NAME OF WORK:KGC - RECTIFICATION OF DAMAGED STEEL LINER PORTION INSIDE THE

51 DEGREE PRESSURE SHAFT II OF DIA 4.5METRE AT KADAMPARAI POWER HOUSE


ABSTRACT ESTIMATE
Sl.No Description Units Quantity Rate
1 Supply of a suitable modular travel Set 1.00
trolley and winch on hire basis
(Tunnel inclined length 493m with an
angle of 51 degree) with suitable
wheels for easy travel inside the
circular 4.5mtr dia Pressure Shaft -II
with suitable capacity electric Power
winch and Drum with flanges to
accommodate suitable rope (as per
Design) non-joinable steel rope
including fabrication, erection (by
taking through the 1m dia Manhole at
ADIT-III ), The scope also includes
providing scaffolding arrangements
using steel pipes for erection of
suitable turn pulley, D-shackles,
special designed hooks for supporting
Trolley with equipment, chain pulley
block, support roller for winch rope,
additional brake arrangements with
manually and mechanically in the
power operated winch, and including
cost of all materials,video cameara
monitoring,communication ,load test,
labour, lead, lift, transporting of
materials to site, and erection charges
etc., complete. The material for trolley
assembly has to be taken from inside
the Pressure Shaft-I and Pressure
2 Rectification of damaged steel liner in Kg 252.00
Pressure shaft II using winch and
trolley including , cutting the damaged
portion if necessary and providing
patch repair works using suitable
A537 CLASS-I Plate of suitable
thickness including cutting, grinding,
welding preparation, welding (as per
IEC/IS or any equivalent standards),
(including DPT and UT Test, grinding
and re-welding, if necessary, based on
the Test results), cutting and
fabrication of steel plate original size,
bending the plate to required
profile,template. Cost of suitable
welding rod, to weld the A537 class I
Plates, providing holes for fixing
anchor rod for holding plate, including
providing suitable hole in the plate for
grouting and plugging the hole with
suitable plug and welding the plug
suitably on completion of the
grouting, including all labour, winch
operator, lead lift, cost of plate,
cleaning the plate, area with wire
brush, grinding emery sheet, CC
Charges,lighting, safety belt, providing
temporary barriguard to safety for
3 men and material,Helmet,
Documntation gumboot,
of the work carried out. Set 5.00
Videography along with report hard
and soft copies (5 sets).

TAL VALUE EPF @ 13% OF THE TOTAL LABOUR


ESI @ 3.25% OF THE TOTAL LABOUR

GST 18%
Sub Total
Contigencies 1%
Sub Total
TOTAL (ORSAY)