Lighting Control
Lighting Control Panels (Internal): Various Locations (refer to Lighting
Layout)
The BMS shall integrate to the FOH lighting control system via an EIB
interface and provide monitoring functionality.
Lifts / Elevators
Provisions shall be made on the BMS to allow for monitoring all lifts
for:-
Lift Alarm
Lift Out Of Service
LV Switchgear Monitoring
Location: LV Switchgear: Substation Room (Ground Floor Level)
Open
Closed
UPS Systems
Location of UPS System: Various Locations (Refer to Electrical
Drawings)
The following systems shall be monitored by the BMS:-
UPS System
Battery Status
Charger Status
Mains Supply Tripped
All MCC room air conditioning (A/C) system (motorised smoke fire
dampers) shall be switched off thru the signal from Automatic Gas
Fire Suppresion System Panel. The Fan Coil Unit (FCU) serving the
MCC room shall be switched of thru BMS DDC.
The BMS shall receive individual alarm signals from manual call alarm
in each toilet through volt free contact (VFC) from panel to DDC.