Progress Concrete Outline

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

1 2 4 5 6 7 8 9 10 11 12 13 14 15 16

A A
E F G
DE-1056 DE-1057 DE-1058 I

G H J
DE-1061
I
1302 10000 5833 4114
2700

B
1 K B
DE-1050 DE-1062

40 68
1 255 20 20
H
DE-1059
I 3

2300
DE-1060 DE-1050

3800

12

12
C C

00
R120

700
4980 3324 2850
7650

00
P1

R100
X=797353.012
6500

Y=9754657.375

100
D DE-1050 D
2375 2769
A
DE-1051

B
2 DE-1051 CONTRACTION
JOINT

C
E DE-1054 2375 2769 E
D

2500
DE-1056
CONTRACTION
6500

JOINT

R100
7650

00
6158 3344 2850 30 20

P2
R1200

F F
0

P2
CONTRACTION
X=797419.6420
JOINT

12
Y=9754670.6034

2300

700
3 10 20 20

G 21250 4000 11955 G

DETAIL 3
SCALE 1:400 -

PLAN ON EL.+720.00
SCALE 1:750

H H
G H H

1302 1048
721 581 449 599
REV. DATE DESCRIPTION DRN CHK'D APP'D
500

R12000
1 500
549

J J
650

500
12

3
400

R1
351

500

500
R4
300

00

250
9
510

1000

2
200

250
6

00

DOC NO. REFERENCES DOCUMENTS


22

500

500
R4
400
7
1. GRID_720.00_DDRG LH41-C04-G10-DE-1050_POWER INTAKE-CONCRETE OUTLINE-DETAIL & SECTION.dwg

230 270 PT KERINCI MERANGIN HIDRO


640

K K
490

500

R12000
54

500 Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor


Phone: (62-21) 8232323, Fax: (62-21) 8232626
KERINCI MER ANGIN HIDRO
1848 400 126 2450

331 390 26 15 4 PT BUKAKA TEKNIK UTAMA


HYDROPOWER ENGINEERING DIVISION
Engineering Center 2nd Floor
Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
Phone: (62-21) 8232323, Fax: (62-21) 8232626

EXTERNAL USE INTERNAL USE PROJECT


- FOR REVIEW - FABRICATION
MERANGIN HYDROELECTRIC
L DETAIL 2 X FOR CONSTRUCTION - REFERENCE L
SCALE 1:300 - - AS BUILT
POWER PLANT 350 MW
Sign Date AREA
DETAIL 1 Approved : M. Yusri R. INTAKE/DAM
SCALE 1:250 - Sign Date
Reviewed : Hari Suhartanto POWER INTAKE
Sign Date
Design : Yahya A. L. CONCRETE OUTLINE
Sign Date
Drawn : Septian H. PLAN, SECTION & DETAIL
6/4/2022 2:42:05 PM

Projection Method: SCALE SHEET DRAWING NUMBER REV.


THIRD ANGLE
M A1 1 : 100 1 of 1 DDRG LH41-C04-G10-DE-1050 0 M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16
A A
G H I
7
DE-1053

B 7° B
1302 4792 594

130

11563

25°
400

C C

200
8

400
14050

DE-1053

L 200
400

25°
DE-1051
D D

8555 3008
DETAIL 4
SCALE 1:200 -

E E
G H
9
DE-1053

5 5 10
00
DE-1052
R145

F F
250

500

500
3 3
250
R2
P1 50
X=797353.012 2913 2696 1500

360
Y=9754657.375 337 400

6
721 581
G G

15

15
P1

890
X=797353.012
Y=9754657.375

1302 1948 500

6 P2
X=797419.6420
H DE-1051 Y=9754670.6034 H

SECTION A DETAIL 6
SCALE 1:100 - SCALE 1:250 -

J J
1. GRID_720.00_DDRG LH41-C04-G10-DE-1050_POWER INTAKE-CONCRETE OUTLINE-DETAIL & SECTION.dwg

PT KERINCI MERANGIN HIDRO


K Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
K
Phone: (62-21) 8232323, Fax: (62-21) 8232626
KERINCI MER ANGIN HIDRO

PT BUKAKA TEKNIK UTAMA


HYDROPOWER ENGINEERING DIVISION
Engineering Center 2nd Floor
Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
Phone: (62-21) 8232323, Fax: (62-21) 8232626

EXTERNAL USE INTERNAL USE PROJECT


- FOR REVIEW - FABRICATION
MERANGIN HYDROELECTRIC
L X FOR CONSTRUCTION - REFERENCE L
REV. DATE DESCRIPTION DRN CHK'D APP'D
- AS BUILT
POWER PLANT 350 MW
Sign Date AREA
Approved : M. Yusri R. INTAKE/DAM
Sign Date
Reviewed : Hari Suhartanto POWER INTAKE
Sign Date
Design : Yahya A. L. CONCRETE OUTLINE
Sign Date
Drawn : Septian H. PLAN, SECTION & DETAIL
6/4/2022 2:42:27 PM

Projection Method: SCALE SHEET DRAWING NUMBER REV.


THIRD ANGLE
M DOC NO. REFERENCES DOCUMENTS
A1 1 : 100 1 of 1 DDRG LH41-C04-G10-DE-1051 0 M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16
A A
-
DE-1052

B B

580

1650
510
N

1100
DE-1052

300
C C

290
600 750
200

651
D 1900 D
SECTION N
SCALE 1:100 -

580

1649
470
E E

1100
300
330
600 750 200
F F

651
1900
580

G G
400

1649
1100
300
400

H H

600 750 200

649
1900
REV. DATE DESCRIPTION DRN CHK'D APP'D
580

J J
310

33

DOC NO. REFERENCES DOCUMENTS


300

1100
1. GRID_720.00_DDRG LH41-C04-G10-DE-1050_POWER INTAKE-CONCRETE OUTLINE-DETAIL & SECTION.dwg

PT KERINCI MERANGIN HIDRO


K Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
K
490

Phone: (62-21) 8232323, Fax: (62-21) 8232626


KERINCI MER ANGIN HIDRO

PT BUKAKA TEKNIK UTAMA


200 HYDROPOWER ENGINEERING DIVISION
600 750 Engineering Center 2nd Floor
Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
Phone: (62-21) 8232323, Fax: (62-21) 8232626

EXTERNAL USE INTERNAL USE PROJECT


1900 - FOR REVIEW - FABRICATION
MERANGIN HYDROELECTRIC
L X FOR CONSTRUCTION - REFERENCE L
- AS BUILT
POWER PLANT 350 MW
Sign Date AREA
Approved : M. Yusri R. INTAKE/DAM
Sign Date
Reviewed : Hari Suhartanto POWER INTAKE
Sign Date
Design : Yahya A. L. CONCRETE OUTLINE
DETAIL 5 DETAIL (MIDDLE PILAR) 5 Sign Date
SCALE 1:250 -
Drawn : Septian H. PLAN, SECTION & DETAIL
SCALE 1:200 -
6/6/2022 8:50:51 AM

Projection Method: SCALE SHEET DRAWING NUMBER REV.


THIRD ANGLE
M A1 1 : 100 1 of 1 DDRG LH41-C04-G10-DE-1052 0 M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16
A A
I
I 1000 1500 1700 1300 500 1000

O
DE-1051

B 10 B
DE-1053

P
DE-1051

C C

300

300
1750
1300

1000
1000 1700

D 700 800 700 D

DETAIL 7 DETAIL 8
E SCALE 1:500 SCALE 1:250
E
- -

F F

4
3008 1500

302 1133

80
°
G G
1133
1683

0
00


R1
550

1633

1435

H H

DETAIL 10
SCALE 1:500 -

J J
1. GRID_720.00_DDRG LH41-C04-G10-DE-1050_POWER INTAKE-CONCRETE OUTLINE-DETAIL & SECTION.dwg

PT KERINCI MERANGIN HIDRO


K Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
K
Phone: (62-21) 8232323, Fax: (62-21) 8232626
KERINCI MER ANGIN HIDRO

PT BUKAKA TEKNIK UTAMA


HYDROPOWER ENGINEERING DIVISION
Engineering Center 2nd Floor
Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
Phone: (62-21) 8232323, Fax: (62-21) 8232626

EXTERNAL USE INTERNAL USE PROJECT


- FOR REVIEW - FABRICATION
MERANGIN HYDROELECTRIC
L X FOR CONSTRUCTION - REFERENCE L
DETAIL 9 REV. DATE DESCRIPTION DRN CHK'D APP'D
- AS BUILT
POWER PLANT 350 MW
SCALE 1:500 Sign Date AREA
- Approved : M. Yusri R. INTAKE/DAM
Sign Date
Reviewed : Hari Suhartanto POWER INTAKE
Sign Date
Design : Yahya A. L. CONCRETE OUTLINE
Sign Date
Drawn : Septian H. PLAN, SECTION & DETAIL
6/4/2022 2:56:43 PM

Projection Method: SCALE SHEET DRAWING NUMBER REV.


THIRD ANGLE
M DOC NO. REFERENCES DOCUMENTS
A1 1 : 100 1 of 1 DDRG LH41-C04-G10-DE-1053 0 M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16
A A

G H I
I
1500
B B
1302 4792 59 302

63
11563 6

C C

150
14050

25

450
D D

680

1525
8555 3008

E E

150
25

326
00
R145

F F

450 1050

2913 2696 1500 12


DE-1050 DETAIL 12
SCALE 1:500 -

G G

H 11 H
DE-1055

SECTION B
SCALE 1:100 -

J J
1. GRID_720.00_DDRG LH41-C04-G10-DE-1050_POWER INTAKE-CONCRETE OUTLINE-DETAIL & SECTION.dwg

PT KERINCI MERANGIN HIDRO


K Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
K
Phone: (62-21) 8232323, Fax: (62-21) 8232626
KERINCI MER ANGIN HIDRO

PT BUKAKA TEKNIK UTAMA


HYDROPOWER ENGINEERING DIVISION
Engineering Center 2nd Floor
Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
Phone: (62-21) 8232323, Fax: (62-21) 8232626

EXTERNAL USE INTERNAL USE PROJECT


- FOR REVIEW - FABRICATION
MERANGIN HYDROELECTRIC
L X FOR CONSTRUCTION - REFERENCE L
REV. DATE DESCRIPTION DRN CHK'D APP'D
- AS BUILT
POWER PLANT 350 MW
Sign Date AREA
Approved : M. Yusri R. INTAKE/DAM
Sign Date
Reviewed : Hari Suhartanto POWER INTAKE
Sign Date
Design : Yahya A. L. CONCRETE OUTLINE
Sign Date
Drawn : Septian H. PLAN, SECTION & DETAIL
6/4/2022 2:43:28 PM

Projection Method: SCALE SHEET DRAWING NUMBER REV.


THIRD ANGLE
M DOC NO. REFERENCES DOCUMENTS
A1 1 : 100 1 of 1 DDRG LH41-C04-G10-DE-1054 0 M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16
A A
-
DE-1052

-
DE-1052

B B

580

3
510

4
Q 2

1100

7
C DE-1052 C

300

4
290

3
600 750 8 16

D 1900 D
SECTION M
SCALE 1:200 -

580
470
E E

1100
300
330
600 750
F F

1900
580

G G
400

1100
300
400

H H

600 750

1900
REV. DATE DESCRIPTION DRN CHK'D APP'D
580

J J
310

DOC NO. REFERENCES DOCUMENTS


300

1100
1. GRID_720.00_DDRG LH41-C04-G10-DE-1050_POWER INTAKE-CONCRETE OUTLINE-DETAIL & SECTION.dwg

PT KERINCI MERANGIN HIDRO


K Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
K
490

Phone: (62-21) 8232323, Fax: (62-21) 8232626


KERINCI MER ANGIN HIDRO

PT BUKAKA TEKNIK UTAMA


HYDROPOWER ENGINEERING DIVISION
600 750 Engineering Center 2nd Floor
Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
Phone: (62-21) 8232323, Fax: (62-21) 8232626

EXTERNAL USE INTERNAL USE PROJECT

1900 - FOR REVIEW - FABRICATION


MERANGIN HYDROELECTRIC
L X FOR CONSTRUCTION - REFERENCE L
- AS BUILT
POWER PLANT 350 MW
Sign Date AREA
Approved : M. Yusri R. INTAKE/DAM
Sign Date
Reviewed : Hari Suhartanto POWER INTAKE
Sign Date
DETAIL 11 Design : Yahya A. L. CONCRETE OUTLINE
DETAIL (MIDDLE PILAR) 5 Sign Date
SCALE 1:50 - SCALE 1:200 -
Drawn : Septian H. PLAN, SECTION & DETAIL
6/4/2022 2:43:53 PM

Projection Method: SCALE SHEET DRAWING NUMBER REV.


THIRD ANGLE
M A1 1 : 100 1 of 1 DDRG LH41-C04-G10-DE-1052 0 M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16
A A
G H I

B B
1302 4792 594

11563

C C
14050

D D

8555 3008

E E

00
R145

F F

P1
X=797353.012 2913 2696 1500
Y=9754657.375

G G

13 P2
DE-1057 X=797419.6420
H Y=9754670.6034 H

SECTION C
SCALE 1:100 -

J J
1. GRID_720.00_DDRG LH41-C04-G10-DE-1050_POWER INTAKE-CONCRETE OUTLINE-DETAIL & SECTION.dwg

PT KERINCI MERANGIN HIDRO


K Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
K
Phone: (62-21) 8232323, Fax: (62-21) 8232626
KERINCI MER ANGIN HIDRO

PT BUKAKA TEKNIK UTAMA


HYDROPOWER ENGINEERING DIVISION
Engineering Center 2nd Floor
Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
Phone: (62-21) 8232323, Fax: (62-21) 8232626

EXTERNAL USE INTERNAL USE PROJECT


- FOR REVIEW - FABRICATION
MERANGIN HYDROELECTRIC
L X FOR CONSTRUCTION - REFERENCE L
REV. DATE DESCRIPTION DRN CHK'D APP'D
- AS BUILT
POWER PLANT 350 MW
Sign Date AREA
Approved : M. Yusri R. INTAKE/DAM
Sign Date
Reviewed : Hari Suhartanto POWER INTAKE
Sign Date
Design : Yahya A. L. CONCRETE OUTLINE
Sign Date
Drawn : Septian H. PLAN, SECTION & DETAIL
6/4/2022 2:44:11 PM

Projection Method: SCALE SHEET DRAWING NUMBER REV.


THIRD ANGLE
M DOC NO. REFERENCES DOCUMENTS
A1 1 : 100 1 of 1 DDRG LH41-C04-G10-DE-1055 0 M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16
A A
-
DE-1052

B B

580
R
2

22
DE-1052
C C

4
3
8 16
1900

D D
SECTION M
SCALE 1:200 -

580
E E

22

1900
F F
12

G G
22

H H

1900

REV. DATE DESCRIPTION DRN CHK'D APP'D


12

J J

DOC NO. REFERENCES DOCUMENTS


22
1. GRID_720.00_DDRG LH41-C04-G10-DE-1050_POWER INTAKE-CONCRETE OUTLINE-DETAIL & SECTION.dwg

PT KERINCI MERANGIN HIDRO


K Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
K
Phone: (62-21) 8232323, Fax: (62-21) 8232626
KERINCI MER ANGIN HIDRO

PT BUKAKA TEKNIK UTAMA


HYDROPOWER ENGINEERING DIVISION
1900 Engineering Center 2nd Floor
Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
Phone: (62-21) 8232323, Fax: (62-21) 8232626

EXTERNAL USE INTERNAL USE PROJECT


- FOR REVIEW - FABRICATION
MERANGIN HYDROELECTRIC
L X FOR CONSTRUCTION - REFERENCE L
- AS BUILT
POWER PLANT 350 MW
Sign Date AREA
Approved : M. Yusri R. INTAKE/DAM
Sign Date
Reviewed : Hari Suhartanto POWER INTAKE
Sign Date
Design : Yahya A. L. CONCRETE OUTLINE
DETAIL 13 DETAIL (MIDDLE PILAR) 5 Sign Date
SCALE 1:250 -
Drawn : Septian H. PLAN, SECTION & DETAIL
SCALE 1:200 -
6/4/2022 2:44:35 PM

Projection Method: SCALE SHEET DRAWING NUMBER REV.


THIRD ANGLE
M A1 1 : 100 1 of 1 DDRG LH41-C04-G10-DE-1052 0 M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16
A A

B I H G B

C 594 4792 1302 C

11563

D D

14050
E E

3008 8555

F F

14
R145
DE-1059
00

G G

P1
1500 2696 2913 X=797353.012
Y=9754657.375

H H

P2
X=797419.6420
Y=9754670.6034

J J

SECTION D
SCALE 1:100 -
1. GRID_720.00_DDRG LH41-C04-G10-DE-1050_POWER INTAKE-CONCRETE OUTLINE-DETAIL & SECTION.dwg

PT KERINCI MERANGIN HIDRO


K Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
K
Phone: (62-21) 8232323, Fax: (62-21) 8232626
KERINCI MER ANGIN HIDRO

PT BUKAKA TEKNIK UTAMA


HYDROPOWER ENGINEERING DIVISION
Engineering Center 2nd Floor
Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
Phone: (62-21) 8232323, Fax: (62-21) 8232626

EXTERNAL USE INTERNAL USE PROJECT


- FOR REVIEW - FABRICATION
MERANGIN HYDROELECTRIC
L X FOR CONSTRUCTION - REFERENCE L
- AS BUILT
POWER PLANT 350 MW
Sign Date AREA
Approved : M. Yusri R. INTAKE/DAM
Sign Date
Reviewed : Hari Suhartanto POWER INTAKE
Sign Date
Design : Yahya A. L. CONCRETE OUTLINE
Sign Date
Drawn : Septian H. TOP PLAN, SECTION & DETAIL
6/4/2022 2:45:00 PM

Projection Method: SCALE SHEET DRAWING NUMBER REV.


THIRD ANGLE
M A1 1 : 100 1 of 1 DDRG LH41-C04-G10-DE-1056 0 M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 4 5 6 7 8 9 10 11 12 13 14 15 16
A A

B B

1100

720
C C

1848
1900

D D

E E
1100

1900
F F

G G
1100

H H

1900

REV. DATE DESCRIPTION DRN CHK'D APP'D

J J

DOC NO. REFERENCES DOCUMENTS


1100
1. GRID_720.00_DDRG LH41-C04-G10-DE-1050_POWER INTAKE-CONCRETE OUTLINE-DETAIL & SECTION.dwg

PT KERINCI MERANGIN HIDRO


K Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
K
Phone: (62-21) 8232323, Fax: (62-21) 8232626
KERINCI MER ANGIN HIDRO

PT BUKAKA TEKNIK UTAMA


HYDROPOWER ENGINEERING DIVISION
1900 Engineering Center 2nd Floor
Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
Phone: (62-21) 8232323, Fax: (62-21) 8232626

EXTERNAL USE INTERNAL USE PROJECT


- FOR REVIEW - FABRICATION
MERANGIN HYDROELECTRIC
L X FOR CONSTRUCTION - REFERENCE L
- AS BUILT
POWER PLANT 350 MW
Sign Date AREA
Approved : M. Yusri R. INTAKE/DAM
Sign Date
Reviewed : Hari Suhartanto POWER INTAKE
Sign Date
Design : Yahya A. L. CONCRETE OUTLINE
Sign Date
Drawn : Septian H. PLAN, SECTION & DETAIL
DETAIL 12
6/6/2022 7:45:31 AM

Projection Method: SCALE SHEET DRAWING NUMBER REV.


SCALE 1:50 THIRD ANGLE
M
-
A1 1 : 100 1 of 1 DDRG LH41-C04-G10-DE-DE-1057 0 M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like