Project Estimate

Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
ALL KINDS OF
SOIL.-"SURFACE DRESSING
OF THE GROUND
INCLUDING REMOVING
VEGETATION AND IN- ALL KINDS OF
1/1.1 NII-2.1.1
EQUALITIES NOT
1 1 1 2.060 M2 1003.00 2066.18
SOIL.
EXCEEDING 15 CM DEEP
AND DISP OSAL OF
RUBBISH, LEAD UPTO 50 M
AND LIFT UPTO 1.5 M."
ALL KINDS OF SOIL-"EARTH
WORK IN EXCAVATION FOR
FOUNDATION, TRENCHES
FOR PIPES / CABLES OR
DRAINS ETC. BY
MECHANICAL MEANS /
MANUAL MEANS
(EXCEEDING 30CM IN
1/2.1 NII-2.6.1 DEPTH.) INCLUDING 6 1.80 0.25 0.10 0.270 M3 151.00 40.77
RAMMING OF BOTTOM,
DRESSING OF SIDES,
DISPOSAL OF EXCAVATED
EARTH INCLUDING OF ALL
LIFT A ND LEAD UPTO 50M.
DISPOSED EARTH TO BE
LEVELLED AND NEATLY
DRESSED."

FOR COLUMNS
16 1.50 1.50 1.20 43.200 M3 151.00 6523.20
C-1

10 1.50 0.25 0.10 0.375 M3 151.00 56.63 BELOW BEAMS

"FILLING BY AVAILABLE
EXCAVATED EARTH
(EXCLUDING ROCK) IN
TRENCHES, PLINTH, SIDES
OF FOUNDATIONS ETC. IN
LAYERS NOT EXCEEDING
1/3.1 NII-2.16
20CM I N DEPTH,
1 0.30 1 43.85 13.155 M3 89.00 1170.80
CONSOLIDATING EACH
DEPOSITED LAYER BY
RAMMING AND WATERING,
LEAD UP TO 50 M AND LIFT
UPTO 1.5 M."
CRUSHER STONE
DUST-"SUPPLYING AND
FILLING IN PLINTH UNDER
TOTAL
1/4.1 NII-2.18.2 FLOORS INCLUDING, 1 43.85 1 1 43.850 M3 687.00 30124.95
EXCAVATION
WATERING, RAMMING
CONSOLIDATING AND
DRESSING COMPLETE."

1 -18.5 1 1 -18.500 M3 687.00 -12709.50 LESS P.C.C.

LESS PLINTH
1 -0.65 1 1 -0.650 M3 687.00 -446.55
BEAMS

Page 1 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
LESS BACK
1 -13.1 1 1 -13.150 M3 687.00 -9034.05
FILLING QTY

1 13 9.60 0.50 62.400 M3 687.00 42868.80 FOR PLINTH

"FOUNDATIONS,
FOOTINGS, BASES OF
COLUMNS, ETC. FOR MASS
CONCRETE."-"CENTERING
AND SHUTTERING
1/5.1 NII-19.1.1 INCLUDING STRUTTING, 2 9.60 0.30 5.760 M2 160.00 921.60
PROPPING STRETCHIN G
ETC. COMPLETE FOR AND
REMOVAL OF FORM WORK
BY SHEET PLATE OR PLY
WOOD SHUTTERING FOR :"

FOR COLUMNS
16 5.40 0.15 12.960 M2 160.00 2073.60
C-1 FOOTINGS

FOR COLUMNS
16 1.20 1.35 25.920 M2 160.00 4147.20
UPTO PLINTH V

FOR PLINTH
2 15.20 0.30 9.120 M2 160.00 1459.20
BEAM

LONG WALL
2 14.50 0.30 8.700 M2 160.00 1392.00
(OUTER)

2 10.00 0.30 6.000 M2 160.00 960.00 FOR PLINTH

CEMENT CONCRETE
GRADE M-10 (NOMINAL MIX)
WITH 40 MM MAXIMUM SIZE
OF STONE AGGREGATE-
PROVIDING AND LAYING IN
FOR
1/6.1 NII-4.1.6 POSITION CEMENT 16 1.50 2 0.10 4.800 M3 4112.00 19737.60
FOUNDATION
CONCRETE OF SPECIFIED
GRADE EXCLUDING THE
COST OF CENTERING AND
SHUTTERING ALL WORK UP
TO PLINTH LEVEL.

1 14.60 9.60 0.10 14.016 M3 4112.00 57633.79 PLINTH FLOOR

FOR BRICK
2 1.20 1.00 0.10 0.240 M3 4112.00 986.88
STEPS

10 1.50 0.25 0.10 0.375 M3 4112.00 1542.00 BELOW BEAM

6 1.80 0.40 0.10 0.432 M3 4112.00 1776.38

Page 2 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
CEMENT CONCRETE
GRADE M-20 (NOMINAL MIX)
WITH 20 MM MAXIMUM SIZE
OF STONE
AGGREGATE.-"PROVIDING
AND LAYING IN POSITION
SPECIFIED GRA DE OF
1/7.1 NII-5.1.1
REINFORCED CEMENT
16 1.35 1.35 0.15 4.374 M3 5435.00 23772.69 FOR FOOTING
CONCRETE EXCLUDING
THE COST OF CENTERING,
SHUTTERING, FINISHING
AND REINFORCEMENT -
ALL WORK UP TO PLINTH
LE VEL :"

TRAPEZOIDAL
16 1.82 0.16 0.15 0.699 M3 5435.00 3799.07
FOOTING

FOR COLUMNS
16 0.30 0.30 1.85 2.664 M3 5435.00 14478.84
UPTO PLINTH

2 15.20 0.20 0.30 1.824 M3 5435.00 9913.44 LONG WALL

2 9.60 0.20 0.30 1.152 M3 5435.00 6261.12

DEDUCTION
-16 0.30 0.20 0.30 -0.288 M3 5435.00 -1565.28
FOR COLUMN

CEMENT MORTAR 1:6 (1


CEMENT : 6 COARSE
SAND)-"BRICK WORK WITH
FLY ASH LIME BRICKS
(FALG BRICKS)
CONFORMING TO IS:12894-
2002, CLASS DESIGNATION
1/8.1 NII-6.17.2
75 KG/CM2 (AVERAGE
12 4 0.20 1.00 9.600 M3 4810.00 46176.00 FOR TRENCHES
COMPRESSIVE STRENGTH)
IN SUPERSTRUCTURE
ABOVE PLINTH LEVEL UP
TO FLOOR 2 LEVEL
INCLUDING THE COST OF
SCAFFOLDING :"

12 1.4 0.20 1.00 3.360 M3 4810.00 16161.60

15 MM CEMENT PLASTER
ON ROUGH SIDE OF SINGLE
OUTER SIDE OF
1/9.1 NII-13.2.2 OR HALF BRICK WALL OF 12 4.00 1.00 48.000 M2 159.00 7632.00
TRENCHES
MIX- 1:6 (1 CEMENT: 6
SAND)

INNER SIDE OF
12 1.40 1.00 16.800 M2 159.00 2671.20
TRENCHES

Page 3 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
1:3 (1 CEMENT: 3 SAND)-15
MM CEMENT PLASTER ON
ROUGH SIDE OF SINGLE OR
1:3 (1 CEMENT: 3
1/10.1 NII-13.5.1 HALF BRICK WALL 12 4.00 1.00 48.000 M2 206.00 9888.00
SAND)
FINISHED WITH A FLOATING
COAT OF NEAT CEMENT OF
MIX :

1:3 (1 CEMENT: 3
12 4.00 1.00 48.000 M2 206.00 9888.00
SAND)

40MM THICK WITH 20MM


MAXIMUM SIZE OF STONE
AGGREGATE.-"CEMENT
CONCRETE FLOORING M-15
(NOMINAL MIX) FINISHED
FOR FLOORING
1/11.1 NII-11.3.1 WITH A FLOATING COAT OF 1 14.8 9.8 145.040 M2 285.00 41336.40
UNDER SHED
NEAT CEMENT INCLUDING
CEMENT SLURRY, BUT
EXCLUDING THE COST OF
NOSING OF
STEPS ETC. COMPLETE."

2 2.4 0.9 4.320 M2 285.00 1231.20 FOR STEPS

HOT FINISHED WELDED


TYPE TUBES.-"STEEL WORK
IN BUILT UP M.S. TUBULAR
SECTION (ROUND, SQUARE
OR RECTANGULAR
HOLLOW TUBE ETC.)
TRUSSES /FRAME WORK
ETC./ RAILING WORK ETC.
INCLUDING CUTTING,
1/12.1 NII-10.15.1
HOISTING FIXING IN
1 1664.940 KG 99.00 164829.06 FOR PURLIN
POSITION AND APPLYING A
PRIMING COAT OF
APPROVED STEEL PRI MER,
WELDED AND BOLTED
INCLUDING SPECIAL
SHAPED
WASHERS ETC.
COMPLETE."

FOR VERTICAL
1 1440.960 KG 99.00 142655.04
SUPPORTS

FOR BASE
1 552.960 KG 99.00 54743.04
PLATE ETC

1 1200.000 KG 99.00 118800.00

Page 4 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
"SUPPLY & INSTALLATION
OF PRECOATED
GALVANISED IRON PROFILE
SHEETS (SIZE, SHAPE AND
PITCH OF CORRUGATION
AS APPROVED BY
ENGINEER-IN- CHARGE)
0.50 MM ±5% TOTAL
COATED THICKNESS (TCT)
THICK ZINC COATING
120GSM AS PER IS: 277 IN
240MPA STEEL GRADE, 5-7
MICRONS EPOXY PRIMER
ON BOTH SIDE OF THE
SHEET AND POLYESTER
TOP COAT 15- 18 MICRONS.
SHEET SHOULD HAVE
PROTECTIVE GUARD FILM
OF 25 MICRONS MINIMU M
TO AVOID SCRATCHES
WHILE TRANSPORTATION
AND SHOULD BE SUPPLIED
SHEETING
IN SINGLE LENGTH UPTO 12
1/13.1 NII-12.8
METER OR AS DESIRED BY
2 15.80 5.80 183.280 M2 422.00 77344.16 WORK
ROOF
ENGINEER-IN CHARGE.
THE SHEET SHALL BE
FIXED USING SELF
DRILLING/SELF TAPPING
SCREWS OF SIZE (5.5X
55MM) WITH EPDM SEAL OR
WITH POLYMER COATED J
OR L H OOKS, BOLTS AND
NUTS 8MM DIAMETER WITH
BITUMEN AND G.I. LIMPET
WASHERS OR WITH G.I.
LIMPET WASHERS FILLED
WITH WHITE LEAD
COMPLETE U PTO ANY
PITCH IN HORIZONTAL/
VERTICAL OR CURVED
SURFACES EXCLUDING
THE COST OF PURLINS,
RAFTERS AND TRUSSES
AND INCLUDING CUTTING
TO SIZE AND SHAPE
WHEREVER REQUIRED."
VERTICAL SIDE
2 11.00 3.00 66.000 M2 422.00 27852.00 COVERING FOR
SHE

Page 5 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
RIDGES PLAIN (500 -
600MM).-"PROVIDING AND
FIXING PRECOATED
GALVANISED STEEL SHEET
ROOFING ACCESSORIES
0.50 MM +/- 5% TOTAL
COATED T HICKNESS (TCT)
THICK ZINC COATING
120GSM AS PER IS: 277 IN
240MPA STEEL GRADE, 5-7
MICRONS EPOXY PRIMER
RIDGES PLAIN
1/14.1 NII-12.9.1 ON BOTH SIDE OF THE 1 15.8 15.800 M 628.00 9922.40
(500 - 600MM)
SHEET AN D POLYESTER
TOP COAT 15-18 MICRONS
USING SELF DRILLING/
SELF TAPPING SCREWS OR
WITH POLYMER COATED J
OR L HOOKS, BOLTS AND
NUTS AND OR
G.I. SEAM BOLTS AND
NUTS, G.I. PLAIN AND
BITUMEN WASHERS
COMPLETE :"
GUTTER .(600 MM OVER
ALL GIRTH).-"PROVIDING
AND FIXING PRECOATED
GALVANISED STEEL SHEET
ROOFING ACCESSORIES
0.50 MM +/- 5% TOTAL COA
TED THICKNESS (TCT)
THICK ZINC COATING
120GSM AS PER IS: 277 IN
240MPA STEEL GRADE, 5-7
MICRONS EPOXY PRIMER GUTTER .(600
1/15.1 NII-12.9.6 ON BOTH SIDE OF THE SHE 2 15.8 31.600 M 630.00 19908.00 MM OVER ALL
ET AND POLYESTER TOP GIRTH
COAT 15-18 MICRONS
USING SELF DRILLING/
SELF TAPPING SCREWS OR
WITH POLYMER COATED J
OR L HOOKS, BOLTS AND
NUTS AND OR
G.I. SEAM BOLTS AND
NUTS, G.I. PLAIN AND
BITUMEN WASHERS
COMPLETE :"
110MM
DIAMETER-"PROVIDING
AND FIXING ON WALL FACE
UNPLASTICISED RIGID PVC
RAIN WATER PIPES
CONFORMING TO IS : 13592
110MM
1/16.1 NII-12.51.2 TYPE A INCLUDING 3 3.5 10.500 M 201.00 2110.50
DIAMETER
JOINTING WITH SEAL RING
CONFORMING TO IS : 5382
LEAVING 10 MM GAP FOR
THERMAL EXPANSION.
(I) SINGLE SOCKETED
PIPES."

Page 6 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
100 MM DIAMETER
PIPES-"PAINTING (TWO OR
MORE COATS) ON RAIN
WATER, SOIL, WASTE AND
VENT PIPES AND FITTINGS
WITH SYNTHETIC ENAMEL LENGTH OF THE
1/17.1 NII-13.53.2 PAI NT OF APPROVED 1 240.0 240.000 M 30.00 7200.00 TRUSS &
BRAND AND SUPPORT
MANUFACTURE AND
REQUIRED COLOUR OVER
A PRIMING COAT OF
APPROVED STEEL PRIMER
ON NEW WORK."
"PAINTING ON G.S. SHEET
WITH SYNTHETIC ENAMEL
PAINT OF APPROVED
BRAND AND
MANUFACTURE OF
REQUIRED COLOUR TO
GIVE AN EVEN SHADE :
1/18.1 NII-13.50
NEW WORK (TWO OR
4 1.00 2.10 8.400 M2 61.00 512.40
MORE COATS) INCLUDING
A COAT OF
APPROVEDSTEEL PRIMER
BUT
EXCLUDING A COAT OF
MORDANT SOLUTION."

10 0.75 2.10 15.750 M2 61.00 960.75

9 0.60 0.30 1.620 M2 61.00 98.82

1.5 1.20 0.30 0.540 M2 61.00 32.94

2 1.20 2.10 5.040 M2 61.00 307.44

"Excavation for roadwork in


soil with hydraulic excavator
including cutting and loading in
tippers, trimming bottom and
side slopes, in accordance
with requirements of lines, NEW APPROACH
2/1.2 NIII-3.3
grades and cross sections,
1 200.0 4.50 0.30 270.000 M3 65.00 17550.00
ROAD
and transporting to the
embankment location with all
lifts and lead upto 1000m as
per relevent clauses of
section-300 of specification."

Page 7 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
"CONSTRUCTION OF
EMBANKMENT/SUB GRADE/
EARTH SHOULDERS, AS
PER CLAUSE 305 & ITS SUB-
CLAUSES, WHERE
REQUIRED BUT WITH
APPROVED MATERI ALS
HAVING CBR>7 OBTAINED
FROM THE EXCAVATION OF
ROAD CONSTRUCTION
(VIDE CLAUSES 3.1-3.7)
CONSOLIDATING THE
ORIGINAL GROUND BY
ROLLI NG AS DIRECTED BY
ENGINEER IN CHARGE BUT
2/2.1 NIII-3.10
WITH A MAXIMUM OF 6
1 200.0 4.50 0.30 270.000 M3 76.00 20520.00
PASSES OF 8-10 TONNES
VIBRATORY ROLLERS AND
MAINTENANCE OF
SURFACE DURI NG
CONSTRUCTION TO
ENSURE SHEDDING OF
WATER & PREVENTING
PONDING, SHAPING &
DRESSING, FINISHING ETC.
COMPLETE AS PER CLAUSE
305 BUT EXCLUDING
SCARIFYING EXISTING
GRANULAR/BITUMINOUS
ROAD SURFACE."
BY MIX IN PLACE METHOD
FOR 37.5 MM MAXIMUM
SIZE-"CRUSHER RUN
MACADAM - PROVIDING &
LAYING CRUSHED STONE
AGGREGATE, ON A
PREPARED SUR FACE ,
2/4.1 NIII-4.2(A)(II)
SPREADING AND MIXING
1 200.0 4.50 0.15 135.000 M3 1249.00 168615.00
WITH A MOTOR GRADER,
WATERING AND
COMPACTING WITH A
VIBRATORY ROLLER AS
PER CLAUSE 407 OF THE
SPECIFICAT IONS."

Page 8 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
"CONSTRUCTION OF DRY
LEAN CEMENT CONCRETE
SUB-BASE OVER A
PREPARED SUB GRADE
WITH COARSE AND FINE
AGGREGATE CONFORMING
TO IS: 383, T HE SIZE OF
COARSE AGGREGATE NOT
EXCEEDING 26.5MM,
AGGREGATE CEMENT
RATIO NOT TO EXCEED
15:1, AGGREGATE
GRADATION AFTER
BLENDING TO B E AS PER
MORTH SPECIFICATIONS
TABLE 600-1, CEMENT
CONTENT NOT TO BE LESS
THAN 150 KG/CUM,
2/5.1 NIII-6.1 OPTIMUM MOISTURE 1 200.0 4.50 0.10 90.000 M3 3017.00 271530.00
CONTENT TO BE
DETERMINED DURING
TRIAL LENGTH
CONSTRUCTION,
CONCRETE STRENGTH
NOT TO BE LESS THAN 10
MPA AT 7 DAYS, MIXED IN A
BATCHING PLANT,
TRANSPORTED TO SITE,
LAID WITH PAVER WITH
ELECTRONIC SENSOR/
MECHANICAL PAVER,
COMPACTING WITH 8-10
TONNES VIBRATORY
ROLLER, FINISHING AND
CURING AN D AS PER
RELEVANT CLAUSES OF
SECTION- 601."

Page 9 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
"CONSTRUCTION OF
DOWEL JOINTED, PLAIN
CEMENT CONCRETE
PAVEMENT IN M-30 GRADE
CONCRETE OVER A
PREPARED SUB BASE WITH
43 OR HIGHER GRA DE
CEMENT, COARSE AND
FINE AGGREGATE
CONFORMING TO IS:383
MAXIMUM SIZE OF COARSE
AGGREGATE NOT
EXCEEDING 25 MM, MIXED
IN A BATCHING AND MIXING
PLANT AS PER APPROVED
MIX DESIGN,
TRANSPORTED TO SITE,
LAID WITH A FIXED FORM
OR SLIP FORM PAVER WITH
SPREADING THE CONCR
ETE BY SHOVELS, RAKES
COMPACTED USING
NEEDLE, SCREED AND
2/6.1 NIII-6.2 PLATE VIBRATOR AND 1 200.0 4.5 0.25 225.000 M3 5583.00 1256175.00
FINISHED IN A
CONTINUOUS OPERATION
INCLUDING PROVISION O F
CONTRACTION,
EXPANSION, AND
LONGITUDINAL JOINTS,
JOINT FILLER, SEPARATION
MEMBRANE, SEALANT
PRIMER, JOINT SEALANT,
DEBONDING STRIP ,
PLACING OF DOWEL
BAR,TIE ROD ADMIXTURES
AS APPROVED, CURING
COMPOUND, FINISHING TO
LINES AND GRADES AS PER
APPROVED DRAWINGS AS
PE R IRC-15 2011 AND AS
PER RELEVANT CLAUSES
OF SECTION-602 OF
SPECIFICATIONS
COMPLETE EXCLUDING
COST OF STEEL IN DOWEL
BER & TIE ROD E TC."

Page 10 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
"DEDUCT FROM ITEM
NO.6.2, 6.3 AND 6.6 ABOVE
IF PAVER WITH
ELECTRONIC SENSOR IS
NOT USED AND LAYING,
COMPACTION IS DONE BY
ANY OTHER METHOD
(NOTE :- THE ACCEPTANCE
CRITERIA REGARDING
LEVEL, THICKNESS,
2/6.2 NIII-6.7 SURFACE REGULARITY, 1 200.0 4.5 0.25 225.000 M3 -391.00 -87975.00
TEXTURE FINISH,
STRENGTH OF CONCRETE
AND ALL OTHER QUALITY
CONTROL MEASURES
SHALL BE THE SAME AS IN
CASE OF MACHINE LAID
WORK.) THIS ITEM IS TO BE
EXECUTED WITH PRIOR
WRITTEN P ERMISSION OF
ENGINEER- IN-CHARGE"
"MILD STEEL DOWEL BARS
V32 MM DIA BAR
2/7.1 NIII-6.4.1 CONFIRMING TO IS 432, 1 3.48 9.60 0.50 3.480 M 47300.00 164604.00
300 MM C/C
GRADE I"
"HYSD TIE BARS OF FE 500 FOR PLINTH12
2/8.1 NIII-6.4.2 GRADE CONFIRMING TO IS 1 0.14 9.60 0.50 0.140 M 49500.00 6930.00 MM DIA BAR 720
1786," MM
ALL KINDS OF SOIL-"EARTH
WORK IN EXCAVATION FOR
FOUNDATION, TRENCHES
FOR PIPES / CABLES OR
DRAINS ETC. BY
MECHANICAL MEANS /
MANUAL MEANS
(EXCEEDING 30CM IN
3/1.1 NII-2.6.1 DEPTH.) INCLUDING 1 225.0 0.60 0.70 94.500 M3 151.00 14269.50 DRAIN
RAMMING OF BOTTOM,
DRESSING OF SIDES,
DISPOSAL OF EXCAVATED
EARTH INCLUDING OF ALL
LIFT A ND LEAD UPTO 50M.
DISPOSED EARTH TO BE
LEVELLED AND NEATLY
DRESSED."
CEMENT CONCRETE
GRADE M-10 (NOMINAL MIX)
WITH 40 MM MAXIMUM SIZE
OF STONE AGGREGATE-
PROVIDING AND LAYING IN
3/2.1 NII-4.1.6 POSITION CEMENT 1 225.0 0.60 0.10 13.500 M3 4112.00 55512.00
CONCRETE OF SPECIFIED
GRADE EXCLUDING THE
COST OF CENTERING AND
SHUTTERING ALL WORK UP
TO PLINTH LEVEL.

Page 11 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
CEMENT CONCRETE
GRADE M-20 (NOMINAL MIX)
WITH 20 MM MAXIMUM SIZE
OF STONE
AGGREGATE.-"PROVIDING
AND LAYING IN POSITION
SPECIFIED GRA DE OF
3/3.1 NII-5.1.1
REINFORCED CEMENT
1 225.0 0.50 0.10 11.250 M3 5435.00 61143.75
CONCRETE EXCLUDING
THE COST OF CENTERING,
SHUTTERING, FINISHING
AND REINFORCEMENT -
ALL WORK UP TO PLINTH
LE VEL :"
CEMENT CONCRETE
GRADE M-20 (NOMINAL MIX)
WITH 20 MM MAXIMUM SIZE
OF STONE
AGGREGATE.-"REINFORCE
D CEMENT CONCRETE
WORK IN WALLS (ANY
THICKNESS), INCLUDING
ATTACHED PILASTERS,
BUTTRESSES, PLINTH AND
3/4.1 NII-5.2.1 STRING COURSES, 2 225 0.10 0.50 22.500 M3 5656.00 127260.00
FILLETS, COLUMNS,
PILLARS, PIERS,
ABUTMENTS, POSTS AND
STRUTS ETC.ABOVE
PLINTH LEVEL AND UP TO
FLOOR TWO LEVEL
EXCLUDING COST OF
CENTERING, SHUTTERING
AND REINFORCEMENT
ETC."
"FILLING BY AVAILABLE
EXCAVATED EARTH
(EXCLUDING ROCK) IN
TRENCHES, PLINTH, SIDES
OF FOUNDATIONS ETC. IN
LAYERS NOT EXCEEDING
3/5.1 NII-2.16
20CM I N DEPTH,
1 1 1 1 85.050 M3 89.00 7569.45
CONSOLIDATING EACH
DEPOSITED LAYER BY
RAMMING AND WATERING,
LEAD UP TO 50 M AND LIFT
UPTO 1.5 M."
"FOUNDATIONS,
FOOTINGS, BASES OF
COLUMNS, ETC. FOR MASS
CONCRETE."-"CENTERING
AND SHUTTERING
3/6.1 NII-19.1.1 INCLUDING STRUTTING, 2 225.0 0.10 45.000 M2 160.00 7200.00
PROPPING STRETCHIN G
ETC. COMPLETE FOR AND
REMOVAL OF FORM WORK
BY SHEET PLATE OR PLY
WOOD SHUTTERING FOR :"

Page 12 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit

4 225.0 0.50 450.000 M2 160.00 72000.00

THERMO-MECHANICALLY
TREATED BARS. (FE 500 D
OR
MORE)-"REINFORCEMENT
FOR R.C.C. WORK
INCLUDING
STRAIGHTENING, CUTTING,
BENDING, PLACI NG IN
POSITION AND BINDING
UPTO FLOOR LEVEL
INCLUDING COST OF
BINDING WIRE, WASTAGE
3/7.1 NII-5.11.4 AND OVER LAPS UPTO 1 780.090 KG 58.00 45245.22
12MM HORIZONTAL/
INCLINED POS ITION OF
REINFORCEMENT BARS IN
SLAB AND BEAMS, PLINTH,
CHAJJAS, LINTELS, UPTO
4.5M VERTICAL LENGTH OF
REINFORCEMENT IN WALL
COLUMNS (OVER LAPS
SHALL BE PROVIDED AS
PER REQUIREMENT OF IS :
13920; IS 456 & SP :
34) ETC. COMPLETE."
CEMENT CONCRETE
GRADE M-20 (NOMINAL MIX)
WITH 20 MM MAXIMUM SIZE
OF STONE AGGREGATE-
PROVIDING AND LAYING IN
3/8.1 NII-4.1.2 POSITION CEMENT 1 225.0 0.30 0.05 3.375 M3 5178.00 17475.75
CONCRETE OF SPECIFIED
GRADE EXCLUDING THE
COST OF CENTERING AND
SHUTTERING ALL WORK UP
TO PLINTH LEVEL.
"PROVIDING, HOISTING
AND FIXING UP TO FLOOR
TWO LEVEL PRECAST
REINFORCED CEMENT
CONCRETE IN LINTELS,
MANHOLE COVER,
SHELVES AND LIKE
INCLUDING SETTING IN
CEMENT MORTAR 1:3 (1
3/9.1 NII-5.9 CEMENT : 3 SAND), COST 1 225.0 0.50 0.10 11.250 M3 7944.00 89370.00
OF REQUIRED CENTERING,
SHUTTERING AND
FINISHING WITH NEAT
CEMENT P UNNING ON
EXPOSED SURFACES BUT
EXCLUDING THE COST OF
REINFORCEMENT WITH M
20
–GRADE CONCRETE."

Page 13 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
ALL KINDS OF SOIL-"EARTH
WORK IN EXCAVATION FOR
FOUNDATION, TRENCHES
FOR PIPES / CABLES OR
DRAINS ETC. BY
MECHANICAL MEANS /
MANUAL MEANS
(EXCEEDING 30CM IN
4/1.1 NII-2.6.1 DEPTH.) INCLUDING 1 70 3.5 2.22 543.900 M3 151.00 82128.90
RAMMING OF BOTTOM,
DRESSING OF SIDES,
DISPOSAL OF EXCAVATED
EARTH INCLUDING OF ALL
LIFT A ND LEAD UPTO 50M.
DISPOSED EARTH TO BE
LEVELLED AND NEATLY
DRESSED."
CEMENT CONCRETE
GRADE M-10 (NOMINAL MIX)
WITH 40 MM MAXIMUM SIZE
OF STONE AGGREGATE-
PROVIDING AND LAYING IN
4/2.1 NII-4.1.6 POSITION CEMENT 1 70 3.5 0.20 49.000 M3 4112.00 201488.00
CONCRETE OF SPECIFIED
GRADE EXCLUDING THE
COST OF CENTERING AND
SHUTTERING ALL WORK UP
TO PLINTH LEVEL.
CEMENT CONCRETE
GRADE M-20 (NOMINAL MIX)
WITH 20 MM MAXIMUM SIZE
OF STONE
AGGREGATE.-"PROVIDING
AND LAYING IN POSITION
SPECIFIED GRA DE OF
4/3.1 NII-5.1.1
REINFORCED CEMENT
1 70 3 0.40 84.000 M3 5435.00 456540.00
CONCRETE EXCLUDING
THE COST OF CENTERING,
SHUTTERING, FINISHING
AND REINFORCEMENT -
ALL WORK UP TO PLINTH
LE VEL :"

1 70 0.45 1.67 52.605 M3 5435.00 285908.18

1 1 1 1 123.900 M3 5435.00 673396.50

Page 14 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
CEMENT CONCRETE
GRADE M-20 (NOMINAL MIX)
WITH 20 MM MAXIMUM SIZE
OF STONE
AGGREGATE.-"REINFORCE
D CEMENT CONCRETE
WORK IN WALLS (ANY
THICKNESS), INCLUDING
ATTACHED PILASTERS,
BUTTRESSES, PLINTH AND
4/4.1 NII-5.2.1 STRING COURSES, 1 54.5 0.45 0.98 24.035 M3 5656.00 135941.96
FILLETS, COLUMNS,
PILLARS, PIERS,
ABUTMENTS, POSTS AND
STRUTS ETC.ABOVE
PLINTH LEVEL AND UP TO
FLOOR TWO LEVEL
EXCLUDING COST OF
CENTERING, SHUTTERING
AND REINFORCEMENT
ETC."

1 1 1 1 19.600 M3 5656.00 110857.60

"FILLING BY AVAILABLE
EXCAVATED EARTH
(EXCLUDING ROCK) IN
TRENCHES, PLINTH, SIDES
OF FOUNDATIONS ETC. IN
LAYERS NOT EXCEEDING
4/5.1 NII-2.16
20CM I N DEPTH,
1 1 1 1 489.510 M3 89.00 43566.39 543.90
CONSOLIDATING EACH
DEPOSITED LAYER BY
RAMMING AND WATERING,
LEAD UP TO 50 M AND LIFT
UPTO 1.5 M."
"FOUNDATIONS,
FOOTINGS, BASES OF
COLUMNS, ETC. FOR MASS
CONCRETE."-"CENTERING
AND SHUTTERING
4/6.1 NII-19.1.1 INCLUDING STRUTTING, 2 70 0.40 56.000 M2 160.00 8960.00
PROPPING STRETCHIN G
ETC. COMPLETE FOR AND
REMOVAL OF FORM WORK
BY SHEET PLATE OR PLY
WOOD SHUTTERING FOR :"

Page 15 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
THERMO-MECHANICALLY
TREATED BARS. (FE 500 D
OR
MORE)-"REINFORCEMENT
FOR R.C.C. WORK
INCLUDING
STRAIGHTENING, CUTTING,
BENDING, PLACI NG IN
POSITION AND BINDING
UPTO FLOOR LEVEL
INCLUDING COST OF
BINDING WIRE, WASTAGE
4/7.1 NII-5.11.4 AND OVER LAPS UPTO 1 1 6000.000 KG 58.00 348000.00
12MM HORIZONTAL/
INCLINED POS ITION OF
REINFORCEMENT BARS IN
SLAB AND BEAMS, PLINTH,
CHAJJAS, LINTELS, UPTO
4.5M VERTICAL LENGTH OF
REINFORCEMENT IN WALL
COLUMNS (OVER LAPS
SHALL BE PROVIDED AS
PER REQUIREMENT OF IS :
13920; IS 456 & SP :
34) ETC. COMPLETE."
"WALLS (ANY THICKNESS)
INCLUDING ATTACHED
PILASTERS, BUTTERESSES,
PLINTH AND STRING
COURSES
ETC"-"CENTERING AND
4/8.1 NII-19.1.2 SHUTTERING INCLUDING 1 70 1.17 81.900 M2 289.00 23669.10
STRUTTING, PROPPING
STRETCHING ETC.
COMPLETE FOR AND
REMOVAL OF FORM WORK
BY SHEET PLATE OR PLY
WOOD SHUTTERING FOR :"

2 70 1.8 252.000 M2 289.00 72828.00

"PROVIDING WEEP HOLES


IN BRICK MASONRY/PLAIN/
REINFORCED CONCRETE
ABUTMENT, WING WALL/
RETURN WALL WITH 100
MM DIA AC/PVC/HDPE PIPE,
E XTENDING THROUGH THE
FULL WIDTH OF THE
4/9.1 NIII-13.8
STRUCTURE WITH SLOPE
2 70.0 140.000 M 173.00 24220.00
OF 1V :20H TOWARDS
DRAWING FOCE.
COMPLETE AS PER
DRAWING AND TECHNICAL
S PECIFICATIONS AND AS
PER CLAUSE 2706 OF
SPECIFICATIONS."

Page 16 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
"PAINTING TWO COATS ON
CONCRETE SURFACE
AFTER FILLING THE
SURFACE WITH SYNTHETIC
ENAMEL PAINT IN ALL
4/10.1 NIII-8.8
SHADES AS PER RELEVANT
1 70 1.80 126.000 M2 54.00 6804.00
CLAUSES OF SECTION-800
& I.R.C.-67 INCLUDING
COST OF PAINT ETC.
COMPLETE."
50 AMP TO 63 AMP RATING
FOR TRIPLE POLE &
NEUTRAL(TPN)-"SUPPLYING
OF ISI MARKED AND
ACCEPTED STANDARD OF
MINIATURE CIRCUIT
BREAKER ( MCB) OF 'C'
SERIES SUITABLE FOR
5/1.1 NIV-8.5.5(4)
240/415 VOLTS, 50 CYCLE ,
0.75 0.750 EA 745.00 558.75
10 KA VALUE AC SUPPLY
CONFIRMING TO IS : 8828 :
1996, IEC : 60898
:2002 BU T WITHOUT
ENCLOSURES :-
FOR TRIPLE POLE &
NEUTRAL(TPN)"
0.5 AMP TO 5 AMP
RATING-"SUPPLYING OF ISI
MARKED AND ACCEPTED
STANDARD OF MINIATURE
CIRCUIT BREAKER (MCB)
OF 'C' SERIES SUITABLE
5/1.2 NIV-8.5.1(1) FOR 240/415 VOLTS, 50 15 15.000 EA 178.00 2670.00
CYCLE , 10 KA VALUE AC
SUPPLY CONFIRMING TO
IS : 8828 : 1996, IEC : 60898
:2002 BUT WITHOUT
ENCLOSURES :-
SINGLE POLE (SP)"
2.5 SQ.MM.(HEAVY
DUTY)-"SUPPLY OF XLPE
INSULATED POWER CABLE
(CONFORMING IS-7098
) 1100 VOLT GRADE/HEAVY
DUTY POWER CABLE
5/2.1 NIV-14.1.1(A) CONFORMING TO IS 1 420 420.000 M 43.00 18060.00
1554-1100 VOLTS GRADE , 2
CORE /3½ CORE/4 COREISI
MARKED WITH ALU.
STRANDED /SOLID
CONDUCTOR
UNARMOURED 2 CORE"

Page 17 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
10 SQ.MM.(XLPE)
ARMOURED 4
CORE-"SUPPLY OF XLPE
INSULATED POWER CABLE
(CONFORMING IS-7098
) 1100 VOLT GRADE/HEAVY
DUTY POWER CABLE C
5/3.1 NIV-14.1.8(B)
ONFORMING TO IS
1 105 105.000 M 99.00 10395.00
1554-1100 VOLTS GRADE , 2
CORE /3½ CORE/4 COREISI
MARKED WITH ALU.
STRANDED /SOLID
CONDUCTOR.
ARMOURED 4 CORE"
16 SQ.MM.(XLPE)
ARMOURED 4
CORE-"SUPPLY OF XLPE
INSULATED POWER CABLE
(CONFORMING IS-7098
) 1100 VOLT GRADE/HEAVY
DUTY POWER CABLE C
5/4.1 NIV-14.1.8(C)
ONFORMING TO IS
1 50 50.000 M 113.00 5650.00
1554-1100 VOLTS GRADE , 2
CORE /3½ CORE/4 COREISI
MARKED WITH ALU.
STRANDED /SOLID
CONDUCTOR.
ARMOURED 4 CORE"
25 SQ.MM(XLPE)
ARMOURED 4
CORE-"SUPPLY OF XLPE
INSULATED POWER CABLE
(CONFORMING IS-7098
) 1100 VOLT GRADE/HEAVY
5/5.1 NIV-14.1.8(D) DUTY POWER CABLE CO 1 157 157.000 M 153.00 24021.00
NFORMING TO IS 1554-1100
VOLTS GRADE , 2 CORE /3½
CORE/4 COREISI MARKED
WITH ALU. STRANDED /
SOLID CONDUCTOR.
ARMOURED 4 CORE"
35 SQ.MM(XLPE)
ARMOURED 4
CORE-"SUPPLY OF XLPE
INSULATED POWER CABLE
(CONFORMING IS-7098
) 1100 VOLT GRADE/HEAVY
5/6.1 NIV-14.1.8(E) DUTY POWER CABLE CO 1 105 105.000 M 187.00 19635.00
NFORMING TO IS 1554-1100
VOLTS GRADE , 2 CORE /3½
CORE/4 COREISI MARKED
WITH ALU. STRANDED /
SOLID CONDUCTOR.
ARMOURED 4 CORE"

Page 18 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
"GLAND SIZE 22MM
SUITABLE FOR CABLE 2,3,
3½, 4 X 10 SQ.MM
OR 2X 16
SQ.MM"-"SUPPLYING AND
FIXING HEAVY DUTY CABLE
GLAND FOR P.V.C. IN
SULATED ARMOURED
CABLE WITH BRASS
WASHER, RUBBER RING
5/7.1 NIV-14.6.1(B) COMPLETE ERECTED WITH 22 22.000 EA 41.00 902.00
CABLE AND LEAD
CONNECTION ETC. AS PER
SPECIFICATION COMP
LETE.
BRASS COMPRESSION
GLAND
GLAND SIZE 22MM
SUITABLE FOR CABLE 2,3,
3½, 4 X 10 SQ.MM
OR 2X 16 SQ.MM"
"GLAND SIZE 28MM
SUITABLE FOR CABLE 3,4 X
16 SQ.MM"-"SUPPLYING
AND FIXING HEAVY DUTY
CABLE GLAND FOR P.V.C.
INSULATED ARMOURED
CABLE WITH BRASS
WASHER, RUBBER RING
5/8.1 NIV-14.6.1(C) COMPLETE ERECTED WITH 18 18.000 EA 59.00 1062.00
CABLE AND LEAD
CONNECTION ETC. AS PER
SPECIFICATION COMPLETE.
BRASS COMPRESSIO N
GLAND
GLAND SIZE 22MM GLAND
SIZE 28MM SUITABLE FOR
CABLE 3,4 X 16 SQ.MM"

Page 19 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
"GLAND SIZE 32MM
SUITABLE FOR CABLE 2,3,
3½, 4 X 25 SQ.MM
OR 2,3, 3½ X 35 SQ.MM OR
2,3 X 50
SQ.MM."-"SUPPLYING AND
FIXING HEAVY DUTY
CABLE GLAND FOR P.V.C.
INSULATED ARMOURED
CABLE WITH BRASS
WASHER, RUBBER RING
5/9.1 NIV-14.6.1(D) COMPLETE ERECTED WITH 7.5 7.500 EA 70.00 525.00
CABLE AND LEAD
CONNECTION ETC. AS PER
SPECIFICATION COMPLETE.
BRASS COMPRESSION
GLAND
GLAND SIZE 22MM GLAND
GLAND SIZE 32MM
SUITABLE FOR CABLE 2,3,
3½, 4 X 25 SQ. MM
OR 2,3, 3½ X 35 SQ.MM OR
2,3 X 50 SQ.MM."
CABLE LAYING Laying of
one number PILC/PVC
insulated and PVC sheathed
power cable of grade exceedin
5/10.1 IV-14.10.16 g 1.1kV but not exceeding 1 525 525.000 M 29.00 15225.00
11kV of size not exceeding
400 Sq.mm. in the existing
masonary open duct a s
requied.
"SUPPLYING, INSTALLING,
TESTING OF EARTH COIL
(COIL OF 115 TURNS OF
5/11.1 NIV-15.13
50MM DIA, AND 2.5
15 15.000 EA 241.00 3615.00
MTRS. LEAD OF 4 MM G.I
WIRE."
"PROVIDING AND
ERECTING 9 MTRS. HIGH
HOT DIPPED GALVANIZED
OCTAGONAL POLES WITH
BOTTOM OF 200MM A/F,
TOP 100MM, A/F MADE
FROM 3MM TH ICK HT
PLATE & 290X290X16MM
BASE PLATE WITH 1500MM
LONG DECORATIVE SWORD
5/12.1 NIV-16.3 TYPE DOUBLE ARM 15 15.000 EA 31094.00 466410.00
BRACKET COMPLETE
ERERTED IN AN APPROVED
MAN NER ON PROVIDED
FOUNDATION. SUITABLE
SIZE & TYPE OF
FOUNDATION BOLTS. 4
NOS. BOLTS TYPE
M20X750MM 'J' TYPE
FOUNDATION BOLTS (EN8
GRA DE)"

Page 20 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
"DESIGNING & CASTING
WITH M-20 CEMENT
CONCRETE FOUNDATION
SUITABLE FOR 9 MTRS.
OCTAGONAL POLES
CONSIDERING THE SAFE
5/13.1 NIV-16.7
SOIL BEARING CAP ACITY
15 15.000 EA 16145.00 242175.00
AT SITE AS 10 T/SQM AT 2
MTRS. DEPTH INCLUDING
EXCAVATION, FOUNDATION
NUT BOLTS IN AN
APPROVED MANNER."
80.00MM A' CLASS G.I.PIPE
ISI MARKED
(IS-1161-69)-"SUPPYING &
INSTALLING G.I. PIPE FOR
PROTECTION OF
UNDERGROUND CABLE
FIXED ON WALL /SUPPORT/
IN TRENCH/FIXED
BETWEEN TWO RIGID
EXISTING SUPPORT OF
WALL/BEAM FOR ERECTION
OF CEILING FAN/DOWN
ROD FOR STIFF PENDENT
FOR LIGHT LUMINARIES /
FAN/PROTECTIVE FOR
EARTHING, LIGHTENING
CONDUCTOR DOWN STRIP/
5/14.1 NIV-17.2(E)
EVERHEAD SERVICE LINE/
1 15 15.000 M 410.00 6150.00
FOR SUBMER CABLE OR
CENTRIFUGAL PUMP FOR
WATER SUPPLY WITH
NECESSARY IRON CLAMP
COUPLER, BEND, TE,
ELBOW, NUTS AND BOLTS
ETC. COMPLETE IN AN
APPROVED MANNER AS
REQ UIRED TO COMPLETE
THE JOB EXCLUDING COST
OF EXCAVATION/
DISMANTLING & OTHER
FINISHED MASONARY ITEM
COMPLETE.
A' CLASS G.I.PIPE ISI M
ARKED (IS-1161-69)"

Page 21 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
90.00MM OUTSIDE
DIA.-"SUPPLYING AND
INSTALLING DOUBLE WALL
CORRUGATED PIPES (DWC)
OF HDPE ( IS 14930 PART II -
MARKED ) FOR CABLE LAI D
UNDER GROUND WITH
NECESSARY CONNECTING
SOCKETS/
COUPLINGS,TEES OF SAME
5/15.1 NIV-17.4(D) MATERIAL AND AT 1 375 375.000 M 238.00 89250.00
REQUIRED DEPTH UPTO
90CM. BELOW ROAD/
GROUND
SURFACE,INCLUDING
EXCAVATION, BACK
FILLING WITH EXCAVATED
MATERIAL
WITH RAMMING AND
MAKING THE SURFACE
GOOD."
90W-"SUPPLYING OF
STREET LIGHT WITH HIGH
POWER LED OF 1 TO 3 W
EACH ASSEMBLED ON
SINGLE MCPCB, SYSTEM
LUMENS OUTPUT WITH
EFFICACY>11 0 LM/W.
LUMINIARE HAVING COLOR
TEMP 6500K & 50000
BURNING HRS LIFE WITH
MINIMUM @ L 70, THE
COLOUR RENDERING
INDEX OF LED LIGHT SHOU
LD BE MORE THAN 70.
LUMINIARE COMPRISES OF
DRIVER, PF 0.95 & SURGE
PROTECTION 4KV.
HOUSING MADE OF
PRESSURE DIE CAST
5/16.1 NIV-19.9.4
ALUMINIUM WITH HEAT
15 15.000 EA 6912.00 103680.00
RESISTANT FLAT GLASS /
LENS TYPE, IP66
PROTECTION. SUBMISSION
LM 80-08 FORM LED
SOURCE MANUFACTURER
& LM79- 08 / IS16106 FROM
N ABL APPROVED LAB.
MANUFACTURER
MANADATORY I/C 50MM.DIA
G.I. PIPE BRACKET UPTO 2
MTR. LONG IN REQUIRED
ANGLE/SHAPE,
CONNECTION LEAD,
TESTING ETC TO
COMPLETE THE JOB. 2 YRS
GUARANTEE CERTIFICATE
FROM MANUFACTURER.
90W"

Page 22 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
ALL KINDS OF SOIL-"EARTH
WORK IN EXCAVATION FOR
FOUNDATION, TRENCHES
FOR PIPES / CABLES OR
DRAINS ETC. BY
MECHANICAL MEANS /
MANUAL MEANS
(EXCEEDING 30CM IN
5/17.1 NII-2.6.1 DEPTH.) INCLUDING 1 72.000 M3 151.00 10872.00
RAMMING OF BOTTOM,
DRESSING OF SIDES,
DISPOSAL OF EXCAVATED
EARTH INCLUDING OF ALL
LIFT A ND LEAD UPTO 50M.
DISPOSED EARTH TO BE
LEVELLED AND NEATLY
DRESSED."
"FILLING BY AVAILABLE
EXCAVATED EARTH
(EXCLUDING ROCK) IN
TRENCHES, PLINTH, SIDES
OF FOUNDATIONS ETC. IN
LAYERS NOT EXCEEDING
5/18.1 NII-2.16
20CM I N DEPTH,
1 64.000 M3 89.00 5696.00
CONSOLIDATING EACH
DEPOSITED LAYER BY
RAMMING AND WATERING,
LEAD UP TO 50 M AND LIFT
UPTO 1.5 M."
1400 MM DIA-PROVIDING
AND LAYING NON-
PRESSURE (NP3) RCC
5/19.1 NI-12.3.16 SOCKET & SPIGOT PIPES 1 15 15.000 M 12775.00 191625.00
WITH RUBBER GASKET
JOINT INCLUDING TESTING
OF JOINTS.
ALL KINDS OF SOIL-"EARTH
WORK IN EXCAVATION FOR
FOUNDATION, TRENCHES
FOR PIPES / CABLES OR
DRAINS ETC. BY
MECHANICAL MEANS /
MANUAL MEANS
(EXCEEDING 30CM IN
6/1.1 NII-2.6.1 DEPTH.) INCLUDING 4 2.6 0.60 0.6 3.744 M3 151.00 565.34
RAMMING OF BOTTOM,
DRESSING OF SIDES,
DISPOSAL OF EXCAVATED
EARTH INCLUDING OF ALL
LIFT A ND LEAD UPTO 50M.
DISPOSED EARTH TO BE
LEVELLED AND NEATLY
DRESSED."

4 1.2 1.20 1.2 6.912 M3 151.00 1043.71

Page 23 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
CEMENT CONCRETE
GRADE M-10 (NOMINAL MIX)
WITH 40 MM MAXIMUM SIZE
OF STONE AGGREGATE-
PROVIDING AND LAYING IN
6/2.1 NII-4.1.6 POSITION CEMENT 4 1.2 1.20 0.15 0.864 M3 4112.00 3552.77
CONCRETE OF SPECIFIED
GRADE EXCLUDING THE
COST OF CENTERING AND
SHUTTERING ALL WORK UP
TO PLINTH LEVEL.

4 2.6 0.60 0.15 0.936 M3 4112.00 3848.83

CEMENT CONCRETE
GRADE M-20 (NOMINAL MIX)
WITH 20 MM MAXIMUM SIZE
OF STONE
AGGREGATE.-"PROVIDING
AND LAYING IN POSITION
SPECIFIED GRA DE OF
6/3.1 NII-5.1.1
REINFORCED CEMENT
4 1.1 1.10 0.20 0.968 M3 5435.00 5261.08
CONCRETE EXCLUDING
THE COST OF CENTERING,
SHUTTERING, FINISHING
AND REINFORCEMENT -
ALL WORK UP TO PLINTH
LE VEL :"

4 0.075 1.30 1.96 0.764 M3 5435.00 4152.34

4 0.2 0.30 1.25 0.300 M3 5435.00 1630.50

4 2.6 0.20 0.20 0.416 M3 5435.00 2260.96

"REINFORCED CEMENT
CONCRETE WORK IN
BEAMS, SUSPENDED
FLOORS, ROOFS HAVING
SLOPE UP TO 15°
LANDINGS, BALCONIES,
SHELVES, CHAJJAS, LIN
TELS, BANDS, PLAIN
WINDOW SILLS,
6/4.1 NII-5.3 STAIRCASES AND SPIRAL 4 0.2 0.30 3.3 0.792 M3 5932.00 4698.14
STAIR CASES UP TO FLOOR
TWO LEVEL EXCLUDING
THE COST OF CENTERING,
SHUTTERING AND
REINFORCEMENT WITH
CEMENT CONCRETE
GRADE M-20 (NOMINAL MIX)
WITH 20 MM MAXIMUM SIZE
OF STONE AGGREGATE."

1 2.6 0.20 0.2 0.104 M3 5932.00 616.93

Page 24 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit

4 2.6 0.20 0.2 0.416 M3 5932.00 2467.71

1 3.6 3.60 0.1 1.296 M3 5932.00 7687.87

"FOUNDATIONS,
FOOTINGS, BASES OF
COLUMNS, ETC. FOR MASS
CONCRETE."-"CENTERING
AND SHUTTERING
6/5.1 NII-19.1.1 INCLUDING STRUTTING, 4 2.6 0.20 2.080 M2 160.00 332.80
PROPPING STRETCHIN G
ETC. COMPLETE FOR AND
REMOVAL OF FORM WORK
BY SHEET PLATE OR PLY
WOOD SHUTTERING FOR :"

8 2.6 0.20 4.160 M2 160.00 665.60

1 4.00 1 4.000 M2 160.00 640.00

16 1.10 1.10 19.360 M2 160.00 3097.60

16 0.70 0.70 7.840 M2 160.00 1254.40

"SUSPENDED FLOORS,
ROOFS, LANDINGS,
BALCONIES AND ACCESS
PLATFORM."-"CENTERING
AND SHUTTERING
6/6.1 NII-19.1.3 INCLUDING STRUTTING, 1 3.60 3.60 12.960 M2 305.00 3952.80
PROPPING STRETCHI NG
ETC. COMPLETE FOR AND
REMOVAL OF FORM WORK
BY SHEET PLATE OR PLY
WOOD SHUTTERING FOR :"

4 3.60 0.10 1.440 M2 305.00 439.20

"LINTELS, BEAMS, PLINTH


BEAMS, GIRDERS,
BRESSUMERS AND
CANTILEVERS."-"CENTERIN
G AND SHUTTERING
6/7.1 NII-19.1.5 INCLUDING STRUTTING, 1 2.6 0.20 0.520 M2 270.00 140.40
PROPPING STRETCH ING
ETC. COMPLETE FOR AND
REMOVAL OF FORM WORK
BY SHEET PLATE OR PLY
WOOD SHUTTERING FOR :"

2 2.6 0.20 1.040 M2 270.00 280.80

Page 25 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit

4 2.6 0.20 2.080 M2 270.00 561.60

8 2.6 0.20 4.160 M2 270.00 1123.20

"COLUMNS, PILLARS,
PIERS, ABUTMENTS, POSTS
AND STRUTS."-"CENTERING
AND SHUTTERING
INCLUDING STRUTTING,
6/8.1 NII-19.1.6
PROPPING STRETCHING
1 1 1 13.200 M2 362.00 4778.40
ETC. COMP LETE FOR AND
REMOVAL OF FORM WORK
BY SHEET PLATE OR PLY
WOOD SHUTTERING FOR :"
THERMO-MECHANICALLY
TREATED BARS. (FE 500 D
OR
MORE)-"REINFORCEMENT
FOR R.C.C. WORK
INCLUDING
STRAIGHTENING, CUTTING,
BENDING, PLACI NG IN
POSITION AND BINDING
UPTO FLOOR LEVEL
INCLUDING COST OF
BINDING WIRE, WASTAGE TOTAL QTY. OF
6/9.1 NII-5.11.4 AND OVER LAPS UPTO 1 500.000 KG 58.00 29000.00 RCCM-20
12MM HORIZONTAL/ 5.27CUM@
INCLINED POS ITION OF
REINFORCEMENT BARS IN
SLAB AND BEAMS, PLINTH,
CHAJJAS, LINTELS, UPTO
4.5M VERTICAL LENGTH OF
REINFORCEMENT IN WALL
COLUMNS (OVER LAPS
SHALL BE PROVIDED AS
PER REQUIREMENT OF IS :
13920; IS 456 & SP :
34) ETC. COMPLETE."
RANDOM RUBBLE
MASONRY WITH HARD
STONE IN FOUNDATION
6/10.1 NII-7.1
AND PLINTH WITH CEMENT
4 2.6 0.45 0.60 2.808 M3 3724.00 10456.99
MORTAR 1:6 (1 CEMENT : 6
COARSE SAND)
BRICK WORK WILL WELL
BURNT OPEN BHATTA
BRICKS CRUSHING
STRENGTH NOT LESS THAN
25KG/CM² AND WATER
6/11.1 NII-6.9 ABSOPTION NOT MORE 2 2.6 0.20 2.80 2.912 M3 4155.00 12099.36
THAN 20% IN ABOV E
PLINTH LEVEL UPTO FLOOR
TWO LEVEL IN CM 1:6
INCLUDING THE COST OF
SCAFFHOLDING ETC.

Page 26 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit

2 2.6 0.20 2.80 2.912 M3 4155.00 12099.36

-1 1.2 0.20 2.10 -0.504 M3 4155.00 -2094.12

-2 0.9 0.20 0.90 -0.324 M3 4155.00 -1346.22

-2 0.5 0.20 0.45 -0.090 M3 4155.00 -373.95

ADD EXTRA FROM ITEM


6/12.1 NII-6.10 NO. 6.8 & 6.9 IF MORTAR 1 1 1 4.915 M3 345.00 1695.68
USED 1:4 INSTEAD OF 1:6.
12 MM CEMENT PLASTER
6/13.1 NII-13.1.2 OF MIX- :1:6 (1 CEMENT: 6 8 2.6 3.3 68.640 M2 137.00 9403.68
SAND)

-2 1.2 2.1 -5.040 M2 137.00 -690.48

-4 0.9 0.9 -3.240 M2 137.00 -443.88

-4 0.5 0.45 -0.900 M2 137.00 -123.30

KOTA STONE 25MM THICK


FLOORING OVER 20 MM
(AVERAGE) THICK BASE
LAID OVER AND JOINTED
WITH GREY CEMENT
SLURRY MIXED WITH
PIGMENT TO M ATCH THE
6/14.1 NII-11.25 SHADE OF THE SLAB 1 2.8 2.8 7.840 M2 875.00 6860.00
INCLUDING RUBBING AND
POLISHING COMPLETE
WITH BASE OF 1:4 CEMENT
MORTAR (1 CEMENT : 4
COURSE SAND) (MINIM UM
SIZE OF KOTA STONE 2.0
SQFT)
"STRUCTURAL STEEL
WORK RIVETED, BOLTED
OR WELDED IN BUILT UP
SECTIONS, TRUSSES AND
FRAMED WORK, INCLUDING
6/15.1 NII-10.2 CUTTING, HOISTING, FIXING 1 139.000 KG 69.00 9591.00
IN POSITION AND APPLYING
A PRIMING COAT OF
APPROVED STEEL PRIMER
ALL
COMPLETE:"

Page 27 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

WBSN Activity Price /


Description Count L B H Quantity Unit Amount Remarks
O/SNO Number Unit
TWO OR MORE COATS ON
NEW
WORK.-"DISTEMPERING
WITH 1ST QUALITY
ACRYLIC DISTEMPER
(READY MIXED) OF
6/16.1 NII-13.38 APPROVED 8 2.6 3.3 68.640 M2 42.00 2882.88
MANUFACTURER, OF
REQUIRED SHADE AND
COLOUR COMPLETE, AS
PER
MANUFACTURER'S
SPECIFICATION."

-2 1.2 2.1 -5.040 M2 42.00 -211.68

-4 0.9 0.9 -3.240 M2 42.00 -136.08

-4 0.5 0.45 -0.900 M2 42.00 -37.80

PAINTING STEEL WORK


WITH DELUXE MULTI
SURFACE PAINT TO GIVE
AN EVEN SHADE. TWO OR
MORE COAT APPLIED
@0.90 LTR/-FINISHING WITH
6/17.1 NII-13.46.3
DELUXE MULTI SURFACE
2 1.00 2.10 4.200 M2 68.00 285.60
PAINT SYSTEM FOR
INTERIORS AND
EXTERIORS USING PRIMER
AS PER MANUFACTURERS
SPECIFICATIONS :

4 0.90 0.90 3.240 M2 68.00 220.32

4 0.45 0.45 0.810 M2 68.00 55.08

"20MM CEMENT PLASTER


1:3( 1 CEMENT : COARSE
6/18.1 NII-13.6 SAND) FINISHED WITH 1 3 3 9.000 M2 262.00 2358.00
COAT
OF NEAT CEMENT"

Page 28 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

SNO WBS NO WBS Text Amount

1 PW1-185-21-011.001 deve.of infrastructure at tranching gr. 972212.32

2 PW1-185-21-011.002 CC ROAD 1817949.00

3 PW1-185-21-011.003 CC DRAIN 497045.67

4 PW1-185-21-011.004 RETAINING WALL 2474308.63

5 PW1-185-21-011.005 ELECTRIFICATION WORK 1218176.75

6 PW1-185-21-011.006 gard room 146603.44

Total PAC 7126295.81

Page 29 of 30
Project Estimate
Project Details

Project Number: PW1-185-21-011 Work : Dave.of infrastructure at tranching gro.


ULB: Jobat Nagar Parishad G/L Code : 4102089000 OTHER STRUCTURES
Department: Public Work Departme PAC 7,126,295.81
Dispatch No 1520001064 Total Submitted PAC(ULb):0.00
Activity / SOR / NON SOR and WBS Details

Nikita Bhanwar SUB ENGG.


Created by (Sub eng / A.E)
IST : Dec 1, 2021 7:46:17 PM
GST 855,155.5
and digitally signed by
Gross 7,981,451.3
Forwarded by (CMO / AARTI SALVI CMO

Comm) and digitally IST: Dec 2, 2021 11:44:06 AM


signed by Jobat Nagar Parishad

TECHNICAL SANCTION AS PER CONDITIONS,VIDE, Notification - 100000154799


Dated : 2022-01-04
For Construction of : Dave.of infrastructure at tranching gro.

At ward No : 1 Gross Granted for RS : 7981451.31


In Words : SEVENTY NINE LAKH EIGHTY ONE THOUSAND FOUR HUNDRED FIFTY ONE Rupees
THIRTY ONE Paise

GST 12% applicable on this Project,GST = 855155.50


Checked by :Sub.Eng. / A.E(optional)
Neeraj Kesharwani DIV SUB. ENG Checked by
Checked by IST:Jan 4, 2022-1:28:06 PM IST: - 12:00:00 AM
A.E and
(Sub eng and
digitally
digitally signed
signed

म.प्र. नगर पालिका िेखा एवं ववत्त ननयम 2018 के प्रावधान अनस
ु ार आवश्यक स्वीकृनत एवं ननववदा सम्बन्धी अन्य समस्त प्रक्रिया अपनाई जाना सनु नश्श्ित
करं . -भू स्वालमत्व ननकाय का है ,तथा अवैध कॉिोनी मं यह कायय प्रस्ताववत नही है , इस शतय के आधार पर टी. एस. (SOR 02.08.2021) जारी की जा रही
Note: है ,क्रकसी प्रकार के वववाद की श्स्थनत मं टी एस स्वमेव ननरस्त समझी जावेगी.इस कायय के वीरुध ननकाय मं रालश पयायप्त रूपसे उपिब्धता होने की दशा मं ही
ननववदा आमंत्रण क्रकया जावे अन्यथा की दशा मं सम्पण
ू य उत्तरदानयत्व आपका होगा |संिािनािय का पत्र िमांक /07-3/2021/17651 भोपाि ददनांक
31.12.2021 के अनस
ु ार शहरी क्षेत्र मं ननलमयत सड़कं मं यदू टलिदट सववयस डािने हे तु रोड कदटंग एवं रोड रे स्टोरे शन के संबंध मं एवं प्रमख
ु सचिव महोदय का पत्र
िमांक 5002/2021/18-2,R3876 ददनांक 17.11.2021 से शहरी क्षेत्रं मं सीमं ट कंिीट एवं डामरीकृत सड़क ननमायण के संबंध मं ददशा ननदे श साथ ही संदलभयत

Assistantशासन के पररपत्र का कठोरता से पािन करना सनु नश्श्ित करं उल्िेखखत कायय की तकनीकी स्वीकृनत अगर तथ्य छुपाकर प्राप्त की गई है तो जारी तकनीकी
SHRIKANT
SHRIKANT GEETE

/ Executive / Superintendent A.E/ c=IN, o=urban administration and development


department, ou=urban administration and development

स्वीकृनत ननरस्त मानी जाएगी क्रकसी अन्य शासकीय ववभाग से स्वीकृनत अथवाE.E/अनापश्त्त प्राप्त करना आवश्यक हो तो कायय प्रारं भ करने के पवू य प्राप्त करं
department,

Engineer 2.5.4.20=fc16dced1d1079bded1f621130cb4656d1ce3

S.E GEETE
d0e9e1dc355378fca8595e72fbe, postalCode=452001,
st=MADHYA PRADESH, cn=SHRIKANT GEETE
2022.01.04 14:54:02 +05'30'
Urban Administration
कायय की गुणवत्ता का ववशेष ध्यान रखा जावे प्रयक् ु त ननमायण सामग्री कंिीट क्यब
ू कोर टे श्स्टं ग इंटरिॉक्रकं ग पेवर ब्िाक आदद का परीक्षण ननधायररत आवश्ृ त्त मं
&
मान्यता प्राप्त प्रयोगशािा से कराया जाना सनु नश्श्ित करं
Development, Indore Division S.E
Scan to Verify TS
Important Note: Valid only after digital signature of CMO/Commissioner and EE

Page 30 of 30
संभागीय कायार्लय , नगर�य प्रशासन एवं �वकास , इंदौर संभाग ,इंदौर
क्रमांक/यां.प्र./तक.स्वी./भवन/2022/1520001064 INDORE, �दनांक - 04.01.2022

प्र�त,
मख्
ु य नगर पा�लका अ�धकार�,
JOBAT NAGAR PARISHAD,िजला:ALIRAJPUR

�वषयः- DAVE.OF INFRASTRUCTURE AT TRANCHING GRO. क� तकनीक� स्वीकृ�त के सम्बंध म� ।


संदभर्ः- E-NOTIFICATION NUMBER PROJECT NUMBER PW118521011000

विषयान्तर्गत, सन्दर्भगत पत्र से निकाय क्षेत्रान्तर्गत में शासकीय निमेागण कायं के प्राक्कलिं का परीक्षण ककया र्या। निमेागण कायग प्रांरभ करिे के पि
ू ग शासकीय इंजीनियर कॉलेज से स्ट्रक्चरल
डिज़ाईिकराकर उसका अिमे
ु ोदि इस कायागलय से कराया जािा सनु िष्चचत करे | मेध्यप्रदे श िर्र पार्लका लेखा एिं वित्त नियमे 2018 अिस
ु ार पश्चात तकिीकी स्ट्िीकृनत प्रदाि की जाती
है .संचालिालय का पत्र क्रमेांक /07-3/2021/17651 भोपाल ददिांक 31.12.2021 के अिस
ु ार शहरी क्षेत्र में निर्मेगत सड़कं में यदू िर्लदि सविगस िालिे हे तु रोि कदिंर् एिं रोि रे स्ट्िोरे शि के संबंध में एिं
प्रमेख
ु सचचि मेहोदय का पत्र क्रमेांक 5002/2021/18-2,R3876 ददिांक 17.11.2021 से शहरी क्षेत्रं में सीमें ि कंक्रीि एिं िामेरीकृत सड़क निमेागण के संबंध में ददशा निदे श साथ ही संदर्भगत शासि के
पररपत्र का पालि करिा सनु िष्श्चत करं |

क्र. कायर् का नाम मद प्रभावशील एस.ओ.आर. का �ववरण तकनीक� स्वीकृ�त क� रा�श

1 DAVE.OF INFRASTRUCTURE AT निकाय निधि/अिद


ु ाि UADD S.O.R 02.08.21 7981451.31
TRANCHING GRO.

शतर्ः-
1. निर्माण के दौरमि पी.डब्ल्य.ू डी. स्पेसिफिकेशि एवं य.ू ए.डी.डी. स्पेसशफिकेशि कम पमलि िनु िश्चित फकयम जमवे। निर्माण कमया के दौरमि निर्माण कमयो र्ं प्रयक्
ु त निर्माण िमर्ग्री/कमंक्रीट आदद
कम शमिकीय/र्मन्यतम प्रमप्त प्रयोगशमलम परीक्षण निर्माररत आवश्ृ तत अिि ु मर करमयम जमवे। कमया के िल दे यक, भगु तमि के पव
ू ा उपयोग की िर्स्त िमर्ग्रीयं एवं कमंक्रटी की टे स्ट ररपोटा आवचयक रूप िे
प्रमप्त की जमवे एवं कमया की ववधर्वत निववदम आर्ंत्रित की जमवे।

2. र्.प्र. िगर पमसलकम लेखम नियर् 1971 के नियर् 131 के उपनियर् (3) के खण्ड (दो) के प्रमवर्मि अिि
ु मर िक्षर् प्रशमिकीय स्वीकृनत प्रमप्त की जमवे।
3. र्.प्र. ि.पम. (प्रेिीडंट-इि-कमंउसिल के कमर्कमज कम िंिमलक तथम प्रमधर्कमररयं की शश्क्तयमॅ एवं कताव्य) नियर् 1998 के नियर् 7 (3) अिि
ु मर िंववदमकमरं िे अिब
ु ंर् िम्पमदि के िर्य
पमंि प्रनतशत प्रनतभसू र् रमसश कमया की अिर् ु मनित लमगत यम िमर्ग्री यम र्मल के अिर्
ु मनित र््
ू य की जमर् करमई जमवे।
4. र्.प्र. ि.पम. (प्रेिीडंट-इि-कमंउसिल के कमर्कमज कम िंिमलक तथम प्रमधर्कमररयं की शश्क्तयमॅ एवं कताव्य) नियर् 1998 के नियर् 5 (5)(एक)(ग्यमरह) के प्रमवर्मिं के अिि
ु मर निववदम
आर्ंत्रित की जमवेगी।

5. निर्माणकमया प्रमरं भ करिे के पव


ू ा स्रे क्िर की भमर वहि क्षर्तम कम परीक्षण शमिकीय र्मन्यतम प्रमप्त प्रयोगशमलम िे करमयम जमवे। परीक्षण ररपोटा के आर्मर पर भवि की िंरििम डडजमईि
िक्षर् स्रक्िरल शमिकीय इंजीनियर िे करवमई जमकर निर्माण कमया प्रमरं भ फकयम जमवे। ड्रमइंग डडजमईि र्ं भक ू म्प अवरोर्ी तकिीक कम िर्मवेश फकयम जमवे।
6. िक्षर् श्जलम प्रशमिि अधर्कमरी एवं िगर तथम ग्रमर् निवेश की अिर्
ु नत प्रमप्त कर निववदम आर्ंिण की कमयावमही की जमवे।
7. र्ौके की श्स्थनत अिि
ु मर यदद फकिी प्रकमर कम पररवताि आवचयक प्रतीत होतम है तो निर्माण के पव
ू ा नियर्मिि
ु मर िक्षर् स्वीकृनत प्रमप्त की जमवे।
8. निर्माण कमया स्वयं के अधर्पतय की भसू र् र्ं फकयम जमवे।

9. ववस्तत
ृ प्रमक्कलि के िमथ िेिेटरी एवं इलेश्क्रकल के आयटर् कम िर्मवेश कर एकजमई तकिीकी स्वीकृनत एवं अन्य स्वीकृनतयमॅ प्रमप्त की जमए।
10. स्थल पर वमस्तववक रूप िे िम्पन्ि कमयो कम ही भग
ु तमि फकयम जमवे।
11. भसू र् वववमद की श्स्थनत र्ं अथवमि शमिकीय ववभमग द्वमरम आपश्तत ली जमिे पर प्रमप्त तकिीकी स्वीकृनत स्वतः ही निरस्त र्मिी जमवेगी।

12. कमया टुकड़ो र्ं ववभमश्जत होिे की श्स्थनत र्ं इिकम दमनयतव निकमय के र्ख्
ु य िगर पमसलकम अधर्कमरी कम होगम तथम उक्त श्स्थनत र्ं प्रदमय की गई तकिीकी स्वीकृनत स्वतः निरस्त र्मिी
जमवेगी।

13. निर्माण कमया की िक्षर् प्रशमिकीय एवं ववततीय स्वीकृनत प्रमप्त करिे के उपरमंत ही निववदम आर्ंिण की कमयावमही की जमवे।
14. कमया स्थल पर िंबधर्त निर्माण कमया कम बोडा अनिवमया रुप िे लगमयम जमवे, िमथ ही कमया प्रमरं भ के पव
ू ा एवं कमया िर्मश्प्त पर वीडडयंग्रमिी/िोटोग्रमि तैयमर करमये जमवं ।
15. िगर तथम ग्रमर्ीण नियोजि ववभमग के नियर्मिि
ु मर आवचयक स्थल अिर्
ु ोदि/अिमपश्तत प्रमप्त की जमवे। िजल
ू एवं अन्य ववभमगं िे आवचयक एि.ओ.िी./िहर्नत भी प्रमप्त की जमवे।
16. प्रमप्त निववदम/कोटे शि की दरं की तल
ु िम निकमय के क्षेि अथवम िजदीकी लोक निर्माण ववभमग /गह ृ निर्माण ववभमग/ग्रमर्ीण यंमत्रिकी ववभमग/लोक स्थम0 यमंत्रिकी ववभमग के िर्मि कमयो की
वतार्मि प्रिसलत दरं िे तल ु िम की जमकर, निववदम िसर्नत के स्पष्ट असभर्त के िमथ पमररत प्रस्तमव पर र्ख्
ु य िगर पमसलकम अधर्कमरी अपिे स्पष्ट र्त अंकि कर, नियर्मिि ु मर पी.आई.िी./पररषद िे
िक्षर् स्वीकृनत प्रमप्त करे गं।

17. निर्माण कमया की लमगत रमसश रु. 25.00 लमख िे अधर्क होिे पर स्थल प्रयोगशमलम की स्थमपिम, निर्माण एजेन्िी िे करमई जमकर टे स्टे ड र्टे ररयल ही उपयोग र्ं लमयम जमवे।

18. र्.प्र. शमिि, िगरीय ववकमि एवं पयमावरण ववभमग र्ंिमलय भोपमल के आदे श क्र. F-6-18/10/18-3/7814 भोपमल ददिमंक 17 जि
ू 2016 के अिि
ु मर रमसश रू. 1.00 लमख अथवम उििे
अधर्क के करमये जमिे वमले कमयो के सलये ई-टं डररंग व्यवस्थम के र्मध्यर् िे आहुत की जमिम िनु िश्चित करं ।

19. निववदम िि
ू िम र्ं प्रमवर्मि फकयम जमये फक निववदमकमर को ई.पी.एि. एवं लेवर ववभमग कम पंजीयि प्रर्मण पि दे िम होगम। Cost Escalation Clause लमगू िहीं होगम।
20. भवि र्ं रे ि वमटर हमवेश्स्टं ग तकिीक कम उपयोग करिम होगम। निर्माण भक
ू म्परोर्ी तकिीकी कम होगम।
21. निववदम दर स्वीकृनत उपरमंत ठे केदमर को श्जले के श्रर्पदमधर्कमरी के पमि श्रर् आयक्
ु त के िंववदम श्रसर्क (ववनियर्ि एवं िर्मश्प्त) अधर्नियर् 1970 के अंतगात आवेदि प्रमरूप-05 ततकमल
जर्म करमिम अनिवमया होगम। ततपचिमत ् ठे केदमर िे उक्त पंजीयि निकमय र्ं जर्म करमकर अिब ु ंर् िंपमददत फकयम जमवेगम। पंजीयि निर्माररत अवधर् र्ं जर्म ि होिे पर ठे कम निरस्त की कमयावमही की
जमवेगी।
22. उपरोक्त शतो की पनू ता की श्जम्र्ेदमरी निकमय के र्ख्
ु य िगर पमसलकम अधर्कमरी, िगर पमसलकम/िगर पररषद की होगी।

SHRIKANT GEETE

अधी�ण यंत्री / कायर्पालन यंत्री ,नगर�य प्रशासन एवं


c=IN, o=urban administration and development department,
ou=urban administration and development department,

�वकास SHRIKANT GEETE 2.5.4.20=fc16dced1d1079bded1f621130cb4656d1ce3d0e9e1dc355378


fca8595e72fbe, postalCode=452001, st=MADHYA PRADESH,
cn=SHRIKANT GEETE

INDORE संभाग INDORE 2022.01.04 14:57:45 +05'30'

You might also like