Status of Amicable Settlement Cases [ (ut of total Cases 49 cases, On Going = 16. Time Barred Cases = 13. Cases Amicably Closed= 23. Closed Cases = 10 Duration Uptation ate ‘Condonton Other Amoun in Ce lsu satus a tmng | Rerne Cina" | tet) tamer Aey | comer | Fitna Stats Detais Contact person i anal New rales demanded beyond orginal ewe. 1 1.Oemandes «4822, itta0 4 No Keindee-TPL EDNC —GWFILKO EDISETICO, 42 ee WV He 82 ss 3 wz Now rales demanded beyond orginal MNTSPRIPKGS yp, completion date fom May 2018 Med m+ EDSETICO ‘amounting to 234 Cr. Mandeep Kepoo tom 4 1.Demanded 4522 s10@0 63 No "aie EDiots GUE eOee| © Ata apes as Unmad Nagar Statement of claims reed from GMR. await trom thor JV partners. Sid Line Sanchi- NOC 5 2inProgess 4522 aH 178 No ae REECE 8 Bridge constuction atoe. 6 6.Faled&Cosed | 4522 30322 No in Sambalpr fy | ED East + 133 BBS Titagar project OWA 1 epadiouet ice sum We WiaBeaDating Kare | epcanra cusp eDsarico 45 SetmCMIErsamenianes — “ENag PRGA Cobra WV) ‘Award accepted by Contractor. | geeacettey I | Clams can not be seed in this 8 6 FaledtClosed 4822 | 911720 zanna PSCOCEPL! Daas COMFR®) commitee Seen om s \on pense srraarr77 | Fist_meeing hed on 18.11.2020 Clemant has requested fr pesiponment of amicable settement shri | | wm Siege se. somn caee I ay SoCs SO py Catack Barong Ee vide their later dated 191.2022. No futher equest fer resumption recived ti New Line Vidatha- IPL Gwe EDRKSH 102 mnPropress 11822) 2ar201 209 No EDRKSH 8 RKSH | VKIPPLIV SP IPL: Party accepted the award ‘Niu SE 6209867020 \VKLIUPL: Consent on award awated rso7200 11,6 FaledeClsed 12.2 InProgress 13.2 inProgress 14-2 lnProgress 15 6.Faled&Closed 16 6.FaledBClosed 4522 198122 16722 46522 10922 1022 ate Initiate 2619 manna 31g 9122 300120 30819 Duration [RodeTime bared} 216 176 Condonation setiad —NamecfWork Agency obtained Doubing Mc. haktapuraharl, Viayargiya- PKG-1 Bright Power Aarvee PMCKolaBina 4 Doubling MOVK- | Malhotra MAKR Buldoon eDaBS ED Conta ED Cental EDEast DBS GWEN se Gwrise GMs GoM’ NOLS GGMFIN SP Gowen SP (Other -Amoun in Ce Mem e PEDISeT 8 Status Detals 1. Penaly was decided on falure of ‘meeting the deadine but the same was ‘not imposed. CVC not acepting reply of RVNL. Case not closed 2. Further, exersions were lator wihout penalty due to Forest Issues. Over issues are blankt ‘material and P. Way fitings el '3, Setiement is nal bi payment not made. 14. Peciormance secuy i eased and Final bil ®6Cr) passed but not pac Claims doc to be submitedby Con Demanded LoadiUnload of sleeper & packing tobe paid separately. "MIL der preparation. advised claimant that settlement isnot feasible ‘Arb demanded (One meeting held so far. [Arb demanded MeRN Jena \VRNaidu GM (CPM Watair MeRN Jona MeRN Jona 17 2.InProgress 18 6 FalledBCiosed 19 6.Falled&Ciosed 20 6 FaledBClosed 21 6 FaledBClosed 22 6 FaledBClosed 23 6, Paid&Closed 24 6 PeidBClosed (6. Paid&Closed 26 6. Paid&Ciosed 27 6.PadBClosed 022 22 ‘0a ‘022 sora swam 022 10922 ‘1a 02 ‘ze Date nitates ont amg rr) ania entz0 181070 aiming swore ‘Daraton [RedsTine ares) ‘Condonation obtained Seted Name of Work Closed —Ihoke Majerhat Opened Sectionl(JMS-) (Gammon) pain? GCLKO 8 STP PKG Closes Cloned Oe coos "Bina Dowding Pp PASS Gove“ Usergaon Pigs Doubling Bhimson- SEW-ETF ‘gency Convenor loses Ket@BinaDowbing gop. ED Cental PKG ciosea_._ Maridaspur Paradeeprewine. _ Adhkarya Closed Mancharpur Ge nae MEN pence ¢ 126 Gone tonaded Aton oo EDM ‘int fgur On Cant neigh O22 nd ‘next date to be feed = Ine sett oad od Chom be ot he oe ina ton oe wan MFLAOM dk var peDsTR_cFt4o enero Fo te, stn GUFLUOM Ave vat | pEDSTR.oFtHO EDSETO FL Ue ‘on date9 3.22 with GMIFILKO) c emeee | ng ne ey i810 vou saate-| EDRISK GMP cori wes Sted ai wot Ft ney bal 81120 Adaya EDRSH IESE foie cons — i Aran ced Cat Flos | ‘oMrn| ‘Recommendations not accepted by cia reouee OME cnr arty wsakean Sg I

You might also like