TIMEBOOKING

WORKORDER

Workorder based Barcode Scanning Post-Timebooking to edit Type of Work

ATL-based Post-Timebooking
1 CLOCK IN APN
1441

2 3
APN 1225:
INDIRECT JOB WORKORDER
Timebooking

4
REVIEW ALL
CLOCK OUT APN TIMEBOOKINGS
1441 FOR THE WHOLE
12 HOURS SHIFT

5
PROJECT NUMBER

IATA CUSTOMER
PILLAR YEAR FLEET
CODE

TRN
LN 330
LT 22 5J 320
SHOP ATR
TRN22_5J320
TRN22_5JATR TRN22_CEBU
LN22_5J330
TRN22_GF330
INDIRECT
JOB
A+5S Sort, Set in Order, Shine, Standardize, and Sustain in workplace
HAND OVER Turnover of workload to the next shift group
IDLE TIME No workload assigned as of the moment
LGHTNINGALRT Weather-related disturbances
NON-EXHAUSTIVE JOB
PRODCTIVETSK Perform DFP signing and documentation
PTI-STANDBY Waiting for arrival of flight; on standby beside a/c when pilot is performing PTI
STOPOPS No Operations
TOOLBOXBRIEF Toolbox briefing
TOOLPART WDR Tools and Parts Withdrawal
TRAINING On Training

REPO-FULL-M FULL –
REPO-FULL-O BRAKE RIDER + HEADSET + TRACTOR + OPERATOR)
-M > Maintenance-related
AIRCRAFT REPO-HBROP-M HBROP –
REPOSITIONING
-O > Operations or HEADSET + BRAKE RIDER + OPERATOR
REPO-HBROP-O Network-related
REPO-HS-BR-M HS-BR –
REPO-HS-BR-O HEADSET + BRAKE RIDER
CEBU PACIFIC TYPE OF WORK GROUPINGS

ROUTINE
ENGINE- • CCS-LIGHT
MAJOR
SERVICE RELATED •

CCS-LINE
CCS-TRANSIT
NON- EVENTS
CHECKS • APU CHANGE


EOAPPROVEDMH
MPD
ROUTINE • A CHECK
• APU INVNTORY • PGC - 1 YEAR • C CHECK
• APU-HUMIDITY • PGC - 120 DY • NRT-LIGHT • C01+C03
• 3 DAYS CHECK • DEPRSRVE-ENG • NRT-LINE • C01+C03+OOP
• PGC - 15 DYS
• 8DAYS • ENG INVNTORY • NRT-TRANSIT • C01+OOP
• PGC - 30 DYS
• A330 PDSC • ENG PART KIT • AOG-BASE • CARPETCHANGE
• PGC - 60 DYS
• LINE CHECK • ENG-HUMIDITY • AOG-LINE • COMPASSSWING
• PGC - 7 DYS
• POST FLIGHT • ENGBUILDUP • CABDEEPCLEAN • EXTRIORCLEAN
• PGC - 90 DYS
• PRE FLIGHT • ENGINECHANGE • PAINTING • FLTCTRLCHNGE
• WEEKLYCHECK • FUELNOZZLE • PRESERVE-AF • LC


INLET COWL NDT TASK •

DEPRSRVE-AF
WATERSAMPLE


LC+C01

GROUND •
LRU INSTALL
LRU REMOVE
• NDT-LIGHT

LC+C01+C03
LC+C01+OOP
• PRESERVE-ENG • LC+OOP
SUPPORT • QEC INSTALL


NDT-LINE
NDT-SHOP
OTHERS • LCC01C03OOP
• QEC REMOVE • FLIGHT MECH • LDGGEARCHNGE
• NDT-TRANSIT
• QEC REPLACE • OOP BASE CHE
• APU BSI
• THRUST REVER • OOP CHECK
• ENGINE BSI
TYPE OF WORK
SAMPLES
• CCS-LIGHT
• CCS-LINE
• CCS-TRANSIT
When viewing workorder
using APN 1418
(Workorder), you may
observe that PART
NUMBER is included.

Normal aircraft workorders


DO NOT have part
number in the header.

Basically, CCS are


COMPONENT
WORKORDERS.

CCS NOT CCS


TYPE OF WORK
SAMPLES
• EOAPPROVEDMH
All Engineering Orders
TYPE OF WORK
SAMPLES

• MPD
All task cards originating from
Maintenance Planning
Document.

AMP tasks are MPD.

For easier identification, MPD


tasks generally follow this
format:

XXXXXX-XX-X

e.g.
321000-04-1
TYPE OF WORK
SAMPLES
• NRT-LIGHT
• NRT-LINE
• NRT-TRANSIT
1. All non-routine / findings

2. MEL / ADD / CFI


raising, re-inspection, and
clearing.

3. REQUESTED
workorders
e.g.
• Component
verification
• PN/SN verification
• CAAP AO/AI and REI
• Safety Equipment
Verification

This list of samples is


non-exhaustive.
GROUND 5J-BRKECOOL 5J Brake Cooling (use 3RD-BRKECOOL if Third Party)
5J-PUSHBACK Perform another pushback
SUPPORT
AIR STARTER Utilize A+ owned air starter unit
AIRCON Utilize A+ owned air-conditioning unit
AXLE JACK Utilize A+ owned axle jack
BOOMTRUCK Utilize A+ owned boom truck
CHERRYPICKER Utilize A+ owned cherry picker
ONE-TIME USE OF HYDRAULICMUL Utilize A+ owned hydraulic mule
EQUIPMENT
LAVATORY Perform Lavatory servicing during transit
MAINTSTAND Utilize A+ owned maintenance stand or maintenance stairs
NITROGEN Utilize A+ owned nitrogen tank
POTABLE Perform Potable water servicing during transit
TANDEMPARKIN Perform tandem parking
TOWBAR Utilize A+ owned tow bar
TOWTRACTOR Utilize A+ owned tow tractor
TOWTUG Utilize A+ owned tow tug

REPO-FULL-M FULL –
BRAKE RIDER + HEADSET + TRACTOR + OPERATOR)
REPO-FULL-O
-M > Maintenance-related
AIRCRAFT REPO-HBROP-M -O > Operations or
HBROP –
REPOSITIONING HEADSET + BRAKE RIDER + OPERATOR
REPO-HBROP-O Network-related
REPO-HS-BR-M HS-BR –
HEADSET + BRAKE RIDER
REPO-HS-BR-O
THIRD 3RD-36HRSCHK Perform 36 Hours Check for 3rd Party
PARTY 3RD-3DAYS Perform 3 Days Check for 3rd Party
3RD-48HRSCHK Perform 48 Hours Check for 3rd Party
3RD-750HRCHK Perform 750 Hours Check for 3rd Party
3RD-BRKECOOL Perform Brake Cooling for 3rd Party
3RD-DAILYCHK Perform Daily Check for 3rd Party
3RD-LAYOVER Perform Layover Check for 3rd Party
TRANSIT / ONE-TIME
EVENT 3RD-PREFLT Perform Pre-flight Check for 3rd Party
3RD-PUSHBACK Perform another requested Pushback.
3RD-REPO Perform aircraft repositioning for 3rd Party
3RD-STAYOVER Perform Stayover Check for 3rd Party
3RD-TOWING Perform another requested towing.
3RD-TRANWITH Perform Transit with Certification
3RD-TRANWOUT Perform Transit without Certification
3RD-WHEELJCK Utilize A+ owned wheel jack for 3rd Party

3RD-TRNMECH I am the mechanic of non-routine remarks during TRANSIT


3RD-TRNRELEA I am the releaser of non-routine remarks during TRANSIT
NON-ROUTINE / 3RD-LNMECH I am the mechanic of non-routine remarks during LINE
FINDINGS 3RD-LNRELEAM I am the releaser of non-routine remarks during LINE
3RD-LTMECH I am the mechanic of non-routine remarks during LIGHT
3RD-LTRELEAM I am the releaser of non-routine remarks during LIGHT
COMPONENT
MAINTENANCE

BATTERY SHOP WHEEL SHOP BRAKE SHOP CABIN & STRUCTURES

BATT-CAPCHEK BEARINGCUP BRAKEOVERHAL


BATT-MUTILAT NDT-SHOP BRAKEREPAIR
BATT-OVERHAU NRT-SHOP NDT-SHOP COMPOSITESHO
BATT-PERIODI TIREOVERHAUL NRT-SHOP NDT-SHOP
BATT-REGULAR TIRERPLCMENT WBS-FAULTISO NRT-SHOP
BATT-TAPCHAR WBS-FAULTISO WBS-HEATSINK
BATTERY-NRT WBS-HEATSINK WBS-MUTILATE
NDT-SHOP WBS-MUTILATE

3RD-SHOP-RM
3RD-SHOPMECH
WHAT IF I HELPED OTHER PILLAR IN PERFORMING THEIR TASK?
CASE 1

WO: 10'208'739 TIMEBOOKING: TYPE OF WORK


PERFORM CLEANING OF VACUUM WASTE LINE IN
ACCORDANCE WITH EO A330-38-002. A+00672 – Tommy Hernandez (LMBU) EOAPPROVEDMH

LN22_5JATR A+01355 – Jason Dimagmaliw (LMBU) EOAPPROVEDMH


PROJECT NUMBER
A+00081 – Vincent Ecraela (LIGHT) EOAPPROVEDMH

Mr. Ecraela would still use EOAPPROVEDMH as type of work since the task performed is
an Engineering Order regardless if he is from LIGHT PILLAR.
WHAT IF I HELPED OTHER PILLAR IN PERFORMING THEIR TASK?
CASE 2

WO: 2'617'954 TIMEBOOKING: GROUP TYPE OF WORK


LH NOSE WHEEL WITH DEEP CUT A+00601 – Jason David (TRANSIT) NRT-TRANSIT
A+00720 – Ryan Nadal (TRANSIT) NRT-TRANSIT
TRN22_5J320
PROJECT NUMBER A+00081 – Vincent Ecraela (LIGHT) NRT-TRANSIT

Mr. Ecraela would still use NRT-TRANSIT as type of work since the task performed is a
finding / non-routine remark during transit

regardless if he is from LIGHT PILLAR.


regardless if the project number is for TRANSIT PILLAR.
WHAT IF AN ADD OR MEL IS DONE BY MULTIPLE PILLARS ON DIFFERENT
TIME?
MEL
MEL RAISING MEL CLEARING
TROUBLESHOOTING
WO: 2'634'983 WO: 2'634'983 WO: 2‘764‘712
MEL - 1EA CABIN MEL - 1EA CABIN RESEQ# 2634983 1EA CABIN
FLASHLIGHT LED NOT FLASHLIGHT LED NOT FLASHLIGHT LED NOT FLASHING AT
FLASHING AT 6120ME FLASHING AT 6120ME 6120ME

TRN22_5J330 TRN22_5J330 LN22_5J330


PROJECT NUMBER PROJECT NUMBER PROJECT NUMBER

TIMEBOOKING: GROUP TYPE OF WORK TIMEBOOKING: GROUP TYPE OF WORK


A+00601 – Jason David (TRANSIT) NRT-TRANSIT A+00601 – Crisostomo (LMBU) NRT-LINE
A+00081 – Ecraela (LIGHT) NRT-TRANSIT A+00720 – Gahito (LMBU) NRT-LINE
A+00081 – Ecraela (LIGHT) NRT-LINE

JAN 10 TIMEBOOKING: GROUP TYPE OF WORK JAN 12


A+00601 – David (LMBU) NRT-TRANSIT
A+00720 – Nadal (TRANSIT) NRT-TRANSIT
A+00081 – Ecraela (LIGHT) NRT-TRANSIT

JAN 11
WHAT IF A WORKORDER IS TRANSFERRED / HANDED OVER TO OTHER
PILLAR?
MEL
MEL RAISING MEL CLEARING
TROUBLESHOOTING
WO: 2'634'983 WO: 2'634'983 WO: 2‘764‘712
MEL - 1EA CABIN MEL - 1EA CABIN RESEQ# 2634983 1EA CABIN
FLASHLIGHT LED NOT FLASHLIGHT LED NOT FLASHLIGHT LED NOT FLASHING AT
FLASHING AT 6120ME FLASHING AT 6120ME 6120ME

TRN22_5J330 TRN22_5J330 LN22_5J330


PROJECT NUMBER PROJECT NUMBER PROJECT NUMBER

TIMEBOOKING: GROUP TYPE OF WORK TIMEBOOKING: GROUP TYPE OF WORK


A+00601 – Jason David (TRANSIT) NRT-TRANSIT A+00601 – Crisostomo (LMBU) NRT-LINE
A+00081 – Ecraela (LIGHT) NRT-TRANSIT A+00720 – Gahito (LMBU) NRT-LINE
A+00081 – Ecraela (LIGHT) NRT-LINE

JAN 10 TIMEBOOKING: GROUP TYPE OF WORK JAN 12


A+00601 – David (LMBU) NRT-TRANSIT
A+00720 – Nadal (TRANSIT) NRT-TRANSIT
A+00081 – Ecraela (LIGHT) NRT-TRANSIT

JAN 11
WHAT IF A FINDING IS CHANGED TO AOG?

Type of Work will be NRT-TRANSIT since the remark is not yet considered as AOG on
January 9.
WO: 2'620'116 It will be changed from NRT-TRANSIT to AOG-LINE starting January 10 if already considered
DURING PREPARATION FOR AIRCRAFT
as AOG until lifting
REPOSITION FOUND HYD LEAK ON FWD
FUSELAGE DRAIN HOLE Use: AOG-LINE – AOG outside hangar / AOG rescue
AOG-BASE – aircraft is parked inside the hangar as AOG
TRN22_5J320
PROJECT NUMBER regardless of what pillar group (except NDT).
regardless if the project number is for TRANSIT PILLAR.

TIMEBOOKING: TYPE OF WORK DATE


A+00601 – Jason David (TRANSIT) NRT-TRANSIT JAN 9
A+00720 – Ryan Nadal (TRANSIT) NRT-TRANSIT JAN 9
A+00081 – Vincent Ecraela (LIGHT) NRT-TRANSIT JAN 9

A+00601 – Jason David (TRANSIT) AOG-LINE JAN 10


A+00720 – Ryan Nadal (TRANSIT) AOG-LINE JAN 10
A+00081 – Vincent Ecraela (LIGHT) AOG-LINE JAN 10

A+00601 – Jason David (TRANSIT) AOG-LINE JAN 11


A+00672 – Tommy Hernandez (LMBU) AOG-LINE JAN 11
A+00081 – Vincent Ecraela (LIGHT) AOG-LINE JAN 11
WHAT IF I HELPED OTHER PILLAR IN PERFORMING THEIR TASK?
SPECIAL CASE FOR NDT INSPECTORS

WO: 10'149'633
AMP 724100-R1-1 TIMEBOOKING: TYPE OF WORK
PERFORM BORESCOPE INSPECTION OF
COMBUSTION LINER IAW AMM 720000-200-818. A+00251 – Weinwright Bullecer (LMBU) MPD
LN22_5J320 A+00448 – Renz Correos (NDT) NDT-LINE
PROJECT NUMBER

Mr. Bullecer would use MPD as type of work since the task is an AMP.
Mr. Correos would use NDT-LINE since NDT inspectors have different rate:
NDT-TRANSIT
NDT-LINE
NDT-LIGHT
NDT-SHOP
regardless if he is from SHOP PILLAR.
regardless if the project number is for LINE PILLAR.