MICHIGAN DEPARTMENT OF TRANSPORTATION

STR 8269 BRIDGE SAFETY INSPECTION REPORT


Facility Latitude / Longitude MDOT Structure ID Structure Condition
MARTIN LUTHER KING 42.6169 / -83.2698 634548400217R01 Critical Condition(2)
Feature Length / Width / Spans Owner
GRAND TRUNK WESTERN RR 188 / 70.2 / 3 City: PONTIAC(5484)
Location Built / Recon. / Paint / Ovly. TSC Operational Status
1/4 MI E EAST BLVD & BL75 1976 / / / Oakland(23) K Closed to all traffic(K)
Region / County Material / Design Last NBI Inspection Scour Evaluation
Metro(7) / Oakland(63) 3 Steel / 32 Multi Str Comp 07/29/2022 / 1JZY N Not Over Waterway

NBI INSPECTION 1JZY


Inspector Name Agency / Company Name Insp. Freq. Insp. Date
Jake VanHorn Alfred Benesch 12 07/29/2022

GENERAL NOTES
Direction: MLK is considered E-W; RR is considered N-S.
Access: Through slopes along SWQ and SEQ. Access to beam seat hinges in span 2 requires reachall bucket truck with traffic control
Weather: 77deg and sunny

Weight limit signs in place on both ends of bridge NO


Required advance warning weight limit signs in place NO

DECK
06/18 07/20 07/22
1. Surface 6 6 5 Concrete overlay top surface. Open transverse cracks at 8' spacing and longitudinal cracks
(SIA-58A) up to 1/16" wide. Diagonal and transverse cracking observed at multiple locations. EB lanes
have 2 HMA filled patches approximately 6 sft. WB lanes Span 1w has a 14 sft and 6sft HMA
patch. Map cracking observed in span 1W. Minor open spalls in both bounds of of span 3w.
(07/22)
Concrete overlay top surface. Open transverse cracks at 8' spacing and longitudinal cracks
up to 1/16" wide. Diagonal and transverse cracking observed at multiple locations. EB lanes
have 2 HMA filled patches approximately 6 sft. Span 1w has 14 sft HMA patch. Map cracking
span 1W. (07/20)
Concrete overlay top surface. Open transverse cracks at 8' spacing and longitudinal cracks
up to 1/16" wide. Some cracks are sealed. (06/18)
2. Expansion 4 3 3 Expansion Joint devices (EJD) located on top of piers 1w and 2w over the hinges. EJD
Joints significantly deteriorated at multiple locations with HMA patches along each joint (100%
damaged over pier 1w, 100% damaged over pier 2w). EJD at WB sidewalk over pier 1w is
heaving and is a tripping hazard. Rubber mat compression seals over each hinge joint with
evidence of leakage below with daylight visible through joint. (07/22)
Expansion Joint device (EJD) located on top of piers 1w and 2w over the hinges. EJD
significantly deteriorated at multiple locations (25% damaged EB over pier 2w, 30% damaged
WB over pier 2w). EJD at WB sidewalk over pier 1w is heaving and is a tripping hazard.
Rubber mat compression seals over each hinge joint with evidence of leakage below with
daylight visible through joint. (07/20)
HPR joints along the abutment reference lines, HMA patches in the east header.
Rubber mat compression seals over each saddle joint, evidence of leakage below. Patches
and holes over both saddle joints. (06/18)
3. Other N 4 4 HPR joints along the abutment reference lines, HMA patches in the east header. 80%
Joints damage to HPR in EB lane @ abut B. 4ft long spall in west header EB lanes. (07/22)
HPR joints along the abutment reference lines, HMA patches in the east header. 80%
damage to HPR in EB lane @ abut B. 4ft long spall in west header. (07/20)
N/A (06/18)

Modified by: VANHORNJ0120 on 08/12/2022 Printed on 08/16/2022 Page 1 of 11


MICHIGAN DEPARTMENT OF TRANSPORTATION

STR 8269 BRIDGE SAFETY INSPECTION REPORT


Facility Latitude / Longitude MDOT Structure ID Structure Condition
MARTIN LUTHER KING 42.6169 / -83.2698 634548400217R01 Critical Condition(2)
Feature Length / Width / Spans Owner
GRAND TRUNK WESTERN RR 188 / 70.2 / 3 City: PONTIAC(5484)
Location Built / Recon. / Paint / Ovly. TSC Operational Status
1/4 MI E EAST BLVD & BL75 1976 / / / Oakland(23) K Closed to all traffic(K)
Region / County Material / Design Last NBI Inspection Scour Evaluation
Metro(7) / Oakland(63) 3 Steel / 32 Multi Str Comp 07/29/2022 / 1JZY N Not Over Waterway

4. Railings 6 5 5 Outside railing: Solid concrete parapets with 2-tube rails. 7' horizontal STS in the solid
concrete barrier in the SEQ. 7 Missing tube sections (5 in SE corner and 2 in NW corner). NE,
NW, SE approach guardrails have impact damage.
Median: Dual face Type 4 median barrier, open vertical cracks up to 1/16" wide spaced at 2'-
4'. Some horizontal cracking observed. (07/22)
Outside railing: Solid concrete parapets with 2-tube rails. 7' horizontal STS in the solid
concrete barrier in the SEQ. 5 Missing tube sections (3 in SE corner and 2 in NW corner). NE,
NW, SE approach guardrails have impact damage.
Median: Dual face Type 4 median barrier, open vertical cracks up to 1/16" wide spaced at 2'-
4'. Some horizontal cracking observed. (07/20)
Outside rails: Solid concrete parapets with 2-tube uppers. 6' horizontal STS in the solid
concrete barrier in the SEQ. 5 Missing tube sections, 3 in SE corner and 2 in NW corner. NE,
NW, SE approach guardrails have impact damage.
Median: Dual face Type 4 median barrier, open vertical cracks up to 1/16" wide spaced at 2'-
4'. (06/18)
5. Sidewalks 7 7 7 Raised concrete sidewalks along both fascias. Isolated HL transverse cracks spaced at 15'
or Curbs and diagonal cracks. Debris buildup along both sidewalks. (07/22)
Raised concrete sidewalks along both fascias. Isolated HL transverse cracks spaced at 15'
and diagonal cracks. (07/20)
Raised concrete sidewalks along both fascias. Isolated HL transverse spaced at 15' and
diagonal cracks. (06/18)
6. Deck 7 6 6 SIP metal deck pans, minor corrosion on isolated seams. Heavier corrosion on the pans
Bottom above the hinge joints. Bay 7s Span 2w has large deflection in SIP form pan. (07/22)
Surface SIP metal deck pans, minor corrosion on isolated seams. Heavier corrosion on the pans
(SIA-58B) above the hinge joints. (07/20)
SIP metal deck pans, minor corrosion on isolated seams. Heavier corrosion on the pans
above the saddle joints. (06/18)
7. Deck 6 6 5 Top: Concrete overlay top surface. Open transverse cracks at 8' spacing and longitudinal
(SIA-58) cracks up to 1/16" wide. Diagonal and transverse cracking observed at multiple locations. EB
lanes have 2 HMA filled patches approximately 6 sft. WB lanes Span 1w has a 14 sft and 6sft
HMA patch. Map cracking observed in span 1W.
Bottom: SIP metal deck pans, minor corrosion on isolated seams. Heavier corrosion on the
pans above the hinge joints. Bay 7s Span 2w has large deflection in SIP form pan.
Fascias: HL vertical cracks spaced at 6'-10'. (07/22)
Top: Concrete overlay top surface. Open transverse cracks at 8' spacing and longitudinal
cracks up to 1/16" wide. Diagonal and transverse cracking observed at multiple locations. EB
lanes have 2 HMA filled patches approximately 6 sft. Span 1w has 14 sft HMA patch. Map
cracking span 1W.
Bottom: SIP metal deck pans, minor corrosion on isolated seams. Heavier corrosion on the
pans above the hinge joints.
Fascias: HL vertical cracks spaced at 6'-10'. (07/20)
Top: Concrete overlay top surface. Open transverse cracks at 8' spacing and longitudinal
cracks up to 1/16" wide. Some cracks are sealed.
Bottom: SIP metal deck pans, minor corrosion on isolated seams. Heavier corrosion on the
pans above the saddle joints.
Fascias: HL vertical cracks spaced at 6'-10'. (06/18)
8. Drainage Catch basins located off of structure. (07/22)
Off structure. (07/20)
Off structure. (06/18)

SUPERSTRUCTURE
06/18 07/20 07/22

Modified by: VANHORNJ0120 on 08/12/2022 Printed on 08/16/2022 Page 2 of 11


MICHIGAN DEPARTMENT OF TRANSPORTATION

STR 8269 BRIDGE SAFETY INSPECTION REPORT


Facility Latitude / Longitude MDOT Structure ID Structure Condition
MARTIN LUTHER KING 42.6169 / -83.2698 634548400217R01 Critical Condition(2)
Feature Length / Width / Spans Owner
GRAND TRUNK WESTERN RR 188 / 70.2 / 3 City: PONTIAC(5484)
Location Built / Recon. / Paint / Ovly. TSC Operational Status
1/4 MI E EAST BLVD & BL75 1976 / / / Oakland(23) K Closed to all traffic(K)
Region / County Material / Design Last NBI Inspection Scour Evaluation
Metro(7) / Oakland(63) 3 Steel / 32 Multi Str Comp 07/29/2022 / 1JZY N Not Over Waterway

9. Stringer 5 5 2 (10) A-588 weathering steel beams, span 2s is suspended via hinges 4' north of pier 1s and
(SIA-59) 4' south of pier 2s. Deck is curved and beams are on chords. Severe corrosion with heavy
flaking of steel observed at all interior beam seat hinges. Minor to heavy section loss
observed in the webs, flanges, stiffeners and steel bearing seats of the beam seat hinges at
beams 2s through 9s at both pier 1w and pier 2w. Beam 2s pier 1w has the worst section loss
with multiple large holes in the web throughout the cantilever portion. Beam 2s pier 1w
bearing stiffeners at the beam seat hinge and the bearing stiffeners over the rocker bearing at
the pier are completely gone with 100% LOS for full width of both stiffeners. Beam 2s is in
critical condition with no load path back to the pier. Beams 3s & 8s at pier 1w and beams 2s,
3s, 4s, 8s & 9s at pier 2w are in serious condition. All cross frames under the EJD are in
serious condition with heavy section loss and steel flaking and corrosion at both pier1w and
pier 2w. A few cross frames have 100% section loss with holes in the webs. (07/22)
(10) A-588 weathering steel beams, span 2s is suspended via hinges 4' north of pier 1s and
4' south of pier 2s. Deck is curved and beams are on chords. Steel flaking and corrosion
observed under hinges (at EJD locations) at beams 2-3s; 7-9s and diaphragms. Beam 8s has
the worst deterioration. (07/20)
(10) A-588 weathering steel beams, span 2s is suspended via saddles 4' north of pier 1s and
4' south of pier 2s. Bridge is curved, beams are on chords. No deficiencies noted. (06/18)
10. Paint 8 6 N Steel patina is smooth with a solid encapsulation. Majority of damage to patina is observed
(SIA-59A) under EJD and also along bottom portion of web and bottom flange of beam 2s in span 1w.
(07/22)
Steel patina is smooth with a solid encapsulation. Majority of damage to patina is observed
under EJD. (07/20)
Steel patina is smooth with a solid encapsulation. (06/18)
11. Section 2 2 0 100% section loss observed in webs, flanges and stiffeners at beam 2s/Pier1w at the beam
Loss seat hinges. Other beam seat hinge locations have significant section loss as well. (07/22)
Section loss on and surrounding the beam hinges. Section loss not measured. Section loss
needs to be verified via a detailed inspection utilizing MDOT's reachall unit. Beams 2s-3s and
7s-9s are worst at both hinges. (07/20)
Section loss on and surrounding the saddles. Section loss not measured, approximated at
less than 10% +/-. Section loss needs to be verified via a detailed inspection utilizing MDOT's
reachall. Beams 2s and 3s are worst at both saddle joints. (06/18)
12. Bearings 7 7 4 Steel bearing plates at each abutment with moderate corrosion and elastomeric bearings at
each hinge location. One row of steel rocker bearings at each pier, pier 1w has approximately
10-15 degree tilt towards span 2. Most rocker bearings are in fair condition. Rockers 2s, 3s,
8s at pier 1w and rocker 2s-4s, 8s-9s at pier 2w are in poor condition with heavy corrosion
and steel flaking and pack rust observed. Most of the beam seats are in contact at the hinges
and packed with pack rust and debris. Elastomeric bearings are in fair condition with some
minor bulging and tearing. Some pads are only 90-95% full contact as the bearings have
slightly rotated. (07/22)
Steel bearing plates at each abutment and elastomeric bearings at each hinge location, no
deficiencies noted. One row of steel rocker bearings at each pier, rocker 1w has
approximately 10-15 degree tilt towards span 2, surface rust throughout. (07/20)
Elastomeric bearings at each abutment, no deficiencies noted.
One row of steel rocker bearings at each pier, no significant tilt noted, surface rust
throughout. (06/18)

SUBSTRUCTURE
06/18 07/20 07/22

Modified by: VANHORNJ0120 on 08/12/2022 Printed on 08/16/2022 Page 3 of 11


MICHIGAN DEPARTMENT OF TRANSPORTATION

STR 8269 BRIDGE SAFETY INSPECTION REPORT


Facility Latitude / Longitude MDOT Structure ID Structure Condition
MARTIN LUTHER KING 42.6169 / -83.2698 634548400217R01 Critical Condition(2)
Feature Length / Width / Spans Owner
GRAND TRUNK WESTERN RR 188 / 70.2 / 3 City: PONTIAC(5484)
Location Built / Recon. / Paint / Ovly. TSC Operational Status
1/4 MI E EAST BLVD & BL75 1976 / / / Oakland(23) K Closed to all traffic(K)
Region / County Material / Design Last NBI Inspection Scour Evaluation
Metro(7) / Oakland(63) 3 Steel / 32 Multi Str Comp 07/29/2022 / 1JZY N Not Over Waterway

13. Abutments 7 6 6 Concrete cantilever abutment walls. Minor to moderate staining under bearings, and some
(SIA-60) hairline vertical cracking observed. Abut A: 0.12" crack under bearing of beam 1s. Abut B:
Large open crack (1/2" +/-) with 20sft spall in the front face of the wall, likely due to pavement
growth. (07/22)
Concrete cantilever abutment walls. Minor staining under bearings, and some hairline vertical
cracking observed. Abut A: 0.12" crack under bearing of beam 1s. Abut B: Large open crack
(1/2" +/-) with 4sft spall in the front face of the wall, bay 9s, likely due to pavement growth.
(07/20)
Concrete cantilever abutment walls, 2 Hairline vertical cracks in north abutment and 4 hairline
vertical cracks in south abutment.
North Abutment: Jagged open (1/2" +/-) crack in the front face of the wall, bay 1w. (06/18)
14. Piers 7 5 5 Five 3' diameter concrete columns with concrete cap and crashwalls. Isolated HL horizontal
(SIA-60) cap cracks and rust stains at pier 1w with two 3sft delaminations. Pier 1w, west face has
some map cracking under beam 10s. Major washout at north end of pier 1w along west side
exposing 4' of crash wall below grade and approximately 12ft of crashwall length along north
end. Many PVC communication lines and a steel conduit exposed. Reason for washout is
undetermined. Pier 2w pier cap has 3 vertical HL cracks. (07/22)
Five 3' diameter concrete columns with concrete cap and crashwalls. Isolated HL horizontal
cap cracks, rust stains. Pier 1w, north face has some map cracking under beam 10s. Major
washout along north side of pier 1w exposing 3' of crash wall below grade. Many PVC
communication lines and a steel conduit exposed. (07/20)
Five 3' diameter concrete columns with concrete cap and crashwalls. Isolated HL horizontal
cap cracks, rust stains. Pier 1w, north face the first 5 feet are map cracked. (06/18)
15. Slope 8 8 0 Concrete slope paving with cast concrete side headers. Slope paving has failed in span 1w
Protection near the pier. A scour hole with size of 16ft wide perpendicular to pier crashwall x 12ft long
along pier crashwall x 4ft deep below grade at pier crashwall observed at north end of pier
1w. Many PVC communication lines and a steel conduit exposed. Cause of scour hole not yet
determined and has grown in size since the last inspection. (07/22)
Concrete slope paving with cast concrete side headers. (07/20)
Concrete slope paving with cast concrete side headers, no deficiencies noted. (06/18)
16. Channel N N N Grade separation. (07/22)
(SIA-61) Grade separation. (07/20)
Grade separation. (06/18)
17. Scour N N N Cause of scour hole along pier 1w not yet determined and has grown in size since the last
Inspection inspection. (07/22)
N/A (07/20)
N/A (06/18)

APPROACH
06/18 07/20 07/22
18. Approach 6 4 4 Concrete approach pavement with sealed transverse and longitudinal joints. Isolated HMA
Pavement patches and open transverse cracks. SWQ has a lane wide transverse crack that has settled
1.5". Evidence of previous patching to this settlement was observed. (07/22)
Concrete approach pavement with sealed transverse and longitudinal joints. Isolated HMA
patches and open transverse cracks. SWQ has a lane wide transverse crack that has settled
1.5". Evidence of previous patching to this settlement was observed. (07/20)
Concrete approach pavement with sealed transverse and longitudinal joints. Isolated HMA
patches and open transverse cracks. In southwest quadrant there is a lane wide transverse
crack that has settled 1/2". (06/18)
19. Approach 4 8 8 Concrete approach sidewalks and concrete curb & gutter in all four quadrants. All quadrants
Shoulders recently reconstructed. (07/22)
Sidewalks Concrete approach sidewalks and concrete curb & gutter in all four quadrants. NWQ and
SEQ recently reconstructed. (07/20)
Concrete approach sidewalks and concrete curb & gutter in all four quadrants. Up to 6" of
settlement at the abutment reference lines. (06/18)

Modified by: VANHORNJ0120 on 08/12/2022 Printed on 08/16/2022 Page 4 of 11


MICHIGAN DEPARTMENT OF TRANSPORTATION

STR 8269 BRIDGE SAFETY INSPECTION REPORT


Facility Latitude / Longitude MDOT Structure ID Structure Condition
MARTIN LUTHER KING 42.6169 / -83.2698 634548400217R01 Critical Condition(2)
Feature Length / Width / Spans Owner
GRAND TRUNK WESTERN RR 188 / 70.2 / 3 City: PONTIAC(5484)
Location Built / Recon. / Paint / Ovly. TSC Operational Status
1/4 MI E EAST BLVD & BL75 1976 / / / Oakland(23) K Closed to all traffic(K)
Region / County Material / Design Last NBI Inspection Scour Evaluation
Metro(7) / Oakland(63) 3 Steel / 32 Multi Str Comp 07/29/2022 / 1JZY N Not Over Waterway

20. Approach Grass and brush. (07/22)


Slopes Grass and brush. (07/20)
Grass and brush. (06/18)
21. Utilities Steel and PVC conduit buried under span 1 running parallel to RR. Overhead lines directly
over span 3. (07/22)
Utilities buried under span 1 running parallel to RR. Overhead lines directly over span 3.
(07/20)
None noted. (06/18)
22. Drainage C&G takes water to catch basins away from bridge. (07/22)
Culverts None noted. (07/20)
None noted. (06/18)

MISCELLANEOUS
Guard Rail Other Items
Item Rating Item Rating
36A. Bridge Railings 0 71. Water Adequacy N
36B. Transitions 0 72. Approach Alignment 8
36C. Approach Guardrail 0 Temporary Support 0 No Temporary Supports
36D. Approach Guardrail Ends 0 High Load Hit (M) No
Special Insp. Equipment 4
Underwater Insp. Method 0
False Decking (Timber) Removed to Complete Inspection N/A - No False Decking

Critical Feature Inspections (SIA-92)


Freq Date
92A. Fracture Critical
92B. Underwater
92C. Other Special
92D. Fatigue Sensitive

Modified by: VANHORNJ0120 on 08/12/2022 Printed on 08/16/2022 Page 5 of 11


MICHIGAN DEPARTMENT OF TRANSPORTATION

STR 8269 BRIDGE SAFETY INSPECTION REPORT


Facility Latitude / Longitude MDOT Structure ID Structure Condition
MARTIN LUTHER KING 42.6169 / -83.2698 634548400217R01 Critical Condition(2)
Feature Length / Width / Spans Owner
GRAND TRUNK WESTERN RR 188 / 70.2 / 3 City: PONTIAC(5484)
Location Built / Recon. / Paint / Ovly. TSC Operational Status
1/4 MI E EAST BLVD & BL75 1976 / / / Oakland(23) K Closed to all traffic(K)
Region / County Material / Design Last NBI Inspection Scour Evaluation
Metro(7) / Oakland(63) 3 Steel / 32 Multi Str Comp 07/29/2022 / 1JZY N Not Over Waterway

SUPPORTING IMAGES 1JZY 07/29/2022

Document Name: IMG_0043.JPG Document Name: IMG_0041.JPG


Category: Railing Category: Joints
Span Number: 3 Span Number: 3
Comments: Missing steel tube sections in SEQ and NWQ. Comments: Abutment B HPR joint in EB lanes.

Document Name: IMG_0052.JPG Document Name: 20220728_180014.jpg


Category: Joints Category: Superstructure
Span Number: 2 Span Number: 2
Comments: Expansion joint device in span 2w near pier 1w wb Comments: Large holes in web and bearing stiffeners. Beam
lanes. 2s/Pier1w.

Modified by: VANHORNJ0120 on 08/12/2022 Printed on 08/16/2022 Page 6 of 11


MICHIGAN DEPARTMENT OF TRANSPORTATION

STR 8269 BRIDGE SAFETY INSPECTION REPORT


Facility Latitude / Longitude MDOT Structure ID Structure Condition
MARTIN LUTHER KING 42.6169 / -83.2698 634548400217R01 Critical Condition(2)
Feature Length / Width / Spans Owner
GRAND TRUNK WESTERN RR 188 / 70.2 / 3 City: PONTIAC(5484)
Location Built / Recon. / Paint / Ovly. TSC Operational Status
1/4 MI E EAST BLVD & BL75 1976 / / / Oakland(23) K Closed to all traffic(K)
Region / County Material / Design Last NBI Inspection Scour Evaluation
Metro(7) / Oakland(63) 3 Steel / 32 Multi Str Comp 07/29/2022 / 1JZY N Not Over Waterway

Document Name: 20220728_180018.jpg Document Name: 20220728_180024.jpg


Category: Superstructure Category: Superstructure
Span Number: 2 Span Number: 2
Comments: Large holes in web and bearing stiffeners. Beam Comments: Large holes in web and bearing stiffeners. Beam
2s/Pier1w. 2s/Pier1w.

Document Name: 20220728_180106.jpg Document Name: 20220728_180117.jpg


Category: Superstructure Category: Superstructure
Span Number: 2 Span Number: 2
Comments: Large holes in web and bearing stiffeners. Beam Comments: Large holes in web and bearing stiffeners. Beam
2s/Pier1w. 2s/Pier1w.

Modified by: VANHORNJ0120 on 08/12/2022 Printed on 08/16/2022 Page 7 of 11


MICHIGAN DEPARTMENT OF TRANSPORTATION

STR 8269 BRIDGE SAFETY INSPECTION REPORT


Facility Latitude / Longitude MDOT Structure ID Structure Condition
MARTIN LUTHER KING 42.6169 / -83.2698 634548400217R01 Critical Condition(2)
Feature Length / Width / Spans Owner
GRAND TRUNK WESTERN RR 188 / 70.2 / 3 City: PONTIAC(5484)
Location Built / Recon. / Paint / Ovly. TSC Operational Status
1/4 MI E EAST BLVD & BL75 1976 / / / Oakland(23) K Closed to all traffic(K)
Region / County Material / Design Last NBI Inspection Scour Evaluation
Metro(7) / Oakland(63) 3 Steel / 32 Multi Str Comp 07/29/2022 / 1JZY N Not Over Waterway

Document Name: DSCF1188.JPG Document Name: DSCF1196.JPG


Category: Superstructure Category: Superstructure
Span Number: 2 Span Number: 2
Comments: Beam 8s/Pier 1w. Comments: Beam 8s/Pier 1w.

Document Name: DSCF1198.JPG Document Name: DSCF1199.JPG


Category: Superstructure Category: Superstructure
Span Number: 2 Span Number: 2
Comments: Beam 8s/Pier 1w. Comments: Beam 8s/Pier 1w.

Modified by: VANHORNJ0120 on 08/12/2022 Printed on 08/16/2022 Page 8 of 11


MICHIGAN DEPARTMENT OF TRANSPORTATION

STR 8269 BRIDGE SAFETY INSPECTION REPORT


Facility Latitude / Longitude MDOT Structure ID Structure Condition
MARTIN LUTHER KING 42.6169 / -83.2698 634548400217R01 Critical Condition(2)
Feature Length / Width / Spans Owner
GRAND TRUNK WESTERN RR 188 / 70.2 / 3 City: PONTIAC(5484)
Location Built / Recon. / Paint / Ovly. TSC Operational Status
1/4 MI E EAST BLVD & BL75 1976 / / / Oakland(23) K Closed to all traffic(K)
Region / County Material / Design Last NBI Inspection Scour Evaluation
Metro(7) / Oakland(63) 3 Steel / 32 Multi Str Comp 07/29/2022 / 1JZY N Not Over Waterway

Document Name: DSCF1230.JPG Document Name: DSCF1233.JPG


Category: Superstructure Category: Superstructure
Span Number: 2 Span Number: 2
Comments: Large holes in web and bearing stiffeners. Beam Comments: Bearing stiffener at rocker bearing has 100% section
2s/Pier1w. loss for full bearing stiffener width on both sides of beam. beam
2s/Pier 1w.

Document Name: IMG_0033.JPG Document Name: IMG_0036.JPG


Category: Superstructure Category: Superstructure
Span Number: 2 Span Number: 1
Comments: Span 2w underside. Comments: Heavy corrosion of beam 2s bottom flange and bottom
of web in span 1w near pier 1w.

Modified by: VANHORNJ0120 on 08/12/2022 Printed on 08/16/2022 Page 9 of 11


MICHIGAN DEPARTMENT OF TRANSPORTATION

STR 8269 BRIDGE SAFETY INSPECTION REPORT


Facility Latitude / Longitude MDOT Structure ID Structure Condition
MARTIN LUTHER KING 42.6169 / -83.2698 634548400217R01 Critical Condition(2)
Feature Length / Width / Spans Owner
GRAND TRUNK WESTERN RR 188 / 70.2 / 3 City: PONTIAC(5484)
Location Built / Recon. / Paint / Ovly. TSC Operational Status
1/4 MI E EAST BLVD & BL75 1976 / / / Oakland(23) K Closed to all traffic(K)
Region / County Material / Design Last NBI Inspection Scour Evaluation
Metro(7) / Oakland(63) 3 Steel / 32 Multi Str Comp 07/29/2022 / 1JZY N Not Over Waterway

Document Name: IMG_0032.JPG Document Name: IMG_0034.JPG


Category: Substructure Category: Substructure
Span Number: 2 Span Number: 3
Comments: Pier 2w west face. Comments: Abutment B delamination under beam 10s.

Document Name: IMG_0035.JPG Document Name: IMG_0037.JPG


Category: Substructure Category: Slope Protection
Span Number: 1 Span Number: 1
Comments: Wide crack in abutment A under beam 1s. Comments: Heavy washout of slope along the north end of pier 1w
exposing utilities and pier crashwall.

Modified by: VANHORNJ0120 on 08/12/2022 Printed on 08/16/2022 Page 10 of 11


MICHIGAN DEPARTMENT OF TRANSPORTATION

STR 8269 BRIDGE SAFETY INSPECTION REPORT


Facility Latitude / Longitude MDOT Structure ID Structure Condition
MARTIN LUTHER KING 42.6169 / -83.2698 634548400217R01 Critical Condition(2)
Feature Length / Width / Spans Owner
GRAND TRUNK WESTERN RR 188 / 70.2 / 3 City: PONTIAC(5484)
Location Built / Recon. / Paint / Ovly. TSC Operational Status
1/4 MI E EAST BLVD & BL75 1976 / / / Oakland(23) K Closed to all traffic(K)
Region / County Material / Design Last NBI Inspection Scour Evaluation
Metro(7) / Oakland(63) 3 Steel / 32 Multi Str Comp 07/29/2022 / 1JZY N Not Over Waterway

Document Name: 2B705521.JPG Document Name: 46B481A0.JPG


Category: Other Category: Other
Span Number: Span Number:
Comments: WB approach closure Comments: EB approach closure

Modified by: VANHORNJ0120 on 08/12/2022 Printed on 08/16/2022 Page 11 of 11


MICHIGAN DEPARTMENT OF TRANSPORTATION

STR 8269 WORK RECOMMENDATIONS


Facility Latitude / Longitude MDOT Structure ID Structure Condition
MARTIN LUTHER KING 42.6169 / -83.2698 634548400217R01 Critical Condition(2)
Feature Length / Width / Spans Owner
GRAND TRUNK WESTERN RR 188 / 70.2 / 3 City: PONTIAC(5484)
Location Built / Recon. / Paint / Ovly. TSC Operational Status
1/4 MI E EAST BLVD & BL75 1976 / / / Oakland(23) K Closed to all traffic(K)
Region / County Material / Design Last NBI Inspection Scour Evaluation
Metro(7) / Oakland(63) 3 Steel / 32 Multi Str Comp 07/29/2022 / 1JZY N Not Over Waterway

WORK RECOMMENDATIONS 1JZY


Inspector Name Agency / Company Name Insp. Freq. Insp. Date
Jake VanHorn Alfred Benesch 12 07/29/2022

RECOMMENDATIONS & ACTION ITEMS


Recommendation Type Priority Description
Approach Repair H Apply HMA wedges at the settled region of West approach EB right
lane.
Slope Repair H Repair washout along north side of pier 1w.
Railing Repair H Replace missing 2-tube steel railing segments.
Joint Repl H Replace all expansion joint devices and apply a new layer of HPR
along the abutment reference line joints.
Deck Patching L Perform full depth deck patching.
Substr Repair L Hand chip and patch large delamination in bay 9s at Abutment B.
Perform patching repairs on abutments and piers. Seal cracks in
abutments.
Bridge Repl. H Replace bridge due to critical condition of steel superstructure.
Other H To open the bridge to traffic, construct temporary supports under
beam ends with heavy section loss.

Printed on 08/16/2022 Page 1 of 1