Name of the Contractor : Sri Challa Constructions .


Name of the Client : Ferring Laboratories Pvt.Ltd.
Name of Work :-Shape Project

Sr. No. Code Description Unit Quantity Rate Amount Remarks

Providing dowel for connecting to existing structural member of


RCC M20/M25/M30 Grade for 12 mm dia rod or as per design
requirement after drilling hole of following dia and depth upto
3.9
200mm. The hole to be filled with LOCKSET P of M/s Fosroc or RE
500 hilti or equivalent make before fixing the rod in in flowable
consistancy. (Rebar from Hilti or equivalent Make)

a 8mm dia No's 405.000 380 153,949


Total Amount without taxes 153,949
CGST 9% 13,855
SGST 9% 13,855
TOTAL Amount with Taxes 181,660
ABSTRACT SHEET
Name of the Contractor : Sri Challa Constructions .
Name of the Client : Ferring Laboratories Pvt.Ltd.
Name of Work :-Shape Project

Sr. No. Code Description Unit Quantity Rate Amount Remarks


Details of cost for 1 no Rebar of 8mm dia

Providing dowel for connecting to existing structural


member of RCC M20/M25/M30 Grade for 12 mm dia rod
or as per design requirement after drilling hole of following
dia and depth upto 200mm. The hole to be filled with
LOCKSET P of M/s Fosroc or RE 500 hilti or equivalent
make before fixing the rod in in flowable consistancy.
(Rebar from Hilti or equivalent Make)

Qty of rebar chemical for 1 hole 8mm dia rebar-1 hole=3.63ml


Rebar chemical ml/hole 10.08 9.60 97
rebar gun LS 70
10mm drill bit for hole making LS 50

Total Material 217 A


Manpower -
labour charges for making hole and filling hilti chemical No 1.00 100.00 100
TOTAL manpower 100 B
TOTAL material+manpower 317 C=A+B
Add 20 % overheads and profit 63 D=Cx20%
TOTAL (manpower+material+overheads and profit) 380 E=C+D
Cost for 1 no 380
Cost for 1 no 380
c
a b c=bxb d=12xd e=(dxc)/1000 Rebar
length of Volume of add 5 % Total No's Total
hole in chemical in ml wastage consump consump
mm 12d tion in ml tion in ml
d=Rebar dia Hole dia
location in mm Hole dia mm area
1 hole rebar chemical 8.00 10.00 100.00 96.00 9.60 0.48 10.08 1 10.08
Total Qty in Ml 10.08