Quantity Surveying Eathworks Lecture

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

DATE: I/27/202

NO:

CESSP-2 A
SAMPLE PROBLEM NO. 1 ln
eotiny
KGL Notura
Compute p 4 ufeu yolume OF i d unt

(Cvevyd Svpae
CKLMatien sp kaa and bowkfill
of tu ollowing stwctual
lennonts
footing
F5 GL B/1 and Fo GL D/L GL Gri&ling

2 FooHg Tle Beam CI CFS


FtB2 GL B D/1
3 Column S

CMC at GL D/1 and CAAGL D/1


reluro SAedule
EXCA VATnON
NGL
7R
300 DE dapth o exauathon
dupla or
Povndathon FOOTTNC DE Dt100mm
fooing
bocrOOOTU 00mm tmck ovnd
RAVEL-PEPDtN6 esiea Ubetisg
(FbOTING DETAILS)

VoL DE X Lx W

Fs@ GL B/1
P D 3m FeD : 3y E (3+0-1) (8)(18)
t 0- n t0.4n 0-0 m
L m L (-8M
W1-m 8m

NE
34D-1) »(La) ( ) 8 451 m3 VECO
DATE:
NO:

FTES Np@FTB2
NGL
TA 1200nmn
D nd padlcae
grwel beddog)
L

VE@ Pra2
Not ndudad n tmpuluthon
TB<ince sa(eop na
Ty pep- aud
baka maA exCeed 3 nakia
4-443522T=755(

VEPTB2 C1C
FS CAA/F
FTB2

FTB2 20O mn
H 60 mn
L75- ( )
E tTB2nVE L b
= o-3+0-) (5.4 0-2) 200 +Get dneysdpns an ssdul
400 1 C 200 60 mm

C1A 200 400 ) mm


TE VEF tVE@FD
V 7t 0:9G197 m
L 5.4 m

DIsFDCAL
NGL
L W xt
LX xt
FTp2 LT KB H
D-tt
C1C XWXHo H NGLto top level nq feo-ting ttc
C1A L He Colegy
DATE:
NO:

LT L - Wcic -VUA
VDrsL7(o4) I 156m

VDE(L6)(8)(o.4)1 290 m
YDED 55 0.8 ) Co-2)(%.4) 0-54 m
DeA 0-2 (0.q(3 -0y) o.206 m 3
pC1A0-2 (o-4 (3 -o-4)= 0.208 m
NpCAA
-2( (0. 028 m
0-324 m
ROt = 1- (-8)(o-)
O.329
-|Se t 1.290 +0.5 +0 208 tO. 208t 0-2 89
N
3 4.02
4.02 m
TV 4.02 m

PAC&EILL
Backeill =TVE TV)x1-25
(19- -4-02(125)
19.65 m 19.68 m

You might also like