AMEC FOSTER WHEELER (B) SDN BHD

BSP FACILITIES REJUVENATION PROJECT


BRUNEI DARUSSALAM

Positive Declaration of Technical Compliance

 We, the Manufacturer and Local Vendor, confirm that our offer is in full technical compliance w ith all specification(s) and
standard(s), etc as contain w ithin AMEC Foster Wheeler request for quotation L____________________

 We, the Manufacturer and Local Vendor, take exception(s) / deviation(s) to all specification(s) and standard(s) etc, as contain
w ithin AMEC Foster Wheeler request for quotation L__________________ as noted overleaf.

Manufacturer

Nam e :

Address :

Signed :

Date :

Local Vendor

Nam e :

Address :

Signed :

Date :

AFW Document No: 1000-310-0000-FRM-015-R3


Part I – For Standard Item

(1) (2) (3) (4) (5) (6) (7)


Item Description Conform Deviation Justification/alternative offer TA TNA
Code 1 Code 2 Code 3 Code 4 Code 5
Full compliance with the specified manufacturer and
1 country of origin as per TAMAP/AML
The packing is in compliance with the requirement
2
specified in the RFQ document
The time stipulated for the delivery of goods in the
3
RFQ shall be met
4 Scope of supply as per RFQ shall be met
Full compliance with SAP / MESC buying
5 descriptions and specifications as stated in the RFQ
document
List of deviation(s):
5.1
5.2
5.3
5.4
5.5

Note:
(2) For list of deviations, (3), (4) and (5): To be filled in by vendors. Vendors shall provide justification for any deviations and
description of alternative offer (if any)
(6) and (7): To be filled in by BSP

Review Code and Status

Code 1 Fully conforms. Technically Acceptable.

Code 2 Deviation declared w ith justification

Code 3 Alternative/Vendor’s Offer w ith detailed description

Code 4 Deviation / Alternative Technically Acceptable

Code 5 Deviation / Alternative Technically Not Acceptable.

AFW Document No: 1000-310-0000-FRM-015-R3