Professional Documents
Culture Documents
Day Wise Work Planning
Day Wise Work Planning
4/1/2022
4/2/2022
4/3/2022
4/4/2022
4/5/2022
4/6/2022
4/7/2022
4/8/2022
4/9/2022
4/10/2022
4/11/2022
4/12/2022
4/13/2022
4/14/2022
4/15/2022
4/16/2022
4/17/2022
4/18/2022
4/19/2022
4/20/2022
4/21/2022
4/22/2022
4/23/2022
4/24/2022
4/25/2022
4/26/2022
4/27/2022
4/28/2022
4/29/2022
4/30/2022
MAINTENANCE TYPE STATUS MAN POWER
SUPERVISION REMARKS
DATE WORK DESCRIPTION
LC-03 AC, P&V SYSTEM MFM SUPPLY VOLTAGE TO BE PROVIDED WITH UPS
5/1/2022 SUPPLY.
5/2/2022 CEMENT MILL HYDRAULIC & ROLLER LUBRICATION SYSTEM ALL FI CM/PM
CEMENT MILL GEARBOX LUBRICATION SYSTEM ALL FI CM/PM
5/3/2022
PC-02 I/O SCHEDULE ALL LISTED SIGNAL TO BE CROSS CHECKED PHYSICALLY
REC BUILDING, HAG, SILO TOP ALL JB & FI WATER PROTECTION ENSURING
5/4/2022 COAL MILL SECTION ALL FI & JB WATER PROTECTION ENSURING
WTP SECTION & LC-05 SIGNAL FERRULING IN JB & PANEL
WTP SECTION & LC-05 SIGNAL FERRULING IN JB & PANEL
5/5/2022
531BC2, 531DG1, 561BC1 ALL FI PREVENTIVE MAINTENANCE
5/6/2022 561BE1, 531BC2 FI PREVENTIVE MAINTENANCE
561BE1 BDS_2 (PACKING SIDE BOTTOM LVL) TARGET MOUNTING
5/7/2022 ALL SCS PANEL ROOM WATER PROTECTION TO BE RECTIFIED
5/8/2022 CEMENT MILL BAG HOUSE ALL FI PREVENTIVE MAINTENANCE
5/9/2022 591BE1 BDS MODIFICATION, 591SG1, 591BF1 & 591BF2 PM
5/10/2022 531MS1, 561DG1 & 561BE1 PM
5/11/2022 ultrasonic sensor installation work and signal to be assigned in DCS,
Coal mill Vib , all LVDT signal , main drive wdg/brg signal to be checked.
561LD2 position transmitter to be checked and calibration to be done.
5/12/2022 531WF1 ,2,3,4 maintenance to be done.
5/13/2022
5/14/2022
5/15/2022 531WF1,2,3,4 , HAG panel C/M or P/M to be done
5/16/2022 571LD2 ,571SD2,L51LD1,L41LD1,2,3 PM
5/17/2022 Coal mill Hydraulic room all FI maintenance
5/18/2022
5/19/2022
Coal Mill Bag house i/l, o/l RTD , draft , DP transmitter maintenance and to be
5/20/2022 cross checked.
5/21/2022 Coal mill Vibration sensor & controller maintenance
Coal mill Fan and coal mill MD wdg/brg RTD , L41LD1, Coal mill I/L and O/L draft
& temp sensor maintenance.
5/22/2022 L21BC1 & L21BC2 safety switches preventive maintenance to be done
5/23/2022 Roller 6 seal air Ptx to be replaced with ABB Tx
Classifier bearing Temp., Classifier Draft, L41EF1 , L41EF2,L41EF3 damper
operation monitoring, coal mill seal air pressure Transmitter and Explosion vent
5/24/2022 proxy inspection
5/25/2022 Coal innertization system to be checked and maintenance to be done.
5/26/2022 LC3 IO's . VFD . SCS panel maintenance
5/27/2022 Coal mill IO panel maintenace & Schedule update, cable dressing
5/28/2022 RTD for inertization inspection
Gas Analyser control panel, Bag House scavanging panel & Fine coal Bin
5/29/2022
scavanging panel PM/CM to be done
5/30/2022 GA Room SCS panel inspection and maintenance
Coal mill L91SC1, L91PG1 preventive maintenance
5/31/2022
591BF1 & 2, 561BF 2& 3 preventive maintenance
MAINTENANCE TYPE STATUS MAN POWER SUPERVISION
inlet draft/outlet draft, inlet temp/outlet temp, mill DP, flape valve proxy,
vibration transmitter, cement mill auxilary drive proxy PM to be done
6/3/2022
fol system, prejacking system, mill main drive wdg/brg rtd ispection, cooling
water flow switch & Water injection Field instruments PM to be done
6/10/2022 Silo feed B/E all safety device , 561PG1 to 591PG6 all sov gate maintenance.
6/11/2022
6/12/2022
6/13/2022 LIW operation and field instruments PM/CM to be done
6/14/2022
6/15/2022
6/16/2022 571LD2 ,571SD2,L51LD1,L41LD1,2,3
6/17/2022
6/18/2022 531WF1 & 531WF2 panel and FI PM to be done
6/19/2022
6/20/2022
6/21/2022
6/22/2022
6/23/2022
6/24/2022
6/25/2022
6/26/2022
6/27/2022
6/28/2022
6/29/2022
6/30/2022
MAINTENANCE TYPE STATUS MAN POWER SUPERVISION
PM AMRENDRA, RABI, RAJENDRA
PM ANAND, JITENDRA
PM ANAND, RAJENDRA
PM AMIT, LIKU
PM SOUBHAGYA, AMIT, PRABIN
ANAND+Rabi+Shantanu+Amrendra
PM
PM ANAND,RABI,ANIL
PM MANTOSH, SHANTANU
PM SOUBHAGYA,PRABIN, RAJENDRA
CM SOUBHAGYA, RABI
REMARKS
WORK DESCRIPTION
DATE
7/1/2022 L41BF1 FI PM
561HT1 FI PM
7/2/2022
561BF1 FI PM
7/3/2022 561LQ1 & 561LQ4 FI PM
561FN2 FI PM
7/4/2022
561MD2 FI PM
7/5/2022 L41BF1 FI PM
WTP PLC PNL & FI
7/6/2022
CEMENT MILL FI, FOL & PREJACKING SYSTEM FI
7/7/2022 561BF1 FI PM
7/8/2022 COAL MILL FI
7/9/2022 COAL MILL FI
CEMENT MILL DJB,RJB & AJB
7/10/2022
CEMENT MILL DJB,RJB & AJB
7/11/2022 L41LD1,L41LD2,L41LD3,L41EF1,L41EF2 & L41EF3.
561HP1,HP2, 561SG1,SG2, & 561BC3 ALL FI Maintenance
AMRENDRA
PM DONE
PM DONE 13-07-2022 ANIL
PRABIN, ANIL
PM DONE
PM DONE JITENDRA
PM DONE JITENDRA, ANIL
PM PRABIN,RAJENDRA
PM AMIT, LIKU
PM ANIL,SUDARSHAN,JITENDRA
PM AMIT, LIKU
PM DONE 17-07-2022 SHANTANU, LIKU
PM DONE AMIT, LIKU, RAJENDRA
PM DONE JITENDRA
PM DONE SHANTANU, ANIL
PM RAJENDRA
PM DONE PRABIN, SHANTANU
PM DONE PRABIN, RAJENDRA
CM SUDARSHAN
PM LIKU, JITENDRA
PM MANTOSH, SUDARSHAN, RAJENDRA
PM LIKU, JITENDRA
PM DONE 26-07-2022 SHANTANU
PM AMIT, RAJENDRA
PM SUDARSHAN
PM DONE AMRENDRA, SHANTANU
PM DONE RAJENDRA
PM LIKU
PM DONE PRABIN,JITU
PM JITENDRA
PM DONE PRABIN, SUDARSHAN
PM MANTOSH, SUDARSHAN
PM DONE JITENDRA
PM JITENDRA
PM DONE S
SUPERVISION REMARKS
AMRENDRA
SOUBHAGYA
AMRENDRA
ANAND
ANAND
SOUBHAGYA
ANAND
SOUBHAGYA
ANAND
ANAND
ANAND PENDING DUE TO RUNNING
ANAND
SOUBHAGYA
ANAND
SOUBHAGYA
ANAND PENDING
SOUBHAGYA
ANAND PENDING
SOUBHAGYA
ANAND
SOUBHAGYA
SOUBHAGYA
ANAND
SOUBHAGYA
ANAND
MANTOSH PENDING DUE TO RUNNING
SOUBHAGYA
ANAND
ANAND
SOUBHAGYA
ANAND
SOUBHAGYA
MANTOSH PENDING DUE TO RUNNING
ANAND
SOUBHAGYA
ANAND
AMRENDRA PENDING DUE TO RUNNING
ANAND WORK IN PROGRESS
MANTOSH WORK IN PROGRESS
SOUBHAGYA
ANAND COMPLETED
AMIT COMPLETED
SOUBHAGYA
SOUBHAGYA PENDING
ANAND IN PROGRESS
SOUBHAGYA
ANAND COMPLETED
SOUBHAGYA PENDING