Group 2 Removal and Installation of Unit: 1. Mast
Group 2 Removal and Installation of Unit: 1. Mast
1. MAST
1) REMOVAL
(1) Backrest
Remove bolts securing backrest to fork Backrest
carriage. Lift backrest straight up and
remove it from carriage.
Carriage Bolt
Fork
BR147RE02
(2) Forks
Fork set pin
Remove shaft cover and bolt.
Remove fork set pin and then draw out
the shaft. Shaft
Carriage
Carefully remove forks one by one.
Fork
Cover
Bolt
BR147RE03
(3) Carriage
With the mast vertical, raise the carriage
high enough to place blocks under the
load forks. This is done to create slack in
the load chains when the carriage is
lowered. Lower the carriage all the way
down to the floor. Make sure the carriage
is level, this will prevent any binding when
the mast is raised.
BR147RE04
2-2
While supporting lift chains, remove the
Lift chain
split pins and slide out chain anchor pins
from the chain anchors of stationary Outer mast
upright.
Nut
BR147RE05
Carriage
Lift chain
Block
BR147RE06
Carriage
Block
BR147RE07
2-3
(4) PIPING
Remove the return hoses and clamps Inner mast
attached to the cylinder.
Remove the return hoses from the
connector.
Remove hose assembly, connector, Return
hose
down safety valve from the lift cylinder.
Band
Disconnect hose assembly from the flow clamp Hose
clamp
regulator. Lift TO MCV
cylinder
BR147RE08
2-4
(6) MAST REMOVAL
Crane
Pass wire rope around the inner and
outer masts to allow lifting them out with
a hoist.
Remove the stopper pin at the end of
reach cylinder and then remove the
stopper bolt at the end of guide rail. Mast
Draw out the mast from the guide rail with
Wire rope
lifting up.
Lower the mast and place it on stand.
Draw out
Stopper pin
Stopper bolt
BR147RE10-1
Outer mast
Outer mast
stopper
bracket
Load roller
BR147RE10
2-5
2) INSTALLATION
After assembling mast components totally without piping connections, install mast assembly to the
equipment.
Installation procedure for each of mast component is the reverse of the removal procedure.
(1) LIFT CYLINDER INSTALLATION AND ADJUSTMENT
Assemble the lift cylinder inside the outer
mast, then tighten the stopper bolt. If the
cylinder assembly has been replaced,
adjust as follows so that the left and right
cylinders are synchronized at the
maximum lifting height.
Assemble the cylinder rod to the inner
mast, and check the left-to-right play of
the mast at the maximum lifting height.
If play is to LEFT, install adjustment
shim to LEFT cylinder.
If play is to RIGHT, install adjustment
L15C3RE12
shim to RIGHT cylinder.
Shim thickness : 1.0mm(0.04in)
2-6
2. POWER TRAIN ASSEMBLY
1) REMOVAL
BR147RE001
Battery
Disconnect
battery
Battery cable
stand or
carrier BR147RE12
Pin
Universal joint
BR147RE13
To hyd tank
To MCV
Mounting nut
BR147RE15
2-7
(4) Remove brake cable. Brake cam
Wrench
Brake cable
BR147RE16
EPS
motor
BR147RE17
BR147JB09
2-8
(8) Remove drive unit assembly from frame
by lifting. Wire rope
Drive unit
assembly
BR147RE19
2) INSTALLATION
Installatron is in the reverse order to
removal, but be careful of following points.
(1) Link pin support bolts. Link pin
Tightening torque : 4.0~6.0kgf m
Wrench Link pin
(28.9~43.4lbf ft)
To hyd tank
To MCV
Mounting nut
BR147RE15
2-9
3. ELECTRICAL COMPONENTS
Before removing each component, disconnect cables and earth lines attached to the component.
1) REMOVAL
BR147RE002
Side door
BR147RE20
2-10
Disconnect the hose, pipe and wiring
from pump & motor assembly. Pump & motor assembly
To hyd tank
To MCV
Mounting nut
BR147RE15
Socket bolt
BR147RE21
Side door
BR147RE20
2-11
Remove brake cable. Brake cam
Wrench
Brake cable
BR147RE16
EPS
motor
BR147RE17
Bolt
BR147RE22
Tie wire rope around the drive motor and Wire rope
lift up slowly.
BR147RE23
2-12
Put the motor on the clean work bench.
BR147RE24
Battery
Disconnect
battery
Battery cable
stand or
carrier BR147RE12
Side door
BR147RE20
Disconnect wirings.
EPS
motor
BR147RE25
2-13
Loosen bolts and remove EPS motor
assembly.
EPS
motor
BR147RE26
BR147OM120
Battery
stand
BR147OM133
Pin
Battery Battery
stand cover
BR147OM134
2-14
Adjust the height of the roller of the stand
to that of the roller of the vehicle.
Slide the battery to the stand.
Battery
Battery
stand
BR147OM139
Battery
Battery
carrier
BR147OM135
2-15
2) INSTALLATION
Installation is in the reverse order to
removal, but be careful of following points.
Socket bolt
BR147RE21
Bolt
BR147RE22
BR147RE26
2-16
4. CASTER LINK ASSEMBLY
BR147RE003
1) REMOVAL
(1) Disconnect the battery cable and then pull
out the battery to battery stand or carrier.
Battery
Disconnect
battery
Battery cable
stand or
carrier BR147RE12
Floor plate
BR147RE28
Inspection
cover
Screw
BR147RE29
2-17
(4) Remove bolt, pin, spring and brake cable
to remove the brake pedal assembly. Brake
cable
Spring
Pin
Brake Bolt
pedal
BR147RE30
Support
bolt
BR147RE31
Caster assy
BR147RE32
2-18
2) INSTALLATION
Installation is in the reverse order to
removal, but be careful of the following
points.
(1) No.3 link pin(lowest one) fixing bolt.
Tightening torque : 2.0~3.0kgf m Bolt
(14.5~21.7lbf ft)
No.3 Link pin
Caster assy
BR147RE32
Caster
assy
Spring
Support
bolt
BR147RE31
2-19
5. TIRE & WHEEL ASSEMBLY
1) REMOVAL
(1) DRIVE TIRE & WHEEL ASSEMBLY
Jack up the frame
Jack up until the tire clear off the
ground.
BR147JB09
Flange
bolt
Floor plate
BR147RE28
End cover
Caster assy
BR147RE34
2-20
Remove bolt and take out the steering
shaft & caster wheel assembly from axle
fork. Bolt
Axle fork
Steering shaft
& caster wheel assy
BR147RE35
Axle fork
Bearing
Bearing cover
BR147RE36
Jack up
Block BR147RE37
Bolt
Castle nut
Wheel cap
BR147RE38
2-21
2) INSTALLATION
Installation is in the reverse order to removal,
but be careful of the following points.
(1) Drive wheel flange bolts
Tightening torque :
HBR14/15/18-7 : 19~22kgf m
(137~159lbf ft)
HBR20/25-7 : 13.5~15.5kgf m
(98~112lbf ft)
Flange
bolt
Axle fork
Steering shaft
& caster wheel assy
BR147RE35
Bolt
Castle nut
Wheel cap
BR147RE38
2-22