MEGHNAGHAT,NARAYANGANJ,BANGLADESH CLIENT: SUMMIT MEGHNAGHAT II POWER COMPANY LIMITED O EPC CONTRACTOR: CHINA NORTHEAST ELECTRIC POWER ENGINEERING & SERVICES i CO.LTD. SUB: CONTRACTOR: MECHATRONICS POWER ENGINEERING l Request For Inspection C (RFIW) Date: 21-05-2022 RFIo No: NEPCS-MEG-RFIW-007 Rev No: 00 Time: 16.30 m Ref. ITPL No: NEPCS-MEG-002 ITPL b Step No: 5.11 Rev: 04 Inspection Type: i Documents Review Witness Point Hold Point n Discipline: e Civil Structural Mechanical dElectrical I&C Others C Description of Inspection: y c Request for Inspection of Tank#6 Bottom Plate Butt Welding Radiography Film View. l e RFI From: NEPCS P Drawing No. 375-F1771S-J0205 o Rev. A Inspection Time: 14.30 Inspection w Date: 21-5-2022 Revised Time: Inspection Date: e Inspection Location: Tank No.7 Foundation area. EPC Contractor: Name: Md. Mahmud Alamr Contract Number: +880172944170 Note: P l ACCEPTED WITH COMMENTS a ACCEPTED WITNESS ONLY n REJECTED ( Reason of Rejection) t RESCHEDULE (Reason of Reschedule) T CANCEL (Reason of Cancelation) a OTHER REMARKS: n k F Initiated & Performed By Confirmed a By Inspected by OE (SUM) MPE NEPCS (Tractebel Engineer) r Signature: m Name: ; Date: M The Sub-Contractor request for site inspection works aselisted above and certifies that all items have been properly executed in accordance with the contract specification g & approved drawing. h n a Format Rev.01, Date: March 30, 2022 Page No 1 of 1 g h a