MRB Index (Minimum Requirements) : Sub Index Sub. Sub Index Description No. No. Remarks Part 1 - Purchase Order Data
MRB Index (Minimum Requirements) : Sub Index Sub. Sub Index Description No. No. Remarks Part 1 - Purchase Order Data
MRB Index (Minimum Requirements) : Sub Index Sub. Sub Index Description No. No. Remarks Part 1 - Purchase Order Data
Sub.
Sub Page Volume
sub Description Remarks
Index No. No.
Index
Part 1 – Purchase Order Data
Purchase Requisition, all approved
A. data sheets including motors, pumps,
E&I items etc.
Purchase Order "PO" (un-priced) &
B.
Change orders, if any
Pre Inspection Minutes (PIM) copies, if
C.
applicable
D. Sub-Orders Index and Orders
Part 2 – Manufacturing and Quality Data
Inspection Release Certificate / Note
A.
(IRC/IRN)
B. Technical Deviation(s) If any
Master log/register of NCR's and
C.
Analysis of NCR’s
Final product certificates such as
D. "Certificate of Conformity" (By Main
Supplier and major sub-suppliers)
E. Supplier ISO 9001 Certificate
F. Audit Reports, if any
Material Certification (Properly
G. Indexed and certified/Verified by
Inspectors, QA/QC Engineers)
Material Certificates summary and
traceability log/Register (Plates,
G.1 Structural Steel, Casting, Forging,
Pipes, Fittings, etc…)*Refer note including
all E&I items.
G.2 Material Test Certificates/Reports
H. Welding Book
Welding Procedure Specifications
H.1 (WPS's) and Procedure Qualifications
Reports (PQR's)
H.2 Welding logs and Weld Maps
Welders/ Welding Operator
H.3
Performance Qualification Records
H.4 Calibration Certificates (if any)
Non-Destructive Testing (RT, UT, PT,
I.
ET, MT, PMI, etc…)*Refer note 1
I.1 Non-Destructive Test Procedures
NDT scope of work and NDT
I.2 Please refer H.2
log/register
MRB Index Sample_Rev.A2
I.3 NDT Records/Reports and Certificates
I.4 NDT Operators Level-II/III certificates
I.5 Calibration Certificates (if any)
J. Heat treatment NA
J.1 Heat treatment procedure
J.2 Heat treatment Plan
J.3 Heat treatment Reports/Records
J.4 Calibration Certificates (if any)
K. Pipe Forming Procedure NA
Visual and Dimensional Inspection
L.
Records/Reports
L.1 Stage Inspection Reports
M. Destructive Testing NA
Destructive Test Procedures (Tensile,
M.1 Impact, HIC, Corrosion testing, SSC,
Hardness, Ferrite, etc..)*Refer note 1
M.2 DT scope of work and DT log/register
M.3 DT Records/Reports and Certificates
M.4 Calibration Certificates (if any)
Hydrostatic/pressure Test Procedure
N.
and Reports
Leak tightening/ Pneumatic, fugitive
Only flushing, draining,
emission tests, Flushing,…etc *Refer note 1
O. & Drying report are
procedures and Reports. (As
applicable
applicable)
Painting / Coating / Pickling &
P.
Passivation / Galvanising / Insulation
Painting, Coating, Pickling &
P.1 Passivation, Galvanising, Insulation
Procedures
Painting, Coating, Pickling &
P.2 Passivation, Galvanising, Insulation
records and test certificates
Functional test certificates FAT/SAT
Q. procedures, Mechanical Run Test (As
applicable)
Pump-Motor Certificates and Test
R. Reports (Type Tests, Routine Tests,
etc.)*Refer note 1 (as applicable)
S. Inspection and Test Plans (ITP)
Manufacturing Procedure
T. NA
Specifications (MPS)
Rubbing of Name Plate and Stamping
U.
– Copy/Photograph
Colour Coding/ Marking/Traceability Only Packing, Shipping
V. Procedure & Packing, Shipping & & handling procedure
handling procedure applicable
W. Reports on Repairs, if any NA
X. Close out report including all Quality If any