Professional Documents
Culture Documents
DMC Pimng Jor K-Ag Otundod: Excavation Plan Showing The Layout of Trial Trench
DMC Pimng Jor K-Ag Otundod: Excavation Plan Showing The Layout of Trial Trench
DMC Pimng Jor K-Ag Otundod: Excavation Plan Showing The Layout of Trial Trench
Note: Excavation plan is to be prepared by the Contractor and to be approved by Consultant and Tata Steel
engineer
Cse ofCabe Detector
Used before start of Trial Trench Y/N
Used inside trial trench, bottom and side wall | Y/N
-
Electric Cables
YI Supported/ Telephone Cables Supported/ Diverted
Diverted /Defunct N
Defunct
FO Cables Supportedd Water Pipe lines YI Supported/ iverted
Diverted/Defunct N
/ Defunct
Y/
Storm water pipes Supported Sewer Line Y Supported/ Diverted
N
DivertedDefunct N
Defunct
Declaration
Trial trench excavated upto a minimum depth of 1S00 mm manually. Clearance is hereby given to the contractor
to proceed with mechanised excavation/grading upto a depth of 1200mm, after ensuring cables/pipes/structures
in use do not exist in the area earmarked for excavation.
Department Name Signature Date Remarks
Electrical (MEDE,
S&T)
Engineering Services
i) PHES
i) Pipe Line
ITS
Telecommunication
Consultant
2 X P r P E Rnek
N 2624
E 665014S Ne2629.302
6459-0
PILL
N 2610 o0
Et &649 s25 N+ 26t/-41S
Et 666135S
A
ondéei
t26/10-92
6t 6661225
N+ 260g 949
+ 6658 0237 h: PIPE
265.42
E 6b61 293 2
n+2607 829 Nt 2609 o09
E+66564081 E+666t 299
N+ 260 281
E+6656 S81
N+ 202 655
+ 2600 454
6650.04
ORD
-1