TRAINING PLAN

Qualification: EIM NCII


Trainees’ Mode Facilities/ Date
Training Assessment
Training of Staff Tools and Venue And
Activity/Task Arrangement
Requirements Training Equipment Time
 Objective/Goal School OJT LCD MTTCI June 19,
 Submits and Based Coordinator Projector, 2021
checks Laptop, Direct 8:00 am –
documents Tables and Observation 5:00 pm
 Issues TRB and Chairs
Evaluation Report
School  Discuss the do’s
Orientation and don’ts while
on OJT
 Brief overview of
company policy
 Legal policies
 Monitoring and
evaluation system

Date Developed: Document No.


June 2021
ELECTRICAL INSTALLATION AND Issued by: Page
MAINTENANCE NC II Compiled by:

Timothy John N. Mandia Revision #


 Discuss company Dual Industry LCD Electrical Direct June 23,
rules and Training Coordinator Projector, Shop Observation 2021
regulation, Program Laptop, 8:00 am –
organizational Tables and 5:00 pm
structure, legal Chairs
responsibility,
workplace safety
Industry
 Familiarization on
Orientation
the workplace and
the tools
equipment
 Lecture on
Shielded Metal
Arc Welding and
Written Test
Perform  Perform Dual Industry Electrical Electrical Direct June 25,
Roughing-In Roughing-In Training Coordinator area Shop Observation 2021 to
Activities, Activities Program Electrical July. 6
Wiring and  Perform Wiring PPE 8:00 am –
Cabling Works Layout Basic Hand 5:00 pm
for Single-  Perform Cabling tools
Phase Works for Single- Multi-tester
Distribution, Phase
Power, Distribution
Lighting and  Perform Cabling
Auxiliary Work for Power
Systems  Perform Cabling
Works for
Lighting and
Date Developed: Document No.
June 2021
ELECTRICAL INSTALLATION AND Issued by: Page
MAINTENANCE NC II Compiled by:

Timothy John N. Mandia Revision #


Auxiliary System
Install  Install Electrical Electrical
Electrical Protective Devices area
Protective for Distribution Electrical
Devices for  Install Electrical PPE
Distribution, Protective Devices Basic Hand
Power, for Power tools
Dual Electrical Direct July 7,
Lighting,  Install Electrical Industry Multi-tester
Training Shop Observation 2021 to
Auxiliary, Protective Devices Coordinator
Program July 12
Lightning for Lighting and 8:00 am –
Protection and Auxiliary 5:00 pm
Grounding  Install Electrical
Systems Protective Devices
for Lightning
Protection
 Install Electrical
Protective Devices
for Ground
System
Install Wiring  Install Wiring Electrical
Devices of Devices of Floor area July 13,
Floor and Wall Outlets Dual Industry Electrical Electrical Direct 2021 to
Mounted  Install Wiring Training Coordinator PPE Shop Observation July 18
Outlets, Devices of Wall Program Basic Hand 8:00 am –
Lighting Mounted outlets tools 5:00 pm
Fixture/Switc  Install Wiring Multi-tester
hes and Devices of
Auxiliary Auxiliary Outlets
Outlets
Date Developed: Document No.
June 2021
ELECTRICAL INSTALLATION AND Issued by: Page
MAINTENANCE NC II Compiled by:

Timothy John N. Mandia Revision #


Prepared by: Noted by:
TIMOTHY JOHN N. MANDIA
OJT Coordinator Vocational School Coordinator

Conformed by:

Industry Coordinator

Date Developed: Document No.


June 2021
ELECTRICAL INSTALLATION AND Issued by: Page
MAINTENANCE NC II Compiled by:

Timothy John N. Mandia Revision #

You might also like