TOTAL VOLUME BADAN + PLAT LANTAI

Volume box pei


NO.

STRUKTUR

PERHITUNGAN VOLUME

SKETSA.

VOLUME BETON K-125 (LANTAI KERJA)


= 0.10 x 690

= 0.69 x 3.50

1 Luas

Volume

0.69
2 Luas = 0.10 x 0.40 = 0.04

Volume = 0.04 x 6.90 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X

1
2
3
4

m2
m2

m2

25.20 m3

r meter' = 7.200

m3
m3
m2

m3

3.81

m3
16.10 m3

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 125~~
VOLUME I m3

2.42

m3

m2

m2

-300

6342
tabel

0.55
2.97
560.70
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box pei


NO.

2 Luas = 0.10 x 0.40 = 0.04

Volume = 0.04 x 6.90 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X

1
2
3
4
m2
m2

m2

23.63 m3

r meter' = 6.750

m3
m3
m2

m3

3.54

m3

13.73 m3

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 125~~
VOLUME I m3

m2

2.42
m3

m2

(250)

5197
tabel

0.55
2.97
-32.00

TOTAL VOLUME BADAN + PLAT LANTAI

Volume box pei


NO.

2 Luas = 0.10 x 0.40 = 0.04

Volume = 0.04 x 6.90 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X

1
2
3
4
m2
m2

m2

22.05 m3

r meter' = 6.300

m3
m3
m2

m3

3.27

m3

11.66 m3

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 125~~
VOLUME I m3

2.42

m3
m2

m2

(200)

4636
tabel

0.55
2.97
-82.70

TOTAL VOLUME BADAN + PLAT LANTAI

Volume box pei


NO.

STRUKTUR

PERHITUNGAN VOLUME

SKETSA.

VOLUME BETON K-125 (LANTAI KERJA)


= 0.10 x 690

= 0.69 x 3.50

1 Luas

Volume

0.69
2 Luas = 0.10 x 0.40 = 0.04

Volume = 0.04 x 6.90 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X

1
2
3
4

m2
m2

m2

20.48 m3

r meter' = 5.850

m3
m3
m2

m3

3.00

m3
9.89 m3

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 125~~
VOLUME I m3

m2

2.42

m3

m2

(150)

4354
tabel

0.55
2.97
103.60
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box pei

NO.

SKETSA.

STRUKTUR

PERHITUNGAN VOLUME

TUMIT, WING WALL, KERB (Sayap box culvert)


TUMIT :

Volume =

WING
WALL :
Volume =

KERB :
Luas

0.14

2
NO.

2 Luas = 0.10 x 0.40 = 0.04

Volume = 0.04 x 5.84 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X

1
2
3
4
m2
m2

m2

21.36 m3

r meter' = 6.104

m3
m3
m2

3.50

m3

m3

15.07 m3

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 125~~
VOLUME I m3

m2

2.04
m3

m2

(300)

4590
tabel

0.47
2.51
-510.10

TOTAL VOLUME BADAN + PLAT LANTAI

Volume box pei


NO.

STRUKTUR

PERHITUNGAN VOLUME

SKETSA.

VOLUME BETON K-125 (LANTAI KERJA)


= 0.10 x 578

= 0.58 x 3.50

1 Luas

Volume

0.58
2 Luas = 0.10 x 0.40 = 0.04

Volume = 0.04 x 5.78 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X

1
2
3
4

m2
m2

m2

m3
m3
m2

m3

3.19

m3

12.56 m3

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 125~~
VOLUME I m3

m2

2.02

m3

m2

(250)

5692
tabel

0.46
2.49
1373.35
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box pei


NO.

STRUKTUR

PERHITUNGAN VOLUME

SKETSA.

VOLUME BETON K-125 (LANTAI KERJA)


= 0.10 x 578

= 0.58 x 3.50

1 Luas

Volume

0.58
2 Luas = 0.10 x 0.40 = 0.04

Volume = 0.04 x 5.78 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X

1
2
3
4

m2
m2

m2

16.93 m3

r meter' = 4.836

m3
m3
m2

m3

2.92

m3
10.55 m3

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 125~~
VOLUME I m3

m2

2.02

m3

m2

(200)

4436
tabel

0.46
2.49
589.85
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box pei


NO.

STRUKTUR

PERHITUNGAN VOLUME

SKETSA.

VOLUME BETON K-125 (LANTAI KERJA)


= 0.10 x 578

= 0.58 x 3.50

1 Luas

Volume

0.58
2 Luas = 0.10 x 0.40 = 0.04

Volume = 0.04 x 5.78 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X

1
2
3
4

m2
m2

m2

15.56 m3

r meter' = 4.446

m3
m3
m2

m3

2.65

m3
9.11 m3

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 125~~
VOLUME I m3

m2

2.02

m3

m2

(150)

3312
tabel

0.46
2.49
-142.49
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box pei


NO.

STRUKTUR

PERHITUNGAN VOLUME

SKETSA.

VOLUME BETON K-125 (LANTAI KERJA)


= 0.10 x 478

= 0.48 x 3.50

1 Luas

Volume

0.48
2 Luas = 0.10 x 0.40 = 0.04

Volume = 0.04 x 4.78 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X

1
2
3
4

m2
m2

m2

17.84 m3

r meter' = 5.096

m3
m3
m2

m3

3.19

m3
14.00 m3

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 125~~
VOLUME I m3

1.67

m3

m2

m2

(300)

4696
tabel

0.38
2.06
238.33
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box pei


NO.

STRUKTUR

PERHITUNGAN VOLUME

SKETSA.

VOLUME BETON K-125 (LANTAI KERJA)


= 0.10 x 475

= 0.48 x 3.50

1 Luas

Volume

0.48
2 Luas = 0.10 x 0.40 = 0.04

Volume = 0.04 x 4.75 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X

1
2
3
4

m2
m2

m2

15.75 m3

r meter' = 4.500

m3
m3
m2

2.9025 m3

m3

11.60 m3
PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 125

VOLUME m3

1.66

m3

m2

m2

(250)

4788
tabel

0.38
2.04
958.65
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box pei


NO.

2 Luas = 0.10 x 0.40 = 0.04

Volume = 0.04 x 4.72 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X

1
2
3
4
m2
m2

m2

13.78 m3

r meter' = 3.936

m3
m3
m2

m3

2.61

m3

9.53 m3

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 125~~
VOLUME I m3

1.65

m3
m2

m2

(200)

3533
tabel

0.38
2.03
270.06

TOTAL VOLUME BADAN + PLAT LANTAI

Volume box pei


NO.

STRUKTUR

PERHITUNGAN VOLUME

SKETSA.

VOLUME BETON K-125 (LANTAI KERJA)


= 0.10 x 472

= 0.47 x 3.50

1 Luas

Volume

0.47
2 Luas = 0.10 x 0.40 = 0.04

Volume = 0.04 x 4.72 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X

1
2
3
4

m2
m2

m2

12.52 m3

r meter' = 3.576

m3
m3
m2

m3

2.34

m3
7.57 m3

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 125~~
VOLUME I m3

1.65

m3

m2

m2

(150)

2997
tabel

0.38
2.03
185.58
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box pei


NO.

STRUKTUR

PERHITUNGAN VOLUME

SKETSA.

VOLUME BETON K-125 (LANTAI KERJA)


= 0.10 x 472

= 0.47 x 3.50

1 Luas

Volume

0.47
2 Luas = 0.10 x 0.40 = 0.04

Volume = 0.04 x 4.72 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X

1
2
3
4

m2
m2

m2

11.26 m3

r meter' = 3.216

m3
m3
m2

m3

2.07

m3
6.62 m3

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 125~~
VOLUME I m3

1.65

m3

m2

m2

(100)

3065
tabel

0.38
2.03
562.11
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box pei


NO.

STRUKTUR

PERHITUNGAN VOLUME

SKETSA.

VOLUME BETON K-125 (LANTAI KERJA)


= 0.10 x 360

= 0.36 x 3.50

1 Luas

Volume

0.36
2 Luas = 0.10 x 0.40 = 0.04

Volume = 0.04 x 3.60 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(150 X

1
2
3
4

m2
m2

m2

7.70 m3

r meter' = 2.200

m3
m3
m2

1.728 m3

m3

5.38 m3
PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 125~~
VOLUME I m3

m2

1.26

m3

m2

(100)

2587
tabel

0.29
1.55
756.36
OTAL VOLUME BADAN + PLAT LANTAI

olume box pei


ERHITUNGAN VOLUME

OLUME BETON K-125 (LANTAI KERJA)

0.69 x 3.50
Luas = 0.10 x 0.40 = 0.04

olume = 0.04 x 6.90 x 2

EKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X

VOLUME BETON K350


VOLUME BETON K125
BERAT BESI POLOS
BERAT BESI ULIR
TOTAL BERAT BESI

=
=
=
=
=

meter' = 7.200

PERHITUNGAN VOLUME PEKERJAAN


BETON K
VOLUME
3.864
8.42
ERHITUNGAN

EKERJAAN

ETON K - 125~~
OLUME I m3

m3
m3
OTAL VOLUME BADAN + PLAT LANTAI

olume box pei


STRUKTUR
SKETSA.

Luas = 0.10 x 0.40 = 0.04

olume = 0.04 x 6.90 x 2

EKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X

VOLUME BETON K350


VOLUME BETON K125
BERAT BESI POLOS
BERAT BESI ULIR
TOTAL BERAT BESI

=
=
=
=
=

meter' = 6.750

PERHITUNGAN VOLUME PEKERJAAN


BETON K
VOLUME
3.864
6.32

ERHITUNGAN

EKERJAAN

ETON K - 125~~
OLUME I m3
m3
m3

OTAL VOLUME BADAN + PLAT LANTAI

olume box pei


STRUKTUR
SKETSA.

Luas = 0.10 x 0.40 = 0.04

olume = 0.04 x 6.90 x 2

EKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X

VOLUME BETON K350


VOLUME BETON K125
BERAT BESI POLOS
BERAT BESI ULIR
TOTAL BERAT BESI

=
=
=
=
=

meter' = 6.300

PERHITUNGAN VOLUME PEKERJAAN


BETON K
VOLUME
3.864
4.52

ERHITUNGAN

EKERJAAN

ETON K - 125~~
OLUME I m3
m3
m3

OTAL VOLUME BADAN + PLAT LANTAI

olume box pei


ERHITUNGAN VOLUME

OLUME BETON K-125 (LANTAI KERJA)

0.69 x 3.50
Luas = 0.10 x 0.40 = 0.04

olume = 0.04 x 6.90 x 2

EKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X

VOLUME BETON K350


VOLUME BETON K125
BERAT BESI POLOS
BERAT BESI ULIR
TOTAL BERAT BESI

=
=
=
=
=

meter' = 5.850

PERHITUNGAN VOLUME PEKERJAAN


BETON K
VOLUME
3.864
3.02
ERHITUNGAN

EKERJAAN

ETON K - 125~~
OLUME I m3

m3
m3
OTAL VOLUME BADAN + PLAT LANTAI

olume box pei

ERHITUNGAN VOLUME

UMIT, WING WALL, KERB (Sayap box culvert)


0.40 x

1.78 x

ERB :
=
STRUKTUR
SKETSA.

Luas = 0.10 x 0.40 = 0.04

olume = 0.04 x 5.84 x 2

EKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X

VOLUME BETON K350


VOLUME BETON K125
BERAT BESI POLOS
BERAT BESI ULIR
TOTAL BERAT BESI

=
=
=
=
=

meter' = 6.104

PERHITUNGAN VOLUME PEKERJAAN


BETON K
VOLUME
3.364
8.20

ERHITUNGAN

EKERJAAN

ETON K - 125~~
OLUME I m3
m3
m3

OTAL VOLUME BADAN + PLAT LANTAI

olume box pei


ERHITUNGAN VOLUME

OLUME BETON K-125 (LANTAI KERJA)

0.58 x 3.50
Luas = 0.10 x 0.40 = 0.04

olume = 0.04 x 5.78 x 2

EKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X

VOLUME BETON K350


VOLUME BETON K125
BERAT BESI POLOS
BERAT BESI ULIR
TOTAL BERAT BESI

=
=
=
=
=

PERHITUNGAN VOLUME PEKERJAAN


BETON K
VOLUME
3.422
5.94

ERHITUNGAN

EKERJAAN

ETON K - 125~~
OLUME I m3

m3
m3
OTAL VOLUME BADAN + PLAT LANTAI

olume box pei


ERHITUNGAN VOLUME

OLUME BETON K-125 (LANTAI KERJA)

0.58 x 3.50
Luas = 0.10 x 0.40 = 0.04

olume = 0.04 x 5.78 x 2

EKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X

VOLUME BETON K350


VOLUME BETON K125
BERAT BESI POLOS
BERAT BESI ULIR
TOTAL BERAT BESI

=
=
=
=
=

meter' = 4.836

PERHITUNGAN VOLUME PEKERJAAN


BETON K
VOLUME
3.42
4.20
ERHITUNGAN

EKERJAAN

ETON K - 125~~
OLUME I m3

m3
m3
OTAL VOLUME BADAN + PLAT LANTAI

olume box pei


ERHITUNGAN VOLUME

OLUME BETON K-125 (LANTAI KERJA)

0.58 x 3.50
Luas = 0.10 x 0.40 = 0.04

olume = 0.04 x 5.78 x 2

EKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X

VOLUME BETON K350


VOLUME BETON K125
BERAT BESI POLOS
BERAT BESI ULIR
TOTAL BERAT BESI

=
=
=
=
=

meter' = 4.446

PERHITUNGAN VOLUME PEKERJAAN


BETON K
VOLUME
3.699
2.76
ERHITUNGAN

EKERJAAN

ETON K - 125~~
OLUME I m3

m3
m3
OTAL VOLUME BADAN + PLAT LANTAI

olume box pei


ERHITUNGAN VOLUME

OLUME BETON K-125 (LANTAI KERJA)

0.48 x 3.50
Luas = 0.10 x 0.40 = 0.04

olume = 0.04 x 4.78 x 2

EKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X

VOLUME BETON K350


VOLUME BETON K125
BERAT BESI POLOS
BERAT BESI ULIR
TOTAL BERAT BESI

=
=
=
=
=

meter' = 5.096

PERHITUNGAN VOLUME PEKERJAAN


BETON K
VOLUME
2.830
7.98
ERHITUNGAN

EKERJAAN

ETON K - 125~~
OLUME I m3

m3
m3
OTAL VOLUME BADAN + PLAT LANTAI

olume box pei


ERHITUNGAN VOLUME

OLUME BETON K-125 (LANTAI KERJA)

0.48 x 3.50
Luas = 0.10 x 0.40 = 0.04

olume = 0.04 x 4.75 x 2

EKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X

VOLUME BETON K350


VOLUME BETON K125
BERAT BESI POLOS
BERAT BESI ULIR
TOTAL BERAT BESI

=
=
=
=
=

meter' = 4.500

PERHITUNGAN VOLUME PEKERJAAN


BETON K
VOLUME
2.850
5.85
ERHITUNGAN

EKERJAAN

ETON K - 125

OLUME m3

m3
m3
OTAL VOLUME BADAN + PLAT LANTAI

olume box pei


STRUKTUR
SKETSA.

Luas = 0.10 x 0.40 = 0.04

olume = 0.04 x 4.72 x 2

EKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X

VOLUME BETO K350 =


VOLUME BETO K125 =
BERAT BESI POLOS =
BERAT BESI ULIR =
TOTAL BERAT BESI

=
=
=
=
=

meter' = 3.936

PERHITUNGAN VOLUME PEKERJAAN


BETON K
VOLUME
2.870
4.05

ERHITUNGAN

EKERJAAN

ETON K - 125~~
OLUME I m3
m3
m3

OTAL VOLUME BADAN + PLAT LANTAI

olume box pei


ERHITUNGAN VOLUME

OLUME BETON K-125 (LANTAI KERJA)

0.47 x 3.50
Luas = 0.10 x 0.40 = 0.04

olume = 0.04 x 4.72 x 2

EKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X

VOLUME BETON K350


VOLUME BETON K125
BERAT BESI POLOS
BERAT BESI ULIR
TOTAL BERAT BESI

=
=
=
=
=

meter' = 3.576

PERHITUNGAN VOLUME PEKERJAAN


BETON K
VOLUME
2.870
2.35
ERHITUNGAN

EKERJAAN

ETON K - 125~~
OLUME I m3

m3
m3
OTAL VOLUME BADAN + PLAT LANTAI

olume box pei


ERHITUNGAN VOLUME

OLUME BETON K-125 (LANTAI KERJA)

0.47 x 3.50
Luas = 0.10 x 0.40 = 0.04

olume = 0.04 x 4.72 x 2

EKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X

VOLUME BETON K350


VOLUME BETON K125
BERAT BESI POLOS
BERAT BESI ULIR
TOTAL BERAT BESI

=
=
=
=
=

meter' = 3.216

PERHITUNGAN VOLUME PEKERJAAN


BETON K
VOLUME
3.021
1.53
ERHITUNGAN

EKERJAAN

ETON K - 125~~
OLUME I m3

m3
m3
OTAL VOLUME BADAN + PLAT LANTAI

olume box pei


ERHITUNGAN VOLUME

OLUME BETON K-125 (LANTAI KERJA)

0.36 x 3.50
Luas = 0.10 x 0.40 = 0.04

olume = 0.04 x 3.60 x 2

EKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(150 X

VOLUME BETON K350


VOLUME BETON K125
BERAT BESI POLOS
BERAT BESI ULIR
TOTAL BERAT BESI

=
=
=
=
=

meter' = 2.200

PERHITUNGAN VOLUME PEKERJAAN


BETON K
VOLUME
2.304
1.34
ERHITUNGAN

EKERJAAN

ETON K - 125~~
OLUME I m3

m3
m3
= 41.30
= 2.97
= 2958.9
= 2822.4
5781.3

PERHITUNGAN VOLUME PEKERJAAN


BETON K 350
VOLUME m3
11.34 m3
1.26 m3
12.60 m3
12.60 m3
12.60 m3

N VOLUME PEKERJAAN
350
m3
m3
m3
PERHITUNGAN VOLUME
VOLUME BETON K-125 (LANTAI KERJA) 1 Luas = 0.10 x 6.90 =
0.69 Volume = 0.69 x 3.50

= 37.35
= 2.97
= 2583
= 2646
5229

PERHITUNGAN VOLUME PEKERJAAN


BETON K 350
VOLUME m 3

9.77 m3
1.26 m3
11.03 m3
12.60 m3
12.60 m3

N VOLUME PEKERJAAN
350
m3
m3
m3
PERHITUNGAN VOLUME
VOLUME BETON K-125 (LANTAI KERJA) 1 Luas = 0.10 x 6.90 =
0.69 Volume = 0.69 x 3.50

= 33.71
= 2.97
= 2249.1
= 2469.6
4718.7

PERHITUNGAN VOLUME PEKERJAAN


BETON K 350
VOLUME m 3

8.19 m3
1.26 m3
9.45 m3
12.60 m3
12.60 m3

N VOLUME PEKERJAAN
350
m3
m3
m3
= 30.36
= 2.97
= 1957.2
= 2293.2
4250.4

PERHITUNGAN VOLUME PEKERJAAN


BETON K 350
VOLUME m3
6.62 m3
1.26 m3
7.88 m3
12.60 m3
12.60 m3

N VOLUME PEKERJAAN
350
m3
m3
m3
0.72 x 5.84 x

3.84 x 4.00 x

0.30 x 0.20 +
PERHITUNGAN VOLUME
VOLUME BETON K-125 (LANTAI KERJA) 1 Luas = 0.10 x 5.84 =
0.58 Volume = 0.58 x 3.50

= 36.43
= 2.51
= 2707
= 2393
5100

PERHITUNGAN VOLUME PEKERJAAN


BETON K 350
VOLUME m 3

10.47 m3
1.10 m3
11.56 m3
9.80 m3
9.80 m3

N VOLUME PEKERJAAN
350
m3
m3
m3
= 30.85
= 2.49
= 2270
= 2049
4319

PERHITUNGAN VOLUME PEKERJAAN


BETON K 350
VOLUME m3
8.24 m3
0.95 m3
9.19 m3
9.10 m3
9.10 m3

N VOLUME PEKERJAAN
350
m3
m3
m3
= 27.47
= 2.49
= 1950
= 1896
3846

PERHITUNGAN VOLUME PEKERJAAN


BETON K 350
VOLUME m3
6.88 m3
0.95 m3
7.83 m3
9.10 m3
9.10 m3

N VOLUME PEKERJAAN
350
m3
m3
m3
= 24.67
= 2.49
= 1712
= 1743
3454

PERHITUNGAN VOLUME PEKERJAAN


BETON K 350
VOLUME m3
5.51 m3
0.95 m3
6.46 m3
9.10 m3
9.10 m3

N VOLUME PEKERJAAN
350
m3
m3
m3
= 31.84
= 2.06
= 2460
= 1998
4458

PERHITUNGAN VOLUME PEKERJAAN


BETON K 350
VOLUME m3
9.61 m3
0.95 m3
10.56 m3
7.28 m3
7.28 m3

N VOLUME PEKERJAAN
350
m3
m3
m3
= 27.35
= 2.04
= 2065
= 1764
3829

PERHITUNGAN VOLUME PEKERJAAN


BETON K 350
VOLUME m3
7.88 m3
0.88 m3
8.75 m3
7.00 m3
7.00 m3

N VOLUME PEKERJAAN
350
m3
m3
m3
PERHITUNGAN VOLUME
VOLUME BETON K-125 (LANTAI KERJA) 1 Luas = 0.10 x 4.72 =
0.47 Volume = 0.47 x 3.50

23.31 m3
2.03 m3
1720 kg (d< 12;
1543 kg (d>12)
3263 3263

PERHITUNGAN VOLUME PEKERJAAN


BETON K 350
VOLUME m 3

6.25 m3
0.81 m3
7.06 m3
6.72 m3
6.72 m3

N VOLUME PEKERJAAN
350
m3
m3
m3
= 20.08
= 2.03
= 1410
= 1402
2811

PERHITUNGAN VOLUME PEKERJAAN


BETON K 350
VOLUME m3
4.99 m3
0.81 m3
5.80 m3
6.72 m3
6.72 m3

N VOLUME PEKERJAAN
350
m3
m3
m3
= 17.88
= 2.03
= 1242
= 1261
2503

PERHITUNGAN VOLUME PEKERJAAN


BETON K 350
VOLUME m3
3.73 m3
0.81 m3
4.54 m3
6.72 m3
6.72 m3

N VOLUME PEKERJAAN
350
m3
m3
m3
= 13.08
= 1.55
= 968.24
= 862.4
1831

PERHITUNGAN VOLUME PEKERJAAN


BETON K 350
VOLUME m3
2.94 m3
0.56 m3
3.50 m3
4.20 m3
4.20 m3

N VOLUME PEKERJAAN
350
m3
m3
m3
m3
m3
kg (d< 12;
kg (d>12)
5781
m3
m3
kg (d< 12;
kg (d>12)
5229
m3
m3
kg (d< 12;
kg (d>12)
4719
m3
m3
kg (d< 12;
kg (d>12)
4250
2.00 = 3.364

0.30 = 8.20

0.30 + 0.20 x 0.30 =


m3
m3
kg (d< 12;
kg (d>12)
5100
m3
m3
kg (d< 12;
kg (d>12)
4319
m3
m3
kg (d< 12;
kg (d>12)
3846
m3
m3
kg (d< 12;
kg (d>12)
3454
m3
m3
kg (d< 12;
kg (d>12)
4458
m3
m3
kg (d< 12;
kg (d>12)
3829
m3
m3
kg (d< 12;
kg (d>12)
2811
m3
m3
kg (d< 12;
kg (d>12)
2503
m3
m3
kg (d< 12;
kg (d>12)
1831