SUMMIT MEGHNAGHAT II POWER COMPANY LIMITED FUEL

TANK AND ASSOCIATED SYSTEM AT


MEGHNAGHAT,NARAYANGANJ,BANGLADESH
CLIENT: SUMMIT MEGHNAGHAT II POWER COMPANY LIMITED
O
EPC CONTRACTOR: CHINA NORTHEAST ELECTRIC POWER
ENGINEERING & SERVICES
i CO.LTD.
SUB: CONTRACTOR: MECHATRONICS POWER ENGINEERING
l
Request For Inspection
C (RFIW)
Date: 17-05-2022 RFIo No: NEPCS-MEG-RFIW-002 Rev No: 00
Time: 14.00 2 m
Ref. ITPL No: NEPCS-MEG-002 ITPL
b Step No: 5.3 Rev: 04
Inspection Type: i
Documents Review Witness Point Hold Point
n
Discipline: e
 Civil  Structural  Mechanical  Electrical
d  I&C
 Others C
Description of Inspection:
y
c
Request for Inspection of Tank No.7 Bottom Plate Painting.
1. Bottom Plate No. 2-2-1-04Pieces, 2-2-2- o4Pieces, 2-2-5-
l 02Pieces, 2-2-3-04Pieces, 2-2-4-02Pieces,
Total-16Pieces. e
RFI From: NEPCS P
Drawing No. 375-F1771S-Jo205 o Rev. A
Inspection Time: 14.00 Inspection
w Date: 17-5-2022
Revised Time: Inspection Date:
e
Inspection Location: Tank No.07 Foundation area.
EPC Contractor: Name: Md.Mahmud Alam r Contract Number: +880172944170
Note: P
l
ACCEPTED WITH COMMENTS a
 ACCEPTED
 WITNESS ONLY n
 REJECTED ( Reason of Rejection) t
 RESCHEDULE (Reason of Reschedule) T
 CANCEL (Reason of Cancelation)
a
OTHER REMARKS: n
k
F
Initiated & Performed By Confirmed
a By Inspected by OE (SUM)
MPE NEPCS (Tractebel Engineer)
r
Signature:
m
Name: ;
Date: M
The Sub-Contractor request for site inspection works aselisted above and certifies that all items have been
properly executed in accordance with the contract specification