Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SUMMIT MEGHNAGHAT II POWER COMPANY LIMITED FUEL

TANK AND ASSOCIATED SYSTEM AT


MEGHNAGHAT,NARAYANGANJ,BANGLADESH
CLIENT: SUMMIT MEGHNAGHAT II POWER COMPANY LIMITED
O
EPC CONTRACTOR: CHINA NORTHEAST ELECTRIC POWER
ENGINEERING & SERVICES
i CO.LTD.
SUB: CONTRACTOR: MECHATRONICS POWER ENGINEERING
l
Request For Inspection
C (RFIW)
Date: 21-05-2022 RFIo No: NEPCS-MEG-RFIW-007 Rev No: 00
Time: 16.30 m
Ref. ITPL No: NEPCS-MEG-002 ITPL
b Step No: 5.11 Rev: 04
Inspection Type: i
 Documents Review  Witness Point  Hold Point
n
Discipline: e
 Civil  Structural  Mechanical  dElectrical  I&C
 Others C
Description of Inspection:
y
c
Request for Inspection of Tank#6 Bottom Plate Butt Welding Radiography Film View.
l
e
RFI From: NEPCS P
Drawing No. 375-F1771S-J0205 o Rev. A
Inspection Time: 14.30 Inspection
w Date: 21-5-2022
Revised Time: Inspection Date:
e
Inspection Location: Tank No.7 Foundation area.
EPC Contractor: Name: Md. Mahmud Alamr Contract Number: +880172944170
Note: P
l
ACCEPTED WITH COMMENTS a
 ACCEPTED
 WITNESS ONLY n
 REJECTED ( Reason of Rejection) t
 RESCHEDULE (Reason of Reschedule) T
 CANCEL (Reason of Cancelation)
a
OTHER REMARKS: n
k
F
Initiated & Performed By Confirmed
a By Inspected by OE (SUM)
MPE NEPCS (Tractebel Engineer)
r
Signature:
m
Name: ;
Date: M
The Sub-Contractor request for site inspection works aselisted above and certifies that all items have been
properly executed in accordance with the contract specification
g & approved drawing.
h
n
a
Format Rev.01, Date: March 30, 2022 Page No 1 of 1
g
h
a

You might also like