The document is a request for inspection from Mechatronics Power Engineering, the sub-contractor, to China Northeast Electric Power Engineering & Services Co., Ltd., the EPC contractor, for inspection of the bottom plate painting of Tank No. 7 at the Summit Meghnahat II Power Company fuel tank site in Bangladesh. It details the specific pieces to be inspected, the reference drawings, proposed inspection time and date, inspection location, and provides space for comments and signatures to confirm or reject the inspection.
The document is a request for inspection from Mechatronics Power Engineering, the sub-contractor, to China Northeast Electric Power Engineering & Services Co., Ltd., the EPC contractor, for inspection of the bottom plate painting of Tank No. 7 at the Summit Meghnahat II Power Company fuel tank site in Bangladesh. It details the specific pieces to be inspected, the reference drawings, proposed inspection time and date, inspection location, and provides space for comments and signatures to confirm or reject the inspection.
The document is a request for inspection from Mechatronics Power Engineering, the sub-contractor, to China Northeast Electric Power Engineering & Services Co., Ltd., the EPC contractor, for inspection of the bottom plate painting of Tank No. 7 at the Summit Meghnahat II Power Company fuel tank site in Bangladesh. It details the specific pieces to be inspected, the reference drawings, proposed inspection time and date, inspection location, and provides space for comments and signatures to confirm or reject the inspection.
MEGHNAGHAT,NARAYANGANJ,BANGLADESH CLIENT: SUMMIT MEGHNAGHAT II POWER COMPANY LIMITED O EPC CONTRACTOR: CHINA NORTHEAST ELECTRIC POWER ENGINEERING & SERVICES i CO.LTD. SUB: CONTRACTOR: MECHATRONICS POWER ENGINEERING l Request For Inspection C (RFIW) Date: 17-05-2022 RFIo No: NEPCS-MEG-RFIW-002 Rev No: 00 Time: 14.00 2 m Ref. ITPL No: NEPCS-MEG-002 ITPL b Step No: 5.3 Rev: 04 Inspection Type: i Documents Review Witness Point Hold Point n Discipline: e Civil Structural Mechanical Electrical d I&C Others C Description of Inspection: y c Request for Inspection of Tank No.7 Bottom Plate Painting. 1. Bottom Plate No. 2-2-1-04Pieces, 2-2-2- o4Pieces, 2-2-5- l 02Pieces, 2-2-3-04Pieces, 2-2-4-02Pieces, Total-16Pieces. e RFI From: NEPCS P Drawing No. 375-F1771S-Jo205 o Rev. A Inspection Time: 14.00 Inspection w Date: 17-5-2022 Revised Time: Inspection Date: e Inspection Location: Tank No.07 Foundation area. EPC Contractor: Name: Md.Mahmud Alam r Contract Number: +880172944170 Note: P l ACCEPTED WITH COMMENTS a ACCEPTED WITNESS ONLY n REJECTED ( Reason of Rejection) t RESCHEDULE (Reason of Reschedule) T CANCEL (Reason of Cancelation) a OTHER REMARKS: n k F Initiated & Performed By Confirmed a By Inspected by OE (SUM) MPE NEPCS (Tractebel Engineer) r Signature: m Name: ; Date: M The Sub-Contractor request for site inspection works aselisted above and certifies that all items have been properly executed in accordance with the contract specification g & approved drawing. h n a Format Rev.01, Date: March 30, 2022 Page No 1 of 1 g h a