FOOTINGS
FOOTING DIMENSIONS
MARK NO. OF PCS L W t D Ø no. of pcs per footing total length
F1 24.00 2.40 2.40 0.45 1.50 20.00 24.00 2.85
F2 34.00 1.90 1.90 0.40 1.50 16.00 24.00 2.25
F3 36.00 1.70 1.70 0.35 1.50 16.00 20.00 2.05
F4 210.00 2.10 2.10 0.40 1.50 16.00 24.00 2.45
4.00 3.60 1.00 0.40 1.50 16.00 44.00 1.35
F5
4.00 16.00 16.00 3.95
ACTUAL TOTAL EM
ACTUAL TOTAL EMBANKMENT FROM STRUCTURE EXCAVATION (90%
ACTUAL TOTAL EMBANKME
ACTUAL
EXCAVATION 5,453.35
EMBANKMENT FROM STRUCTURE EXCAVATION 4,908.02
EMBANKMENT BY HAUL BORROW 1,845.46
RSB
LRSB(m) total no. of pcs total length (m) Wt/m Total Wt RSB(kgs) Total Vol of C"A"C
6.00 288.00 1,728.00 2.47 4,261.25 62.21
9.00 204.00 1,836.00 1.58 2,897.21 49.10
10.50 144.00 1,512.00 1.58 2,385.94 36.41
7.50 1,680.00 12,600.00 1.58 19,882.80 370.44
6.00 44.00 264.00 1.58 416.59
5.76
12.00 24.00 288.00 1.58 454.46
TOTAL 30,298.25 523.92
1,013.04 5,453.35
CUTTING LIST
FOOTINGS
FOOTING DIMENSIONS
MARK NO. OF PCS L W t D
F1 24.00 2.40 2.40 0.45 1.50
F2 34.00 1.90 1.90 0.40 1.50
F3 36.00 1.70 1.70 0.35 1.50
F4 100.00 2.10 2.10 0.40 1.50
F4 60.00 2.10 2.10 0.40 2.10
F4 50.00 2.10 2.10 0.40 1.90
4.00 3.60 1.00 0.40 1.50
F5
4.00
BUILDING
MARK DEPTH WIDTH LENGTH AREA VOLUME
LEFT 0.90 16.00 40.00 14.40 576.00
0.90 16.00 14.40
40.00 384.00
0.30 16.00 4.80
RIGHT 0.90 16.00 40.00 14.40 576.00
0.90 16.00 14.40
40.00 384.00
0.30 16.00 4.80
MIDDLE 0.90 16.00 56.00 14.40 806.40
2,726.40
TOTAL
SUMMARY
Total Vol of Excavation
EMBANKMENT FROM STRUCTURE EXCAVATION
EMBANKMENT FROM COMMON BORROW BY EQUIPMENT
RSB
Ø no. of pcs per foo total length LRSB(m) total no. of pcs total length (m)
20.00 24.00 2.85 6.00 288.00 1,728.00
16.00 24.00 2.25 9.00 204.00 1,836.00
16.00 20.00 2.05 10.50 144.00 1,512.00
16.00 24.00 2.45 7.50 800.00 6,000.00
16.00 24.00 2.45 7.50 480.00 3,600.00
16.00 24.00 2.45 7.50 400.00 3,000.00
16.00 44.00 1.35 6.00 44.00 264.00
16.00 16.00 3.95 12.00 24.00 288.00
1,839.12 cu.m.
cu.m.
ELEVATION LENGTH
SIDEWALK - 0.05 1.20
PROMENADE - 0.15 5.00
PARKING - 0.65 7.00
cu.m.
6,410.04 cu.m.
MMARY
6,130.39
ATION 4,291.28
W BY EQUIPMENT 6,410.04
Wt/m Total Wt RSB(kgs)Total Vol of C"A"CTotal Area of forms
Total Vol of Excavation Remarks
2.47 4,261.25 62.21 103.68 513.00
1.58 2,897.21 49.10 103.36 548.25
1.58 2,385.94 36.41 85.68 512.46
1.58 9,468.00 176.40 336.00 1,813.50
1.58 5,680.80 105.84 201.60 1,523.34
1.58 4,734.00 88.20 168.00 1,148.55
1.58 416.59
5.76 14.72 71.29
1.58 454.46
TOTAL 30,298.25 523.92 1,013.04 6,130.39
GROUND SLAB ACTUAL LENGTH CUTTING LENGTH] NUMBER OF CUT BARS
LEFT 82.25 9 10
18.25
RIGHT 82.25
18.25
MIDDLE 54.25
18.25
LENGTH OF CUT BARS PCS
87