REKAPITULASI

ENGINEERING ESTIMATE

SKPD :
PEKERJAAN : PEMBANGUNAN GEDUNG KESBANGPOL
LOKASI : KABUPATEN KOLAKA TIMUR
TAHUN ANGGARAN : 2022

JUMLAH HARGA
NO URAIAN PEKERJAAN
( Rp )

I. PEKERJAAN PENDAHULUAN Rp 27,650,000.00


II. PEKERJAAN PONDASI Rp 297,663,582.29
III. PEKERJAAN BETON Rp 206,161,465.89
IV. PEKERJAAN DINDING Rp 557,119,802.46
V. PEKERJAAN LANTAI DAN DINDING GRANIT Rp 297,640,155.47
VI. PEKERJAAN KUSEN ALUMUNIUM Rp 377,170,805.73
VII. PEKERJAAN PENGECATAN Rp 100,242,561.20
VIII. PEKERJAAN PLAFON Rp 99,437,516.22
IX. PEKERJAAN DAK BETON Rp 165,386,039.04
X. PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP Rp 433,706,698.81
XI PEKERJAAN ELEKTRIKAL Rp 22,895,300.00
XII PEKERJAAN SANITASI Rp 111,441,367.78
XIII PEKERJAAN AKHIR Rp 6,000,000.00

A REAL COST = Rp Rp 2,702,515,294.88


B PPN 10 % = Rp Rp 270,251,529.49
C TOTAL(A+B) = Rp. Rp 2,972,766,824.37
TERBILANG :

Kolaka Timur, 8 Desember 2021


Mengetahui,
Kepala Dinas Pekerjaan Umum
Penataan Ruang Dan Perhubungan Dibuat Oleh:
Kabupaten Kolaka Timur

,Md
Syafrul L
Jun Rachmat, S.STP.,M.Si DIREKTUR
NIP. 19770605 199511 1 002
NO JENIS PEKERJAAN GAMBAR/SKETS PERHITUNGAN
LANTAI 1
A SLOOF
1 S1 PANJANG AS-AS = 6.00 M

PANJANG EFEKTIF = 5.75

0.45 TINGGI = 0.45 M

LEBAR = 0.20 M

JUMLAH S1 B. 4 M = 14.00 BH
0.2
VOL. BETON SLOOF S1 = panjang x lebar x tinggi X JUMLAH
5.75 x 0.20 x 0.45 X 14.00

VOL. BETON = 7.25 M3

BEKISTING = 72.45 m2

PEMBESIN
BESI ATAS MENERUS = 4.00 BTG
BESI ATAS TEPI = 1.00 BTG
BESI TENGAH MENERUS = 2.00 BTG
BESI BAWAH MENERUS = 3.00 BTG
BESI BAWAH TEPI = 1.00 BTG
JUMLAH BEUGEL = 47.00 BTG 47.00

- BESI TEPI ATAS D13 = 4.00 X 6.00

= 24.00 M = 25.01 KG

- BESI TEPI ATAS D13 = 2.00 X 1.56

= 3.12 M 3.251 KG

BESI TENGAH D13 = 2.00 X 6.00

= 12 M 7.40 KG

BESI TEPI BAWAH D 13 = 3.00 X 6.00

= 18.00 M 18.75 KG

BESI BAWAH LAPANGAN D 13 = 1.00 X 3.52

= 3.52 M 3.67 KG

VOLUME PEMBESIAN S1 B. 4 M = 813.05 KG

BEUGEL D8 = 47.00 X 0.59

= 27.73 M 86.18 KG

2 S2 PANJANG = 71.35 M
TINGGI = 0.20 M
LEBAR = 0.15 M
PANJANG BEUGEL = 0.52 M
0.2 JARAK BEUGEL = 0.15 M
TULANGAN = 4 BTG

BEUGEL DIA. 6 = 0.222 KG/M


TULANGAN DIA. 10 = 0.617 KG/M

0.15 VOL. BETON = TINGGI X LEBAR X PANJANG


= 0.20 X 0.15 X 71.35
= 2.14 M3

VOL. BESI
V. BEUGEL

JUMLAH BEUGEL = 71.35 : 0.15


= 476.67 = 477 BTG

V. BEUGEL = PANJANG BEUGEL X JUMLAH BEUGEL


= 0.52 X 477
= 248.04 M1
= 55.06 KG

V. TULANGAN = J. TULANGAN X PANJANG


= 4 X 71.35
= 285.4 M1
= 176.09 KG

BEKISTING

V. BEKISTING = TINGGI X 2 X PANJANG


= 0.20 X 2 X 71.35
= 28.54 M2

B KOLOM
1 K1
JUMLAH KOLOM = 14.00 BH
TINGGI = 5.00 M
LEBAR = 0.35 M
0.35 PANJANG = 0.25 M

JUMLAH TULANGAN = 8.00 BH


JARAK BEUGEL = 0.15 M
PANJANG BEUGEL = 0.98 M
0.25
BERAT JENIS D 13 = 1.04 KG/M
BERAT JENIS Ø6 = 0.222 KG/M

VOL. BETON = TINGGI X LEBAR X PANJANG X JUMLAH KOLOM


= 5.00 X 0.35 X 0.25 X 14.00
= 6.13 M3

BEKISTING = 84.00 M2

PEMBESIAN

VOL. TULANGAN = JUMLAH KOLOM X TINGGI X JUMLAH TULANGAN X BERAT JENIS D 13


= 14.00 X 5.00 X 8.00 X 1.04
= 583.46 KG
VOL. BEUGEL

JUMLAH BEUGEL = TINGGI : JARAK BEUGEL X JUMLAH KOLOM


= 5.00 : 0.15 X 14.00
= 466.67 BH

VOL. BEUGEL = JUMLAH BEUGEL X PANJANG BEUGEL X BERAT JENIS Ø6


= 466.67 X 0.98 X 0.222
= 101.50 KG

1 k2\
JUMLAH KOLOM = 4.00 BH
TINGGI = 3.53 M
LEBAR = 0.30 M
0.3 PANJANG = 0.30 M

JUMLAH TULANGAN = 8.00 BH


JARAK BEUGEL = 0.15 M
PANJANG BEUGEL = 0.98 M
0.3
BERAT JENIS D 13 = 1.04 KG/M
BERAT JENIS Ø6 = 0.222 KG/M

VOL. BETON = TINGGI X LEBAR X PANJANG X JUMLAH KOLOM


= 3.53 X 0.30 X 0.30 X 4.00
= 1.27 M3

BEKISTING = 16.94 M2

PEMBESIAN

VOL. TULANGAN = JUMLAH KOLOM X TINGGI X JUMLAH TULANGAN X BERAT JENIS D 13


= 4.00 X 3.53 X 8.00 X 1.04
= 117.69 KG

VOL. BEUGEL

JUMLAH BEUGEL = TINGGI : JARAK BEUGEL X JUMLAH KOLOM


= 3.53 : 0.15 X 4.00
= 94.13 BH

VOL. BEUGEL = JUMLAH BEUGEL X PANJANG BEUGEL X BERAT JENIS Ø6


= 94.13 X 0.98 X 0.222
= 20.47 KG

2 KP
JUMLAH = 20.00 BH
TINGGI = 5.00 M

VOL. KOLOM = JUMLAH X TINGGI


= 20.00 X 5.00
= 100.00 M

C BALOK LATEI
2 15/20 PANJANG = 23.68 M 100.5 M
TINGGI = 0.25 M
LEBAR = 0.15 M
PANJANG BEUGEL = 0.66 M
0.25 JARAK BEUGEL = 0.15 M
TULANGAN = 6 BTG

BEUGEL DIA. 6 = 0.222 KG/M


0.15 TULANGAN DIA. 12 = 0.888 KG/M

VOL. BETON = TINGGI X LEBAR X PANJANG


= 0.25 X 0.15 X 23.68
= 0.89 M3

VOL. BESI
V. BEUGEL

JUMLAH BEUGEL = 23.68 : 0.15


= 158.87 = 161 BTG

V. BEUGEL = PANJANG BEUGEL X JUMLAH BEUGEL


= 0.66 X 161
= 106.26 M1
= 23.59 KG

V. TULANGAN = J. TULANGAN X PANJANG


= 6 X 23.68
= 142.08 M1
= 126.17 KG

BEKISTING

V. BEKISTING = TINGGI X 2 X PANJANG


= 0.25 X 2 X 23.68
= 11.84 M2

LANTAI 2
A dak atap
1 PLAT LANTAI 2 TEBAL = 0.12 M
LUAS BIDANG = 39.45 M2

VOL BETON = TEBAL X LUAS BIDANG


= 0.12 X 39.45
= 4.734 M3

VOL. BEKISTING = 39.45 M2

PEMBESIAN = 615.42 KG

B ringbalk
1 rb1 PANJANG AS-AS = 6.00 M

PANJANG EFEKTIF = 5.85

0.4 TINGGI = 0.40 M

LEBAR = 0.20 M

JUMLAH rB1 B. 6 M = 16.00 BH


0.2
VOL. BETON SLOOF S1 = panjang x lebar x tinggi X JUMLAH
5.85 x 0.20 x 0.40 X 16.00

VOL. BETON = 7.49 M3

BEKISTING = 73.01 M2

PEMBESIN
BESI ATAS MENERUS = 4.00 BTG
BESI ATAS TEPI = 1.00 BTG
BESI TENGAH MENERUS = 2.00 BTG
BESI BAWAH MENERUS = 2.00 BTG
BESI BAWAH TEPI = 1.00 BTG
JUMLAH BEUGEL = 45.00 BTG 47.00

- BESI TEPI ATAS D13 = 4.00 X 6.00

= 24.00 M = 37.88 KG

- BESI TEPI ATAS D13 = 2.00 X 1.56

= 3.12 M 4.924 KG

BESI TENGAH D10 = 2.00 X 6.00

= 12 M 7.40 KG

BESI TEPI BAWAH D 13 = 2.00 X 6.00

= 12.00 M 18.94 KG

BESI BAWAH LAPANGAN D 13 = 1.00 X 3.52

= 3.52 M 5.56 KG

VOLUME PEMBESIAN BL1 B. 6 M = 1195.11 KG ULIR

BEUGEL 10 = 47.00 X 0.98

= 46.06 M 163.61 KG POLOS

2 15/25 PANJANG = 35.85 M 100.5 M


TINGGI = 0.20 M
LEBAR = 0.15 M
PANJANG BEUGEL = TINGGI M
0.2 JARAK BEUGEL = 0.15 M
TULANGAN = 4 BTG

BEUGEL DIA. 6 = 0.222 KG/M


0.15 TULANGAN DIA. 10 = 0.617 KG/M

VOL. BETON = TINGGI X LEBAR X PANJANG


= 0.20 X 0.15 X 35.85
= 1.08 M3

VOL. BESI
V. BEUGEL

JUMLAH BEUGEL = 35.85 : 0.15


= 240.00 = 161 BTG

V. BEUGEL = PANJANG BEUGEL X JUMLAH BEUGEL


= 0.66 X 161
= 106.26 M1
= 23.59 KG

V. TULANGAN = J. TULANGAN X PANJANG


= 4 X 35.85
= 143.4 M1
= 88.48 KG

BEKISTING

V. BEKISTING = TINGGI X 2 X PANJANG


= 0.20 X 2 X 35.85
= 14.34 M2

C KOLOM
1 K1
JUMLAH KOLOM = 9.00 BH
TINGGI = 3.50 M
LEBAR = 0.35 M
0.35 PANJANG = 0.35 M

JUMLAH TULANGAN = 8.00 BH


JARAK BEUGEL = 0.15 M
PANJANG BEUGEL = 1.20 M
0.35
BERAT JENIS D 16 = 1.58 KG/M
BERAT JENIS Ø8 = 0.395 KG/M

VOL. BETON = TINGGI X LEBAR X PANJANG X JUMLAH KOLOM


= 3.50 X 0.35 X 0.35 X 9.00
= 3.86 M3

BEKISTING = 44.10 M2

PEMBESIAN

VOL. TULANGAN = JUMLAH KOLOM X TINGGI X JUMLAH TULANGAN X BERAT JENIS D 16


= 9.00 X 3.50 X 8.00 X 1.58
= 398.16 KG

VOL. BEUGEL

JUMLAH BEUGEL = TINGGI : JARAK BEUGEL X JUMLAH KOLOM


= 3.50 : 0.15 X 9.00
= 210.00 BH

VOL. BEUGEL = JUMLAH BEUGEL X PANJANG BEUGEL X BERAT JENIS Ø8


= 210.00 X 1.20 X 0.395
= 99.54 KG

2 KP
JUMLAH = 2.00 BH
TINGGI = 3.50 M

VOL. KOLOM = JUMLAH X TINGGI


= 2.00 X 3.50
= 7.00 M

D BALOK LATEI
2 S2 PANJANG = 16.00 M
TINGGI = 0.15 M
LEBAR = 0.15 M
PANJANG BEUGEL = 0.44 M
0.15 JARAK BEUGEL = 0.15 M
TULANGAN = 4 BTG

BEUGEL DIA. 6 = 0.222 KG/M


0.15 TULANGAN DIA. 10 = 0.617 KG/M

VOL. BETON = TINGGI X LEBAR X PANJANG


= 0.15 X 0.15 X 16
= 0.36 M3

VOL. BESI
V. BEUGEL

JUMLAH BEUGEL = 16 : 0.15


= 106.67 = 107 BTG

V. BEUGEL = PANJANG BEUGEL X JUMLAH BEUGEL


= 0.44 X 107
= 47.08 M1
= 10.45 KG

V. TULANGAN = J. TULANGAN X PANJANG


= 4 X 16
= 64 M1
= 39.49 KG

BEKISTING

V. BEKISTING = TINGGI X 2 X PANJANG


= 0.15 X 2 X 16
= 4.8 M2

TOP FLOOR
A PLAT LANTAI
1 PLAT LANTAI 2 TEBAL = 0.12 M
LUAS BIDANG = 52.41 M2

VOL BETON = TEBAL X LUAS BIDANG


= 0.12 X 52.41
= 6.2892 M3

VOL. BEKISTING = 40.73 M2

PEMBESIAN = 716.97 KG

B BALOK
1 B1 PANJANG AS-AS = 4.00 M

PANJANG EFEKTIF = 3.65

0.4 TINGGI = 0.40 M

LEBAR = 0.20 M

JUMLAH B1 B. 4 M = 16.00 BH
0.2
VOL. BETON SLOOF S1 = panjang x lebar x tinggi X JUMLAH
3.65 x 0.20 x 0.29 X 16.00

VOL. BETON = 3.39 M3

BEKISTING = 45.55 M2

PEMBESIN
BESI ATAS MENERUS = 2.00 BTG
BESI ATAS TEPI = 3.00 BTG
BESI TENGAH MENERUS = 2.00 BTG
BESI BAWAH MENERUS = 2.00 BTG
BESI BAWAH TEPI = 2.00 BTG
JUMLAH BEUGEL = 30.00 BTG 30.00

- BESI TEPI ATAS D16 = 2.00 X 4.00

= 8.00 M = 12.67 KG

- BESI TEPI ATAS D16 = 6.00 X 1.06

= 6.36 M 10.070 KG

BESI TENGAH D13 = 2.00 X 4.00

= 8 M 8.33 KG

BESI TEPI BAWAH D 16 = 2.00 X 4.00

= 8.00 M 12.67 KG

BESI BAWAH LAPANGAN D 16 = 2.00 X 2.52

= 5.04 M 7.98 KG

VOLUME PEMBESIAN BL1 B. 6 M = 827.47 KG ULIR

BEUGEL 10 = 30.00 X 1.00

= 30 M 18.51 KG POLOS

C KOLOM
1 KP
JUMLAH = 8.00 BH
TINGGI = 0.50 M

VOL. KOLOM = JUMLAH X TINGGI


= 8.00 X 0.50
= 4.00 M

D RINGBALK
1 RINGBALK
PANJANG = 24.00 M
E TANGGA
JUMLAH ANAK TANGGA = 18.00 BH
LEBAR TANGGA = 1.00 M1
PANJANG PLAT TANGGA = 6.14 M1
LEBAR BORDES = 1.07 M1
PANJANG BORDES = 2.07 M1
TEBAL PLAT = 0.12 M1
TINGGI ANAK TANGGA = 0.20 M1
LEBAR PIJAKAN = 0.30 M1
JUMLAH BORDES = 1.00 M1
JUMLAH TANGGA = 1.00 BH

VOL. BETON PLAT TANGGA = PANJANG PLAT TANGGA X LEBAR TANGGA X TEBAL PLAT

= 6.14 X 1.00 X 0.12

= 0.74 M3

VOL. BETON PLAT BORDES = LEBAR BORDES X PANJANG BORDES X TEBAL PLAT X J. BORDES

= 1.07 X 2.07 X 0.12 X 1.00

= 0.27 M3

BETON ANAK TANGGA =

0.50 X T. ANAK TANGGA X L. PIJAKAN X J. A. TANGGA X L. TANGGA

0.50 X 0.20 X 0.30 X 18.00 X 1.00

0.54 M3

BEGISTING = 12.04 M2

KERAMIK TANGGA 30/60 = 11.18 M2

PEMBESIAN PLAT DAN BORDES = 218.63 KG

PEMBESIAN ANAK TANGGA = 51.09 KG

RAILING TANGGA = 15.15 M2

RAILING BALKON = 4.00 M2


NO JENIS PEKERJAAN GAMBAR/SKETS PERHITUNGAN
b POER PLAT P2
1 GALIAN TANAH POER PLAT JUMLAH = 14.00 BH

TINGGI = 0.60 M

LEBAR = 1.30 M

0.60 PANJANG = 1.30 M

VOL. GALIAN = panjang x lebar x tinggi x jumlah


1.30 = 1.30 x 1.30 x 0.6 x 14.00
= 14.20 M3

2 LANTAI KERJA JUMLAH = 14.00 BH

TINGGI = 0.05 M

0.05 LEBAR = 1.30 M

PANJANG = 1.30 M
1.30
VOL. LANTAI KERJA = panjang x lebar x tinggi x jumlah
1.30 x 1.30 x 0.05 x 14.00
= 1.18 M3

3 PASIR URUG JUMLAH = 14.00 BH

TINGGI = 0.05 M

0.05 LEBAR = 1.30 M

PANJANG = 1.30 M
1.30
VOL. PASIR URUG P1 = panjang x lebar x tinggi x jumlah
1.30 x 1.30 x 0.05 x 14.00
= 1.18 M3

4 VOL. POER PLAT JUMLAH = 14.00 BH

TINGGI = 0.30 M
0.3
PANJANG 1.20 M

LEBAR = 1.20 M
1.20
VOL. POER PLAT TINGGI X PANJANG X LEBAR X JUMLAH
=

= 0.30 X 1.20 X 1.20 X 14.00

= 6.05 M3

BEKISTING = ((PANJANG X 2) + (LEBAR X 2)) X TINGGI X JUMLAH

= ((1,2 X 2) + (1,2 X 2)) X 0.30 X 14.00

= 20.16 M2

PEMBESIAN = 418.08 KG polos

4 VOL. urugan tanah kembali = volume galian - 8.41


URUGAN TANAH KEMBALI
PONDASI POER PLAT
= 14.20 - 8.414

= 5.78 M3

e KOLOM PEDESTAL
PANJANG = 0.41 M

TINGGI = 3.45 M

0.41 LEBAR = 0.31 M

JUMLAH KOLOM = 14.00 BH

VOL. KOLOM PEDESTAL = PANJANG x LEBAR x TINGGI x J. KOLOM


0.31 0.41 x 0.31 x 3.45 x 14.00
= 6.14 M3

BEGISTING = TINGGI X ((PANJANG X 2) X (LEBAR X 2)) X J. KOLOM

= 3.45 X ((0,41 X 2) X (0,31X 2)) X 14.00

= 69.55 M2

JUMLAH BESI = 8.00 BH 10.00

PANJANG BEUGEL = 0.98 M

PANJANG TULANGAN = 3.45 M

JARAK BEUGEL = 0.15 M

PANJANG BESI = JUMLAH BESI X PANJANG TULANGAN X JUMLAH KOLOM

= 8.00 X 3.45 X 14.00

= 386.40 M = 401.856 KG ULIR

JUMLAH BEUGEL = TINGGI KOLOM : JARAK BEUGEL X JUMLAH KOLOM

= 3.45 : 0.15 X 14.00

= 336.00 BH

PANJANG BEUGEL = JUMLAH BEUGEL X PANJANG BEUGEL

= 336.00 X 0.98
= 329.28 M = 73.08 KG POLOS
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GEDUNG KESBANGPOL
KOLAKA TIMUR - SULAWESI TENGGARA

BANGUNAN KESBANGPOL

HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)
I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi Ls 1.00 3,000,000.00 3,000,000.00
2 Pembuatan Pagar Sementara M' 1.00 5,000,000.00 5,000,000.00
3 Pembuatan Barak Kerja & Gudang Ls 1.00 5,000,000.00 5,000,000.00
4 Pengukuran & Pemasangan Bouwplank M' - 70,408.75 -
5 Adminstrasi & Dokumentasi Ls 1.00 3,000,000.00 3,000,000.00
6 Papan Nama Proyek Ls 1.00 250,000.00 250,000.00
7 Penyediaan Air Bersih & Listrik Kerja Ls 1.00 5,000,000.00 5,000,000.00
8 Kesehatan & Keselamatan Kerja (K3) Ls 1.00 6,400,000.00 6,400,000.00
s JUMLAH I 27,650,000.00

II. PEKERJAAN PONDASI


1 Pek. Pondasi Garis
- Pek. Galian Tanah M³ 228.10 89,843.75 20,493,679.22
- Pek. Urugan Pasir M³ 19.01 270,537.50 5,142,547.24
- Pek. Batu Kosong (Aanstamping) M³ 57.03 530,193.54 30,234,758.25
- Pek. Pasangan Batu 1 : 3 M³ 199.59 1,079,913.32 215,540,562.83
- Pek. Urugan Kembali M³ 57.03 64,687.50 3,688,862.26
2 Pek. Urugan Tanah di Datangkan M³ 222.64 101,343.75 22,563,172.50
3 Pek. Ramp
- Pek. Pasangan Batu 1 : 3 M³ 1,079,913.32 -
- Pek. Plasteran M² 75,606.36 -
4 Pek. Rabat Keliling Bangunan
- Pek. Urugan Pasir M³ 270,537.50 -
- Pek. Rabat Beton M³ 1,060,792.57 -
5 Pek. Saluran Keliling Bangunan
- Pek. Tanah Urug M³ 270,537.50 -
- Pek. Pasangan Batu 1 : 3 M³ 1,079,913.32 -
- Pek. Plasteran M² 75,606.36 -
- Pek. Acian M² 44,278.94 -
JUMLAH II 297,663,582.29

III. PEKERJAAN BETON


1 Pek. Sloof 15/20
- Pek. Beton f’c = 21,7 MPa M³ 12.67 1,355,263.86 17,174,472.80
- Pek. Pembesian (Besi polos) Kg 1,643.19 19,698.35 32,368,140.80
- Pek. Bekisting M² 168.97 160,686.34 27,150,463.43
2 Pek. Kolom 11/11 M' 456.00 111,542.99 50,863,601.16
3 Pek. Balok Latei 10/15 M' 249.79 111,542.99 27,862,322.22
4 Pek. Ringbalk 10/15 M' 454.91 111,542.99 50,742,465.48
JUMLAH III 206,161,465.89

IV. PEKERJAAN DINDING


1 Pek. Pemasangan Dinding Bata Merah 1 PC : 4 PP M² 1,074.35 135,655.61 145,741,604.60
2 Pek. Plasteran dinding 1 PC : 4 PP M² 2,148.70 75,606.36 162,455,393.47
3 Pek. Acian M² 2,148.70 44,199.33 94,971,100.37
4 Pek. Pas. Transram 1 PC : 3 PP M² 297.90 139,854.76 41,662,732.05
5 Pek. Plasteran dinding Transram 1 PC : 3 PP M² 595.80 78,027.81 46,488,971.96
6 Pek. Second Skin conwood M² 131.60 500,000.00 65,800,000.00
JUMLAH IV 557,119,802.46

V. PEKERJAAN LANTAI DAN DINDING GRANIT


1 Pek. Rabat Lantai
- Pek. Pasir Urug M³ 27.83 270,537.50 7,529,058.63
- Pek. Rabat Lantai M³ 27.83 1,060,792.57 29,521,857.26
2 Pek. Pemasangan Batu Koral Hambur M² 31.16 126,500.00 3,941,740.00
3 Pemasangan Lantai Granit 60x60 untuk Interior M² 432.33 311,793.82 134,797,821.77
4 Pemasangan Lantai Keramik 20x20 untuk WC/KM M² 40.79 236,567.29 9,649,579.90
5 Pemasangan Dinding Granit 20x25 untuk WC/KM M² 307.20 321,357.59 98,721,052.93
6 Pemasangan Plint Lantai Interior M' 224.17 60,128.67 13,479,044.99
JUMLAH V 297,640,155.47

VI. PEKERJAAN KUSEN ALUMUNIUM


1 Pek. Pemasangan Kusen Pintu Jendela Alumunium
- Pekerjaan PJ1 Bh 1.00 32,200,730.35 32,200,730.35
- Pekerjaan PJ2 Bh 4.00 15,121,519.64 60,486,078.57
- Pekerjaan PJ3 Bh 4.00 12,866,050.84 51,464,203.35
- Pekerjaan PJ4 Bh 2.00 12,355,176.66 24,710,353.32
- Pekerjaan PJ5 Bh 5.00 9,684,721.24 48,423,606.20
2 Pek. Pemasangan Kusen Jendela Alumunium
- Pekerjaan J1 Bh 1.00 5,977,281.63 5,977,281.63
- Pekerjaan J2 Bh 7.00 4,717,329.86 33,021,309.02
- Pekerjaan J3 Bh 2.00 6,524,125.48 13,048,250.97
- Pekerjaan J4 Bh 4.00 3,466,128.09 13,864,512.36
- Pekerjaan PA1 Bh 1.00 3,435,355.02 3,435,355.02
- Pekerjaan PA2 Bh 1.00 7,407,849.14 7,407,849.14
- Pekerjaan PA3 Bh 4.00 7,331,723.73 29,326,894.92
3 Pek. Pemasangan Kusen Pintu Alumunium
- Pekerjaan P1 Bh 18.00 2,355,148.09 42,392,665.60
- Pekerjaan P2 Bh 3.00 2,336,630.00 7,009,890.00
4 Pek. Pemasangan Ventilasi Alumunium
- Pekerjaan V1 Bh 15.00 293,455.02 4,401,825.28
JUMLAH VI 377,170,805.73

VII. PEKERJAAN PENGECATAN


1 Pek. Pengecatan Tembok Baru M² 2,148.70 37,128.90 79,778,867.43
2 Pek. Pengecatan Plafon M² 473.12 43,252.65 20,463,693.77
JUMLAH VII 100,242,561.20

VIII. PEKERJAAN PLAFON


1 Pek. Rangka Plafond Hollow Galvalume M² 473.12 127,743.15 60,437,839.13
2 Pek. Plafon Gypsum board M² 473.12 59,426.14 28,115,692.99
3 Pek. List Plafond M' 245.19 44,390.00 10,883,984.10
JUMLAH VIII 99,437,516.22

IX. PEKERJAAN DAK BETON


1 Pek. Beton f’c = 21,7 MPa M³ 32.82 1,355,263.86 44,476,344.51
2 Pek. Pembesian (Besi polos) Kg 19,698.35 -
3 Pek. Bekisting M² 273.48 442,116.93 120,909,694.53
JUMLAH IX 165,386,039.04

X. PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP


1 Pek. Atap Bitumen M² 608.97 350,000.00 213,140,410.96
2 Pek. Struktur Kuda-Kuda Baja M² 608.97 333,873.75 203,319,966.52
3 Pek. Nok atap Spandeks M' 54.70 106,236.43 5,811,132.45
4 Pek. Pemasangan Kalsiplank M' 141.90 80,586.25 11,435,188.88
JUMLAH X 433,706,698.81

XI PEKERJAAN ELEKTRIKAL
1 Down Light PL-C RD 125 13W Putih, Ex. Philips Bh 130.00 110,500.00 14,365,000.00
2 Down Light PL-C RD 100 9W Putih, Ex. Philips Bh 22.00 71,500.00 1,573,000.00
3 Ceiling Decorative Lamp 6W, Ex. Philips Bh 11.00 195,000.00 2,145,000.00
4 Exhaust Fan Krisbow 8'' Bh 3.00 390,000.00 1,170,000.00
5 Saklar Tunggal Ex. Panasonic/Setara, SNI Bh 21.00 31,950.00 670,950.00
6 Saklar Ganda Ex. Panasonic/Setara, SNI Bh 27.00 63,900.00 1,725,300.00
7 Stop Kontak, SNI Bh 39.00 31,950.00 1,246,050.00
8 CCTV High Resolution Dome Camera, Include Acc Bh 17.00 2,300,000.00
9 AC Unit 0,5 pk Dalam Ruangan Bh 18.00 5,325,000.00
10 -
11 -
12 -
JUMLAH XI 22,895,300.00

XII PEKERJAAN SANITASI


1 Pek. Pemasangan Pipa PVC 3/4'' M' 66.85 29,456.17 1,969,145.09
2 Pek. Pemasangan Pipa PVC 2'' M' 33.70 57,235.50 1,928,836.35
3 Pek. Pemasangan Pipa PVC 3'' M' 4.50 114,256.81 514,155.66
4 Pek. Pemasangan Pipa PVC 4'' M' 115.00 152,224.06 17,505,767.19
5 Pek. Pemasangan Closet Duduk/Monoblock Bh 18.00 4,697,382.00 84,552,876.00
6 Pek. Pemasangan Jet washer Bh 18.00 162,265.00 2,920,770.00
7 Pek. Pemasangan Floor Drain Bh 18.00 113,878.75 2,049,817.50
8 Pek. Sumur Bor Bh 1.00 20,000,000.00
9 Tangki Air 100L Bh 3.00 400,000.00
-
-
JUMLAH XII 111,441,367.78

XI. PEKERJAAN AKHIR


1 Pembersihan Akhir Ls 1.00 6,000,000.00 6,000,000.00
JUMLAH XI 6,000,000.00
JUMLAH 2,702,515,294.88
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GEDUNG NICU PICU
KOLAKA TIMUR - SULAWESI TENGGARA

BANGUNAN PICU

HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)
I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi Ls 4,000,000.00 -
2 Pembuatan Pagar Sementara M'
3 Pembuatan Barak Kerja & Gudang Ls 10,000,000.00 -
4 Pengukuran & Pemasangan Bouwplank M' 70,408.75 -
5 Adminstrasi & Dokumentasi Ls 7,000,000.00 -
6 Papan Nama Proyek Ls 250,000.00 -
7 Penyediaan Air Bersih & Listrik Kerja Ls 5,500,000.00 -
8 Kesehatan & Keselamatan Kerja (K3) Ls 6,400,000.00 -
JUMLAH I -

II. PEKERJAAN PONDASI


1 Pek. Pondasi Garis
- Pek. Galian Tanah M³ 89,843.75 -
- Pek. Urugan Pasir M³ 270,537.50 -
- Pek. Batu Kosong (Aanstamping) M³ 530,193.54 -
- Pek. Pasangan Batu 1 : 3 M³ 1,079,913.32 -
- Pek. Urugan Kembali M³ 64,687.50 -
2 Pek. Urugan Tanah di Datangkan M³ 101,343.75 -
3 Pek. Ramp
- Pek. Pasangan Batu 1 : 3 M³ 1,079,913.32 -
- Pek. Plasteran M² 75,606.36 -
4 Pek. Rabat Keliling Bangunan
- Pek. Urugan Pasir M³ 270,537.50 -
- Pek. Rabat Beton M³ 1,060,792.57 -
5 Pek. Saluran Keliling Bangunan
- Pek. Galian Tanah M³ 89,843.75 -
- Pek. Urugan Pasir M³ 270,537.50 -
- Pek. Pasangan Batu 1 : 3 M³ 1,079,913.32 -
- Pek. Plasteran M² 75,606.36 -
- Pek. Acian M² 44,278.94 -
JUMLAH II -

III. PEKERJAAN BETON


1 Pek. Sloof 15/20
- Pek. Beton f’c = 21,7 MPa M³ 1,355,263.86 -
- Pek. Pembesian (Besi polos) Kg 19,698.35 -
- Pek. Bekisting M² 160,686.34 -
2 Pek. Kolom 15/15
- Pek. Beton f’c = 21,7 MPa M³ 1,355,263.86 -
- Pek. Pembesian (Besi ulir) Kg 23,407.10 -
- Pek. Pembesian (Besi polos) Kg 19,698.35 -
- Pek. Bekisting M² 279,650.68 -
3 Pek. Balok Latei 11/11 M'
4 Pek. Ringbalk 11/11 M' 145,550.27 -
JUMLAH III -

IV. PEKERJAAN DINDING


1 Pek. Pemasangan Dinding Bata Merah 1 PC : 4 PP M² 135,655.61 -
2 Pek. Plasteran dinding 1 PC : 4 PP M² 75,606.36 -
3 Pek. Pas. Transram 1 PC : 3 PP M² 139,854.76 -
4 Pek. Plasteran dinding Transram 1 PC : 3 PP M² 78,027.81 -
JUMLAH IV -

V. PEKERJAAN LANTAI DAN DINDING GRANIT


1 Pek. Rabat Lantai
- Pek. Pasir Urug M³ 270,537.50 -
- Pek. Rabat Lantai M³ 1,060,792.57 -
2 Pemasangan Keramik 60x60 Interior M² 311,793.82 -
3 Pemasangan Keramik 60x60 Eksterior M² 312,028.97 -
4 Pemasangan Dinding Granit 60x60 KM/WC M² Err:509 Err:509
5 Pemasngan Dinding Granit 60x60 untuk Eksterior M² Err:509 Err:509
6 Pemasangan Plint Lantai Interior M' 60,128.67 -
JUMLAH V Err:509

VI. PEKERJAAN KUSEN ALUMUNIUM


1 Pek. Pemasangan Kusen Pintu Alumunium
- Pekerjaan PJ1 Bh 32,200,730.35 -
- Pekerjaan PJ2 Bh 15,121,519.64 -
- Pekerjaan PJ3 Bh 12,866,050.84 -
- Pekerjaan P1 Bh 15,000,000.00 -
- Pekerjaan P2 Bh 2,336,630.00 -
- Pekerjaan P3 Bh Err:509 Err:509
2 Pek. Pemasangan Kusen Jendela Alumunium
- Pekerjaan J1 Bh 5,977,281.63 -
- Pekerjaan V1 Bh 3,466,128.09 -
- Pekerjaan V2 Bh Err:509 Err:509
- Pekerjaan V3 Bh 293,455.02 -
- Pekerjaan V4 Bh Err:509 Err:509
JUMLAH VI Err:509

VII. PEKERJAAN PENGECATAN


1 Pek. Pengecatan Tembok Baru M² 37,128.90 -
2 Pek. Pengecatan Plafon M² 43,252.65 -
JUMLAH VII -

VIII. PEKERJAAN PLAFON


1 Pek. Rangka Plafond Hollow Galvalume M² 127,743.15 -
2 Pek. Plafon Gypsum board M² 59,426.14 -
3 Pek. Rangka Plafon PVC Hollow Galvalume M² 127,743.15 -
4 Pek. Plafon PVC M² Err:509 Err:509
JUMLAH VIII Err:509

IX. PEKERJAAN ATAP DAK BETON


1 Pek. Beton f’c = 21,7 MPa M³ 1,355,263.86 -
2 Pek. Pembesian (Besi polos) Kg 19,698.35 -
3 Pek. Bekisting M² 442,116.93 -
JUMLAH IX -

X. PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP


1 Pek. Atap Spandeks M² 107,874.60 -
2 Pek. Struktur Kuda-Kuda Baja
- Pek. Baja WF 175.90.5.8 mm Kg Err:509 Err:509
- Pek. Baja WF 150.75.5.7 mm Kg Err:509 Err:509
- Pek. Perakitan Kg Err:509 Err:509
- Pek. Gording CNP Chanel C 100.50.20.2,3 Kg Err:509 Err:509
- Pek. Besi Siku 60.60.5 Kg Err:509 Err:509
- Pek. Besi Plat 10 mm Kg 13,491.43 -
- Pek. Pemasangan Baut 16 mm Bh 9,000.00 -
- Pek. Pemasagan Baut Angkur diameter 16 mm Kg 33,200.00 -
- Pek Pemasangan Ikatan Angin Kg 19,698.35 -
- Pek, Pasangan Jarum Pengeras Bh 57,500.00 -
3 Pek. Nok atap Spandeks M' 106,236.43 -
4 Pek. Pengecatan Rangka Atap M² Err:509 Err:509
5 Pek. Pemasangan Kalsiplank M' 80,586.25 -
JUMLAH X Err:509
XI. PEKERJAAN INSTALASI LISTRIK
1 Pek. Panel DP Penerangan Dan KKb (Pabrikasi) Unit 6,000,000.00 -
2 Pemasangan MCB Bh 53,100.00 -
3 Pemasangan 1 Buah Titik Lampu Bh Err:509 Err:509
4 Pemasangan Lampu LED 9 Watt Bh 35,000.00 -
5 Pemasangan Lampu LED 13 Watt Bh 64,000.00 -
6 Pemasangan Lampu Baret Bh 312,000.00 -
7 Pemasangan Saklar Ganda Bh 18,900.00 -
8 Pemasangan Saklar Tuanggal Bh 13,300.00 -
9 Pemasangan Kotak Kontak Biasa Bh 14,800.00 -
10 Pengadaan Listrik Kaps. Daya 5500 Watt Ls 6,163,425.00 -
JUMLAH XI Err:509

XII. PEKERJAAN SANITASI


1 Pemasangan Kloset Duduk ex TOTO Bh 4,697,382.00 -
2 Pemasangan Pipa PVC 3/4 Inchi M' Err:509 Err:509
3 Pemasangan Pipa PVC 2Inchi M' Err:509 Err:509
4 Pemasangan Pipa PVC 4 Inchi M' Err:509 Err:509
5 Pemasangan Keran Air 3/4 Bh 86,911.25 -
6 Pemasangan Jet Washer Bh 162,265.00 -
7 Pemasangan Floor Drain Bh 113,878.75 -
8 Tandon Air 1200 Liter Bh 2,300,000.00 -
9 Pek. Septictank Ls Err:509 Err:509
JUMLAH XII Err:509

XIII. PEKERJAAN TALUD PAGAR DEPAN


1 Pek. Pondasi Batu Gunung
- Pek. Galian Tanah M³ 89,843.75 -
- Pek. Urugan Tanah Kembali M³ 64,687.50 -
- Pek. Urugan Pasir M³ 270,537.50 -
- Pek. Pas Batu Kosong M³ 530,193.54 -
- Pek. Pas. Batu Belah 1SP : 4PP M³ 1,021,193.86 -
P2ek. Beton
a. Sloof 15/20
- Beton f'c = 14,5 Mpa M³ 1,272,196.47 -
- Pek. Pembesian (Besi polos) Kg 19,698.35 -
- Bekisting M² 160,686.34 -
b. Kolom 20/20
- Beton f'c = 14,5 Mpa M³ 1,272,196.47 -
- Pembesian Besi Polos Kg 19,698.35 -
- Bekisting M² 279,650.68 -
c. Ringbalk 10/15 M 145,550.27 -
3 Pekerjaan Dinding
- Pek. Pasangan Dinding Batako M² 280,081.96 -
- Pek. Plasteran dinding 1 PC : 3 PP M² 78,027.81 -
- Pek. Pengecatan M² 37,128.90 -
4 Pek. Pintu Gerbang Hollow M² 350,000.00 -
JUMLAH XIII -

XIV. PEKERJAAN AKHIR


1 Pembersihan Akhir Ls 6,000,000.00 -
JUMLAH XIV -
DAFTAR UPAH DAN HARGA BAHAN

NO URAIAN JENIS TENAGA/BAHAN SATUAN HARGA SATUAN

1 2 3 4
I UPAH TENAGA KERJA
1 Pekerja Hari 100,000.00
2 Tukang Batu Hari 110,000.00
3 Tukang Kayu Hari 110,000.00
4 Tukang Besi Hari 110,000.00
4 Tukang Cat Hari 110,000.00
5 Tukang Listrik Hari 120,000.00
6 Kepala Tukang Hari 120,000.00
7 Mandor Hari 125,000.00

II HARGA BAHAN
A. Bahan Dasar
1 Tanah Urug didatangkan M3 51,000.00
2 Pasir Urug M3 170,000.00
3 Pasir Pasang M3 250,000.00
4 Pasir Beton M3 250,000.00
5 Pasir Beton Kg Kg 178.57
6 Air Kerja Ltr 50.00
7 Kerikil M3 320,000.00
8 Kerikil Kg 237.04
9 Semen Portland @ 50 Kg Zak 77,745.00
10 Semen Portland Kg 1,554.90
11 Semen Warna Kg 26,625.00
12 Batu Belah M3 257,142.86
13 Batu Bata Merah Bh 700.00
14 Plafon PVC M2 275,000.00
15 minyak pelumas Ltr 19,242.50
16 solar Ltr 11,368.00

B. Bahan Lantai
1 Granit 60 x 60 Cm (Exterior) Dos 212,000.00
2 Granit 60 x 60 Cm (Interior) Dos 212,000.00
3 Granit 10 x 60 Bh 45,900.00

C. Bahan Besi dan Paku


1 Besi Polos Kg 15,500.00
2 Besi Ulir Kg 17,500.00
3 Paku Campur (5, 7, 10 Cm) Kg 20,000.00
4 Baut Railing Bh 1,500.00
5 Paku Sekrup 2cm Kg 70,000.00
6 Skrup Fixer bh 5,532.50
7 Kawat Beton Kg 25,000.00
8 Besi Strep Kg 4,200.00
9 Kawat Las Kg 35,000.00
10 Besi Plat 10 mm (120 cm x 240 cm) Lbr 2,737,000.00
11 Besi Plat 10 mm Kg 13,491.43
12 Baut Mur Kg 20,000.00
13 Baut diameter 15 mm BH 9,000.00
14 Jarum Pengeras Bh 57,500.00
15 Besi siku 2x2x3mm BH 62,705.00
16 Baut Angkur Kg 33,200.00
17 baja IWF Kg 25,000.00

C Bahan Kaca Dan Alumunium


1 Kusen Alumunium 4" M1 5,000.00
2 Daun Pintu Swing Standard Unit 2,000,000.00
3 Jalusi Alumunium Unit 650,000.00
4 *Spare Part & Instalation Unit 550,000.00
5 **Spare Part & Instalation Unit 525,000.00
6 Kaca Ryben 5 mm M2 186,050.00
7 Kaca Ryben 8 mm M2 170,000.00
8 Silikon/Sealent Kg 12,455.00
9 Pemasangan Dan perakitan M2 43,480.00
10 Daun Jendela Casemant Jungkit M1 85,000.00
11 Hollow 20.40 mm (baja Ringan) M1 3,700.00
12 Hollow 40.40 mm (baja Ringan) M1 5,000.00
13 Sandblash Fullblock M2 100,000.00
14 Baja Ringan Canal (C-0.80 mm) M 15,975.00
15 baja Chanel CNP Kg 15,000.00
16 Penutup Lurus Open Back 4" M 21,000.00
17 Tangga Alumunium M 42,500.00
18 Spycoat M 12,000.00
19 Sealant Tube 38,200.00
20 Skrup Aluminium Bh 4,400.00
21 Baut Fixer Bh 2,000.00
22 Paku Rivet Bh 325.00
23 Pintu Alumunium Unit 1,500,000.00
24 Pintu Lipat Besi Set 15,000,000.00
D Bahan Kunci Dan Gantungan
1 Handel Pintu Stainless Bh 160,000.00
2 Penggantung Kesmen Bh 65,000.00
E Bahan Cat dan Minyak
1 Cat Dasar Kg 44,400.00
2 Cat Penutup Kg 95,400.00
3 Cat Meny Kayu Kg 28,800.00
4 Thener Ltr 20,400.00
5 Minyak Bekisting Ltr 7,200.00
6 Plamur Tembok Kg 14,300.00
7 Kuas Biasa Buah 15,300.00
8 Plamur Kayu Kg 19,320.00
9 Cat Zinkcromate Kg 71,400.00

F Bahan Kayu dan Atap


1 Balok Kayu Kls II M3 2,958,000.00
2 Papan Kayu Kls III M3 1,980,000.00
3 Balok Kayu Kls III M3 1,980,000.00
4 Atap Spandeck M 37,800.00
5 Plywood T=9mm Lbr 133,600.00
6 Dolken Btg 7,500.00
7 Gibsum Board (240x120Cm) Lbr 76,500.00
8 List Gypsum M1 12,500.00
9 Kalsiplank M 25,500.00
10 Nok Atap m' 40,000.00

G Bahan Elektrikal
1 Panel DP Penerangan Dan KKb (Pabrikasi) Unit 6,000,000.00
2 Saklar Ganda Bh 18,900.00
3 Saklar Tunggal Bh 13,300.00
4 Fitting Plafond Segi Empat Ex. Broco Bh 9,200.00
5 L.Bow Bh 1,200.00
6 T. dus Bh 7,280.00
7 Las Dop Bh 2,400.00
8 Mangkok Listrik Bh 5,000.00
9 Klem Pipa Bh 1,200.00
10 Pipa Listrik 5/8 Btg 8,395.00
11 Lampu LED 9 watt Bh 35,000.00
12 Kotak Kontak Biasa Bh 14,800.00
13 Lampu Baret Bh 312,000.00
14 Lampu LED 13 watt Bh 64,000.00
15 Kabel NYM 2 x 1,5 M' 8,400.00
16 MCB 10A BH 53,100.00
17 Penyambungan Daya Kaps. 5500 Watt {Sudah termasuk Ls 6,163,425.00
Biaya Pemasangan Dan Mterial}

H Bahan Sanitasi
1 Kloset Duduk Bh 2,500,000.00
2 Floor Drain Bh 48,750.00
3 Kran Air 1/2 '' Bh 153,000.00
4 sealtape Bh 6,000.00
5 Pipa PVC 3/4 '' M 7,500.00
6 Pipa PVC 2 '' M 22,500.00
7 Pipa PVC 4" M 75,000.00
8 Jetwasher Bh 350,000.00
9 Tandon Air 1200 Liter Bh 2,300,000.00
No Uraian dan Jenis Pekerjaan Gambar Sketsa Perhitungan
I PEKERJAAN PENDAHULUAN
1. Pembersihan Lokasi Volume = 1.00 Ls

2. Pembuatan pagar sementara Volume = M1

3. Pembuatan Barak Kerja & Gudang Volume = 1.00 Ls

4. Pengukuran & Pemasangan Bouwplank Volume = M1

5. Adminstrasi & Dokumentasi Volume = 1.00 Ls

6. Papan Nama Proyek Volume = 1.00 Ls

7. Penyediaan Air Bersih & Listrik Kerja Volume = 1.00 Ls

8. Kesehatan & Keselamatan Kerja (K3) Volume = 1.00 Ls

II PEKERJAAN PONDASI
1. Pekerjaan Pondasi Garis
Pondasi Type 2
Galian Pondasi = Panjang x Lebar x Tinggi
= 422.41 x 0.90 x 0.60
= 228.10 M3

Pasir Urug = Panjang x Lebar x Tinggi


= 422.41 x 0.90 x 0.05
= 19.01 M3

Batu Kosong (Aanstamping) = Panjang x Lebar x Tinggi


= 422.41 x 0.90 x 0.15
= 57.03 M3

Volume Pas. Batu = a + b x Tinggi x panjang


2
= 0.25 + 0.80 x 0.90 x 422.41
2
= 0.53 x 0.90 x 422.41
= 199.59 M3

Urugan Kembali = 0.25 x V.Galian


= 0.25 x 228.10
= 57.03 M3

Pondasi Type 1
Galian Pondasi = Panjang x Lebar x Tinggi
= 136.00 x 0.73 x 0.50
= 49.64 M3

Pasir Urug = Panjang x Lebar x Tinggi


= 136.00 x 0.73 x 0.05
= 4.96 M3

Batu Kosong (Aanstamping) = Panjang x Lebar x Tinggi


= 136.00 x 0.73 x 0.15
= 14.89 M3

Volume Pas. Batu = a + b x Tinggi x panjang


2
= 0.25 + 0.63 x 1.60 x 136.00
2
= 0.44 x 1.60 x 136.00
= 95.74 M3

Urugan Kembali = 0.25 x V.Galian


= 0.25 x 49.64
= 12.41 M3

Total
Galian Pondasi = 277.74 M3
Pasir Urug = 23.97 M3
Batu Kosong (Aanstamping) = 71.92 M3
Pas. Batu = 295.33 M3
Urugan Kembali = 69.44 M3

2. Urugan Tanah Di Datangkan Urugan Yang di Datangkan = Luas x Tebal


= 556.60 x 0.40
= 222.64 M3

3. Pekerjaan Ramp
Pekerjaan Ramp
Pekerjaan Pas. Batu 1:3 = Luas
= 2.50 M3

Pekerjaan Plasteran 1:3 = Luas


= 10.03 M2

Pekerjaan Tangga
Pekerjaan Pas. Batu 1:3 = Luas
= 3.58 M3

Pekerjaan Plasteran 1:3 = Luas


= 17.43 M2

Total Vol. Pasangan Batu = 6.08 M3


Total Vol. Plasteran = 27.46 M2

Reiling = M1

4. Rabat Keliling Bangunan


Pekerjaan Urugan Pasir = Panjang x Lebar x Tinggi
= 55.47 x 1.21 x 0.05
= 3.36 M3

Pekerjaan Rabat Beton = Panjang x Lebar x Tinggi


= 55.47 x 1.21 x 0.05
= 3.36 M3

5. Saluran Keliling Bangunan


Pekerjaan Tanah Urug = Panjang x Luas
= 65.60 x 1.40
= 91.84 M3

Pekerjaan Pas. Batu = Panjang x Luas


= 65.60 x 0.23
= 15.09 M3

Pekerjaan Plasteran = Panjang x Lebar


= 65.60 x 2.48
= 162.69 M2

Pekerjaan Acian = Panjang x Lebar


= 65.60 x 2.48
= 162.69 M2

III PEKERJAAN BETON


1. Pekerjaan Sloof 15/20 Panjang Sloof 15/20 = 422.41 M1
Volume Sloof 15/20 = Panjang x Lebar x Tinggi
= 422.41 x 0.15 x 0.20
= 12.67 M3

Pembesian Sloof
Begelø8 = Panjang bg x Jml Bgl x Berat Jenis
= 0.54 x 2,816.09 x 0.395
= 600.67 kg

Tulangan Pokok D10 = Panjang x Berat Jenis x Jumlah


= 422.41 x 0.617 x 4.00
= 1,042.52 Kg

Total Tulangan 15/20 = 1,643.19 Kg

Bekisting = Tinggi x Sisi x P. Sloof


= 0.20 x 2.00 x 422.41
= 168.97 M2

2. ###
Pekerjaan Kolom 11/11 A = Tinggi x Jumlah
= 4.00 x 114.00
= 456.00 M1

Pekerjaan Kolom 15/30 A


Beton Kolom 15/30 A = Panjang x Lebar x Tinggi x Jumlah
= 0.15 x 0.30 x 4.00 x 20.00
= 3.60 M3

Pembesian Kolom
Begelø8 = Panjang bg x Jml Bgl x Berat Jenis
= 0.78 x 533.33 x 0.395
= 164.32 Kg

Tulangan Pokok D10 = Panjang Klm x Berat Jenis x Jumlah


= 80.00 x 0.617 x 4.00
= 197.44 Kg

Total Tulangan 15/30 A = 361.76 Kg

Bekisting = 2.00 x Luas Sisi A+B x Jumlah


= 2.00 x 1.75 x 20.00
= 69.84 M2

Pekerjaan Kolom 15/30 B


Beton Kolom 15/30 B = Panjang x Lebar x Tinggi x Jumlah
= 0.15 x 0.30 x 3.88 x 16.00
= 2.79 M3

Pembesian Kolom
Begelø8 = Panjang bg x Jml Bgl x Berat Jenis
= 0.78 x 413.87 x 0.395
= 127.51 Kg

Tulangan Pokok D10 = Panjang Klm x Berat Jenis x Jumlah


= 62.08 x 0.617 x 4.00
= 153.21 Kg

Total Tulangan 15/30 B = 280.73 Kg

Bekisting = 2.00 x Luas Sisi A+B x Jumlah


= 2.00 x 1.71 x 16.00
= 54.72 M2

Total Kolom 15/30 A+B


Vol. Beton Kolom = 6.39 M3
Pembesian = 642.49 Kg
Bekisting = 124.56 M2

3. Pekerjaan Balok Latei 11/11


Pekerjaan Balok Latei 11/11 = 249.79 M1

4. ###
Panjang Balok Talang 15/20 = 169.00 M1
Volume Balok Talang 15/20 = Panjang x Lebar x Tinggi
= 169.00 x 0.15 x 0.20
= 5.07 M3

Pembesian Balok Talang


Begelø8 = Panjang bg x Jml Bgl x Berat Jenis
= 0.54 x 1,126.67 x 0.395
= 240.32 Kg

Tulangan Pokok D10 = Panjang Blk x Berat Jenis x Jumlah


= 169.00 x 0.617 x 4.00
= 417.09 Kg

Total Tulangan 15/20 = 657.41 Kg

Bekisting = Panjang + Lebar x P. Balok Talang


= 0.15 + 0.40 x 169.00
= 92.95 M2

5. Pek. Ringbalk 10/15


Pekerjaan RingBalk 11/11 = 454.91 M1

IV PEKERJAAN DINDING
1. Pek. Pemasangan Dinding Bata Merah 1 PC : 4 PP 461.99 4.00 120.35 177.53 4.00 50.23 297.37 4.00 88.50
23.66 0.91 26.00 6.37 0.91 7.00 21.84 0.91 24.00 Volume Dinding Biasa = Panjang x Tinggi - V. Kusen
53.41 4.00 28.00 7.13 4.00 5.78 25.05 4.00 13.00 = x 4.50 -
539.06 191.03 344.26 = 1,074.35 M2

2. Pek. Plasteran dinding 1 PC : 4 PP 19.41 23.39 56.63 Plasteran = 2.00 x V.Dinding


58.59 15.99 26.95 = 2.00 x 1,074.35
= 2,148.70 M2

3. Pek. Pas. Transram 1 PC : 3 PP Dinding Trasram = Panjang x Tinggi


= 165.50 x 1.80
= 297.90 M2

4. Pek. Plasteran dinding Transram 1 PC : 3 PP Plasteran Trasram = 595.80 M2

V PEKERJAAN LANTAI DAN DINDING GRANIT


1. Pek. Rabat Lantai Pekerjaan Pasir Urug = Luas x Tebal
= 556.60 x 0.05
= 27.83 M3

Pekerjaan Rabat = Luas x Tebal


= 556.60 x 0.05
= 27.83 M3

2. Pemasangan Batu Koral Hambur Pek. Batu Koral Hambur = Luas


= 31.16 M2

3. Pemasangan Lantai Granit 60x60 untuk Interior Lantai Granit 60 x 60 Interior = Luas
= 432.33 M2

4. Pemasangan Lantai Keramik 25x25 untuk WC/KM Lantai Granit 25 x 25 WC/KM = Luas
40.79 M2

5. Pemasangan Dinding Granit 25x50 untuk WC/KM Dinding Granit 25 x 50 WC/KM = Panjang x Tinggi 38.25
= 98.70 x 3.50
= 307.20 M2

6. Pemasangan Plint Lantai Interior Plint Lantai Interior = Panjang 21.02


= 224.17 M1
VI PEKERJAAN KUSEN ALUMUNIUM
1. Pek. Pemasangan Kusen Pintu Jendela Alumunium
Pekerjaan PJ1 = Jumlah
=

Pekerjaan PJ2 = Jumlah


=

Pekerjaan PJ3 = Jumlah


=

Pekerjaan PJ4 = Jumlah


=

Pekerjaan PJ5 = Jumlah


=

Pekerjaan P1 = Jumlah
= 18.00

Pekerjaan P2 = Jumlah
=

2. Pek. Pemasangan Kusen Jendela Alumunium


Pekerjaan J1 = Jumlah
=

Pekerjaan J2 = Jumlah
=

Pekerjaan J3 = Jumlah
=

Pekerjaan J4 = Jumlah
=

Pekerjaan PA1 = Jumlah


=

Pekerjaan PA2 = Jumlah


=

Pekerjaan PA3 = Jumlah


=

Pekerjaan V1 = Jumlah
= 15.00

VII PEKERJAAN PENGECATAN


1. Pek. Pengecatan Tembok Baru Pengecatan Tembok baru = 2,148.70 M2

2. Pek. Pengecatan Plafon Pengecatan Plafond = 473.12 M2

VIII PEKERJAAN PLAFON


1. Pek. Rangka Plafond Hollow Galvalume Pek. Rangka Plafond Hollow = Luas
= 473.12 M2

2. Pek. Plafon Gypsum board Pek. Plafon Gypsum board = Luas


= 473.12 M2

3. Pek. List Plafond List Plafond = Panjang


= 245.19 M1

IX PEKERJAAN DAK BETON


1. Pek. Beton f’c = 21,7 MPa Tebal = 0.12
Luas Bidang = 273.48
Volume Beton = Tebal x L. Bidang
= 0.12 x 273.48
= 32.82 M3

2. Pek. Pembesian (Besi polos) Pembesian = Kg

3. Pek. Bekisting Bekisting = 273.48 M2

X PEKERJAAN KUDA-KUDA DAN PENUTUP ATAP


1. Pek. Atap Bitumen Pek. Atap Spandek = Luas Gdg A + Luas Gdg B / Cos 43
= 241.24 + 203.31 / 0.73
= 608.97 M2

2. Pek. Struktur Kuda-Kuda Baja Pek. Struktur Kuda-Kuda Baja = Luas Gdg A x Luas Gdg B / Cos 43
= 241.24 x 203.31 / 0.73
= 608.97 M2

3. Pek. Nok atap Spandeks Pek. Nok Atap Spandek = 54.70 M1

4. Pek. Pemasangan Kalsiplank Pemasangan Kalsiplank = 141.90 M1

XIV PEKERJAAN AKHIR


Pembersihan Akhir Volume = 1.00 Ls

PERPIPAAN
1 PIPA PVC 4'' 115.00
2 PIPA PVC 3'' 4.50
3 PIPA PVC 3/4'' 66.85
4 PIPA PVC 2'' 33.70
Analisis Harga Satuan Pekerjaan (AHSP)
1 (Anl. Spl) Pek. Pintu 1 (P1)
Harga
No. Uraian Satuan Koefisien
Satuan (Rp)
A TENAGA KERJA
Pekerja OH 100,000.00
Tukang OH 110,000.00
Kepala Tukang OH 120,000.00
Mandor OH 125,000.00
Jumlah Tenaga Kerja
B BAHAN
1 Frameless-Clear Tempered Glass M2 8.10
2 List Aluminium U M1 9.40
3 Over Panel Set 2.00
4 Top Patch Fitting Set 2.00
5 Pull Handle Set 2.00
6 Bottom Patch Fitting Set 2.00
7 Engsel Lantai Set 2.00
8 Bottom Patch Lock + cylinder Set 2.00
Jumlah Bahan
C PERALATAN
1 Alat Bantu % - -
Jumlah Peralatan
D Harga Satuan (A+B+C)

2 (Anl. Spl) Pek. Pintu 2 (P2)


Harga
No. Uraian Satuan Koefisien
Satuan (Rp)
A TENAGA KERJA
Pekerja OH 100,000.00
Tukang OH 110,000.00
Kepala Tukang OH 120,000.00
Mandor OH 125,000.00
Jumlah Tenaga Kerja
B BAHAN
1 Pas. Kusen UPVC 4'' M' 6.90
2 Panel T.35 mm M2 3.61
3 Kaca Panasap Biru 5mm M2 0.79
4 Epoxy Coat (Warna) M2 7.22
5 Engsel 3x4'' Buah 4.00 93,750.00
6 Kunci + Bodi Pelor Set 1.00
7 Lever Handle SS Buah 2.00
8 Grendel Tanam
9 Door Close Buah 2.00
10 Lem Kaca Kg 7,455.00
Jumlah Bahan
C PERALATAN
1 Alat Bantu % - -
Jumlah Peralatan
D Harga Satuan A + B + C

3 (Anl. Spl) Pek. Pintu 3 (P3)


Harga
No. Uraian Satuan Koefisien
Satuan (Rp)
A TENAGA KERJA
Pekerja OH 100,000.00
Tukang OH 110,000.00
Kepala Tukang OH 120,000.00
Mandor OH 125,000.00
Jumlah Tenaga Kerja
B BAHAN
1 Pas. Kusen UPVC 4'' M' 6.56
2 Multipleks 2x9mm M2 1.68
3 Kaca Panasap Biru 5mm M2 0.41
4 HPL Motif Serat Kayu M1 4.50
5 Engsel 3x4'' Buah 2.00 93,750.00
6 Kunci + Bodi Set 1.00
7 Lefer Handle SS Buah 1.00
8 Door Close Buah 1.00
9 Lem Kaca Kg 7,455.00
Jumlah Bahan
C PERALATAN
1 Alat Bantu % - -
Jumlah Peralatan
D Harga Satuan A + B + C

4 (Anl. Spl) Pek. Pintu 4 (P4)


Harga
No. Uraian Satuan Koefisien
Satuan (Rp)
A TENAGA KERJA
Pekerja OH 100,000.00
Tukang OH 110,000.00
Kepala Tukang OH 120,000.00
Mandor OH 125,000.00
Jumlah Tenaga Kerja
B BAHAN
1 Pas. Kusen UPVC 4'' M' 6.50
2 Rangka Kayu T.35mm Lapis PVC M2 1.58
3 Kaca Bening 5mm M2 0.23 170,400.00
5 Engsel 3x4'' Buah 2.00 93,750.00
6 Handle Putar + Kunci Set 1.00 437,500.00
7 Lem Kaca Kg 7,455.00
Jumlah Bahan
C PERALATAN
1 Alat Bantu % - -
Jumlah Peralatan
D Harga Satuan A + B + C

5 (Anl. Spl) Pek. Pintu 5 (P5)


Harga
No. Uraian Satuan Koefisien
Satuan (Rp)
A TENAGA KERJA
Pekerja OH 100,000.00
Tukang OH 110,000.00
Kepala Tukang OH 120,000.00
Mandor OH 125,000.00
Jumlah Tenaga Kerja
B BAHAN
1 Pas. Kusen UPVC 4'' M' 7.40
2 Panel T.35 mm M2 2.52
3 Kaca Panasap Biru 5mm M2 0.17
5 Kaca Panasap 5mm M2 0.36
6 Epoxy Coat (Warna) M2 5.04
7 Engsel 3x4'' Buah 4.00 93,750.00
8 Kunci + Bodi Pelor Set 1.00
9 Lefer Handle SS Buah 2.00
10 Grendel Tanam
11 Door Close Buah 1.00
12 Lem Kaca Kg 7,455.00
Jumlah Bahan
C PERALATAN
1 Alat Bantu % - -
Jumlah Peralatan
D Harga Satuan A + B + C

6 (Anl. Spl) Pek. Jendela 1 (J1)


Harga
No. Uraian Satuan Koefisien
Satuan (Rp)
A TENAGA KERJA
Pekerja OH 100,000.00
Tukang OH 110,000.00
Kepala Tukang OH 120,000.00
Mandor OH 125,000.00
Jumlah Tenaga Kerja
B BAHAN
1 Pas. Kusen UPVC 4'' M' 25.21
2 Pas. Kaca Panasap Biru T.5mm M² 7.20
3 Lem Kaca Kg 7,455.00
Jumlah Bahan
C PERALATAN
1 Alat Bantu % - -
Jumlah Peralatan
D Harga Satuan A + B + C

7 (Anl. Spl) Pek. Jendela 3 (J3)


Harga
No. Uraian Satuan Koefisien
Satuan (Rp)
A TENAGA KERJA
Pekerja OH 100,000.00
Tukang OH 110,000.00
Kepala Tukang OH 120,000.00
Mandor OH 125,000.00
Jumlah Tenaga Kerja
B BAHAN
1 Pas. Kusen UPVC 4'' M' 20.56
2 DN Jndela UPVC 56x116 M' 6.24
3 Pas. Kaca Panasap Biru T.5mm M² 2.51
4 Cassement 14"/engsel multi fungsi Bh 2.00 103,000.00
5 Lem Kaca Kg 7,455.00
Jumlah Bahan
C PERALATAN
1 Alat Bantu % - -
Jumlah Peralatan
D Harga Satuan A + B + C

8 (Anl. Spl) Pek. Jendela 2 (J2)


Harga
No. Uraian Satuan Koefisien
Satuan (Rp)
A TENAGA KERJA
Pekerja OH 100,000.00
Tukang OH 110,000.00
Kepala Tukang OH 120,000.00
Mandor OH 125,000.00
Jumlah Tenaga Kerja
B BAHAN
1 Pas. Kusen UPVC 4'' M' 15.20
2 Pas. Kaca Panasap Biru T.5mm M² 3.45
3 Lem Kaca Kg 7,455.00
Jumlah Bahan
C PERALATAN
1 Alat Bantu % - -
Jumlah Peralatan
D Harga Satuan A + B + C
Jumlah
Harga (Rp)

-
-
-
-
-

-
-
-
-
-
-
-
-
-

-
-
-

Jumlah
Harga (Rp)

-
-
-
-
-

-
-
-
-
375,000.00
-
-
-
-

375,000.00

-
-
375,000.00

Jumlah
Harga (Rp)

-
-
-
-
-

-
-
-
-
187,500.00
-
-
-

187,500.00

-
-
187,500.00

Jumlah
Harga (Rp)

-
-
-
-
-

-
-
38,340.00
187,500.00
437,500.00

663,340.00

-
-
663,340.00

Jumlah
Harga (Rp)

-
-
-
-
-

-
-
-
-

-
-
-
Jumlah
Harga (Rp)

-
-
-
-
-

-
-
-
-

-
-
-

Jumlah
Harga (Rp)

-
-
-
-
-

-
-

-
-
-

Jumlah
Harga (Rp)

-
-
-
-
-

-
-
-
-

-
-
-
RINCIAN DAFTAR KUANTITAS DAN HARGA
BIAYA PENYELENGGARAAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)

Satuan Harga Satuan Total Harga


No. Uraian Pekerjaan Kuantitas
Ukuran (Rp) (Rp)
A Penyiapan RKK

1 Pembuatan Dokumen Rencana Keselamatan Konstruksi


Set 1.00 1,000,000.00 1,000,000.00
2 Pembuatan Prosedur & Instruksi Kerja
3 Penyiapan Formulir
Sub Total Penyiapan RKK 1,000,000.00
B Sosialisasi, Promosi dan Pelatihan
1 Induksi K3 (Safety Induction) Org 12.00 7,500.00 90,000.00
2 Pengarahan K3 (Safety Briefing) Org 9.00 15,000.00 135,000.00
3 Pelatihan K3
a. Bekerja diketinggian Org 9.00 7,500.00 67,500.00
b. Penggunaan Bahan Kimia (MSDS) Org - 1,500.00 -
4 Simulasi K3 Org 9.00 7,500.00 67,500.00
5 Spanduk (Banner) Lbr 1.00 150,000.00 150,000.00
6 Poster Lbr 1.00 50,000.00 50,000.00
7 Papan Informasi K3 Bh 1.00 500,000.00 500,000.00
Sub Total Sosialisasi, Promosi dan Pelatihan 1,060,000.00
C Alat Pelindung Kerja & Alat Pelindung Diri
1 Alat Pelindung Kerja :
a. Jaring Pengaman (Safety Net) Ls - 540,000.00 -
b. Tali Keselamatan ( Life Line) Ls - 3,600,000.00 -
c. Pagar Pengaman (Guard Railling) Ls - 3,600,000.00 -
d. Pembatas Area (Restricted Area) Ls 1.00 70,000.00 70,000.00
2 Alat Pelindung Diri :
a. Topi Pelindung (Safety Helmet) Bh 12.00 60,000.00 720,000.00
b. Pelindung Mata (Goggles Spectacles) Bh - 30,000.00 -
c. Tameng Muka (Face Shield) Bh - 300,000.00 -
d. Pelindung Pernafasan & Mulut (Masker) Bh 27.00 1,500.00 40,500.00
e. Sarung Tangan (Safety Gloves) Psg 9.00 20,000.00 180,000.00
f. Sepatu Keselamatan (Safety Shoes) Psg 5.00 150,000.00 750,000.00
g. Penunjang Seluruh Tubuh (Full Body Harness) Bh - 750,000.00 -
h. Rompi Keselamatan (Safety Vest) Bh 5.00 25,000.00 125,000.00
i. Celemek (Apron/Coveralls) Bh - 150,000.00 -
j. Pelindung Jatuh (Fall Arrester) Bh - 100,000.00 -
Sub Total Sosialisasi, Promosi dan Pelatihan 1,885,500.00
D Asuransi
1 Asuransi Ls 1.00 1,500,000.0 1,500,000.00
Sub Total Asuransi 1,500,000.00
E Personil K3 Konstruksi
1 Ahli K3 Konstruksi OB - 10,000,000.00 -
2 Petugas K3 Konstruksi OB - 2,500,000.00 -
Sub Total Personil K3 Konstruksi -
F Fasilitas Sarana & Prasarana Kesehatan
1 Peralatan P3K (Kotak P3K, Obat Luka, dll) Ls 1.00 300,000.00 300,000.00
2 Peralatan Pengasapan (Fogging) Ls - 500,000.00 -
Sub Total Fasilitas Sarana & Prasarana Kesehatan 300,000.00
G Rambu-Rambu
1 Rambu Petunjuk Bh 1.00 75,000.00 75,000.00
2 Rambu Larangan Bh 1.00 75,000.00 75,000.00
3 Rambu Peringatan Bh 1.00 75,000.00 75,000.00
4 Rambu Kewajiban Bh 1.00 75,000.00 75,000.00
5 Rambu Informasi Bh 1.00 75,000.00 75,000.00
6 Jalur Evakuasi (Escape Route) Ls - 300,000.00 -
Sub Total Rambu-Rambu 375,000.00
H Konsultasi Ahli
1 Konsultasi Ahli K3 Konstruksi OJ - - -
Sub Total Konsultasi Ahli -
I Lain-Lain
Alat Pemedam Api Ringan (APAR) Bh - 750,000.00 -
Bendera K3 Bh 1.00 150,000.00 150,000.00
Program Inspeksi Ls - 2,000,000.00 -
Pelaporan & Penyelidikan Insiden Ls - 500,000.00 -
Pembuatan Kartu Identitas Pekerja (KIP) Lbr 9.00 10,000.00 90,000.00
Sub Total Lain-Lain 240,000.00
J J u m l a h (A+B+C+D+E+F+G+H+I) 6,360,500.00
K Overhead & Profit 0.0% X D -
L Harga Satuan Pekerjaan (J+K) 6,400,000.00
PEMERINTAH KABUPATEN KOLAKA TIMUR
DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERHUBUNGAN
Jalan. Poros Kolaka - Kendari, Desa Orawa, Kecamatan Tirawuta

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja OH 0.10 100,000.00 10,000.00
Tukang Kayu OH 0.10 110,000.00 11,000.00
Kepala Tukang OH 0.01 120,000.00 1,200.00
Mandor OH 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 22,825.00
B BAHAN
Kayu balok 5/7 m³ 0.01 2,000,000.00 24,000.00
Paku 2”-3” Kg 0.02 20,000.00 400.00
Kayu papan 3/20 m³ 0.01 2,000,000.00 14,000.00
JUMLAH HARGA BAHAN 38,400.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 61,225.00
E Overhead & Profit 15% xD 9,183.75
F Harga Satuan Pekerjaan (D+E) 70,408.75
A.2.3.1. HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1. Menggali 1 m³ tanah biasa sedalam 1 m'
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 100,000.00 Rp 75,000.00
Mandor L.04 OH 0.025 125,000.00 Rp 3,125.00
Jumlah Tenaga Kerja Rp 78,125.00
B BAHAN

Jumlah Harga Bahan Rp -


C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 78,125.00
E Overhead & Profit 15% X D Rp 11,718.75
F Harga Suatu Pekerjaan (D+E) Rp 89,843.75

A.2.3.1.9. Pengurugan kembali 1 m³ galian tanah


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 100,000.00 Rp 50,000.00
Mandor L.04 OH 0.0500 125,000.00 Rp 6,250.00
Jumlah Tenaga Kerja Rp 56,250.00
B BAHAN

Jumlah Harga Bahan Rp -


C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 56,250.00
E Overhead & Profit 15% X D Rp 8,437.50
F Harga Suatu Pekerjaan (D+E) Rp 64,687.50

Anl. Tanah Page 39


A.2.3.1.11. Pengurungan 1 m³ dengan pasir urug
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 100,000.00 Rp 30,000.00
Mandor L.04 OH 0.010 125,000.00 Rp 1,250.00
Jumlah Tenaga Kerja Rp 31,250.00
B BAHAN
Pasir Urug m³ 1.200 170,000.00 Rp 204,000.00
Jumlah Harga Bahan Rp 204,000.00
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 235,250.00
E Overhead & Profit 15% X D Rp 35,287.50
F Harga Suatu Pekerjaan (D+E) Rp 270,537.50

A.2.3.1.14. Pengurugan 1 m³ tanah urug didatangkan


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 100,000.00 Rp 25,000.00
Mandor L.04 OH 0.025 125,000.00 Rp 3,125.00
Jumlah Tenaga Kerja Rp 28,125.00
B BAHAN
Tanah Urug m³ 1.200 50,000.00 Rp 60,000.00
Jumlah Harga Bahan Rp 60,000.00
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 88,125.00
E Overhead & Profit 15% X D Rp 13,218.75
F Harga Suatu Pekerjaan (D+E) Rp 101,343.75

Anl. Tanah Page 40


A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.1 Pemasangan 1 m³ pondasi batu belah campuran 1SP : 3PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 100,000.00 Rp 150,000.00
Tukang Batu L.02 OH 0.750 110,000.00 Rp 82,500.00
Kepala Tukang L.03 OH 0.075 120,000.00 Rp 9,000.00
Mandor L.04 OH 0.075 125,000.00 Rp 9,375.00
Jumlah Tenaga Kerja Rp 250,875.00
B BAHAN
Batu Belah m³ 1.200 214,285.71 Rp 257,142.86
Semen Portland Kg 202.000 1,533.60 Rp 309,787.20
Pasir Pasang m³ 0.485 250,000.00 Rp 121,250.00
Jumlah Harga Bahan Rp 688,180.06
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 939,055.06
E Overhead & Profit 15% X D Rp 140,858.26
F Harga Suatu Pekerjaan (D+E) Rp 1,079,913.32

A.3.2.1.2 Pemasangan 1 m³ pondasi batu belah campuran 1SP : 4PP


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 100,000.00 Rp 150,000.00
Tukang Batu L.02 OH 0.750 110,000.00 Rp 82,500.00
Kepala Tukang L.03 OH 0.075 120,000.00 Rp 9,000.00
Mandor L.04 OH 0.075 125,000.00 Rp 9,375.00
Jumlah Tenaga Kerja Rp 250,875.00
B BAHAN
Batu Belah m³ 1.200 214,285.71 Rp 257,142.86
Semen Portland Kg 163.000 1,533.60 Rp 249,976.80
Pasir Pasang m³ 0.520 250,000.00 Rp 130,000.00
Jumlah Harga Bahan Rp 637,119.66
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 887,994.66
E Overhead & Profit 15% X D Rp 133,199.20
F Harga Suatu Pekerjaan (D+E) Rp 1,021,193.86
A.3.2.1.9. (K3) Pemasangan 1 m³ batu kosong (anstamping)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.780 100,000.00 Rp 78,000.00
Tukang Batu L.02 OH 0.390 110,000.00 Rp 42,900.00
Kepala Tukang L.03 OH 0.039 120,000.00 Rp 4,680.00
Mandor L.04 OH 0.039 125,000.00 Rp 4,875.00
Jumlah Tenaga Kerja Rp 130,455.00
B BAHAN
Batu Belah m³ 1.200 214,285.71 Rp 257,142.86
Pasir Urug m³ 0.432 170,000.00 Rp 73,440.00
Jumlah Harga Bahan Rp 330,582.86
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 461,037.86
E Overhead & Profit 15% X D Rp 69,155.68
F Harga Suatu Pekerjaan (D+E) Rp 530,193.54
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A. A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 14,5 Mpa
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 125,000.00 10,375.00
JUMLAH TENAGA KERJA 208,985.00
B BAHAN
Semen Portland Kg 247.00 1,533.60 378,799.20
Pasir beton Kg 869.00 178.57 155,178.57
Kerikil Kg 999.00 237.04 236,800.00
Air Ltr 215.00 50.00 10,750.00
JUMLAH HARGA BAHAN 781,527.77
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 990,512.77
E Overhead & Profit 15% xD 148,576.92
F Harga Satuan Pekerjaan (D+E) 1,139,089.69

A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 125,000.00 10,375.00
JUMLAH TENAGA KERJA 208,985.00
B BAHAN
Semen Portland Kg 384.00 1,533.60 588,902.40
Pasir beton Kg 692.00 178.57 123,571.43
Kerikil (Maksimum 30mm) Kg 1,039.00 237.04 246,281.48
Air Ltr 215.00 50.00 10,750.00
JUMLAH HARGA BAHAN 969,505.31
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,178,490.31
E Overhead & Profit 15% xD 176,773.55
F Harga Satuan Pekerjaan (D+E) 1,355,263.86
A.4.1.1.17 Pembesian 10 kg dengan besi polos
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.07 100,000.00 7,000.00
Tukang besi L.02 OH 0.07 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.004 125,000.00 500.00
JUMLAH TENAGA KERJA 16,040.00
B BAHAN
Besi polos Kg 10.50 14,500.00 152,250.00
Kawat beton Kg 0.15 20,000.00 3,000.00
JUMLAH HARGA BAHAN 155,250.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 171,290.00
E Overhead & Profit 15% xD 25,693.50
F Harga Satuan Pekerjaan (D+E) 196,983.50
G Harga Satuan Pekerjaan 1 Kg Besi 19,698.35

A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.52 100,000.00 52,000.00
Tukang kayu L.02 OH 0.26 110,000.00 28,600.00
Kepala tukang L.03 OH 0.03 120,000.00 3,120.00
Mandor L.04 OH 0.03 125,000.00 3,250.00
JUMLAH TENAGA KERJA 86,970.00
B BAHAN
Kayu kelas III m³ 0.04 2,000,000.00 80,000.00
Paku 5 – 10 cm Kg 0.30 20,000.00 6,000.00
Minyak bekisting Ltr 0.10 17,572.50 1,757.25
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 88,727.25
E Overhead & Profit 15% xD 13,309.09
F Harga Satuan Pekerjaan (D+E) 102,036.34
A.SPL (K3) Pemasangan 1 m2 bekisting untuk sloof (Asumsi 2x Pakai)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.52 100,000.00 52,000.00
Tukang kayu L.02 OH 0.26 110,000.00 28,600.00
Kepala tukang L.03 OH 0.026 120,000.00 3,120.00
Mandor L.04 OH 0.026 125,000.00 3,250.00
JUMLAH TENAGA KERJA 86,970.00
B BAHAN
Kayu kelas III m³ 0.023 2,000,000.00 45,000.00
Paku 5 cm – 10 cm Kg 0.30 20,000.00 6,000.00
Minyak bekisting Ltr 0.10 17,572.50 1,757.25
JUMLAH HARGA BAHAN 52,757.25
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 139,727.25
E Overhead & Profit 15% xD 20,959.09
F Harga Satuan Pekerjaan (D+E) 160,686.34

A.SPL (K3) Pemasangan 1 m2 bekisting untuk kolom (Asumsi 2x Pakai)


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.66 100,000.00 66,000.00
Tukang kayu L.02 OH 0.33 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 125,000.00 4,125.00
JUMLAH TENAGA KERJA 110,385.00
B BAHAN
Kayu kelas III m³ 0.02 2,000,000.00 40,000.00
Paku 5 cm – 12 cm Kg 0.40 20,000.00 8,000.00
Minyak bekisting Ltr 0.20 17,572.50 3,514.50
Balok kayu kelas II m³ 0.008 3,200,000.00 24,000.00
Plywood tebal 9 mm Lbr 0.18 213,000.00 37,275.00
Dolken kayu Ø 8-10cm –panj 4 m Btg 2.00 10,000.00 20,000.00
JUMLAH HARGA BAHAN 132,789.50
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 243,174.50
E Overhead & Profit 15% xD 36,476.18
F Harga Satuan Pekerjaan (D+E) 279,650.68
A.SPL (K3) Pemasangan 1 m2 bekisting untuk balok (Asumsi 2x Pakai)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.66 100,000.00 66,000.00
Tukang kayu L.02 OH 0.33 110,000.00 36,300.00
Kepala tukang L.03 OH 0.03 120,000.00 3,960.00
Mandor L.04 OH 0.03 125,000.00 4,125.00
JUMLAH TENAGA KERJA 110,385.00
B BAHAN
Kayu kelas III m³ 0.02 2,000,000.00 40,000.00
Paku 5 cm – 12 cm Kg 0.40 20,000.00 8,000.00
Minyak bekisting Ltr 0.20 17,572.50 3,514.50
Balok kayu kelas II m³ 0.009 3,200,000.00 28,800.00
Plywood tebal 9 mm Lbr 0.18 213,000.00 37,275.00
Dolken kayu (8–10) cm 4 m Btg 2.00 10,000.00 20,000.00
JUMLAH HARGA BAHAN 137,589.50
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 247,974.50
E Overhead & Profit 15% xD 37,196.18
F Harga Satuan Pekerjaan (D+E) 285,170.68

A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.66 100,000.00 66,000.00
Tukang kayu L.02 OH 0.33 110,000.00 36,300.00
Kepala tukang L.03 OH 0.03 120,000.00 3,960.00
Mandor L.04 OH 0.03 125,000.00 4,125.00
JUMLAH TENAGA KERJA 110,385.00
B BAHAN
Kayu kelas III m3 0.04 2,000,000.00 80,000.00
Paku 5 cm – 12 cm kg 0.40 20,000.00 8,000.00
Minyak bekisting Liter 0.20 17,572.50 3,514.50
Balok kayu kelas II m3 0.02 3,200,000.00 48,000.00
Plywood tebal 9 mm Lbr 0.35 213,000.00 74,550.00
Dolken Btg 6.00 10,000.00 60,000.00
JUMLAH HARGA BAHAN 274,064.50
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 384,449.50
E Overhead & Profit 15% xD 57,667.43
F Harga Satuan Pekerjaan (D+E) 442,116.93
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.18 100,000.00 18,000.00
Tukang batu L.02 OH 0.02 110,000.00 2,200.00
Tukang kayu L.02 OH 0.02 110,000.00 2,200.00
Tukang besi L.02 OH 0.02 110,000.00 2,200.00
Kepala tukang L.03 OH 0.01 120,000.00 720.00
Mandor L.04 OH 0.01 125,000.00 1,125.00
JUMLAH TENAGA KERJA 26,445.00
B BAHAN
Kayu kelas III m3 0.0020 2,000,000.00 4,000.00
Paku 5 cm – 12 cm kg 0.010 20,000.00 200.00
Minyak bekisting Liter 0.20 17,572.50 3,514.50
Besi beton polos kg 3.00 14,500.00 43,500.00
Kawat beton kg 0.45 20,000.00 9,000.00
Semen Portland kg 4.00 1,533.60 6,134.40
Pasir Beton m3 0.006 250,000.00 1,500.00
Kerikil m3 0.009 300,000.00 2,700.00
JUMLAH HARGA BAHAN 70,548.90
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 96,993.90
E Overhead & Profit 15% xD 14,549.09
F Harga Satuan Pekerjaan (D+E) 111,542.99
A.4.4.3 HARGA SATUAN PENUTUP LANTAI DAN PENUTUP DINDING
A.4.4.3.13 (Anl.Spl) Pemasangan 1 m² lantai granit interior ukuran 60 cm x 60 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.2400 100,000.00 Rp 24,000.00
2 Tukang Batu L.03 OH 0.1200 110,000.00 Rp 13,200.00
3 Kepala Tukang L.03 OH 0.0120 120,000.00 Rp 1,440.00
4 Mandor L.04 OH 0.0120 125,000.00 Rp 1,500.00
Jumlah Tenaga Kerja Rp 40,140.00
B BAHAN
1 Granit 60 x 60 cm Bh 3.1000 53,250.00 Rp 165,075.00
2 Semen Portland Kg 9.6000 1,533.60 Rp 14,722.56
3 Semen Warna Kg 1.5000 26,625.00 Rp 39,937.50
4 Pasir Pasang M3 0.0450 250,000.00 Rp 11,250.00
Jumlah Harga Bahan Rp 230,985.06
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 271,125.06
E Overhead & Profit 15% X D Rp 40,668.76
F Harga Suatu Pekerjaan (D+E) Rp 311,793.82

A.4.4.3.28 (Anl. Spl) Pemasangan 1 m' plint ubin granit ukuran 10 cm x 60 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.0900 100,000.00 Rp 9,000.00
2 Tukang Batu L.03 OH 0.0900 110,000.00 Rp 9,900.00
3 Kepala Tukang L.03 OH 0.0090 120,000.00 Rp 1,080.00
4 Mandor L.04 OH 0.0050 125,000.00 Rp 625.00
Jumlah Tenaga Kerja Rp 20,605.00
B BAHAN
1 Plint Ubin granit Bh 1.7000 15,600.00 Rp 26,520.00
2 Semen Portland Kg 1.1400 1,533.60 Rp 1,748.30
3 Semen Warna Kg 0.1000 26,625.00 Rp 2,662.50
4 Pasir Pasang m³ 0.0030 250,000.00 Rp 750.00
Jumlah Harga Bahan Rp 31,680.80
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 52,285.80
E Overhead & Profit 15% X D Rp 7,842.87
F Harga Suatu Pekerjaan (D+E) Rp 60,128.67
A.4.4.3.36 Pemasangan 1 m² Lantai Keramik Warna 20cm x 20cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.7000 100,000.00 Rp 70,000.00
2 Tukang Batu L.03 OH 0.3500 110,000.00 Rp 38,500.00
3 Kepala Tukang L.03 OH 0.0350 120,000.00 Rp 4,200.00
4 Mandor L.04 OH 0.0350 125,000.00 Rp 4,375.00
Jumlah Tenaga Kerja Rp 117,075.00
B BAHAN
1 Ubin Keramik Warna Dos 1.0500 69,225.00 Rp 72,686.25
2 Semen Portland Kg 10.4000 1,533.60 Rp 15,949.44
3 Semen Warna Kg 0.5000 26,625.00 Rp 13,312.50
4 Pasir Pasang m³ 0.0450 250,000.00 Rp 11,250.00
Jumlah Harga Bahan Rp 88,635.69
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 205,710.69
E Overhead & Profit 15% X D Rp 30,856.60
F Harga Suatu Pekerjaan (D+E) Rp 236,567.29

A.4.4.3.54. Pemasangan 1 m² Keramik Dinding Uk. 20 cm x 25 cm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.9000 100,000.00 Rp 90,000.00
2 Tukang Batu L.03 OH 0.4500 110,000.00 Rp 49,500.00
3 Kepala Tukang L.03 OH 0.0450 120,000.00 Rp 5,400.00
4 Mandor L.04 OH 0.0450 125,000.00 Rp 5,625.00
Jumlah Tenaga Kerja Rp 150,525.00
B BAHAN
1 Ubin Warna Bh 26.5000 4,326.56 Rp 114,653.91
2 Semen Portland Kg 9.3000 1,533.60 Rp 14,262.48
3 Semen Warna Kg 1.9400 26,625.00 Rp 51,652.50
4 Pasir Pasang m³ 0.0180 250,000.00 Rp 4,500.00
Jumlah Harga Bahan Rp 128,916.39
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 279,441.39
E Overhead & Profit 15% X D Rp 41,916.21
F Harga Suatu Pekerjaan (D+E) Rp 321,357.59
(Anl.Spl) Pemasangan 1 m² Hamparan Batu Koral Sikat 3- 5 cm ( 1 Lapis = Ketebalan 3-5 cm)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.3500 100,000.00 Rp 35,000.00
Jumlah Tenaga Kerja Rp 35,000.00
B BAHAN
1 Batu Koral M2 1.0000 75,000.00 Rp 75,000.00
Jumlah Harga Bahan Rp 75,000.00
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 110,000.00
E Overhead & Profit 15% X D Rp 16,500.00
F Harga Suatu Pekerjaan (D+E) Rp 126,500.00
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.043 100,000.00 4,300.00
Tukang khusus Alumunium L.03 OH 0.043 Err:509 Err:509
Kepala tukang L.03 OH 0.004 120,000.00 516.00
Mandor L.04 OH 0.002 125,000.00 262.50
JUMLAH TENAGA KERJA Err:509
B BAHAN
Profil alluminium m 1.10
Skrup fixer buah 2.00
Sealant Tube 0.06
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.09
Tukang khusus 0.09
allumunium L.03 OH
Kepala tukang L.03 OH 0.01
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Profil alluminium m 4.40
Alluminium strip m 14.60
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.09
Tukang 0.09
allumunium/kaca L.03 OH
Kepala tukang L.03 OH 0.01
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
Pintu alluminium m 4.40
Profil kaca m 4.50
Sealant Tube 0.27
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.20
Tukang L.03 OH 0.20
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Jendela nako m2 1.10
(rangka + kaca 5 mm)
Paku skrup buah 10.00
1 cm – 2,5 cm
Besi strip m 7.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.20
Tukang L.03 OH 0.20
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Seng pelat m 1.05
Paku 1 cm - 2,5 cm kg 0.02
Papan kayu kelas II m3 0.02
atau III
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.15
Tukang L.03 OH 0.30
Kepala tukang L.03 OH 0.03
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
Seng pelat m 1.05
Paku 1 cm – 2,5 cm kg 0.01
Besi strip kg 0.50
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.20.Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.25
Tukang besi L.02 OH 0.25
Kepala tukang L.03 OH 0.03
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal M1 3.50
hollow 40.40.2 mm
Assesoris Ls 100% x
(perkuatan, las dll) rangka
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.35
Tukang besi L.02 OH 0.35
Kepala tukang L.03 OH 0.04
Mandor L.04 OH 0.02
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal M1 4.00
hollow 40.40.2 mm
Assesoris Ls 100%xrangka
(perkuatan, las
dll)

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.73
Tukang besi L.02 OH 0.73
Kepala tukang L.03 OH 0.07
Mandor L.04 OH 0.04
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canai dingin C75 kg 3.07
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 10.00
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.76
Tukang besi L.02 OH 7,604.00
Kepala tukang L.03 OH 0.08
Mandor L.04 OH 0.04
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canai kg 4.05
dingin C75
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 10.00
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
Analisis Harga Satuan Pekerjaan (AHSP)
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.8 Pemasangan 1 m² dinding bata merah ( 5x11x22 ) cm tebal 1/2 batu campuran 1SP : 3PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 100,000.00 Rp 30,000.00
Tukang Batu L.03 OH 0.1000 110,000.00 Rp 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 Rp 1,200.00
Mandor L.04 OH 0.0150 125,000.00 Rp 1,875.00
Jumlah Tenaga Kerja Rp 44,075.00
B BAHAN
Bata Merah Bh 70.0000 650.00 Rp 45,500.00
Semen Portland Kg 14.3700 1,533.60 Rp 22,037.83
Pasir Pasang m³ 0.0400 250,000.00 Rp 10,000.00
Jumlah Harga Bahan Rp 77,537.83
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 121,612.83
E Overhead & Profit 15% X D Rp 18,241.92
F Harga Suatu Pekerjaan (D+E) Rp 139,854.76

A.4.4.1.9 Pemasangan 1 m² dinding bata merah ( 5x11x22 ) cm tebal 1/2 batu campuran 1SP : 4PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 100,000.00 Rp 30,000.00
Tukang Batu L.03 OH 0.1000 110,000.00 Rp 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 Rp 1,200.00
Mandor L.04 OH 0.0150 125,000.00 Rp 1,875.00
Jumlah Tenaga Kerja Rp 44,075.00
B BAHAN
Bata Merah Bh 70.0000 650.00 Rp 45,500.00
Semen Portland Kg 11.5000 1,533.60 Rp 17,636.40
Pasir Pasang m³ 0,043 250,000.00 Rp 10,750.00
Jumlah Harga Bahan Rp 73,886.40
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 117,961.40
E Overhead & Profit 15% X D Rp 17,694.21
F Harga Suatu Pekerjaan (D+E) Rp 135,655.61
Analisa Pekerjaan Kusen, Pintu & Partisi
Analisa Pintu + Jendela
Type PJ1
No. Uraian Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp.)
1 Kusen Alumunium 4 " 19.66 m' Rp 5,000.00 Rp 98,300
2 Daun Pintu Swing Standard 2.00 Unit Rp 2,000,000.00 Rp 4,000,000
3 * Spare Part & Instalation 2.00 Unit Rp 550,000.00 Rp 1,100,000
4 Kaca Polos 8 mm 8.88 m² Rp 170,000.00 Rp 1,509,940
5 Silikon/Sealant 29.70 m' Rp 12,455.00 Rp 369,914
6 Pemasangan & Perakitan 9.45 m² Rp 43,480.00 Rp 410,973
* engsel 4in, lockset lidah & Hendle Lever
** frictian stay tipe HD & rambuncis
A Jumlah 7,489,126.46
B Overhead & Profit 15% x A 1,123,368.97
C Harga Satuan Pekerjaan (A+B) 8,612,495.43

Type PJ2

No. Uraian Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp.)

1 Kusen Alumunium 4 " 33.67 m' Rp 5,000.00 Rp 168,350


2 Daun Pintu Swing Standard 1.00 Unit Rp 2,000,000.00 Rp 2,000,000
3 * Spare Part & Instalation 1.00 Unit Rp 550,000.00 Rp 550,000
4 Kaca Polos 8 mm 12.15 m² Rp 170,000.00 Rp 2,066,282
5 Sandblash Full Block 6.57 m² Rp 100,000.00 Rp 656,880
6 Silikon/Sealant 52.00 m' Rp 12,455.00 Rp 647,660
7 Pemasangan & Perakitan 13.55 m² Rp 43,480.00 Rp 589,154
* engsel 4in, lockset lidah & Hendle Lever
A Jumlah 6,678,326.00
B Overhead & Profit 15% x A 1,001,748.90
C Harga Satuan Pekerjaan (A+B) 7,680,074.90

Analisa Pintu
Type P1
No. Uraian Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp.)

1 Kusen Alumunium 4 " 5.18 m' Rp 5,000.00 25,900.00


2 Daun Pintu Swing Standard 1.00 Unit Rp 2,000,000.00 2,000,000.00
3 * Spare Part & Instalation 1.00 Unit Rp 550,000.00 550,000.00
4 Kaca Polos 8 mm 1.45 m² Rp 170,000.00 246,500.00
5 Silikon/Sealant 5.00 m' Rp 12,455.00 62,275.00
6 Pemasangan & Perakitan 1.89 m² Rp 43,480.00 82,264.16
* engsel 4in, lockset lidah & Hendle Lever
A Jumlah 2,966,939.16
B Overhead & Profit 15% x A 445,040.87
C Harga Satuan Pekerjaan (A+B) 3,411,980.03

Type P2

No. Uraian Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp.)

1 Kusen Alumunium 4 " 5.20 m' Rp 5,000.00 26,000.00


2 Daun Pintu Teakwood 1.77 Unit Rp 2,000,000.00 3,542,400.00
3 * Spare Part & Instalation 1.00 Unit Rp 550,000.00 550,000.00
4 Pemasangan & Perakitan 1.94 m² Rp 43,480.00 84,133.80
* engsel 4in, lockset lidah & Hendle Lever
A Jumlah 4,202,533.80
B Overhead & Profit 15% x A 630,380.07
C Harga Satuan Pekerjaan (A+B) 4,832,913.87

Type P3

No. Uraian Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp.)

1 Kusen Alumunium 4 " 5.10 m' Rp 5,000.00 25,500.00


2 Daun Pintu Alumunium + ACC (engsel 3 bh, 1.00 Unit Rp 2,000,000.00 2,000,000.00
handle + lockcase)
3 Pemasangan & Perakitan 1.72 m² Rp 43,480.00 74,785.60
* engsel 4in, lockset lidah & Hendle Lever
A Jumlah 2,100,285.60
B Overhead & Profit 15% x A 315,042.84
C Harga Satuan Pekerjaan (A+B) 2,415,328.44

Analisa Jendela
Type J1

No. Uraian Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp.)

1 Kusen Alumunium 4 " 60.40 m' Rp 5,000.00 302,000.00


2 Kaca Polos 8 mm 22.95 m² Rp 170,000.00 3,901,670.00
3 Silikon/Sealant 79.96 m' Rp 12,455.00 995,901.80
4 Pemasangan & Perakitan 26.55 m² Rp 43,480.00 1,154,394.00
** frictian stay tipe HD & rambuncis
A Jumlah 6,353,965.80
B Overhead & Profit 15% x A 953,094.87
C Harga Satuan Pekerjaan (A+B) 7,307,060.67

Type J2
No. Uraian Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp.)

1 Kusen Alumunium 4 " 14.20 m' Rp 5,000.00 71,000.00


2 Daun Jendela Casement Jungkit (100x100 cm) 17.08 m' Rp 85,000.00 1,451,800.00
3 ** Spare Part & Instalation 5.00 Unit Rp 550,000.00 2,750,000.00
4 Kaca Polos 5 mm 2.39 m² Rp 186,050.00 444,547.87
5 Silikon/Sealant 14.18 m' Rp 12,455.00 176,611.90
6 Pemasangan & Perakitan 4.16 m² Rp 43,480.00 180,876.80
** frictian stay tipe HD & rambuncis
A Jumlah 5,074,836.57
B Overhead & Profit 15% x A 761,225.49
C Harga Satuan Pekerjaan (A+B) 5,836,062.06

Type J3

No. Uraian Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp.)

1 Kusen Alumunium 4 " 10.35 m' Rp 5,000.00 51,750.00


2 Daun Jendela Casement Jungkit (100x100 cm) 12.92 m' Rp 85,000.00 1,098,200.00
3 ** Spare Part & Instalation 4.00 Unit Rp 550,000.00 2,200,000.00
4 Kaca Polos 5 mm 1.46 m² Rp 186,050.00 271,744.63
5 Silikon/Sealant 9.72 m' Rp 12,455.00 121,062.60
6 Pemasangan & Perakitan 2.96 m² Rp 43,480.00 128,700.80
** frictian stay tipe HD & rambuncis
A Jumlah 3,871,458.03
B Overhead & Profit 15% x A 580,718.70
C Harga Satuan Pekerjaan (A+B) 4,452,176.73

Type J4

No. Uraian Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp.)

1 Kusen Alumunium 4 " 20.95 m' Rp 5,000.00 104,750.00


2 Daun Jendela Casement Jungkit (100x100 cm) 19.32 m' Rp 85,000.00 1,642,200.00
3 ** Spare Part & Instalation 4.00 Unit Rp 550,000.00 2,200,000.00
4 Kaca Polos 5 mm 5.52 m² Rp 186,050.00 1,027,889.04
5 Silikon/Sealant 26.32 m' Rp 12,455.00 327,815.60
6 Pemasangan & Perakitan 3.65 m² Rp 43,480.00 158,702.00
** frictian stay tipe HD & rambuncis
A Jumlah 5,461,356.64
B Overhead & Profit 15% x A 819,203.50
C Harga Satuan Pekerjaan (A+B) 6,280,560.14

Type J5
No. Uraian Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp.)

1 Kusen Alumunium 4 " 45.63 m' Rp 5,000.00 228,150.00


2 Daun Jendela Casement Jungkit (100x100 cm) 33.04 m' Rp 85,000.00 2,808,400.00
3 ** Spare Part & Instalation 4.00 Unit Rp 550,000.00 2,200,000.00
4 Kaca Polos 5 mm 24.76 m² Rp 186,050.00 4,607,323.60
5 Silikon/Sealant 109.48 m' Rp 12,455.00 1,363,573.40
6 Pemasangan & Perakitan 33.28 m² Rp 43,480.00 1,447,188.32
** frictian stay tipe HD & rambuncis
A Jumlah 12,654,635.32
B Overhead & Profit 15% x A 1,898,195.30
C Harga Satuan Pekerjaan (A+B) 14,552,830.61
Analisa Ventilasi
Type V1

No. Uraian Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp.)

1 Kusen Alumunium 4 " 16.22 m' Rp 5,000.00 81,100.00


2 Jalusi Alumunium 3.00 Unit Rp 650,000.00 1,950,000.00
3 Kaca Polos 5 mm 1.78 m² Rp 186,050.00 331,169.00
4 Silikon/Sealant 7.56 m' Rp 12,455.00 94,159.80
5 Pemasangan & Perakitan 4.63 m² Rp 43,480.00 201,442.84
** frictian stay tipe HD & rambuncis
A Jumlah 2,657,871.64
B Overhead & Profit 15% x A 398,680.75
C Harga Satuan Pekerjaan (A+B) 3,056,552.39

Type V2

No. Uraian Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp.)

1 Kusen Alumunium 4 " 1.60 m' Rp 5,000.00 8,000.00


2 Kaca Polos 5 mm 0.13 m² Rp 186,050.00 24,930.70
3 Silikon/Sealant 1.36 m' Rp 12,455.00 16,938.80
4 Pemasangan & Perakitan 0.15 m² Rp 43,480.00 6,522.00
A Jumlah 56,391.50
B Overhead & Profit 15% x A 8,458.73
C Harga Satuan Pekerjaan (A+B) 64,850.23
Analisis Harga Satuan Pekerjaan (AHSP)
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.3 Pemasangan 1 m² plesteran 1SP : 3PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 100,000.00 Rp 30,000.00
Tukang Batu L.03 OH 0.1500 110,000.00 Rp 16,500.00
Kepala Tukang L.03 OH 0.0150 120,000.00 Rp 1,800.00
Mandor L.04 OH 0.0150 125,000.00 Rp 1,875.00
Jumlah Tenaga Kerja Rp 50,175.00
B BAHAN
Semen Portland Kg 7.7760 1,533.60 Rp 11,925.27
Pasir Pasang m³ 0.0230 250,000.00 Rp 5,750.00
Jumlah Harga Bahan Rp 17,675.27
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 67,850.27
E Overhead & Profit 15% X D Rp 10,177.54
F Harga Suatu Pekerjaan (D+E) Rp 78,027.81

A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 100,000.00 Rp 30,000.00
Tukang Batu L.03 OH 0.1500 110,000.00 Rp 16,500.00
Kepala Tukang L.03 OH 0.0150 120,000.00 Rp 1,800.00
Mandor L.04 OH 0.0150 125,000.00 Rp 1,875.00
Jumlah Tenaga Kerja Rp 50,175.00
B BAHAN
Semen Portland Kg 6.2400 1,533.60 Rp 9,569.66
Pasir Pasang m³ 0.0240 250,000.00 Rp 6,000.00
Jumlah Harga Bahan Rp 15,569.66
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 65,744.66
E Overhead & Profit 15% X D Rp 9,861.70
F Harga Suatu Pekerjaan (D+E) Rp 75,606.36

A.4.4.2.27 Pemasangan 1 m² Acian


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 100,000.00 Rp 20,000.00
Tukang Batu L.03 OH 0.1000 110,000.00 Rp 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 Rp 1,200.00
Mandor L.04 OH 0.0100 125,000.00 Rp 1,250.00
Jumlah Tenaga Kerja Rp 33,450.00
B BAHAN
Semen PC Kg 3.2500 1,533.60 Rp 4,984.20
Jumlah Harga Bahan Rp 4,984.20
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 38,434.20
E Overhead & Profit 15% X D Rp 5,765.13
F Harga Suatu Pekerjaan (D+E) Rp 44,199.33
NO URAIAN SATUAN ZONA 1
(Rp)

TIRAWUTA, LOEA,
LADONGI

(1) (2) (3)


I SEMEN DAN BAHAN LAINNYA
1 Semen Tonasa (50 Kg) Zak 76,680
Kg 1,534 1,534
2 Semen Bosowa (50 Kg) Zak 74,550
Kg 1,491
3 Semen Tiga Roda (50 Kg) Zak 75,615
Kg 1,512
4 Semen Conch (50 Kg) Zak 72,420
Kg 1,448
3 Semen Warna Kg 26,625
3 Alkasit Bungkus 26,625
4 Plamur Tembok BIG Lion/Setara (20 Kg) Zak 79,875
5 Kapur Pasang Kg 15,975
6 Semen Sika Waterproofing Mortal Kg 26,625
7 Air Bersih ltr 50
II BAHAN BESI DAN KAWAT -
1 Besi baja Profil SNI Kg 17,900
2 Besi Beton Ulir SNI Kg 16,500
3 Besi Beton Polos SNI Kg 14,500
Baja WF Kg 22,400
4 Kawat Beton (Kawat Bidrat) Kg 20,000
5 Besi Siku 2 x 2 x 3 mm Batang 60,705
6 Besi Siku 3 x 3, Tbl. 3 mm Batang 80,940
7 Besi Siku 4 x 4 x 4 mm Batang 154,425
Besi Siku 5 x 5 x 5 mm Batang 223,650
Besi Siku 6 x 6 x 6 mm Batang 378,075
8 Baut/Mur P.25 Batang 10,000
9 Baut/Mur P.20 Batang 9,000
10 Baut/Mur P.15 Batang 8,000
11 Paku Campur (5,7,10,12 Cm) Kg 20,000
12 Paku Seng Kg 45,000
Paku Seng Ulir Kg 63,000
13 Paku Tripleks Kg 42,000
14 Paku Sekrup 2 Cm Dos 65,000
15 Paku Beton (5 cm) Dos 36,750
Paku Beton (7 cm) Dos 42,000
Paku Beton (10 cm) Dos 47,250
16 Paku Kalsiboard/Gypsumboard Kg 45,000
17 Paku Asbes Kg 40,000
18 Paku undoline Biji 3,600
19 Karet Pelapis Paku Seng Lembar 4,000
20 Angkur baja dia 19 L= 75 cm Buah 30,000
21 Angkur baja dia 19 L= 25 cm Buah 13,000
22 Baut baja dia 16 Buah 13,000
23 Stainless 2x4 cm, 3 mm M 38,000
24 Stainless 4x4 cm, 3 mm M 41,000
25 Kawat Stainless M 19,000
26 Wiremesh M8 Uk.2.1 x 5.4 m (61.79 kg/lbr) M2 77,000
27 Wiremesh M8 Uk.2.1 x 5.4 m (61.79 kg/lbr) lbr 87,000
28 Besi Hollow 2x2 cm, 1,6 mm M1 13,100
29 Besi Hollow 2x4 cm, 1,2 mm M1 14,000
30 Besi Hollow 4x4 cm, 3 mm M1 26,250
31 Besi Hollow 4x6 cm, 3 mm M1 39,400
III BAHAN KERAMIK -
1 Keramik Putih 10 x 20 Cm Dos 69,225
2 Keramik Warna 10 x 20 Cm Dos 69,225
3 Keramik Putih 20 x 20 Cm Dos 69,225
4 Keramik Warna 20 x 20 Cm Dos 69,225
5 Keramik Putih 20 x 25 Cm Dos 69,225
6 Keramik Warna 20 x 25 Cm Dos 69,225
7 Keramik Putih 30 x 30 Cm Dos 69,225
8 Keramik Warna 30 x 30 Cm Dos 74,550
9 Keramik Putih 40 x 40 Cm Dos 69,225
10 Keramik Warna 40 x 40 Cm Dos 74,550
11 Tegel Keramik List 5 x 20 Cm (Putih) Dos 42,600
12 Granit 60 x 60 cm. Dos 213,000 53,250 8,875
IV BAHAN KACA -
1 Kaca Bening 3 mm M2 138,450
2 Kaca Bening 5 mm M2 170,400
3 Kaca Bening 8 mm M2 287,550
4 Kaca Riben 3 mm M2 159,750
5 Kaca Riben 5 mm M2 181,050
6 Kaca Ray Ban 5 mm Ex. Asahi Kw 1 M2 202,350
7 Kaca Ray Ban 8 mm Ex. Asahi Kw 1 M2 276,900
NO URAIAN SATUAN ZONA 1
(Rp)

TIRAWUTA, LOEA,
LADONGI

8 Kaca Wire Glass 12 mm Ex. Asahi Kw 1 Uk. 1x2.3


m Buah 2,769,000
9 Kaca Wire Glass 12 mm Ex. Asahi Kw 1 Uk. 1x2.3
m M2 1,224,750
10 Kaca Mika akrilik bening 8 mm uk. 122 x 244 cm Lbr 1,970,250
11 Kaca Mika akrilik bening 8 mm uk. 122 x 244 cm M2 798,750
12 Kaca Cermin 3 mm M2 159,750
13 Silicon Sealant kaca/Lem Kaca Kg 7,455
14 Karet Sealant Tube 15,975
15 Spider Kaca Buah 53,250
16 Sekrup Fisher Buah 533
17 Door Closer Buah 138,450
18 Kaca naco 8 Glip Set 101,175
V BAHAN LANGIT-LANGIT -
1 Triplex 2 mm (122x244 Cm) Lembar 53,250
2 Triplex 3 mm (122x244 Cm) Lembar 60,705
3 Multiplex 6 mm (122x244 Cm) Lembar 101,175
4 Multiplex 9 mm (122x244 Cm) Lembar 159,750
5 Melamin Dico Lembar 95,850
6 Playwood / Teacwood 9 mm Lembar 213,000
7 Gypsum Board (120x240 Cm) Lembar 95,850
8 Kalsiboard (240x120 Cm) 9 mm Lembar 90,525
9 Kalsiplank 8 mm uk. 30 x 240 cm Lembar 58,575
10 Pvc Plafond 25x400 cm tebal 8 mm Lembar 133,125
16 Alumunium Hollow Galvavalum 2.4 cm M1' 3,700
17 Alumunium Hollow Galvavalum 4.4 cm M1' 5,000
18 Hollow Alumunium 2.5x3.8 cm M1' 23,000
11 Sekrup Plafond Buah 550
12 Sekrup Rangka Plafond Biji 100
13 Kawat Penggantung (Tali Scoor) M1 5,500
14 Allow Angel (Sudut) M1 7,000
Alumunium Composite Panel Seven 4mm uk.
15 1.2x2.4 m Lembar 798,750
16 HPL ex. Taco Lembar 190,000
17 Karet Putih Pelapis Kaca 5 mm M1 3,500
18 Eternit 3 mm Lembar 75,000
VI LIST PROFIL PLAFOND -
1 1 x 4 cm panjang 4 m Batang 8,000
2 3 x 3 cm panjang 4 m Batang 10,000
3 4 x 4 cm panjang 4 m Batang 15,000
4 5 x 5 cm panjang 4 m Batang 18,000
5 List Plafond Gypsum Batang 40,000
6 List Plafond Gypsum M1 16,000
VII BAHAN ATAP -
1 Genteng Multi Roof (77x100 cm) Lembar 63,900
2 Genteng Sakura Roof (77x80 cm) Lembar 58,575
3 Genteng Soka crystal Lembar 72,420
4 Atap Spandek 0,4 mm m 56,445
5 Atap Spandek 0,3 mm m 47,925
6 Atap Spandek 0,25 mm m 40,470
7 Paku Genteng Kg 37,275
8 Nok Genteng Multi Roof Color Std (P=100 cm) Buah 37,275
7 Nok Genteng Surya Roof Color Std (P=91 cm) Buah 37,275
8 Nok Genteng Sakura Roof Clasic Std (P=91 cm) Buah 37,275
9 Nok Genteng Sakura Roof Royal Std (P=91 cm) Buah 37,275
10 Nok Genteng Soka Crystal (P=110 cm) Buah 37,275
11 Nok Seng Andolin Buah 74,550
12 Seng BWG 34" BJLS 0.20 mm kk 7,668
14 Seng Plat BWG BJLS 0.22 mm (lebar 30 Cm) m 12,780
15 Seng Plat BWG BJLS 0.22 mm (lebar 40 Cm) m 21,300
16 Seng Datar BJLS 0,3 Lembar 319,500
17 Seng Andoline Lembar 202,350
18 Karet Talang 50 Cm m 15,975
19 Atap Fiber / Seng Plastik kk 34,080
20 Atap Anduline Lbr 191,700
21 Nok atap Anduline M 79,875
22 Sekrup Atap Bh 1,598
23 Rangka Baja Ringan Canal C-80 M 15,975
24 Gording baja ringan canal U-40 M 7,988
25 Baut (screw driver) Bungkus 202,350
26 Dynabolt Bh 6,390
27 Talang Jurai M 35,145
28 Karet Talang Lebar 60 Cm M 18,105
29 Tali Slink Dia 16 mm M 56,445
VIII BAHAN CAT DAN MINYAK -
1 Plamir kayu Kg 48,990
NO URAIAN SATUAN ZONA 1
(Rp)

TIRAWUTA, LOEA,
LADONGI

2 Minyak Bekisting Ltr 17,573


3 Thinner Ltr 26,625
4 Cat Tembok Altex/Setara Kg 24,495
5 Cat Tembok Metrolite kg 31,950
6 Cat Dasar Tembok Aries Gold /Setara Kg 18,638
7 Cat Tembok Mowilex/Setara Kg 21,300
8 Cat Tembok Nodrop/Setara Kg 53,250
9 Cat Tembok kimex/Setara Kg 24,495
10 Cat Dasar Many Kayu/Besi Kg 26,625
11 Cat Tembok Propan/Setara Kg 21,300
12 Cat Dasar Tembok Tiger/Setara Kg 58,575
13 Cat Kilap Kayu (Sejenis Avian)/Besi Kg 63,900
14 Cat Plat Beton ex. Nodrop/Setara Kg 53,250
15 Lem Fox/Lem Kayu Kg 21,300
16 Politur/ Vernis Ltr 74,550
17 Dempul Kayu Altek/Setara Kg 58,575
18 Clear Impra Ltr 69,225
19 Plamur Tembok Boyo 23 Kg Kg 53,250
20 Dempul Kayu Kg 58,575
21 Residu Kg 8,520
22 Cat Atap AGA Kg 10,650
23 Amplas Kasar Fuji Star/Setara Lembar 7,455
24 Amplas Halus Fuji Star/ Setara Lembar 7,455
25 Kuas 3 Cm Buah 21,300
26 Kuas 4 Cm Buah 26,625
27 Kuas 5 Cm Buah 31,950
28 Kuas Rol Buah 37,275
IX KUNCI - KUNCI -
1 Handel Pintu Kaca wire glass 12 mm Stainles Set 452,625
2 Handel Pintu Aluminium Stainles Set 170,400 Handel Putar
3 Kunci Tanam 2 Kali Putar T Buah 159,750 Push/Pull Handel
4 Kunci Tanam Antik Buah 79,875 Lever Handel
5 Kunci Gembok Besar Acura Buah 39,938
6 Kunci Gembok Sedang Acura Buah 34,613
7 Kunci Gembok Kecil Acura Buah 29,288
8 Grendel Pintu Biasa Buah 31,950
9 Grendel Pintu Kuningan Antik Buah 42,600
10 Grendel Jendela Biasa Buah 10,650
11 Grendel Jendela Kuningan Solid Buah 23,963
12 Engsel Pintu H Kupu-kupu Biasa Pasang 21,300
13 Engsel Pintu H Kupu-kupu Kuningan Pasang 26,625
16 Engsel Pintu 3 mm x 4 inch Pasang 26,625
17 Hak Angin Biasa Buah 15,975
18 Hak Angin Kuningan Buah 26,625
19 Kunci Lemari 808 Buah 26,625
X BAHAN INSTALASI LISTRIK -

1 RM TL LED Mirror stainless + balon 2 Pcs 18 Watt Buah 532,500


2 Downlight panasonic 5 inchi Buah 95,850 110500 Downlight 13W Philips Meson Putih
3 Downlight panasonic 4 inchi Buah 69,225
4 Lampu hias kotak 4 mata Lampu Buah 596,400
5
Lampu Spot tabung slast body penutup kaca 1 pcs Buah 266,250
6
Lampu Spot tabung slast body penutup kaca 2 pcs Buah 399,375
7 Pipa ø 5/8 inch, panjang 4 m, SNI Power Batang 15,975
8 Pipa ø 3/4 inch, panjang 4 m, SNI Wavin Batang 26,625
9 Pipa ø 1 inch, panjang 4 m, SNI Wavin Batang 42,600
10 Kabel NYY 2 x 1.5 mm, SNI Rol 905,250
11 Kabel NYY 2 x 2.5 mm, SNI Rol 1,278,000
13 Kabel NYM 1,5 mm, SNI Rol 213,000
14 Kabel NYM 2,5 mm, SNI Rol 319,500
15.1333 Kabel NYM 4x6 mm Eterna , SNI M1 37,275
16.3619 Kabel NYM 4x6 mm Eterna , SNI (100 M) Rol 3,727,500
17.5905 Kabel NYM 3x2,5 mm Eterna , SNI M1 13,313
18.819 Kabel NYM 3x2,5 mm Eterna , SNI (100 M) Rol 1,278,000
20.0476 Kabel NYM 1x2,5 mm Eterna M1 5,325
20.7289 Saklar Tunggal Ex. Panasonic/Setara, SNI Buah 31,950
21.8527 Saklar Ganda Ex. Panasonic/Setara, SNI Buah 63,900
22.9765 Stop Kontak, SNI Buah 31,950
24.1003 Sekring Kast 1 Group Biasa, SNI Buah 15,975
25.2241 Sekring Kast 2 Group Biasa, SNI Buah 26,625
26.3479 Sekring Kast 3 Group Biasa, SNI Buah 37,275
27.4717 Fitting Gantung, SNI Buah 13,313
28.5954 Fitting Plafond, SNI Buah 21,300
29.7192 AC. Unit 0.5 PK dalam Ruangan Set 5,325,000
NO URAIAN SATUAN ZONA 1
(Rp)

TIRAWUTA, LOEA,
LADONGI

30.843 AC. Floor Standing (Berdiri) 3 PK Set 21,300,000


31.9668 Outlet kabel data Buah 53,250
34.2144 Lampu TL Besar 1 x 18 W, Philips/ setara/SNI Buah 106,500
35.3382 Lampu TL kecil 10 W, Philips/ setara/SNI Buah 47,925
36.462 Lampu PLC 8 Watt, SNI Buah 53,250
37.5858 Lampu PLC 10 Watt, SNI Buah 58,575
38.7096 Lampu PLC 14 Watt, SNI Buah 63,900
39.8333 Lampu PLC 18 Watt, SNI Buah 69,225
40.9571 Lampu PLC 23 Watt, SNI Buah 74,550
42.0809 Lampu PLC 35 Watt, SNI Buah 79,875
43.2047 Arde Diameter 16 mm Buah 745,500
44.3285 Kabel Audio M1 10,650
45.4523 Kee nee Buah 3,195
46.5761 Inbow Dos Buah 7,988
47.6999 Las Dos Buah 3,195
48.8237 Isolasi Listrik, Ex. Unibell Buah 15,975
49.9475 Klem Kabel No 10 Buah 1,065
51.0712 Tee Doz 5/8 ex. Clipsal Buah 10,650
52.195 Ground Box Set 106,500
53.3188 Kawat Penghantar M1 31,950
54.4426 Penangkal Petir (Tongkat Tembaga) Bh 266,250
55.5664 MCB 6 A 1 o Merlin Gering Buah 106,500
56.6902 MCB 10 A 1 o Merlin Gering Buah 106,500
57.814 MCB 16 A 1 o Merlin Gering Buah 106,500
58.9378 Box MCB SNI Buah 106,500
60.0616 Sekring Cas (MCB) SNI Buah 266,250
XI BAHAN SANITASI -
1 Kloset duduk + Tabung euro ex. Toto/Setara Buah 3,408,000
2 Jet Washer ex. Onda/Setara Buah 90,525
3 Urinoir ex. Toto/Setara Buah 1,597,500
4 Dinding Kaca sekat rg. Mandi Buah 3,195,000
5 Kloset Jongkok kramik Vito Buah 191,700 exhaustfan 300000
6 Kloset Duduk Tanpa Tabung American Standar Buah 852,000
7 Kloset Duduk Dengan Tabung American Standar Set 1,863,750
8 Wastafel Dinding American Standar Buah 852,000
9 Wastafel top lava ex.Toto/Setara Unit 639,000
10 Bak Cuci Logam 1 Lubang Royal Set 479,250
11 Bak Mandi Fiber Glass Buah 585,750
12 Pompa Air Simitsu pakai tabung Buah 1,970,250
13 Kran Air Kuningan ø 1/2" GI Buah 25,000
14 Kran Air Kuningan ø 3/4" GI Buah 30,000
15 Kran Air Biasa ø 1/2" GI Buah 20,000
16 Kran Air Biasa ø 3/4" GI Buah 25,000
17 Soket ø 1/2" s/d 3/4" Buah 4,260
18 Knee ø 1/2" s/d 3/4" Buah 4,260
19 Elbow ø 1/2" s/d 3/4" Buah 5,325
20 Tee Stuk ø 1/2" s/d 3/4" Buah 5,325
21 Lem Pipa PVC Kaleng 53,250
22 Floor Drain Buah 85,200
23 Selang Plastik 3/4" Rol 170,400
XII BAHAN PIPA -
1 Pipa PVC ø 1/2" (AW) 4 m Batang 26,625
2 Pipa PVC ø3/4" (AW) 4 m Batang 37,275
Pipa PVC ø3/4" (AW) 4 m M1 9,319
3 Pipa PVC ø 1" (AW) 4 m Batang 47,925
4 Pipa PVC ø 1,5" (AW) 4 m Batang 69,225
5 Pipa PVC ø 2" (AW) 4 m Batang 85,200
Pipa PVC ø 2" (AW) 4 m M1 21,300
6 Pipa PVC ø 2,5" (AW) 4 m Batang 138,450
7 Pipa PVC ø 3" (AW) 4 m Batang 191,700
Pipa PVC ø 3" (AW) 4 m M1 47,925
8 Pipa PVC ø 4" (AW) 4 m Batang 276,900
Pipa PVC ø 4" (AW) 4 m M1 69,225
9 Water Meter ø 1/2" (Standar PDAM) Buah 181,050
10 Pipa Galvanis ø 1/2" panjang 6 m MB I Batang 106,500
11 Pipa Galvanis ø 3/4" panjang 6 m MB I Batang 127,800
Pipa Ø 1/2" GI M1 79,875
Pipa Ø 3/4" GI M1 85,200
Pipa Ø 1" GI M1 106,500
Pipa Ø 1,5" GI M1 138,450
Pipa Ø 2" GI M1 175,725
Pipa Ø 2,5" GI M1 234,300
Pipa Ø 3" GI M1 426,000
Asseories Standar SNI -
Gate Valves JIS 10K Ø 2" GI Bh 1,065,000
Gate Valves JIS 10K Ø 3" GI Bh 1,650,750
NO URAIAN SATUAN ZONA 1
(Rp)

TIRAWUTA, LOEA,
LADONGI

Gate Valves JIS 10K Ø 4" GI Bh 2,023,500


Gate Valves JIS 10K Ø 6" GI Bh 3,834,000
Air Vent (Single Port) Ø 1/2" GI Bh 1,065,000
Air Vent (Single Port) Ø 3/4" GI Bh 1,384,500
Air Vent (Single Port) Ø 1" GI Bh 1,704,000
Air Vent (Single Port) Ø 2" GI Bh 3,195,000
Air Vent (Single Port) Ø 3" GI Bh 3,834,000
Air Vent (Single Port) Ø 4" GI Bh 6,177,000
Air Vent (Single Port) Ø 5" GI Bh 9,904,500
Air Vent (Single Port) Ø 6" GI Bh 13,312,500
Flanges Ø 3" GI Bh 117,150
Flanges Ø 4" GI Bh 149,100
Flanges Ø 5" GI Bh 223,650
Flanges Ø 6" GI Bh 330,150
Wosh Out Ø 2" GI Bh 1,065,000
Wosh Out Ø 3" GI Bh 1,704,000
Wosh Out Ø 4" GI Bh 2,130,000
Wosh Out Ø 6" GI Bh 3,834,000
74 Water Mor 1/2 Buah 74,550
75 Water Meter 1/2 Buah 159,750
77 Over Sock GI 1/2 Buah 7,455
78 Knee GI 1/2 Buah 7,455
79 Double Niple 1/2 " Buah 15,975
80 Box Meter Buah 159,750
81 Stop Kran 1/2" Buah 53,250
90 Tangki Air 2200 Liter Ex. Penyu / Setara Buah 3,000,000
Knee
BAHAN LOKAL
I TANAH TIMBUNAN
1 Material Tanah Timb. Sirtu M3 60,000
2 Material Tanah Timb. Tasirtu M3 50,000
3 Tanah Timbunan Biasa M3 50,000
II PASIR
1 Pasir Urug M3 170,000
2 Pasir Pasangan M3 250,000
3 Pasir Beton M3 250,000 179 kg
III BATU
1 Batu Merah Biji 650
2 Kerikil Kali M3 250,000
3 Kerikil Pecah (Pecah manual) M3 300,000 237 kg
4 Batu Belah Gunung M3 214,286
5 Batu Kali (Padat) M3
6 Batu Gunung 0,5 - 1 cm (Pecah manual) M3 350,000
7 Batu Gunung 1 - 2 cm (Pecah manual) M3 340,000
8 Batu Gunung 2 - 3 cm (Pecah manual) M3 300,000
9 Batu Gunung 3 - 5 cm (Pecah manual) M3 300,000
10 Batu Gunung 5 - 7 cm (Pecah manual) M3 300,000
IV PAVING BLOCK & BAHAN LAINNYA
1 Paving Block Uk. 21 x 10.5 Tebal 8 Cm K-300 Buah 3,000
2 Paving Block Hexagon Tebal 8 Cm K-300 Buah 4,500
3 Batako UK 30 x 20 Tebal 10 Cm Buah 3,500
4 Konsteen Uk. 10x25x40 Cm K-250 Buah 28,600
5 Loster Uk. 15 x 20 Buah 25,000
6 Rumput Gajah Mini M2 65,000
7 Stiker Kaca Motif Daerah M2 110,000
V BAHAN KAYU
1 Papan Kayu/Balok Kelas I (Sejenis) M3 4,000,000
2 Papan Kayu/Balok Klas II (Sejenis) M3 3,200,000
3 Papan Kayu/Balok Klas III (Sejenis) M3 2,000,000
15.5818 Dolken Ø 5 - 10 Cm Batang 10,000
16.8061 Dolken Ø 15 Cm Batang 15,000
18.0303 Bambu Tebal panjang 7 m Batang 50,000
19.2545 Bambu Tipis panjang 7 m Batang 30,000
20.4788 Batang Kelapa Batang 150,000
21.703 Atap Rumbia Lembar 5,000
22.9273 Ijuk Kg 70,000
24.1515 List Kayu Profil M1 20,000
VI BAHAN ASPAL
1 Aspal Cement (AC) Drum 2,000,000
2 Aspal RMA Ton 1,600,000
3 Aspal Lawele Ton 1,450,000
VIII HARGA JUAL BBM KEEKONOMIAN (NON SUBSIDI)
1 Minyak Solar HSD (Industri) + PPh Liter 11,368
2 Minyak Tanah/Kerosene Liter 10,037
3 Pertalite Liter 9,542
IX UPAH KERJA
NO URAIAN SATUAN ZONA 1
(Rp)

TIRAWUTA, LOEA,
LADONGI

1 Mandor Org/Hari 125,000


2 Kepala Tukang Org/Hari 120,000
3 Tukang
- Tukang Batu Org/Hari 110,000
- Tukang Kayu Org/Hari 110,000
- Tukang Besi Org/Hari 110,000
- Tukang Cat Org/Hari 110,000
4 Pekerja Org/Hari 100,000
5 Sopir Org/Hari 150,000
6 Pembantu Sopir Org/Hari 120,000
7 Operator Alat Berat Org/Hari 200,000
8 Pembantu Operator Alat Berat Org/Hari 120,000
9 Mekanik Org/Hari 300,000

TIM SURVEY

HASRI , ST
NIP. 19811121 201101 1 017

MENYETUJUI:
KABID CIPTA KARYA KABID BINA MARGA

ILHAM, ST AGUSALIM, ST
NIP. 19830507 201101 1 009 NIP. 19750805 200701 1 017

MENGETAH
KEPALA DINAS PEK
PENATAAN RUANG D

B. MANSUR, S.Pd., M.Si.,M.Pd


NIP. 19641105
t 13W Philips Meson Putih
Analisis Harga Satuan Pekerjaan (AHSP)
1 Anl. SPL. Pek. Kusen Aluminium Open Back 4 x 1¾" /m'
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA KERJA
1 Tukang Besi OH 0.430 110,000.00 47,300.00
2 Kepala Tukang OH 0.004 120,000.00 480.00
3 Pekerja OH 0.043 100,000.00 4,300.00
4 Mandor OH 0.002 125,000.00 250.00
Jumlah Tenaga Kerja 52,330.00
B BAHAN
1 Open Back 4" Coklat m' 1.100 5,000.00 5,500.00
2 Penutup Lurus Open Back 4" m' 1.100 21,000.00 23,100.00
3 Tangga Aluminium m' 1.100 42,500.00 46,750.00
4 Spycoat m' 0.150 12,000.00 1,800.00
5 Sealant Aluminium Tube 0.060 15,975.00 958.50
6 Skrup Aluminium Buah 4.000 4,400.00 17,600.00
7 Baut Fixer Buah 2.000 2,000.00 4,000.00
8 Paku Rivet Buah 2.000 325.00 650.00
Jumlah Bahan 100,358.50
C Harga Satuan A + B 152,688.50
D Overhead & Profit 15.0% X C 22,903.28
E Harga Satuan C + D 175,591.78

2 Anl. SPL. Pemasangan 1 Buah Push/Pull Handle Pintu Stenlis


Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA KERJA
1 Tukang Besi OH 0.500 110,000.00 55,000.00
2 Kepala Tukang OH 0.050 120,000.00 6,000.00
3 Pekerja OH 0.050 100,000.00 5,000.00
4 Mandor OH 0.003 125,000.00 312.50
Jumlah Tenaga Kerja 66,312.50
B BAHAN
1 Handle Pintu Stainless Type Push/Pull Handle Bh 1.000 500,000.00 500,000.00
Jumlah Bahan 500,000.00
C Harga Satuan A + B 566,312.50
D Overhead & Profit X C 15% 84,946.88
E Harga Satuan C + D 651,259.38
3 Anl. SPL. Pemasangan 1 Buah Lever Handle Pintu Stenlis
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA KERJA
1 Tukang Besi OH 0.500 110,000.00 55,000.00
2 Kepala Tukang OH 0.050 120,000.00 6,000.00
3 Pekerja OH 0.050 100,000.00 5,000.00
4 Mandor OH 0.003 125,000.00 312.50
Jumlah Tenaga Kerja 66,312.50
B BAHAN
1 Handle Pintu Stainless Type Lever Handel Bh 1.000 150,000.00 150,000.00
Jumlah Bahan 150,000.00
C Harga Satuan A + B 216,312.50
D Harga Satuan A + B X C 15% 32,446.88
E Harga Satuan C + D 248,759.38

3 Anl. SPL. Pemasangan 1 Buah Handle Putar


Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA KERJA
1 Tukang Besi OH 0.500 110,000.00 55,000.00
2 Kepala Tukang OH 0.050 120,000.00 6,000.00
3 Pekerja OH 0.050 100,000.00 5,000.00
4 Mandor OH 0.003 125,000.00 312.50
Jumlah Tenaga Kerja 66,312.50
B BAHAN
1 Handle Putar Bh 1.000 -
Jumlah Bahan -
C Harga Satuan A + B 66,312.50
D Harga Satuan A + B X C 15% 9,946.88
E Harga Satuan C + D 76,259.38

4 Anl. SPL. Pemasangan 1 Buah Grendel Pintu


Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA KERJA
1 Tukang Besi OH 0.150 120,000.00 18,000.00
2 Kepala Tukang OH 0.015 140,000.00 2,100.00
3 Pekerja OH 0.015 100,000.00 1,500.00
4 Mandor OH 0.001 120,000.00 96.00
Jumlah Tenaga Kerja 21,696.00
B BAHAN
1 Grendel Pintu Bh 1.000 31,950.00 31,950.00
Jumlah Bahan 31,950.00
C Harga Satuan A + B 53,646.00
D Harga Satuan A + B X C 15% 8,046.90
E Harga Satuan C + D 61,692.90
3 A.4.6.2.5. Pemasangan 1 Buah Engsel Pintu
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA KERJA
1 Tukang Besi OH 0.015 110,000.00 1,650.00
2 Kepala Tukang OH 0.150 120,000.00 18,000.00
3 Pekerja OH 0.015 100,000.00 1,500.00
4 Mandor OH 0.001 125,000.00 100.00
Jumlah Tenaga Kerja 21,250.00
B BAHAN
1 Engsel Pintu Bh 1.000 26,625.00 26,625.00
Jumlah Bahan 26,625.00
C Harga Satuan A + B 47,875.00
D Overhead & Profit X C 15% 7,181.25
E Harga Satuan C + D 55,056.25

3 A.4.6.2.5. Pemasangan 1 Buah Engsel Casement


Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA KERJA
1 Tukang Kayu OH 0.015 110,000.00 1,650.00
2 Kepala Tukang OH 0.150 120,000.00 18,000.00
3 Pekerja OH 0.015 100,000.00 1,500.00
4 Mandor OH 0.001 125,000.00 100.00
Jumlah Tenaga Kerja 21,250.00
B BAHAN
1 Engsel Casement Bh 1.000 -
Jumlah Bahan -
C Harga Satuan A + B 21,250.00
D Harga Satuan C + D X C 15% 3,187.50
E Harga Satuan C + D 24,437.50

4 A.4.6.2.4. Pemasangan 1 Buah Kunci Silinder


Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA KERJA
1 Tukang Besi OH 0.005 110,000.00 550.00
2 Kepala Tukang OH 0.500 120,000.00 60,000.00
3 Pekerja OH 0.050 100,000.00 5,000.00
4 Mandor OH 0.003 125,000.00 375.00
Jumlah Tenaga Kerja 65,925.00
B BAHAN
1 Kunci Silinder Bh 1.000 -
Jumlah Bahan -
C Harga Satuan A + B 65,925.00
D Harga Satuan C + D X C 15% 9,888.75
E Harga Satuan C + D 75,813.75

4 A.4.6.2.17. Pemasangan 1 m2 Kaca Tebal 5mm


Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA KERJA
1 Tukang Kaca OH 0.150 110,000.00 16,500.00
2 Kepala Tukang OH 0.015 120,000.00 1,800.00
3 Pekerja OH 0.015 100,000.00 1,500.00
4 Mandor OH 0.008 125,000.00 1,000.00
Jumlah Tenaga Kerja 20,800.00
B BAHAN
1 Kaca Bening 5 mm M2 1.000 170,400.00 170,400.00
2 Sealant Kaca Tube 0.050 15,975.00 798.75
Jumlah Bahan 171,198.75
C Harga Satuan A + B 191,998.75
D Overhead & Profit X C 15% 28,799.81
E Harga Satuan C + D 220,798.56

5 A.4.6.2.19. Pemasangan 1 m2 kaca tebal 12 mm


Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA KERJA
1 Tukang Kaca OH 0,017 110,000.00 1,870.00
2 Kepala Tukang OH 0,17 120,000.00 20,400.00
3 Pekerja OH 0,017 100,000.00 1,700.00
4 Mandor OH 0,0009 125,000.00 112.50
Jumlah Tenaga Kerja 24,082.50
B BAHAN
1 Kaca Polos 12mm M2 1.000 -
2 Sealant Kaca Tube 0.070 15,975.00 1,118.25
Jumlah Bahan 1,118.25
C Harga Satuan A + B 25,200.75
D A.4.6.2.5. X C 15% 3,780.11
E Harga Satuan C + D 28,980.86

6 Anl. SPL. Pek. Kusen PJ1


Harga Jumlah
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 48.540 175,591.78 8,523,224.76
2 Pas. Kaca Polos 5 mm m2 10.684 220,798.56 2,359,011.84
3 Pas. Kaca Tempered 12mm Ls 1.000 20,000,000.00 20,000,000.00
4 Push/Pull Handel Pintu Stainless Unit 2.000 651,259.38 1,302,518.75
5 Sealant Aluminium Tube 1.000 15,975.00 15,975.00
Jumlah Bahan 32,200,730.35
C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 32,200,730.35
7 Anl. SPL. Pek. Kusen PJ2
Harga Jumlah
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 42.280 175,591.78 7,424,020.25
2 Pas. Kaca Polos 5 mm m2 9.960 220,798.56 2,199,153.68
3 Bingkai Pintu Jendela aluminium m' 21.360 175,591.78 3,750,640.31
4 Push/Pull Handel Pintu Stainless Unit 2.000 651,259.38 1,302,518.75
5 Grendel Pintu Bh 1.000 61,692.90 61,692.90
6 Grendel Jendela Bh 4.000 23,962.50 95,850.00
7 Sealant Aluminium Tube 1.000 15,975.00 15,975.00
8 Pas. Engsel Pintu Psg 3.000 55,056.25 165,168.75
9 Pas. Engsel Jendela Psg 4.000 26,625.00 106,500.00
Jumlah Bahan 15,121,519.64
C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 15,121,519.64

8 Anl. SPL. Pek. Kusen PJ3


Harga Jumlah
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 31.580 175,591.78 5,545,188.25
2 Pas. Kaca Polos 5 mm m2 7.618 220,798.56 1,682,043.45
3 Bingkai Pintu Jendela aluminium m' 22.160 175,591.78 3,891,113.73
4 Push/Pull Handel Pintu Stainless Unit 2.000 651,259.38 1,302,518.75
5 Grendel Pintu Bh 1.000 61,692.90 61,692.90
6 Grendel Jendela Bh 4.000 23,962.50 95,850.00
7 Sealant Aluminium Tube 1.000 15,975.00 15,975.00
8 Pas. Engsel Pintu Psg 3.000 55,056.25 165,168.75
9 Pas. Engsel Jendela Psg 4.000 26,625.00 106,500.00
Jumlah Bahan 12,866,050.84
C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 12,866,050.84

9 Anl. SPL. Pek. Kusen PJ4


Harga Jumlah
No. Uraian Satuan Volume
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 30.300 175,591.78 5,320,430.78
2 Pas. Kaca Polos 5 mm m2 7.022 220,798.56 1,550,447.51
3 Bingkai Pintu Jendela aluminium m' 21.280 175,591.78 3,736,592.97
4 Push/Pull Handel Pintu Stainless Unit 2.000 651,259.38 1,302,518.75
5 Grendel Pintu Bh 1.000 61,692.90 61,692.90
6 Grendel Jendela Bh 4.000 23,962.50 95,850.00
7 Sealant Aluminium Tube 1.000 15,975.00 15,975.00
8 Pas. Engsel Pintu Psg 3.000 55,056.25 165,168.75
9 Pas. Engsel Jendela Psg 4.000 26,625.00 106,500.00
Jumlah Bahan 12,355,176.66
C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 12,355,176.66

10 Anl. SPL. Pek. Kusen PJ5


Harga Jumlah
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 35.160 175,591.78 6,173,806.81
2 Pas. Kaca Polos 5 mm m2 9.532 220,798.56 2,104,541.50
3 Bingkai Pintu Aluminium m' 5.680 175,591.78 997,361.28
4 Lever Handel Pintu Stainless Unit 1.000 248,759.38 248,759.38
5 Grendel Pintu Bh 1.000 61,692.90 61,692.90
6 Sealant Aluminium Tube 1.000 15,975.00 15,975.00
7 Pas. Engsel Pintu Psg 1.500 55,056.25 82,584.38
Jumlah Bahan 9,684,721.24
C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 9,684,721.24
11 Anl. SPL. Pek. Kusen P1
Harga Jumlah
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 6.500 175,591.78 1,141,346.54
2 Pas. Kaca Polos 5 mm Unit 0.225 220,798.56 49,679.68
3 Handel Putar Unit 1.000 76,259.38 76,259.38
4 Sealant Aluminium Tube 1.000 15,975.00 15,975.00
5 Daun Pintu Rangka Hollow T.35 mm Lapis PVC Bh 1.000 1,000,000.00 1,000,000.00
6 Engsel Pintu Pasang 1.500 26,625.00 39,937.50
7 Grendel Biasa Bh 1.000 31,950.00 31,950.00
Jumlah Bahan 2,355,148.09
C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 2,355,148.09

12 Anl. SPL. Pek. Kusen P2


Harga Jumlah
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 5.050 175,591.78 886,738.46
2 Pas. Kaca Polos 5 mm Unit 0.513 220,798.56 113,269.66
3 Handel Pintu Type Lever Handle Unit 1.000 248,759.38 248,759.38
4 Grendel Biasa Bh 1.000 31,950.00 31,950.00
5 Sealant Aluminium Tube 1.000 15,975.00 15,975.00
6 Daun Pintu Rangka Hollow T.35 mm Lapis PVC Item 1.000 1,000,000.00 1,000,000.00
7 Engsel Psg 1.500 26,625.00 39,937.50

Jumlah Bahan 2,336,630.00


C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 2,336,630.00

13 Anl. SPL. Pek. Kusen J1


Harga Jumlah
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 19.800 175,591.78 3,476,717.15
2 Pas. Kaca Polos 5 mm m2 5.180 220,798.56 1,143,736.55
3 Bingkai Jendela Aluminium m' 7.060 175,591.78 1,239,677.93
4 Engsel Jendela Set 2.000 26,625.00 53,250.00
5 Grendel Jendela Bh 2.000 23,962.50 47,925.00
6 Sealant Aluminium Tube 1.000 15,975.00 15,975.00
Jumlah Bahan 5,977,281.63
C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 5,977,281.63

14 Anl. SPL. Pek. Kusen J2


Harga Jumlah
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 14.850 175,591.78 2,607,537.86
2 Pas. Kaca Polos 5 mm m2 3.430 220,798.56 757,339.07
3 Bingkai Jendela Aluminium m' 7.060 175,591.78 1,239,677.93
4 Engsel Jendela Set 2.000 24,437.50 48,875.00
5 Grendel Jendela Bh 2.000 23,962.50 47,925.00
6 Sealant Aluminium Tube 1.000 15,975.00 15,975.00
Jumlah Bahan 4,717,329.86
C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 4,717,329.86

15 Anl. SPL. Pek. Kusen J3


Harga Jumlah
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 21.600 175,591.78 3,792,782.34
3 Bingkai Jendela Aluminium m' 7.060 175,591.78 1,239,677.93
4 Engsel Jendela Set 2.000 26,625.00 53,250.00
5 Pas. Kaca Polos 5 mm m2 6.225 220,798.56 1,374,515.21
6 Grendel Jendela Buah 2.000 23,962.50 47,925.00
7 Sealant Aluminium Tube 1.000 15,975.00 15,975.00
Jumlah Bahan 6,524,125.48
C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 6,524,125.48

15 Anl. SPL. Pek. Kusen J4


Harga Jumlah
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 9.900 175,591.78 1,738,358.57
3 Bingkai Jendela Aluminium m' 7.060 175,591.78 1,239,677.93
4 Engsel Jendela Set 2.000 26,625.00 53,250.00
6 Pas. Kaca Polos 5 mm m2 1.680 220,798.56 370,941.59
7 Grendel Jendela Buah 2.000 23,962.50 47,925.00
8 Sealant Aluminium Tube 1.000 15,975.00 15,975.00
Jumlah Bahan 3,466,128.09
C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 3,466,128.09

16 Anl. SPL. Pek. Kusen PA1


Harga Jumlah
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 14.250 175,591.78 2,502,182.79
2 Pas. Kaca Polos 5 mm m2 4.154 220,798.56 917,197.23
3 Sealant Aluminium Tube 1.000 15,975.00 15,975.00
Jumlah Bahan 3,435,355.02
C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 3,435,355.02

17 Anl. SPL. Pek. Kusen PA2


Harga Jumlah
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 31.650 175,591.78 5,557,479.68
2 Pas. Kaca Polos 5 mm m2 8.308 220,798.56 1,834,394.46
3 Sealant Aluminium Tube 1.000 15,975.00 15,975.00
Jumlah Bahan 7,407,849.14
C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 7,407,849.14
17 Anl. SPL. Pek. Kusen PA3
Harga Jumlah
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 33.500 175,591.78 5,882,324.46
2 Pas. Kaca Polos 5 mm m2 6.492 220,798.56 1,433,424.27
3 Sealant Aluminium Tube 1.000 15,975.00 15,975.00
Jumlah Bahan 7,331,723.73
C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 7,331,723.73
18 Anl. SPL. Pek. Kusen V1
Harga Jumlah
No. Uraian Satuan Volume
Satuan (Rp) Harga (Rp)
A TENAGA KERJA

Jumlah Tenaga Kerja -


B BAHAN
1 Kusen Aluminium 4" m' 1.500 175,591.78 263,387.66
2 Pas. Kaca Polos 5 mm m2 0.100 220,798.56 22,079.86
3 Sealant Aluminium Tube 0.500 15,975.00 7,987.50
Jumlah Bahan 293,455.02
C PERALATAN
1 Alat Bantu Ls -
Jumlah Peralatan -
D Harga Satuan A + B + C 293,455.02
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.02 100,000.00 2,000.00
Tukang cat L.02 OH 0.06 110,000.00 6,930.00
Kepala tukang L.03 OH 0.01 120,000.00 756.00
Mandor L.04 OH 0.00 125,000.00 375.00
JUMLAH TENAGA KERJA 10,061.00
B BAHAN
Plamuur Kg -
Cat dasar Kg 0.10 53,250.00 5,325.00
Cat penutup Kg 0.26 65,000.00 16,900.00
JUMLAH HARGA BAHAN 22,225.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 32,286.00
E Overhead & Profit 15% xD 4,842.90
F Harga Satuan Pekerjaan (D+E) 37,128.90

A.4.7.1.10 Spl. Pengecatan 1 m2 Plafond (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.02 100,000.00 2,000.00
Tukang cat L.02 OH 0.06 110,000.00 6,930.00
Kepala tukang L.03 OH 0.01 120,000.00 756.00
Mandor L.04 OH 0.00 125,000.00 375.00
JUMLAH TENAGA KERJA 10,061.00
B BAHAN
Plamuur Kg 0.10 53,250.00 5,325.00
Cat dasar Kg 0.10 53,250.00 5,325.00
Cat penutup Kg 0.26 65,000.00 16,900.00
JUMLAH HARGA BAHAN 27,550.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 37,611.00
E Overhead & Profit 15% xD 5,641.65
F Harga Satuan Pekerjaan (D+E) 43,252.65
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.21 Spl. Pemasangan 1 m2 Rangka hollow Galvalume 40.40. dan 20.40 mm, untuk plafon
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 100,000.00 35,000.00
Tukang besi L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.018 125,000.00 2,250.00
JUMLAH TENAGA KERJA 79,950.00
B BAHAN
Hollow 20.40 mm (baja Ringan) m' 3.800 3,700.00 14,060.00
Hollow 40.40 mm (baja Ringan) m' 1.800 5,000.00 9,000.00
Aksesoris % 35.000 23,060.00 8,071.00
JUMLAH HARGA BAHAN 31,131.00
C PERALATAN
Peralatan % 0% - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 111,081.00
E Overhead & Profit 15% xD 16,662.15
F Harga Satuan Pekerjaan (D+E) 127,743.15

A.4.2.1.22 (SPL) (K3) Pemasangan 1 M2 Atap Pelana Atap Rangka Baja Canai Dingin Profill C75
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.734 100,000.00 73,400.00
Tukang besi L.02 OH 0.734 110,000.00 80,740.00
Kepala tukang L.03 OH 0.073 120,000.00 8,760.00
Mandor L.04 OH 0.037 125,000.00 4,625.00
JUMLAH TENAGA KERJA 167,525.00
B BAHAN
Baja Ringan Canai Dingin m1 3.72 20,000.00 74,400.00
Skrup Buah 20.00 250.00 5,000.00
Reng Baja Ringan M1 3.72 11,666.67 43,400.00
JUMLAH HARGA BAHAN 122,800.00
C PERALATAN
Peralatan % 0% - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 290,325.00
E Overhead & Profit 15% xD 43,548.75
F Harga Satuan Pekerjaan (D+E) 333,873.75
A.4.4.2 HARGA SATUAN PEKERJAAN PLAFON
A. 4.5.1.7 Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) cm, tebal 9 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.10 100,000.00 10,000.00
Tukang Alumunium L.03 OH 0.05 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 16,725.00
B BAHAN
Gypsum Board Lbr 0.36 95,850.00 34,889.40
Paku Sekrub Kg 0.11 550.00 60.50
JUMLAH HARGA BAHAN 34,949.90
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 51,674.90
E Overhead & Profit 15% xD 7,751.24
F Harga Satuan Pekerjaan (D+E) 59,426.14

SPL. Pemasangan 1 M1 List Plafond Gypsum


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.10 100,000.00 10,000.00
Tukang Kayu L.03 OH 0.05 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.003 125,000.00 375.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
List Gipsum M1 1.05 16,000.00 16,800.00
Lem Kg 0.25 21,300.00 5,325.00
JUMLAH HARGA BAHAN 22,125.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 38,600.00
E Overhead & Profit 15% xD 5,790.00
F Harga Satuan Pekerjaan (D+E) 44,390.00
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.30 100,000.00 330,000.00
Tukang batu L.02 OH 1.10 110,000.00 121,000.00
Kepala tukang L.03 OH 0.01 120,000.00 1,200.00
Mandor L.04 OH 0.16 125,000.00 20,000.00
JUMLAH TENAGA KERJA 472,200.00
B BAHAN
Closet duduk Bh 1.00 3,408,000.00 3,408,000.00
Perlengkapan % 6.00 3,408,000.00 204,480.00
JUMLAH HARGA BAHAN 3,612,480.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 4,084,680.00
E Overhead & Profit 15% xD 612,702.00
F Harga Satuan Pekerjaan (D+E) 4,697,382.00
A.5.1.1.19 SPL Pemasangan 1 buah Jetwahser
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.01 100,000.00 1,000.00
Tukang batu L.02 OH 0.40 110,000.00 44,000.00
Kepala tukang L.03 OH 0.04 120,000.00 4,800.00
Mandor L.04 OH 0.01 125,000.00 625.00
JUMLAH TENAGA KERJA 50,425.00
B BAHAN
Jetwasher Bh 1.00 90,525.00 90,525.00
Sealtape Bh 0.03 6,000.00 150.00
JUMLAH HARGA BAHAN 90,675.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 141,100.00
E Overhead & Profit 15% xD 21,165.00
F Harga Satuan Pekerjaan (D+E) 162,265.00

A.5.1.1.1. (K3) Pemasangan 1 buah wastafel


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.30 100,000.00 330,000.00
Tukang batu L.02 OH 1.10 110,000.00 121,000.00
Kepala tukang L.03 OH 0.01 120,000.00 1,200.00
Mandor L.04 OH 0.16 125,000.00 20,000.00
JUMLAH TENAGA KERJA 472,200.00
B BAHAN
Wastafel Bh 1.00 852,000.00 852,000.00
Perlengkapan % 6.00 852,000.00 51,120.00
JUMLAH HARGA BAHAN 903,120.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,375,320.00
E Overhead & Profit 15% xD 206,298.00
F Harga Satuan Pekerjaan (D+E) 1,581,618.00

A.5.1.1.14 Pemasangan 1 buah floor drain


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.01 100,000.00 1,000.00
Tukang batu L.02 OH 0.10 110,000.00 11,000.00
Kepala tukang L.03 OH 0.01 120,000.00 1,200.00
Mandor L.04 OH 0.01 125,000.00 625.00
JUMLAH TENAGA KERJA 13,825.00
B BAHAN
Floor Drain Bh 1.00 85,200.00 85,200.00
JUMLAH HARGA BAHAN 85,200.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 99,025.00
E Overhead & Profit 15% xD 14,853.75
F Harga Satuan Pekerjaan (D+E) 113,878.75
A.5.1.1.19 Pemasangan 1 buah kran diameter 1/2" atau 3/4"
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.01 100,000.00 1,000.00
Tukang batu L.02 OH 0.40 110,000.00 44,000.00
Kepala tukang L.03 OH 0.04 120,000.00 4,800.00
Mandor L.04 OH 0.01 125,000.00 625.00
JUMLAH TENAGA KERJA 50,425.00
B BAHAN
Kran air Bh 1.00 25,000.00 25,000.00
Sealtape Bh 0.03 6,000.00 150.00
JUMLAH HARGA BAHAN 25,150.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 75,575.00
E Overhead & Profit 15% xD 11,336.25
F Harga Satuan Pekerjaan (D+E) 86,911.25

A.5.1.1 26. Pemasangan 1 m’ Pipa PVC tipe AW diameter 3/4''


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.04 100,000.00 3,600.00
Tukang Pipa L.02 OH 0.06 110,000.00 6,600.00
Kepala tukang L.03 OH 0.01 120,000.00 720.00
Mandor L.04 OH 0.002 125,000.00 250.00
JUMLAH TENAGA KERJA 11,170.00
B BAHAN
Pipa PVC 3/4'' m 1.20 9,318.75 11,182.50
Perlengkapan % 35.00 9,318.75 3,261.56
JUMLAH HARGA BAHAN 14,444.06
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 25,614.06
E Overhead & Profit 15% xD 3,842.11
F Harga Satuan Pekerjaan (D+E) 29,456.17

A.5.1.1 29. Pemasangan 1 m’ Pipa PVC tipe AW diameter 2''


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.05 100,000.00 5,400.00
Tukang Pipa L.02 OH 0.09 110,000.00 9,900.00
Kepala tukang L.03 OH 0.01 120,000.00 1,080.00
Mandor L.04 OH 0.003 125,000.00 375.00
JUMLAH TENAGA KERJA 16,755.00
B BAHAN
Pipa PVC 2'' m 1.20 21,300.00 25,560.00
Perlengkapan % 35.00 21,300.00 7,455.00
JUMLAH HARGA BAHAN 33,015.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 49,770.00
E Overhead & Profit 15% xD 7,465.50
F Harga Satuan Pekerjaan (D+E) 57,235.50

A.5.1.1 31. Pemasangan 1 m’ Pipa PVC tipe AW diameter 3''


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.08 100,000.00 8,100.00
Tukang Pipa L.02 OH 0.14 110,000.00 14,850.00
Kepala tukang L.03 OH 0.01 120,000.00 1,620.00
Mandor L.04 OH 0.004 125,000.00 500.00
JUMLAH TENAGA KERJA 25,070.00
B BAHAN
Pipa PVC 4'' m 1.20 47,925.00 57,510.00
Perlengkapan % 35.00 47,925.00 16,773.75
JUMLAH HARGA BAHAN 74,283.75
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 99,353.75
E Overhead & Profit 15% xD 14,903.06
F Harga Satuan Pekerjaan (D+E) 114,256.81

A.5.1.1 32. Pemasangan 1 m’ Pipa PVC tipe AW diameter 4''


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.08 100,000.00 8,100.00
Tukang Pipa L.02 OH 0.14 110,000.00 14,850.00
Kepala tukang L.03 OH 0.01 120,000.00 1,620.00
Mandor L.04 OH 0.004 125,000.00 500.00
JUMLAH TENAGA KERJA 25,070.00
B BAHAN
Pipa PVC 4'' m 1.20 69,225.00 83,070.00
Perlengkapan % 35.00 69,225.00 24,228.75
JUMLAH HARGA BAHAN 107,298.75
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 132,368.75
E Overhead & Profit 15% xD 19,855.31
F Harga Satuan Pekerjaan (D+E) 152,224.06

(Spl) Pemasangan 1 Buah Lampu Down light 13W


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A PEMASANGAN/INSTALASI/UJI COBA
Pekerja OH 0.85 100,000.00 85,000.00
Mandor OH 0.24 125,000.00 30,000.00
JUMLAH TENAGA KERJA 115,000.00
B BAHAN
Down light 13W Philips Meson 1.00 110,500.00 110,500.00
Perlengkapan 1.00 -
JUMLAH HARGA BAHAN 110,500.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 225,500.00
E Overhead & Profit 15% xD 33,825.00
F Harga Satuan Pekerjaan (D+E) 259,325.00

(Spl) Pemasangan 1 Buah Lampu Down light 9W


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A PEMASANGAN/INSTALASI/UJI COBA
Pekerja OH 0.85 100,000.00 85,000.00
Mandor OH 0.24 125,000.00 30,000.00
JUMLAH TENAGA KERJA 115,000.00
B BAHAN
Down light 13W 1.00 -
Perlengkapan 1.00 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 115,000.00
E Overhead & Profit 15% xD 17,250.00
F Harga Satuan Pekerjaan (D+E) 132,250.00

(Spl) Pemasangan 1 Buah Ceiling Decorative Lamp 15W


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A PEMASANGAN/INSTALASI/UJI COBA
Pekerja OH 0.85 100,000.00 85,000.00
Mandor OH 0.24 125,000.00 30,000.00
JUMLAH TENAGA KERJA 115,000.00
B BAHAN
Ceiling Decorative Lamp 15W 1.00 -
Perlengkapan 1.00 -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 115,000.00
E Overhead & Profit 15% xD 17,250.00
F Harga Satuan Pekerjaan (D+E) 132,250.00
(Spl) Pemasangan 1 Buah CCTV High Resolution Dome Camera
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A PEMASANGAN/INSTALASI/UJI COBA
Pemasangan CCTV 1.00 300,000.00 300,000.00
Line Up/Set Up System 1.00 50,000.00 50,000.00
Uji Coba System 1.00 50,000.00 50,000.00
Akomodasi 1.000 100,000.00 100,000.00
JUMLAH TENAGA KERJA 500,000.00
B BAHAN
High Resolution Dome Camera, Include Acc 1.00 1,500,000.00 1,500,000.00
Perlengkapan -
JUMLAH HARGA BAHAN 1,500,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 2,000,000.00
E Overhead & Profit 15% xD 300,000.00
F Harga Satuan Pekerjaan (D+E) 2,300,000.00
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.39.(SPL) Pemasangan 1 m2 atap spandek
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.12 100,000.00 12,000.00
Tukang kayu L.02 OH 0.06 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.006 125,000.00 750.00
JUMLAH TENAGA KERJA 20,070.00
B BAHAN
Atap Spandek 0,4mm m' 1.20 56,445.00 67,734.00
Baut Railing Bh 4.00 1,500.00 6,000.00
JUMLAH HARGA BAHAN 73,734.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 93,804.00
E Overhead & Profit 15% xD 14,070.60
F Harga Satuan Pekerjaan (D+E) 107,874.60
A.4.5.2.42 Pemasangan 1 m' Nok Atap Spandek
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.15 100,000.00 15,000.00
Tukang kayu L.02 OH 0.07 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.006 125,000.00 750.00
JUMLAH TENAGA KERJA 24,290.00
B BAHAN
Nok Atap m' 1.10 56,445.00 62,089.50
Baut Railing Bh 4.00 1,500.00 6,000.00
JUMLAH HARGA BAHAN 68,089.50
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 92,379.50
E Overhead & Profit 15% xD 13,856.93
F Harga Satuan Pekerjaan (D+E) 106,236.43

Kolaka Timur, 08 Desember 2021


MENGETAHUI :
KEPALA DINAS PEKERJAAN UMUM
PENATAAN RUANG DAN PERHUBUNGAN
KABUPATEN KOLAKA TIMUR

JUN RACHMAT, S.STP.,M.Si


NIP. 19770605 199511 1 002
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.21. (SPL) Pemasangan 1 m’ Kalsiplank ukuran (30x300)cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.10 100,000.00 10,000.00
Tukang kayu L.03 OH 0.20 110,000.00 22,000.00
Kepala tukang L.03 OH 0.02 120,000.00 2,400.00
Mandor L.04 OH 0.005 125,000.00 625.00
JUMLAH TENAGA KERJA 35,025.00
B BAHAN
Kalsiplank m 1.10 25,500.00 28,050.00
Sekrup kg 0.10 70,000.00 7,000.00
JUMLAH HARGA BAHAN 35,050.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 70,075.00
E Overhead & Profit 15% xD 10,511.25
F Harga Satuan Pekerjaan (D+E) 80,586.25
Analisis Harga Satuan Pekerjaan (AHSP)
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.2(Anl. Spl) Pemasangan 1 buah hendel pintu stenlis
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 100,000.00 Rp 1,000.00
Tukang Kayu L.02 OH 0.5000 120,000.00 Rp 60,000.00
Kepala Tukang L.03 OH 0.0500 140,000.00 Rp 7,000.00
Mandor L.04 OH 0.0050 120,000.00 Rp 600.00
Jumlah Tenaga Kerja Rp 68,600.00
B BAHAN
Hendel Pintu Stenlis Bh 1.0000 160,100.00 Rp 160,100.00
Jumlah Harga Bahan Rp 160,100.00
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 228,700.00
E Overhead & Profit 15% X D Rp 34,305.00
F Harga Suatu Pekerjaan (D+E) Rp 263,005.00

A.4.6.2.4 Pemasangan 1 buah Kunci Silinder


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.005 100,000.00 Rp 500.00
Tukang Kayu L.02 OH 0.500 120,000.00 Rp 60,000.00
Kepala Tukang L.03 OH 0.050 140,000.00 Rp 7,000.00
Mandor L.04 OH 0.003 120,000.00 Rp 360.00
Jumlah Tenaga Kerja Rp 67,860.00
B BAHAN
Kunci Silinder Bh 1.00 Rp 65,000.00 Rp 65,000.00
Jumlah Harga Bahan Rp 65,000.00
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 132,860.00
E Overhead & Profit 15% X D Rp 19,929.00
F Harga Suatu Pekerjaan (D+E) Rp 152,789.00

Anl. Kunci dan Kaca (2) Page 98


A.4.6.2.5 Pemasangan 1 buah engsel pintu kesmen
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 100,000.00 Rp 1,500.00
Tukang Kayu L.02 OH 0.1500 120,000.00 Rp 18,000.00
Kepala Tukang L.03 OH 0.0150 140,000.00 Rp 2,100.00
Mandor L.04 OH 0.0008 120,000.00 Rp 96.00
Jumlah Tenaga Kerja Rp 21,696.00
B BAHAN
Engsel Pintu Kesmen Bh 1.0000 Rp 65,000.00 Rp 65,000.00
Jumlah Harga Bahan Rp 65,000.00
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 86,696.00
E Overhead & Profit 15% X D Rp 13,004.40
F Harga Suatu Pekerjaan (D+E) Rp 99,700.40

A.4.6.2.17 Pemasangan 1 m² kaca tebal 5 mm


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 100,000.00 Rp 1,500.00
Tukang Kayu L.02 OH 0.1500 120,000.00 Rp 18,000.00
Kepala Tukang L.03 OH 0.0150 140,000.00 Rp 2,100.00
Mandor L.04 OH 0.0008 120,000.00 Rp 96.00
Jumlah Tenaga Kerja Rp 21,696.00
B BAHAN
Kaca 5 mm m² 1.1000 113,400.00 Rp 124,740.00
Sealent Kg 0.0500 38,200.00 Rp 1,910.00
Jumlah Harga Bahan Rp 126,650.00
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 148,346.00
E Overhead & Profit 15% X D Rp 22,251.90
F Harga Suatu Pekerjaan (D+E) Rp 170,597.90

Anl. Kunci dan Kaca (2) Page 99


A.4.6.2.18 Pemasangan 1 m² kaca tebal 8 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0170 100,000.00 Rp 1,700.00
Tukang Kayu L.02 OH 0.1700 120,000.00 Rp 20,400.00
Kepala Tukang L.03 OH 0.0170 140,000.00 Rp 2,380.00
Mandor L.04 OH 0.0009 120,000.00 Rp 108.00
Jumlah Tenaga Kerja Rp 24,588.00
B BAHAN
Kaca 8 mm m² 1.1000 170,000.00 Rp 187,000.00
Sealent Kg 0.0700 38,200.00 Rp 2,674.00
Jumlah Harga Bahan Rp 189,674.00
C PERALATAN

Jumlah Harga Alat Rp -


D J u m l a h (A+B+C) Rp 214,262.00
E Overhead & Profit 15% X D Rp 32,139.30
F Harga Suatu Pekerjaan (D+E) Rp 246,401.30

Anl. Kunci dan Kaca (2) Page 100


TABEL BESI
Besi Beton Pelos dan Ulir

UKURAN (mm) BERAT (mm)


6 0.222
8 0.395
9 0.5
10 0.617
12 0.888
13 1.04
16 1.578
16 1.578
19 2.223
22 2.985
25 3.853
28 4.83
29 5.185
32 6.313
36 7.99
6p 0.22
8p 0.4
9p 0.5
10p 0.62
12p 0.89
13p 1.04
16p 1.57
16p 1.58
19p 2.23
22p 2.98
25p 3.85
28p 4.83
29p 5.19
32p 6.31
36p 7.99
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.1. Pemasangan 1 buah kunci tanam antik


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.06
Tukang kayu L.02 OH 0.60
Kepala tukang L.03 OH 0.06
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam antik buah 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.01
Tukang kayu L.02 OH 0.50
Kepala tukang L.03 OH 0.05
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam biasa buah 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.01
Tukang kayu L.02 OH 0.50
Kepala tukang L.03 OH 0.05
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam KM buah 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.4. Pemasangan 1 buah kunci silinder


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.01
Tukang kayu L.02 OH 0.50
Kepala tukang L.03 OH 0.05
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci silinder buah 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.5. Pemasangan 1 buah engsel pintu


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.02
Tukang kayu L.02 OH 0.15
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel pintu buah 1.00

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.01
Tukang kayu L.02 OH 0.10
Kepala tukang L.03 OH 0.01
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel kupu-kupu buah 1.00

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.7. Pemasangan 1 buah engsel angin


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.10
Tukang kayu L.02 OH 0.20
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel angin buah 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.8. Pemasangan 1 buah spring knip


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.02
Tukang kayu L.02 OH 0.15
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
Spring knip buah 1.00

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.9. Pemasangan 1 buah kait angin


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.02
Tukang kayu L.02 OH 0.15
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
Kait angin buah 1.00

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.10. Pemasangan 1 buah door closer


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.05
Tukang kayu L.02 OH 0.50
Kepala tukang L.03 OH 0.05
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Door closer set 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.11. Pemasangan 1 buah kunci slot
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.02
Tukang kayu L.02 OH 0.20
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci slot buah 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.12. Pemasangan 1 buah door holder


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.05
Tukang kayu L.02 OH 0.50
Kepala tukang L.03 OH 0.05
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Door holder buah 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.13. Pemasangan 1 buah door stop


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.01
Tukang kayu L.02 OH 0.10
Kepala tukang L.03 OH 0.01
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
Door stop buah 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.14. Pemasangan 1 buah rel pintu sorong


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.06
Tukang kayu L.02 OH 0.60
Kepala tukang L.03 OH 0.06
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Rel pintu sorong Set 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.15. Pemasangan 1 buah kunci lemari


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.03
Tukang kayu L.02 OH 0.25
Kepala tukang L.03 OH 0.03
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci lemari Set 1.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

Harga Jumlah
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.02
Tukang kayu L.02 OH 0.15
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 3 mm m2 1.10
Sealant Kg 0.05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm


Harga Jumlah
(Rp) (Rp)
Pekerja L.01 OH 0.02
Tukang kayu L.02 OH 0.15
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 5 mm m2 1.10
Sealant Kg 0.05
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
Pekerja L.01 OH 0.02
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 8 mm m2 1.10
Sealant Kg 0.07
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.03
Kepala tukang L.03 OH 0.03
JUMLAH TENAGA KERJA
B BAHAN
Kaca buram 12 mm m2 1.10
Sealant Kg 0.07
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.02
Tukang kayu L.02 OH 0.15
Kepala tukang L.03 OH 0.02
JUMLAH TENAGA KERJA
Kaca cermin 5 mm m2 1.10
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.02
Tukang kayu L.02 OH 0.17
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
Kaca cermin 8 mm m2 1.10
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.02
Tukang kayu L.02 OH 0.15
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.01
JUMLAH TENAGA KERJA
B BAHAN
Kaca wireglassed 5 mm m2 1.10

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.08
Tukang kayu L.02 OH 0.15
Kepala tukang L.03 OH 0.02
Mandor L.04 OH 0.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca patri 5mm m2 1.10
Sealant Kg 0.05
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.65. (SPL) Pemasangan 1m² Paving Block Natural Tebal 8 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.5000 100,000.00 50,000.00
3 Tukang batu L.03 OH 0.5000 110,000.00 55,000.00
5 Kepala Tukang L.03 OH 0.0500 120,000.00 6,000.00
6 Mandor L.04 OH 0.0013 125,000.00 162.50
Jumlah Tenaga Kerja 111,162.50
B BAHAN
23 Paving Block Segi 4 (Empat) Tbl 8 cm M2 1.0100 Err:509 Err:509
4 Pasir Urug M3 0.0500 170,000.00 8,500.00
Jumlah Harga Bahan Err:509
C PERALATAN
Peralatan 10% Err:509 Err:509

Jumlah Harga Alat Err:509


D J u m l a h (A+B+C) Err:509
E Overhead & Profit 15.0% X D Err:509
F Harga Suatu Pekerjaan (D+E) Err:509

You might also like