SUMMARY

No. item Total(€)

1 1-1 Main Road -

2 1-4 Deviation -

3 1-5 Interchange -

4 1-6 Drainage -

5 1-5 Structure_km.0+417.50-left carriageway -

6 1-5 Structure_km.0+417.50-right carriageway -

7 1-5 Structure__ Viaduct km.0+078.00 -

8 1-5 Structure_km.1+420.00-left carriageway -

9 1-5 Structure_km.1+420.00-right carriageway -

10 1-5 Structure_km.4+011.00-left carriageway -

11 1-5 Structure_km.4+011.00-right carriageway -

12 1-5 Structure_ km.5+784.00-left carriageway -

13 1-5 Structure_ km.5+784.00-right carriageway -

14 1-5 Structure_ km.2+681.35-left carriageway -

15 1-5 Structure_ km.2+681.35-right carriageway -

16 1-5 Structure_ km.8+200.00-left carriageway -

17 1-5 Structure_ km.8+200.00-right carriageway -

18 1-5 Structure_ km.8+360.00-left carriageway -

19 1-5 Structure_ km.8+360.00-right carriageway -

20 1-5 Structure_overpass km.8+891.15 -

21 HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Retaining wall of km1+616.00 -

22 HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Retaining wall of km.3+075.00 -

23 HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Retaining wall of km.4+530.00 83,928.18

24 HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Retaining wall of km. 5+390.00 -

25 HIGHWAY CORRIDOR K- 8 Deve Bair - Kafasan object Retaining wall of km.6+151,40 -

26 HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Retaining wall of km.7+544.00 -

27 HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Retaining wall of km.7+800.00 -

28 HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Retaining wall of km. 8+393.00 -

29 HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Retaining wall of km.8+679.50 -


SUMMARY
No. item Total(€)

30 HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Retaining wall of km.9+302.00 -

31 HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Retaining wall of km.9+600.00 -

32 HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Retaining wall of km.9+902.30 -

33 HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Retaining wall of km.10+200.00 -

34 F.C. BOX CULVERT L=3.00m. NA Km 0+388.50 -

35 F.C. PIPE CULVERT L=3.00m. on Km 9+615.90 -

36 1-7 Landscaping -

1-9 Viaduct__km.2+380 - left carriageway ( KCEVO - TREBENISTA, VIADUCTS WITH


37 -
L>150,00m)
1-9 Viaduct__km.2+380 - Right carriageway ( KCEVO - TREBENISTA, VIADUCTS
38 -
WITH L>150,00m)
1-9 Viaduct__ km.5+094 - left carriageway ( KCEVO - TREBENISTA, VIADUCTS WITH
39 -
L>150,00m)
1-9 Viaduct__km.5+094 - Right carriageway ( KCEVO - TREBENISTA, VIADUCTS
40 -
WITH L>150,00m)
1-9 Viaduct__ km.6+024 - left carriageway ( KCEVO - TREBENISTA, VIADUCTS WITH
41 -
L>150,00m)
1-9 Viaduct__km.6+024 - Right carriageway ( KCEVO - TREBENISTA, VIADUCTS
42 -
WITH L>150,00m)
1-9 Viaduct__km.6+860 - left carriageway ( KCEVO - TREBENISTA, VIADUCTS WITH
43 -
L>150,00m)
1-9 Viaduct__km.6+860 - Right carriageway ( KCEVO - TREBENISTA, VIADUCTS
44 -
WITH L>150,00m)
1-9 Viaduct__ km.7+420 - left carriageway ( KCEVO - TREBENISTA, VIADUCTS WITH
45 -
L>150,00m)
1-9 Viaduct__ km.7+420 - Right carriageway ( KCEVO - TREBENISTA, VIADUCTS
46 -
WITH L>150,00m)
1-9 Viaduct__km.9+105 - left carriageway ( KCEVO - TREBENISTA, VIADUCTS WITH
47 -
L>150,00m)
1-9 Viaduct__ km.9+105 - Right carriageway ( KCEVO - TREBENISTA, VIADUCTS
48 -
WITH L>150,00m)
1-9 Viaduct__km.9+780 - left carriageway ( KCEVO - TREBENISTA, VIADUCTS WITH
49 -
L>150,00m)
1-9 Viaduct__ km.9+780 - Right carriageway ( KCEVO - TREBENISTA, VIADUCTS
50 -
WITH L>150,00m)
1-9 Viaduct__ km.10+380 - left carriageway ( KCEVO - TREBENISTA, VIADUCTS
51 -
WITH L>150,00m)
1-9 Viaduct__ km.10+380 - Right carriageway ( KCEVO - TREBENISTA, VIADUCTS
52 -
WITH L>150,00m)

TOTAL 83,928.18
Unit price
No. Type of work/ Вид на работа Unit Quantity Total price (€)
(€)
1 2 3 4 5 6

I. Preparation works/ Подготвителни работи:


Labelling and securing of the roads/ Обележување
1 km 10.42 -
и обезбедување на патиштата
Clearing up shrubbery/shrub/twig, trees and roots/
2 Расчистување на грмушки / џбунови / гранки, km 8.35 -
дрвја и корени
Total: -
II. Chassis Earthen works/ Земјени работи:
Excavation of humus with transport and deposition/
1 m3 86,013 -
Ископ на хумус со транспорт и депонирање
Excavation of ground in wide excavation
2.1 of the roads material IV -V layer/ Широк ископ на
земја IV и V категорија
a) with average transport to 500m/ со среден
m3 6,779 -
транспорт од 500 м
b) with average transport to 1000m/ со среден
m3 302,740 -
транспорт од 1000 м
c) with average transport to 1500m/ со среден
m3 666,283 -
транспорт од 1500 м
d) with average transport to 2000m/ со среден
m3 1,705,449 -
транспорт од 2000 м
e) with average transport to 2500m/ со среден
m3 1,031,458 -
транспорт од 2500 м
Addition for excavation in rock with mine/ Додаток
3 m3 294,139 -
за ископ во карпа со минирање
4 Production of embankment/ Изработка на насип

b) of stone material/ од камен материјал m3 286,101 -


Production of bed planum of foundation/ Изработка
5 m2 235,282 -
на постелка за темел
Compression under the ground/ Набивање на
6 m2 62,639 -
тлото
7 Hummusing of slopes/ Хумусирање на косините m2 239,946 -
Sowing grass on lands/ Засадување на трева на
8 m2 23,217 -
површините
Spread out and planing of the remaining humus/
9 Распростирање и планирање на остатокот од m3 35,863 -
хумусот
Total: -

III. Drainage/ Дренажа:

1 Excavation of canal/ Ископ на канал


a) in hard stone material/ во цврст камен материјал m3 465 -
b) addition for excavation in rock/ додаток за ископ
m3 279 -
во карпа
Unit price
No. Type of work/ Вид на работа Unit Quantity Total price (€)
(€)
Coating of ditch with C-30/ Обложување на ровот
2 m2 1,775 -
со C-30
3 Construction of drainage/ Изведба на дренажа
a) depth of 0–2m. In stone material/ длабина од 0-2
m1 13,146 -
м. Во камен материјал
Supply, transport and put on drainage and drainage
pipes , culvert pipes with construction of entrance
4 and exit/ Набавка, транспорт и монтажа на
дренажа и дренажни цевки, цевки за пропусти со
конструкција на влез и излез
a) perforated pipes F 400/мперфорирани цевки Ф
m1 5,815 -
400
b) concrete pipes F 1000 cm/ m1 285 -
Production of inspecton manholes (complete
5 construction)F 1000 cm/ Изработка на ревизиони m1 116 -
шахти (целосна конструкција) Ф 1000 см.
Total: -

V Upper plant/ Горен слој:


Production of a protective layer of crushed stone
1 d=50сm/ Изведба на заштитен слој од кршен m3 25,322 -
камен d=50 cm
Production of layer of crushed stone d=35 cm/
2 m3 55,468 -
Изработка на слој од кршен камен d=35 cm.
Production of upper bearing layer from bitumen
3 material BNS-22CA/ Изработка на горен носечки
слој од битуменски материјал BNS-22CA

a)d=13.00 cm m2 -
Production of asphaltic concrete-wearing course AB-
4
11C polymer layer d=5sm
a)d= 5.00cm m2 -
Production of verge with mechanical stabilization/
5 Изработка на ножица со механичка m2 5,036 -
стабилизација
Production of prefabricated concrete kerbs C-30 on
concrete base -18/24/ Изработка на монтажни
6 m1 44 -
бетонски ивичници C-30 на бетонска подлога -
18/24
Production of asphalt gutters with concrete kerb
7 24x18cm/ Изработка на асфалтни сливници со
бетонски ивичници 24x18 cm

a)breadth/ ширина 75.00 cm m1 10,451 -


production of channels of concrete elements c-30/
8 m1 1,134 -
Изработка на канали од бетонски елементи C-30
Total: -

IV. Constructions/ Конструкции


Unit price
No. Type of work/ Вид на работа Unit Quantity Total price (€)
(€)
Construction of walls from
1 polymer reinforcement soil/ Изведба на ѕидови од m2 19,380 -
полимерно зајакната почва
-

Summary

I Preparation works/ Подготвителни работи: -

II Chassis Earthen works/ Земјени работи: -

III Drainage/ Дренажа: -

IV Constructions/ Конструкции -

V Upper plant/ Горен слој: -

Total : -
BILL OF QUANTITIES
FOR DEVIATION "2"
Asphalt road for "LAVCANI"

No. Type of work Unit Quantity Unit price (€) Total price (€)

1 2 3 4 5 6

I. Preparation works:

1. Labelling and securing of the roads km 0.38 -

Demolishing of existing carringway m2 2,084.00 -

Total : -

II. Chassis

-Earthen works :
Excavation of humus.with transport and
1 m3 759 -
lodgement
Excavation of ground in wide excavation of the
2 -
roads and the borrows III-IV floor.
a)with average transport to 60m m3 695 -

b) with average transport to 200m. m3 1,042 -


d) with average transport to 1000m
m3 285 -

3 Addition for excavation in rock with mining m3 1,216 -

4 Production of embankment

b) of earth material m3 2,022 -

5 Production of bed planum of foundation m2 3,127 -

6 Compression under the ground m2 1,887 -

7 Hummusing of slopes m2 1,215 -


Spread out and planning of the remaining
8 m3 516 -
humus
Total : -

III. Drainage :

Excavation of ditch

a) in mat III-IV floor. m3 341 -

Total : -

V. Upper plant:
Production of a protective layer of crushed
1 m3 691 -
stone d=30сm.
Production of upper bearing layer from
2
bitumen material BNS-16A
a) d=8.00 m2 -
Production of verge with mechanical
3 m2 614 -
stabilization
BILL OF QUANTITIES
FOR DEVIATION "2"
Asphalt road for "LAVCANI"

No. Type of work Unit Quantity Unit price (€) Total price (€)

Total : -

lV . Construction
Production of walls polymer reinforcement
m2 312 -
earth
Production of R.C. Overrpass L=2x36m m2 612 -

Total : -

Recapitulation

I. Preparation works: -

II. -Earthen works : -

III. Drainage : -

IV. Construction -

V. Upper plant: -

Total -
BILL OF QUANTITIES
FOR INTERCHAINGE
"KNEZINO"
Unit price
No. Type of work Unit Quantity Total price (€)
(€)
1 2 3 4 5 6

I Preparation works:

1 Labelling and securing of the roads km 2.39 -

2 Clearing up shrubbery / shrub/ twig, trees and root km 1.44 -

Total : -

II Chassis - Earthen works


Excavation of humus d=50сm. with transport and
1 m3 7,429 -
deposition
Excavation of ground in wide excavation of the roads
2
and the borrows IV-V floor.
b) with average transport to 200M. m3 103,700 -

d) with average transport to 1000m. m3 14,853 -

3 Production of embankment

a) of stone material m3 103,686 -

4 Production of bed planum of foundation m2 10,817 -

5 Compression under the ground m2 24,926 -

6 Hummusing of slopes m2 27,022 -

7 Sowing grass on lands m2 18,915 -

8 Spread out and planning of the remaining humus m3 2,025 -

Total : -

III Drainage :

1 Excavation of canal

a) in hard stone material. m3 124 -


Supply, transport and placement of tubular passage
2
with production of entry and exit
a) F1500cm. m1 27 -

Total : -

V. Upper plant:
Production of a protective layer of crushed stone
1 m3 11,424 -
d=30сm.
Production of upper bearing layer from bitumen
2
material BNS-32CA
a) d=8.00 m2 -
Production of asphaltic concrete -wearing course AB-
3 -
11C polymer layer
BILL OF QUANTITIES
FOR INTERCHAINGE
"KNEZINO"
Unit price
No. Type of work Unit Quantity Total price (€)
(€)
a)d= 4.00cm m2 -

4 Production ofverge with mechanical stabilization m2 749 -

5 Production of concrete kerb

a)24/18sm-C30 m1 1,857 -

b)15/8sm -C30 m1 1,674 -

6 Production of pavement

a)behaton d=6.00cm m2 2,511 -

b)sand d=5.00cm m2 2,511 -

layer of crushed stone d=20cm m3 502 -


Production of concrete ditch on downward of
7 m1 33 -
embankmant
Total : -

lV Construction

1 R.C. Underpass L=10,00m m2 240 -

Total : -

Recapitulation

I. Preparatory works -

II. Chassis -
III. Drainage -

IV Construction -
V. Upper plant -

Total : -
3. Survey- calculations
Drainage of CORRIDOR - 8
section: Kicevo - Podvis: of km. 0+000, 00 up to km. 10+424,89
No. Type of work Unit Quantity Unit price (€) Total price (€)
1 2 3 4 5 6
Mechanical excavation in the ground in
narrow digging up, for ditches for laying
1
pipes, digging of the ditch and drain of the
surplus material
–excavation according to table m3 23,035
–excavation for leaks, release/ on the side m 3
100
Total excavation m 3
23,135
a./ Of a depth from 0 – 2 m m 3
18,508
material III and IV layer. (80 %) m 3
14,806 -
–in rock (20 %) m 3
3,701.6 -
b./ Of a depth of 2 – 4 m m 3
4,627
material III and IV layer. (20 %) m3 925.4 -
– in rock (80 %) m3 3,701.6 -
Manual additional excavation in the ground III
2 m3 462.94 -
and IV layer.
Supply,transport and construction of filter
3 material of gravel, to be filled in the drainage m3 6,605 -
ditch
creation of exit heads made out of concrete
blocks and channels out of reinforced
concrete for side outlet MB 30 with a proper
4 inclination
– concrete blocks m3 3 -
– exit heads m 3
2 -
Purchase-transport and the construction of
concrete, drainage and drainage and waste
pipes
-F 300 m' 10,400 -
5
-F 400 m' 2,520 -
-F 500 m' 290 -
Purchase-transport and construction of
concrete drainage pipes (non perforated)
6 -F 300 m' 160 -
-F 400 m' 50 -
Production of a set of inspection manholes
7 – with a height of up to 2. 0 M pcs 314 -
– with a height above 2. 0 M pcs 21 -
Supply, transport and construction of grids for
8 round drainpipes with a frame of the heavy pcs 335 -
type with a capacity of 40 MP.
Preparation of a set of Oil-catch basins
9 pcs 33 -
F1000
Supply, transport and construction of shutters
10 for oil-catcher. Round with frame; heavy type pcs 33 -
with a capacity of 40MP.
Total: -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.0+417.50-left carriageway

Unit Total price


No. Type of work Unit Quantity
price (€) (€)
1 2 3 4 5 6
1. 8.4. Structures with an opening larger then 5,0 m
1

4. 8.452 1. Ground works   


Wide excavation for foundations in dry with spreading
5. 8.4521   
out storage and transport С1 and С6
a) for a depth of 0-2 m1 m3 756.00 -

a1) addition for rock m3 756.00 -

b) for a depth of 2–4 m m3 504.00 -

b1) addition for rock m3 504.00 -

c) for a depth of 4–6 m m3 420.00 -

c1) addition for rock m3 420.00 -


Digging in of foundation of pillars in layers of 30 cm
6. 8.4528 m3 720.00 -
with compacting
-

TOTAL EARTHEN WORKS :    -

     

7. 8.455 2. Concrete and reinforced   

concrete works   
Concrete fill-in without formwork MB > 15 (foundation
8. 8.45543 m3 56.00 -
for reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
9. 8.45561 m3 803.50 -
beams and slab-like foundations MB30
10. 8.455464 Reinforced concrete pillars    -

a)End pillars with ring beam and wings MB 30 M – 100 m3 738.80 -

b)Centre pillars МВ 30 m – 100 m3 243.00 -

11. 8.455465 Upper part of end and middle columns    -


a) Parapet and console wings for end columns MB 30
m3 53.00 -
M – 100
b) Laid joist for centre columns MB 30 M – 100 m3 103.00 -
Parapet beam and fences ”New Jersey” elements with
12. 8.455468    -
surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
m3 58.70 -
protection, paint МB 45 М–100
13. 8.4554610Assembly of main beam at the objects    -

a) with weight until 100 t. Nr. 12.00 -


Pre-stressed and reinforced concrete elements of the
14. 8.455481    -
object
a) Assembled pre-stressed girder MB 45 М–100 m3 352.20 -
Cross girders at objects of pre-stressed and reinforced
15. 8.455482    -
concrete
a) of reinforced concrete MB 45 М–100 m3 50.00 -

16. 8.455483 Lane slab at the objects    -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.0+417.50-left carriageway

Unit Total price


No. Type of work Unit Quantity
price (€) (€)
a) MB 45 M-100 d = 8+15=22 cm m3 258.17 -

b) Transition slab MB 30 M-100 d=30 cm m3 25.20 -

17. 8.455487 Injection of cables m1 1,705.00 -

18. 8.4556 Protection of the slopes of the embankment with    -

a) Production of concrete canals MB 30 М–100 m1 - -

19. 8.456 Activities of metal    -

20. 8.4562 Reinforcement of concrete steel    -


a) Supply, cutting, tailoring and assembly GA 240/360
kg. 10,328.00 -
F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA 240/360
kg. 1,001.00 -
F >12 mm
c) Supply, cutting, tailoring and assembly RА 400/500-
kg. 90,220.00 -
2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА 400/500-
kg. ### -
2 F > 12 mm
21. 8.4564 Steel elements of rolled profiles and sheet metal kg. 5,300.00 -

22. 8.4567 Reinforcement for pre-stressing    -


Ropes and wires for overtensing anchors, the safety
23. 8.45671    -
pipes assembly and overtensing sO2 / sv = 1670 / 1860
a) For cables kg. 22,317.96 -

b) Anchors Nr. 96.00 -

c) Pipes m1 1,705.00 -

     
TOTAL CONCRETE AND REINFORCED CONCRETE
   -
WORKS :
3. Other works   
Dilatational devices of roadway surfaces of the building
24. 8.45681 m1 23.20 -
type T-80
Dilatational devices of fence NEW JERSEY type
25. 8.45682 m1 8.00 -
RHEINSTHAL
26. 8.4569 Drainpipes of cast iron with water outlet Nr. 6.00 -

with respect to detail L = 100 m m1 100.00 -

a) Supply and building landmarks for oscultation Nr. 14.00 -

27. 8.458 Finishing works of the superstructure of the object    -

28. 8.4582 Hydroinsulation of objects    -

29. 8.45822 Hydroinsulation of ready insulation tapes, strips m2 1,173.50 -

30. 8.4583 Protection of concrete areas under ground m2 2,000.00 -

31. 8.4584 Roadway of the objects d = 6 cm m2 1,173.50 -

32. 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 24.00 -

33. 8.458.10 Elements for dilatation    -

a) with permanent elastic kit m1 120.00 -

34. 8.458.11 Testing of ready object Nr. 1.00 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.0+417.50-left carriageway

Unit Total price


No. Type of work Unit Quantity
price (€) (€)
Production and the construction of slab with year of
35. 8.458.13 Nr. 1.00 -
construction and category of the object.
TOTAL OTHER WORKS :    -

     

SUMMARY   

TOTAL EARTHEN WORKS :    -

TOTAL CONCRETE AND REINFORCED CONCRETE


   -
WORKS :

TOTAL OTHER WORKS :    -

TOTAL EUR :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.0+417.50-right carriageway
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
1. 8.4. Structures with an opening larger then 5,0 m1

4. 8.452 1. Ground works   


Wide excavation for foundations in dry with
5. 8.4521   
spreading out storage and transport
a) for a depth of 0-2 m1 m3 135.00 -

a1) addition for rock m3 135.00 -

b) for a depth of 2–4 m m3 90.00 -

b1) addition for rock m3 90.00 -

c) for a depth of 4–6 m m3 75.00 -

c1) addition for rock m3 75.00 -


Digging in of foundation of pillars in layers of 30 cm
6. 8.4528 m3 186.00 -
with compacting
-

TOTAL EARTHEN WORKS :    -

     

7. 8.455 2. Concrete and reinforced   

concrete works   
Concrete fill-in without formwork MB > 15
8. 8.45543 m3 9.00 -
(foundation for reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
9. 8.45561 m3 132.80 -
beams and slab-like foundations MB30
10. 8.455464Reinforced concrete pillars    -

a)Centre pillars МВ 30 m – 100 m3 261.84 -

11. 8.455465Upper part of end and middle columns    -

a) Laid joist for centre columns MB 30 M – 100 m3 103.00 -


Parapet beam and fences ”New Jersey” elements
12. 8.455468    -
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
m3 58.70 -
protection, paint МB 45 М–100
13. 8.4554610Assembly of main beam at the objects    -

a) with weight until 100 t. Nr. 12 -


Pre-stressed and reinforced concrete elements of
14. 8.455481    -
the object
a) Assembled pre-stressed girder MB 45 М–100 m3 352.20 -
Cross girders at objects of pre-stressed and
15. 8.455482    -
reinforced concrete
a) of reinforced concrete MB 45 М–100 m3 50.00 -

16. 8.455483Lane slab at the objects    -

a) MB 45 M-100 d = 8+15=22 cm m3 258.17 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.0+417.50-right carriageway
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
b) Transition slab MB 30 M-100 d=30 cm m3 25.20 -

17. 8.455487Injection of cables m1 1,705.00 -

18. 8.4556 Protection of the slopes of the embankment with    -

a) Production of concrete canals MB 30 М–100 m1 25.00 -

19. 8.456 Activities of metal    -

20. 8.4562 Reinforcement of concrete steel    -


a) Supply, cutting, tailoring and assembly GA
kg. 10,328.00 -
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
kg. 1,001.00 -
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА
kg. 73,459.00 -
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
kg. ### -
400/500-2 F > 12 mm
21. 8.4564 Steel elements of rolled profiles and sheet metal kg. 5,300.00 -

22. 8.4567 Reinforcement for pre-stressing    -


Ropes and wires for overtensing anchors, the safety
23. 8.45671 pipes assembly and overtensing sO2 / sv = 1670 /    -
1860
a) For cables kg. 22,317.96 -

b) Anchors Nr. 96 -

c) Pipes m1 1,705.00 -

     
TOTAL CONCRETE AND REINFORCED
   -
CONCRETE WORKS :
3. Other works   
Dilatational devices of roadway surfaces of the
24. 8.45681 m1 23.20 -
building type T-80
Dilatational devices of fence NEW JERSEY type
25. 8.45682 m1 8.00 -
RHEINSTHAL
26. 8.4569 Drainpipes of cast iron with water outlet Nr. 6 -

with respect to detail L = 100 m m1 100.00 -

a) Supply and building landmarks for oscultation Nr. 14 -


Finishing works of the superstructure of the
27. 8.458    -
object
28. 8.4582 Hydroinsulation of objects    -

29. 8.45822 Hydroinsulation of ready insulation tapes, strips m2 1,173.50 -

30. 8.4583 Protection of concrete areas under ground m2 500.00 -

31. 8.4584 Roadway of the objects d = 6 cm m2 1,173.50 -

32. 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 24 -

33. 8.458.10 Elements for dilatation    -

a) with permanent elastic kit m1 120.00 -

34. 8.458.11 Testing of ready object Nr. 1 -


Production and the construction of slab with year of
35. 8.458.13 Nr. 1 -
construction and category of the object.
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.0+417.50-right carriageway
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
TOTAL OTHER WORKS :    -

SUMMARY   

TOTAL EARTHEN WORKS :    -


TOTAL CONCRETE AND REINFORCED
   -
CONCRETE WORKS :
TOTAL OTHER WORKS :    -

TOTAL EUR :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.0+078.00
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
1. 8.4.
Structures with an opening larger then 5,0 m1

4. 8.452 1. Ground works   

5. 8.4521 Wide excavation for foundations in dry with spreading   


out storage and transport С1 and С6
a) for a depth of 0-2 m1 m3 1,267.00 -

a1) addition for rock m3 1,267.00 -

b) for a depth of 2–4 m m3 1,063.00 -

b1) addition for rock m3 1,063.00 -

c) for a depth of 4–6 m m3 657.00 -

c1) addition for rock m3 657.00 -

d) for a depth of 6-8 and beyond m3 657.00 -

d1) addition for rock m3 657.00 -

6. 8.4528 Digging in of foundation of pillars in layers of 30 cm m3 1,230.00 -


with compacting

TOTAL EARTHEN WORKS :   

     

7. 8.455 2. Concrete and reinforced   

concrete works   

8. 8.45543 Concrete fill-in without formwork MB > 15 (foundation m3 44.97 -


for reinforced concrete foundations).
9. 8.45561 Reinforced concrete foundation cobblestone, contra m3 441.72 -
beams and slab-like foundations MB30
10. 8.455464Reinforced concrete pillars    -

a)End pillars with ring beam and wings MB 30 M – 100 m3 145.59 -

b)Reinforced concrete walls МВ 30 M – 100 m3 446.87 -

c)Centre pillars МВ 30 m – 100 m3 60.98 -

11. 8.455465Upper part of end and middle columns    -

a) Parapet and console wings for end columns MB 30 m3 13.50 -


M – 100
b) Laid joist for centre columns MB 30 M – 100 m3 17.30 -

12. 8.455468Parapet beam and fences ”New Jersey” elements with    -


surface. protection and facade elements.
a) Facade elements production and assembly MB 30 m3 5.93 -
М–100
13. 8.455469Prefabrication tiles of pedestrian paths and    -
pavements’ elements
a) Pavements of non-reinforced concrete MB М–100 m1 94.00 -

14. 8.4554610Assembly of main beam at the objects    -

a) with weight until 50 t. Nr. 10 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.0+078.00
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
15. 8.455481Pre-stressed and reinforced concrete elements of the    -
object
a) Assembled pre-stressed girder MB 45 М–100 m3 113.40 -

16. 8.455482Cross girders at objects of pre-stressed and reinforced    -


concrete
a) of reinforced concrete MB 45 М–100 m3 12.96 -

17. 8.455483Lane slab at the objects    -

a) MB 45 M-100 d = 15 cm m3 25.54 -

b) Transition slab MB 30 M-100 d=30 cm m3 5.60 -

18. 8.455487Injection of cables m1 994.00 -

19. 8.4556 Protection of the slopes of the embankment with    -

a) Production of concrete canals MB 30 М–100 m1 - -

20. 8.456 Activities of metal    -

21. 8.4562 Reinforcement of concrete steel    -

a) Supply, cutting, tailoring and assembly GA 240/360 kg. 2,079.00 -


F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA 240/360 kg. 1,353.00 -
F >12 mm
c) Supply, cutting, tailoring and assembly RА 400/500- kg. ### -
2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА 400/500- kg. ### -
2 F > 12 mm
22. 8.4564 Steel elements of rolled profiles and sheet metal kg. - -

23. 8.4567 Reinforcement for pre-stressing    -

24. 8.45671 Ropes and wires for overtensing anchors, the safety    -
pipes assembly and overtensing sO2 / sv = 1570 / 1770
a) For cables kg. 7,584.22 -

b) Anchors Nr. 80 -

c) Pipes m1 994.00 -

     

TOTAL CONCRETE AND REINFORCED    -


CONCRETE WORKS :
3. Other works   

25. 8.45681 Dilatational devices of roadway surfaces of the m1 15.00 -


building type T-80
26. 8.45682 Dilatational devices of fence NEW JERSEY type m1 - -
RHEINSTHAL
27. 8.4569 Drainpipes of cast iron with water outlet Nr. - -

with respect to detail L = 0 m m1 - -

a) Supply and building landmarks for oscultation Nr. 10 -

28. 8.456.11 Steel fences of the objects set    -

a) Combined m1 167.00 -

29. 8.458 Finishing works of the superstructure of the object    -

30. 8.4581 Concrete or stone kerbs m1 94.00 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.0+078.00
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
31. 8.4582 Hydroinsulation of objects    -

32. 8.45822 Hydroinsulation of ready insulation tapes, strips m2 170.27 -

33. 8.4583 Protection of concrete areas under ground m2 2,000.00 -

34. 8.4584 Roadway of the objects d = 6 cm m2 170.27 -

35. 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 20 -

36. 8.458.10 Elements for dilatation    -


a) with permanent elastic kit m1 - -

37. 8.458.11 Testing of ready object Nr. 1 -

38. 8.458.13 Production and the construction of slab with year of Nr. 1 -
construction and category of the object.
TOTAL OTHER WORKS :    -

SUMMARY   
TOTAL EARTHEN WORKS : -
  
TOTAL CONCRETE AND REINFORCED -
CONCRETE WORKS :   
TOTAL OTHER WORKS : -
  
-
TOTAL EUR :   
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.1+420.00-left carriageway
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
1. 8.4. Structures with an opening larger then 5,0 m1

4. 8.452 1. Ground works   


Wide excavation for foundations in dry with
5. 8.4521   
spreading out storage and transport С1 and С6
a) for a depth of 0-2 m1 m3 1,650.00 -
a1) addition for rock m3 1,650.00 -
b) for a depth of 2–4 m m3 990.00 -
b1) addition for rock m3 990.00 -
c) for a depth of 4–6 m m3 660.00 -
c1) addition for rock m3 660.00 -
Digging in of foundation of pillars in layers of 30 cm
6. 8.4528 m3 2,300.00 -
with compacting
-
TOTAL EARTHEN WORKS :    -
     
7. 8.455 2. Concrete and reinforced   
concrete works   
Concrete fill-in without formwork MB > 15
8. 8.45543 m3 51.23 -
(foundation for reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
9. 8.45561 m3 574.20 -
beams and slab-like foundations MB30
10.8.455464Reinforced concrete pillars    -
a)End pillars with ring beam and wings MB 30 M –
m3 720.00 -
100
b)Centre pillars МВ 30 m – 100 m3 250.80 -
11.8.455465Upper part of end and middle columns    -
a) Parapet and console wings for end columns MB
m3 53.00 -
30 M – 100
b) Laid joist for centre columns MB 30 M – 100 m3 103.00 -
Parapet beam and fences ”New Jersey” elements
12.8.455468    -
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
m3 64.76 -
protection, paint МB 45 М–100
13.8.4554610Assembly of main beam at the objects    -
a) with weight until 100 t. Nr. 12 -
Pre-stressed and reinforced concrete elements of
14.8.455481    -
the object
a) Assembled pre-stressed girder MB 45 М–100 m3 352.20 -
Cross girders at objects of pre-stressed and
15.8.455482    -
reinforced concrete
a) of reinforced concrete MB 45 М–100 m3 50.00 -
16.8.455483Lane slab at the objects    -
a) MB 45 M-100 d = 8+15=22 cm m3 258.17 -
b) Transition slab MB 30 M-100 d=30 cm m3 25.20 -
17.8.455487Injection of cables m1 1,705.00 -
18. 8.4556 Protection of the slopes of the embankment with    -
a) Production of concrete canals MB 30 М–100 m1 - -
19. 8.456 Activities of metal    -
20. 8.4562 Reinforcement of concrete steel    -
a) Supply, cutting, tailoring and assembly GA
kg. 10,328.00 -
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
kg. 1,001.00 -
240/360 F >12 mm
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.1+420.00-left carriageway
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
c) Supply, cutting, tailoring and assembly RА
kg. 88,560.00 -
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
kg. ### -
400/500-2 F > 12 mm
21. 8.4564 Steel elements of rolled profiles and sheet metal kg. 5,300.00 -
22. 8.4567 Reinforcement for pre-stressing    -
Ropes and wires for overtensing anchors, the safety
23. 8.45671 pipes assembly and overtensing sO2 / sv = 1670 /    -
1860
a) For cables kg. 22,317.96 -
b) Anchors Nr. 96 -
c) Pipes m1 1,705.00 -
     
TOTAL CONCRETE AND REINFORCED
   -
CONCRETE WORKS :
3. Other works   
Dilatational devices of roadway surfaces of the
24. 8.45681 m1 23.20 -
building type T-80
Dilatational devices of fence NEW JERSEY type
25. 8.45682 m1 8.00 -
RHEINSTHAL
26. 8.4569 Drainpipes of cast iron with water outlet Nr. 6 -
with respect to detail L = 100 m m1 100.00 -
a) Supply and building landmarks for oscultation Nr. 14 -
Finishing works of the superstructure of the
27. 8.458    -
object
28. 8.4582 Hydroinsulation of objects    -
29. 8.45822Hydroinsulation of ready insulation tapes, strips m2 1,173.50 -
30. 8.4583 Protection of concrete areas under ground m2 2,500.00 -
31. 8.4584 Roadway of the objects d = 6 cm m2 1,173.50 -
32. 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 24 -
33.8.458.10Elements for dilatation    -
a) with permanent elastic kit m1 125.00 -
34.8.458.11Testing of ready object Nr. 1 -
Production and the construction of slab with year of
35.8.458.13 Nr. 1 -
construction and category of the object.

TOTAL OTHER WORKS :    -

SUMMARY   

TOTAL EARTHEN WORKS :    -

TOTAL CONCRETE AND REINFORCED


   -
CONCRETE WORKS :

TOTAL OTHER WORKS :    -

TOTAL EUR :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.1+420.00-right carriageway

Unit Total price


No. Type of work Unit Quantity
price (€) (€)
1 2 3 4 5 6
1. 8.4. Structures with an opening larger then 5,0 m 1

4. 8.452 1. Ground works   


Wide excavation for foundations in dry with spreading
5. 8.4521   
out storage and transport
a) for a depth of 0-2 m1 m3 500.00 -

a1) addition for rock m3 500.00 -

b) for a depth of 2–4 m m3 400.00 -

b1) addition for rock m3 400.00 -

c) for a depth of 4–6 m m3 400.00 -

c1) addition for rock m3 400.00 -

d) for a depth of 6-8 and beyond m3 400.00 -

d1) addition for rock m3 400.00 -


Digging in of foundation of pillars in layers of 30 cm
6. 8.4528 m3 1,200.00 -
with compacting
-

TOTAL EARTHEN WORKS :    -

     

7. 8.455 2. Concrete and reinforced   

concrete works   
Concrete fill-in without formwork MB > 15 (foundation
8. 8.45543 m3 10.23 -
for reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
9. 8.45561 m3 145.65 -
beams and slab-like foundations MB30
10. 8.455464Reinforced concrete pillars    -

a)Centre pillars МВ 30 m – 100 m3 226.92 -

11. 8.455465Upper part of end and middle columns    -

a) Laid joist for centre columns MB 30 M – 100 m3 103.00 -


Parapet beam and fences ”New Jersey” elements with
12. 8.455468    -
surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
m3 64.76 -
protection, paint МB 45 М–100
13.8.4554610
Assembly of main beam at the objects    -
a) with weight until 100 t. Nr. 12 -
Pre-stressed and reinforced concrete elements of the
14. 8.455481    -
object
a) Assembled pre-stressed girder MB 45 М–100 m3 352.20 -
Cross girders at objects of pre-stressed and
15. 8.455482    -
reinforced concrete
a) of reinforced concrete MB 45 М–100 m3 50.00 -

16. 8.455483Lane slab at the objects    -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.1+420.00-right carriageway

Unit Total price


No. Type of work Unit Quantity
price (€) (€)
a) MB 45 M-100 d = 8+15=22 cm m3 258.17 -

b) Transition slab MB 30 M-100 d=30 cm m3 25.20 -

17. 8.455487Injection of cables m1 1,705.00 -

18. 8.4556 Protection of the slopes of the embankment with    -

a) Production of concrete canals MB 30 М–100 m1 15.00 -

19. 8.456 Activities of metal    -

20. 8.4562 Reinforcement of concrete steel    -


a) Supply, cutting, tailoring and assembly GA 240/360
kg. 10,328.00 -
F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA 240/360
kg. 1,001.00 -
F >12 mm
c) Supply, cutting, tailoring and assembly RА
kg. 73,532.00 -
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
kg. ### -
400/500-2 F > 12 mm
21. 8.4564 Steel elements of rolled profiles and sheet metal kg. 5,300.00 -

22. 8.4567 Reinforcement for pre-stressing    -


Ropes and wires for overtensing anchors, the safety
23. 8.45671    -
pipes assembly and overtensing sO2 / sv = 1670 / 1860
a) For cables kg. 22,317.96 -

b) Anchors Nr. 96 -

c) Pipes m1 1,705.00 -

     
TOTAL CONCRETE AND REINFORCED
   -
CONCRETE WORKS :
3. Other works   
Dilatational devices of roadway surfaces of the
24. 8.45681 m1 23.20 -
building type T-80
Dilatational devices of fence NEW JERSEY type
25. 8.45682 m1 8.00 -
RHEINSTHAL
26. 8.4569 Drainpipes of cast iron with water outlet Nr. 6 -

with respect to detail L = 100 m m1 100.00 -

a) Supply and building landmarks for oscultation Nr. 14 -


Finishing works of the superstructure of the
27. 8.458    -
object
28. 8.4582 Hydroinsulation of objects    -

29. 8.45822Hydroinsulation of ready insulation tapes, strips m2 1,173.50 -

30. 8.4583 Protection of concrete areas under ground m2 500.00 -

31. 8.4584 Roadway of the objects d = 6 cm m2 1,173.50 -

32. 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 24 -


33. 8.458.10Elements for dilatation    -

a) with permanent elastic kit m1 125.00 -

34. 8.458.11Testing of ready object Nr. 1 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.1+420.00-right carriageway

Unit Total price


No. Type of work Unit Quantity
price (€) (€)
Production and the construction of slab with year of
35. 8.458.13 Nr. 1 -
construction and category of the object.
TOTAL OTHER WORKS :    -

SUMMARY   

TOTAL EARTHEN WORKS :    -

TOTAL CONCRETE AND REINFORCED


   -
CONCRETE WORKS :

TOTAL OTHER WORKS :    -

TOTAL EUR :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.4+011.00-left carriageway

Unit Total
No. Type of work Unit Quantity
price (€) price (€)
1 2 3 4 5 6
1. 8.4. Structures with an opening larger then 5,0 m 1

4. 8.452 1. Ground works   


Wide excavation for foundations in dry with spreading out
5. 8.4521   
storage and transport С1 and С6
a) for a depth of 0-2 m1 m3 1,462.50 -
a1) addition for rock m3 1,462.50 -

b) for a depth of 2–4 m m3 877.50 -

b1) addition for rock m3 877.50 -

c) for a depth of 4–6 m m3 58.50 -

c1) addition for rock m3 58.50 -


Digging in of foundation of pillars in layers of 30 cm with
6. 8.4528 m3 1,800.00 -
compacting
-

TOTAL EARTHEN WORKS :    -

     

7. 8.455 2. Concrete and reinforced   

concrete works   
Concrete fill-in without formwork MB > 15 (foundation for
8. 8.45543 m3 49.34 -
reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra beams
9. 8.45561 m3 709.17 -
and slab-like foundations MB30
10. 8.455464Reinforced concrete pillars    -

a)End pillars with ring beam and wings MB 30 M – 100 m3 634.40 -

b)Centre pillars МВ 30 m – 100 m3 338.80 -

11. 8.455465Upper part of end and middle columns    -


a) Parapet and console wings for end columns MB 30 M –
m3 53.00 -
100
b) Laid joist for centre columns MB 30 M – 100 m3 103.00 -
Parapet beam and fences ”New Jersey” elements with
12. 8.455468    -
surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
m3 64.76 -
protection, paint МB 45 М–100
13.8.4554610Assembly of main beam at the objects    -

a) with weight until 100 t. Nr. 12.00 -

14. 8.455481Pre-stressed and reinforced concrete elements of the object    -

a) Assembled pre-stressed girder MB 45 М–100 m3 352.20 -


Cross girders at objects of pre-stressed and reinforced
15. 8.455482    -
concrete
a) of reinforced concrete MB 45 М–100 m3 50.00 -

16. 8.455483Lane slab at the objects    -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.4+011.00-left carriageway

Unit Total
No. Type of work Unit Quantity
price (€) price (€)

a) MB 45 M-100 d = 8+15=22 cm m3 258.17 -

b) Transition slab MB 30 M-100 d=30 cm m3 25.20 -

17. 8.455487Injection of cables m1 1,705.00 -

18. 8.4556 Protection of the slopes of the embankment with    -

a) Production of concrete canals MB 30 М–100 m1 - -

19. 8.456 Activities of metal    -

20. 8.4562 Reinforcement of concrete steel    -


a) Supply, cutting, tailoring and assembly GA 240/360 F ≤
kg. 10,328.00 -
12 mm
b) Supply, cutting, tailoring and assembly GA 240/360 F
kg. 1,001.00 -
>12 mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤
kg. 90,395.00 -
12 mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F
kg. ### -
> 12 mm
21. 8.4564 Steel elements of rolled profiles and sheet metal kg. 5,300.00 -

22. 8.4567 Reinforcement for pre-stressing    -


Ropes and wires for overtensing anchors, the safety pipes
23. 8.45671    -
assembly and overtensing sO2 / sv = 1670 / 1860
a) For cables kg. 22,317.96 -
b) Anchors Nr. 96 -

c) Pipes m1 1,705.00 -

     
TOTAL CONCRETE AND REINFORCED CONCRETE
   -
WORKS :
3. Other works   
Dilatational devices of roadway surfaces of the building type
24. 8.45681 m1 23.20 -
T-80
Dilatational devices of fence NEW JERSEY type
25. 8.45682 m1 8.00 -
RHEINSTHAL
26. 8.4569 Drainpipes of cast iron with water outlet Nr. 6 -

with respect to detail L = 100 m m1 100.00 -

a) Supply and building landmarks for oscultation Nr. 14 -

27. 8.458 Finishing works of the superstructure of the object    -

28. 8.4582 Hydroinsulation of objects    -

29. 8.45822 Hydroinsulation of ready insulation tapes, strips m2 1,173.50 -

30. 8.4583 Protection of concrete areas under ground m2 2,386.50 -

31. 8.4584 Roadway of the objects d = 6 cm m2 1,173.50 -

32. 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 24 -

33. 8.458.10Elements for dilatation    -

a) with permanent elastic kit m1 125.00 -

34. 8.458.11Testing of ready object Nr. 1 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.4+011.00-left carriageway

Unit Total
No. Type of work Unit Quantity
price (€) price (€)
Production and the construction of slab with year of
35. 8.458.13 Nr. 1 -
construction and category of the object.
TOTAL OTHER WORKS :    -

SUMMARY   

TOTAL EARTHEN WORKS :    -


TOTAL CONCRETE AND REINFORCED CONCRETE
   -
WORKS :
TOTAL OTHER WORKS :    -

TOTAL EUR :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.4+011.00-right carriageway
Unit price
No. Type of work/ Вид на работа Unit Quantity Total price (€)
(€)
1 2 3 4 5 6
1. 8.4.
Structures with an opening larger then/
Објекти со отвор поголем од 5,0 m1

4. 8.452 1. Ground works/ Земјени работи   

5. 8.4521 Wide excavation for foundations in dry with   


spreading out storage and transport/ Широк
ископ за темели во суво со распростирање,
складирање и транспорт

a) for a depth of/ за длабочина од 0-2 m1 m3 300.00 -

a1) addition for rock/ додаток за карпа m3 300.00 -

b) for a depth of/ за длабочина од 2–4 m m3 180.00 -

b1) addition for rock/ додаток за карпа m3 180.00 -

c) for a depth of/ за длабочина од 4–6 m m3 120.00 -

c1) addition for rock/ додаток за карпа m3 120.00 -

6. 8.4528 Digging in of foundation of pillars in layers of m3 400.00 -


30 cm with compacting/ Насипување на
темели од столбови во слоеви од 30 cm со
набивање
-

TOTAL EARTHEN WORKS/ ВКУПНО    -


ЗЕМЈЕНИ РАБОТИ:
     

7. 8.455 2. Concrete and reinforced/ Бетон и   


арматура
concrete works/ бетонски работи   

8. 8.45543 Concrete fill-in without formwork MB > 15 m3 14.00 -


(foundation for reinforced concrete
foundations)/ мршав бетон без оплата MB >
15 (подлога за армирано бетонски темели)

9. 8.45561 Reinforced concrete foundation cobblestone, m3 129.30 -


contra beams and slab-like foundations MB30/
Армирано бетонски темели самци, контра
греди и плочасти темели МБ30

10. 8.455464 Reinforced concrete pillars/ Армирано    -


бетонски столбови
a)Centre pillars/ Централни столбови МВ 30 m3 238.20 -
m – 100
11. 8.455465 Upper part of end and middle columns/ Горен    -
дел од крајни и средни столбови
a) Laid joist for centre columns/ Належни m3 103.00 -
греди за централни столбови MB 30 M –
100
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.4+011.00-right carriageway
Unit price
No. Type of work/ Вид на работа Unit Quantity Total price (€)
(€)
12. 8.455468 Parapet beam and fences ”New Jersey”    -
elements with surface. protection and facade
elements./ Парапетни греди и огради ”New
Jersey” елементи со површина, заштита и
фасадни елменти.
a) ”New Jersey” fence production and m3 64.76 -
assembly with protection, paint МB 45 М–100/
Изведба и монтирање на ограда ”New
Jersey” со заштита, боја МB 45 М–100

13. 8.4554610Assembly of main beam at the objects/    -


Монтажа на главната греда на објект.
a) with weight until 100 t./ со тежина до 100 Nr. 12.00 -
тони
14. 8.455481 Pre-stressed and reinforced concrete elements    -
of the object/ Преднапрегнати и
армиранобетонски елементи од објектот
a) Assembled pre-stressed girder MB 45 М– m3 352.20 -
100/ Монтажен преднапрегнат носач MB 45
15. 8.455482 М-100
Cross girders at objects of pre-stressed and    -
reinforced concrete / Попречни носачи на
објекти од преднапрегнат и армиран бетон
a) of reinforced concrete MB 45 М–100/ од m3 50.00 -
армиран бетон MB 45 М-100
16. 8.455483 Lane slab at the objects / Коловозна плоча на    -
објектите
a) MB 45 M-100 d = 8+15=22 cm m3 258.17 -

b) Transition slab Преодна плоча MB 30 M- m3 25.20 -


100 d=30 cm
17. 8.455487 Injection of cables / Инјектирање на кабли m1 1,705.00 -

18. 8.4556 Protection of the slopes of the embankment    -


with/ Заштита на косините на насипот со

a) Production of concrete canals MB 30 М– m1 - -


100/ Изработка на бетонски канали MB 30
19. 8.456 M-100 of metal/ Активности од метал
Activities    -

20. 8.4562 Reinforcement of concrete steel/ Арматура од    -


бетонски челик

a) Supply, cutting, tailoring and assembly/ kg. 10,328.00 -


Набавка, сечење, кроење и монтажа GA
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly / kg. 1,001.00 -
Набавка, сечење, кроење и монтажа GA
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly/ kg. 73,459.00 -
Набавка, сечење, кроење и монтажа RА
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly/ kg. ### -
Набавка, сечење, кроење и монтажа RА
400/500-2 F > 12 mm
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.4+011.00-right carriageway
Unit price
No. Type of work/ Вид на работа Unit Quantity Total price (€)
(€)
21. 8.4564 Steel elements of rolled profiles and sheet kg. 5,300.00 -
metal/ Челични елементи од заоблени
профили и валан метал

22. 8.4567 Reinforcement for pre-stressing/ Арматура за    -


пренапрегање
23. 8.45671 Ropes and wires for overtensing anchors, the    -
safety pipes assembly and overtensing/
Јажиња и жици за котви за напрегање, sO2 /
sv = 1670 / 1860
a) For cables / За кабли kg. 22,317.96 -

b) Anchors / Анкери Nr. 96 -

c) Pipes / Цевки m1 1,705.00 -

     

TOTAL CONCRETE AND REINFORCED    -


CONCRETE WORKS: ВКУПНО БЕТОНСКИ
И А.Б. РАБОТИ:

3. Other works/ Други работи   

24. 8.45681 Dilatational devices of roadway surfaces of the m1 23.20 -


building type T-80/ Дилатациони направи на
патните површини од градежен тип Т-80

25. 8.45682 Dilatational devices of fence NEW JERSEY m1 8.00 -


type RHEINSTHAL/ Дилатациони направи од
огради NEW JERSEY тип RHEINSTHAL

26. 8.4569 Drainpipes of cast iron with water outlet/ Nr. 6 -


Одводни цевки од лиено железо со испуст
на водата
with respect to detail/ према дадениот детал m1 100.00 -
L = 100 m
a) Supply and building landmarks for Nr. 14 -
oscultation/ Набавка и изведба на маркери
27. 8.458 за оскултација
Finishing works of the superstructure of    -
the object/ Завршни работи на горната
структура на објектот
28. 8.4582 Hydroinsulation of objects/ Хидроизолација    -
на објектите

29. 8.45822 Hydroinsulation of ready insulation tapes, m2 1,173.50 -


strips/ Хидроизолација од готови
изолациони траки, ленти

30. 8.4583 Protection of concrete areas under ground/ m2 500.00 -


Заштита на бетонски површини под земја

31. 8.4584 Roadway of the objects /Колосек на објектите m2 1,173.50 -


d = 6 cm

32. 8.4589 Elastomer bearings with dimensions/ Nr. 24 -


Еластомерни лежишта со
димензии :300/400/85
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.4+011.00-right carriageway
Unit price
No. Type of work/ Вид на работа Unit Quantity Total price (€)
(€)
33. 8.458.10 Elements for dilatation/ Елементи за    -
дилатација
a) with permanent elastic kit/ со траен m1 125.00 -
еластичен кит
34. 8.458.11 Testing of ready object/ Тестирање на готов Nr. 1 -
објект
35. 8.458.13 Production and the construction of slab with Nr. 1 -
year of construction and category of the
object./ Изведба и конструкција на плоча по
година од констрирањето и категоризација
на објектот.
TOTAL OTHER WORKS :    -

SUMMARY   
TOTAL EARTHEN WORKS :
   -
TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS :    -
TOTAL OTHER WORKS :
   -

TOTAL EUR :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.5+784.00-left carriageway
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
1. 8.4.
Structures with an opening larger then 5,0 m1

4. 8.452 1. Ground works   

5. 8.4521 Wide excavation for foundations in dry with   


spreading out storage and transport С1 and С6
a) for a depth of 0-2 m1 m3 1,342.00 -

a1) addition for rock m3 1,342.00 -

b) for a depth of 2–4 m m3 939.40 -

b1) addition for rock m3 939.40 -

c) for a depth of 4–6 m m3 402.60 -

c1) addition for rock m3 402.60 -


6. 8.4528 Digging in of foundation of pillars in layers of 30 cm m3 1,500.00 -
with compacting
-

TOTAL EARTHEN WORKS :    -

     

7. 8.455 2. Concrete and reinforced   

concrete works   

8. 8.45543 Concrete fill-in without formwork MB > 15 m3 58.80 -


(foundation for reinforced concrete foundations).
9. 8.45561 Reinforced concrete foundation cobblestone, m3 897.98 -
contra beams and slab-like foundations MB30
10. 8.455464 Reinforced concrete pillars    -

a)End pillars with ring beam and wings MB 30 M – m3 814.72 -


100
b)Centre pillars МВ 30 m – 100 m3 391.80 -

11. 8.455465 Upper part of end and middle columns    -

a) Parapet and console wings for end columns MB m3 53.00 -


30 M – 100
b) Laid joist for centre columns MB 30 M – 100 m3 103.00 -

12. 8.455468 Parapet beam and fences ”New Jersey” elements    -


with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly m3 64.76 -
with protection, paint МB 45 М–100
13.8.4554610Assembly of main beam at the objects    -

a) with weight until 100 t. Nr. 12.00 -

14. 8.455481 Pre-stressed and reinforced concrete elements of    -


the object
a) Assembled pre-stressed girder MB 45 М–100 m3 352.20 -

15. 8.455482 Cross girders at objects of pre-stressed and    -


reinforced concrete
a) of reinforced concrete MB 45 М–100 m3 50.00 -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.5+784.00-left carriageway
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
16. 8.455483 Lane slab at the objects    -
a) MB 45 M-100 d = 8+15=22 cm m3 258.17 -

b) Transition slab MB 30 M-100 d=30 cm m3 25.20 -

17. 8.455487 Injection of cables m1 1,705.00 -

18. 8.4556 Protection of the slopes of the embankment with    -

a) Production of concrete canals MB 30 М–100 m1 15 -

19. 8.456 Activities of metal    -

20. 8.4562 Reinforcement of concrete steel    -

a) Supply, cutting, tailoring and assembly GA kg. 10,328.00 -


240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA kg. 1,001.00 -
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА kg. 91,751.00 -
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА kg. ### -
400/500-2 F > 12 mm
21. 8.4564 Steel elements of rolled profiles and sheet metal kg. 5,300.00 -

22. 8.4567 Reinforcement for pre-stressing    -

23. 8.45671 Ropes and wires for overtensing anchors, the    -


safety pipes assembly and overtensing sO2 / sv =
1670 / 1860
a) For cables kg. 22,317.96 -

b) Anchors Nr. 96 -

c) Pipes m1 1,705.00 -

     

TOTAL CONCRETE AND REINFORCED    -


CONCRETE WORKS :
3. Other works   

24. 8.45681 Dilatational devices of roadway surfaces of the m1 23.20 -


building type T-80
25. 8.45682 Dilatational devices of fence NEW JERSEY type m1 8.00 -
RHEINSTHAL
26. 8.4569 Drainpipes of cast iron with water outlet Nr. 6 -

with respect to detail L = 100 m m1 100.00 -

a) Supply and building landmarks for oscultation Nr. 14 -

27. 8.458Finishing works of the superstructure of the    -


object
28. 8.4582 Hydroinsulation of objects    -

29. 8.45822 Hydroinsulation of ready insulation tapes, strips m2 1,173.50 -

30. 8.4583 Protection of concrete areas under ground m2 3,178.05 -

31. 8.4584 Roadway of the objects d = 6 cm m2 1,173.50 -

32. 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 24 -

33. 8.458.10 Elements for dilatation    -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.5+784.00-left carriageway
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
a) with permanent elastic kit m1 125.00 -
34. 8.458.11 Testing of ready object Nr. 1 -

35. 8.458.13 Production and the construction of slab with year of Nr. 1 -
construction and category of the object.
TOTAL OTHER WORKS :    -

SUMMARY   
TOTAL EARTHEN WORKS :
   -
TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS :    -
TOTAL OTHER WORKS :
   -

TOTAL EUR :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.5+784.00-right carriageway
Unit price Total
No. Type of work Unit Quantity
(€) price (€)
1 2 3 4 5 6
1. 8.4.
Structures with an opening larger then 5,0 m1

4. 8.452 1. Ground works   

5. 8.4521 Wide excavation for foundations in dry with spreading out   


storage and transport
a) for a depth of 0-2 m1 m3 440.00 -

a1) addition for rock m3 440.00 -

b) for a depth of 2–4 m m3 280.00 -

b1) addition for rock m3 280.00 -

c) for a depth of 4–6 m m3 80.00 -

c1) addition for rock m3 80.00 -

6. 8.4528 Digging in of foundation of pillars in layers of 30 cm with m3 510.50 -


compacting
-

TOTAL EARTHEN WORKS :    -

     

7. 8.455 2. Concrete and reinforced   

concrete works   

8. 8.45543 Concrete fill-in without formwork MB > 15 (foundation for m3 9.60 -


reinforced concrete foundations).
9. 8.45561 Reinforced concrete foundation cobblestone, contra m3 143.36 -
beams and slab-like foundations MB30
10. 8.455464Reinforced concrete pillars    -

a)Centre pillars МВ 30 m – 100 m3 308.00 -

11. 8.455465Upper part of end and middle columns    -

a) Laid joist for centre columns MB 30 M – 100 m3 103.00 -

12. 8.455468Parapet beam and fences ”New Jersey” elements with    -


surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with m3 64.76 -
protection, paint МB 45 М–100
13.8.4554610Assembly of main beam at the objects    -

a) with weight until 100 t. Nr. 12.00 -

14. 8.455481Pre-stressed and reinforced concrete elements of the    -


object
a) Assembled pre-stressed girder MB 45 М–100 m3 352.20 -

15. 8.455482Cross girders at objects of pre-stressed and reinforced    -


concrete
a) of reinforced concrete MB 45 М–100 m3 50.00 -

16. 8.455483Lane slab at the objects    -

a) MB 45 M-100 d = 8+15=22 cm m3 258.17 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.5+784.00-right carriageway
Unit price Total
No. Type of work Unit Quantity
(€) price (€)
b) Transition slab MB 30 M-100 d=30 cm m3 25.20 -

17. 8.455487Injection of cables m1 1,705.00 -

18. 8.4556 Protection of the slopes of the embankment with    -

a) Production of concrete canals MB 30 М–100 m1 - -

19. 8.456 Activities of metal    -

20. 8.4562 Reinforcement of concrete steel    -

a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ kg. 10,328.00 -


12 mm
b) Supply, cutting, tailoring and assembly GA 240/360 F kg. 1,001.00 -
>12 mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f kg. 73,589.00 -
≤ 12 mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F kg. ### -
> 12 mm
21. 8.4564 Steel elements of rolled profiles and sheet metal kg. 5,300.00 -

22. 8.4567 Reinforcement for pre-stressing    -

23. 8.45671 Ropes and wires for overtensing anchors, the safety pipes    -
assembly and overtensing sO2 / sv = 1670 / 1860
a) For cables kg. 22,317.96 -

b) Anchors Nr. 96.00 -

c) Pipes m1 1,705.00 -

     

TOTAL CONCRETE AND REINFORCED CONCRETE    -


WORKS :
3. Other works   

24. 8.45681 Dilatational devices of roadway surfaces of the building m1 23.20 -


type T-80
25. 8.45682 Dilatational devices of fence NEW JERSEY type m1 8.00 -
RHEINSTHAL
26. 8.4569 Drainpipes of cast iron with water outlet Nr. 6 -

with respect to detail L = 100 m m1 100.00 -

a) Supply and building landmarks for oscultation Nr. 14 -

27. 8.458 Finishing works of the superstructure of the object    -

28. 8.4582 Hydroinsulation of objects    -

29. 8.45822 Hydroinsulation of ready insulation tapes, strips m2 1,173.50 -

30. 8.4583 Protection of concrete areas under ground m2 402.30 -

31. 8.4584 Roadway of the objects d = 6 cm m2 1,173.50 -

32. 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 24 -

33. 8.458.10 Elements for dilatation    -

a) with permanent elastic kit m1 125.00 -

34. 8.458.11 Testing of ready object Nr. 1 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.5+784.00-right carriageway
Unit price Total
No. Type of work Unit Quantity
(€) price (€)
35. 8.458.13 Production and the construction of slab with year of Nr. 1 -
construction and category of the object.
TOTAL OTHER WORKS :    -

SUMMARY   
TOTAL EARTHEN WORKS :
   -
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :    -
TOTAL OTHER WORKS :
   -

TOTAL EUR :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.2+681.35-left carriageway
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
1. 8.4.
Structures with an opening larger then 5,0 m1

4. 8.452 1. Ground works   

5. 8.4521 Wide excavation for foundations in dry with spreading out   


storage and transport С1 and С6
a) for a depth of 0-2 m1 m3 1,300.00 -

a1) addition for rock m3 1,300.00 -

b) for a depth of 2–4 m m3 1,200.00 -

b1) addition for rock m3 1,200.00 -

c) for a depth of 4–6 m m3 1,150.00 -

c1) addition for rock m3 1,150.00 -

d) for a depth of 6-8 and beyond m3 1,100.00 -

d1) addition for rock m3 1,100.00 -

6. 8.4528 Digging in of foundation of pillars in layers of 30 cm with m3 1,743.00 -


compacting
-

TOTAL EARTHEN WORKS :    -

     

7. 8.455 2. Concrete and reinforced   

concrete works   

8. 8.45543 Concrete fill-in without formwork MB > 15 (foundation for m3 28.40 -


reinforced concrete foundations).
9. 8.45561 Reinforced concrete foundation cobblestone, contra beams and m3 246.60 -
slab-like foundations MB30
10.8.455464Reinforced concrete pillars    -

a)End pillars with ring beam and wings MB 30 M – 100 m3 128.22 -

b)Centre pillars МВ 30 m – 100 m3 - -

11.8.455465Upper part of end and middle columns    -

a) Parapet and console wings for end columns MB 30 M – 100 m3 9.70 -

b) Laid joist for centre columns MB 30 M – 100 m3 - -

12.8.455468Parapet beam and fences ”New Jersey” elements with surface.    -


protection and facade elements.
a) ”New Jersey” fence production and assembly with protection, m3 11.54 -
paint МB 45 М–100
13.8.455481Pre-stressed and reinforced concrete elements of the object    -

a) Assembled reinforced concrete slab-like girder MB 30 М–100 m3 43.89 -

14.8.455483Lane slab at the objects    -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.2+681.35-left carriageway
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
a) MB 45 M-100 d = 35 cm m3 46.55 -

b) Transition slab MB 30 M-100 d=30 cm m3 25.32 -

15. 8.456 Activities of metal    -

16. 8.4562 Reinforcement of concrete steel    -

a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ 12 kg. - -


mm
b) Supply, cutting, tailoring and assembly GA 240/360 F >12 kg. - -
mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤ 12 kg. ### -
mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F > 12 kg. ### -
mm
17. 8.4564 Steel elements of rolled profiles and sheet metal kg. 602.00 -

     

TOTAL CONCRETE AND REINFORCED CONCRETE    -


WORKS :
3. Other works   

18. 8.45682 Dilatational devices of fence NEW JERSEY type RHEINSTHAL m1 8.00 -

19. 8.456.13Bitumenised stripes and tiles as bearings at object with a span m2 9.50 -
up to L = 10.0 m
20. 8.458 Finishing works of the superstructure of the object    -

21. 8.4582 Hydroinsulation of objects    -


22. 8.45822 Hydroinsulation of ready insulation tapes, strips m2 133.00 -

23. 8.4583 Protection of concrete areas under ground m2 1,582.00 -

24. 8.4584 Roadway of the objects d = 6 cm m2 133.00 -

25. 8.458.10Elements for dilatation    -

a) with permanent elastic kit m1 8.00 -

26. 8.458.11Testing of ready object Nr. - -

27. 8.458.13Production and the construction of slab with year of Nr. - -


construction and category of the object.
TOTAL OTHER WORKS :    -

SUMMARY   
TOTAL EARTHEN WORKS :
   -
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :    -
TOTAL OTHER WORKS :
   -

TOTAL EUR :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.2+681.35-right carriageway
Unit price Total
No. Type of work Unit Quantity
(€) price (€)
1 2 3 4 5 6
1. 8.4.
Structures with an opening larger then 5,0 m1

4. 8.452 1. Ground works   

5. 8.4521 Wide excavation for foundations in dry with spreading out   


storage and transport
a) for a depth of 0-2 m1 m3 - -

a1) addition for rock m3 - -

b) for a depth of 2–4 m m3 - -

b1) addition for rock m3 - -

c) for a depth of 4–6 m m3 - -

c1) addition for rock m3 - -

6. 8.4528 Digging in of foundation of pillars in layers of 30 cm with m3 - -


compacting
-

TOTAL EARTHEN WORKS :    -

     

7. 8.455 2. Concrete and reinforced   

concrete works   

8. 8.45543 Concrete fill-in without formwork MB > 15 (foundation for m3 - -


reinforced concrete foundations).
9. 8.45561 Reinforced concrete foundation cobblestone, contra beams m3 - -
and slab-like foundations MB30
10. 8.455464Reinforced concrete pillars    -

a)Centre pillars МВ 30 m – 100 m3 - -

11. 8.455465Upper part of end and middle columns    -

a) Laid joist for centre columns MB 30 M – 100 m3 - -

12. 8.455468Parapet beam and fences ”New Jersey” elements with    -


surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with m3 11.54 -
protection, paint МB 45 М–100
13. 8.455481Pre-stressed and reinforced concrete elements of the object    -

a) Assembled reinforced concrete slab-like girder MB 30 М– m3 43.89 -


100
14. 8.455483Lane slab at the objects    -

a) MB 45 M-100 d = 35 cm m3 46.55 -

b) Transition slab MB 30 M-100 d=30 cm m3 25.32 -

15. 8.456 Activities of metal    -

16. 8.4562 Reinforcement of concrete steel    -

a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ 12 kg. - -


mm
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.2+681.35-right carriageway
Unit price Total
No. Type of work Unit Quantity
(€) price (€)
b) Supply, cutting, tailoring and assembly GA 240/360 F >12 kg. - -
mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤ kg. 8,955.00 -
12 mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F > kg. 9,554.00 -
12 mm
17. 8.4564 Steel elements of rolled profiles and sheet metal kg. 602.00 -

     

TOTAL CONCRETE AND REINFORCED CONCRETE    -


WORKS :
3. Other works   

18. 8.45682 Dilatational devices of fence NEW JERSEY type m1 8.00 -


RHEINSTHAL
19. 8.456.13Bitumenised stripes and tiles as bearings at object with a m2 9.50 -
span up to L = 10.0 m
20. 8.458 Finishing works of the superstructure of the object    -

21. 8.4582 Hydroinsulation of objects    -

22. 8.45822 Hydroinsulation of ready insulation tapes, strips m2 133.00 -

23. 8.4583 Protection of concrete areas under ground m2 - -

24. 8.4584 Roadway of the objects d = 6 cm m2 133.00 -

25. 8.458.10Elements for dilatation    -

a) with permanent elastic kit m1 8.00 -

26. 8.458.11Testing of ready object Nr. - -

27. 8.458.13Production and the construction of slab with year of Nr. - -


construction and category of the object.
TOTAL OTHER WORKS :    -

SUMMARY   
TOTAL EARTHEN WORKS :
   -
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :    -
TOTAL OTHER WORKS :
   -

TOTAL EUR :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.8+200.00-left carriageway
Unit Total
No. Type of work Unit Quantity
price (€) price (€)
1 2 3 4 5 6
1. 8.4.
Structures with an opening larger then 5,0 m1

4. 8.452 1. Ground works   

5. 8.4521 Wide excavation for foundations in dry with spreading out   


storage and transport С1 and С6
a) for a depth of 0-2 m1 m3 2,117.70 -

a1) addition for rock m3 2,117.70 -

b) for a depth of 2–4 m m3 1,647.10 -

b1) addition for rock m3 1,647.10 -

c) for a depth of 4–6 m m3 941.20 -

c1) addition for rock m3 941.20 -

6. 8.4528 Digging in of foundation of pillars in layers of 30 cm with m3 3,054.00 -


compacting
-

TOTAL EARTHEN WORKS :    -

     

7. 8.455 2. Concrete and reinforced   

concrete works   

8. 8.45543 Concrete fill-in without formwork MB > 15 (foundation for m3 58.80 -


reinforced concrete foundations).
9. 8.45561 Reinforced concrete foundation cobblestone, contra beams m3 847.56 -
and slab-like foundations MB30
10. 8.455464Reinforced concrete pillars    -

a)End pillars with ring beam and wings MB 30 M – 100 m3 792.94 -

b)Centre pillars МВ 30 m – 100 m3 290.60 -

11. 8.455465Upper part of end and middle columns    -

a) Parapet and console wings for end columns MB 30 M – m3 53.00 -


100
b) Laid joist for centre columns MB 30 M – 100 m3 103.00 -

12. 8.455468Parapet beam and fences ”New Jersey” elements with    -


surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with m3 67.72 -
protection, paint МB 45 М–100
13.8.4554610Assembly of main beam at the objects    -

a) with weight until 100 t. Nr. 12.00 -

14. 8.455481Pre-stressed and reinforced concrete elements of the object    -

a) Assembled pre-stressed girder MB 45 М–100 m3 352.20 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.8+200.00-left carriageway
Unit Total
No. Type of work Unit Quantity
price (€) price (€)
15. 8.455482Cross girders at objects of pre-stressed and reinforced    -
concrete
a) of reinforced concrete MB 45 М–100 m3 50.00 -

16. 8.455483Lane slab at the objects    -

a) MB 45 M-100 d = 8+15=22 cm m3 258.17 -

b) Transition slab MB 30 M-100 d=30 cm m3 25.20 -

17. 8.455487Injection of cables m1 1,705.00 -

18. 8.4556 Protection of the slopes of the embankment with    -

a) Production of concrete canals MB 30 М–100 m1 30.00 -

19. 8.456 Activities of metal    -

20. 8.4562 Reinforcement of concrete steel    -

a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ 12 kg. 10,184.00 -


mm
b) Supply, cutting, tailoring and assembly GA 240/360 F >12 kg. 1,001.00 -
mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤ kg. 84,591.00 -
12 mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F > kg. 181,976.00 -
12 mm
21. 8.4564 Steel elements of rolled profiles and sheet metal kg. 5,300.00 -

22. 8.4567 Reinforcement for pre-stressing    -

23. 8.45671 Ropes and wires for overtensing anchors, the safety pipes    -
assembly and overtensing sO2 / sv = 1670 / 1860
a) For cables kg. 22,317.96 -

b) Anchors Nr. 96 -

c) Pipes m1 1,705.00 -

     

TOTAL CONCRETE AND REINFORCED CONCRETE    -


WORKS :
3. Other works   

24. 8.45681 Dilatational devices of roadway surfaces of the building type m1 23.20 -
T-80
25. 8.45682 Dilatational devices of fence NEW JERSEY type m1 8.00 -
RHEINSTHAL
26. 8.4569 Drainpipes of cast iron with water outlet Nr. 6 -

with respect to detail L = 100 m m1 100.00 -

a) Supply and building landmarks for oscultation Nr. 14 -

27. 8.458 Finishing works of the superstructure of the object    -

28. 8.4582 Hydroinsulation of objects    -

29. 8.45822 Hydroinsulation of ready insulation tapes, strips m2 1,173.50 -

30. 8.4583 Protection of concrete areas under ground m2 2,990.00 -

31. 8.4584 Roadway of the objects d = 6 cm m2 1,173.50 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.8+200.00-left carriageway
Unit Total
No. Type of work Unit Quantity
price (€) price (€)
32. 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 24 -

33. 8.458.10 Elements for dilatation    -

a) with permanent elastic kit m1 125.00 -

34. 8.458.11 Testing of ready object Nr. 1 -

35. 8.458.13 Production and the construction of slab with year of Nr. 1 -
construction and category of the object.
TOTAL OTHER WORKS :    -

SUMMARY   
TOTAL EARTHEN WORKS :
   -
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :    -
TOTAL OTHER WORKS :
   -

TOTAL EUR :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.8+200.00-right carriageway
Unit Total
No. Type of work Unit Quantity
price (€) price (€)
1 2 3 4 5 6
1. 8.4.
Structures with an opening larger then 5,0 m1

4. 8.452 1. Ground works   

5. 8.4521 Wide excavation for foundations in dry with spreading out   


storage and transport
a) for a depth of 0-2 m1 m3 400.50 -

a1) addition for rock m3 400.50 -

b) for a depth of 2–4 m m3 311.50 -

b1) addition for rock m3 311.50 -

c) for a depth of 4–6 m m3 178.00 -

c1) addition for rock m3 178.00 -

6. 8.4528 Digging in of foundation of pillars in layers of 30 cm with m3 655.00 -


compacting
-

TOTAL EARTHEN WORKS :    -

     

7. 8.455 2. Concrete and reinforced   

concrete works   

8. 8.45543Concrete fill-in without formwork MB > 15 (foundation for m3 8.82 -


reinforced concrete foundations).
9. 8.45561Reinforced concrete foundation cobblestone, contra beams m3 125.76 -
and slab-like foundations MB30
10.8.455464Reinforced concrete pillars    -

a)Centre pillars МВ 30 m – 100 m3 150.00 -

11.8.455465Upper part of end and middle columns    -

a) Laid joist for centre columns MB 30 M – 100 m3 103.00 -

12.8.455468Parapet beam and fences ”New Jersey” elements with    -


surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with m3 61.12 -
protection, paint МB 45 М–100
13.8.4554610
Assembly of main beam at the objects    -

a) with weight until 100 t. Nr. 12.00 -

14.8.455481Pre-stressed and reinforced concrete elements of the object    -

a) Assembled pre-stressed girder MB 45 М–100 m3 352.20 -

15.8.455482Cross girders at objects of pre-stressed and reinforced    -


concrete
a) of reinforced concrete MB 45 М–100 m3 50.00 -

16.8.455483Lane slab at the objects    -

a) MB 45 M-100 d = 8+15=22 cm m3 269.27 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.8+200.00-right carriageway
Unit Total
No. Type of work Unit Quantity
price (€) price (€)
b) Transition slab MB 30 M-100 d=30 cm m3 25.20 -

17.8.455487Injection of cables m1 1,705.00 -

18. 8.4556 Protection of the slopes of the embankment with    -

a) Production of concrete canals MB 30 М–100 m1 - -

19. 8.456 Activities of metal    -


20. 8.4562 Reinforcement of concrete steel    -

a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ 12 kg. 10,328.00 -


mm
b) Supply, cutting, tailoring and assembly GA 240/360 F >12 kg. 1,001.00 -
mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤ kg. 74,244.00 -
12 mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F > kg. 85,345.00 -
12 mm
21. 8.4564 Steel elements of rolled profiles and sheet metal kg. 5,300.00 -

22. 8.4567 Reinforcement for pre-stressing    -

23. 8.45671Ropes and wires for overtensing anchors, the safety pipes    -
assembly and overtensing sO2 / sv = 1670 / 1860
a) For cables kg. 22,317.96 -

b) Anchors Nr. 96 -

c) Pipes m1 1,705.00 -

     

TOTAL CONCRETE AND REINFORCED CONCRETE    -


WORKS :
3. Other works   

24. 8.45681Dilatational devices of roadway surfaces of the building type m1 24.10 -


T-80
25. 8.45682Dilatational devices of fence NEW JERSEY type m1 8.00 -
RHEINSTHAL
26. 8.4569 Drainpipes of cast iron with water outlet Nr. 6 -

with respect to detail L = 100 m m1 100.00 -

a) Supply and building landmarks for oscultation Nr. 14 -

27. 8.458 Finishing works of the superstructure of the object    -

28. 8.4582 Hydroinsulation of objects    -

29. 8.45822Hydroinsulation of ready insulation tapes, strips m2 1,223.95 -

30. 8.4583 Protection of concrete areas under ground m2 498.00 -

31. 8.4584 Roadway of the objects d = 6 cm m2 1,223.95 -

32. 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 24 -

33. 8.458.10Elements for dilatation    -

a) with permanent elastic kit m1 125.00 -

34. 8.458.11Testing of ready object Nr. 1 -

35. 8.458.13Production and the construction of slab with year of Nr. 1 -


construction and category of the object.
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.8+200.00-right carriageway
Unit Total
No. Type of work Unit Quantity
price (€) price (€)
TOTAL OTHER WORKS :    -

SUMMARY   
TOTAL EARTHEN WORKS :
   -
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :    -
TOTAL OTHER WORKS :
   -

TOTAL EUR :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.8+360.00-left carriageway
Unit price Total
No. Type of work Unit Quantity
(€) price (€)
1 2 3 4 5 6
1. 8.4.
Structures with an opening larger then 5,0 m1

4. 8.452 1. Ground works   

5. 8.4521 Wide excavation for foundations in dry with spreading out   


storage and transport С1 and С6
a) for a depth of 0-2 m1 m3 1,382.00 -

a1) addition for rock m3 1,382.00 -

b) for a depth of 2–4 m m3 1,382.00 -

b1) addition for rock m3 1,382.00 -

c) for a depth of 4–6 m m3 1,382.00 -

c1) addition for rock m3 1,382.00 -

d) for a depth of 6-8 and beyond m3 1,382.00 -

d1) addition for rock m3 1,382.00 -

6. 8.4528 Digging in of foundation of pillars in layers of 30 cm with m3 3,900.00 -


compacting
-

TOTAL EARTHEN WORKS :    -

     

7. 8.455 2. Concrete and reinforced   

concrete works   

8. 8.45543 Concrete fill-in without formwork MB > 15 (foundation for m3 60.70 -


reinforced concrete foundations).
9. 8.45561 Reinforced concrete foundation cobblestone, contra beams m3 868.00 -
and slab-like foundations MB30
10. 8.455464Reinforced concrete pillars    -

a)End pillars with ring beam and wings MB 30 M – 100 m3 1,000.14 -

b)Centre pillars МВ 30 m – 100 m3 182.00 -

11. 8.455465Upper part of end and middle columns    -

a) Parapet and console wings for end columns MB 30 M – 100 m3 53.63 -


b) Laid joist for centre columns MB 30 M – 100 m3 52.00 -

12. 8.455468Parapet beam and fences ”New Jersey” elements with    -


surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with m3 43.37 -
protection, paint МB 45 М–100
13.8.4554610Assembly of main beam at the objects    -

a) with weight until 100 t. Nr. 8.00 -

14. 8.455481Pre-stressed and reinforced concrete elements of the object    -

a) Assembled pre-stressed girder MB 45 М–100 m3 234.80 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.8+360.00-left carriageway
Unit price Total
No. Type of work Unit Quantity
(€) price (€)
15. 8.455482Cross girders at objects of pre-stressed and reinforced    -
concrete
a) of reinforced concrete MB 45 М–100 m3 30.95 -

16. 8.455483Lane slab at the objects    -

a) MB 45 M-100 d = 8+15=22 cm m3 171.77 -

b) Transition slab MB 30 M-100 d=30 cm m3 25.20 -

17. 8.455487Injection of cables m1 1,136.64 -

18. 8.4556 Protection of the slopes of the embankment with    -


a) Production of concrete canals MB 30 М–100 m1 - -

19. 8.456 Activities of metal    -

20. 8.4562 Reinforcement of concrete steel    -

a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ 12 kg. 6,886.00 -


mm
b) Supply, cutting, tailoring and assembly GA 240/360 F >12 kg. 667.00 -
mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤ 12 kg. 62,218.00 -
mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F > kg. 122,774.00 -
12 mm
21. 8.4564 Steel elements of rolled profiles and sheet metal kg. 3,946.97 -

22. 8.4567 Reinforcement for pre-stressing    -

23. 8.45671 Ropes and wires for overtensing anchors, the safety pipes    -
assembly and overtensing sO2 / sv = 1670 / 1860
a) For cables kg. 14,878.64 -

b) Anchors Nr. 64 -
c) Pipes m1 1,136.64 -

     

TOTAL CONCRETE AND REINFORCED CONCRETE    -


WORKS :
3. Other works   

24. 8.45681 Dilatational devices of roadway surfaces of the building type T- m1 23.20 -
80
25. 8.45682 Dilatational devices of fence NEW JERSEY type m1 8.00 -
RHEINSTHAL
26. 8.4569 Drainpipes of cast iron with water outlet Nr. 4 -

with respect to detail L = 86 m m1 86.00 -

a) Supply and building landmarks for oscultation Nr. 10 -

27. 8.458 Finishing works of the superstructure of the object    -

28. 8.4582 Hydroinsulation of objects    -

29. 8.45822 Hydroinsulation of ready insulation tapes, strips m2 780.77 -

30. 8.4583 Protection of concrete areas under ground m2 3,625.00 -

31. 8.4584 Roadway of the objects d = 6 cm m2 780.77 -

32. 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 16 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.8+360.00-left carriageway
Unit price Total
No. Type of work Unit Quantity
(€) price (€)
33. 8.458.10Elements for dilatation    -

a) with permanent elastic kit m1 89.37 -

34. 8.458.11Testing of ready object Nr. 1 -

35. 8.458.13Production and the construction of slab with year of Nr. 1 -


construction and category of the object.
TOTAL OTHER WORKS :    -

SUMMARY   
TOTAL EARTHEN WORKS :
   -
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :    -
TOTAL OTHER WORKS :
   -

TOTAL EUR :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.8+360.00-right carriageway
Unit Total
No. Type of work Unit Quantity
price (€) price (€)
1 2 3 4 5 6
1. 8.4.
Structures with an opening larger then 5,0 m1

4. 8.452 1. Ground works   

5. 8.4521 Wide excavation for foundations in dry with spreading out   


storage and transport
a) for a depth of 0-2 m1 m3 - -

a1) addition for rock m3 - -

b) for a depth of 2–4 m m3 - -

b1) addition for rock m3 - -

c) for a depth of 4–6 m m3 - -

c1) addition for rock m3 - -

6. 8.4528 Digging in of foundation of pillars in layers of 30 cm with m3 - -


compacting
-

TOTAL EARTHEN WORKS :    -

     

7. 8.455 2. Concrete and reinforced   

concrete works   

8. 8.45543 Concrete fill-in without formwork MB > 15 (foundation for m3 - -


reinforced concrete foundations).
9. 8.45561 Reinforced concrete foundation cobblestone, contra beams m3 - -
and slab-like foundations MB30
10. 8.455464Reinforced concrete pillars    -

a)Centre pillars МВ 30 m – 100 m3 - -

11. 8.455465Upper part of end and middle columns    -

a) Laid joist for centre columns MB 30 M – 100 m3 - -

12. 8.455468 Parapet beam and fences ”New Jersey” elements with    -
surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with m3 33.88 -
protection, paint МB 45 М–100
13.8.4554610Assembly of main beam at the objects    -

a) with weight until 100 t. Nr. 4.00 -

14. 8.455481Pre-stressed and reinforced concrete elements of the object    -

a) Assembled pre-stressed girder MB 45 М–100 m3 117.40 -

15. 8.455482 Cross girders at objects of pre-stressed and reinforced    -


concrete
a) of reinforced concrete MB 45 М–100 m3 15.48 -

16. 8.455483Lane slab at the objects    -

a) MB 45 M-100 d = 8+15=22 cm m3 89.60 -

b) Transition slab MB 30 M-100 d=30 cm m3 25.20 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.8+360.00-right carriageway
Unit Total
No. Type of work Unit Quantity
price (€) price (€)
17. 8.455487Injection of cables m1 568.32 -

18. 8.4556 Protection of the slopes of the embankment with    -

a) Production of concrete canals MB 30 М–100 m1 - -

19. 8.456 Activities of metal    -

20. 8.4562 Reinforcement of concrete steel    -

a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ 12 kg. 3,500.00 -


mm
b) Supply, cutting, tailoring and assembly GA 240/360 F >12 kg. 334.00 -
mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤ kg. 33,922.00 -
12 mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F > kg. 43,501.00 -
12 mm
21. 8.4564 Steel elements of rolled profiles and sheet metal kg. 3,083.30 -

22. 8.4567 Reinforcement for pre-stressing    -

23. 8.45671 Ropes and wires for overtensing anchors, the safety pipes    -
assembly and overtensing sO2 / sv = 1670 / 1860
a) For cables kg. 7,439.32 -

b) Anchors Nr. 32 -

c) Pipes m1 568.32 -

     

TOTAL CONCRETE AND REINFORCED CONCRETE    -


WORKS :
3. Other works   

24. 8.45681 Dilatational devices of roadway surfaces of the building type m1 24.10 -
T-80
25. 8.45682 Dilatational devices of fence NEW JERSEY type m1 8.00 -
RHEINSTHAL
26. 8.4569 Drainpipes of cast iron with water outlet Nr. 2 -

with respect to detail L = 25 m m1 25.00 -

a) Supply and building landmarks for oscultation Nr. 6 -

27. 8.458 Finishing works of the superstructure of the object    -

28. 8.4582 Hydroinsulation of objects    -

29. 8.45822 Hydroinsulation of ready insulation tapes, strips m2 407.27 -

30. 8.4583 Protection of concrete areas under ground m2 - -

31. 8.4584 Roadway of the objects d = 6 cm m2 407.27 -

32. 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 8 -

33. 8.458.10 Elements for dilatation    -

a) with permanent elastic kit m1 69.81 -

34. 8.458.11 Testing of ready object Nr. 1 -

35. 8.458.13 Production and the construction of slab with year of Nr. 1 -
construction and category of the object.
TOTAL OTHER WORKS :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object Viaduct of km.8+360.00-right carriageway
Unit Total
No. Type of work Unit Quantity
price (€) price (€)

SUMMARY   
TOTAL EARTHEN WORKS :
   -
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :    -
TOTAL OTHER WORKS :
   -

TOTAL EUR :    -
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object overpass of km.8+891.15
Unit price Total
No. Type of work Unit Quantity
(€) price (€)
1 2 3 4 5 6
1. 8.4.
Structures with an opening larger then 5,0 m1

4. 8.452 1. Ground works   

5. 8.4521 Wide excavation for foundations in dry with spreading out   


storage and transport С1 and С6
a) for a depth of 0-2 m1 m3 1,340.00 -

a1) addition for rock m3 1,340.00 -

b) for a depth of 2–4 m m3 1,200.00 -

b1) addition for rock m3 1,200.00 -

c) for a depth of 4–6 m m3 1,150.00 -

c1) addition for rock m3 1,150.00 -

d) for a depth of 6-8 and beyond m3 1,100.00 -

d1) addition for rock m3 1,100.00 -

6. 8.4528 Digging in of foundation of pillars in layers of 30 cm with m3 3,500.00 -


compacting
Renovation m3 580.00 -

TOTAL EARTHEN WORKS :    -

     

7. 8.455 2. Concrete and reinforced   

concrete works   

8. 8.45543 Concrete fill-in without formwork MB > 15 (foundation for m3 44.40 -


reinforced concrete foundations).
9. 8.45561 Reinforced concrete foundation cobblestone, contra beams m3 378.00 -
and slab-like foundations MB30
10. 8.455464Reinforced concrete pillars    -

a)End pillars with ring beam and wings MB 30 M – 100 m3 50.04 -

b)Reinforced concrete walls МВ 30 M – 100 m3 320.00 -

c)Centre pillars МВ 30 m – 100 m3 14.20 -

11. 8.455465Upper part of end and middle columns    -

a) Parapet and console wings for end columns MB 30 M – m3 13.00 -


100
b) Laid joist for centre columns MB 30 M – 100 m3 11.52 -

12. 8.455468Parapet beam and fences ”New Jersey” elements with    -


surface. protection and facade elements.
a) Facade elements production and assembly MB 30 М–100 m3 6.00 -
13. 8.455469Prefabrication tiles of pedestrian paths and pavements’    -
elements
HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object overpass of km.8+891.15
Unit price Total
No. Type of work Unit Quantity
(€) price (€)
a) Pavements of non-reinforced concrete MB М–100 m1 95.00 -

14.8.4554610Assembly of main beam at the objects    -

a) with weight until 50 t. Nr. 8.00 -

15. 8.455481Pre-stressed and reinforced concrete elements of the object    -

a) Assembled pre-stressed girder MB 45 М–100 m3 90.72 -

16. 8.455482Cross girders at objects of pre-stressed and reinforced    -


concrete
a) of reinforced concrete MB 45 М–100 m3 11.60 -

17. 8.455483Lane slab at the objects    -

a) MB 45 M-100 d = 15 cm m3 38.21 -

b) Transition slab MB 30 M-100 d=30 cm m3 - -

18. 8.455487Injection of cables m1 795.20 -

19. 8.4556 Protection of the slopes of the embankment with    -

a) Production of concrete canals MB 30 М–100 m1 - -

20. 8.456 Activities of metal    -

21. 8.4562 Reinforcement of concrete steel    -

a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ kg. 2,233.00 -


12 mm
b) Supply, cutting, tailoring and assembly GA 240/360 F kg. 585.00 -
>12 mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤ kg. 31,010.00 -
12 mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F > kg. 27,202.00 -
12 mm
22. 8.4564 Steel elements of rolled profiles and sheet metal kg. - -

23. 8.4567 Reinforcement for pre-stressing    -

24. 8.45671 Ropes and wires for overtensing anchors, the safety pipes    -
assembly and overtensing sO2 / sv = 1570 / 1770
a) For cables kg. 6,067.38 -

b) Anchors Nr. 64 -

c) Pipes m1 795.20 -

     

TOTAL CONCRETE AND REINFORCED CONCRETE    -


WORKS :
3. Other works   

25. 8.45681 Dilatational devices of roadway surfaces of the building type m1 15.00 -
T-80
26. 8.45682 Dilatational devices of fence NEW JERSEY type m1 - -
RHEINSTHAL
27. 8.4569 Drainpipes of cast iron with water outlet Nr. - -

with respect to detail L = 0 m m1 - -

a) Supply and building landmarks for oscultation Nr. 10 -


HIGHWAY CORRIDOR K-8 Deve Bair-Kafasan object overpass of km.8+891.15
Unit price Total
No. Type of work Unit Quantity
(€) price (€)
28. 8.456.11Steel fences of the objects set    -

a) Combined m1 200.00 -

29. 8.458 Finishing works of the superstructure of the object    -

30. 8.4581 Concrete or stone kerbs m1 95.00 -

31. 8.4582 Hydroinsulation of objects    -

32. 8.45822Hydroinsulation of ready insulation tapes, strips m2 254.73 -

33. 8.4583 Protection of concrete areas under ground m2 2,000.00 -

34. 8.4584 Roadway of the objects d = 6 cm m2 254.73 -

35. 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 16 -

36. 8.458.10Elements for dilatation    -

a) with permanent elastic kit m1 - -

37. 8.458.11Testing of ready object Nr. 1 -

38. 8.458.13Production and the construction of slab with year of Nr. 1 -


construction and category of the object.

TOTAL OTHER WORKS :    -

SUMMARY   
TOTAL EARTHEN WORKS :
   -
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :    -
TOTAL OTHER WORKS :
   -

TOTAL EUR :    -
Unit Total
NO. Type of work Unit Quantity price(€ price(€
) )
1 2 3 4 5 6
1. 8.4. SUPPORT STRUCTURES (RETAINING WALLS)

2. 8.4.5. Construction of the work


3. 8.451 Preparatory works:
a) The preparatory works for the object (cleaning of the roads
under the object), as well as the remaining works connected with
the object (wedges, stone piles, drainages, etc. are covered in
the calculations of the works for the lane of the road.
4. 8.452 1. Ground works   
Wide excavation for foundations in dry with spreading out storage
5. 8.4521   
and transport
a) for a depth of 0-2 m m3 1,029.43

a1) addition for rock m3 -

b) for a depth of 2–4 m m3 883.45

b1) addition for rock m3 883.45

c) for a depth of 4–6 m m3 631.10

c1) addition for rock m3 631.10


Digging in of foundation of pillars in layers of 30 cm with
6. 8.4528 m3 1,559.73
compacting
TOTAL EARTHEN WORKS :

7. 8.455 2. Concrete and reinforced

concrete works
Concrete fill-in without formwork MB > 15 (foundation for
8. 8.45543 m3 57.29
reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra beams and
9. 8.45561 m3 603.05
slab-like foundations MB30
10.8.455464Reinforced concrete retaining walls
a)Reinforced concrete retaining walls with ring beam MB 30 M
m3 785.79
– 100
Parapet beam and fences ”New Jersey” elements with surface.
12.8.455468
protection and facade elements.
a) ”New Jersey” fence production and assembly with protection,
m3 -
paint МB 45 М–100

19. 8.456 Activities of metal

20. 8.4562Reinforcement of concrete steel


a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ 12
kg. 0.00
mm
b) Supply, cutting, tailoring and assembly GA 240/360 F >12 mm kg. 0.00
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤ 12
kg. 25,543.00
mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F > 12
kg. 47,503.00
mm
TOTAL CONCRETE AND REINFORCED CONCRETE WORKS :

3. Other works   

26. 8.456.11Steel fences of the objects set   


Unit Total
NO. Type of work Unit Quantity price(€ price(€
) )
a) ”New Jersey" m1 0.00

27. 8.458 Finishing works of the superstructure of the object   

30. 8.4583Protection of concrete areas under ground m2 2,445.58

33. 8.458.10Elements for dilatation   

a) with permanent elastic kit m1 60.84

TOTAL OTHER WORKS :   

SUMMARY

TOTAL EARTHEN WORKS :

TOTAL CONCRETE AND REINFORCED CONCRETE WORKS :

TOTAL OTHER WORKS :

TOTAL EUR :
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
1 2 3 4 5 6
1. 8.4. SUPPORT STRUCTURES (RETAINING WALLS)

2. 8.4.5. Construction of the work

3. 8.451 Preparatory works:


a) The preparatory works for the object (cleaning of the roads
under the object), as well as the remaining works connected with
the object (wedges, stone piles, drainages, etc. are covered in
the calculations of the works for the lane of the road.
4. 8.452 1. Ground works   
Wide excavation for foundations in dry with spreading out storage
5. 8.4521   
and transport
a) for a depth of 0-2 m m3 57.58

a1) addition for rock m3 -

b) for a depth of 2–4 m m3 50.33

b1) addition for rock m3 50.33

c) for a depth of 4–6 m m3 36.03

c1) addition for rock m3 36.03


Digging in of foundation of pillars in layers of 30 cm with
6. 8.4528 m3 103.68
compacting
TOTAL EARTHEN WORKS :

7. 8.455 2. Concrete and reinforced

concrete works
Concrete fill-in without formwork MB > 15 (foundation for
8. 8.45543 m3 3.88
reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra beams and
9. 8.45561 m3 22.23
slab-like foundations MB30
10.8.455464Reinforced concrete retaining walls
a)Reinforced concrete retaining walls with ring beam MB 30 M
m3 27.70
– 100
Parapet beam and fences ”New Jersey” elements with surface.
12.8.455468
protection and facade elements.
a) ”New Jersey” fence production and assembly with protection,
m3 -
paint МB 45 М–100
19. 8.456 Activities of metal

20. 8.4562 Reinforcement of concrete steel


a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ 12
kg. -
mm
b) Supply, cutting, tailoring and assembly GA 240/360 F >12 mm kg. -
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤ 12
kg. 1,973.00
mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F > 12
kg. 1,397.00
mm
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
3. Other works   

26. 8.456.11Steel fences of the objects set   

a) ”New Jersey" m1 -
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
27. 8.458 Finishing works of the superstructure of the object   

30. 8.4583 Protection of concrete areas under ground m2 188.80

33. 8.458.10Elements for dilatation   

a) with permanent elastic kit m1 -

TOTAL OTHER WORKS :   

SUMMARY

TOTAL EARTHEN WORKS :

TOTAL CONCRETE AND REINFORCED CONCRETE WORKS

TOTAL OTHER WORKS :

TOTAL EUR :
Unit
Unit Total price(€
NO. Type of work/ Вид на работа Quantity price(€
t )

1 2 3 4 5 6
SUPPORT STRUCTURES (RETAINING WALLS)
1. 8.4.
ПОТПОРНИ ЅИДОВИ
2. 8.4.5. Construction of the work/ Изведба на работата

3. 8.451 Preparatory works/ Подготвителни работи:


a) The preparatory works for the object (cleaning of the roads
under the object), as well as the remaining works connected with
the object (wedges, stone piles, drainages, etc. are covered in
the calculations of the works for the lane of the road.
a) Подготвителни работи
на објект (чистење на патиштата под објектот), како и на
останатитe работи поврзани со објектот (клинови, купови од
камења, одводни канали, итн, се опфатени во пресметките на
работите за патот.
4. 8.452 1. Ground works/ Земјени работи   
Wide excavation for foundations in dry with spreading out storage
and transport
5. 8.4521   
Широк ископ за темели во суво со распростирање,
складирање и транспорт
a) for a depth of/ за длабочина од 0-2 m m3 431.78 4.17 1800.51

a1) addition for rock/ додаток за карпа m3 215.89 6.46 1394.64

b) for a depth of/ за длабочина од 2–4 m m3 107.94 5.52 595.85

b1) addition for rock/ додаток за карпа m3 53.97 11.06 596.91

c) for a depth of/ / за длабочина од 4–6 m m3 7.73 0.00

c1) addition for rock/ додаток за карпа m3 13.28 0.00

Digging in of foundation of pillars in layers of 30 cm with


6. 8.4528 compacting/ Затрупување на темели од столбови во слоеви од m3 1,284.87 2.41 3096.53
30 cm со набивање

TOTAL EARTHEN WORKS/ Вкупно земјени работи : 7484.43

7. 8.455 2. Concrete and reinforced/ Бетон и арматура

concrete works/ бетонски работи


Concrete fill-in without formwork MB > 15 (foundation for
reinforced concrete foundations)
8. 8.45543 m3 8.36 97.46 814.77
Mршав бетон без оплата MB > 15
(подлога за армирано бетонски темели)
Reinforced concrete foundation cobblestone, contra beams and
slab-like foundations MB30
9. 8.45561 m3 126.69 118.01 14950.69
Армирано бетонски темели самци, контра греди
и плочасти темели МБ30

Reinforced concrete retaining walls


10. 8.455464
Армирано-бетонски потпорни ѕидови

a) Reinforced concrete retaining walls with ring beam


Армирано-бетонски потпорни ѕидови со m3 213.40 149.62 31928.91
прстенеста греда MB 30 M – 100

110
Unit
Unit Total price(€
NO. Type of work/ Вид на работа Quantity price(€
t )

Parapet beam and fences ”New Jersey” elements with surface.


protection and facade elements.
12. 8.455468
Парапетни греди и огради ”New Jersey”
елементи со површина, заштита и фасадни елменти.
a) ”New Jersey” fence production and assembly with protection,
paint МB 45 М–100
m3
Изведба и монтирање на ограда ”New
Jersey” со заштита, боја МB 45 М–100
19. 8.456 Activities of metal/ Активности од метал

20. 8.4562 Reinforcement of concrete steel/ Арматура од бетонски челик


a) Supply, cutting, tailoring and assembly
Набавка, сечење, кроење и монтажа GA 240/360 F ≤ kg. -
12 mm
b) Supply, cutting, tailoring and assembly
Набавка, сечење, кроење и монтажа GA 240/360 F kg. -
>12 mm
c) Supply, cutting, tailoring and assembly
Набавка, сечење, кроење и монтажа RА 400/500-2 f ≤ kg. 8,464.40 1.07 9056.91
12 mm
d) Supply, cutting, tailoring and assembly
Набавка, сечење, кроење и монтажа RА 400/500-2 F > kg. 18,745.20 1.01 18932.65
12 mm

TOTAL CONCRETE AND REINFORCED CONCRETE WORKS/


75683.92
ВКУПНО БЕТОНСКИ И А.Б. РАБОТИ:

3. Other works/ Други работи   


Steel fences of the objects set
26. 8.456.11   
Челични огради од поставените објекти
a) ”New Jersey" m1

Finishing works of the superstructure of the object


27. 8.458   
Завршни работи на надградба на објектот

Protection of concrete areas under ground


30. 8.4583 m2 135.20 5.62 759.82
Заштита на бетонски површини под земја

33. 8.458.10 Elements for dilatation/ Елемети за дилатација   

a) with permanent elastic kit/ со траен еластичен кит m1

TOTAL OTHER WORKS :    759.82

SUMMARY

TOTAL EARTHEN WORKS : 7,484.43

TOTAL CONCRETE AND REINFORCED CONCRETE WORKS : 75,683.92

TOTAL OTHER WORKS : 759.82

TOTAL EUR : 83,928.18

110
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
1 2 3 4 5 6
1. 8.4. SUPPORT STRUCTURES (RETAINING WALLS)

2. 8.4.5. Construction of the work

3. 8.451 Preparatory works:


a) The preparatory works for the object (cleaning of the roads
under the object), as well as the remaining works connected
with the object (wedges, stone piles, drainages, etc. are
covered in the calculations of the works for the lane of the road.
4. 8.452 1. Ground works   
Wide excavation for foundations in dry with spreading out
5. 8.4521   
storage and transport
a) for a depth of 0-2 m m3 310.36

a1) addition for rock m3 -

b) for a depth of 2–4 m m3 273.20

b1) addition for rock m3 273.20

c) for a depth of 4–6 m m3 195.18

c1) addition for rock m3 195.18


Digging in of foundation of pillars in layers of 30 cm with
6. 8.4528 m3 488.62
compacting
TOTAL EARTHEN WORKS :

7. 8.455 2. Concrete and reinforced

concrete works
Concrete fill-in without formwork MB > 15 (foundation for
8. 8.45543 m3 15.87
reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra beams and
9. 8.45561 m3 174.76
slab-like foundations MB30
10.8.455464Reinforced concrete retaining walls
a)Reinforced concrete retaining walls with ring beam MB 30
m3 248.14
M – 100
Parapet beam and fences ”New Jersey” elements with surface.
12.8.455468
protection and facade elements.
a) ”New Jersey” fence production and assembly with protection,
m3 -
paint МB 45 М–100
19. 8.456 Activities of metal

20. 8.4562 Reinforcement of concrete steel


a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ 12
kg. -
mm
b) Supply, cutting, tailoring and assembly GA 240/360 F >12
kg. -
mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤ 12
kg. 7,225.00
mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F > 12
kg. ###
mm
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
3. Other works   

26.8.456.11Steel fences of the objects set   

a) ”New Jersey" m1 -
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
27. 8.458 Finishing works of the superstructure of the object   

30. 8.4583 Protection of concrete areas under ground m2 666.35

33.8.458.10Elements for dilatation   

a) with permanent elastic kit m1 -

TOTAL OTHER WORKS :   

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
TOTAL OTHER WORKS :

TOTAL EUR :
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
1 2 3 4 5 6
1. 8.4. SUPPORT STRUCTURES (RETAINING WALLS)

2. 8.4.5. Construction of the work

3. 8.451 Preparatory works:


a) The preparatory works for the object (cleaning of the roads
under the object), as well as the remaining works connected
with the object (wedges, stone piles, drainages, etc. are
covered in the calculations of the works for the lane of the road.
4. 8.452 1. Ground works   
Wide excavation for foundations in dry with spreading out
5. 8.4521   
storage and transport
a) for a depth of 0-2 m m3 126.09

a1) addition for rock m3 -

b) for a depth of 2–4 m m3 110.43

b1) addition for rock m3 110.43

c) for a depth of 4–6 m m3 78.87

c1) addition for rock m3 78.87


Digging in of foundation of pillars in layers of 30 cm with
6. 8.4528 m3 155.64
compacting
TOTAL EARTHEN WORKS :

7. 8.455 2. Concrete and reinforced

concrete works
Concrete fill-in without formwork MB > 15 (foundation for
8. 8.45543 m3 12.53
reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra beams and
9. 8.45561 m3 131.33
slab-like foundations MB30
10. 8.455464Reinforced concrete retaining walls
a)Reinforced concrete retaining walls with ring beam MB 30
m3 223.17
M – 100
Parapet beam and fences ”New Jersey” elements with surface.
12. 8.455468
protection and facade elements.
a) ”New Jersey” fence production and assembly with protection,
m3 9.86
paint МB 45 М–100
19. 8.456 Activities of metal

20. 8.4562 Reinforcement of concrete steel


a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ 12
kg. -
mm
b) Supply, cutting, tailoring and assembly GA 240/360 F >12
kg. -
mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤ 12
kg. 7,145.00
mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F > 12
kg. ###
mm
TOTAL CONCRETE AND REINFORCED CONCRETE WORKS
:
3. Other works   
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
26. 8.456.11Steel fences of the objects set   

a) ”New Jersey" m1 28.00

27. 8.458 Finishing works of the superstructure of the object   

30. 8.4583 Protection of concrete areas under ground m2 547.27

33. 8.458.10Elements for dilatation   

a) with permanent elastic kit m1 6.80

TOTAL OTHER WORKS :   

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED CONCRETE WORKS
:
TOTAL OTHER WORKS :

TOTAL EUR :
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
1 2 3 4 5 6
1. 8.4. SUPPORT STRUCTURES (RETAINING WALLS)

2. 8.4.5. Construction of the work

3. 8.451 Preparatory works:


a) The preparatory works for the object (cleaning of the
roads under the object), as well as the remaining works
connected with the object (wedges, stone piles,
drainages, etc. are covered in the calculations of the
works for the lane of the road.
4. 8.452 1. Ground works   
Wide excavation for foundations in dry with spreading
5. 8.4521   
out storage and transport
a) for a depth of 0-2 m m3 2495.46

a1) addition for rock m3 -

b) for a depth of 2–4 m m3 2183.59

b1) addition for rock m3 2183.59

c) for a depth of 4–6 m m3 1560.01

c1) addition for rock m3 1560.01


Digging in of foundation of pillars in layers of 30 cm with
6. 8.4528 m3 3726.89
compacting
TOTAL EARTHEN WORKS :

7. 8.455 2. Concrete and reinforced

concrete works
Concrete fill-in without formwork MB > 15 (foundation for
8. 8.45543 m3 109.79
reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
9. 8.45561 m3 1930.58
beams and slab-like foundations MB30
10.8.455464Reinforced concrete retaining walls
a)Reinforced concrete retaining walls with ring beam
m3 2606.79
MB 30 M – 100
Parapet beam and fences ”New Jersey” elements with
12.8.455468
surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
m3 0.00
protection, paint МB 45 М–100
19. 8.456 Activities of metal

20. 8.4562 Reinforcement of concrete steel


a) Supply, cutting, tailoring and assembly GA 240/360 F
kg. 0.00
≤ 12 mm
b) Supply, cutting, tailoring and assembly GA 240/360 F
kg. 0.00
>12 mm
c) Supply, cutting, tailoring and assembly RА 400/500-2
kg. 25849.00
f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА 400/500-2
kg. 260436.00
F > 12 mm
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
3. Other works   

26. 8.456.11Steel fences of the objects set   

a) ”New Jersey" m1 -

27. 8.458 Finishing works of the superstructure of the object   

30. 8.4583 Protection of concrete areas under ground m2 4420.03

33. 8.458.10Elements for dilatation   

a) with permanent elastic kit m1 92.54

TOTAL OTHER WORKS :   

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
TOTAL OTHER WORKS :

TOTAL EUR :
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
1 2 3 4 5 6
1. 8.4. SUPPORT STRUCTURES (RETAINING WALLS)

2. 8.4.5. Construction of the work

3. 8.451 Preparatory works:

a) The preparatory works for the object (cleaning of the roads


under the object), as well as the remaining works connected
with the object (wedges, stone piles, drainages, etc. are
covered in the calculations of the works for the lane of the road.

4. 8.452 1. Ground works   


Wide excavation for foundations in dry with spreading out
5. 8.4521   
storage and transport
a) for a depth of 0-2 m m3 2318.08

a1) addition for rock m3 -

b) for a depth of 2–4 m m3 2028.25

b1) addition for rock m3 2028.25

c) for a depth of 4–6 m m3 1452.08

c1) addition for rock m3 1452.08


Digging in of foundation of pillars in layers of 30 cm with
6. 8.4528 m3 3331.51
compacting
TOTAL EARTHEN WORKS :

7. 8.455 2. Concrete and reinforced

concrete works
Concrete fill-in without formwork MB > 15 (foundation for
8. 8.45543 m3 126.73
reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra beams and
9. 8.45561 m3 1645.55
slab-like foundations MB30
10. 8.455464Reinforced concrete retaining walls
a)Reinforced concrete retaining walls with ring beam MB 30
m3 2278.25
M – 100
Parapet beam and fences ”New Jersey” elements with surface.
12. 8.455468
protection and facade elements.
a) ”New Jersey” fence production and assembly with protection,
m3 0.00
paint МB 45 М–100
19. 8.456 Activities of metal

20. 8.4562 Reinforcement of concrete steel


a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ 12
kg. 0.00
mm
b) Supply, cutting, tailoring and assembly GA 240/360 F >12
kg. 0.00
mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤ 12
kg. 54951.00
mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F > 12
kg. 158303.00
mm
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
3. Other works   
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
26. 8.456.11Steel fences of the objects set   

a) ”New Jersey" m1 0.00

27. 8.458 Finishing works of the superstructure of the object   

30. 8.4583 Protection of concrete areas under ground m2 5836.66

33. 8.458.10Elements for dilatation   

a) with permanent elastic kit m1 137.00

TOTAL OTHER WORKS :   

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
TOTAL OTHER WORKS :

TOTALEUR:
Total
Unit
NO. Type of work Unitt Quantity price(€
price(€)

1 2 3 4 5 6
1. 8.4. SUPPORT STRUCTURES (RETAINING WALLS)

2. 8.4.5. Construction of the work

3. 8.451 Preparatory works:

a) The preparatory works for the object (cleaning of the roads


under the object), as well as the remaining works connected
with the object (wedges, stone piles, drainages, etc. are
covered in the calculations of the works for the lane of the road.

4. 8.452 1. Ground works   


Wide excavation for foundations in dry with spreading out
5. 8.4521   
storage and transport
a) for a depth of 0-2 m m3 122.58

a1) addition for rock m3 -

b) for a depth of 2–4 m m3 107.29

b1) addition for rock m3 107.29

c) for a depth of 4–6 m m3 76.74

c1) addition for rock m3 76.74


Digging in of foundation of pillars in layers of 30 cm with
6. 8.4528 m3 192.63
compacting
TOTAL EARTHEN WORKS :

7. 8.455 2. Concrete and reinforced

concrete works
Concrete fill-in without formwork MB > 15 (foundation for
8. 8.45543 m3 7.85
reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra beams and
9. 8.45561 m3 61.75
slab-like foundations MB30
10. 8.455464Reinforced concrete retaining walls
a)Reinforced concrete retaining walls with ring beam MB 30
m3 92.05
M – 100
Parapet beam and fences ”New Jersey” elements with surface.
12. 8.455468
protection and facade elements.
a) ”New Jersey” fence production and assembly with protection,
m3 -
paint МB 45 М–100
19. 8.456 Activities of metal

20. 8.4562 Reinforcement of concrete steel


a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ 12
kg. -
mm
b) Supply, cutting, tailoring and assembly GA 240/360 F >12
kg. -
mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤ 12
kg. ###
mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F > 12
kg. ###
mm
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
3. Other works   
Total
Unit
NO. Type of work Unitt Quantity price(€
price(€)

26. 8.456.11Steel fences of the objects set   

a) ”New Jersey" m1 -

27. 8.458 Finishing works of the superstructure of the object   

30. 8.4583 Protection of concrete areas under ground m2 411.15

33. 8.458.10 Elements for dilatation   

a) with permanent elastic kit m1 -

TOTAL OTHER WORKS :   

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
TOTAL OTHER WORKS :

TOTAL EUR :
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
1 2 3 4 5 6
1. 8.4. SUPPORT STRUCTURES (RETAINING WALLS)

2. 8.4.5. Construction of the work

3. 8.451 Preparatory works:


a) The preparatory works for the object (cleaning
of the roads under the object), as well as the
remaining works connected with the object
(wedges, stone piles, drainages, etc. are covered
in the calculations of the works for the lane of the
road.
4. 8.452 1. Ground works   
Wide excavation for foundations in dry with
5. 8.4521   
spreading out storage and transport
a) for a depth of 0-2 m m3 681.18

a1) addition for rock m3 -

b) for a depth of 2–4 m m3 596.04

b1) addition for rock m3 596.04

c) for a depth of 4–6 m m3 425.78

c1) addition for rock m3 425.78


Digging in of foundation of pillars in layers of 30 cm
6. 8.4528 m3 1,185.27
with compacting
TOTAL EARTHEN WORKS :

7. 8.455 2. Concrete and reinforced

concrete works
Concrete fill-in without formwork MB > 15
8. 8.45543 m3 28.78
(foundation for reinforced concrete foundations).
Reinforced concrete foundation cobblestone,
9. 8.45561 m3 327.23
contra beams and slab-like foundations MB30
10. 8.455464Reinforced concrete retaining walls
a)Reinforced concrete retaining walls with ring
m3 527.14
beam MB 30 M – 100
Parapet beam and fences ”New Jersey” elements
12. 8.455468
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly
m3 19.72
with protection, paint МB 45 М–100
19. 8.456 Activities of metal

20. 8.4562 Reinforcement of concrete steel


a) Supply, cutting, tailoring and assembly GA
kg. -
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
kg. -
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА
kg. 7,145.00
400/500-2 f ≤ 12 mm
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
1 2 3 4 5 6
d) Supply, cutting, tailoring and assembly RА
kg. ###
400/500-2 F > 12 mm
TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS :
3. Other works   

26. 8.456.11Steel fences of the objects set   

a) ”New Jersey" m1 64.00

27. 8.458 Finishing works of the superstructure of the object   

30. 8.4583 Protection of concrete areas under ground m2 1359.40

33. 8.458.10Elements for dilatation   

a) with permanent elastic kit m1 14.45

TOTAL OTHER WORKS :   

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS :
TOTAL OTHER WORKS :

TOTAL EUR :
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
1 2 3 4 5 6
1. 8.4. SUPPORT STRUCTURES (RETAINING WALLS)

2. 8.4.5. Construction of the work

3. 8.451 Preparatory works:


a) The preparatory works for the object (cleaning of the
roads under the object), as well as the remaining works
connected with the object (wedges, stone piles, drainages,
etc. are covered in the calculations of the works for the lane
of the road.
4. 8.452 1. Ground works   
Wide excavation for foundations in dry with spreading out
5. 8.4521   
storage and transport
a) for a depth of 0-2 m m3 529.24

a1) addition for rock m3 -

b) for a depth of 2–4 m m3 463.31

b1) addition for rock m3 463.31

c) for a depth of 4–6 m m3 330.93

c1) addition for rock m3 330.93


Digging in of foundation of pillars in layers of 30 cm with
6. 8.4528 m3 647.09
compacting
TOTAL EARTHEN WORKS :

7. 8.455 2. Concrete and reinforced

concrete works
Concrete fill-in without formwork MB > 15 (foundation for
8. 8.45543 m3 32.95
reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra beams
9. 8.45561 m3 503.36
and slab-like foundations MB30
10. 8.455464Reinforced concrete retaining walls
a)Reinforced concrete retaining walls with ring beam MB
m3 703.64
30 M – 100
Parapet beam and fences ”New Jersey” elements with
12. 8.455468
surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
m3 -
protection, paint МB 45 М–100
19. 8.456 Activities of metal

20. 8.4562 Reinforcement of concrete steel


a) Supply, cutting, tailoring and assembly GA 240/360 F ≤
kg. -
12 mm
b) Supply, cutting, tailoring and assembly GA 240/360 F
kg. -
>12 mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤
kg. ###
12 mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F >
kg. ###
12 mm
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
1 2 3 4 5 6
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
3. Other works   

26. 8.456.11Steel fences of the objects set   

a) ”New Jersey" m1 -

27. 8.458 Finishing works of the superstructure of the object   

30. 8.4583 Protection of concrete areas under ground m2 1429.56

33. 8.458.10Elements for dilatation   

a) with permanent elastic kit m1 21.42

TOTAL OTHER WORKS :   

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
TOTAL OTHER WORKS :

TOTAL EUR :
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
1 2 3 4 5 6
1. 8.4. SUPPORT STRUCTURES (RETAINING WALLS)

2. 8.4.5. Construction of the work

3. 8.451 Preparatory works:


a) The preparatory works for the object (cleaning of the
roads under the object), as well as the remaining works
connected with the object (wedges, stone piles,
drainages, etc. are covered in the calculations of the
works for the lane of the road.
4. 8.452 1. Ground works   
Wide excavation for foundations in dry with spreading out
5. 8.4521   
storage and transport
a) for a depth of 0-2 m 444.28

a1) addition for rock m3 -

b) for a depth of 2–4 m m3 388.73

b1) addition for rock m3 388.73

c) for a depth of 4–6 m m3 277.73

c1) addition for rock m3 277.73


Digging in of foundation of pillars in layers of 30 cm with
6. 8.4528 m3 493.40
compacting
TOTAL EARTHEN WORKS :

7. 8.455 2. Concrete and reinforced

concrete works
Concrete fill-in without formwork MB > 15 (foundation for
8. 8.45543 m3 33.90
reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
9. 8.45561 m3 475.30
beams and slab-like foundations MB30
10.8.455464Reinforced concrete retaining walls
a)Reinforced concrete retaining walls with ring beam
m3 668.86
MB 30 M – 100
Parapet beam and fences ”New Jersey” elements with
12.8.455468
surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
m3 -
protection, paint МB 45 М–100
19. 8.456 Activities of metal

20. 8.4562 Reinforcement of concrete steel


a) Supply, cutting, tailoring and assembly GA 240/360 F
kg. -
≤ 12 mm
b) Supply, cutting, tailoring and assembly GA 240/360 F
kg. -
>12 mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f
kg. ###
≤ 12 mm
d) Supply, cutting, tailoring and assembly RА 400/500-2
kg. ###
F > 12 mm
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
Unit Total
NO. Type of work Unitt Quantity price(€ price(€
) )
3. Other works   

26. 8.456.11Steel fences of the objects set   

a) ”New Jersey" m1 0

27. 8.458 Finishing works of the superstructure of the object   

30. 8.4583 Protection of concrete areas under ground m2 1457.45

33. 8.458.10Elements for dilatation   

a) with permanent elastic kit m1 15.64

TOTAL OTHER WORKS :   

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
TOTAL OTHER WORKS :

TOTAL EUR :
Unit
Total
NO. Type of work Unitt Quantity price(€
price(€)

1 2 3 4 5 6
1. 8.4. SUPPORT STRUCTURES (RETAINING WALLS)

2. 8.4.5. Construction of the work

3. 8.451 Preparatory works:


a) The preparatory works for the object (cleaning of the roads
under the object), as well as the remaining works connected with
the object (wedges, stone piles, drainages, etc. are covered in
the calculations of the works for the lane of the road.

4. 8.452 1. Ground works   

Wide excavation for foundations in dry with spreading out storage


5. 8.4521   
and transport

a) for a depth of 0-2 m m3 739.43

a1) addition for rock m3 -

b) for a depth of 2–4 m m3 648.42

b1) addition for rock m3 648.42

c) for a depth of 4–6 m m3 463.09

c1) addition for rock m3 463.09


Digging in of foundation of pillars in layers of 30 cm with
6. 8.4528 m3 1,075.82
compacting
TOTAL EARTHEN WORKS :

7. 8.455 2. Concrete and reinforced

concrete works
Concrete fill-in without formwork MB > 15 (foundation for
8. 8.45543 m3 48.16
reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra beams and
9. 8.45561 m3 568.81
slab-like foundations MB30
10. 8.455464Reinforced concrete retaining walls
a)Reinforced concrete retaining walls with ring beam MB 30 M
m3 967.74
– 100
Parapet beam and fences ”New Jersey” elements with surface.
12. 8.455468
protection and facade elements.
a) ”New Jersey” fence production and assembly with protection,
m3 37.03
paint МB 45 М–100
19. 8.456 Activities of metal

20. 8.4562 Reinforcement of concrete steel


a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ 12
kg. -
mm
b) Supply, cutting, tailoring and assembly GA 240/360 F >12 mm kg.
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤ 12
kg. 29201.00
mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F > 12
kg. 71955.00
mm
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
Unit
Total
NO. Type of work Unitt Quantity price(€
price(€)

3. Other works   

26. 8.456.11Steel fences of the objects set   

a) ”New Jersey" m1 120.00

27. 8.458 Finishing works of the superstructure of the object   

30. 8.4583 Protection of concrete areas under ground m2 2300.84

33. 8.458.10Elements for dilatation   

a) with permanent elastic kit m1 86.70

TOTAL OTHER WORKS :   

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
TOTAL OTHER WORKS :

TOTAL EUR :
Unit
Total
NO. Type of work Unitt Quantity price(€
price(€)

1 2 3 4 5 6
1. 8.4. SUPPORT STRUCTURES (RETAINING WALLS)

2. 8.4.5. Construction of the work

3. 8.451 Preparatory works:


a) The preparatory works for the object (cleaning of the roads
under the object), as well as the remaining works connected
with the object (wedges, stone piles, drainages, etc. are
covered in the calculations of the works for the lane of the
road.

4. 8.452 1. Ground works   


Wide excavation for foundations in dry with spreading out
5. 8.4521   
storage and transport
a) for a depth of 0-2 m m3 129.05

a1) addition for rock m3 -

b) for a depth of 2–4 m m3 112.93

b1) addition for rock m3 112.93

c) for a depth of 4–6 m m3 80.70

c1) addition for rock m3 80.70


Digging in of foundation of pillars in layers of 30 cm with
6. 8.4528 m3 190.85
compacting
TOTAL EARTHEN WORKS :

7. 8.455 2. Concrete and reinforced

concrete works
Concrete fill-in without formwork MB > 15 (foundation for
8. 8.45543 m3 16.98
reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra beams
9. 8.45561 m3 99.60
and slab-like foundations MB30
10. 8.455464Reinforced concrete retaining walls
a)Reinforced concrete retaining walls with ring beam MB 30
m3 159.44
M – 100
Parapet beam and fences ”New Jersey” elements with
12. 8.455468
surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
m3 23.78
protection, paint МB 45 М–100

19. 8.456 Activities of metal

20. 8.4562 Reinforcement of concrete steel


a) Supply, cutting, tailoring and assembly GA 240/360 F ≤ 12
kg. -
mm
b) Supply, cutting, tailoring and assembly GA 240/360 F >12
kg. -
mm
c) Supply, cutting, tailoring and assembly RА 400/500-2 f ≤
kg. 12593
12 mm
d) Supply, cutting, tailoring and assembly RА 400/500-2 F >
kg. 16581
12 mm
TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
3. Other works   
Unit
Total
NO. Type of work Unitt Quantity price(€
price(€)

26. 8.456.11Steel fences of the objects set   

a) ”New Jersey" m1 75

27. 8.458 Finishing works of the superstructure of the object   

30. 8.4583 Protection of concrete areas under ground m2 783.38

33. 8.458.10Elements for dilatation   

a) with permanent elastic kit m1 41.72

TOTAL OTHER WORKS :   

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED CONCRETE
WORKS :
TOTAL OTHER WORKS :

TOTAL EUR :
Unit
Total
NO. Type of work Unit Quantity price(€
price(€)

1 2 3 4 5 6
B2 EARTH WORKS
Excavation of ground in wide excavation of the road until 1000m
B202 m3 253.00
in rock
TOTAL B2 :

B3 CONCRETE WORKS

concreting of foundation with C-15 m3 48.00

concreting of column with C-25 m3 75.00

concreting of placed beam with C-30 m3 4.50

concreting of plate with C-30 m3 21.00

concreting of foundation on wings with C-15 m3 6.60

concreting of wings with C-25 m3 10.80

concreting of base with C-15 m3 10.00

producing of chock from of gravel material m3 133.00

Producing and erection of reinforcement

until F 12mm kg 526.00

above F 12mm kg 1,074.00

TOTAL :

B2 EARTH WORKS

B3 CONCRETE WORKS

B3.1 FERRO-CONCRETE WORKS

10 % UNPREDICTED WORKS
TOTAL EUR
Unit Total
NO. Type of work Unit Quantity price(€ price(€
) )
1 2 3 4 5 6
SUPPLY AND TRANSPORT AND ASSEMBLY PIPE
1.1
CULVERT
1+658 F1000mm, m1 44.7

1+174 F1000mm, m1 48

3+080 F1000mm, m1 38.4

3+420 B.C, m1 3330.14

4+380 F1000mm, m1 40

4+600 F1000mm, m1 53.65

5+428 F1000mm, m1 51.2

7+920 F1000mm, m1 43.5

8+050 F1000mm, m1 48.7

10 % UNPREDICTED WORKS

TOTAL EUR
Unit Price Total Price

NO. Type of work Unit Quantity

1 2 3 4 5 6
1. 1. Reforesting
(€) (€)
2. 1.1 Supply and transport of annual plants

3. 1.1.1 - QUERCUS PUBESCENS pcs. 1270

4. 1.1.2 - PINUS NIGRA pcs. 20530

5. 1.1.3 - FRXINUS ORNUS pcs. 2779

6. 1.1.4 - ROBINIA PSEUDOACACIA pcs. 2350

7. 1.1.5 - ELAEAGNUS ANGUSTIFOLIA pcs. 1820

8. 1.1.6 - ACER OBTUSATUM pcs. 2382

9. 1.1.7 - JUNIPERUS COMMUNIS pcs. 105

- JUNIPERUS HORIZONTALIS
10. 1.1.8 pcs. 1040
"GlAUCA"
- BERBERIS x MEDIA "RED JEWEL"
11. 1.1.9 pcs. 9320

12. 1.1.10 - HEDERA HELIX pcs. 10320

13. 1.1.11 - CEDRUS DEODARA pcs. 168


- SPIRAEA x VANHOUTTEI
14. 1.1.12 pcs. 800
- SYRINGA VULGARIS "MME.
15. 1.1.13 pcs. 2026
LEMOINE"
16. 1.1.14 - SORBUS TORMINALIS pcs. 2382
17. 1.1.15 - TAMARIX PARVIFLORA pcs. 60
18. 1.1.16 - HYPERICUM CALYCINUM pcs. 9488
TOTAL:
19 1.2. Supply, transport and placing of mud L 89118
Supply, transport and placing of peat
20 1.3. L 20052
and fertilizer
Earth excavation for holes 20/20/20
21 1.4. m3 535
and planting
TOTAL:
TOTAL 1: Reforesting
22 2 SOWING OF GRASS
Evening and leveling of terrain
23 2.1 m2 43305
designated for planting grass
24 2.2 Spreading out humus d=20cm m3 8661
25 2.3 Rough and smooth leveling m2 43305
26 2.4 Supply and transport of grass kg 1732
27 2.5 Sowing and leveling m2 43305
TOTAL 2: SOWING OF GRASS

SUMMARY
1. REFORESTING
2. SOWING OF GRASS
TOTAL:
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
C001 8.4 Structures with an opening larger then 5,0 m 1

C002 8.45 Construction of the work


C003 8.451 Preparatory works:
a) The preparatory works for the object (cleaning of
the roads under the object), as well as the
C003.1 remaining works connected with the object (wedges,
stone piles, drainages, etc. are covered in the
calculations of the works for the lane of the road.

C004 8.452
1. Ground works
Wide excavation for foundations in dry with
C005 8.4521
spreading out storage and transport
C005.1 a) for a depth of 0-2 m1 m3 4,749.72
C005.2 a1) addition for rock m3 -
C005.3 b) for a depth of 2–4 m m3 3,682.00
C005.4 b1) addition for rock m3 3,682.00
C005.5 c) for a depth of 4–6 m m3 1,980.92
C005.6 c1) addition for rock m3 1,980.92
C005.7 d) for a depth of 6-8 m and further m3
C005.8 d1) addition for rock m3
Digging in of foundation of pillars in layers of 30 cm
C006 8.4528 m3 7,673.58
with compacting

TOTAL EARTHEN WORKS :

C007 8.455 2. Concrete and reinforced


concrete works
Concrete fill-in without formwork MB > 15
C008 8.45543 m3 122.16
(foundation for reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
C009 8.45561 m3 1,910.13
beams and slab-like foundations MB30
C010 8.455464 Reinforced concrete pillars
a)End pillars with ring beam and wings MB 30 M –
C010.1 m3 1,411.70
100
C010.2 b)Centre pillars МВ 30 m – 100 m3 786.38
C011 8.455465 Upper part of end and middle columns
a) Parapet and console wings for end columns MB
C011.1 m3 72.84
30 M – 100
C011.2 b) Laid joist for centre columns MB 30 M – 100 m3 412.38
Parapet beam and fences ”New Jersey” elements
C012 8.455468
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
C012.1 m3 169.62
protection, paint МB 45 М–100
C013 8.45546.10Assembly of main beam at the objects
C013.1 a) with weight until 100 t. br. 32
Pre-stressed and reinforced concrete elements of
C014 8.455481
the object
C014.1 a) Assembled pre-stressed girder MB 45 М–100 m3 999.36
Cross girders at objects of pre-stressed and
C015 8.455482
reinforced concrete
C015.1 a) of reinforced concrete MB 45 М–100 m3 127.52
C016 8.455483 Lane slab at the objects
C016.1 a) MB 45 M-100 d = 8+15=22 cm m3 698.58
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
C016.2 b) Transition slab MB 30 M-100 d=30 cm m3 31.71
C017 8.455487 Injection of cables m1 4,224.00
C018 8.4556 Protection of the slopes of the embankment with
C018.1 a) Production of concrete canals MB 30 М–100 m1 30.00
C019 8.456 Activities of metal
C020 8.4562 Reinforcement of concrete steel
a) Supply, cutting, tailoring and assembly GA
C020.1 kgr. 26,164.00
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
C020.2 kgr. 2,670.00
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА
C020.3 kgr. ###
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
C020.4 kgr. ###
400/500-2 F > 12 mm
C021 8.4567 Reinforcement for pre-stressing
Ropes and wires for overtensing anchors, the safety
C022 8.45671 pipes assembly and overtensing sO2 / sv = 1670 /
1860
C022.1 a) For cables kgr. 57,744.00
C022.2 b) Anchors br. 256
C022.3 c) Pipes m1 4,224.00

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :
3. Other works
Dilatational devices of roadway surfaces of the
C023 8.45681 m1 35.25
building type T-100
Dilatational devices of fence NEW JERSEY type
C024 8.45682 m1 12.00
RHEINSTHAL
C025 8.4569 Drainpipes of cast iron with water outlet br. 8
with respect to detail L = 126 m m1 263.00
C025.1 a) Supply and building landmarks for oscultation br. 17
C026 8.456.11 Steel fences of the objects set
C026.1 a) ”New Jersey m1 565.40
C027 8.458 Finishing works of the superstructure of the object
C028 8.4582 Hydroinsulation of objects
C029 8.45822 Hydroinsulation of ready insulation tapes, strips m2 2,932.95
C030 8.4583 Protection of concrete areas under ground m2 6,658.20
C031 8.4584 Roadway of the objects d = 7 cm m2 2,932.95
C032 8.4589 Elastomer bearings with dimensions :300/400/85 br. 64
C033 8.458.10 Elements for dilatation
C033.1 a) with permanent elastic kit m1 347.37
C034 8.458.11 Testing of ready object br. 1
Production and the construction of slab with year of
C035 8.458.13 br. 1
construction and category of the object.

TOTAL OTHER WORKS :

SUMMARY

TOTAL EARTHEN WORKS :

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :

TOTAL OTHER WORKS :


Unit price Total price
No. Type of work Unit Quantity
(€) (€)

TOTAL EUR :
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
C001 8.4 Structures with an opening larger then 5,0 m1

C037 8.45 Construction of the work


C038 8.451 Preparatory works:
a) The preparatory works for the object (cleaning of
the roads under the object), as well as the
C038.1 remaining works connected with the object (wedges,
stone piles, drainages, etc. are covered in the
calculations of the works for the lane of the road.
C039 8.452
1. Ground works
Wide excavation for foundations in dry with
C040 8.4521 -
spreading out storage and transport
C040.1 a) for a depth of 0-2 m1 m3 2,163.10
C040.2 a1) addition for rock m3 -
C040.3 b) for a depth of 2–4 m m3 1,752.20
C040.4 b1) addition for rock m3 1,752.20
C040.5 c) for a depth of 4–6 m m3 1,043.72
C040.6 c1) addition for rock m3 1,043.72
C040.7 d) for a depth of 6-8 m and further m3
C040.8 d1) addition for rock m3
Digging in of foundation of pillars in layers of 30 cm
C041 8.4528 m3 4,201.40
with compacting

TOTAL EARTHEN WORKS :

C042 8.455 2. Concrete and reinforced


concrete works
Concrete fill-in without formwork MB > 15
C043 8.45543 m3 46.10
(foundation for reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
C044 8.45561 m3 711.52
beams and slab-like foundations MB30
C045 8.455464 Reinforced concrete pillars
a)End pillars with ring beam and wings MB 30 M –
C045.1 m3 -
100
C045.2 b)Centre pillars МВ 30 m – 100 m3 723.60
C046 8.455465 Upper part of end and middle columns
a) Parapet and console wings for end columns MB
C046.1 m3 -
30 M – 100
C046.2 b) Laid joist for centre columns MB 30 M – 100 m3 403.34
Parapet beam and fences ”New Jersey” elements
C047 8.455468
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
C047.1 m3 165.80
protection, paint МB 45 М–100
C048 8.45546.10Assembly of main beam at the objects
C048.1 a) with weight until 100 t. br. 32
Pre-stressed and reinforced concrete elements of
C049 8.455481
the object
C049.1 a) Assembled pre-stressed girder MB 45 М–100 m3 999.36
Cross girders at objects of pre-stressed and
C050 8.455482
reinforced concrete
C050.1 a) of reinforced concrete MB 45 М–100 m3 123.68
C051 8.455483 Lane slab at the objects
C051.1 a) MB 45 M-100 d = 8+15=22 cm m3 680.55
C051.2 b) Transition slab MB 30 M-100 d=30 cm m3 31.71
C052 8.455487 Injection of cables m1 4,224.00
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
C053 8.4556 Protection of the slopes of the embankment with
C053.1 a) Production of concrete canals MB 30 М–100 m1
C054 8.456 Activities of metal
C055 8.4562 Reinforcement of concrete steel
a) Supply, cutting, tailoring and assembly GA
C055.1 kgr. 25,808.00
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
C055.2 kgr. 2,670.00
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА
C055.3 kgr. ###
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
C055.4 kgr. ###
400/500-2 F > 12 mm
C056 8.4567 Reinforcement for pre-stressing
Ropes and wires for overtensing anchors, the safety
C057 8.45671 pipes assembly and overtensing sO2 / sv = 1670 /
1860
C057.1 a) For cables kgr. 57,744.00
C057.2 b) Anchors br. 256
C057.3 c) Pipes m1 4,224.00

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :

3. Other works
Dilatational devices of roadway surfaces of the
C058 8.45681 m1 35.25
building type T-100
Dilatational devices of fence NEW JERSEY type
C059 8.45682 m1 12.00
RHEINSTHAL
C060 8.4569 Drainpipes of cast iron with water outlet br. 8
with respect to detail L = 126 m m1 263.00
C060.1 a) Supply and building landmarks for oscultation br. 17.00
C061 8.456.11 Steel fences of the objects set
C061.1 a) ”New Jersey m1 552.67
C062 8.458 Finishing works of the superstructure of the object
C063 8.4582 Hydroinsulation of objects
C064 8.45822 Hydroinsulation of ready insulation tapes, strips m2 2,850.95
C065 8.4583 Protection of concrete areas under ground m2 2,132.44
C066 8.4584 Roadway of the objects d = 7 cm m2 2,850.95
C067 8.4589 Elastomer bearings with dimensions :300/400/85 br. 64
C068 8.458.10 Elements for dilatation
C068.1 a) with permanent elastic kit m1 347.37
C069 8.458.11 Testing of ready object br. 1
Production and the construction of slab with year of
C070 8.458.13 br. 1
construction and category of the object.
TOTAL OTHER WORKS :

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS :
TOTAL OTHER WORKS :

TOTAL EUR :
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
C001 8.4 Structures with an opening larger then 5,0 m1

C072 8.45 Construction of the work


C073 8.451 Preparatory works:
a) The preparatory works for the object (cleaning of
the roads under the object), as well as the
C073.1 remaining works connected with the object (wedges,
stone piles, drainages, etc. are covered in the
calculations of the works for the lane of the road.

C074 8.452
1. Ground works
Wide excavation for foundations in dry with
C075 8.4521 -
spreading out storage and transport
C075.1 a) for a depth of 0-2 m1 m3 2,309.92
C075.2 a1) addition for rock m3 -
C075.3 b) for a depth of 2–4 m m3 1,918.20
C075.4 b1) addition for rock m3 1,918.20
C075.5 c) for a depth of 4–6 m m3 868.33
C075.6 c1) addition for rock m3 868.33
C075.7 d) for a depth of 6-8 m and further m3 137.97
C075.8 d1) addition for rock m3 137.97
Digging in of foundation of pillars in layers of 30 cm
C076 8.4528 m3 4,759.87
with compacting

TOTAL EARTHEN WORKS :

C077 8.455 2. Concrete and reinforced


concrete works
Concrete fill-in without formwork MB > 15
C078 8.45543 m3 92.74
(foundation for reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
C079 8.45561 m3 1,461.81
beams and slab-like foundations MB30
C080 8.455464 Reinforced concrete pillars
C080.1 a)End pillarsand wings MB 30 M – 100 m3 1,348.12
C080.2 b)Centre pillars МВ 35 m – 100 m3 392.58
C081 8.455465 Upper part of end and middle columns
a) Parapet and console wings for end columns MB
C081.1 m3 76.76
30 M – 100
C081.2 b) Laid joist for centre columns MB 35 M – 100 m3 239.35
Parapet beam and fences ”New Jersey” elements
C082 8.455468
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
C082.1 m3 113.25
protection, paint МB 45 М–100
C083 8.45546.10Assembly of main beam at the objects
C083.1 a) with weight until 100 t. Nr. 20
Pre-stressed and reinforced concrete elements of
C084 8.455481
the object
C084.1 a) Assembled pre-stressed girder MB 45 М–100 m3 631.05
Cross girders at objects of pre-stressed and
C085 8.455482
reinforced concrete
C085.1 a) of reinforced concrete MB 45 М–100 m3 83.90
C086 8.455483 Lane slab at the objects
C086.1 a) MB 45 M-100 d = 7+15=22 cm m3 413.97
C086.2 b) Transition slab MB 30 M-100 d=30 cm m3 31.71
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
C087 8.455487 Injection of cables m1 2,640.00
C088 8.4556 Protection of the slopes of the embankment with
C088.1 a) Production of concrete canals MB 30 М–100 m1 30.00
C089 8.456 Activities of metal
C090 8.4562 Reinforcement of concrete steel
a) Supply, cutting, tailoring and assembly GA
C090.1 kg. 16,191.00
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
C090.2 kg. 1,675.00
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА
C090.3 kg. ###
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
C090.4 kg. ###
400/500-2 F > 12 mm
C091 8.4567 Reinforcement for pre-stressing   
Ropes and wires for overtensing anchors, the safety
C092 8.45671 pipes assembly and overtensing sO2 / sv = 1670 /   
1860
C092.1 a) For cables kg. 36,090.00
C092.2 b) Anchors Nr. 160
C092.3 c) Pipes m1 2,640.00

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :
3. Other works
Dilatational devices of roadway surfaces of the
C093 8.45681 m1 35.25
building type T-160
Dilatational devices of fence NEW JERSEY type
C094 8.45682 m1 6.60
RHEINSTHAL
C095 8.4569 Drainpipes of cast iron with water outlet Nr. 5
with respect to detail L = 222.10 m m1 153.75
C095.1 a) Supply and building landmarks for oscultation Nr. 11.00
C096 8.456.11 Steel fences of the objects set   
C096.1 a) ”New Jersey m1 377.48
C097 8.458 Finishing works of the superstructure of the object   
C098 8.4582 Hydroinsulation of objects   
C099 8.45822 Hydroinsulation of ready insulation tapes, strips m2 1,881.68
C100 8.4583 Protection of concrete areas under ground m2 5,274.00
C101 8.4584 Roadway of the objects d = 7 cm m2 1,881.68
C102 8.4589 Elastomer bearings with dimensions 300/400/85 Nr. 40
C103 8.458.10 Elements for dilatation   
C103.1 a) with permanent elastic kit m1 187.99
C104 8.458.11 Testing of ready object Nr. 1
Production and the construction of slab with year of
C105 8.458.13 Nr. 1
construction and category of the object.

TOTAL OTHER WORKS :

SUMMARY

TOTAL EARTHEN WORKS :

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :
Unit price Total price
No. Type of work Unit Quantity
(€) (€)

TOTAL OTHER WORKS :

TOTAL EUR :
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
C106 8.4 Structures with an opening larger then 5,0 m1

C107 8.45 Construction of the work


C108 8.451 Preparatory works:
a) The preparatory works for the object (cleaning of
the roads under the object), as well as the
C108.1 remaining works connected with the object (wedges,
stone piles, drainages, etc. are covered in the
calculations of the works for the lane of the road.
C109 8.452
1. Ground works
Wide excavation for foundations in dry with
C110 8.4521 -
spreading out storage and transport
C110.1 a) for a depth of 0-2 m1 m3 477.01
C110.2 a1) addition for rock m3 -
C110.3 b) for a depth of 2–4 m m3 378.69
C110.4 b1) addition for rock m3 378.69
C110.5 c) for a depth of 4–6 m m3 150.83
C110.6 c1) addition for rock m3 150.83
Digging in of foundation of pillars in layers of 30 cm
C111 8.4528 m3 734.20
with compacting

TOTAL EARTHEN WORKS :

C112 8.455 2. Concrete and reinforced


concrete works
Concrete fill-in without formwork MB > 15
C113 8.45543 m3 16.93
(foundation for reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
C114 8.45561 m3 255.40
beams and slab-like foundations MB30
C115 8.455464 Reinforced concrete pillars
a)End pillars with ring beam and wings MB 30 M –
C115.1 m3 -
100
C115.2 b)Centre pillars МВ 35 m – 100 m3 347.40
C116 8.455465 Upper part of end and middle columns
a) Parapet and console wings for end columns MB
C116.1 m3 -
30 M – 100
C116.2 b) Laid joist for centre columns MB 35 M – 100 m3 239.35
Parapet beam and fences ”New Jersey” elements
C117 8.455468   
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
C117.1 m3 110.16
protection, paint МB 45 М–100
C118 8.4554610Assembly of main beam at the objects   
C118.1 a) with weight until 100 t. Nr. 20
Pre-stressed and reinforced concrete elements of
C119 8.455481   
the object
C119.1 a) Assembled pre-stressed girder MB 45 М–100 m3 631.05
Cross girders at objects of pre-stressed and
C120 8.455482
reinforced concrete
C120.1 a) of reinforced concrete MB 45 М–100 m3 83.90
C121 8.455483 Lane slab at the objects
C121.1 a) MB 45 M-100 d = 7+15=22 cm m3 413.97
C121.2 b) Transition slab MB 30 M-100 d=30 cm m3 31.71
C122 8.455487 Injection of cables m1 2,640.00
C123 8.4556 Protection of the slopes of the embankment with   
C123.1 a) Production of concrete canals MB 30 М–100 m1 -
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
C124 8.456 Activities of metal   
C125 8.4562 Reinforcement of concrete steel   
a) Supply, cutting, tailoring and assembly GA
C125.1 kg. 16,191.00
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
C125.2 kg. 1,669.00
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА
C125.3 kg. ###
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
C125.4 kg. ###
400/500-2 F > 12 mm
C126 8.4567 Reinforcement for pre-stressing   
Ropes and wires for overtensing anchors, the safety
C127 8.45671 pipes assembly and overtensing sO2 / sv = 1670 /   
1860
C127.1 a) For cables kg. 36,090.00
C127.2 b) Anchors Nr. 160
C127.3 c) Pipes m1 2,640.00

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :

3. Other works   
Dilatational devices of roadway surfaces of the
C128 8.45681 m1 35.25
building type T-100
Dilatational devices of fence NEW JERSEY type
C129 8.45682 m1 6.60
RHEINSTHAL
C130 8.4569 Drainpipes of cast iron with water outlet Nr. 5
with respect to detail L = 189.13 m m1 153.75
C130.1 a) Supply and building landmarks for oscultation Nr. 11
C131 8.456.11 Steel fences of the objects set   
C131.1 a) ”New Jersey m1 367
C132 8.458 Finishing works of the superstructure of the object   
C133 8.4582 Hydroinsulation of objects   
C134 8.45822 Hydroinsulation of ready insulation tapes, strips m2 1,881.69
C135 8.4583 Protection of concrete areas under ground m2 1,062.00
C136 8.4584 Roadway of the objects d = 7 cm m2 1,881.69
C137 8.4589 Elastomer bearings with dimensions 300/400/85 Nr. 40
C138 8.458.10 Elements for dilatation   
C138.1 a) with permanent elastic kit m1 182.87
C139 8.458.11 Testing of ready object Nr. 1
Production and the construction of slab with year of
C140 8.458.13 Nr. 1
construction and category of the object.
TOTAL OTHER WORKS :

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS :
TOTAL OTHER WORKS :

TOTAL EUR :
Unit price Total price
No. Type of work/Вид на работа Unit Quantity
(€) (€)
1 2 3 4 5 6
Structures with an opening larger then 5,0 m /
1
C141 8.4
Објекти со отвор поголем од 5,0 м1

C142 8.45 Construction of the work/ Изведба на работата


C143 8.451 Preparatory works:
a) The preparatory works for the object (cleaning of
the roads under the object), as well as the
remaining works connected with the object (wedges,
stone piles, drainages, etc. are covered in the
calculations of the works for the lane of the road.
C143.1
Подготвителни работи на објект (чистење на
патиштата под објектот), како и на останатитe
работи поврзани со објектот (клинови, купови од
камења, одводни канали, итн, се опфатени во
пресметките на работите за патот.

C144 8.452
1. Ground works
Wide excavation for foundations in dry with
C145 8.4521 -
spreading out storage and transport
C145.1 a) for a depth of 0-2 m1 m3 2,220.00
C145.2 a1) addition for rock m3 -
C145.3 b) for a depth of 2–4 m m3 2,597.00
C145.4 b1) addition for rock m3 2,597.00
Digging in of foundation of pillars in layers of 30 cm
C146 8.4528 m3 1,456.00
with compacting
Production of the grid stone wedge under the lane
C147 8.452 m3 1,258.40
construction

TOTAL EARTHEN WORKS :

C148 8.455 2. Concrete and reinforced


concrete works
Concrete fill-in without formwork MB > 15
C149 8.45543 m3 62.40
(foundation for reinforced concrete foundations).
Concreting of foundation for covering of slope with
C150 8.455 m3 22.50
concrete blocks MB 30
Reinforced concrete foundation cobblestone, contra
C151 8.45561 m3 1,005.00
beams and slab-like foundations MB30
C152 8.455464 Reinforced concrete pillars
a)End pillars with ring beam and wings MB 30 M –
C152.1 m3 493.80
100
C152.2 b)Centre pillars МВ 35 m – 100 m3 684
C153 8.455465 Upper part of end and middle columns
a) Parapet and console wings for end columns MB
C153.1 m3 108.72
30 M – 100
C153.2 b) Laid joist for centre columns MB 35 M – 100 m3 264
Parapet beam and fences ”New Jersey” elements
C154 8.455468   
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
C154.1 m3 153.00
protection, paint МB 45 М–100
C155 8.45546.10Assembly of main beam at the objects   
C155.1 a) with weight 130 t. Nr. 20.00
Pre-stressed and reinforced concrete elements of
C156 8.455481   
the object
C156.1 a) Assembled pre-stressed girder MB 50 М–100 m3 1,060.91
Cross girders at objects of pre-stressed and
C157 8.455482
reinforced concrete
Unit price Total price
No. Type of work/Вид на работа Unit Quantity
(€) (€)
C157.1 a) of reinforced concrete MB 50 М–100 m3 131.33
C158 8.455483 Lane slab at the objects
C158.1 a) MB 45 M-100 d = 7+15=22 cm m3 541.58
C158.2 b) Transition slab MB 30 M-100 d=30 cm m3 33.00
C159 8.455487 Injection of cables m1 5,040.00
C160 8.456 Activities of metal   
C161 8.4562 Reinforcement of concrete steel   
a) Supply, cutting, tailoring and assembly GA
C161.1 kg. 20,546.43
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
C161.2 kg. 374.46
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА
C161.3 kg. ###
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
C161.4 kg. ###
400/500-2 F > 12 mm
C162 8.4567 Reinforcement for pre-stressing   
Ropes and wires for overtensing anchors, the safety
C163 8.45671 pipes assembly and overtensing sO2 / sv = 1670 /   
1860
C163.1 a) For cables kg. 64,800.00
C163.2 b) Anchors Nr. 128
C163.3 c) Pipes m1 2,274.00

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :
3. Other works   
Dilatational devices of roadway surfaces of the
C164 8.45681 m1 34.35
building type
C165 8.4569 Drainpipes of cast iron with water outlet Nr. 13
C165.1 with respect to detail m1 20.00
C166 8.456.11 Steel fences of the objects set   
C166.1 a) ”New Jersey kg. 7,500.00
C167 8.458 Finishing works of the superstructure of the object   
C168 8.4582 Hydroinsulation of objects   
C169 8.45822 Hydroinsulation of ready insulation tapes, strips m2 2,332.75
C170 8.4583 Protection of concrete areas under ground m2 2,525
C171 8.4584 Roadway of the objects d = 6 cm m2 2,332.50
C172 8.4589 Elastomer bearings br. 40.00
C173 8.458.10 Elements for dilatation   
C173.1 a) with permanent elastic kit m1 430.00
Protection of cones and surfaces, according to the
C174 8.4556 150
project with concrete blocks
C175 8.458.11 Testing of ready object Nr. 1
Production and the construction of slab with year of
C176 8.458.13 Nr. -
construction and category of the object.

TOTAL OTHER WORKS :

SUMMARY

TOTAL EARTHEN WORKS :

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :

TOTAL OTHER WORKS :


Unit price Total price
No. Type of work/Вид на работа Unit Quantity
(€) (€)

TOTAL EUR :
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
C177 8.4 Structures with an opening larger then 5,0 m1

C178 8.45 Construction of the work


C179 8.451 Preparatory works:
a) The preparatory works for the object (cleaning of
the roads under the object), as well as the
C179.1 remaining works connected with the object (wedges,
stone piles, drainages, etc. are covered in the
calculations of the works for the lane of the road.

C180 8.452
1. Ground works
Wide excavation for foundations in dry with
C181 8.4521
spreading out storage and transport
C181.1 a) for a depth of 0-2 m1 m3 2,220.00
C181.2 a1) addition for rock m3 -
C181.3 b) for a depth of 2–4 m m3 3,746.00
C181.4 b1) addition for rock m3 3,756.00
Digging in of foundation of pillars in layers of 30 cm
C182 8.4528 m3 1,733.80
with compacting
Production of the grid stone wedge under the lane
C183 8.452 m3 -
construction

TOTAL EARTHEN WORKS :

C184 8.455 2. Concrete and reinforced


C185 concrete works
Concrete fill-in without formwork MB > 15
C186 8.45543 m3 -
(foundation for reinforced concrete foundations).
Concreting of foundation for covering of slope with
C187 8.455 m3 22.50
concrete blocks MB 30
Reinforced concrete foundation cobblestone, contra
C188 8.45561 m3 1,005
beams and slab-like foundations MB30
C189 8.455464 Reinforced concrete pillars
a)End pillars with ring beam and wings MB 30 M –
C189.1 m3 -
100
C189.2 b)Centre pillars МВ 35 m – 100 m3 684.10
C190 8.455465 Upper part of end and middle columns
a) Parapet and console wings for end columns MB
C190.1 m3 12
30 M – 100
C190.2 b) Laid joist for centre columns MB 35 M – 100 m3 264.36
Parapet beam and fences ”New Jersey” elements
C191 8.455468
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
C191.1 m3 153.00
protection, paint МB 45 М–100
C192 8.45546.10Assembly of main beam at the objects
C192.1 a) with weight 130 t. br. 20.00
Pre-stressed and reinforced concrete elements of
C193 8.455481
the object
C193.1 a) Assembled pre-stressed girder MB 50 М–100 m3 1,060.91
Cross girders at objects of pre-stressed and
C194 8.455482
reinforced concrete
C194.1 a) of reinforced concrete MB 50 М–100 m3 131.33
C195 8.455483 Lane slab at the objects
C195.1 a) MB 45 M-100 d = 7+15=22 cm m3 541.58
C195.2 b) Transition slab MB 30 M-100 d=30 cm m3 33.00
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
C196 8.455487 Injection of cables m1 5,040.00
C197 8.456 Activities of metal
C198 8.4562 Reinforcement of concrete steel
a) Supply, cutting, tailoring and assembly GA
C198.1 kgr. 20,546.43
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
C198.2 kgr. 367.43
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА
C198.3 kgr. ###
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
C198.4 kgr. ###
400/500-2 F > 12 mm
C199 8.4567 Reinforcement for pre-stressing
Ropes and wires for overtensing anchors, the safety
C200 8.45671 pipes assembly and overtensing sO2 / sv = 1670 /
1860
C200.1 a) For cables kgr. 64,800.00
C200.2 b) Anchors br. 128
C200.3 c) Pipes m1 2,274.00

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :
3. Other works
Dilatational devices of roadway surfaces of the
C201 8.45681 m1 34.35
building type
C202 8.4569 Drainpipes of cast iron with water outlet br. 13.00
C202.1 with respect to detail br. 20
C203 8.456.11 Steel fences of the objects set
C203.1 a) ”New Jersey kgr. 7,500
C204 8.458 Finishing works of the superstructure of the object
C205 8.4582 Hydroinsulation of objects
C206 8.45822 Hydroinsulation of ready insulation tapes, strips m2 2,333
C207 8.4583 Protection of concrete areas under ground m2 2,525.00
C208 8.4584 Roadway of the objects d = 6 cm m2 2,332.50
C209 8.4589 Elastomer bearings br. 40
C210 8.458.10 Elements for dilatation
C1210.1 a) with permanent elastic kit m1 430.00
Protection of cones and surfaces, according to the
C211 8.4556 150.00
project with concrete blocks
C212 8.458.11 Testing of ready object br. 1
Production and the construction of slab with year of
C213 8.458.13 br. -
construction and category of the object.
TOTAL OTHER WORKS :

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS :
TOTAL OTHER WORKS :

TOTAL EUR :
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6

C214 8.45 Construction of the work


C215 8.451 PREPARATORY WORKS
The preparatory works of the object (cleaning of the
routeunder the object) as well as other remaining
C215.1 worksconnected with the object (wedges, stone
piles,drainages)are concluded in the calculations of
the works for the route

C216 8.452 1. EARTHWORKS


Wide excavation for foundations in dry with
C217 8.4521 -
spreading out storage and transport
C217.1 Depth 0 – 2m m3 3,281.00
C217.2 Attachment for excavation in rock m3 1,641.00
C217.3 Depth 2 – 4m m3 2,213.00
C217.4 Attachment for excavation in rock m3 1,107.00
C217.5 Depth 4 - 6m m3 1,280.00
C217.6 Attachment for excavation in rock m3 640.00
C217.7 Depth 6 – 8m m3 708.00
C217.8 Attachment for excavation in rock m3 354.00
Excavation for foundation in opened caisson or well
C218 8.4525 m3
pipeswith transport of excavated material
C218.1 Depth 0 - 2m m3 649.00
C218.2 Attachment for excavation in rock m3 649.00
C218.3 Depth 2 - 4m m3 618.00
C218.4 Attachment for excavation in rock m3 618.00
C218.5 Depth 4 - 6m m3 608.00
C218.6 Attachment for excavation in rock m3 608.00
C218.7 Attachment for excavation in presence of water m3 608.00
C218.8 Depth 6 - 8m m3 615.00
C218.9 Attachment for excavation in rock m3 615.00
C218.10 Attachment for excavation in presence of water m3 615.00
C218.11 Depth exceeding 8m m3 1,611.00
C218.12 Attachment for excavation in rock m3 1,611.00
C218.13 Attachment for excavation in presence of water m3 1,611.00
Production of cones with earthen material in layers
C219 8.4526 m3 650.00
of 30cm with compression
Burying of foundation with earthen material in layers
C220 8.4528 m3 5,165.00
of 30cm with compression

TOTAL EARTHWORKS (MKD)

2. CONCRETE AND REINFORCED CONCRETE


C221 8.455
WORKS

Concreting of foundation and wall protection of


C222 8.45541 m3 17.00
overlay of cones MB–30 М–100
Concreting of foundation in open caisson or wells (in
C223 8.455411 presence of underground water with drawing of m3 736.00
water) MB–30 (Cover tiles in wells)
Concreting of foundation in open caisson or wells
C224 8.455412 (with control drawing of water or sub-aquatic m3 3,232.00
concerting) MB–30filled in of wells
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
Reinforced concrete caisson or well pipes and
C225 8.455462 protective reinforced concrete curtains MB–30 in m3 92.00
panelling
Concreting of foundation for foundation of non-
C226 8.45543 m3 89.00
reinforced concrete d=10сm MB-20

C227 8.45561 Reinforced concrete foundation in panelling MB-30 m3 480.00


C228 8.455464 Reinforced concrete pillars
Reinforced concrete end pillars and wing walls MB–
C228.1 m3 776.00
30 M-100 in panelling with necessary scaffold
Reinforced concrete centre pillars and МB–35 M-
C228.2 m3 2,335.00
100 in panelling with necessary scaffold
Production and assembly of reinforced concrete
C229 8.455468 fence type New Jersey with surface protection m3 322.00
(protective application) MB–45 М-100
Reinforced concretemonolith overloaded boxed
C230 8.455481 main Span construction according to system free m3 7,340.00
cantilever construction MB–45 М100 OSMO–15
Reinforced concrete overbridging slabs MB–30 M-
C231 8.455483 m3 32.00
100 d=30сm
IInjection of cables 19T15 (7Т15) with injectional
C232 8.456487 m1 18,990.00
mass according to project
Protection of conical slopes with concrete inlay
C233 8.4556 d=15сm on base of compressed sand MB–30 M- m2 258.00
100 (according to detail)
Precast drainage blocks casted on layer of concrete
C233.1 for drainage of conical slopes MB–30 M-100 m1 5.00
(according to detail)
TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS (MKD)

C234 8.456 REINFORCEMENT AND LOCK WORKS


C235 8.4562 Reinforcement of concrete steel
a) Supply, pruning and assembly GА–240/360 with
C235.1 kg -
diameter to12mm
b) Supply, pruning and assembly GА–240/360 with
C235.2 kg -
diameter over 12mm
c) Supply, pruning and assembly RА–400/500–2
C235.3 kg ###
with diameter to12mm
d) Supply, pruning and assembly RА–400/500–2
C235.4 kg 1,824,250
with diameter over 12mm
C236 8.4567 Reinforcement for overtensioning
C237 8.45671 Ropes and wires for overtensing
C237.1 a) Cables type 19T15 system FREYSSINET kg ###
C237.2 b) Cables type 7T15 system FREYSSINET kg 1,150
C237.3 c) Anchors type 19C15 (7C15) nr.
C237.4 d)Protection pipes 95/101 mm m1 18,840.00
C237.5 D) Protection pipes 60/66 mm m1 150.00
TOTAL REINFORCEMENT AND LOCK WORKS
(MKD)
3. OTHER WORKS
Dilatational cluthes of roadway lands type algaflex
C238 8.45681 m1 24.00
Type TM640
C239 8.45682 Dilatational cluthes for ABZO type “New Jersey” m1 4.00
C240 8.4569 Cast iron drainpipes with water outlet
(according to the details for draining nr. 55.00
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
Horizontal installation for drainage (according to
C240.1 m1 520.00
project for draining
Vertical installation for drainage (according to
C240.2 m1 197.00
project for draining
C240.3 Supply and embedding of samples for auscultations nr. 22
Lock (Metal) part of ABZO the fence type “New
C240.4 kg 21,032
Jersey”
C241 8.4582 Hydroinsolation of the object
C242 8.45822 Hydroinsolation of the roadway m2 5,694.00
Protection of concrete areas dig in earth with
C243 8.4583 m2 1,850.00
protective paint
Protection of concrete areas with laying over-fence
C244 8.45323 m2 1,145.00
and with protective paint
C245 8.4584 Roadway of the asphalt objects concrete d=7cm m2 5,612.00
Metallic holder of pipes for installation along the
C246 8.4588 nr. 255.00
object
Instalation of fugues with permanent elastic putty
C247 8.458.10 m1 290.00
(ABZO type “New Јаrsey"
C248 8.458.11 Testing of final object nr. 1
Production of panel with year of construction and
C249 8.458.13 nr. 1
category of the object
C250 8.4589 Teflon bearings movable in longitudinal direction
C250.1 PNu 9 000 KN nr. 4
C250.2 PNu 19 000 KN nr. 4
Diffuse hydraulic shock absorbers 1500 КН moving
C250.3 nr. 6
300+/–150mm
C251 8.456 One wing metal doors 102/152cm nr. 6
C252 8.456 One wing metal shutters 90/90 cm nr. 4
Metal lock stairs in centre columns with base
C253 8.456 m1 191
(according to project)
TOTAL REMAINING WORKS (MKD)

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS :
TOTAL REINFORCEMENT AND LOCK WORKS
(MKD)
TOTAL OTHER WORKS :

TOTAL EUR :
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6

C254 8.45 Construction of the work


C255 8.451 PREPARATORY WORKS
The preparatory works of the object (cleaning of the
routeunder the object) as well as other remaining
C255.1 worksconnected with the object (wedges, stone
piles,drainages)are concluded in the calculations of
the works for the route

C256 8.452 1. EARTHWORKS


Wide excavation for foundations in dry with
C257 8.4521 -
spreading out storage and transport
C257.1 Depth 0 – 2m m3 3,990.00
C257.2 Attachment for excavation in rock m3 1,995.00
C257.3 Depth 2 – 4m m3 2,510.00
C257.4 Attachment for excavation in rock m3 1,255.00
C257.5 Depth 4 - 6m m3 1,280.00
C257.6 Attachment for excavation in rock m3 640.00
C257.7 Depth 6 – 8m m3 708.00
C257.8 Attachment for excavation in rock m3 354.00
Excavation for foundation in opened caisson or well
C258 8.4525 m3
pipeswith transport of excavated material
C258.1 Depth 0 - 2m m3 649.00
C258.2 Attachment for excavation in rock m3 325.00
C258.3 Depth 2 - 4m m3 618.00
C258.4 Attachment for excavation in rock m3 162.00
C258.5 Depth 4 - 6m m3 608.00
C258.6 Attachment for excavation in rock m3 304.00
C258.7 Attachment for excavation in presence of water m3 608.00
C258.8 Depth 6 - 8m m3 615.00
C258.9 Attachment for excavation in rock m3 615.00
C258.10 Attachment for excavation in presence of water m3 615.00
C258.11 Depth exceeding 8m m3 1,611.00
C258.12 Attachment for excavation in rock m3 1,611.00
C258.13 Attachment for excavation in presence of water m3 1,611.00
Production of cones with earthen material in layers
C259 8.4526 m3 132.00
of 30cm with compression
Burying of foundation with earthen material in layers
C260 8.4528 m3 6,800.00
of 30cm with compression

TOTAL EARTHWORKS (MKD)

2. CONCRETE AND REINFORCED CONCRETE


C261 8.455
WORKS

Concreting of foundation and wall protection of


C262 8.45541 m3 6.00
overlay of cones MB–30 М–100
Concreting of foundation in open caisson or wells (in
C263 8.455411 presence of underground water with drawing of m3 736.00
water) MB–30 (Cover tiles in wells)
Concreting of foundation in open caisson or wells
C264 8.455412 (with control drawing of water or sub-aquatic m3 3,232.00
concerting) MB–30filled in of wells
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
Reinforced concrete caisson or well pipes and
C265 8.455462 protective reinforced concrete curtains MB–30 in m3 92.00
panelling
Concreting of foundation for foundation of non-
C266 8.45543 84.00
reinforced concrete d=10сm MB-20

C267 8.45561 Reinforced concrete foundation in panelling MB-30 m3 385.00


C268 8.455464 Reinforced concrete pillars
Reinforced concrete end pillars and wing walls MB–
C268.1 m3 558.00
30 M-100 in panelling with necessary scaffold
Reinforced concrete centre pillars and МB–35 M-
C268.2 m3 2,335.00
100 in panelling with necessary scaffold
Production and assembly of reinforced concrete
C269 8.455468 fence type New Jersey with surface protection m3 321.00
(protective application) MB–45 М-100
Reinforced concretemonolith overloaded boxed
C270 8.455481 main Span construction according to system free m3 7,340.00
cantilever construction MB–45 М100 OSMO–15
Reinforced concrete overbridging slabs MB–30 M-
C271 8.455483 m3 31.00
100 d=30сm
IInjection of cables 19T15 (7Т15) with injectional
C272 8.456487 m1 18,990.00
mass according to project
Protection of conical slopes with concrete inlay
C273 8.4556 d=15сm on base of compressed sand MB–30 M- m2 18.00
100 (according to detail)
Precast drainage blocks casted on layer of concrete
C274 for drainage of conical slopes MB–30 M-100 m1 3.00
(according to detail)
TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS (MKD)

C275 8.456 REINFORCEMENT AND LOCK WORKS


C276 8.4562 Reinforcement of concrete steel
a) Supply, pruning and assembly GА–240/360 with
C276.1 kg -
diameter to12mm
b) Supply, pruning and assembly GА–240/360 with
C276.2 kg -
diameter over 12mm
c) Supply, pruning and assembly RА–400/500–2
C276.3 kg ###
with diameter to12mm
d) Supply, pruning and assembly RА–400/500–2
C276.4 kg 1,824,250
with diameter over 12mm
C277 8.4567 Reinforcement for overtensioning
C278 8.45671 Ropes and wires for overtensing
C278.1 a) Cables type 19T15 system FREYSSINET kg ###
C278.2 b) Cables type 7T15 system FREYSSINET kg 1,150
C278.3 c) Anchors type 19C15 (7C15) nr.
C278.4 d)Protection pipes 95/101 mm m1 18,840.00
C278.5 D) Protection pipes 60/66 mm m1 150.00
TOTAL REINFORCEMENT AND LOCK WORKS
(MKD)
3. OTHER WORKS
Dilatational cluthes of roadway lands type algaflex
C279 8.45681 m1 24.00
Type TM640
C280 8.45682 Dilatational cluthes for ABZO type “New Jersey” m1 4.00
C281 8.4569 Cast iron drainpipes with water outlet
(according to the details for draining nr. 26.00
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
Horizontal installation for drainage (according to
C281.1 m1 520.00
project for draining
Vertical installation for drainage (according to
C281.2 m1 182.00
project for draining
C281.3 Supply and embedding of samples for auscultations nr. 22
Lock (Metal) part of ABZO the fence type “New
C281.4 kg 21,032
Jersey”
C282 8.4582 Hydroinsolation of the object
C283 8.45822 Hydroinsolation of the roadway m2 5,694.00
Protection of concrete areas dig in earth with
C284 8.4583 m2 2,560.00
protective paint
Protection of concrete areas with laying over-fence
C285 8.45323 m2 1,143.00
and with protective paint
C286 8.4584 Roadway of the asphalt objects concrete d=7cm m2 5,612.00
Metallic holder of pipes for installation along the
C287 8.4588 nr. 255.00
object
Instalation of fugues with permanent elastic putty
C288 8.458.10 m1 288.00
(ABZO type “New Јаrsey"
C289 8.458.11 Testing of final object nr. 1
Production of panel with year of construction and
C290 8.458.13 nr. 1
category of the object
C291 8.4589 Teflon bearings movable in longitudinal direction
C291.1 PNu 9 000 KN nr. 4
C291.2 PNu 19 000 KN nr. 4
Diffuse hydraulic shock absorbers 1500 КН moving
C291.3 nr. 6
300+/–150mm
C292 8.456 One wing metal doors 102/152cm nr. 6
C293 8.456 One wing metal shutters 90/90 cm nr. 2
Metal lock stairs in centre columns with base
C294 8.456 m1 191
(according to project)
TOTAL REMAINING WORKS (MKD)

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS :
TOTAL REINFORCEMENT AND LOCK WORKS
(MKD)
TOTAL OTHER WORKS :

TOTAL EUR :
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
C295 8.4 Structures with an opening larger then 5,0 m1

C296 8.45 Construction of the work


C297 8.451 Preparatory works:
a) The preparatory works for the object (cleaning of
the roads under the object), as well as the
C297.1 remaining works connected with the object (wedges,
stone piles, drainages, etc. are covered in the
calculations of the works for the lane of the road.

C298 8.452
1. Ground works
Wide excavation for foundations in dry with
C299 8.4521 -
spreading out storage and transport
C299.1 a) for a depth of 0-2 m1 m3 4,890.05
C299.2 a1) addition for rock m3 -
C299.3 b) for a depth of 2–4 m m3 4,270.10
C299.4 b1) addition for rock m3 4,270.10
C299.5 c) for a depth of 4–6 m m3 2,399.40
C299.6 c1) addition for rock m3 2,399.40
C299.7 d) for a depth of 6-8 m and further m3 1,259.70
C299.8 d1) addition for rock m3 1,259.70
Digging in of foundation of pillars in layers of 30 cm
C300 8.4528 m3 8,800.00
with compacting

TOTAL EARTHEN WORKS :

C301 8.455 2. Concrete and reinforced   


concrete works   
Concrete fill-in without formwork MB > 15
C302 8.45543 m3 112.53
(foundation for reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
C303 8.45561 m3 1,944
beams and slab-like foundations MB30
C304 8.455464 Reinforced concrete pillars   
a)End pillars with ring beam and wings MB 30 M –
C304.1 m3 1,516
100
C304.2 b)Centre pillars МВ 30 m – 100 m3 597.34
C305 8.455465 Upper part of end and middle columns   
a) Parapet and console wings for end columns MB
C305.1 m3 64
30 M – 100
C305.2 b) Laid joist for centre columns MB 30 M – 100 m3 351.78
Parapet beam and fences ”New Jersey” elements
C306 8.455468   
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
C306.1 m3 153.10
protection, paint МB 45 М–100
C307 8.45546.10Assembly of main beam at the objects   
C307.1 a) with weight until 100 t. Nr. 28
Pre-stressed and reinforced concrete elements of
C308 8.455481   
the object
C308.1 a) Assembled pre-stressed girder MB 45 М–100 m3 874.44
Cross girders at objects of pre-stressed and
C309 8.455482   
reinforced concrete
C309.1 a) of reinforced concrete MB 45 М–100 m3 117.73
C310 8.455483 Lane slab at the objects   
C310.1 a) MB 45 M-100 d = 8+15=22 cm m3 576.85
C310.2 b) Transition slab MB 30 M-100 d=30 cm m3 31.71
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
C311 8.455487 Injection of cables m1 3,696.00
C312 8.4556 Protection of the slopes of the embankment with   
C312.1 a) Production of concrete canals MB 30 М–100 m1 30.00
C313 8.456 Activities of metal   
C314 8.4562 Reinforcement of concrete steel   
a) Supply, cutting, tailoring and assembly GA
C314.1 kg. 22,581.00
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
C314.2 kg. 2,344.00
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА
C314.3 kg. ###
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
C314.4 kg. ###
400/500-2 F > 12 mm
C315 8.4567 Reinforcement for pre-stressing   
Ropes and wires for overtensing anchors, the safety
C316 8.45671 pipes assembly and overtensing sO2 / sv = 1670 /   
1860
C316.1 a) For cables kg. 50,526.00
C316.2 b) Anchors Nr. 224
C316.3 c) Pipes m1 3,696.00

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :
3. Other works   
Dilatational devices of roadway surfaces of the
C317 8.45681 m1 34.35
building type T-100
Dilatational devices of fence NEW JERSEY type
C318 8.45682 m1 12.00
RHEINSTHAL
C319 8.4569 Drainpipes of cast iron with water outlet Nr. 7
with respect to detail L = 126 m m1 230.00
C319.1 a) Supply and building landmarks for oscultation Nr. 15
C320 8.456.11 Steel fences of the objects set   
C320.1 a) ”New Jersey m1 610
C321 8.458 Finishing works of the superstructure of the object   
C322 8.4582 Hydroinsulation of objects   
C323 8.45822 Hydroinsulation of ready insulation tapes, strips m2 2,640.94
C324 8.4583 Protection of concrete areas under ground m2 7,296.00
C325 8.4584 Roadway of the objects d = 7 cm m2 2,641
C326 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 56
C327 8.458.10 Elements for dilatation   
C327.1 a) with permanent elastic kit m1 303.95
C328 8.458.11 Testing of ready object Nr. 1
Production and the construction of slab with year of
C329 8.458.13 Nr. 1
construction and category of the object.
TOTAL OTHER WORKS :

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS :
TOTAL OTHER WORKS :

TOTAL EUR :
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
C330 8.4 Structures with an opening larger then 5,0 m1

C331 8.4.5. Construction of the work


C332 8.451 Preparatory works:
a) The preparatory works for the object (cleaning of
the roads under the object), as well as the
C332.1 remaining works connected with the object (wedges,
stone piles, drainages, etc. are covered in the
calculations of the works for the lane of the road.
C333 8.452
1. Ground works
Wide excavation for foundations in dry with
C334 8.4521 -
spreading out storage and transport
C334.1 a) for a depth of 0-2 m1 m3 1,520.97
C334.2 a1) addition for rock m3 -
C334.3 b) for a depth of 2–4 m m3 1,107.20
C334.4 b1) addition for rock m3 1,107.20
C334.5 c) for a depth of 4–6 m m3 907.50
C334.6 c1) addition for rock m3 907.50
C334.7 d) for a depth of 6-8 m and further m3 331.30
C334.8 d1) addition for rock m3 331.30
Digging in of foundation of pillars in layers of 30 cm
C335 8.4528 m3 3,146.97
with compacting

TOTAL EARTHEN WORKS :

C336 8.455 2. Concrete and reinforced   


concrete works   
Concrete fill-in without formwork MB > 15
C337 8.45543 m3 17.85
(foundation for reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
C338 8.45561 m3 332
beams and slab-like foundations MB30
C339 8.455464 Reinforced concrete pillars   
a)End pillars with ring beam and wings MB 30 M –
C339.1 m3 -
100
C339.2 b)Centre pillars МВ 30 m – 100 m3 347.83
C340 8.455465 Upper part of end and middle columns   
a) Parapet and console wings for end columns MB
C340.1 m3 -
30 M – 100
C340.2 b) Laid joist for centre columns MB 30 M – 100 m3 293.15
Parapet beam and fences ”New Jersey” elements
C341 8.455468   
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
C341.1 m3 123.40
protection, paint МB 45 М–100
C342 8.45546.10Assembly of main beam at the objects   
C342.1 a) with weight until 100 t. Nr. 24
Pre-stressed and reinforced concrete elements of
C343 8.455481   
the object
C343.1 a) Assembled pre-stressed girder MB 45 М–100 m3 749.52
Cross girders at objects of pre-stressed and
C344 8.455482   
reinforced concrete
C344.1 a) of reinforced concrete MB 45 М–100 m3 100.93
C345 8.455483 Lane slab at the objects   
C345.1 a) MB 45 M-100 d = 8+15=22 cm m3 493.35
C345.2 b) Transition slab MB 30 M-100 d=30 cm m3 31.71
C346 8.455487 Injection of cables m1 3,168.00
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
C347 8.4556 Protection of the slopes of the embankment with   
C347.1 a) Production of concrete canals MB 30 М–100 m1 -
C348 8.456 Activities of metal   
C349 8.4562 Reinforcement of concrete steel   
a) Supply, cutting, tailoring and assembly GA
C349.1 kg. 19,355.00
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
C349.2 kg. 2,002.00
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА
C349.3 kg. ###
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
C349.4 kg. ###
400/500-2 F > 12 mm
C350 8.4567 Reinforcement for pre-stressing   
Ropes and wires for overtensing anchors, the safety
C351 8.45671 pipes assembly and overtensing sO2 / sv = 1670 /   
1860
C351.1 a) For cables kg. 43,308.00
C351.2 b) Anchors Nr. 192
C351.3 c) Pipes m1 3,168.00

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :

3. Other works   
Dilatational devices of roadway surfaces of the
C352 8.45681 m1 34.35
building type T-100
Dilatational devices of fence NEW JERSEY type
C353 8.45682 m1 8.00
RHEINSTHAL
C354 8.4569 Drainpipes of cast iron with water outlet Nr. 6
with respect to detail L = 126 m m1 197.00
C354.1 a) Supply and building landmarks for oscultation Nr. 13.00
C355 8.456.11 Steel fences of the objects set   
C355.1 a) ”New Jersey m1 411.40
C356 8.458 Finishing works of the superstructure of the object   
C357 8.4582 Hydroinsulation of objects   
C358 8.45822 Hydroinsulation of ready insulation tapes, strips m2 2,263.70
C359 8.4583 Protection of concrete areas under ground m2 4,280
C360 8.4584 Roadway of the objects d = 7 cm m2 2,263.70
C361 8.4589 Elastomer bearings with dimensions :300/400/85 Nr. 48
C362 8.458.10 Elements for dilatation   
C362.1 a) with permanent elastic kit m1 244.50
C363 8.458.11 Testing of ready object Nr. 1
Production and the construction of slab with year of
C364 8.458.13 Nr. 1
construction and category of the object.
TOTAL OTHER WORKS :

SUMMARY

TOTAL EARTHEN WORKS :


TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS :
TOTAL OTHER WORKS :

TOTAL EUR :
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6

C365 8.45 Construction of the work


C366 8.451 PREPARATORY WORKS
The preparatory works of the object (cleaning of the
routeunder the object) as well as other remaining
C366.1 worksconnected with the object (wedges, stone
piles,drainages)are concluded in the calculations of
the works for the route

C367 8.452 1. EARTHWORKS


Wide excavation for foundations in dry with
C368 8.4521
spreading out storage and transport
C368.1 Depth 0 – 2m m3 3,433.00
C368.2 Attachment for excavation in rock m3 1,716.50
C368.3 Depth 2 – 4m m3 2,406.00
C368.4 Attachment for excavation in rock m3 1,203.00
C368.5 Depth 4 - 6m m3 1,647.00
C368.6 Attachment for excavation in rock m3 823.50
C368.7 Depth 6 – 8m m3 1,309.00
C368.8 Attachment for excavation in rock m3 654.50
Excavation for foundation in opened caisson or well
C369 8.4525 m3
pipes with transport of excavated material
C369.1 Depth 0 - 2m m3 0.00
C369.2 Attachment for excavation in rock m3 0.00
C369.3 Depth 2 - 4m m3 0.00
C369.4 Attachment for excavation in rock m3 0.00
C369.5 Depth 4 - 6m m3 0.00
C369.6 Attachment for excavation in rock m3 0.00
C369.7 Attachment for excavation in presence of water m3 0.00
C369.8 Depth 6 - 8m m3 0.00
C369.9 Attachment for excavation in rock m3 0.00
C369.10 Attachment for excavation in presence of water m3 0.00
C369.11 Depth exceeding 8m m3 3,540.00
C369.12 Attachment for excavation in rock m3 3,540.00
C369.13 Attachment for excavation in presence of water m3 0.00
Production of cones with earthen material in layers
C370 8.4526 m3 542.00
of 30cm with compression
Burying of foundation with earthen material in layers
C371 8.4528 m3 11,256.00
of 30cm with compression

TOTAL EARTHWORKS (MKD)

2. CONCRETE AND REINFORCED CONCRETE


C372 8.455
WORKS

Concreting of foundation and wall protection of


C373 8.45541 m3 8.00
overlay of cones MB–30 М–100
Concreting of foundation in open caisson or wells (in
C374 8.455411 presence of underground water with drawing of m3 631.00
water) MB–30 (Cover tiles in wells)
Concreting of foundation in open caisson or wells
C375 8.455412 (with control drawing of water or sub-aquatic m3 2,790.00
concerting) MB–30 filled in of wells
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
Reinforced concrete caisson or well pipes and
C376 8.455462 protective reinforced concrete curtains MB–30 in m3 57.60
panelling
Concreting of foundation for foundation of non-
C377 8.45543 m3 33.39
reinforced concrete d=10сm MB-20

C378 8.45561 Reinforced concrete foundation in panelling MB-30 m3 418.80


C379 8.455464 Reinforced concrete pillars
Reinforced concrete end pillars and wing walls MB–
C379.1 m3 559.53
30 M-100 in panelling with necessary scaffold
Reinforced concrete centre pillars and МB–35 M-
C379.2 m3 2,025.52
100 in panelling with necessary scaffold
Production and assembly of reinforced concrete
C380 8.455468 fence type New Jersey with surface protection m3 239.67
(protective application) MB–45 М-100
Reinforced concretemonolith overloaded boxed
C381 8.455481 main Span construction according to system free m3 5,187.80
cantilever construction MB–45 М100 OSMO–15
Reinforced concrete overbridging slabs MB–30 M-
C382 8.455483 m3 31.20
100 d=30сm
IInjection of cables 19T15 (7Т15) with injectional
C383 8.456487 m1 12,500.00
mass according to project
Protection of conical slopes with concrete inlay
C384 8.4556 d=15сm on base of compressed sand MB–30 M- m2 76.00
100 (according to detail)
Precast drainage blocks casted on layer of concrete
C384.1 for drainage of conical slopes MB–30 M-100 m1 13.00
(according to detail)
TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS (MKD)

C385 8.456 REINFORCEMENT AND LOCK WORKS


C386 8.4562 Reinforcement of concrete steel
a) Supply, pruning and assembly GА–240/360 with
C386.1 kg -
diameter to12mm
b) Supply, pruning and assembly GА–240/360 with
C386.2 kg -
diameter over 12mm
c) Supply, pruning and assembly RА–400/500–2
C386.3 kg 93,961.00
with diameter to12mm
d) Supply, pruning and assembly RА–400/500–2
C386.4 kg 1,078,060
with diameter over 12mm
C387 8.4567 Reinforcement for overtensioning
C388 8.45671 Ropes and wires for overtensing
C388.1 a) Cables type 19T15 system FREYSSINET kg ###
C388.2 b) Cables type 7T15 system FREYSSINET kg 760
C388.3 c) Anchors type 19C15 (7C15) nr.
C388.4 d)Protection pipes 95/101 mm m1 12,500.00
C388.5 D) Protection pipes 60/66 mm m1
TOTAL REINFORCEMENT AND LOCK WORKS
(MKD)
3. OTHER WORKS
Dilatational cluthes of roadway lands type
C389 8.45681 m1 23.50
ALGAFLEX Type TM400
C390 8.45682 Dilatational cluthes for ABZO type “New Jersey” m1 4.00
C391 8.4569 Cast iron drainpipes with water outlet
(according to the details for draining nr. 38.00
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
Horizontal installation for drainage (according to
C391.1 m1 377.00
project for draining
Vertical installation for drainage (according to
C391.2 m1 131.00
project for draining
C391.3 Supply and embedding of samples for auscultations nr. 20
Lock (Metal) part of ABZO the fence type “New
C391.4 kg 16,400
Jersey”
C392 8.4582 Hydroinsolation of the object
C393 8.45822 Hydroinsolation of the roadway m2 4,370.00
Protection of concrete areas dig in earth with
C394 8.4583 m2 825.00
protective paint
Protection of concrete areas with laying over-fence
C395 8.45323 m2 967.00
and with protective paint
C396 8.4584 Roadway of the asphalt objects concrete d=7cm m2 4,123.00
Metallic holder of pipes for installation along the
C397 8.4588 nr. 126.00
object
Instalation of fugues with permanent elastic putty
C398 8.458.10 m1 470.00
(ABZO type “New Јаrsey"
C399 8.458.11 Testing of final object br. 1
Production of panel with year of construction and
C400 8.458.13 br. 1
category of the object
Teflon bearings movable in longitudinal direction
C401 8.4589 nr. 4
ALGAPOT PNu 1300 KN
Diffuse hydraulic shock absorbers type MAURER
C401.1 nr. 4
MTSU 6000
C402 8.456 One wing metal doors 102/152cm nr. 4
C403 8.456 One wing metal shutters 90/90 cm nr. 2
Metal lock stairs in centre columns with base
C404 8.456 m1 69
(according to project)

TOTAL REMAINING WORKS (MKD)

SUMMARY

TOTAL EARTHEN WORKS :

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :
TOTAL REINFORCEMENT AND LOCK WORKS
(MKD)

TOTAL OTHER WORKS :

TOTAL EUR :
Unit price Total price
No. Type of work/ Вид на работа Unit Quantity
(€) (€)
1 2 3 4 5 6

C405 8.45 Construction of the work/ Изведба на работата


PREPARATORY WORKS/ ПОДГОТВИТЕЛНИ
C406 8.451
РАБОТИ
The preparatory works of the object (cleaning of the
routeunder the object) as well as other remaining
worksconnected with the object (wedges, stone
piles,drainages)are concluded in the calculations of
the works for the route/ Подготвителни работи на
C406.1
објект (чистење на патиштата под објектот), како
и на останатитe работи поврзани со објектот
(клинови, купови од камења, одводни канали,
итн, се вклучени во пресметките на работите за
патот.

C407 8.452
1. EARTHWORKS/ ЗЕМЈЕНИ РАБОТИ
Wide excavation for foundations in dry with
spreading out storage and transport/ Широк ископ
C408 8.4521 -
за темели во суво со распростирање,
складирање и транспорт
C408.1 Depth 0 – 2m/ за длабочина од 0-2 m m3 4,062.00
Attachment for excavation in rock/ додаток за
C408.2 m3 2,031.00
ископ во карпа
C408.3 Depth 2 – 4m/ за длабочина од 0-4 m m3 3,576.00
Attachment for excavation in rock/ додаток за
C408.4 m3 1,788.00
ископ во карпа
C408.5 Depth 4 - 6m/ за длабочина од 4-6 m m3 2,286.00
Attachment for excavation in rock/ додаток за
C408.6 m3 1,143.00
ископ во карпа
C408.7 Depth 6 – 8m/ за длабочина од 6-8 m m3 3,427.00
Attachment for excavation in rock/ додаток за
C408.8 m3 1,713.50
ископ во карпа
Excavation for foundation in opened caisson or well
pipes with transport of excavated material/ Ископ
C409 8.4525 m3
на темели во отворен кесон или бунарски цевки
со транпорт на ископаниот материјал
C409.1 Depth 0 – 2m/ за длабочина од 0-2 m m3 0.00
Attachment for excavation in rock/ додаток за
C409.2 m3 0.00
ископ во карпа
C409.3 Depth 2 – 4m/ за длабочина од 0-4 m m3 0.00
Attachment for excavation in rock/ додаток за
C409.4 m3 0.00
ископ во карпа
C409.5 Depth 4 - 6m/ за длабочина од 4-6 m m3 0.00
Attachment for excavation in rock/ додаток за
C409.6 m3 0.00
ископ во карпа
Attachment for excavation in presence of water/
C409.7 m3 0.00
Додаток за ископ во присуство на вода
C409.8 Depth 6 - 8m/ за длабочина од 6-8 m m3 0.00
Attachment for excavation in rock/ додаток за
C409.9 m3 0.00
ископ во карпа
C409.10 Attachment for excavation in presence of water m3 0.00
C409.11 Depth exceeding 8m m3 3,516.00
C409.12 Attachment for excavation in rock m3 3,516.00
C409.13 Attachment for excavation in presence of water m3 0.00
Unit price Total price
No. Type of work/ Вид на работа Unit Quantity
(€) (€)
Production of cones with earthen material in layers
C410 8.4526 m3 0.00
of 30cm with compression
Burying of foundation with earthen material in
C411 8.4528 m3 14,589.00
layers of 30cm with compression

TOTAL EARTHWORKS (MKD)

2. CONCRETE AND REINFORCED CONCRETE


C412 8.455
WORKS

Concreting of foundation and wall protection of


C413 8.45541 m3 -
overlay of cones MB–30 М–100
Concreting of foundation in open caisson or wells
C414 8.455411 (in presence of underground water with drawing of m3 631.00
water) MB–30 (Cover tiles in wells)
Concreting of foundation in open caisson or wells
C415 8.455412 (with control drawing of water or sub-aquatic m3 2,790.00
concerting) MB–30 filled in of wells
Reinforced concrete caisson or well pipes and
C416 8.455462 protective reinforced concrete curtains MB–30 in m3 57.46
panelling
Concreting of foundation for foundation of non-
C417 8.45543 m3 20.16
reinforced concrete d=10сm MB-20

C418 8.45561 Reinforced concrete foundation in panelling MB-30 m3 396.00


C419 8.455464 Reinforced concrete pillars
Reinforced concrete end pillars and wing walls MB–
C419.1 m3 570.72
30 M-100 in panelling with necessary scaffold
Reinforced concrete centre pillars and МB–35 M-
C419.2 m3 1,892.90
100 in panelling with necessary scaffold
Production and assembly of reinforced concrete
C420 8.455468 fence type New Jersey with surface protection m3 239.67
(protective application) MB–45 М-100
Reinforced concretemonolith overloaded boxed
C421 8.455481 main Span construction according to system free m3 5,237.00
cantilever construction MB–45 М100 OSMO–15
Reinforced concrete overbridging slabs MB–30 M-
C422 8.455483 m3 32.10
100 d=30сm
IInjection of cables 19T15 (7Т15) with injectional
C423 8.456487 m1 12,500.00
mass according to project
Protection of conical slopes with concrete inlay
C424 8.4556 d=15сm on base of compressed sand MB–30 M- m2 -
100 (according to detail)
Precast drainage blocks casted on layer of
C424.1 concrete for drainage of conical slopes MB–30 M- m1 -
100 (according to detail)
TOTAL CONCRETE AND REINFORCED
CONCRETE WORKS (MKD)

C425 8.456 REINFORCEMENT AND LOCK WORKS


C426 8.4562 Reinforcement of concrete steel
a) Supply, pruning and assembly GА–240/360 with
C426.1 kg -
diameter to12mm
b) Supply, pruning and assembly GА–240/360 with
C426.2 kg -
diameter over 12mm
c) Supply, pruning and assembly RА–400/500–2
C426.3 kg 109,527.00
with diameter to12mm
Unit price Total price
No. Type of work/ Вид на работа Unit Quantity
(€) (€)
d) Supply, pruning and assembly RА–400/500–2
C426.4 kg 1,062,364
with diameter over 12mm
C427 8.4567 Reinforcement for overtensioning
C428 8.45671 Ropes and wires for overtensing
C428.1 a) Cables type 19T15 system FREYSSINET kg 302,000.00
C428.2 b) Cables type 7T15 system FREYSSINET kg 760
C428.3 c) Anchors type 19C15 (7C15) nr.
C428.4 d)Protection pipes 95/101 mm m1 12,500.00
C428.5 D) Protection pipes 60/66 mm m1
TOTAL REINFORCEMENT AND LOCK WORKS
(MKD)

3. OTHER WORKS
Dilatational cluthes of roadway lands type
C429 8.45681 m1 24.50
ALGAFLEX Type TM400
C430 8.45682 Dilatational cluthes for ABZO type “New Jersey” m1 4.00
C431 8.4569 Cast iron drainpipes with water outlet
(according to the details for draining nr. 38.00
Horizontal installation for drainage (according to
C431.1 m1 377.00
project for draining
Vertical installation for drainage (according to
C431.2 m1 131.00
project for draining
Supply and embedding of samples for
C431.3 nr. 20
auscultations
Lock (Metal) part of ABZO the fence type “New
C431.4 kg 16,400
Jersey”
C432 8.4582 Hydroinsolation of the object
C433 8.45822 Hydroinsolation of the roadway m2 4,370.00
Protection of concrete areas dig in earth with
C434 8.4583 m2 1,278.00
protective paint
Protection of concrete areas with laying over-fence
C435 8.45323 m2 967.00
and with protective paint
C436 8.4584 Roadway of the asphalt objects concrete d=7cm m2 4,123.00
Metallic holder of pipes for installation along the
C437 8.4588 nr. 126.00
object
Instalation of fugues with permanent elastic putty
C438 8.458.10 m1 470.00
(ABZO type “New Јаrsey"
C439 8.458.11 Testing of final object nr. 1
Production of panel with year of construction and
C440 8.458.13 nr. 1
category of the object
Teflon bearings movable in longitudinal direction
C441 8.4589 nr. 4
ALGAPOT PNu 1300 KN
Diffuse hydraulic shock absorbers type MAURER
C441.1 nr. 4
MTSU 6000
C442 8.456 One wing metal doors 102/152cm nr. 4
C443 8.456 One wing metal shutters 90/90 cm nr. 2
Metal lock stairs in centre columns with base
C444 8.456 m1 64
(according to project)

TOTAL REMAINING WORKS (MKD)

SUMMARY

TOTAL EARTHEN WORKS :

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :
TOTAL REINFORCEMENT AND LOCK WORKS
(MKD)

TOTAL OTHER WORKS :


Unit price Total price
No. Type of work/ Вид на работа Unit Quantity
(€) (€)

TOTAL EUR :
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
C445 8.4 Structures with an opening larger then 5,0 m1

C446 8.45 Construction of the work


C447 8.451 Preparatory works:
a) The preparatory works for the object (cleaning of
the roads under the object), as well as the
C447.1 remaining works connected with the object (wedges,
stone piles, drainages, etc. are covered in the
calculations of the works for the lane of the road.

C448 8.452
1. Ground works
Wide excavation for foundations in dry with
C449 8.4521 -
spreading out storage and transport
C449.1 a) for a depth of 0-2 m1 m3 1,133.37
C449.2 a1) addition for rock m3 1,100.00
C449.3 b) for a depth of 2–4 m m3 1,226.42
C449.4 b1) addition for rock m3 940.42
C449.5 c) for a depth of 4–6 m m3 835.15
C449.6 c1) addition for rock m3 763.15
C449.7 d) for a depth of 6-8 m and further m3 509.80
C449.8 d1) addition for rock m3 450.60
Digging in of foundation of pillars in layers of 30 cm
C450 8.4528 m3 2,961.54
with compacting

TOTAL EARTHEN WORKS :

C451 8.455 2. Concrete and reinforced   


concrete works   
Concrete fill-in without formwork MB > 15
C452 8.45543 m3 49.54
(foundation for reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
C453 8.45561 m3 694
beams and slab-like foundations MB30
C454 8.455464 Reinforced concrete pillars   
a)End pillars with ring beam and wings MB 30 M –
C454.1 m3 646
100
C454.2 b)Centre pillars МВ 30 m – 100 m3 443.47
C455 8.455465 Upper part of end and middle columns   
a) Parapet and console wings for end columns MB
C455.1 m3 31
30 M – 100
C455.2 b) Laid joist for centre columns MB 30 M – 100 m3 218.40
Parapet beam and fences ”New Jersey” elements
C456 8.455468   
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
C456.1 m3 143.32
protection, paint МB 40 М–100
C457 8.45546.10Assembly of main beam at the objects   
C457.1 a) with weight until 140 t. Nr. 20
Pre-stressed and reinforced concrete elements of
C458 8.455481   
the object
C458.1 a) Assembled pre-stressed girder MB 45 М–100 m3 1,060.91
Cross girders at objects of pre-stressed and
C459 8.455482   
reinforced concrete
C459.1 a) of reinforced concrete MB 45 М–100 m3 127.50
C460 8.455483 Lane slab at the objects   
C460.1 a) MB 45 M-100 d = 8+15=22 cm m3 567.00
C460.2 b) Transition slab MB 30 M-100 d=30 cm m3 36.00
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
C461 8.455487 Injection of cables m1 5,040.00
C462 8.4556 Protection of the slopes of the embankment with   
C462.1 a) Production of concrete canals MB 30 М–100 m1 15.00
C463 8.456 Activities of metal   
C464 8.4562 Reinforcement of concrete steel   
a) Supply, cutting, tailoring and assembly GA
C464.1 kg. 20,496.88
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
C464.2 kg. 377.77
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА
C464.3 kg. 154,165.94
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
C464.4 kg. 295,513.67
400/500-2 F > 12 mm
C465 8.4567 Reinforcement for pre-stressing   
Ropes and wires for overtensing anchors, the safety
C466 8.45671 pipes assembly and overtensing sO2 / sv = 1670 /   
1860
C466.1 a) For cables kg. 64,800.00
C466.2 b) Anchors Nr. 240
C466.3 c) Pipes m1 5,040.00

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :
3. Other works   
Dilatational devices of roadway surfaces of the
C467 8.45681 m1 24.00
building type T-100
T-200 m1 12.00
Dilatational devices of fence NEW JERSEY type
C468 8.45682 m1 9.00
RHEINSTHAL
C469 8.4569 Drainpipes of cast iron with water outlet Nr. 16
C469.1 with respect to detail L = 304 m m1 304.00
C469.2 a) Supply and building landmarks for oscultation Nr. 22.00
C470 8.456.11 Steel fences of the objects set   
C470.1 a) ”New Jersey m1 460.00
C471 8.458 Finishing works of the superstructure of the object   
C472 8.4582 Hydroinsulation of objects   
C473 8.45822 Hydroinsulation of ready insulation tapes, strips m2 2,580.00
C474 8.4583 Protection of concrete areas under ground m2 1,230
C475 8.4584 Roadway of the objects d = 6 cm m2 2,423.00
C476 8.4589 Elastomer bearings with dimensions :350/450/114; Nr. 16
C476.1 Elastomer bearings with dimensions 350/450/84 Nr. 24
C477 8.458.10 Elements for dilatation   
C477.1 a) with permanent elastic kit m1 850.00
C478 8.458.11 Testing of ready object Nr. 1
Production and the construction of slab with year of
C479 8.458.13 Nr. 1
construction and category of the object.

TOTAL OTHER WORKS :

SUMMARY

TOTAL EARTHEN WORKS :

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :

TOTAL OTHER WORKS :


Unit price Total price
No. Type of work Unit Quantity
(€) (€)

TOTAL EUR :
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
C480 8.4 Structures with an opening larger then 5,0 m1

C481 8.4.5. Construction of the work


C482 8.451 Preparatory works:
a) The preparatory works for the object (cleaning of
the roads under the object), as well as the
C482.1 remaining works connected with the object (wedges, -
stone piles, drainages, etc. are covered in the
calculations of the works for the lane of the road.
C483 8.452
1. Ground works -
Wide excavation for foundations in dry with
C484 8.4521 -
spreading out storage and transport
C484.1 a) for a depth of 0-2 m1 m3 1,574.04
C484.2 a1) addition for rock m3 1,400.00
C484.3 b) for a depth of 2–4 m m3 866.41
C484.4 b1) addition for rock m3 763.00
C484.5 c) for a depth of 4–6 m m3 688.25
C484.6 c1) addition for rock m3 542.00
C484.7 d) for a depth of 6-8 m and further m3 700.83
C484.8 d1) addition for rock m3 630.60
Digging in of foundation of pillars in layers of 30 cm
C485 8.4528 m3 3,762.29
with compacting

TOTAL EARTHEN WORKS :

C486 8.455 2. Concrete and reinforced   


concrete works   
Concrete fill-in without formwork MB > 15
C487 8.45543 m3 44.71
(foundation for reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
C488 8.45561 m3 633.53
beams and slab-like foundations MB30
C489 8.455464 Reinforced concrete pillars   
a)End pillars with ring beam and wings MB 30 M –
C489.1 m3 415.81
100
C489.2 b)Centre pillars МВ 30 m – 100 m3 208
C490 8.455465 Upper part of end and middle columns   
a) Parapet and console wings for end columns MB
C490.1 m3 127.44
30 M – 100
C490.2 b) Laid joist for centre columns MB 30 M – 100 m3 169
Parapet beam and fences ”New Jersey” elements
C491 8.455468   
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
C491.1 m3 143.32
protection, paint МB 40 М–100
C492 8.45546.10Assembly of main beam at the objects   
C492.1 a) with weight until 140 t. Nr. 16
Pre-stressed and reinforced concrete elements of
C493 8.455481   
the object
C493.1 a) Assembled pre-stressed girder MB 45 М–100 m3 848.73
Cross girders at objects of pre-stressed and
C494 8.455482   
reinforced concrete
C494.1 a) of reinforced concrete MB 45 М–100 m3 102.00
C495 8.455483 Lane slab at the objects   
C495.1 a) MB 45 M-100 d = 8+15=22 cm m3 453.60
C495.2 b) Transition slab MB 30 M-100 d=30 cm m3 72.00
C496 8.455487 Injection of cables m1 4,032.00
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
C497 8.4556 Protection of the slopes of the embankment with   
C497.1 a) Production of concrete canals MB 30 М–100 m1 15.00
C498 8.456 Activities of metal   
C499 8.4562 Reinforcement of concrete steel   
a) Supply, cutting, tailoring and assembly GA
C499.1 kg. 16,890.47
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
C499.2 kg. 347.95
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА
C499.3 kg. ###
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
C499.4 kg. ###
400/500-2 F > 12 mm
C500 8.4567 Reinforcement for pre-stressing   
Ropes and wires for overtensing anchors, the safety
C501 8.45671 pipes assembly and overtensing sO2 / sv = 1670 /   
1860
C501.1 a) For cables kg. 51,840.00
C501.2 b) Anchors Nr. 192
C501.3 c) Pipes m1 4,032.00

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :

3. Other works   
Dilatational devices of roadway surfaces of the
C502 8.45681 m1 48.00
building type T-100

Dilatational devices of fence NEW JERSEY type


C503 8.45682 m1 9
RHEINSTHAL
C504 8.4569 Drainpipes of cast iron with water outlet Nr. 14.00
C504.1 with respect to detail m1 236
C504.2 a) Supply and building landmarks for oscultation Nr. 20.00
C505 8.456.11 Steel fences of the objects set   
C505.1 a) ”New Jersey m1 393.00
C506 8.458 Finishing works of the superstructure of the object   
C507 8.4582 Hydroinsulation of objects   
C508 8.45822 Hydroinsulation of ready insulation tapes, strips m2 2,060.00
C509 8.4583 Protection of concrete areas under ground m2 1,250
C510 8.4584 Roadway of the objects d = 7 cm m2 2,060.00
C511 8.4589 Elastomer bearings with dimensions :350/450/114; Nr. 16
C511.1 Elastomer bearings with dimensions :350/450/84; Nr. 16
C512 8.458.10 Elements for dilatation   
C512.1 a) with permanent elastic kit m1 698.00
C513 8.458.11 Testing of ready object Nr. 1
Production and the construction of slab with year of
C514 8.458.13 Nr. 1
construction and category of the object.

TOTAL OTHER WORKS :

SUMMARY

TOTAL EARTHEN WORKS :

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :

TOTAL OTHER WORKS :


Unit price Total price
No. Type of work Unit Quantity
(€) (€)

TOTAL EUR :
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
C515 8.4 Structures with an opening larger then 5,0 m 1

C516 8.45 Construction of the work


C517 8.451 Preparatory works:
a) The preparatory works for the object (cleaning of
the roads under the object), as well as the
C517.1 remaining works connected with the object (wedges, -
stone piles, drainages, etc. are covered in the
calculations of the works for the lane of the road.
-
C518 8.452
1. Ground works -
Wide excavation for foundations in dry with
C519 8.4521
spreading out storage and transport
C519.1 a) for a depth of 0-2 m1 m3 2,832.95
C519.2 a1) addition for rock m3 2,832.95
C519.3 b) for a depth of 2–4 m m3 2,371.33
C519.4 b1) addition for rock m3 2,371.33
C519.5 c) for a depth of 4–6 m m3 1,677.87
C519.6 c1) addition for rock m3 1,677.87
C519.7 d) for a depth of 6-8 m and further m3 552.25
C519.8 d1) addition for rock m3 552.25
Digging in of foundation of pillars in layers of 30 cm
C520 8.4528 m3 5,858.63
with compacting

TOTAL EARTHEN WORKS :

C521 8.455 2. Concrete and reinforced   


concrete works   
Concrete fill-in without formwork MB > 15
C522 8.45543 m3 83.55
(foundation for reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
C523 8.45561 m3 1,492.22
beams and slab-like foundations MB30
C524 8.455464 Reinforced concrete pillars   
C524.1 a)End pillarsand wings MB 30 M – 100 m3 979.68
C524.2 b)Centre pillars МВ 35 m – 100 m3 581
C525 8.455465 Upper part of end and middle columns   
a) Parapet and console wings for end columns MB
C525.1 m3 65.57
30 M – 100
C525.2 b) Laid joist for centre columns MB 35 M – 100 m3 231
Parapet beam and fences ”New Jersey” elements
C526 8.455468   
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
C526.1 m3 97.65
protection, paint МB 45 М–100
C527 8.45546.10Assembly of main beam at the objects   
C527.1 a) with weight until 100 t. Nr. 20
Pre-stressed and reinforced concrete elements of
C528 8.455481   
the object
C528.1 a) Assembled pre-stressed girder MB 45 М–100 m3 517.90
Cross girders at objects of pre-stressed and
C529 8.455482   
reinforced concrete
C529.1 a) of reinforced concrete MB 45 М–100 m3 73.07
C530 8.455483 Lane slab at the objects   
C530.1 a) MB 45 M-100 d = 7+15=22 cm m3 367.25
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
C530.2 b) Transition slab MB 30 M-100 d=30 cm m3 31.71
C531 8.455487 Injection of cables m1 2,400.00
C532 8.4556 Protection of the slopes of the embankment with   
C532.1 a) Production of concrete canals MB 30 М–100 m1
C533 8.456 Activities of metal   
C534 8.4562 Reinforcement of concrete steel   
a) Supply, cutting, tailoring and assembly GA
C534.1 kg. 15,207.00
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
C534.2 kg. 1,258.00
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА
C534.3 kg. ###
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
C534.4 kg. ###
400/500-2 F > 12 mm
C535 8.4567 Reinforcement for pre-stressing   
Ropes and wires for overtensing anchors, the safety
C536 8.45671 pipes assembly and overtensing sO2 / sv = 1670 /   
1860
C536.1 a) For cables kg. 26,995
C536.2 b) Anchors Nr. 160.00
C536.3 c) Pipes m1 2,400.00

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :
3. Other works   
Dilatational devices of roadway surfaces of the
C537 8.45681 m1 22.90
building type T-160
Dilatational devices of fence NEW JERSEY type
C538 8.45682 m1 4.40
RHEINSTHAL
C539 8.4569 Drainpipes of cast iron with water outlet Nr. 10
C539.1 with respect to detail L = 222.10 m m1 222.10
C539.2 a) Supply and building landmarks for oscultation Nr. 11
C540 8.456.11 Steel fences of the objects set   
C540.1 a) ”New Jersey m1 326
C541 8.458 Finishing works of the superstructure of the object   
C542 8.4582 Hydroinsulation of objects   
C543 8.45822 Hydroinsulation of ready insulation tapes, strips m2 1,669
C544 8.4583 Protection of concrete areas under ground m2 3,709.00
C545 8.4584 Roadway of the objects d = 7 cm m2 1,669.32
C546 8.4589 Elastomer bearings with dimensions 300/400/85 Nr. 32
C546.1 Elastomer bearings with dimensions 300/400/118 Nr. 8
C547 8.458.10 Elements for dilatation   
C547.1 a) with permanent elastic kit m1 162.10
C548 8.458.11 Testing of ready object Nr. 1
Production and the construction of slab with year of
C549 8.458.13 Nr. 1
construction and category of the object.

TOTAL OTHER WORKS :

SUMMARY

TOTAL EARTHEN WORKS :

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :

TOTAL OTHER WORKS :


Unit price Total price
No. Type of work Unit Quantity
(€) (€)

TOTAL EUR :
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
1 2 3 4 5 6
C550 8.4 Structures with an opening larger then 5,0 m 1

C551 8.45 Construction of the work


C552 8.451 Preparatory works:
a) The preparatory works for the object (cleaning of
the roads under the object), as well as the
C552.1 remaining works connected with the object (wedges,
stone piles, drainages, etc. are covered in the
calculations of the works for the lane of the road.
C553 8.452
1. Ground works
Wide excavation for foundations in dry with
C554 8.4521
spreading out storage and transport
C554.1 a) for a depth of 0-2 m1 m3 622.42
C554.2 a1) addition for rock m3 622.42
C554.3 b) for a depth of 2–4 m m3 512.58
C554.4 b1) addition for rock m3 512.58
C554.5 c) for a depth of 4–6 m m3 376.48
C554.6 c1) addition for rock m3 376.48
C554.7 d) for a depth of 6-8 m and further m3 168.78
C554.8 d1) addition for rock m3 168.78
Digging in of foundation of pillars in layers of 30 cm
C555 8.4528 m3 1,376.73
with compacting

TOTAL EARTHEN WORKS :

C556 8.455 2. Concrete and reinforced   


concrete works   
Concrete fill-in without formwork MB > 15
C557 8.45543 m3 15.13
(foundation for reinforced concrete foundations).
Reinforced concrete foundation cobblestone, contra
C558 8.45561 m3 288.40
beams and slab-like foundations MB30
C559 8.455464 Reinforced concrete pillars   
a)End pillars with ring beam and wings MB 30 M –
C559.1 m3 -
100
C559.2 b)Centre pillars МВ 35 m – 100 m3 538
C560 8.455465 Upper part of end and middle columns   
a) Parapet and console wings for end columns MB
C560.1 m3 -
30 M – 100
C560.2 b) Laid joist for centre columns MB 35 M – 100 m3 231
Parapet beam and fences ”New Jersey” elements
C561 8.455468   
with surface. protection and facade elements.
a) ”New Jersey” fence production and assembly with
C561.1 m3 94.35
protection, paint МB 45 М–100
C562 8.4554610Assembly of main beam at the objects   
C562.1 a) with weight until 100 t. Nr. 20
Pre-stressed and reinforced concrete elements of
C563 8.455481   
the object
C563.1 a) Assembled pre-stressed girder MB 45 М–100 m3 517.90
Cross girders at objects of pre-stressed and
C564 8.455482   
reinforced concrete
C564.1 a) of reinforced concrete MB 45 М–100 m3 73.07
C565 8.455483 Lane slab at the objects   
C565.1 a) MB 45 M-100 d = 7+15=22 cm m3 367.25
C565.2 b) Transition slab MB 30 M-100 d=30 cm m3 31.71
Unit price Total price
No. Type of work Unit Quantity
(€) (€)
C566 8.455487 Injection of cables m1 2,400.00
C567 8.4556 Protection of the slopes of the embankment with   
C567.1 a) Production of concrete canals MB 30 М–100 m1 -
C568 8.456 Activities of metal   
C569 8.4562 Reinforcement of concrete steel   
a) Supply, cutting, tailoring and assembly GA
C569.1 kg. 15,207.00
240/360 F ≤ 12 mm
b) Supply, cutting, tailoring and assembly GA
C569.2 kg. 1,258.00
240/360 F >12 mm
c) Supply, cutting, tailoring and assembly RА
C569.3 kg. 97,897.00
400/500-2 f ≤ 12 mm
d) Supply, cutting, tailoring and assembly RА
C569.4 kg. ###
400/500-2 F > 12 mm
C570 8.4567 Reinforcement for pre-stressing   
Ropes and wires for overtensing anchors, the safety
C571 8.45671 pipes assembly and overtensing sO2 / sv = 1670 /   
1860
C571.1 a) For cables kg. 26,995.20
C571.2 b) Anchors Nr. 160
C571.3 c) Pipes m1 2,400.00

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :

3. Other works   
Dilatational devices of roadway surfaces of the
C572 8.45681 m1 22.90
building type T-100
Dilatational devices of fence NEW JERSEY type
C573 8.45682 m1 4.40
RHEINSTHAL
C574 8.4569 Drainpipes of cast iron with water outlet Nr. 10
C574.1 with respect to detail L = 189.13 m m1 189.13
C574.2 a) Supply and building landmarks for oscultation Nr. 11
C575 8.456.11 Steel fences of the objects set   
C575.1 a) ”New Jersey m1 314.50
C576 8.458 Finishing works of the superstructure of the object   
C577 8.4582 Hydroinsulation of objects   
C578 8.45822 Hydroinsulation of ready insulation tapes, strips m2 1,669.32
C579 8.4583 Protection of concrete areas under ground m2 1,010
C580 8.4584 Roadway of the objects d = 7 cm m2 1,669.32
C581 8.4589 Elastomer bearings with dimensions 300/400/85 Nr. 32
C581.1 Elastomer bearings with dimensions 300/400/118 Nr. 8
C582 8.458.10 Elements for dilatation   
C582.1 a) with permanent elastic kit m1 186.90
C583 8.458.11 Testing of ready object Nr. 1
Production and the construction of slab with year of
C584 8.458.13 Nr. 1
construction and category of the object.

TOTAL OTHER WORKS :

SUMMARY

TOTAL EARTHEN WORKS :

TOTAL CONCRETE AND REINFORCED


CONCRETE WORKS :

TOTAL OTHER WORKS :


Unit price Total price
No. Type of work Unit Quantity
(€) (€)

TOTAL EUR :