01 00.03 - 24 0005 - 0502
ENVIRONMENTAL COMPLIANCE CERTIFICATE
Pursuant to Presidential Decree No. 1586 and in accordance to Article Section 4
of Department Administrative Order No. 96-37, the Department of Environment and Natural
Resources, Region |, hereby grants this Environmental Compliance Certificate(ECC) to
MR. AUGUSTO CHUA for the Agro-based industry (Plagery) Project located et Bray.
Malabago, Pangasinan , subject to the following conditions:
. That the proponent sha secure all necessary pemmitsiclesrances from concemed
agencies who have administrative jurisdiction over such projectsfoperations, Le.,
HLURB, LSU,
2. This Certificate shall cover the operation of a one (1) unit pighouse with a tote!
Population not to exceed 100 hogs at any given time: one (1) unit water pump with a
Capacity of 2 Hp and one (1) unit standby generator with @ capacity of 3,000 watts
confined in 6 fot area of 542 sq.m:
3. This Certificate shall be posted in a conspicuous place within the operations
srea/office; that the proponent shall inform the generel public about the issuance of the
ECC through the installation of ECC bliboard at all entry point (4° x 8) contetning the
title of the project, name of the proponent, ECC number and dole of issued and
the publication in a regional newspaper for two (2) consecutive weeks the full
(Complete) ECC inchuding attachment within sbty ( 60) days from receipt of ECC. The
Proponent shall submit evidence of compliance to ENVIRONMENTAL MANAGEMENT
BUREAU (EMB) Region 1 ninety (90) days upon receipt of ECC (Memo Circular
NO.02 P.150-151);
4. ‘Thal proper collection and disposal of solid waste resulting from the operation of the
Piggery clean and sanitary housekeeping practice shail be observed at all times and
construction and eperation of wastewater treatment facility shall be covered by
pertinent permits pursuant to the provision of Section 88 of the implementing Rules
and Regulation of PD 984;
S. That the mitigating and enhancement measures embodied in the IEE Checklist
submitted particularly Section 4 (impact Assessment and Miigetion) shall form an
Integral pert of the ECC conditions which shall be undertaken in ell phases of project
implementation and a quarterly report of compliance herewith shall be submitted on or
bofore the end of the quarter to CENRO, Dagupan City copy fumished EMB, Region |:
6. No expansion or additional improvement of the facies or change in operation shail be
undertaken without prior clearance from this office. The Project Proponent shall
Wransfer the piggery project to @ more viable location within three (3) yeers period and
{0 apply for an ECC prior to transfer;
+ The iransfer of ownership of this project carries the same condition embodied in this
ECC for which notification shail be made by herein grantee to DENR, Region 1 within
fifteen (15) days from such transfer ; and
‘Cont.n Next Page01 00 03 24 0005 - 0502 Page 2)
8. Al damages or adverse impact cause to the environment resulting from the
implementation of the project due to non-edoption of appropriate or adequate
mitigating measures shall be the sole responsibility or liability of the proponent.
Commencement of work or operation shall be deemed acceptance of above
condition herein specified -
Non compliance with any of the above stipulation will be sufficient cause for the
suspension or cancellation of this Certificate and for w fine in the amount not to exceed
Fifty Thousand Pesos (60,000.00) for every vioiation thereof at the discretion of the
Department ( Section 9 of PD 1586)
Should any condition of this ECC be found to be contrary to DENR and
Environmental Management Bureau regulation, same shall be amendedievoked
accordingly
This ECC is Issued for the purpose of mitigating the effect of this.project to the
‘environment and its surroundings.
Given under the seal of this Department at City of San Fernando Union this 24th
day of March, Two Thousand.
VICTOR J. ANCHETA,CESOIV
OIC, Regional Executive Director
lin oval:
Vey. Reged ope
“Tapas Ay @ So SS Sachs eg
JOEL &, SALVADOR
Regional Director
Environmental Management Bureau
Processing fee P 1,750.00 O.R.No, 6313345 Date 12-15-1999
Fes :P 340.00 OR.No. 6313345 Date 12-45-1999
PD 1856/Legal research Fee :P 70.00 O.R.No. 6313345 Date 12-15-1999
Penalty fee :P 3,000.00 O.R.No. 9894114 Date: 03-14-2000
TIN:
VALID ONLY IF MARKED WITH SEAL