Elements of Curve: To Be Verified and Corrected To Minimum Design Requirement. Prior To Construction

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ELEMENTS OF CURVE

KM.

BENCH MARK NO.


KILOMETER POST
PIPE CULVERT CUT SLOPE
BOX CULVERT EMBANKMENT
ELEV.
DIRECTION OF FLOW ELEV.
CONTOURS
GROUTED RIPRAP LINED CANAL
CONCRETE SHOULDER GUARDRAIL
TELCO POST ELECTRICAL POST * TO BE VERIFIED AND CORRECTED TO MINIMUM DESIGN
REQUIREMENT. PRIOR TO CONSTRUCTION.

0 .0
00
+7 3
.03 A
ST
E
PROPOSED LINED CANAL @ LS IN
HL
STA. 033+671.35 - STA. 033+790.00 TC
MA

PC
=ST
A S

00.00
.33
+7 @ L .00
55 AL
.35 C AN 3+910 LS
ED A. 03 @ 7.56
AL

.034+2
LIN T AN 33+9
7
ED 00 - S C
PI-33-9

OS . D .0
R OP 3+870 L INE - STA
P 3 ED 35 S
. 0
OS 931. L@B
STA CANA

E STA
OP + LINED 20.00
PR . 033
33+

T A R O P OSED T A. 034+0
P 90 - S
8

S
00

033+9
PI STA.

HLIN
-33
PC -10

MATC
C=
34+100
3-02
ST
PI-3
A. PC
33 C=
+8 ST
1 A.
5. 33
08 +8
7.5 5
4 34+000

PT=STA
33+900
PC
C=

.33+93
STA
.33

1.37
+9

PROPOSED LINED CANAL @ BS P L A N


16
.59

STA. 033+790.00 - STA. 033+870.00 SCALE: 1:1000 M.


END OF PROJECT
PI-33 PROPOSED LINED CANAL @ BS
STA.034+020.00
-01
STA. 033+910.00 - STA. 033+930.00

STATION STA.033+700 STA.033+800 STA.033+900 STA.034+000 STA.034+100 STA.034+200

PI-33-9 PI-33-11
WIDENING W=0.90 M. W=0.90 M.
PI-33-10
W=0.40 M.

SUPERELEVATION PC e= +8.00% PCC e= +4.10% PCC e= +8.00% PT


e= -8.00% e= -4.10% e= -8.00%

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
VIRGO I. AUSTRIA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS "FY -2022" DATA CONTROLLER I SEE COVER SHEET SEE COVER SHEET
REGION IV-B PLAN FOR THE GERALD A. DPWH
CONSTRUCTION OF MISSING GAPS OF KWIN JUVY U. CRUZ GENE RYAN A. ALTEA MELQUIADES H. STO DOMINGO ROADS
PLAN PREPARED: PACANAN, CESO III FY - 2022
VICTORIA - SABLAYAN ROAD
OFFICE OF THE REGIONAL DIRECTOR (MINDORO CROSS ISLAND ROAD) GODOFREDO S. DAGDAG,Jr.
ENGINEER III OIC- CHIEF, PLANNING AND DESIGN DIVISION OIC, ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
R-IV-B
16 58
EDSA, DILIMAN QUEZON CITY DATE: DATE: DATE: DATE:
SABLAYAN,OCCIDENTAL MINDORO ENGINEER III

You might also like