Professional Documents
Culture Documents
Elements of Curve: To Be Verified and Corrected To Minimum Design Requirement. Prior To Construction
Elements of Curve: To Be Verified and Corrected To Minimum Design Requirement. Prior To Construction
Elements of Curve: To Be Verified and Corrected To Minimum Design Requirement. Prior To Construction
KM.
0 .0
00
+7 3
.03 A
ST
E
PROPOSED LINED CANAL @ LS IN
HL
STA. 033+671.35 - STA. 033+790.00 TC
MA
PC
=ST
A S
00.00
.33
+7 @ L .00
55 AL
.35 C AN 3+910 LS
ED A. 03 @ 7.56
AL
.034+2
LIN T AN 33+9
7
ED 00 - S C
PI-33-9
OS . D .0
R OP 3+870 L INE - STA
P 3 ED 35 S
. 0
OS 931. L@B
STA CANA
E STA
OP + LINED 20.00
PR . 033
33+
T A R O P OSED T A. 034+0
P 90 - S
8
S
00
033+9
PI STA.
HLIN
-33
PC -10
MATC
C=
34+100
3-02
ST
PI-3
A. PC
33 C=
+8 ST
1 A.
5. 33
08 +8
7.5 5
4 34+000
PT=STA
33+900
PC
C=
.33+93
STA
.33
1.37
+9
PI-33-9 PI-33-11
WIDENING W=0.90 M. W=0.90 M.
PI-33-10
W=0.40 M.
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
VIRGO I. AUSTRIA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS "FY -2022" DATA CONTROLLER I SEE COVER SHEET SEE COVER SHEET
REGION IV-B PLAN FOR THE GERALD A. DPWH
CONSTRUCTION OF MISSING GAPS OF KWIN JUVY U. CRUZ GENE RYAN A. ALTEA MELQUIADES H. STO DOMINGO ROADS
PLAN PREPARED: PACANAN, CESO III FY - 2022
VICTORIA - SABLAYAN ROAD
OFFICE OF THE REGIONAL DIRECTOR (MINDORO CROSS ISLAND ROAD) GODOFREDO S. DAGDAG,Jr.
ENGINEER III OIC- CHIEF, PLANNING AND DESIGN DIVISION OIC, ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
R-IV-B
16 58
EDSA, DILIMAN QUEZON CITY DATE: DATE: DATE: DATE:
SABLAYAN,OCCIDENTAL MINDORO ENGINEER III