FOOTING SCHEDULE

SIZES THICKNESS DEPTH OF BAR SIZES, mm REBARS QTY.


DESIGNATION
L (mm) W (mm) (mm) EXCAVATI ALONG L ALONG W ALONG L ALONG W
F1 1200 1200 250 ON1800
(mm) 12 12 4 5
F2 1500 1500 250 1800 12 12 6 8
F3 1200 1200 250 1800 12 12 4 4
F4 1300 1300 250 1800 12 12 5 6
F5 1500 1500 250 1800 12 12 9 11
F6 1000 1000 250 1800 12 12 4 4
F7 1200 1200 250 1800 12 12 5 6
F8 600 600 200 1800 10 10 3 3

Beam Cross Bar Diameter LONGITUDINAL BARS QUANTITY


Girder
Section Left Mid Right
Drawing Mark
Width Depth (mm) Top Bottom Top Bottom Top Bottom
RDG-1 200 300 16 2 2 2 2 2 2
RDG-2 200 300 16 2 2 2 2 2 2
RDG-3 250 400 16 2 2 2 2 3 2
RDG-4 200 300 16 3 2 2 2 2 2
RDG-5 200 300 16 3 2 2 2 2 2
RDG-6 200 300 16 2 2 2 3 4 2
RDG-7 200 300 16 5 2 2 3 2 2
RDG-8 200 300 16 2 2 2 2 3 2
RDG-9 200 300 16 5 2 2 3 3 2
RDG-10 200 300 16 2 2 2 2 2 2
RDG-11 200 300 16 3 2 2 3 2 2
RDG-12 200 300 16 2 2 2 2 2 2
RDG-13 200 300 16 2 2 2 2 2 2
RDG-14 200 300 16 2 2 2 2 2 2
RDG-15 200 300 16 5 2 2 4 4 2
RDG-16 200 300 16 2 2 2 2 2 2
RDG-17 250 400 16 2 2 2 2 2 2
RDG-18 200 300 16 2 2 2 2 3 2
RDG-19 250 400 16 5 2 2 5 2 2
RDG-20 250 400 16 2 2 2 2 2 2
RDG-21 250 400 16 2 2 2 2 2 2
RDG-22 200 300 16 2 2 2 2 2 2
RDG-23 200 300 16 3 2 2 2 2 2
RDG-24 200 300 16 2 2 2 2 2 2
RDG-25 200 300 16 2 2 2 2 2 2
RDG-26 200 300 16 2 2 2 2 2 2
RDG-27 200 300 16 2 2 2 2 2 2
Beam Cross STIRRUPS
Girder
Section Diameter STIRRUPS SPACING
Drawing Mark
Width Depth (mm)
RDG-1 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-2 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-3 250 400 12 1@50, 8@100, REST@200mm. O.C.
RDG-4 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-5 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-6 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-7 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-8 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-9 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-10 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-11 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-12 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-13 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-14 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-15 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-16 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-17 250 400 12 1@50, 8@100, REST@200mm. O.C.
RDG-18 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-19 250 400 12 1@50, 8@100, REST@200mm. O.C.
RDG-20 250 400 12 1@50, 8@100, REST@200mm. O.C.
RDG-21 250 400 12 1@50, 8@100, REST@200mm. O.C.
RDG-22 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-23 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-24 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-25 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-26 200 300 12 1@50, 6@100, REST@200mm. O.C.
RDG-27 200 300 12 1@50, 6@100, REST@200mm. O.C.

Column Cross
Column
Section Bar Diameter No. of TIES
Drawing Mark
Width Depth (mm) Bars
C-1 200 300 16 4 12mm dia. 1@50mm, 6@100mm, REST@200mm
C-2 250 350 16 6 12mm dia. 1@50mm, 7@100mm, REST@200mm

SCHEDULE OF SLABS
REMARKS
SHORT SPAN SPACING (mm) LONG SPAN SPACING (mm)
FLOOR LEVEL
LOCATION

A - ONE WAY SLAB


THICKNESS
MARK BAR DIAMETER (mm) B - TWO WAY SLAB
(mm)
DISCONT MIDSPAN CONT DISCONT MIDSPAN CONT
C - CANTILEVERED SLAB

S-1 125 12 175 mm 175 mm 175 mm 250 mm 250 mm 250 mm A


Floor
2nd

S-2 125 12 150 mm 150 mm 150 mm 200 mm 200 mm 200 mm B


GF SOG 150 10 300 mm 300 mm 300 mm 300 mm 300 mm 300 mm