1. During a site inspection of the ground floor roof slab reinforcement at the Gumga AVM 1BHK project, several quality issues were observed including beam reinforcement with insufficient cover, misaligned crank bars in the slab reinforcement, beams not following the specified development length, some slab bars binding, and deviations in shutter levels and loose materials in columns.
2. Photographs were taken to document the issues observed during the inspection including beam bottom and side cover not maintained, slab reinforcement bars not in straight lines, beams not following drawing for development length, and slab shuttering level deviations.
3. The quality observation report was submitted to Mr. Sandip ji of M/s Vivir Construction, the contractor,
1. During a site inspection of the ground floor roof slab reinforcement at the Gumga AVM 1BHK project, several quality issues were observed including beam reinforcement with insufficient cover, misaligned crank bars in the slab reinforcement, beams not following the specified development length, some slab bars binding, and deviations in shutter levels and loose materials in columns.
2. Photographs were taken to document the issues observed during the inspection including beam bottom and side cover not maintained, slab reinforcement bars not in straight lines, beams not following drawing for development length, and slab shuttering level deviations.
3. The quality observation report was submitted to Mr. Sandip ji of M/s Vivir Construction, the contractor,
Original Description:
Original Title
CIVIL OBS -140 AVM ROOF SLAB REINFORCEMENT AND SHUTTERING
1. During a site inspection of the ground floor roof slab reinforcement at the Gumga AVM 1BHK project, several quality issues were observed including beam reinforcement with insufficient cover, misaligned crank bars in the slab reinforcement, beams not following the specified development length, some slab bars binding, and deviations in shutter levels and loose materials in columns.
2. Photographs were taken to document the issues observed during the inspection including beam bottom and side cover not maintained, slab reinforcement bars not in straight lines, beams not following drawing for development length, and slab shuttering level deviations.
3. The quality observation report was submitted to Mr. Sandip ji of M/s Vivir Construction, the contractor,
1. During a site inspection of the ground floor roof slab reinforcement at the Gumga AVM 1BHK project, several quality issues were observed including beam reinforcement with insufficient cover, misaligned crank bars in the slab reinforcement, beams not following the specified development length, some slab bars binding, and deviations in shutter levels and loose materials in columns.
2. Photographs were taken to document the issues observed during the inspection including beam bottom and side cover not maintained, slab reinforcement bars not in straight lines, beams not following drawing for development length, and slab shuttering level deviations.
3. The quality observation report was submitted to Mr. Sandip ji of M/s Vivir Construction, the contractor,
QA-Observation Date: 13-Aug-22 Contractor Name M/s- Vivir Construction.
Quality Observation No: AEL/CIVIL/140 Sub-Contractor Name: M/s- Vivir Construction. Project Name: Gumga AVM 1BHK Discipline: CIVIL S.O N.O: 8130005169 Area Of Inspection/ Location/ Equipment: Ground floor roof slab reinforcement Status Open FQP NO & Clause No/Ref. Drawing No. FQP NO. AEL/VIVIR/CIVIL/AEL-AVM/01 Category: II. Medium Severity Test Perform: Visual Description of Observation Root Cause (if Any)
During site inspection it is observed that,
1. Beam bottom and sides reinforcement cover not maintained particular area. 2.All Slab reinforcement crank bars not in straight (miss align). 3. Particular beam reinforcement bars development length not followed as per drawing. Lake of supervision 4.Slab reinforcement bars some portion binding balance . 5. Particular room slab shuttering level 10mm deviation found. 6. Particular columns inside loose materials and cleaning not done proper. 7. Column all sides shuttering gap found.
Photographs During Inspection
AEL FQA AEL- Project Engineer Submitted To:
Name Name: Mr. Sandip ji. Kishore Kunal /V.Lakshmanan Kaushik Mishra
Signature Date: 13-Aug-22
Date Agency: M/s- Vivir Construction.
13-Aug-22 13-Aug-22
*This is a computer generated report doesn’t need a physical signature