OUTLINE OF THE FACILITY JAPAN


Official Development Assistance

 
( ) :
300 : :
422,000 :
290.6 :
( ) :
2
13,000 :
:

... : ( 2 95.99 ) :
: ( 2 103.97 )
THE PROJECT FOR
– / :
INTRODUCTION OF CLEAN ENERGY
BY SOLAR ELECTRICITY GENERATION SYSTEM
BY PALESTINIAN AUTHORITY
AREA FOR FUTURE EXTENSION

PV MODULES

MONITOR BUILDING
The project site is located on a part
of land for the Jericho Agro-Industrial Park
(JAIP Stage-I) planned and scheduled to be SUBSTATION BUILDING
developed soon at suburb of Jericho Municipality
which is approximatery 8 km away from the Dead Sea.
After the completion of the Project in July 2012, the electricity
being generated by the grid-connected PV system installed by the
Project is supplied to the existing distribution line operated and maintained
by the Jerusalem District Electricity Company (JDECO) that will indeed
supplement the demand of electricity supplies in Jericho. EXISTING SWITCH GEAR STATION

The objectives of the Project are to promote clean energy utilization and to achieve
stable power supply including financial aspect in Palestine through the operation of the
grid-connected PV system as well as to contribute to reduction of greenhouse gases emissions.
This Project is also expected to contribute to the development of JAIP as a renewable energy
supply facility. Moreover, it aims that the Project will help the Palestinian that is groping for
cooperation in measures for climate change with international organizations and an
application of Clean Development Mechanism. SITE PLAN Donor : Government of Japan
JAPAN
Official Development Assistance

Implementing Agency : Japan International Cooperation Agency (JICA)


‫ ع‬Rating Capacity : 300kWp
Recipient : Palestinian National Authority
‫ ع‬Expected Amount of Power Generation : 422,000kWh/year Approx. Palestinian Energy and Natural Resources Authority
Palestinian Energy & Environment Research Centre
‫ ع‬Amount of Reduction of Carbon Dioxide : 290.6tons/year Approx.
Procurement Agent : Japan International Cooperation System (JICS)
FROM THE
FROM THE PEOPLE
PEOPLE OF
OF JAPAN
JAPAN
AS A TOKEN OF FRIENDSHIP AND COOPERATION
AS A TOKEN OF FRIENDSHIP AND COOPERATION
‫ ع‬Area of Installation : 13,000m2 Approx. BETWEEN
Consultant : Oriental Consultants Co., Ltd. BETWEEN
‫ ع‬Facilities JAPAN AND PALESTINE
JAPAN AND PALESTINE
□ Monitor Building (95.99m2) Contractor : Toyota Tsusho Corporation
: Monitor Room, Power Conditioner Room, Work Shop, etc.
□ Substation Building (103.97m2) : Medium Voltage Room, Transformer Room, Low Voltage Room Location : Jericho Agro-Industrial Park (JAIP) Stage-I, Jericho, West Bank
JAPAN
Official Development Assistance
MESSAGE PROJECT PHOTOGRAPHS

.
2009
. .

" " .
.
%10 2020
.%25

. .(2015-2012)

. PV Module
.
.
.

. .
.

+YQWNFNKMGVQGZVGPFO[UKPEGTGEQPITCVWNCVKQPQP Since it was founded, the Palestinian Energy Authority (PEA) was
DGJCNHQHVJGIQXGTPOGPVQH,CRCPHQTVJGQHHKEKCN keen to provide electric energy to all Palestinians. Therefore, PEA has
KPCWIWTCVKQPQHVJG5QNCT'NGEVTKEKV[)GPGTCVKQP5[UVGO developed a policy for the organization and development of the
electricity sector in Palestine; this was through the approval of the
KP,GTKEJQ#ITQKPFWUVTKCN2CTM
,#+2 YJKEJKU General Electricity Law in 2009, which stressed the importance of
CPQVJGTGZCORNGQHCEJKGXGOGPVUQH,CRCP2CNGUVKPG encouraging the search for alternative energy resources. Accordingly,
EQQRGTCVKQP6JGIQXGTPOGPVQH,CRCPJCUDGGP PEA prepared the general strategy of renewable energy as an
UWRRQTVKPIVJG,#+2CUCRKXQVCNRTQLGEVVQKORNGOGPV important part of the system resources to meet the growing needs of
electric energy in a cleaner and more secure approach.
VJGTGIKQPCNKPKVKCVKXGQHVJǦ%QTTKFQTHQT2GCEGCPF
2TQURGTKV[̍VJCVYCUFGUKIPGFVQEQPVTKDWVGVQGEQPQOKE The PEA has set a clear goal through the Renewable Energy General
Strategy for the year 2020; this goal is represented by generating the
FGXGNQROGPVHQT2CNGUVKPKCPUCPFCNUQFGOQPUVTCVG equivalent of 10% of the electricity produced locally from renewable
 GPXKTQPOGPVCNN[UWUVCKPCDNGFGXGNQROGPV energy resources. This will finally lead to raise the renewable energy
share in the total energy consumption by up to 25%.
,CRCPTGOCKPUCFCOCPVVQUWRRQTVCVYQUVCVGUQNWVKQP
To achieve this goal, necessary legislations and regulations have
YJGTGD[CHWVWTGKPFGRGPFGPV2CNGUVKPKCPUVCVGCPF been ratified to develop and promote the use of renewable energy,
+UTCGNNKXGUKFGD[UKFGKPRGCEGCPFUGEWTKV[,CRCP and the Palestinian Solar Initiative was approved for the time period
WPFGTUVCPFUVJG2CNGUVKPKCP̉UCURKTCVKQPHQTC
2CNGUVKPKCPUVCVGCPFJCUEQPVTKDWVGFVQVJG
(2012-2015).
The construction and success of Jericho’ s solar plant is considered
Substation Bldg. & Monitor Bldg.    Monitor Rm.  Monitoring Display
PCVKQPDWKNFKPIGHHQTVUQHC2CNGUVKPKCPUVCVG6JG the first important step towards the practical application to implement
5QNCT'NGEVTKEKV[)GPGTCVKQP5[UVGOKPVJG,#+2RTQLGEV the renewable energy strategy and to disseminate its use. The
success of this plant will lead to the generalization of this experiment
KUVJGHKTUVMKPFKP2CNGUVKPGCPFVJGNCVGUV in other governorates. All this will increase energy security, stabilize
CEJKGXGOGPVQHQWTEQQRGTCVKQPHQT2CNGUVKPKCP̉U its prices and will develop the technical, scientific and economic
PCVKQPDWKNFKPI,CRCPKUXGT[RTQWFQHYQTMKPI capabilities of the Palestinian people.
VQIGVJGTYKVJ2CNGUVKPGHQTVJKURTQLGEV Finally, I would like to thank the Japanese government for providing
this grant which enabled the Palestinian people to accomplish the first
+JQRGVJCVVJGU[UVGOYKNNDGTGEQIPK\GFCUQPGQH step towards energy independence. Also I would like to thank all
U[ODQNUQHVJGHTKGPFUJKRDGVYGGP,CRCPGUGCPF those who contributed and participated to the success and completion
2CNGUVKPKCPRGQRNG of this national achievement.

Junya Matsuura Dr. Omar Kittaneh PV Module


Ambassador for the Palestinian Affairs
Chairman of Palestinian Energy Authority
Boundary Area Guard Rm.  Power Conditioner 
Representative of Japan to the Palestinian Authority