Plan - Final
Plan - Final
3) Install vcredist_x64.exe 4) Run prerequiste checker using ECC SR3 installation master 5) Increase the swap space to 20 GB and then by 10GB for each new system. (Total swap space = 40GB for 3 ECC systems) 6) Restart the server 7) Install the SAP system using ECC SR3 using system copy option(Heterogenous copy) method. 8) Upgrade kernel to the latest level (SAPEXEDB_90-10007271.SAR) Kernel 720 SP 90 9) Install the rest two ECC systems using the same IDE Export
Post Installation Activites 1) Execute SE06. 2) Setup and configure STMS. 3) Modify logon groups in SMLG. 5) Import System Profiles: RZ10-->Utilities-->Import Profiles-->Active Servers. 6) Create logical system names in BD54 7) Define new client 100 in SCC4. 8) Create new client by client copy in SCCL from 000 using SAP_ALL 9) Delete old data in SM58, SM59, SM37, ST03n and SMLG 10) Create RFC server group in rz12 11) Set up SAP batch job from SM36 12) Delete old clients and the user data of the IDE system. 13) Execute SECSTORE TCODE to check two entries which would be in ERROR state, if found, select both and delete them 14) Go to SE38 and execute RFC_PING 15) Check SAP_OSS connection
SOLMAN
Install a new system with MSSQL 2008 database using OSD export using SOLMAN 7.0 EHP1 installation master 1) Install MSSQL 2008 R2 2) Install jdk and setup environment variables 3) Install vcredist_x64.exe 3) Run prerequiste checker using SOLMAN 7.0 EHP1 installation master 4) Increase the swap space to 20 GB 5) Restart the server 6) Install the SAP system using SOLMAN 7.0 EHP1 using system copy option(Heterogenous copy) method. 7) Upgrade kernel to the latest level
Post Installation Activites 1) Execute SE06. 2) Setup and configure STMS. 3) Modify logon groups in SMLG. 5) Import System Profiles: RZ10-->Utilities-->Import Profiles-->Active Servers. 6) Create logical system names in BD54 7) Define new client 100 in SCC4. 8) Create new client by client copy in SCCL from 000 using SAP_ALL 9) Delete old data in SM58, SM59, SM37, ST03n and SMLG 10) Create RFC server group in rz12 11) Set up SAP batch job from SM36 12) Delete old clients and the user data of the IDE system. 13) Execute SECSTORE TCODE to check two entries which would be in ERROR state, if found, select both and delete them 14) Go to SE38 and execute RFC_PING 15) Check SAP_OSS connection 16) Setup parameters for ICM
SID Naming convetions ECC System nos OED 00' OEQ 01' OEP 02' Portal OPQ OPP 03',04' 05',06
Description Solman Offering ECC Dev Solman Offering ECC Quality Solman Offering ECC Prod
Memory 64 GB 64 GB 64 GB
Solution manager SMT 00',01' OPD 02',03' PI 7.0 system OPI 03' Note
INDCLDSAP02 10.240.202.212 64 GB
All SID should start with "o" for offering project Integration activities will be done by project team