SCHEDULE OF REINFORCED CONCRETE COLUMNS SCHEDULE OF REINFORCED CONCRETE BEAMS

R E I N F O R C I N G B A R S BEAM SIZE TOP BARS BOTTOM BARS TOP BARS BOTTOM BARS
DIMENSION BEAM (mm) Ø 10mm STIRRUPS
AT SUPPORT AT SUPPORT AT MID-SPAN AT MID-SPAN
COLUMN MARK VERT. BARS MARK SPACING
VERT. BARS b h pcs Ø (mm) pcs Ø (mm) pcs Ø (mm) pcs Ø (mm)
BASE DEPTH AT FOUNDATION TO LATERAL TIES
AT SECOND LEVEL 2 @ 50mm and REST
GROUND LEVEL GB 250 300
@ 150mm O.C. UP TO MID-SPAN
Ø10mm SPACE: 2-AT 50mm, 4-AT 100mm,
C1 250 mm 350 mm 2 @ 50mm; 8 @ 75mm; 5 @ 100mm; and
4-AT 150mm AND REST-AT 200mm O.C. B-1 250 350 REST @ 150mm O.C. UP TO MID-SPAN
FC
200 mm 200 mm 4- AT Ø10 mm N/A Ø10mm SPACE: AT 150mm O.C.
(FENCE COLUMN) 2 @ 50mm; 3 @ 75mm; 2 @ 100mm; and
B-2 250 350 REST @ 150mm O.C. UP TO MID-SPAN
SC
100 mm 250 mm N/A 3- AT Ø10 mm Ø10mm SPACE: AT 150mm O.C.
(STIFFENER COL.) 2 @ 50mm; 3 @ 75mm; 2 @ 100mm; and
B-3 250 300 REST @ 150mm O.C. UP TO MID-SPAN
2 @ 50mm; 8 @ 75mm; 5 @ 100mm; and
RB-1 250 300 REST @ 150mm O.C. UP TO MID-SPAN
2 @ 50mm; 2 @ 75mm; 2 @ 100mm; and
RB-2 250 300 REST @ 150mm O.C. UP TO MID-SPAN
N/A

CF-1: KEY PLAN LB-1 100 200 1 12 1 12 1 12 1 12 @ 200mm O.C.

AT GROUND LEVEL AT GROUND LEVEL AT GROUND LEVEL

N/A

AT SECOND LEVEL AT SECOND LEVEL AT SECOND LEVEL GB AT SUPPORT GB AT MID-SPAN B1 AT SUPPORT B1 AT MID-SPAN
C1: COLUMN - 1 FC: FENCE COLUMN SC: STIFFENER COLUMN GB: GRADE BEAM B1: BEAM 1

8 R.C. COLUMNS SCHEDULE and DETAILS


S 3 SCALE 1:20 MTS.

0 200 CHB WALL OUTLINE


AT CEN TE R (verify )
Ø10mm VERT. BARS
SP. AT 400mm O.C.

Ø10mm HOR. BA RS
SP. AT EVERY B2 AT SUPPORT B2 AT MID-SPAN B3 AT SUPPORT B3 AT MID-SPAN

0 400
0 050
CF-1: ELEVATION-SECTION 3-LAYERS OF CHB B2: BEAM 2 B3: BEAM 3
NGL 10mm Ø DOWEL 0 034
BARS TO MATCH CHB
0 600

VERTICAL BARS
CF-1: COLUMN-FOOTING 1

0 400
BACK
Ø10mm TRANSVERSE
0 600

FILL

0 030
0 600 FOOTING BARS

0 200
0 075
SP. AS SHOWN
0 200
0 200

FENCE COLUMN (see


SCHEDULE & DETAILS) 3 - Ø 1 0 m m
LONGITUDINAL
FOOTING BARS 0 100
50mm depth GRAVEL
0 400 0 400 B2 AT SUPPORT B2 AT MID-SPAN LB AT SUPPORT LB AT MID-SPAN
0 600
0 200

BASE COURSE
RB 1&2: ROOF BEAM 1&2 LB: LINTEL BEAM
3- Ø10mm FOOTING BARS WF: SECTION WF: PLAN
SP. O.C.B.W.
7 WALL FOOTING DETAIL 9 R.C. BEAMS SCHEDULE and DETAILS
FCF: KEY PLAN S 3 SCALE 1:30 MTS. S 3 SCALE 1:20 MTS.

FENCE COLUMN (see


SCHEDULE & DETAILS) 10 mm Ø VERTICAL BAR IN 0 100
POURED CONCRETE
0 400 0 400
Ø10mm VERT. DEFORMED
Ø10mm LATERAL TILES
BARS SP. AT 400mm O.C.
SPACE AT 150mm O.C. 4" thk. CHB WALL
DOOR CHB WALL COLUMN
0 100

NGL
BACKFILL BACKFILL HORIZONTAL BAR SP. AT
6- Ø10mm FOOTING BARS
w/ ROCK w/ ROCK
0 600

SP. O.C.B.W. EVERY 3-LAYERS OF CHB

0 400
BOULDERS BOULDERS
AT END-DOOR
0 200

0 100 CORNER CHB CELL IN


10 mm Ø VERTICAL BAR IN
POURED CONCRETE w/
50mm depth GRAVEL BASE POURED CONCRETE
Ø10mm VERT. DEFORMED
COURSE
BAR
4" thk. CHB WALL
0 600
0 100

CONTINUOUS DOWEL BARS


TO MATCH CHB HOR. BARS
WINDOW 0 400
FCF: ELEVATION-SECTION VERTICAL BAR (verify)
HORIZONTAL BAR (verify)
FC: FENCE COLUMN FOOTING AT END-WINDOW
6 COLUMN-FOOTINGS DETAIL 10 AT END DOOR & WINDOW 11 WALL INTERSECTING AT R.C. 12 CORNER INTERLOCKING
S 3 SCALE 1:40 MTS. S 3 SECTION DETAIL SCALE 1:15 MTS. S 3 COLUMN DETAIL SCALE 1:15 MTS.
S 3 WALL DETAIL SCALE 1:15 MTS.
CONTRACTOR / DEVELOPER: CIVIL ENGINEER: IOAbing THESE DRAWINGS AS AN INSTRUMENTS OF PROJECT TITLE: PROJECT OWNER: SHEET CONTENT: REVISIONS: DATE: DESCRIPTION: SHEET NO.:
DESIGNED BY: SERVICE ARE SOLELY OWNED BY:
FEB 2019 _COLUMN-FOOTINGS DETAIL
ISABELO O. ABING _WALL-FOOTING DETAIL

ISABELO O. ABING
DRAWN BY:
MMMuli
FEB 20-21 & __, 2019
IOAbing
CIVIL ENGINEER
in Allied Service Collaboration with
MARIO M. MULI
PROPOSED (2)TWO-STOREY RESIDENTIAL BLDG. _R.C. COLUMNS SCHEDULE and DETAILS
_R.C. BEAMS SCHEDULE and DETAILS
_AT END DOOR and WINDOW SECTION DETAIL
_WALL INTERSECTING AT R.C. COLUMN DETAIL
S-3
CHECKED BY: ARCHITECT _CORNER INTERLOCKING WALL DETAIL
P.R.C. NO.: 27723 VALIDITY: 08/10/2020 MARCH 2019 THESE INSTRUMENTS SHALL NOT BE USED PROJECT LOCATION:
WITHOUT PERMISSION AND WRITTEN
PTR NO.: 5580453 DATE: 01/03/2019
REMARKS:
FOR BLDG. PERMIT
AUTHORIZATION. PNB VILLE, MARCOS HI-WAY, BAKAKENG CENTRAL, BAGUIO CITY MR. ROLAND A. ROMERO PAGE S3 of S4
PLACE: TUBA, BENGUET TIN NO.: 162 040 148 ASAP (R.A. 9266 and R.A. 8293)