Four Laning of Munger to Mirzachauki (NH-80) Section from Kharia Village junction to start of existing Bhagalpur Bypass (Design

Km 95+580 to Km 125+000) (Pkg-


Project Name:
02) on Hybrid Annuity Mode the state of Bihar.
Client National Highway Authority of India
Concessionaire Apco Magadh Expressway Pvt. Ltd.
Independent Engineer LEA Associates South Asia Pvt. Ltd. (LEA INDIA)
EPC Contractor Apco Infratech Pvt. Ltd. (APCO)
REQUEST FOR INSPECTION SUMMARY
S. Date of Inspection Chainage Responsible Contact
RFI No Time Side Structure Activities Remarks
No Submission Dated From To Person Number
Concrete Mix Design M-15 PCC,M-20 RCC, M-25 RCC Grade
1 8-Apr-2022 APCO/MMP2/QC/71 9-Apr-2022 9.00 AM B.CAMP QC.LAB Rabinder Mandal 6299310926
with Ultratech OPC-43 Cement Flyash & Kunal Admixture
Checking of Cage Reinforcement, Lowering & Concrete Pouring
2 8-Apr-2022 APCO/MMP2/STR/446 9-Apr-2022 9.00 AM 122+350 RHS MJB Suresh Chand 9451445208
of working Pile P2/4 for MJB
Reinforcement Shuttering Checking & Pouring of M-35
3 8-Apr-2022 APCO/MMP2/STR/447 9-Apr-2022 9.30 AM 120+831 LHS LVUP Suresh Chand 9451445208
Concrete for Bottom Haunch with Wall of LVUP
Reinforcement Shuttering Checking & Pouring of M-35
4 8-Apr-2022 APCO/MMP2/STR/448 9-Apr-2022 10.30 AM 120+865 LHS B.CUL Concrete for Bottom Haunch with Wall 1st lift of Box Culvert Suresh Chand 9451445208
(MCW)
Reinforcement Shuttering & Pouring of M-30 Checking for
5 8-Apr-2022 APCO/MMP2/STR/449 9-Apr-2022 9.30 AM 110+188 LHS B.CUL Dinesh Paswan 8709307284
A1&A2 Wall Bottom Haunch of Box Culvert
Reinforcement Shuttering & Pouring of M-30 Checking for Raft
6 8-Apr-2022 APCO/MMP2/STR/450 9-Apr-2022 10.30 AM 111+685 LHS B.CUL Dinesh Paswan 8709307284
of Box Culvert
Reinforcement Shuttering & Pouring of M-30 Checking for Raft
7 8-Apr-2022 APCO/MMP2/STR/451 9-Apr-2022 11.30 AM 115+200 LHS B.CUL Dinesh Paswan 8709307284
of Box Culvert
Reinforcement Shuttering & Pouring of M-30 Checking for
8 8-Apr-2022 APCO/MMP2/STR/452 9-Apr-2022 12.30 PM 111+306 RHS B.CUL Dinesh Paswan 8709307284
Bottom Haunch of Box Culvert
Reinforcement Shuttering & Pouring of M-30 Checking for Raft
9 8-Apr-2022 APCO/MMP2/STR/453 9-Apr-2022 2.30 PM 108+575 LHS B.CUL Dinesh Paswan 8709307284
of Box Culvert (SR)
Reinforcement Shuttering & Pouring of M-30 Checking for Raft
10 8-Apr-2022 APCO/MMP2/STR/454 9-Apr-2022 2.30 PM 108+575 RHS B.CUL Dinesh Paswan 8709307284
of Box Culvert (SR)

11 8-Apr-2022 APCO/MMP2/HW/256 9-Apr-2022 11.00 AM 121+900 122+180 LHS HWY FDD Checking of Embankment 1st layer Ravi Pratap Singh 8707548316

12 8-Apr-2022 APCO/MMP2/HW/257 9-Apr-2022 2.30 PM 122+000 122+180 RHS HWY FDD Checking of Embankment 1st layer Ravi Pratap Singh 8707548316

13 8-Apr-2022 APCO/MMP2/HW/258 9-Apr-2022 4.00 PM 122+380 122+600 LHS HWY FDD Checking of Embankment 1st layer Ravi Pratap Singh 8707548316

14 8-Apr-2022 APCO/MMP2/HW/259 9-Apr-2022 9.30 AM 114+680 114+980 LHS HWY FDD Checking of Embankment 3rd layer Vikash Shukla 9005099389

15 8-Apr-2022 APCO/MMP2/HW/260 9-Apr-2022 10.30 AM 113+620 114+100 LHS HWY FDD Checking of Embankment 2nd layer Vikash Shukla 9005099389

16 8-Apr-2022 APCO/MMP2/HW/261 9-Apr-2022 11.30 AM 111+500 112+150 LHS HWY OGL Recording & FDD checking Vikash Shukla 9005099389

17 8-Apr-2022 APCO/MMP2/HW/262 9-Apr-2022 12.30 PM 111+500 112+150 RHS HWY OGL Recording & FDD checking Vikash Shukla 9005099389

18 8-Apr-2022 APCO/MMP2/HW/263 9-Apr-2022 2.30 PM 115+250 115+730 LHS HWY OGL Recording & FDD checking Vikash Shukla 9005099389

19 8-Apr-2022 APCO/MMP2/HW/264 9-Apr-2022 2.30 PM 115+250 115+730 RHS HWY OGL Recording & FDD checking Vikash Shukla 9005099389

20 8-Apr-2022 APCO/MMP2/HW/265 9-Apr-2022 10.30 AM 111+000 111+300 RHS HWY FDD Checking of Embankment 1st layer Vikash Shukla 9005099389

21 8-Apr-2022 APCO/MMP2/HW/266 9-Apr-2022 11.30 AM 111+310 111+500 RHS HWY FDD Checking of Embankment 1st layer Vikash Shukla 9005099389

22 8-Apr-2022 APCO/MMP2/HW/267 9-Apr-2022 12.00 PM 096+580 097+080 LHS HWY OGL Recording & FDD checking Sanjay Tyagi 9131774033

23 8-Apr-2022 APCO/MMP2/HW/268 9-Apr-2022 2.00 PM 096+580 097+080 RHS HWY OGL Recording & FDD checking Sanjay Tyagi 9131774033
Four Laning of Munger to Mirzachauki (NH-80) Section from Kharia Village junction to start of existing Bhagalpur Bypass (Design Km 95+580 to Km 125+000) (Pkg-
Project Name:
02) on Hybrid Annuity Mode the state of Bihar.
Client National Highway Authority of India
Concessionaire Apco Magadh Expressway Pvt. Ltd.
Independent Engineer LEA Associates South Asia Pvt. Ltd. (LEA INDIA)
EPC Contractor Apco Infratech Pvt. Ltd. (APCO)
24 8-Apr-2022 APCO/MMP2/HW/269 9-Apr-2022 10.00 AM 097+580 098+580 LHS HWY Clearing & Grubbing Checking Sanjay Tyagi 9131774033

25 8-Apr-2022 APCO/MMP2/HW/270 9-Apr-2022 11.00 AM 097+580 098+080 RHS HWY Clearing & Grubbing Checking Sanjay Tyagi 9131774033