Professional Documents
Culture Documents
Kementerian Pekerjaan Umum Dan Perumahan Rakyat: Propinsi
Kementerian Pekerjaan Umum Dan Perumahan Rakyat: Propinsi
CL
4.00
133
132
EL.+131.64 EL.+131.64
131 Wet Stone Masonry Grass Block
( 1 pc : 4 sand ) Embankment (SoilCement)
130 Weep Hole PVC D= 5 cm Weep Hole PVC D= 5 cm
127
EL.+126.64
Bidang Persamaan 1.00
126
EL.+125.64 Stripping t = 25 cm
Reference Level
DATUM : +125.00
126.775
127,064
127,165
126,865
126,889
126,555
126,753
127,169
0,60 127,135
126,955
126,850
126,635
126,519
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
5,00 5,00 5,00 10,00 3,00 3,50 1,40 1,20 10,00 10,00 10,00
DISTANCE (m)
P26
CL
4.00
135
Weep Hole PVC D= 5 cm
5.00 5.00
134
133
127 1.00
EL.+126.70
Stripping t = 25 cm
Bidang Persamaan
126
Reference Level
DATUM : +125.00
127,598
127,723
127,393
0,60 126,965
126,997
127,420
127,504
127,494
127,543
127,607
127.525
JARAK (m)
0,90
10,00 10,00 10,00 2,30 8,00 10,00 10,00 10,00
DISTANCE (m)
P27
CL
4.00
133
EL.+132.27 EL.+132.27
132
Wet Stone Masonry Grass Block
131 ( 1 pc : 4 sand ) Embankment (SoilCement)
Weep Hole PVC D= 5 cm Weep Hole PVC D= 5 cm
130 4.62 4.63
128
EL.+127.65
Bidang Persamaan 1.00
127
Reference Level EL.+126.65 Stripping t = 25 cm
DATUM : +126.00
127.973
127,953
127,703
0,40 127,343
127,411
127,900
127,749
127,647
127,607
127,595
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
15,00 10,00 2,00 1,00 6,00 10,00 10,00 7,00
DISTANCE (m)
Propinsi :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SULAWESI TENGAH
DIREKTORAT JENDERAL SUMBER DAYA AIR
SNVT PELAKSANAAN JARINGAN SUMBER AIR PPK SUNGAI DAN PANTAI III
WS. PALU - LARIANG, WS. PARIGI - POSO, WS. KALUKU - KARAMA
Jl. Abdul Rachman Saleh No.230 Palu 94114 Phone/Fax (0451) 482147 Pekerjaan :
Gambar MC1:
Cross Section P.24 ~ P.26 PROJECT RIVER IMPROVEMENT AND SEDIMENT
CONTROL IN BANGGA RIVER
Tanggul / Inspection Road