce acceptance letter as a proof during zeroth review if opting
for industry project.
8. The team shall be of three members guided by a faculty of the department
(internal guide) and an external guide in case of industry project
9. A faculty can guide maximum of three batches.
10. The assesment weightage is 60% Internal and 40% External.
11. The students should not assume anything and shall ask the class advisor for
clarification of any of the points mentioned above.
The internal 60% weightage is assesed with the following components

S.No Activity Remarks Deadline

One page write up submission in the


1 Zeroth Review prescribed template (template will be 4 Febrauray 2020
shared) with presentation

Presentation of Design calculations


2 First Review 2 to 6 March 2020
& components must be shown
Protype/ Working model must be
3 Second Review 1 to4 April 2020
shown along with presentation
Report Correction
4 15 April 2020
with Guide
Final Report
5 21 April 2020
Submission
Presentation and demo in front of
6 Final Review 27 to 30 April 2020
external Examiner