LIST OF ONGOING ARBITRATION CASES (As on 03.08.

2022)
Date of Name of Arbitrators Amount of Amount of Remarks
Name of the Appointment of Claim Counter Claim
S.No. PIU Name of the Project Presiding / Sole Contractor RVNL Nominee
Agency (M/s) AT/ Pres. Arb. & by Contractor by RVNL Award challenged in the court.
Arbitrator Nominee Arbitrator
Extns. ₹ ₹
All P. Ways works related to GC from MG to BG line in Rewari-Ringus-
DELHI 24.05.2012 P. K. Sharma P. K. Singh M.P. Singh
1 Phulera-Ajmer Section of NW Rly (CA No. RVNL/JP/2006/002 dt IRCON 285,126,898 - As it is.
PED (STR.) [OLD A&C ACT] CE/NR PED/RVNL ED/Works
07.04.2006).
Doubling of Lakhana (Excl) - ARAND (incl) section (68.936Kms) part of IVRCL-MRT 13.05.2015 S. Sadasiva
RAIPUR S.M. Singla, S.P.S Jain,
2 Raipur-Titlagarh Doubling in Sambalpur division of East Coast Railway - (JV) by IPWE Reddy 450,022,912 726,840,744 As it is.
CPM-II Retd MS Retd ME
Pkg-2 Pkg-2 [OLD A&C ACT] Advocate
C/o Viaduct (5.75Km) excl. station areas Ch. 247 to 6400 between Kavi 09.12.2017 /
AFCONS Justice
KOLKATA Subhas (New Garia) to VIP Bazar, in New Garia - Airport Corridor of 03-06-2020/ Justice (Retd) R. Rajamani,
3 Infrastructure Ltd (Retd.) A.K. 1,603,042,444 - As it is.
CPM-I Kolkata Metro (Pkg ANV-1) 04.06.2021/ KS Radhakrishnan Retd. CCRS
(ANV-1) Patnaik
01.04.2022
C/o Viaduct for 5.16Km length excl. station areas from Ch. 12570 to 31.07.2017 /
KOLKATA AFCONS Justice Justice
18630 between NICCO Park to CBD-1, in New Garia - Airport Corridor of 04-04-2019/ Ramesh Chandra, Last hearing held on 16.11.2021.Next date not
4 CPM-II Infrastructure Ltd (Retd.) KS (Retd.) A.K. 1,744,897,027 4,000,000
Kolkata Metro (Pkg ANV-3) 31.03.2021/ Retd DG/CPWD yet fixed by Ld. Tribunal.
(ANV-3) Radhakrishnan Patnaik
01.04.2022
C/o of Roadbed, Major and Minor Bridges, track linking (excl. supply of
rails, ordinary track sleepers, thick web switches), outdoor Signalling and IVRCL-MRT Justice
23.10.2017/ Justice Shyam Kumar
5 RAIPUR Electrical (General) works for Doubling of Titlagarh (Excl.) - Lakhna(Incl.) (JV) (Retd.) Ms.Usha 532,588,172 192,513,260 As it is.
(Retd.) J.D Kapoor Retd GM/ER
CPM-II (72.948Kms) section part of related to Raipur-Titlagarh doubling [Pkg 1] Pkg 1 Mehra

C/o Major Bridge in Connection with doubling of Railway Line between


HCIL-Adhikarya- Justice (R) Vikramjit
BHUBANESWAR Barang-Rajatgarh (25Km), Cuttack - Barang (12Km) and 3rd line 16.01.2018 Matter is pending before the Hon'ble Supreme
6 ARSS (JV) Sen, Sole (SC Order - - 1,502,288,258 215,956,092
CPM-IV between Barang-Khurda Road (35Km) in Orissa [BRIDGES] [OLD A&C ACT] court of India.
(Bridges) 16.1.18)
C/o Roadbed in connection with doubling of Railway Line Between
HCIL-Adhikarya- Justice (R) Vikramjit
BHUBANESWAR Barang-Rajatgarh (25Km), Cuttack - Barang (12Km) and 3rd line 16.01.2018 Matter is pending before the Hon'ble Supreme
7 ARSS (JV) Sen, Sole (SC Order - - 5,064,662,262 326,525,186
CPM-IV between Barang - Khurda Road (35Km) in Orissa (ROADBED) [OLD A&C ACT] court of India.
(Road Bed) 16.1.18)
C/o doubling between Salka Road-Khongsara (25.8kM) and Khodri- 31.03.2018 /
RAIPUR DSCL-BCEPL Justice (Retd.) R.C S.K. Vij S.P.S Jain
8 Anuppur (61.6kM) on Bilaspur Divison of South East Central Railway in 31.03.2019 / 1,601,778,302 4,533,444,394 Next date- 05.08.2022
CPM-I (JV) Chopra Retd ME Retd. ME
Chattisgarh 31.03.2020
MMTS Phase-II Corridors- Doubling between Medchal- Bolarum & 20.04.2018/
GMR-
Falaknuma – Umdanagar in Secunderabad and Hyderabad Division of 19.04.2019/
SEC'BAD KALINDEE- TPL Justice (Retd.) Rekha S.K. Vij R. Rajamani
9 South Center Railway, Andhra Pradesh, India In 3 (three) Packages- 19.10.2019/ 440,547,162 657,735,621 As it is.
CPM(West) (JV) Sharma Retd. ME Retd.CCRS
Prolongation Cost Claim Package 3 18.05.2020/
(Pkg-3)
16.09.2021
C/o 7 stns i/c related works from Kavi Subhash (New Garia) to Ritwik ITD 27.04.2018/
Usha Mathur
KOLKATA Ghatak, in New Garia-Airport corridor of Kolkata Metro (Pkg ANS-1) Cementation 27.10.2019/ Justice (Retd.) Anil R. Rajamani
10 Retd.Secy./ 646,929,308 - As it is.
CPM-I India Ltd 27.04.2020/ Dev Singh Retd. CCRS
Parlia. Affairs
(ANS-1) 30.04.2021
C/o Viaduct for 5.4 KM length excluding station areas from Ch. 18630.00 29.08.2018 /
to Ch 25102.00 between CBD-1 to RabindraTirtha in New Garia-Airport Last D.O.H of hearing on 20.05.2022.Next
KOLKATA 29.08.2019/ Justice
L&T Justice Sudhir Mathur, date ;24.08.2022 to 30.08.2022(4nos.)-RVNL
11 CPM-II Metro Corridor (Package ANV-4). 29.02.2020 / (Retd.) Mukul 1,715,223,236 20,000,000
(ANV-4) (Retd.) D.K. Jain Retd Dir/IRCON Arguments.Next date;05.09.2022 to
28.02.2021/ Mudgal 07.09.2022.(Rejoinder arguments)
20.04.2022

1/2
LIST OF ONGOING ARBITRATION CASES (As on 03.08.2022)
Date of Name of Arbitrators Amount of Amount of Remarks
Name of the Appointment of Claim Counter Claim
S.No. PIU Name of the Project Presiding / Sole Contractor RVNL Nominee
Agency (M/s) AT/ Pres. Arb. & by Contractor by RVNL Award challenged in the court.
Arbitrator Nominee Arbitrator
Extns. ₹ ₹
C/o Viaduct (4.748 Km) excl. station areas from Ch.(-)1250.00 to 28.12.2018 /
4128.00 between Joka to Behala Chowrasta incl. Depot Approach at 28.12.2019 / Final Award still awaited,However presiding
KOLKATA Joka-BBD Bag corridor (Pkg JMV-1) Simplex Infra Justice (Retd.)
28.06.2020/ Justice (Retd.) Raghvendra arbitrator decided to convence a meeting on
12 CPM-II structures Ltd Swatanter Kumar 1,092,551,980 -
31.10.2020/ GS Singhvi Govind Kulkarni 28.07.2022. to ascertain the view of all on the
(JMV-1) by DHC desirebility of making an award...
30.04.2021/
31.01.2022
D/S/E/T/C of 25kV, 50HZ, single phase, traction OHE, switching stns,
Cobra 04.09.2019/ Justice (Retd.) Justice (Retd.) D K Saini
PUNE traction sub-stations, SCADA, Gen Elec work along with Civil Engg work,
13 lnstalaciones y 04.09.2020/ S K Agarwal S N Dhingra Dir(P&P)/DMRC 361,482,597 - Draft copy of affadavit submitted by claimaint.
CPM-RE i.e. Service Bldgs, Quarters, T/W siding, TSS cross track between Amla
Servicios, S.A. 04.03.2021 04-09-2019 21-08-2019 21-08-2019
(incl.) - Chhindwara (incl.) for 115 RKM/ 145 TKM of Nagpur Division
C/o of Roadbed, Major and Minor Bridges, Track Linking (excl supply of 13.11.2019 /
rails, sleepers, TO sleepers and TWS),incl S&T and OHE & general Cross examination completed , Next hearing
29.01.2021 Justice (R) Madan B.
BHUBANESWAR date not fixed,SLP©no. 15484/2021
14 electrical works for 3rd line between Jakhapura - Haridaspur (25.0 Km) McML-ECI (JV) 20.04.2022 Lokur, Sole. (THC - - 184,194,227 148,273,307
CPM-I challenging AT.Appoinment is not listed till
on Khurda Road division of East Coast Railway in Orissa 25.04.2022 Order 13.11.19) date.

Earthwork in formation, bridges, road under bridges, station building, staff Justice (R) A.K. Sikri,
15 CHENNAI quarter, general electrical work including power line crossing from KM.00 BVSR-KVR (JV) 21.02.2020 Sole (DHC Order - - 448,723,154 0 As it is.
to KM 17 between Obulavaripalle to Nethavaripalle 12.2.20)
C/o road bed, supply of ballast, major and minor bridges, residential and
Justice (Retd.) A.K. Justice
service buildings & general electrical works etc., for Dallirajhara – Keoti
RAIPUR Justice (Retd) A.K. Patnaik (Retd.) D.K. Jain
16 section (42 Km) in connection with a new rail link between Dallirajhara SMS Ltd 28.01.2020 1,073,976,029 0 As it is.
CPM-III Sikri by DHC Order dt by DHC Order dt
and Rowghat in Raipur Division of South East Central Railway in the
14012020 14012020
State of Chhattisgarh
Track Gauge Conversion between Lucknow-Sitapur - C/o Roadbed,
bridges, supply of ballast, dismantling and removal of existing Meter
LUCKNOW L&T R.P. Gupta, Retd
17 Gauge track, Installation of BG track (excl. supply of rails & PSC 04.07.2021 Chander Parkash B K Makhija 1,410,884,519 0 As it is.
CPM-I Pkg-1 AM(W)/RB
sleepers), Electrical (Gen. Electrifn), S&T works Package-1

Track Gauge Conversion between Mailani-Pilibhit - C/o Roadbed,


bridges, supply of ballast, dismantling and removal of existing Meter Admission denial on documents submitted by
LUCKNOW L&T R.P. Gupta, Retd
18 06.07.2021 Chander Parkash B K Makhija 1,562,064,229 0 L&T along with its SOC Submitted on
CPM-I Gauge track, Installation of BG track (excl. supply of rails & PSC Pkg-3 AM(W)/RB
24.06.2022.
sleepers), Electrical (Gen. Electrifn), S&T works Package-3
Construction of 7 Stations from Sub CBD-1 to Titumir in New Garia Justice (Retd) R C
KOLKATA IL&FS Justice (Retd) G B Last date of hearing on 28.06.2022.and Next
19 Airport Corridor of Kolkata Metro railway Line ANS-3 07.08.2021 Lahoti (Expired on SPS Jain 1,238,569,056 1,599,814,476
CPM-II ANS-3 Pattanaik DOH IS 22.08.2022.
23.02.2022)