CUTTING LIST

FOOTINGS
FOOTING DIMENSIONS
MARK NO. OF PCS L W t D Ø no. of pcs per footing total length
F1 24.00 2.40 2.40 0.45 1.50 20.00 24.00 2.85
F2 34.00 1.90 1.90 0.40 1.50 16.00 24.00 2.25
F3 36.00 1.70 1.70 0.35 1.50 16.00 20.00 2.05
F4 210.00 2.10 2.10 0.40 1.50 16.00 24.00 2.45
4.00 3.60 1.00 0.40 1.50 16.00 44.00 1.35
F5
4.00 16.00 16.00 3.95

ACTUAL TOTAL EM
ACTUAL TOTAL EMBANKMENT FROM STRUCTURE EXCAVATION (90%
ACTUAL TOTAL EMBANKME

ACTUAL
EXCAVATION 5,453.35
EMBANKMENT FROM STRUCTURE EXCAVATION 4,908.02
EMBANKMENT BY HAUL BORROW 1,845.46
RSB
LRSB(m) total no. of pcs total length (m) Wt/m Total Wt RSB(kgs) Total Vol of C"A"C
6.00 288.00 1,728.00 2.47 4,261.25 62.21
9.00 204.00 1,836.00 1.58 2,897.21 49.10
10.50 144.00 1,512.00 1.58 2,385.94 36.41
7.50 1,680.00 12,600.00 1.58 19,882.80 370.44
6.00 44.00 264.00 1.58 416.59
5.76
12.00 24.00 288.00 1.58 454.46
TOTAL 30,298.25 523.92

ACTUAL TOTAL EMBANKMENT NEEDED 6,753.48


TURE EXCAVATION (90% TOTAL EXCAVATION) 4,908.02
UAL TOTAL EMBANKMENT BY HAUL BORROW 1,845.46

SUBMITTED DIFF. UNIT COST DIFFERENCE IN COST


5,633.00 179.65 684.94 123,046.84
3,943.10 - 964.92 495.61 - 478,223.24
3,401.00 1,555.54 657.07 1,022,097.66
666,921.25
Total Area of forms Total Vol of Excavation Remarks
103.68 513.00
103.36 548.25
85.68 512.46
705.60 3,808.35
14.72 71.29

1,013.04 5,453.35
CUTTING LIST
FOOTINGS
FOOTING DIMENSIONS
MARK NO. OF PCS L W t D
F1 24.00 2.40 2.40 0.45 1.50
F2 34.00 1.90 1.90 0.40 1.50
F3 36.00 1.70 1.70 0.35 1.50
F4 100.00 2.10 2.10 0.40 1.50
F4 60.00 2.10 2.10 0.40 2.10
F4 50.00 2.10 2.10 0.40 1.90
4.00 3.60 1.00 0.40 1.50
F5
4.00

EMBANKMENT FROM STRUCTURE EXCAVATION =

EMBANKMENT FROM COMMON BORROW BY EQUIPMENT


REMAINING 30% FROM STRUCTURE EXCAVATION =

BUILDING
MARK DEPTH WIDTH LENGTH AREA VOLUME
LEFT 0.90 16.00 40.00 14.40 576.00
0.90 16.00 14.40
40.00 384.00
0.30 16.00 4.80
RIGHT 0.90 16.00 40.00 14.40 576.00
0.90 16.00 14.40
40.00 384.00
0.30 16.00 4.80
MIDDLE 0.90 16.00 56.00 14.40 806.40
2,726.40

SIDEWALK,PROMENADE,PLANT BOX, PARKING


MARK DEPTH WIDTH LENGTH AREA VOLUME
LEFT,SIDEWALK 0.85 1.20 40.00 1.02 40.80
0.85 1.20 1.02
40.00 26.40
0.25 1.20 0.30
0.85 2.00 40.00 1.70 68.00
0.85 2.00 1.70
40.00 44.00
0.25 2.00 0.50
LEFT,PROM. 0.75 5.00 40.00 3.75 150.00
0.75 5.00 3.75
40.00 90.00
0.15 5.00 0.75
0.75 5.00 40.00 3.75 150.00
0.75 5.00 3.75
40.00 90.00
0.15 5.00 0.75
LEFT,PARKING 0.25 7.00 40.00 1.75 35.00
0.25 7.00 1.75
40.00 17.50
- 7.00 -
0.25 7.00 40.00 1.75 35.00
0.25 7.00 1.75
40.00 17.50
- 7.00 -
RIGHT,SIDEWALK 0.85 1.20 40.00 1.02 40.80
0.85 1.20 1.02
40.00 26.40
0.25 1.20 0.30
0.85 2.00 40.00 1.70 68.00
0.85 2.00 1.70
40.00 44.00
0.25 2.00 0.50
RIGHT,PROM. 0.75 5.00 40.00 3.75 150.00
0.75 5.00 3.75
40.00 90.00
0.15 5.00 0.75
0.75 5.00 40.00 3.75 150.00
0.75 5.00 3.75
40.00 90.00
0.15 5.00 0.75
RIGHT,PARKING 0.25 7.00 40.00 1.75 35.00
0.25 7.00 1.75
40.00 17.50
- 7.00 -
0.25 7.00 40.00 1.75 35.00
0.25 7.00 1.75
40.00 17.50
- 7.00 -
MID,SIDEWALK 0.85 1.20 56.00 1.02 57.12
MID,PROM. 0.75 5.00 56.00 3.75 210.00
MID,PARKING 0.25 7.00 56.00 1.75 49.00
1,844.52

TOTAL

SUMMARY
Total Vol of Excavation
EMBANKMENT FROM STRUCTURE EXCAVATION
EMBANKMENT FROM COMMON BORROW BY EQUIPMENT
RSB
Ø no. of pcs per foo total length LRSB(m) total no. of pcs total length (m)
20.00 24.00 2.85 6.00 288.00 1,728.00
16.00 24.00 2.25 9.00 204.00 1,836.00
16.00 20.00 2.05 10.50 144.00 1,512.00
16.00 24.00 2.45 7.50 800.00 6,000.00
16.00 24.00 2.45 7.50 480.00 3,600.00
16.00 24.00 2.45 7.50 400.00 3,000.00
16.00 44.00 1.35 6.00 44.00 264.00
16.00 16.00 3.95 12.00 24.00 288.00

70% OF EXCAVATION 4,291.28 cu.m.

1,839.12 cu.m.

cu.m.

ELEVATION LENGTH
SIDEWALK - 0.05 1.20
PROMENADE - 0.15 5.00
PARKING - 0.65 7.00
cu.m.

6,410.04 cu.m.

MMARY
6,130.39
ATION 4,291.28
W BY EQUIPMENT 6,410.04
Wt/m Total Wt RSB(kgs)Total Vol of C"A"CTotal Area of forms
Total Vol of Excavation Remarks
2.47 4,261.25 62.21 103.68 513.00
1.58 2,897.21 49.10 103.36 548.25
1.58 2,385.94 36.41 85.68 512.46
1.58 9,468.00 176.40 336.00 1,813.50
1.58 5,680.80 105.84 201.60 1,523.34
1.58 4,734.00 88.20 168.00 1,148.55
1.58 416.59
5.76 14.72 71.29
1.58 454.46
TOTAL 30,298.25 523.92 1,013.04 6,130.39
GROUND SLAB ACTUAL LENGTH CUTTING LENGTH] NUMBER OF CUT BARS
LEFT 82.25 9 10
18.25
RIGHT 82.25
18.25
MIDDLE 54.25
18.25
LENGTH OF CUT BARS PCS
87