JIZAN REFINERY & MARINE TERMINAL PROJECT (EPC-PACKAGE 14)

LOG MECHANICAL/PIPING AND COATING INSULATION


INSPEC
SAUDI ARAMCO LEVEL
TION
Subcontr
Contractor QMIS DESCRIPTION OF ACTIVITY TO BE PLANT DATE OF HENC QC Without PID SUBMITTED TO
SN SATIP SAIC LOCATION DRAWING NO. Contract Saudi actor QC PMT DOCUMENT
RFI No. No. INSPECTED/TESTED CODE INSPECTIO TIME Name Name REMARKS
CONTROL
or Aramco Name PMT SIGN PID SIGN
N

RFI FOR 06-Jan-2019

VB-371359-
Pre application of insulation SECT 42" VB-371359- SATIP- SAIC-N- South Mr.Liam O
3 INS-HENC-107 T15 604,607,608,609, 7-Jan-19 10:00:00 AM H W Mr.Jenny Mr.Raja Mr.Sundar
604,607,608,609,610,611,612 N-001-02 2006 Corridor Sullivan
610,611,612