P25

CL
4.00

5.00 2.00 5.00 0.50 3.00 0.50 7.50 2.00 7.37


Perkerasan Kerikil
137 t = 0.20 m
EL.+136.64
136 Wet Stone Masonry Grass Block
( 1 pc : 4 sand )
135 Weep Hole PVC D= 5 cm

134 5.00 5.00

133

132
EL.+131.64 EL.+131.64
131 Wet Stone Masonry Grass Block
( 1 pc : 4 sand ) Embankment (SoilCement)
130 Weep Hole PVC D= 5 cm Weep Hole PVC D= 5 cm

129 5.00 4.91

128 Tanah Asli

127
EL.+126.64
Bidang Persamaan 1.00
126
EL.+125.64 Stripping t = 25 cm
Reference Level
DATUM : +125.00
126.775

127,064

127,165

126,865

126,889

126,555

126,753

127,169
0,60 127,135

126,955

126,850

126,635

126,519
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (m)
5,00 5,00 5,00 10,00 3,00 3,50 1,40 1,20 10,00 10,00 10,00
DISTANCE (m)

P26
CL
4.00

5.00 2.00 5.00 0.50 3.00 0.50 7.50 2.00 6.68


Perkerasan Kerikil
t = 0.20 m
137 EL.+136.95
Wet Stone Masonry Grass Block
136 ( 1 pc : 4 sand )

135
Weep Hole PVC D= 5 cm
5.00 5.00
134

133

132 EL.+131.95 EL.+131.95

131 Wet Stone Masonry Grass Block


( 1 pc : 4 sand ) Embankment (SoilCement)
130
Weep Hole PVC D= 5 cm Weep Hole PVC D= 5 cm
4.25 4.46
129
Tanah Asli
128 EL.+127.70

127 1.00
EL.+126.70
Stripping t = 25 cm
Bidang Persamaan
126
Reference Level
DATUM : +125.00
127,598

127,723

127,393
0,60 126,965

126,997

127,420

127,504

127,494

127,543

127,607
127.525

ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL

JARAK (m)

0,90
10,00 10,00 10,00 2,30 8,00 10,00 10,00 10,00
DISTANCE (m)

P27
CL
4.00

5.00 2.00 5.00 0.50 3.00 0.50 7.50 2.00 6.95


Perkerasan Kerikil
138
t = 0.20 m
EL.+137.27
137 Wet Stone Masonry Grass Block
( 1 pc : 4 sand )
136
Weep Hole PVC D= 5 cm
135
5.00 5.00
134

133
EL.+132.27 EL.+132.27
132
Wet Stone Masonry Grass Block
131 ( 1 pc : 4 sand ) Embankment (SoilCement)
Weep Hole PVC D= 5 cm Weep Hole PVC D= 5 cm
130 4.62 4.63

129 Tanah Asli

128
EL.+127.65
Bidang Persamaan 1.00
127
Reference Level EL.+126.65 Stripping t = 25 cm
DATUM : +126.00
127.973

127,953

127,703
0,40 127,343

127,411

127,900

127,749

127,647

127,607

127,595
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL

JARAK (m)
15,00 10,00 2,00 1,00 6,00 10,00 10,00 7,00
DISTANCE (m)

Propinsi :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SULAWESI TENGAH
DIREKTORAT JENDERAL SUMBER DAYA AIR
SNVT PELAKSANAAN JARINGAN SUMBER AIR PPK SUNGAI DAN PANTAI III
WS. PALU - LARIANG, WS. PARIGI - POSO, WS. KALUKU - KARAMA
Jl. Abdul Rachman Saleh No.230 Palu 94114 Phone/Fax (0451) 482147 Pekerjaan :
Gambar MC1:
Cross Section P.24 ~ P.26 PROJECT RIVER IMPROVEMENT AND SEDIMENT
CONTROL IN BANGGA RIVER
Tanggul / Inspection Road

Project Manager Ir. Anang Widodo


Kabupaten : Sigi
Dibuat Nomor Lembar : 12
Direktur Jeffry E. Letsoin Nomor Register :
0 5.0 10.0 15.0 20.0 25.0 m PT. SELARAS MANDIRI SEJAHTERA

Pengawas Lapangan Makmur Bamojai Tanggal :


SCALE 1 : 250
Disetujui Pelaksana Teknis Muh. Fadhlurrahman .H No. Kontrak Tanggal

No. PPK.Sungai & Pantai III Harianto, ST, M.Sp HK.0201/


Tgl. Yang direvisi Oleh Direnc. Diset. PPK-SDPIII-PJSA.ST-BWS13/02 02 SEPTEMBER 2020
Rev.
Disahkan Ka. SNVT PJSA Radia Zulfikar, ST., M.T.