S U B M I T TA L

Part of

THAKHER CITY PROJECT - MAKKAH –


ARABIAN ROOTS
Table of Contents

1 Company Profile

2 Trade License

3 Technical Data Sheets

4 Certification

5 LEED Credit For The Project

6 System Test Reports

7 Material Test Reports

8 Warranty Certificate

9 Project List

10 Project Approvals
C O M P A NY P R O F I L E

Part of
MADA GYPSUM
COMPANY
The Company was established in
2005 in Yanbu and produces its products
according to the international
standards EN and ASTM. The production
capacity is 400,000 t of plasters and 34
million m2 of plasterboard, more than
7.5 million m2 of Laminated gypsum Ceiling
Tiles and more than 2 million m2 of cement
boards.
WHY MADA
This makes MGC the biggest
GYPSUM?
plasterboard producer in KSA. With its Ͱ ISO certified
product mix and approach to the market, Ͱ World Class manufacturing processes
Dry Wall Academy for market education, first Ͱ Latest state of the art process
system solution for Dry Wall Systems, Mada equipment from Gyptech and Grelbex
Gypsum has become a market leader in the Ͱ Quality control system
MENA region. Ͱ In-house laboratory
Ͱ Production according to ASTM and EN
standards
Ͱ Third party laboratories certificates
Ͱ Best gypsum product mix in GCC
Ͱ Own gypsum rock quarry for best raw
material quality control
Ͱ Sustainable raw materials and input
materials quality control
Ͱ Technical literature to support
consultants, architects and specifiers.
Ͱ On-site technical support
Ͱ Specification (drawings) of solution
based on customers need

MADA PLUS SYSTEMS


MADE IN KSA
MADA GYPSUM
PRODUCTS Why Mada Plus
Ͱ Plasterboards SYSTEMS?
Regular
Fire Resistant Ͱ Complete range of drywall solutions
Moisture Resistant Ͱ Standard as well as customizable systems
Fire & Moisture Resistant
Ͱ Strong technical team for pre/post sales services
Impact Resistant
Shaft Board Ͱ Onsite training for applicators
Acoustical Ͱ Tested and certified by leading 3rd party
Ͱ Plasters laboratories
French molding plaster Ͱ 10 years system warranty
Standard plaster Ͱ Own plasterboard recycling facility giving
French adhesive
additional LEED rating for projects
Ͱ Renders
Thin Coat Render
Hand applied gypsum Render
Machine Render
Ͱ Jointing Compound
Ready mixed multiuse Jointing Compound

Ͱ PVC facing Gypsum Ceiling Tiles

Ͱ PROCEM

MADA PLUS SYSTEMS


MADE IN KSA
MADA PLUS SYSTEMS
BENEFITS

Guaranteed System Performance


Ͱ Mada Plus systems are tested at intentionally reputed
3rd party laboratories for Fire & Acoustics performance
thus offering proven performance to the customer. MGC
offers 10 years warranty for all its products and system
performance.

Wide Area of Application


Ͱ Mada Plus systems cover wide area of application
including hotels, educational & commercial facilities,
recreational centers among others thus offering
something for all needs.

Customized Systems
Ͱ In addition to standard applications, Mada’s strong
Single source of supply
specification engineering team can work with the Ͱ Mada Plus Systems helps drywall contractors
designers and architects of specific projects to offer source their complete requirement from a single
systems suiting specific needs of a particular projects. source, thereby considerably reducing the
complexity involved in projects. In addition, Mada
ensures that different components that goes in
the systems are compatible to each other, thereby
On Site Technical Support ensuring performance, integrity, and longevity of
Ͱ For selected locations Mada can provide onsite technical the system.
support to teach the applicators for correct application of
dry wall partition to achieve system performance. Technical literature
Ͱ Mada Plus Systems are supported by several
technical literatures (system book, system
Recycling Facility selector, installation manuals etc.) to help the
project identify the right system as well as correct
Ͱ Mada Gypsum Company has its own recycling facility method of application. In addition, a wide range
for Plasterboard, thus offering projects additional of typical drawings are made available to easily
opportunity to gain LEED points. integrate Mada Plus Systems within the overall
project masterplan.

MADA PLUS SYSTEMS


MADE IN KSA
MADA PLUS SYSTEMS
Mada Plus drywall systems are non-load bearing, light in weight and easy to install. Comprising of
plasterboards/cement boards screw-fixed on either side of light gauge metal structures (Tracks and
Studs), sealed with joint tapes and other insulators and filled to get even smooth and homogenous
surface.

Mada Plus drywall systems are offered as both standard off the shelf requirements, and tailor made
according to the specifications of the project.

 Performance Aspects to consider while choosing a system


 Wall Dimensions (HxWxL)
 Fire resistance
 Acoustical resistance
 Impact resistance
 Mold resistance

 Performance

Fire protection – up to 3 hrs

Sound Insulation – up to 65 dB

Impact Rating

Advantages of a closed system against open systems


Acquiring all segments of a complete system from a single source (Closed Systems) guarantees the
effectiveness of the system, and ensures the performance of the dry-walls as per the required standards
since it was pre-tested by international laboratories around the world.

What does the Mada system include?


Framing Wall Profiles Ceiling Profiles Shaft wall profiles

Boards Plasterboards Cement Boards

Accessories Screws Anchors Sealant Insulation, etc.

Finishing Renders Plasters Joint Tape Jointing Compound

Our products are tested/certified by world renowned testing agencies

MADA PLUS SYSTEMS


MADE IN KSA
PERFORMANCE CONSIDERATIONS:
1. Fire
The consequences of a fire occurring in a building can lead to serious loss of life and property. It is
therefore essential that adequate consideration is given to fire safety requirements and the provision
of fire protection measures. In order to safeguard life and property, it is important that the correct level
of fire resistance is incorporated in the overall design of buildings. Individual elements of construction
should be specified so as to minimize contribution to fire growth. Spread of fire within a building occurs
as a result of fire exploiting any existing weaknesses or by burning through or conducting heat through
the construction. Fire, smoke and hot gases can also spread throughout a building by various routes
such as stairways, lifts, escalators, corridors, installation shafts, ducts and other cavities. The choice of
building materials and how they are used to provide the required level of passive fire control depends
on two factors - their “reaction to fire” and their “fire resistance”.

1.1 Reaction to fire


Reaction to fire of a given material is an attribute expressing the behavior when the material is
exposed to fire. Reaction to fire is important in determining whether a fire is likely to start and/
or how it will develop. This encompasses series of properties: ease of ignition, spread of flame,
evolution of smoke and toxic gases, and heat release rate of the burning material.

1.2 Fire resistance


The Fire resistance relates to integrity and heat insulation of individual building elements. For load
bearing elements there is the additional requirement of load bearing capacity. In essence, the aim
is to restrict the passage of fire from one space to another and prevent collapse. It is important
that only those elements proved by fire testing to meet the specified level of fire protection are
used for the purpose. It is particularly important that any construction used to protect escape and
fire access routes has the necessary fire resistance

2. Acoustic
Acoustic insulation is the term describing the reduction of sound that passes between two spaces
separated by a dividing element. In transmitting between two spaces, the sound energy may pass
through the dividing element (direct transmission) and through the surrounding structures (indirect or
flanking transmission). In designing for Acoustic insulation, it is important to consider both methods
of transmission. The walls or floors, which flank the dividing element, constitute the main paths for
flanking transmission, but this can also occur at windows, heating or ventilation ducts, doorways, etc.

For these reasons it is unlikely that figures quoted from laboratory test conditions will be achieved in
practice on site.

The Building regulation requirements regarding the sound insulation of walls and partitions relate to
the transmission of airborne sounds. These include speech, musical instruments, loudspeakers and
other sounds that originate in and are transmitted through the air.

MADA PLUS SYSTEMS


MADE IN KSA
2. COMPONENTS FOR BOARD SYSTEMS

Mada Plasterboards
Mada Plus Plasterboards are produced from high purity natural gypsum core with some
additives encased in closely adhering best selected paper linings of different types. Mada
Plasterboards are complying with ASTM C1396 & EN 520 standard.

Mada Plus Regular


Laminated with ivory paper lining on board face & grey paper on the back. Ideally
used in standard systems in regular conditions.

Mada Plus Fire Resistant


Laminated with pink paper on board face & grey paper on the back. It is specially
designed to be used for systems with high requirements for fire resistance.

Mada Plus Moisture Resistant


Laminated with green paper on face & grey paper on the back. It is specially
designed to perform in the interiors with high humidity.

Mada Plus Fire & Moisture Resistant


Laminated with green paper on face & grey paper on the back. It is high
performance plasterboard designed to perform in the interiors with high humidity
and high requirements for fire resistance.

Mada Shaft board


Laminated with green paper on board face & grey paper on the back. It is a special
high performance Plasterboard with superior fire resistance properties for the
use in shaft wall systems.

MADA PLUS SYSTEMS


MADE IN KSA
Mada Impact Resistant
Laminated with yellow paper lining on board face & grey paper on the back. It
is high performance special plasterboard designed for systems for high impact
resistance.

Mada Acoustic Board


Laminated with blue paper lining on board face & grey paper on the back. It is
special Plasterboard formulated to achieve high performance in sound insulation
systems.

Mada PROCEM cement board


Mada PROCEM is a light weight cement board composed of Portland cement, light
aggregate material and silica sand. The board acquires the physical properties,
durability and strength of cement and easy workability. It is 15% lighter than other
type of cement board.

Mada Metal Profile for Drywall & Ceiling Framing


Mada Metal Profile is produced from cold rolled steel coils. The steel coils are hot dip galvanized
using coating of Z 180 to Z 275 depending upon application. Mada Metal Profile is complying to
ASTM C 645.

Mada Wall Stud


Mada Wall Stud is used as the vertical member of the partition system with a
friction fit between the bottom and top tracks. Mada’s Wall Stud features knurled
faces and reinforcing ribs along the stud design. The ribs provide added strength,
are less prone to twist and creating «high-shoulders» when finishing Plasterboard.

Mada Wall Track


Mada Wall Track is used at the floor and soffit to support the wall studs. Mada’s
Wall Track features knurled faces which is the pattern of small ridges formed on
the Wall Track to prevent screws from slipping and damaging the board, without
compromising the strength or thickness of the steel

MADA PLUS SYSTEMS


MADE IN KSA
Mada Deep Flange Wall Track / Deflection Head Track
Mada Deflection head Track are used at the soffit to support the wall studs. Mada’s
Deflection track features knurled faces which is the pattern of small ridges formed
on the Wall Track to prevent screws from slipping and damaging the board, without
compromising the strength or thickness of the steel

Mada Fixing Channel


Mada Fixing Channel is primarily used to cover up the horizontal cut joints of
Plasterboards. It is also used for brazing twin frame wall system. In addition it is
also used to support medium to heavy weight fixtures.

Mada Shaft Wall Stud CH


Mada CH Stud is used to form the vertical elements of a shaft wall structure braced
into horizontal head and bottom J-Tracks. The CH Studs are designed to provide
friction-fit contact for 25 mm Shaft Board as shaft liner.

Mada Shaft Wall Stud E


Mada E Stud is used for starter stud, intersection, door opening and end studs. A 25
mm gap between the flanges allows friction-fit contact for the 25 mm Shaft Board
as shaft liner.

Mada Shaft Wall Track J

Mada J Track is forming the Horizontal element of a shaft wall structure into which
the vertical CH-Studs and E-Studs are fixed.

MADA PLUS SYSTEMS


MADE IN KSA
Mada Deep Flange Shaft Wall Track J / J Deflection Head Track

Mada J Deflection Track is forming the Horizontal element of a shaft wall structure into
which the vertical CH-Studs and E-Studs are fixed. It provides a friction fit for the stud
and also provide a slip joint to allow any movement of the structure. It is positioned
at the top to guide CH-Studs.

Mada Main Channel

Mada Main Channel forms the primary frame of the drywall ceiling framework. It is
suspended from the ceiling roof using hooked wire, adjustment clip or rigid hangers.

Mada Furring Channel

Mada Furring channel is designed for furr-out any surface for application of final
finish. It forms the secondary frame of the drywall ceiling framework.

Mada Wall Angle

Mada Wall angle forms the periphery of the drywall ceiling framework. It is fixed to
the wall with the help of anchors & serves as support for intermediate channels.

MADA PLUS SYSTEMS


MADE IN KSA
Mada Drywall Screws
Mada provides a complete range of drywall screws for the fixing of the Plasterboard with the metal
framing. Mada Screws are produced from hardened steel complying with ASTM C 1002-98.

Mada Self Tapping Screw

Mada Self Tapping bugle head screws have the ability to advance while creating its
own thread. It is used for fastening drywall and other accessories mounting on steel
structures below 0.8mm thickness.

Mada Self Drilling Screw

Mada Self Drilling bugle head screws also known as Tek screws; eradicate the need
for a pre-drilled hole and allow drilling and tie to be done in the same motion. It is
used for fastening drywall and other accessories mounting on steel structures from
0.8mm up to 3.0mm thick

Mada PROCEM Self Drilling Screw

Mada PROCEM Self Drilling screws are special corrosion protected screws with
countersunk head and ribs under head for fixing of Mada PROCEM cement boards to
the metal framing.

Mada Wafer Head Screw

Mada Wafer Head Screws are used for fixing together metal framing members

Mada Hex Head Self Drill Screw

Mada Hex Head Self Drill Screws are used to fasten metal to metal or metal to other
accessories from 0.8mm to 3.0mm thickness. It has excellent tensile strength,

MADA PLUS SYSTEMS


MADE IN KSA
Anchors
Mada provides a complete range of drywall anchors for the fixing of metal framing to
floors and slabs.

Wedge Anchors

Wedge anchors are made from galvanized steel and have multiple uses in non
structural cracked and uncracked concrete. They are specially used for fixing hangers,
brackets, and all kinds of drywall profiles to concrete slab where high work load,
safety and rigidity of the installation is required.

Drop in Anchor

The DynaSet™ Drop-In Anchor is an all steel, medium duty, displacement setting,
expansion anchor designed to provide a permanent anchorage point in concrete.
Its internal thread allows it to be used with both machine bolts and threaded rod,
placing no restrictions on fixture thickness.

Trubolt Anchor

Trubolt Stud Anchor is a true-to-size, heavy duty, torque controlled expansion anchor,
for permanent anchoring into concrete.

Hollow Wall Anchor

Hollow Wall Anchor is a zinc plated metal fixing with metric screw for fixing directly
into the board lining of the wall and / or ceiling. The screw can be removed and
refitted again.

MADA PLUS SYSTEMS


MADE IN KSA
Mada Fire Guard Sealant

Mada Fire Guard sealant is developed for use as a joint seal in drywall systems and
through penetration fire stop systems. As an acrylic based caulk with a tenacious
bond regardless of porosity, it is easy to use on virtually any job. Mada Fire Guard
Sealant has a long shelf life and good open time. It is Water & chemical resistant
(Mild Chemical) can be painted and also contains anti-microbial protection to inhibit
the growth of sustain caused by mold & mildew It can be applied with all commonly
available hand-gun equipment.

Mada Jointing Compound

Mada Jointing Compound contains vinyl binders and other ingredients that provide
performance superior to that of ordinary ready mix products, blended to creamy
smooth consistency. It gives excellent slip and bond and ease workability. It can be
used directly from the pail and require minimal mixing thinning and re-tempering.

Mada PROCEM Cement Jointing Compound

Mada PROCEM Cement Jointing Compound is a 2 component high adhesion, high


flexibility Jointing material of which part A is a powder based on special cement &
part B is a liquid based on acrylic polymer, fiber and special additives. It is used for
jointing and finishing of Mada PROCEM cement board.

Mada French Adhesive

Mada French Adhesive is a special gypsum product for interiors and exteriors. It is
used for adhering of decorations and cornices to the wall and for special cladded
walls where Plasterboard is directly glued to the walls.

MADA PLUS SYSTEMS


MADE IN KSA
Mada L Bracket

Mada L Bracket is used at the floor and soffit to support the wall studs. Its simple
shape of L which is rigid enough to resist moments & shear to an extent.
One arm of L is fixed to a vertical ( wall stud) and other projecting horizontally
fixed to the support of wall ceiling or slab
These brackets are helpful in application of framing for bulkheads & ceilings
having large suspension drop, wall linings, etc.

Mada Slotted L Bracket

Slotted l Brackets are designed typically for both Internal & External applications
to resist high moment & shear due to excessive loading (Live load, Seismic
&Wind)
The vertical slots on the bracket allows to take deflection for slab.

External Corner Beads

Mada external corner beads are used to straight, durable, corrosion and impact
resistant protection to the edges and corners of dray-wall systems. It is concealed
with Mada multi-purpose joint compound to deliver a smooth finished corner.

Casing Bead

Mada Casing Bead are squared corner beads that fit firmly over the edge of the
plasterboard for protection against impact. A range of casing beads are available to
fit different plasterboard thicknesses.

Shadow Gap Angle Bead

Mada shadow gap angle bead provides straight and neat finishing details for
internal corners of the dray wall system.

Control / Expansion Joint Bead

Mada control / expansion joint bead is used for areas where there is a long
continuous wall ( > 8 m ). It is used to prevent the cracks which can occur through the
expansion and contraction of material due the variation in temperature, moisture
etc.

MADA PLUS SYSTEMS


MADE IN KSA
TRADE LICENSE
‫‪1110898078‬‬

‫ﺭﻗﻢ ﺍﻟﺸﻬﺎﺩﺓ ‪١١١٠٨٩٨٠٧٨ :‬‬


‫ﺍﻟﺘﺎﺭﻳﺦ ‪ ١٤٤١/٠٨/٠٤ :‬ﻫـ‬
‫ﺍﻟﺮﻗﻢ ﺍﻟﻤﻤﻴﺰ‪٣٠٠٨٩٨٤٩٨٤ :‬‬

‫ﺷﻬﺎﺩﺓ‬
‫‪CERTIFICATE‬‬

‫ﺗﺸﻬﺪ ﺍﻟﻬﻴﺌﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺰﻛﺎﺓ ﻭﺍﻟﺪﺧﻞ ﺑﺄﻥ ﺍﻟﻤﻜﻠﻒ ‪ /‬ﺷﺮﻛﺔ ﻣﺪﻯ ﻟﻠﺠﺒﺲ ﺍﻟﻤﺤﺪﻭﺩﺓ‬

‫ﺷﺮﻛﺔ ﺭﻗﻢ ‪ ٧٠٠١٦٧٧٧٩٣‬ﻭﺳﺠﻞ ﺗﺠﺎﺭﻱ ﺭﻗﻢ ‪٤٧٠٠٠٠٩٥١٥‬‬

‫ﻗﺪﻡ ﺇﻗﺮﺍﺭﻩ ﻋﻦ ﺍﻟﻔﺘﺮﺓ ﺍﻟﻤﻨﺘﻬﻴﻪ ﻓﻲ ‪٢٠١٩/١٢/٣١‬ﻡ‬

‫ﻭﻗﺪ ﻣﻨﺢ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﻩ ﻟﺘﻤﻜﻴﻨﻪ ﻣﻦ ﺇﻧﻬﺎﺀ ﺟﻤﻴﻊ ﻣﻌﺎﻣﻼﺗﻪ ﺑﻤﺎ ﻓﻲ ﺫﻟﻚ ﺻﺮﻑ ﻣﺴﺘﺤﻘﺎﺗﻪ‬

‫ﺍﻟﻨﻬﺎﺋﻴﺔ ﻋﻦ ﺍﻟﻌﻘﻮﺩ‪.‬‬

‫ﻳﺴﺮﻱ ﻣﻔﻌﻮﻝ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﺣﺘﻰ ﺗﺎﺭﻳﺦ ‪ ١٤٤٢/٠٩/١٨‬ﻫـ ﺍﻟﻤﻮﺍﻓﻖ ‪ ٢٠٢١/٠٤/٣٠‬ﻡ‪.‬‬

‫)ﺍﻟﺜﺎﻣﻦ ﻋﺸﺮ ﻣﻦ ﺭﻣﻀﺎﻥ ﺃﻟﻒ ﻭ ﺃﺭﺑﻌﻤﺎﺋﺔ ﻭ ﺍﺛﻨﺎﻥ ﻭ ﺃﺭﺑﻌﻮﻥ ﻫﺠﺮﻱ(‬

‫ﺍﻟﻔﺮﻭﻉ ) ‪ ( ١‬ﻓﻲ ﺍﻟﻨﻤﻮﺫﺝ ﺍﻟﻤﺮﻓﻖ‬


‫‪1110898078‬‬

‫ﺭﻗﻢ ﺍﻟﺸﻬﺎﺩﺓ ‪١١١٠٨٩٨٠٧٨ :‬‬


‫ﺍﻟﺘﺎﺭﻳﺦ ‪ ١٤٤١/٠٨/٠٤ :‬ﻫـ‬
‫ﺍﻟﺮﻗﻢ ﺍﻟﻤﻤﻴﺰ‪٣٠٠٨٩٨٤٩٨٤ :‬‬

‫ﻗﺎﺋﻤﺔ ﻓﺮﻭﻉ ﺍﻟﻤﻜﻠﻒ ﺷﺮﻛﺔ ﻣﺪﻯ ﻟﻠﺠﺒﺲ ﺍﻟﻤﺤﺪﻭﺩﺓ‬

‫ﺍﻟﻤﺪﻳﻨﺔ‬ ‫ﺇﺳﻢ ﺍﻟﻔﺮﻉ‬ ‫ﺍﻟﺮﺧﺼﺔ‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ‬

‫ﻳﻨﺒﻊ‬ ‫ﻣﺼﻨﻊ ﻓﺮﻉ ﺷﺮﻛﺔ ﻣﺪﻯ ﻟﻠﺠﺒﺲ‬ ‫‪٧١٦٧‬‬


‫ﺗﺎﺭﻳﺦ ﺍﻹﺻﺪﺍﺭ ‪١٤٤١/١٠/١١ :‬‬

‫ﺗﺎﺭﻳﺦ ﺻﻼﺣﻴﺔ ﺍﻟﺸﻬﺎﺩﺓ ‪١٤٤٢/٠١/١٥ :‬‬

‫ﺭﻗﻢ ﺍﻟﺸﻬﺎﺩﺓ ‪٢٠٠٠٢٠٠٦٠٠٣٤٤١ :‬‬

‫ﺍﺳﻢ ﺍﻟﻤﻨﺸﺄﺓ‪ :‬ﺷﺮﻛﺔ ﻣﺪﻯ ﻟﻠﺠﺒﺲ ﺍﻟﻤﺤﺪﻭﺩﻩ‬

‫ﺭﻗﻢ ﺍﻟﻤﻠﻒ‪٣٠١٨٩-١٤ :‬‬

‫ﺳﺠﻞ ﺗﺠﺎﺭﻱ‪٤٧٠٠٠٠٩٥١٥ :‬‬

‫ﺍﻟﺼﺎﺩﺭ ﻣﻦ‪ :‬ﻳﻨﺒﻊ‬

‫ﺗﺸﻬﺪ ﻭﺯﺍﺭﺓ ﺍﻟﻌﻤﻞ ﻭﺍﻟﺘﻨﻤﯿﺔ ﺍﻻﺟﺘﻤﺎﻋﯿﺔ ﺑﺄﻥ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﻤﺬﮐﻮﺭﺓ ﺃﻋﻼﻩ ﺣﻘﻘﺖ ﻧﺴﺐ ﺍﻟﺘﻮﻃﯿﻦ ﺍﻟﻤﻄﻠﻮﺑﺔ ﻣﻨﻬﺎ‪..‬‬
‫ﻭﺗﻢ ﻣﻨﺤﻬﺎ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﺣﺴﺐ ﻃﻠﺒﻬﺎ‬

‫)ﺍﻟﺸﻬﺎﺩﺓ ﻣﻌﺘﻤﺪﺓ ﻣﻦ ﺻﺎﺣﺐ ﺍﻟﺼﻼﺣﻴﺔ ﻭﻻ ﺗﺤﺘﺎﺝ ﺇﻟﻰ ﺗﻮﻗﻴﻊ ﺃﻭ ﺧﺘﻢ(‬

‫ﺗﻨﺒﻴﻬﺎﺕ‪:‬‬

‫‪ - ١‬ﻳﻤﻜﻦ ﺍﻟﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﻭﺻﻼﺣﻴﺔ ﺍﻟﺸﻬﺎﺩﺓ ﻋﺒﺮ ﺯﻳﺎﺭﺓ ﺍﻟﺮﺍﺑﻂ‪http://mol.gov.sa/CERT:‬‬

‫‪ - ٢‬ﻓﻲ ﺣﺎﻝ ﺍﻛﺘﺸﺎﻑ ﺃﻱ ﻋﻤﻠﻴﺔ ﺗﺰﻭﻳﺮ ﻓﻲ ﺍﻟﺸﻬﺎﺩﺓ ﺍﻟﻤﻘﺪﻣﺔ ﻧﺮﺟﻮ ﺍﻟﺘﺒﻠﻴﻎ ﻋﻦ ﺫﻟﻚ ﺑﺨﻄﺎﺏ ﺭﺳﻤﻲ ﻷﻗﺮﺏ ﻣﻜﺘﺐ ﻋﻤﻞ‪.‬‬
‫‪١٤٤١/٠٦/١٦‬‬ ‫ﺍﻟﺘﺎﺭﻳﺦ‬
‫‪٢٠٢٠/٠٢/١٠‬‬ ‫ﺍﻟﻤﻮﺍﻓﻖ‬
‫ﺭﻣﺰ ﺍﻟﺸﻬﺎﺩﺓ ‪٣٢٠٤٢٢٨٤‬‬

‫ﺷﻬﺎﺩﺓ‬

‫ﺷﺮﻛﺔ ﻣﺪﻯ ﻟﻠﺠﺒﺲ ﺍﻟﻤﺤﺪﻭﺩﺓ‬


‫ﺇﺳﻢ ﺍﻟﻤﻨﺸﺄﺓ ‪:‬‬
‫ﺹ‪.‬ﺏ ‪ ٣١٥٤٢ :‬ﻳﻨﺒﻊ ﺍﻟﺼﻨﺎﻋﻴﺔ ‪٤١٩١٢‬‬
‫ﺍﻟﺴﻌﻮﺩﻳﺔ‬
‫‪٥٠١٢٦١١٥٧‬‬ ‫ﺭﻗﻢ ﺍﻹﺷﺘﺮﺍﻙ ‪:‬‬
‫ﻣﺼﺪﺭﻩ ‪ :‬ﻳﻨﺒﻊ‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ‪٤٧٠٠٠٠٩٥١٥ :‬‬

‫ﻛﺘﺎﺑﺔ‬ ‫ﺭﻗﻤﺎ‬
‫ﺍﺛﻨﺎﻥ ﻭ ﺍﺭﺑﻌﻮﻥ ﻣﺸﺘﺮﻛﺎ‬ ‫‪٤٢‬‬ ‫ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ‬
‫ﻣـﺎﺋﺔ ﻭ ﺛﻼﺛﺔ ﻭ ﺧﻤﺴﻮﻥ ﻣﺸﺘﺮﻛﺎ‬ ‫‪١٥٣‬‬ ‫ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﻏﻴﺮ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ‬
‫ﻣـﺎﺋﺔ ﻭ ﺧﻤﺴﺔ ﻭ ﺗﺴﻌﻮﻥ ﻣﺸﺘﺮﻛﺎ‬ ‫‪١٩٥‬‬ ‫ﺍﻟﻤﺠﻤﻮﻉ‬

‫ﺗﺸﻬﺪ ﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ ﺑﺄﻥ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺃﻋﻼﻩ ﻗﺪ ﺃﻭﻓﺖ ﺑﺈﻟﺘﺰﺍﻣﺎﺗﻬﺎ ﺗﺠﺎﻩ ﺍﻟﻤﺆﺳﺴﺔ‬
‫ﻭﻓﻖ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻤﻘﺪﻣﺔ ﻣﻨﻬﺎ ﺣﺘﻰ ﺗﺎﺭﻳﺦ ﺇﺻﺪﺍﺭ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ‪ ،‬ﻭﺍﻟﺘﻲ ﺗﻢ ﻣﻨﺤﻬﺎ ﻟﺘﻘﺪﻳﻤﻬﺎ ﻷﻳﺔ ﺟﻬﺔ ﺗﻄﻠﺒﻬﺎ ‪ ،‬ﻭﻫﻲ‬
‫ﺻﺎﻟﺤﺔ ﻟﺠﻤﻴﻊ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ ﻧﺺ ﻋﻠﻴﻬﺎ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ ﻓﻲ ﺍﻟﻤﺎﺩﺓ )‪ (٦/١٩‬ﻣﻨﻪ‪.‬‬
‫ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﺳﺎﺭﻳﺔ ﺍﻟﻤﻔﻌﻮﻝ ﺣﺘﻰ ‪ ١٤٤١/٠٧/١٦‬ﻫـ‪.‬‬
‫ﻋﻦ ﻃﺮﻳﻖ ﺍﺳﺘﺨﺪﺍﻡ‬ ‫ﺃﻭ‬ ‫ﻳﻠﺰﻡ ﺍﻟﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﻭﺻﻼﺣﻴﺔ ﺍﻟﺸﻬﺎﺩﺓ ﻋﺒﺮ ﺯﻳﺎﺭﺓ ﺍﻟﺮﺍﺑﻂ‬
‫ﺍﻟﺮﻣﺰ ﺍﻟﻤﻌﺮﻑ ﺍﻟﺘﺎﻟﻲ ‪:‬‬ ‫ﺃﺩﻧﺎﻩ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ ﻟﻠﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ‬

‫‪www.gosi.gov.sa/vc‬‬

‫) ﺍﻟﺸﻬﺎﺩﺓ ﻣﻌﺘﻤﺪﺓ ﻣﻦ ﺻﺎﺣﺐ ﺍﻟﺼﻼﺣﻴﺔ ﻭﻻ ﺗﺤﺘﺎﺝ ﺇﻟﻰ ﺗﻮﻗﻴﻊ ﺃﻭ ﺧﺘﻢ (‬

‫ﺗﻌﺪ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﻣﻦ ﺍﻟﻮﺛﺎﺋﻖ ﺍﻻﻟﻜﺘﺮﻭﻧﻴﺔ ﺍﻟﺤﻜﻮﻣﻴﺔ ﺍﻟﺮﺳﻤﻴﺔ ‪ ،‬ﻭﻳﺤﻈﺮ ﻗﻄﻌﻴﺎ ﺗﻘﻠﻴﺪﻫﺎ ﺃﻭ ﺇﺩﺧﺎﻝ ﺃﻱ ﺗﻌﺪﻳﻼﺕ ﻋﻠﻴﻬﺎ ﺳﻮﺍﺀ ﺑﺎﻹﺿﺎﻓﺔ ﺃﻭ ﺍﻟﺤﺬﻑ‬
‫ﺃﻭ ﺍﻟﺘﻐﻴﻴﺮ ﻓﻲ ﺑﻴﺎﻧﺎﺗﻬﺎ ﺃﻭ ﻏﻴﺮ ﺫﻟﻚ ﻣﻦ ﺍﻧﻮﺍﻉ ﺍﻟﺘﻌﺪﻳﻞ ‪ ،‬ﻭﺗﻌﺪ ﺍﻟﺸﻬﺎﺩﺓ ﻻﻏﻴﺔ ﺇﺫﺍ ﺷﺎﺑﻬﺎ ﺷﻲﺀ ﻣﻦ ﺫﻟﻚ ‪ ،‬ﻛﻤﺎ ﺗﻌﺮﺽ ﺻﺎﺣﺒﻬﺎ ﻟﻠﻤﻼﺣﻘﺔ ﺍﻟﻨﻈﺎﻣﻴﺔ‬
‫ﺃﻣﺎﻡ ﺍﻟﺠﻬﺎﺕ ﺍﻟﻤﺨﺘﺼﺔ ﺑﺎﻹﺿﺎﻓﺔ ﺇﻟﻰ ﻣﺎﻳﻔﺮﺿﻪ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻣﻦ ﻋﻘﻮﺑﺎﺕ ‪ ،‬ﻭﻻﻳﺠﻮﺯ ﺗﺪﺍﻭﻝ ﺍﻟﺸﻬﺎﺩﺓ ﺇﻻ ﻓﻲ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ‬
‫ﺃﺻﺪﺭﺕ ﻷﺟﻠﻬﺎ ﻭﻓﻘﺎ ﻷﺣﻜﺎﻡ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ‪ ،‬ﻭﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻏﻴﺮ ﻣﺴﺆﻭﻟﻪ ﻋﻦ ﺃﻱ ﺁﺛﺎﺭ ﺃﺧﺮﻯ ﻣﺘﺮﺗﺒﺔ‬
‫ﻗﺒﻞ ﺍﻟﻐﻴﺮ ﻋﻦ ﺍﻟﺸﻬﺎﺩﺓ ﻭﻏﻴﺮ ﻣﺴﺆﻭﻟﺔ ﻋﻦ ﺃﻱ ﻋﻤﻠﻴﺔ ﺗﺰﻭﻳﺮ ﺃﻭ ﺗﻌﺪﻳﻞ ﺗﺘﻢ ﻋﻠﻰ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻮﺍﺭﺩﺓ ﻓﻴﻬﺎ ‪.‬‬
‫‪100171000053598‬‬

‫ﺗﺎرﻳﺦ اﻟﱰﺧﻴﺺ ‪ ١٤٣٨/١٢/٠٣ :‬ﻫـ‬


‫اﻟﺮﻗﻢ اﳌﻤﻴﺰ ‪٣٠٠٨٩٨٤٩٨٤ :‬‬

‫ﺷﻬﺎدة ﺗﺴﺠﻴﻞ ﰲ ﴐﻳﺒﺔ اﻟﻘﻴﻤﺔ اﳌﻀﺎﻓﺔ‬


‫‪VAT registration certificate‬‬

‫ﺗﺸﻬﺪ اﻟﻬﻴﺌﺔ اﻟﻌﺎﻣﺔ ﻟﻠﺰﻛﺎة واﻟﺪﺧﻞ ﺑﺄن اﳌﻜﻠﻒ ‪ :‬ﴍﻛﺔ ﻣﺪى ﻟﻠﺠﺒﺲ اﳌﺤﺪودة‬
‫ﻣﺴﺠﻞ ﰲ ﴐﻳﺒﺔ اﻟﻘﻴﻤﺔ اﳌﻀﺎﻓﺔ ﺑﺘﺎرﻳﺦ ‪ ١٤٣٨/١٢/٠٣ :‬ﻫـ ‪ ،‬وﺗﺤﻤﻞ اﻟﺮﻗﻢ اﻟﴬﻳﺒﻲ ‪٣٠٠٨٩٨٤٩٨٤٠٠٠٠٣ :‬‬

‫ﻋﻨﻮان اﳌﺮﻛﺰ اﻟﺮﺋﻴﴘ ‪:‬‬


‫اﳌﺪﻳﻨﺔ ‪ :‬ﻳﻨﺒﻊ اﻟﺤﻲ ‪ :‬ﻣﻨﻄﻘﺔ اﻟﺼﻨﺎﻋﺎت اﻟﺨﻔﻴﻔﺔ‬
‫ﺻﻨﺪوق اﻟﱪﻳﺪ ‪ :‬اﻟﺮﻣﺰ اﻟﱪﻳﺪي ‪٤١٩١٢ :‬‬
‫اﻟﻬﺎﺗﻒ ‪٠٠٩٦٦٥٣٧٣٦٦٣٦٥ :‬‬

‫اﻟﻬﻴﺌﺔ اﻟﻌﺎﻣﺔ ﻟﻠﺰﻛﺎة واﻟﺪﺧﻞ‬

‫ﻫﺬه اﻟﻮﺛﻴﻘﺔ ﻣﺮﺳﻠﺔ ﻣﻦ اﻟﻨﻈﺎم اﻵﱄ وﻻ ﺗﺤﺘﺎج إﱃ ﺗﻮﻗﻴﻊ‬


‫‪1020382056‬‬
‫رﻗﻢ اﻟﺸﻬﺎدة ‪١٠٢٠٣٨٢٠٥٦ :‬‬
‫‪ ١٤٤٠/٠٨/٢٤ :‬ﻫـ‬ ‫اﻟﺘﺎرﻳﺦ‬
‫اﻟﺮﻗﻢ اﳌﻤﻴﺰ ‪٣٠٠٨٩٨٤٩٨٤ :‬‬ ‫ﻓﺮع اﻟﺮﻳﺎض‬

‫ﺗﺸﻬﺪ اﻟﻬﻴﺌﺔ اﻟﻌﺎﻣﺔ ﻟﻠﺰﻛﺎة واﻟﺪﺧﻞ ﺑﺄن اﳌﻜﻠﻒ ‪ /‬ﴍﻛﺔ ﻣﺪى ﻟﻠﺠﺒﺲ اﳌﺤﺪودة‬
‫ﴍﻛﺔ رﻗﻢ ‪ ٧٠٠١٦٧٧٧٩٣‬وﺳﺠﻞ ﺗﺠﺎري رﻗﻢ ‪٤٧٠٠٠٠٩٥١٥‬‬
‫ﻗﺪم إﻗﺮاره ﻋﻦ اﻟﻔﱰة اﳌﻨﺘﻬﻴﻪ ﰲ ‪ ٢٠١٧/١٢/٣١‬م‬

‫وﻗﺪ ﻣﻨﺢ ﻫﺬه اﻟﺸﻬﺎده ﻟﺘﻤﻜﻴﻨﻪ ﻣﻦ إﻧﻬﺎء ﺟﻤﻴﻊ ﻣﻌﺎﻣﻼﺗﻪ ﻤﺑﺎ ﰲ ذﻟﻚ ﴏف ﻣﺴﺘﺤﻘﺎﺗﻪ اﻟﻨﻬﺎﺋﻴﺔ ﻋﻦ اﻟﻌﻘﻮد‪.‬‬
‫ﻳﴪي ﻣﻔﻌﻮل ﻫﺬه اﻟﺸﻬﺎدة ﺣﺘﻰ ﺗﺎرﻳﺦ ‪ ١٤٤٠/٠٨/٢٥‬ﻩ اﳌﻮاﻓﻖ ‪٢٠١٩/٠٤/٣٠‬م‪.‬‬
‫)اﻟﺨﺎﻣﺲ و اﻟﻌﴩون ﻣﻦ ﺷﻌﺒﺎن أﻟﻒ و أرﺑﻌﺎﻤﺋﺔ و أرﺑﻌﻮن ﻫﺠﺮي(‬

‫اﻟﻔﺮوع ) ‪ ( ١‬ﰲ اﻟﻨﻤﻮذج اﳌﺮﻓﻖ‬

‫اﻟﺨﺘﻢ اﻟﺮﺳﻤﻲ‬

‫ﻫﺬه اﻟﻮﺛﻴﻘﺔ ﻣﺴﺘﺨﺮﺟﺔ ﻣﻦ اﻟﻨﻈﺎم اﻵﱄ وﻻ ﺗﺤﺘﺎج إﱃ ﺗﻮﻗﻴﻊ‬


‫ﻻﻳﻌﺘﺪ ﺑﻬﺬه اﻟﺸﻬﺎدة إﻻ ﺑﻌﺪ اﻟﺘﺤﻘﻖ ﻣﻦ ﻣﻮﻗﻊ اﻟﻬﻴﺌﺔ ‪www.gazt.gov.sa‬‬
‫‪1020382056‬‬
‫رﻗﻢ اﻟﺸﻬﺎدة ‪١٠٢٠٣٨٢٠٥٦ :‬‬
‫‪ ١٤٤٠/٠٨/٢٤ :‬ﻫـ‬ ‫اﻟﺘﺎرﻳﺦ‬
‫اﻟﺮﻗﻢ اﳌﻤﻴﺰ ‪٣٠٠٨٩٨٤٩٨٤ :‬‬ ‫ﻓﺮع اﻟﺮﻳﺎض‬

‫ﺻﻔﺤﺔ رﻗﻢ ‪١ :‬‬


‫ﻗﺎﻤﺋﺔ ﻓﺮوع اﳌﻜﻠﻒ ﴍﻛﺔ ﻣﺪى ﻟﻠﺠﺒﺲ اﳌﺤﺪودة‬
‫وﺳﺠﻞ ﺗﺠﺎري رﻗﻢ ‪٤٧٠٠٠٠٩٥١٥‬‬

‫اﳌﺪﻳﻨﺔ‬ ‫إﺳﻢ اﻟﻔﺮع‬ ‫اﻟﺮﺧﺼﺔ‬ ‫رﻗﻢ اﻟﺴﺠﻞ‬


‫ﻳﻨﺒﻊ‬ ‫ﻣﺼﻨﻊ ﻓﺮع ﴍﻛﺔ ﻣﺪى ﻟﻠﺠﺒﺲ‬ ‫‪٧١٦٧‬‬

‫ﻫﺬه اﻟﻮﺛﻴﻘﺔ ﻣﺴﺘﺨﺮﺟﺔ ﻣﻦ اﻟﻨﻈﺎم اﻵﱄ وﻻ ﺗﺤﺘﺎج إﱃ ﺗﻮﻗﻴﻊ‬


‫ﻻﻳﻌﺘﺪ ﺑﻬﺬه اﻟﺸﻬﺎدة إﻻ ﺑﻌﺪ اﻟﺘﺤﻘﻖ ﻣﻦ ﻣﻮﻗﻊ اﻟﻬﻴﺌﺔ ‪www.gazt.gov.sa‬‬
TECHNICAL DATA SHEET
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS

Project Name
THAKHER CITY - MAKKAH - ARABIAN ROOTS

ASTM EN
STANDARDS STANDARDS TECHNICAL PROPOSAL

Revision: 07
Client: THAKHER
Date: 28TH SEPTEMBER 2017
Area: WESTERN REGION
Project Code: MGC - 3127

Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS MADA PLUS SYSTEM

To Whom It May Concern

The purpose of this document is to provide a technical proposal based on the submitted
technical documents provided by the Concern / Consultant / End user.

Our technical proposal is based on Test Results, Calculations, Test Reports and Certification,
and is representing the most comparable system solutions to your provided technical documentation.

It is the responsibility of the contractor to obtain approval for the submitted proposal from the consultant.

All application quantities and delivery amounts are based on empirical data that is not easily
transferable to other deviating areas.

The quantities are calculated per m2 drywall partition/ceiling without addition for loss and waste.

The Performance of Mada Technical Systems and Products can solely be ensured with the
exclusive use of Mada system components or other products expressly recommended by Mada.

This technical proposal is based on the information contained in BOQ, Drawing & Specification.

For further Technical information or clarification regarding Technical proposal please contact:

Mada Technical & Specification Team


technical@madagypsum.com
Ph: +966 14 3256338, Ext: 1329 - For KSA
Ph: +971 4 3380818 - For UAE

Mada Gypsum Company


P.O.Box 31642
Yanbu 51000
Tel: +966 14 325 3253
Fax: +966 14 325 0420
Kingdom of Saudi Arabia

Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS 15.1 - AR - DWP – GB - GB - 100 - 1H FIRE RATED

System Construction
Material Description Units Side A Side B
Plasterboard Type 15 mm Mada Plus Fire Resistant Plasterboard Mada Plus Fire Resistant Plasterboard
Plasterboard Layers 1 1
Metal Framing : C - Stud 0.60 mm Size 68 mm Spacing 600 mm Height Ref. Table
Metal Framing : DHT - Track 0.60 mm Size 70 mm x 50mm flanges - Top
Metal Framing : U - Track 0.60 mm Size 70 mm x 32mm flanges - Bottom
Metal Framing : Noggins 0.60 mm Noggins made from Mada U-Track 70 mm x 32mm flanges - Board cut joints
Top Anchor M6 x 55mm Trubolt Anchor @600 centres
Bottom Anchor M6 x 55mm Trubolt Anchor @600 centres
M3.5 x 35mm Self Tapping Screw
Drywall Screws
M4.2 x 13mm Wafer Head Screw - Bottom Track to Stud
Approved Insulation Glasswool Insulation 16kg/m3
Finishing Mada Jointing Tape & Multi Purpose Jointing Compound
Sealant Mada Fire Guard Acrylic Sealant

SECTIONAL ELEVATION PLAN VIEW ISOMETRIC VIEW


Mada Top Anchor @ Mada Plus Plasterboard
Soffit of slab 600mm Centres Mada Drywall Screw Mada Wall Track - Bottom
Clearance to Mada Wall
Stud
Mada Wafer Head Screw

Mada Wall Track, DHT - Top

THICKNESS
Wall Height – Refer System Performance Table

WALL
Mada Plus Plasterboard as
specified

Mada Bottom Anchor@ Mada Wall Stud


Mada Wall Stud @ 600 mm
600mm Centres @ 600mm
System Performance Criteria
Project
Description Standards Mada’s Rating
Requirement
Noggins made from Mada
U-Track@ Horizontal cut Fire Rating E 119 1 Hour 1 Hour
joints
Acoustic Rating (STC) E 90 45 45

Mada Fire Wall thickness (mm) 100 100


Guard Internal Wind Pressure 0.24 kPa 0.24 kPa
Acrylic Mada Wall Track Deflection Limit (under serviceability
Sealant L/240 L/240
condition)
SIDE A SIDE B
Wall Height (mm) - 3500

Mada Bottom Anchor@


Floor Slab 600mm Centres
Additional Note & Comments
• Horizontal board cut joints to be backed up by fixing channel to achieve the fire rating
• Horizontal and vertical board joints are staggered from side to side and layer to layer to achieve the fire rating.
• Filling the void with Acoustic Insulation will enhance acoustic properties and also sealing the perimeter with Sealant will provide
necessary air tightness in case of fire.
• Head fixing details are designed assuming concrete slab & Refer Mada standard head detail drawings for varying deflection head
details
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS 16.1 - AR - DWP – GB - GB - 150 1H FIRE RATED

System Construction
Material Description Units Side A Side B
Plasterboard Type 15 mm Mada Plus Fire Resistant Plasterboard Mada Plus Fire Resistant Plasterboard
Plasterboard Layers 1 1
Metal Framing : C - Stud 0.60 mm Size 123 mm Spacing 600 mm Height Ref. Table
Metal Framing : DHT - Track 0.60 mm Size 125 mm x 50mm flanges - Top
Metal Framing : U - Track 0.60 mm Size 125 mm x 32mm flanges - Bottom
Metal Framing : U - Track 0.60 mm Noggins made from Mada U-Track 125 mm x 32mm flanges - Board Cut Joints
Top Anchor M6 x 55mm Trubolt Anchor @600 centres
Bottom Anchor M6 x 55mm Trubolt Anchor @600 centres
M3.5 x 35mm Self Tapping Screw
Drywall Screws
M4.2 x 13mm Wafer Head Screw - Bottom Track to Stud
Finishing Mada Jointing Tape & Multi Purpose Jointing Compound
Sealant Mada Fire Guard Acrylic Sealant

SECTIONAL ELEVATION PLAN VIEW ISOMETRIC VIEW


Mada Top Anchor @ Mada Plus Plasterboard
Soffit of slab 600mm Centres Mada Drywall Screw Mada Wall Track - Bottom
Clearance to Mada Wall
Stud
Mada Wafer Head Screw

Mada Wall Track, DHT - Top

THICKNESS
Wall Height – Refer System Performance Table

Mada Plus Plasterboard as WALL


specified

Mada Bottom Anchor@ Mada Wall Stud


600mm Centres @ 600mm
Mada Wall Stud @ 600 mm
System Performance Criteria
Project
Description Standards Mada’s Rating
Requirement
Noggins made from Mada
U-Track@ Horizontal cut Fire Rating E 119 1 Hour 1 Hour
joints
Acoustic Rating (STC) E 90 - -

Mada Fire Wall thickness (mm) 150 155


Guard Internal Wind Pressure 0.24 kPa 0.24 kPa
Acrylic Mada Wall Track Deflection Limit (under serviceability
Sealant L/240 L/240
condition)
SIDE A SIDE B
Wall Height (mm) - 3500

Mada Bottom Anchor@


Floor Slab 600mm Centres
Additional Note & Comments
• Horizontal board cut joints to be backed up by fixing channel to achieve the fire rating
• Horizontal and vertical board joints are staggered from side to side and layer to layer to achieve the fire rating.
• Filling the void with Acoustic Insulation will enhance acoustic properties and also sealing the perimeter with Sealant will provide
necessary air tightness in case of fire.
• Head fixing details are designed assuming concrete slab & Refer Mada standard head detail drawings for varying deflection head
details
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS 16.2 - AR - DWP – GB - GB - 150 2H FIRE RATED

System Construction
Material Description Units Side A Side B
Plasterboard Type 12.5 mm Mada Plus Fire Resistant Plasterboard Mada Plus Fire Resistant Plasterboard
Plasterboard Layers 2 2
Metal Framing : C - Stud 0.60 mm Size 98 mm Spacing 600 mm Height Ref. Table
Metal Framing : DHT - Track 0.60 mm Size 100 mm x 50mm flanges - Top
Metal Framing : U - Track 0.60 mm Size 100 mm x 32mm flanges - Bottom
Metal Framing : FC 0.60 mm 72mm x 12/12mm flanges @Horizontal board cut joints
Top Anchor M6 x 55mm Trubolt Anchor @600 centres
Bottom Anchor M6 x 55mm Trubolt Anchor @600 centres
M3.5 x 25mm Self Tapping Screw – 1st layer
Drywall Screws M3.5 x 45mm Self Tapping Screw – 2nd layer
M4.2 x 13mm Wafer Head Screw - Bottom Track to Stud
Finishing Mada Jointing Tape & Multi Purpose Jointing Compound
Sealant Mada Fire Guard Acrylic Sealant

SECTIONAL ELEVATION PLAN VIEW ISOMETRIC VIEW


Mada Top Anchor @ Mada Plus Plasterboard
Soffit of slab 600mm Centres Mada Drywall Screw Mada Wall Track - Bottom
Clearance to Mada Wall
Stud
Mada Wafer Head Screw

Mada Wall Track, DHT - Top

THICKNESS
Wall Height – Refer System Performance Table

WALL
Mada Plus Plasterboard as
specified

Mada Bottom Anchor@ Mada Wall Stud


Mada Wall Stud @ 600 mm
600mm Centres @ 600mm
System Performance Criteria
Project
Description Standards Mada’s Rating
Requirement
Mada Fixing channel @
Fire Rating E 119 2 Hour 2 Hour
Horizontal cut joints
Acoustic Rating (STC) E 90 45 45

Mada Fire Wall thickness (mm) 150 150


Guard Internal Wind Pressure 0.24 kPa 0.24 kPa
Acrylic Mada Wall Track Deflection Limit (under serviceability
Sealant L/240 L/240
condition)
SIDE A SIDE B
Wall Height (mm) - 3500

Mada Bottom Anchor@


Floor Slab 600mm Centres
Additional Note & Comments
• Horizontal board cut joints to be backed up by fixing channel to achieve the fire rating
• Horizontal and vertical board joints are staggered from side to side and layer to layer to achieve the fire rating.
• Filling the void with Acoustic Insulation will enhance acoustic properties and also sealing the perimeter with Sealant will provide
necessary air tightness in case of fire.
• Head fixing details are designed assuming concrete slab & Refer Mada standard head detail drawings for varying deflection head
details
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS 17.1 - AR - DWP – GB - GB - 200 - 1H FIRE RATED

System Construction
Material Description Units Side A Side B
Plasterboard Type 12.5 mm Mada Plus Regular Plasterboard Mada Plus Regular Plasterboard
Plasterboard Layers 2 2
Metal Framing : C - Stud 0.60 mm Size 148 mm Spacing 600 mm Height Ref. Table
Metal Framing : DHT - Track 0.60 mm Size 150 mm x 50mm flanges - Top
Metal Framing : U - Track 0.60 mm Size 150 mm x 32mm flanges - Bottom
Metal Framing : FC 0.60 mm 72mm x 12/12mm flanges @Horizontal board cut joints
Top Anchor M6 x 55mm Trubolt Anchor @600 centres
Bottom Anchor M6 x 55mm Trubolt Anchor @600 centres
M3.5 x 25mm Self Tapping Screw – 1st layer
Drywall Screws M3.5 x 45mm Self Tapping Screw – 2nd layer
M4.2 x 13mm Wafer Head Screw - Bottom Track to Stud
Finishing Mada Jointing Tape & Multi Purpose Jointing Compound
Sealant Mada Fire Guard Acrylic Sealant

SECTIONAL ELEVATION PLAN VIEW ISOMETRIC VIEW


Mada Top Anchor @ Mada Plus Plasterboard
Soffit of slab 600mm Centres Mada Drywall Screw Mada Wall Track - Bottom
Clearance to Mada Wall
Stud
Mada Wafer Head Screw

Mada Wall Track, DHT - Top

THICKNESS
Wall Height – Refer System Performance Table

WALL
Mada Plus Plasterboard as
specified

Mada Bottom Anchor@ Mada Wall Stud


Mada Wall Stud @ 600 mm
600mm Centres @ 600mm
System Performance Criteria
Project
Description Standards Mada’s Rating
Requirement
Mada Fixing channel @
Fire Rating E 119 1 Hour 1 Hour
Horizontal cut joints
Acoustic Rating (STC) E 90 45 45

Mada Fire Wall thickness (mm) 200 200


Guard Internal Wind Pressure 0.24 kPa 0.24 kPa
Acrylic Mada Wall Track Deflection Limit (under serviceability
Sealant L/240 L/240
condition)
SIDE A SIDE B
Wall Height (mm) - 3500

Mada Bottom Anchor@


Floor Slab 600mm Centres
Additional Note & Comments
• Horizontal board cut joints to be backed up by fixing channel to achieve the fire rating
• Horizontal and vertical board joints are staggered from side to side and layer to layer to achieve the fire rating.
• Filling the void with Acoustic Insulation will enhance acoustic properties and also sealing the perimeter with Sealant will provide
necessary air tightness in case of fire.
• Head fixing details are designed assuming concrete slab & Refer Mada standard head detail drawings for varying deflection head
details
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS 17.2 - AR - DWP – GB - GB - 200 - 2H FIRE RATED

System Construction
Material Description Units Side A Side B
Plasterboard Type 12.5 mm Mada Plus Fire Resistant Plasterboard Mada Plus Fire Resistant Plasterboard
Plasterboard Layers 2 2
Metal Framing : C - Stud 0.60 mm Size 148 mm Spacing 600 mm Height Ref. Table
Metal Framing : DHT - Track 0.60 mm Size 150 mm x 50mm flanges - Top
Metal Framing : U - Track 0.60 mm Size 150 mm x 32mm flanges - Bottom
Metal Framing : FC 0.60 mm 72mm x 12/12mm flanges @Horizontal board cut joints
Top Anchor M6 x 55mm Trubolt Anchor @600 centres
Bottom Anchor M6 x 55mm Trubolt Anchor @600 centres
M3.5 x 25mm Self Tapping Screw – 1st layer
Drywall Screws M3.5 x 45mm Self Tapping Screw – 2nd layer
M4.2 x 13mm Wafer Head Screw - Bottom Track to Stud
Finishing Mada Jointing Tape & Multi Purpose Jointing Compound
Sealant Mada Fire Guard Acrylic Sealant

SECTIONAL ELEVATION PLAN VIEW ISOMETRIC VIEW


Mada Top Anchor @ Mada Plus Plasterboard
Soffit of slab 600mm Centres Mada Drywall Screw Mada Wall Track - Bottom
Clearance to Mada Wall
Stud
Mada Wafer Head Screw

Mada Wall Track, DHT - Top

THICKNESS
Wall Height – Refer System Performance Table

WALL
Mada Plus Plasterboard as
specified

Mada Bottom Anchor@ Mada Wall Stud


Mada Wall Stud @ 600 mm
600mm Centres @ 600mm
System Performance Criteria
Project
Description Standards Mada’s Rating
Requirement
Mada Fixing channel @
Fire Rating E 119 2 Hour 2 Hour
Horizontal cut joints
Acoustic Rating (STC) E 90 45 45

Mada Fire Wall thickness (mm) 200 200


Guard Internal Wind Pressure 0.24 kPa 0.24 kPa
Acrylic Mada Wall Track Deflection Limit (under serviceability
Sealant L/240 L/240
condition)
SIDE A SIDE B
Wall Height (mm) - 3500

Mada Bottom Anchor@


Floor Slab 600mm Centres
Additional Note & Comments
• Horizontal board cut joints to be backed up by fixing channel to achieve the fire rating
• Horizontal and vertical board joints are staggered from side to side and layer to layer to achieve the fire rating.
• Filling the void with Acoustic Insulation will enhance acoustic properties and also sealing the perimeter with Sealant will provide
necessary air tightness in case of fire.
• Head fixing details are designed assuming concrete slab & Refer Mada standard head detail drawings for varying deflection head
details
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS 19 - AR - DWP - GB – F&M GB - 100 - NON FIRE RATED

System Construction
Material Description Units Side A Side B
Mada Plus Fire Resistant Plasterboard Mada Plus Moisture Resistant
Plasterboard Type 15 mm
Plasterboard
Plasterboard Layers 1 1
Metal Framing : C - Stud 0.60 mm Size 68mm Spacing 600 mm Height Ref. Table
Metal Framing : DHT - Track 0.60 mm Size 70 mm x 50mm flanges - Top
Metal Framing : U-Track 0.60 mm Size 70mm x 32mm flanges - Bottom & Noggin
Top Anchor M6 x 55 mm Trubolt Anchor @600mm centres
Bottom Anchor M6 x 55 mm Trubolt Anchor @600mm centres
M3.5 x 35mm Self Tapping Screw
Drywall Screws
M4.2 x 13mm Wafer Head Screw - Bottom Track to Stud
Approved Insulation Glasswool Insulation 16kg/m3
Finishing Mada Jointing Tape & Multi Purpose Jointing Compound
Sealant Mada Fire Guard Acrylic Sealant

SECTIONAL ELEVATION PLAN VIEW ISOMETRIC VIEW


Mada Top Anchor @ 600mm Centres
Mada Plus Plasterboard
Soffit of slab Mada Drywall Screw Mada Wall Track - Bottom
Clearance to Mada Wall
Stud
Mada Wafer Head Screw
Mada Plus Plasterboard

THICKNESS
WALL
Wall Height – Refer System Performance Table

Mada Plus Plasterboard

Mada Wall Stud @ 600 mm


Mada Bottom Anchor@ Mada Wall Stud
600mm Centres @ 600 mm
System Performance Criteria
Project
Mada Noggins Made from Description Standards Mada’s Rating
Requirement
U-Track @ Midspan
Fire Rating E 119 - -
Acoustic Rating (STC) E 90 45 45

Mada Fire Wall Thickness (mm) 100 mm 100 mm


Guard Internal Wind Pressure 0.24 kPa 0.24 kPa
Acrylic
Mada Wall Track - Bottom Deflection Limit (under serviceability
Sealant condition)
L/240 L/240
SIDE A SIDE B
Wall Height (mm) - 3500

Mada Bottom Anchor@


Floor Slab 600mm Centres

Additional Note & Comments


• Horizontal board cut joints to be backed up by Flat strap/Fixing Channel to achieve the fire rating
• Horizontal and vertical board joints are staggered from side to side and layer to layer to achieve the fire rating.
• Filling the void with Acoustic Insulation will enhance acoustic properties and also sealing the perimeter with Sealant will provide
necessary air tightness in case of fire.
• Head fixing details are designed assuming concrete slab . In case other than concrete to be informed
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS 20 - AR - DWP - GB – F&M GB - 150 - NON FIRE RATED

System Construction
Material Description Units Side A Side B
Mada Plus Fire Resistant Plasterboard Mada Plus Moisture Resistant
Plasterboard Type 15 mm
Plasterboard
Plasterboard Layers 1 1
Metal Framing : C - Stud 0.60 mm Size 123mm Spacing 600 mm Height Ref. Table
Metal Framing : DHT - Track 0.60 mm Size 125mm x 50mm flanges - Top
Metal Framing : U-Track 0.60 mm Size 125mm x 32mm flanges - Bottom & Noggin
Top Anchor M6 x 55 mm Trubolt Anchor @600mm centres
Bottom Anchor M6 x 55 mm Trubolt Anchor @600mm centres
M3.5 x 35mm Self Tapping Screw
Drywall Screws
M4.2 x 13mm Wafer Head Screw - Bottom Track to Stud
Approved Insulation Glasswool Insulation 16kg/m3
Finishing Mada Jointing Tape & Multi Purpose Jointing Compound
Sealant Mada Fire Guard Acrylic Sealant

SECTIONAL ELEVATION PLAN VIEW ISOMETRIC VIEW


Mada Top Anchor @ 600mm Centres
Mada Plus Plasterboard
Soffit of slab Mada Drywall Screw Mada Wall Track - Bottom
Clearance to Mada Wall
Stud
Mada Wafer Head Screw
Mada Plus Plasterboard

THICKNESS
WALL
Wall Height – Refer System Performance Table

Mada Plus Plasterboard

Mada Wall Stud @ 600 mm


Mada Bottom Anchor@ Mada Wall Stud
600mm Centres @ 600 mm
System Performance Criteria
Project
Mada Noggins Made from Description Standards Mada’s Rating
Requirement
U-Track @ Midspan
Fire Rating E 119 - -
Acoustic Rating (STC) E 90 45 45

Mada Fire Wall Thickness (mm) 150 mm 155 mm


Guard Internal Wind Pressure 0.24 kPa 0.24 kPa
Acrylic
Mada Wall Track - Bottom Deflection Limit (under serviceability
Sealant condition)
L/240 L/240
SIDE A SIDE B
Wall Height (mm) - 3500

Mada Bottom Anchor@


Floor Slab 600mm Centres

Additional Note & Comments


• Horizontal board cut joints to be backed up by Flat strap/Fixing Channel to achieve the fire rating
• Horizontal and vertical board joints are staggered from side to side and layer to layer to achieve the fire rating.
• Filling the void with Acoustic Insulation will enhance acoustic properties and also sealing the perimeter with Sealant will provide
necessary air tightness in case of fire.
• Head fixing details are designed assuming concrete slab . In case other than concrete to be informed
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS 21 - AR - DWP - GB – F&M GB - 150 1H FIRE RATED

System Construction
Material Description Units Side A Side B
Mada Plus Fire Resistance Plasterboard Mada Plus Fire & Moisture Resistant
Plasterboard Type 15 mm
Plasterboard
Plasterboard Layers 1 1
Metal Framing : C - Stud 0.60 mm Size 123mm Spacing 600 mm Height Ref. Table
Metal Framing : DHT-Track 0.60 mm Size 125mm x 50mm flanges - Top
Metal Framing : U-Track 0.60 mm Size 125mm x 32mm flanges - Bottom
Top Anchor M6 x 55 mm Trubolt Anchor @600mm centres
Bottom Anchor M6 x 55 mm Trubolt Anchor @600mm centres
M3.5 x 35mm Self Tapping Screw
Drywall Screws
M4.2 x 13mm Wafer Head Screw - Bottom Track to Stud
Finishing Mada Jointing Tape & Multi Purpose Jointing Compound
Approved Insulation Glasswool Insulation 16kg/m3
Sealant Mada Fire Guard Acrylic Sealant

SECTIONAL ELEVATION PLAN VIEW ISOMETRIC VIEW


Mada Top Anchor @ 600mm Centres
Mada Plus Plasterboard
Soffit of slab Mada Drywall Screw Mada Wall Track - Bottom
Clearance to Mada Wall
Stud
Mada Approved
Mada Wafer Head Screw
Insulation
Mada Plus Plasterboard

THICKNESS
WALL
Wall Height – Refer System Performance Table

Mada Plus Plasterboard

Mada Wall Stud @ 600 mm


Mada Bottom Anchor@ Mada Wall Stud
600mm Centres @ 600 mm
Mada Approved Insulation System Performance Criteria
Project
Mada Noggins Made from Description Standards Mada’s Rating
Requirement
U-Track @ Horizontal Board
Cut Joints Fire Rating E 119 1 Hour 1 Hour
Acoustic Rating (STC) E 90 45 45

Mada Fire Wall Thickness (mm) 150 155


Guard Internal Wind Pressure 0.24 kPa 0.24 kPa
Acrylic
Mada Wall Track - Bottom Deflection Limit (under serviceability
Sealant condition)
L/240 L/240
SIDE A SIDE B
Wall Height (mm) - 3500

Mada Bottom Anchor@


Floor Slab 600mm Centres

Additional Note & Comments


• Horizontal board cut joints to be backed up by Flat strap/Fixing Channel to achieve the fire rating
• Horizontal and vertical board joints are staggered from side to side and layer to layer to achieve the fire rating.
• Filling the void with Acoustic Insulation will enhance acoustic properties and also sealing the perimeter with Sealant will provide
necessary air tightness in case of fire.
• Head fixing details are designed assuming concrete slab . In case other than concrete to be informed
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS 22 - AR - DWP – GB – F&M GB - 150 2H FIRE RATED

System Construction
Material Description Units Side A Side B
Mada Plus Fire & Moisture Resistant
Plasterboard Type 12.5 Mada Plus Fire Resistant Plasterboard
Plasterboard
Plasterboard Layers 2 2
Metal Framing : C - Stud 0.60 mm Size 98 mm Spacing 600 mm Height Ref. Table
Metal Framing : DHT - Track 0.60 mm Size 100 mm x 50mm flanges - Top
Metal Framing : U - Track 0.60 mm Size 100 mm x 32mm flanges - Bottom
Metal Framing : FC 0.60 mm 72mm x 12/12mm flanges @Horizontal board cut joints
Top Anchor M6 x 55mm Trubolt Anchor @600 centres
Bottom Anchor M6 x 55mm Trubolt Anchor @600 centres
M3.5 x 25/45mm Self Tapping Screw
Drywall Screws
M4.2 x 13mm Wafer Head Screw - Bottom Track to Stud
Approved Insulation Glasswool Insulation 16kg/m3
Finishing Mada Jointing Tape & Multi Purpose Jointing Compound
Sealant Mada Fire Guard Acrylic Sealant

SECTIONAL ELEVATION PLAN VIEW ISOMETRIC VIEW


Mada Top Anchor @ Mada Plus Plasterboard
Soffit of slab 600mm Centres Mada Drywall Screw Mada Wall Track - Bottom
Clearance to Mada Wall
Stud
Mada Wafer Head Screw

Mada Wall Track, DHT - Top

THICKNESS
Wall Height – Refer System Performance Table

WALL
Mada Plus Plasterboard as
specified

Mada Bottom Anchor@ Mada Wall Stud


Mada Wall Stud @ 600 mm
600mm Centres @ 600mm
System Performance Criteria
Project
Description Standards Mada’s Rating
Requirement
Mada Fixing channel @
Fire Rating E 119 2 Hour 2 Hour
Horizontal cut joints
Acoustic Rating (STC) E 90 50 50

Mada Fire Wall thickness (mm) 150 150


Guard Internal Wind Pressure 0.24 kPa 0.24 kPa
Acrylic Mada Wall Track Deflection Limit (under serviceability
Sealant L/240 L/240
condition)
SIDE A SIDE B
Wall Height (mm) - 3500

Mada Bottom Anchor@


Floor Slab 600mm Centres
Additional Note & Comments
• Horizontal board cut joints to be backed up by fixing channel to achieve the fire rating
• Horizontal and vertical board joints are staggered from side to side and layer to layer to achieve the fire rating.
• Filling the void with Acoustic Insulation will enhance acoustic properties and also sealing the perimeter with Sealant will provide
necessary air tightness in case of fire.
• Head fixing details are designed assuming concrete slab & Refer Mada standard head detail drawings for varying deflection head
details
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS 23 - AR - DWP - GB – F&M GB - 200 - 2H FIRE RATED

System Construction
Material Description Units Side A Side B
Mada Plus Fire Resistant Plasterboard Mada Plus Fire & Moisture Resistant
Plasterboard Type 12.5
Plasterboard
Plasterboard Layers 2 2
Metal Framing : C - Stud 0.60 mm Size 148 mm Spacing 600 mm Height Ref. Table
Metal Framing : DHT - Track 0.60 mm Size 150 mm x 50mm flanges - Top
Metal Framing : U - Track 0.60 mm Size 150 mm x 32mm flanges - Bottom
Metal Framing : FC 0.60 mm 72mm x 12/12mm flanges @Horizontal board cut joints
Top Anchor M6 x 55mm Trubolt Anchor @600 centres
Bottom Anchor M6 x 55mm Trubolt Anchor @600 centres
M3.5 x 25/45mm Self Tapping Screw
Drywall Screws
M4.2 x 13mm Wafer Head Screw - Bottom Track to Stud
Approved Insulation Glasswool Insulation 16kg/m3
Finishing Mada Jointing Tape & Multi Purpose Jointing Compound
Sealant Mada Fire Guard Acrylic Sealant

SECTIONAL ELEVATION PLAN VIEW ISOMETRIC VIEW


Mada Top Anchor @ Mada Plus Plasterboard
Soffit of slab 600mm Centres Mada Drywall Screw Mada Wall Track - Bottom
Clearance to Mada Wall
Stud
Mada Wafer Head Screw

Mada Wall Track, DHT - Top

THICKNESS
Wall Height – Refer System Performance Table

WALL
Mada Plus Plasterboard as
specified

Mada Bottom Anchor@ Mada Wall Stud


Mada Wall Stud @ 600 mm
600mm Centres @ 600mm
System Performance Criteria
Project
Description Standards Mada’s Rating
Requirement
Mada Fixing channel @
Fire Rating E 119 2 Hour 2 Hour
Horizontal cut joints
Acoustic Rating (STC) E 90 50 50

Mada Fire Wall thickness (mm) 200 200


Guard Internal Wind Pressure 0.24 kPa 0.24 kPa
Acrylic Mada Wall Track Deflection Limit (under serviceability
Sealant L/240 L/240
condition)
SIDE A SIDE B
Wall Height (mm) - 3500

Mada Bottom Anchor@


Floor Slab 600mm Centres
Additional Note & Comments
• Horizontal board cut joints to be backed up by fixing channel to achieve the fire rating
• Horizontal and vertical board joints are staggered from side to side and layer to layer to achieve the fire rating.
• Filling the void with Acoustic Insulation will enhance acoustic properties and also sealing the perimeter with Sealant will provide
necessary air tightness in case of fire.
• Head fixing details are designed assuming concrete slab & Refer Mada standard head detail drawings for varying deflection head
details
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS 24 - AR - DWP - GB – F&M GB - 150 1H FIRE RATED

System Construction
Material Description Units Side A Side B
Mada Plus Fire & Moisture Resistant Mada Plus Fire & Moisture Resistant
Plasterboard Type 15 mm
Plasterboard Plasterboard
Plasterboard Layers 1 1
Metal Framing : C - Stud 0.60 mm Size 123mm Spacing 600 mm Height Ref. Table
Metal Framing : DHT-Track 0.60 mm Size 125mm x 50mm flanges - Top
Metal Framing : U-Track 0.60 mm Size 125mm x 32mm flanges - Bottom
Top Anchor M6 x 55 mm Trubolt Anchor @600mm centres
Bottom Anchor M6 x 55 mm Trubolt Anchor @600mm centres
M3.5 x 35mm Self Tapping Screw
Drywall Screws
M4.2 x 13mm Wafer Head Screw - Bottom Track to Stud
Finishing Mada Jointing Tape & Multi Purpose Jointing Compound
Approved Insulation Glasswool Insulation 16kg/m3
Sealant Mada Fire Guard Acrylic Sealant

SECTIONAL ELEVATION PLAN VIEW ISOMETRIC VIEW


Mada Top Anchor @ 600mm Centres
Mada Plus Plasterboard
Soffit of slab Mada Drywall Screw Mada Wall Track - Bottom
Clearance to Mada Wall
Stud
Mada Approved
Mada Wafer Head Screw
Insulation
Mada Plus Plasterboard

THICKNESS
WALL
Wall Height – Refer System Performance Table

Mada Plus Plasterboard

Mada Wall Stud @ 600 mm


Mada Bottom Anchor@ Mada Wall Stud
600mm Centres @ 600 mm
Mada Approved Insulation System Performance Criteria
Project
Mada Noggins Made from Description Standards Mada’s Rating
Requirement
U-Track @ Horizontal Board
Cut Joints Fire Rating E 119 1 Hour 1 Hour
Acoustic Rating (STC) E 90 45 45

Mada Fire Wall Thickness (mm) 150 155


Guard Internal Wind Pressure 0.24 kPa 0.24 kPa
Acrylic
Mada Wall Track - Bottom Deflection Limit (under serviceability
Sealant condition)
L/240 L/240
SIDE A SIDE B
Wall Height (mm) - 3500

Mada Bottom Anchor@


Floor Slab 600mm Centres

Additional Note & Comments


• Horizontal board cut joints to be backed up by Flat strap/Fixing Channel to achieve the fire rating
• Horizontal and vertical board joints are staggered from side to side and layer to layer to achieve the fire rating.
• Filling the void with Acoustic Insulation will enhance acoustic properties and also sealing the perimeter with Sealant will provide
necessary air tightness in case of fire.
• Head fixing details are designed assuming concrete slab . In case other than concrete to be informed
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
Design Assumptions: PROJECT NAME THAKHER CITY - MAKKAH
• It is assumed that the systemCODE
PROJECT designed is a Non
MGC-load bearing systemREVISION
3127 & no external 28TH SEPTEMBER
- 07 wind pressure is considered.
2017
• The lateral InternalCLIENT
Wind Pressure considered is 0.20ROOTS
ARABIAN kPa as per provided specification. The concerned engineer to verify the Specified
internal live load other than Mada.
• Tiles of weight up to 15 Kg/Sq.m can be fixed on the partitions with 0.80mm thick gauge C-Stud (With Glue or Mechanical Fixtures),
[For 0.55mm thick gauge C-Stud maintain 400mm spacing].
No Additional load or Shelf attachment has been considered in this system design.
• The adequacy of the supporting superstructure such as beams, slabs, columns, steel purlins etc. has not been considered and therefore
shall remain the responsibility of concerned engineer other than Mada.
• The Load Combination considered in the Strength design of Drywall Partition is
[1.2D + 0Q + 1.6W] ; Where, D - Dead Load ; Q - Live Load ; W - Wind Load

Deflection:
• Where a deflection head is required to allow for soffit movement, use Mada Deflection head track at soffit detail. Deflection limit of a
standard partition is 08 - 10 mm. For higher deflection limit contact Mada Technical department for guidance.

Control Joints:
• Movement control joints are recommended at a maximum span of 15m. Control joints should also be installed to concur with any
movement joints in the structure.
• Control joints in interior walls shall be installed where a wall or partition runs in an uninterrupted straight plane exceeding 9.1 m.
• Control joints in interior ceilings with perimeter relief shall be installed so that linear dimensions between control joints do not exceed
15m and total area between control joints does not exceed 230 m2.
• Control joints in interior ceilings without perimeter relief shall be installed so that linear dimensions between control joints do not
exceed 10m and total area between control joints does not exceed 80 m2.
• Control joints shall be installed where ceiling framing members change direction.
Penetrations:
• Please be aware that the Fire & Acoustic performance are affected if the penetrations are not properly treated. Please refer to Mada
drawings or consult the MEP Contractor to ensure that the Fire & Acoustic performance is not affected. Please contact Mada Technical
department for further information and guidance.
Metal Profile Specifications:
• Mada cold formed metal profiles are manufactured using galvanized steel coils with a minimum zinc coating mass of Z180 or Z275 [180 /
275 Grams of Zinc per m2). Steel Grade JIS 3302, SGCC
Plasterboard Specifications:
• Mada Plus plasterboard are manufactured to ASTM C1396 / C1396M Standard and EN 520 Standards
• Regular Plasterboard – ASTM C1396 / C1396M & EN 520 Type A
• Fire Resistant Plasterboard - ASTM C1396 / C1396M Type X & EN 520 Type I, F
• Moisture Resistant Plasterboard - ASTM C1396 / C1396M & EN 520 Type A & H1
• Fire & Moisture Resistant Plasterboard - ASTM C1396 / C1396M Type X & EN 520 Type I, F & H1
• Impact Resistant Plasterboard - ASTM C1396 / C1396M Type X & EN 520 Type D, F, I & R
• Acoustic Resistant Plasterboard - ASTM C1396 / C1396M & EN 520 Type D
Wall stability:
• The wall height at site may not exceed the one specified in respective Mada documentation.
• Wall stability shall be ensured by correct fixing of peripheral profiles so the surrounding structures.
• The wall studs of dimensions as specified shall be installed at spacing distances not exceeding 600 mm as specified.
• The wall lined by boards at one side may not be exposed to air pressure over 0.10 kPa until the other side is lined by boards.
• The stability of the wall with height over 6.0 m stretching over the great length of should be increased by walls branching off at
maximum 6.0 m intervals.
Limitations
• The design proposed is not as per scale and shall be read in concurrence with structural or architectural drawings.
• The Contractor to ensure the workability of the proposed system.
• The information contained in the drawing is the Property and Copyright of Mada Gypsum Co and must not be re-issued, copied or
reproduced without written consent. 14
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE Typical Sections


MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS


T-Junction - Detail Corner - Detail

Corner Junction - Detail Reinforcement for Door - Detail

Bottom Fixing - Detail Top Fixing - Detail

Duct Penetration

Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
PROJECT NAME THAKHER CITY - MAKKAH

PROJECT CODE MGC- 3127 REVISION - 07 28TH SEPTEMBER 2017

CLIENT ARABIAN ROOTS

Range of Products

CW Stud U-Track Deflection Head Track E-Stud CH-Stud

Furring Channel Main Channel Wall Angle Fixing Channel J-Runner Track

Anchors for Different Screws for Different


Application Application Jointing Compound Fire & Acoustic Sealant Access panel

Paper Tape / Fiber Joint


Glasswool Insulation Rockwool Insulation Metal Corner Tape Tape Finishing Metal Profile

Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420
TECHNICAL DATA SHEET
[BOARDS]
TECHNICAL DATA SHEET
Advantages
• Light Weight Construction, Easy
& Fast Installation Material Storage &
• Improved strength & SAG Handling Conditions
Resistant
• Mada Plus Plasterboards to be
MADA PLUS • Good Fire Protection stored on pallets or on a pack of
boards and supported evenly on a
REGULAR • Good Sound Insulation & Good
firm, dry, level and structurally
Thermal Insulation
sound floor. Load up to 4 pallets
PLASTERBOARD “Part of Mada Plus Drywall System:
of Plasterboards on each other.
System performance warranty only
Product Description by using the proposed Mada plus • Do not store any other material
system products.” on top of Plasterboards.
Mada Plus Plasterboards are Product Characteristics • Protect Plasterboards from direct
produced from high purity natural rain, sunlight or other extensive
gypsum core being sheeted in a • Length : Standard length is weather conditions.
closely adhering best selected 2400mm & 3000mm. Special
• Mada Plus Plasterboards to be
paper liners. Mada Plus Regular length is 1800mm to 4500mm
stored in dry area inside the
Plasterboard has fiber glass which • Width : 1200mm & 1220mm. building which is ready to receive
improves strength and Sag drywall fixings.
resistnace. It is lightweight for use • Thickness : 9.5mm, 12.5mm,
in standard internal wall and 15mm & 16mm.
ceiling applications. • Edge : Tapered, Square, Beveled & Material Packing Details
Field of Application Round.
Mada Plus Regular Plasterboard • Color : Ivory / Grey
used in Residential Buildings, Board Boards Per
• Fire Rating (Mada System Thickness Pallet
Commercial Buildings, Hospitals, application) - Tested as per
Airports, Educational Institutions ASTM E119 9.5 mm 90
and other such applications.
• Acoustic Rating (Mada System 12.5 mm 66
Manufacturing Standard application) - Tested as per
ASTM E90 15.0 mm 54
Mada Plus Plasterboards are Technical Specification 16.0 mm 54
produced to ASTM C1396 /
C1396M & EN 520 Type A
standards. Tested accordance to ASTM C473-06a Plaster Board Thickness (mm)
ASTM E84 & ASTM 473
Parameters 9.5 12.5 15 16
Weight (kg / m2) +/- 0.2 7.0 9.8 11.0 11.7
Min Board Density (kg / m3) 736 784 733 731
Flame Spread Index Nil Nil Nil Nil
Smoke Developed Index Nil Nil Nil Nil
Asbestos (% by weight) Nil Nil Nil Nil
“MGC reserves the right to
Flexural Strength (N)(Ⱶ) >400 493 620 645
update technical parameters as
per its own discretion. For official Flexural Strength (N)(ǁ) >160 264 310 326
use of this TDS please consult
Nail Pull Resistance (N) >260 425 485 561
Mada Technical department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Light Weight Construction, Easy Material Storage &
& Fast Installation
Handling Conditions
• Improved strength & SAG • Mada Plus Plasterboards to be
MADA PLUS Resistant stored on pallets or on a pack of
• Good Fire Protection boards and supported evenly on a
MOISTURE RESISTANT firm, dry, level and structurally
• Good Sound Insulation & Good
sound floor. Load up to 4 pallets
PLASTERBOARD Thermal Insulation
of Plasterboards on each other.
“Part of Mada Plus Drywall System:
Product Description
System performance warranty only • Do not store any other material
by using the proposed Mada plus on top of Plasterboards.
Mada Plus Plasterboards are
produced from high purity natural system products.” • Protect Plasterboards from direct
gypsum core being sheeted in a Product Characteristics rain, sunlight or other extensive
closely adhering best selected paper weather conditions.
• Length : Standard length is
liners. Mada Plus Moisture Resistant • Mada Plus Plasterboards to be
2400mm & 3000mm. Special
Plasterboard has fiber glass which stored in dry area inside the
length is 1800mm to 4500mm
improves strength and Sag building which is ready to receive
resistnace. It is lightweight for use in • Width : 1200mm & 1220mm.
drywall fixings.
standard internal wall and ceiling • Thickness : 9.5mm, 12.5mm,
applications where Moisture 15mm & 16mm. Material Packing Details
Resistant properties is required.
• Edge : Tapered, Square, Beveled &
Field of Application Round.
Mada Plus Moisture Resistant Board Boards Per
Plasterboard used in Residential • Color : Green / Grey Thickness Pallet
Buildings, Commercial Buildings, • Fire Rating (Mada System
9.5 mm 90
Hospitals, Airports, Educational application) - Tested as per
Institutions and other such ASTM E119 12.5 mm 66
applications.
• Acoustic Rating (Mada System 15.0 mm 54
Manufacturing Standard application) - Tested as per
ASTM E90 16.0 mm 54
Mada Plus Plasterboards are
Technical Specification
produced to ASTM C1396 /
C1396M & EN 520 Type A & H1
standards. Tested accordance to ASTM C473-06a Plaster Board Thickness (mm)
ASTM E84 & ASTM 473 Parameters 9.5 12.5 15 16
Weight (kg / m2) +/- 0.2 7.2 9.5 11.4 12.1
Min Board Density (kg / m3) 757 760 760 756
Flame Spread Index Nil Nil Nil Nil
Smoke Developed Index Nil Nil Nil Nil
Asbestos (% by weight) Nil Nil Nil Nil
“MGC reserves the right to
Flexural Strength (N)(Ⱶ) >400 487 575 670
update technical parameters as
per its own discretion. For official Flexural Strength (N)(ǁ) >160 213 256 267
use of this TDS please consult
Nail Pull Resistance (N) >260 395 420 503
Mada Technical department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Light Weight Construction, Easy
Material Storage &
& Fast Installation
Handling Conditions
• Good Fire Protection
• Mada Plus Plasterboards to be
MADA PLUS FIRE • Good Sound Insulation & Good stored on pallets or on a pack of
Thermal Insulation
RESISTANT boards and supported evenly on a
firm, dry, level and structurally
“Part of Mada Plus Drywall System:
PLASTERBOARD System performance warranty only
sound floor. Load up to 4 pallets
of Plasterboards on each other.
by using the proposed Mada plus
Product Description system products.” • Do not store any other material
on top of Plasterboards.
Product Characteristics
Mada Plus Plasterboards are • Protect Plasterboards from direct
produced from high purity natural • Length : Standard length is rain, sunlight or other extensive
gypsum core being sheeted in a 2400mm & 3000mm. Special weather conditions.
closely adhering best selected paper length is 1800mm to 4500mm • Mada Plus Plasterboards to be
liners. Mada Plus Fire Resistant
• Width : 1200mm & 1220mm. stored in dry area inside the
Plasterboard is lightweight for use in
building which is ready to receive
standard internal wall and ceiling • Thickness : 9.5mm, 12.5mm, drywall fixings.
applications where Fire protection is 15mm & 16mm.
required.
• Edge : Tapered, Square, Beveled & Material Packing Details
Field of Application Round.
Mada Plus Fire Resistant
Plasterboard used in Residential • Color : Pink / Grey Board Boards Per
Buildings, Commercial Buildings, • Fire Rating (Mada System Thickness Pallet
Hospitals, Airports, Educational application) - Tested as per
Institutions and other such ASTM E119 9.5 mm 90
applications. 12.5 mm 66
• Acoustic Rating (Mada System
Manufacturing Standard application) - Tested as per 15.0 mm 54
ASTM E90
Mada Plus Plasterboards are 16.0 mm 54
produced to ASTM C1396 / Technical Specification
C1396M Type X & EN 520 Type
I, F standards. Tested accordance
to ASTM E84 & ASTM 473 ASTM C473-06a Plaster Board Thickness (mm)
Parameters 9.5 12.5 15 16
Weight (kg / m2) +/- 0.2 8.4 11.1 13.6 14.5
Min Board Density (kg / m3) 884 888 906 906
Flame Spread Index Nil Nil Nil Nil
Smoke Developed Index Nil Nil Nil Nil
Asbestos (% by weight) Nil Nil Nil Nil
“MGC reserves the right to
Flexural Strength (N)(Ⱶ) >400 517 690 702
update technical parameters as
per its own discretion. For official Flexural Strength (N)(ǁ) >160 241 462 466
use of this TDS please consult
Nail Pull Resistance (N) >260 425 595 603
Mada Technical department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Light Weight Construction, Easy Material Storage &
& Fast Installation
Handling Conditions
• Good Fire Protection • Mada Plus Plasterboards to be
MADA PLUS FIRE & • Good Sound Insulation & Good stored on pallets or on a pack of
MOISTURE RESISTANT Thermal Insulation
“Part of Mada Plus Drywall System:
boards and supported evenly on a
firm, dry, level and structurally
PLASTERBOARD System performance warranty only sound floor. Load up to 4 pallets
of Plasterboards on each other.
by using the proposed Mada plus
Product Description
system products.” • Do not store any other material
on top of Plasterboards.
Mada Plus Plasterboards are Product Characteristics
produced from high purity natural • Protect Plasterboards from direct
gypsum core being sheeted in a • Length : Standard length is rain, sunlight or other extensive
closely adhering best selected paper 2400mm & 3000mm. Special weather conditions.
liners. Mada Plus Fire & Moisture length is 1800mm to 4500mm • Mada Plus Plasterboards to be
Resistant Plasterboard is lightweight stored in dry area inside the
• Width : 1200mm & 1220mm.
used for standard internal wall and building which is ready to receive
ceiling applications where Fire & • Thickness : 9.5mm, 12.5mm, drywall fixings.
Moisture Resistant properties are 15mm & 16mm.
required. • Edge : Tapered, Square, Beveled & Material Packing Details
Field of Application Round.
Mada Plus Fire & Moisture
• Color : Green / Grey Board Boards Per
Resistant Plasterboard used in
Residential Buildings, Commercial • Fire Rating (Mada System Thickness Pallet
Buildings, Hospitals, Airports, application) - Tested as per
Educational Institutions and other ASTM E119 9.5 mm 90
such applications. • Acoustic Rating (Mada System 12.5 mm 66
Manufacturing Standard application) - Tested as per 15.0 mm 54
ASTM E90
Mada Plus Plasterboards are 16.0 mm 54
produced to ASTM C1396 / Technical Specification
C1396M Type X & EN 520 Type
I, F & H1 standards. Tested
accordance to ASTM E84 & ASTM C473-06a Plaster Board Thickness (mm)
ASTM 473 Parameters 9.5 12.5 15 16
Weight (kg / m2) +/- 0.2 8.5 11.1 13.7 14.6
Min Board Density (kg / m3) 894 888 913 912
Flame Spread Index Nil Nil Nil Nil
Smoke Developed Index Nil Nil Nil Nil
Asbestos (% by weight) Nil Nil Nil Nil
“MGC reserves the right to
Flexural Strength (N)(Ⱶ) >400 644 742 776
update technical parameters as
per its own discretion. For official Flexural Strength (N)(ǁ) >160 270 462 475
use of this TDS please consult
Nail Pull Resistance (N) >260 414 422 443
Mada Technical department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | technical@madagypsum.com
TECHNICAL DATA SHEET
[METAL PROFILES & ACCESSORIES]
TECHNICAL DATA SHEET
Advantages
• Easy & Fast Installation Material Storage &
• High Adhesion Handling Conditions
• Low Consumption • Mada Render should be protected
from continuous exposure to
• Versatility of Usage
THIN COAT RENDER moisture. Prolonged or repeated
exposure to moisture may cause a
loss of strength. If storing on the
Product Characteristics concrete floor, wooden pallets have
to be used.
Product Description • Composition: Stucco & Adhesive • Mada Render can be mixed by hand
to improve adhesion to base or mechanically. Before mixing
Mada Thin Coat Render is a material.
perfect solution to create the thin please ensure that the mixing
surfaces perfectly suitable to apply • Usage: Internal walls & Ceilings at equipment and bucket being used
finishing on. The Thin Coat temperature > 5˚C. are clean. Contamination from
Render is a single layer, smooth- previous mixes adversely affect the
• Working Time: 60-90 mins setting time and strength.
coat render of grey-white color
intended for hand application in • Base Material for Application: • Add Mada Render to the water and
thickness of 3-6mm. Concrete, Porous Concrete, mix using hand or electric mixture.
Render. Allow the mixture to settle for 3-5
Field of Application • Thickness: 3-6mm mins. Check the consistency of the
Mada Thin Coat Render is best mixture and if the mixture is too
option to use for concrete or • Storage: 12 months approx.
thick then add slightly more water ,
porous concrete. Thin Coat
Material Packing Details conversely if the mixture is too
Render is used to prepare the wall liquid then add slightly more Render.
for the finishing items (paints, Mix Again and if necessary repeat
wallpapers, etc.). Thin Coat the process until the desired
Render is also perfect for repair Bags Per
Weight viscosity of the mixture is achieved
works. Pallet
for optimum application. .
40 Kg 36
Manufacturing Standards
Mada Renders are produced under a Technical Specification
quality system independently audited
and certified as conforming to ISO
9001:2010 Parameters
Color Grey-White
Mixing Ratio with Water 21.5 L of water per 40 Kg
pH Level 7
Tensile Strength ≥ 1.0 MPA
Compressive Stregth ≥ 2.5 MPA
“MGC reserves the right to update
Adhesive Strength ≥ 0.5 MPA
technical parameters as per its own
discretion. For official use of this TDS Diffusion Resistance Factor (µ) 10
please consult Mada Technical
Coverage Ratio 1 Kg / m2 / mm
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Easy & Fast Installation Material Storage &
• High Adhesion Handling Conditions
• Low Consumption • Mada Render should be protected
from continuous exposure to
HAND APPLIED • Versatility of Usage
moisture. Prolonged or repeated
RENDER exposure to moisture may cause a
loss of strength. If storing on the
Product Characteristics concrete floor, wooden pallets have
to be used.
Product Description • Composition: Stucco, Perlite, • Mada Render can be mixed by hand
Light weight fillers & Adhesive to or mechanically. Before mixing please
Mada Hand Applied Render is improve adhesion to base material.
your go to product for projects ensure that the mixing equipment and
that require versatile thicknesses • Usage: Internal walls & Ceilings at bucket being used are clean.
of Renders within small area. temperature > 5˚C. Contamination from previous mixes
Hand Applied Renders can be adversely affect the setting time and
• Working Time: 60-90 mins strength.
used for thickness ranging from 5-
30mm. • Base Material for Application: • Add Mada Render to the water and
Brickwork, Concrete, Porous mix using hand or electric mixture.
Concrete, Render. Allow the mixture to settle for 3-5
Field of Application • Thickness: 5-30mm mins. Check the consistency of the
Mada Hand Applied Render is the mixture and if the mixture is too
best option to use when surface • Storage: 12 months approx.
thick then add slightly more water ,
requires thickness, small areas of
Material Packing Details conversely if the mixture is too liquid
renders. Hand Applied Render is then add slightly more Render. Mix
primarily used for brick walls, Again and if necessary repeat the
concrete, stable mortar and other process until the desired viscosity of
concrete structures. Bags Per
Weight the mixture is achieved for optimum
Pallet
application. .
25 Kg 50
Manufacturing Standards
Mada Renders are produced under a Technical Specification
quality system independently audited
and certified as conforming to ISO
9001:2010 Parameters
Color Grey-White
Mixing Ratio with Water 10 L of water per 25 Kg
pH Level 7
Tensile Strength ≥ 1.0 MPA
Compressive Stregth ≥ 2.5 MPA
“MGC reserves the right to update
Adhesive Strength ≥ 0.5 MPA
technical parameters as per its own
discretion. For official use of this TDS Diffusion Resistance Factor (µ) 10
please consult Mada Technical
Coverage Ratio 1 Kg / m2 / mm
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Easy & Fast Installation Material Storage &
• High Adhesion Handling Conditions
• Low Consumption • Mada Render should be protected
from continuous exposure to
MACHINE APPLIED • Versatility of Usage
moisture. Prolonged or repeated
exposure to moisture may cause a
RENDER Product Characteristics
loss of strength. If storing on the
concrete floor, wooden pallets have
to be used.
Product Description • Composition: Stucco, Lime, Sand, • Mada Render can be mixed by hand
Perlite & Adhesive to improve or mechanically. Before mixing
Mada Machine Applied Render is adhesion to base material.
our solution for covering big areas please ensure that the mixing
using regular plastering machine. • Usage: Internal walls & Ceilings at equipment and bucket being used
The machine render is designed to temperature > 5˚C. are clean. Contamination from
have a higher application period as previous mixes adversely affect the
• Working Time: 120-150 mins setting time and strength.
compared to a Hand Applied
Render. • Base Material for Application: • Add Mada Render to the water and
Concrete, Porous Concrete, mix using hand or electric mixture.
Field of Application Render. Allow the mixture to settle for 3-5
Mada Machine Applied Render is • Thickness: > 6mm mins. Check the consistency of the
used when designated area is big mixture and if the mixture is too
• Storage: 12 months approx.
and thickness required exceed thick then add slightly more water ,
6mm. best option to use for Material Packing Details conversely if the mixture is too
concrete or porous concrete. liquid then add slightly more Render.
Machine Applied Render is Mix Again and if necessary repeat
primarily used for brick walls, the process until the desired
Bags Per
concrete, stable mortar and other Weight viscosity of the mixture is achieved
Pallet
concrete structures. for optimum application. .
40 Kg 36
Manufacturing Standards
Mada Renders are produced under a Technical Specification
quality system independently audited
and certified as conforming to ISO
9001:2010 Parameters
Color Grey-White
Mixing Ratio with Water 20 L of water per 40 Kg
pH Level 7
Tensile Strength ≥ 1.0 MPA
Compressive Stregth ≥ 2.5 MPA
“MGC reserves the right to update
Adhesive Strength ≥ 0.5 MPA
technical parameters as per its own
discretion. For official use of this TDS Diffusion Resistance Factor (µ) 10
please consult Mada Technical
Coverage Ratio 1 Kg / m2 / mm
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Easy & Fast Application Material Storage &
• Low Consumption Handling Conditions
• Versatility of Usage • Mada Standard Plaster should be
protected from continuous exposure
STANDARD to moisture. Prolonged or repeated
exposure to moisture may cause a
PLASTER Product Characteristics
loss of strength. If storing on the
concrete floor, wooden pallets have
to be used.
Product Description • Environmental & Healthy: • Mada Standard Plaster can be mixed
Mada Standard Plaster is gypsum • Simple mixing and application by hand or mechanically. Before
molding powder product for process mixing please ensure that the mixing
interiors. The powder product will equipment and bucket being used
• Usage on all conventional surface are clean. Contamination from
be mixed with water according to
specifications. • Create a smooth surface previous mixes adversely affect the
setting time and strength.
• Are an appropriate basis under
different surface treatment (paint, • Add Mada Standard Plaster to the
wallpaper, tiles etc.). water and mix using hand or electric
mixture. Allow the mixture to settle
Field of Application for 3-5 mins. Check the consistency
Mada Standard Plaster is a molding of the mixture and if the mixture is
powder product for interiors use only. Material Packing Details
too thick then add slightly more
It is designed for molding of water , conversely if the mixture is
decorations, cornices, repair works too liquid then add slightly more
and for modeling. Bags Per Plaster. Mix Again and if necessary
Weight
Pallet repeat the process until the desired
viscosity of the mixture is achieved
25 Kg 50
for optimum application. .
40 Kg 33
Manufacturing Standards
Mada Standard Plaster is produced
under a quality system independently
audited and certified as conforming to
ISO 9001:2010
Technical Specification

Parameters
Color White / Off White
Mixing Ratio with Water 20 L of water per 25 Kg bag
32 L of water per 40 Kg bag
“MGC reserves the right to update Workability 5 mins approx.
technical parameters as per its own
Final Set Time 21 mins approx.
discretion. For official use of this TDS
please consult Mada Technical
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Easy & Fast Application Material Storage &
• Low Consumption Handling Conditions
• Versatility of Usage • Mada Molding French Plaster should
be protected from continuous
MOLDING FRENCH exposure to moisture. Prolonged or
repeated exposure to moisture may
PLASTER Product Characteristics
cause a loss of strength. If storing on
the concrete floor, wooden pallets
have to be used.
Product Description • Environmental & Healthy: • Mada Molding French Plaster can be
Mada Molding French Plaster is a • Simple mixing and application mixed by hand or mechanically.
premium gypsum molding powder process Before mixing please ensure that the
product for interiors. The powder mixing equipment and bucket being
• Usage on all conventional surface used are clean. Contamination from
product will be mixed with water
according to specifications. • Create a smooth surface previous mixes adversely affect the
setting time and strength.
• Are an appropriate basis under
different surface treatment (paint, • Add Mada Molding French Plaster to
wallpaper, tiles etc.). the water and mix using hand or
electric mixture. Allow the mixture to
Field of Application settle for 3-5 mins. Check the
Mada Molding French Plaster is a consistency of the mixture and if the
molding powder product for interiors mixture is too thick then add slightly
use only. It is designed for molding Material Packing Details more water , conversely if the
of decorations, cornices, repair works mixture is too liquid then add slightly
and for modeling. more Plaster. Mix Again and if
necessary repeat the process until the
Bags Per
Weight desired viscosity of the mixture is
Pallet
achieved for optimum application. .
40 Kg 33
Manufacturing Standards
Mada Molding French Plaster is
produced under a quality system
independently audited and certified as
conforming to ISO 9001:2010
Technical Specification

Parameters
Color White
Mixing Ratio with Water 32 L of water per 40 Kg bag
Workability 5 mins approx.
“MGC reserves the right to update
technical parameters as per its own Final Set Time 21 mins approx.
discretion. For official use of this TDS
please consult Mada Technical
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Easy & Fast Application Material Storage &
• Low Consumption Handling Conditions
• Versatility of Usage • Mada French Adhesive should be
protected from continuous exposure
MADA FRENCH to moisture. Prolonged or repeated
exposure to moisture may cause a
ADHESIVE Product Characteristics
loss of strength. If storing on the
concrete floor, wooden pallets have
to be used.
Product Description • Environmental & Healthy: • Mada French Adhesive can be mixed
Mada FRENCH ADHESIVE is a • Simple mixing and application by hand or mechanically. Before
special gypsum product for interiors process mixing please ensure that the mixing
and exteriors. The powder product equipment and bucket being used are
• Usage on all conventional surface clean. Contamination from previous
will be mixed with water according to
specifications. mixes adversely affect the setting time
and strength.
• Add Mada French Adhesive to the
water and mix using hand or electric
Field of Application mixture. Allow the mixture to settle
Mada French Adhesive is used for for 3-5 mins. Check the consistency
adhering of decorations and cornices of the mixture and if the mixture is
to the wall and for cladded walls, too thick then add slightly more water
where gypsum boards are glued to Material Packing Details , conversely if the mixture is too
the walls. liquid then add slightly more Plaster.
Mix Again and if necessary repeat the
process until the desired viscosity of
Bags Per
Weight the mixture is achieved for optimum
Pallet
application. .
25 Kg 50
Manufacturing Standards
Mada French Adhesive is produced
under a quality system independently
audited and certified as conforming to
ISO 9001:2010
Technical Specification

Parameters
Color White / Off White
Mixing Ratio with Water 20 L of water per 25 Kg bag
Workability 60 mins approx.
“MGC reserves the right to update
technical parameters as per its own Final Set Time 90 mins approx.
discretion. For official use of this TDS Bonding Strength > 1.5 N/mm2
please consult Mada Technical
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Light Weight Construction
• Easy & Fast Installation Material Storage &
• Good Fire Protection Handling Conditions
• Good Sound Insulation
MADA WALL STUD • Environment Friendly
• Products are supplied in pack and
sub–pack quantities and should be
(C-STUD) “Part of Mada Plus Drywall System:
handled in accordance with the
recommendations contained in AS
System performance warranty only
1470 – Health and Safety at Work
by using the proposed Mada plus Principles and Practice..
Product Description system products.”
• Where mechanical lifting or
Mada Wall Studs fabricated from Product Characteristics moving equipment is required,
Cold rolled galvanized steel are trained and licensed operators are
used as the vertical member of the to be used.
Technical
partition. system with a friction fit Detail • Metal products should be stored
Parameters
between the bottom and top in an environmentally–friendly
tracks. Mada studs features knurled Z120, Z180 & area away from airborne
Coating
faces and reinforcing ribs along the Z275 contaminants such as acid and salt
stud design. The ribs provide Yield sprays.
added strength, are less prone to 240MPa - 310MPa
Strength • People with sensitive skin
twist and creating "high-shoulders"
when finishing gypsum board. Tensile conditions should seek medical
340MPa - 420MPa advice before prolonged handling
Strength
of metal products; hands should
Field of Application Material Galvanized Steel be washed before eating and for
Applicable for Partition system, personal hygiene.
32/32, 34/34,
Liner System, Stud ceiling system
Flanges (mm) 36/36, 32/34 & • Non–fogging goggles (AS/NZS
and other such applications.
34/36 1336) should be worn when
Manufacturing Standards cutting metal sections.
Lip (mm) 4.5, 5.0, 5.5 & 6.0

Mada Metal Profile comply to


Minimum 3mtrs Cold-Formed Steel
and varies as per
ASTM C645, ASTM A653, Length
project Design References
ASTM A641, ASTM C955 and
requirement
ASTM A1003
• North American Specification for
0.50, 0.55, 0.60,
Thickness the Design of Cold-Formed Steel
0.70, 0.80, 0.90,
(mm), [TCT] Structural Members (AISI S100,
1.0, 1.20 & 1.50.
AISI S200).
Sizes (mm), 40, 48, 60, 68, 73, • Analysis and Design of Cold
[Depth] 90, 98, 148 & 198 Formed Members is according to
LRFD & ASD Method.
General Note • Cold-Formed Steel Design, Fourth
Edition by Wei-Wen Yu & Roger A.
“MGC reserves the right to update
The products should not be used LaBoube
technical parameters as per its own
for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical
please consult Mada Technical Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Light Weight Construction
• Easy & Fast Installation Material Storage &
• Good Fire Protection Handling Conditions
MADA (DHT) • Good Sound Insulation
• Products are supplied in pack and
• Environment Friendly
DEFLECTION HEAD sub–pack quantities and should be
handled in accordance with the
“Part of Mada Plus Drywall System:
TRACK System performance warranty only
recommendations contained in AS
1470 – Health and Safety at Work
by using the proposed Mada plus Principles and Practice..
Product Description system products.”
• Where mechanical lifting or
Mada Deflection Head Track Product Characteristics moving equipment is required,
fabricated from Cold rolled trained and licensed operators are
galvanized steel are used at the to be used.
Technical
soffit to support the wall studs. Detail • Metal products should be stored
Parameters
Mada’s Deflection Head track in an environmentally–friendly
features knurled faces without Z120, Z180 & area away from airborne
Coating
compromising the strength or Z275 contaminants such as acid and salt
thickness of the steel Yield sprays.
240MPa - 310MPa
Strength • People with sensitive skin
Tensile conditions should seek medical
Field of Application 340MPa - 420MPa advice before prolonged handling
Strength
Applicable for Non load bearing of metal products; hands should
Material Galvanized Steel be washed before eating and for
Partition system, Liner System,
Stud ceiling system and other such personal hygiene.
applications. Flanges (mm) 50/50 • Non–fogging goggles (AS/NZS
1336) should be worn when
Manufacturing Standards cutting metal sections.
Length 3000 mm
Mada Metal Profile comply to Cold-Formed Steel
ASTM C645, ASTM A653,
0.50, 0.55, 0.60,
Design References
ASTM A641, ASTM C955 and Thickness
ASTM A1003 0.70, 0.80, 0.90,
(mm), [TCT]
1.0, 1.20 & 1.50. • North American Specification for
the Design of Cold-Formed Steel
42, 50, 60, 62, 70, Structural Members (AISI S100,
Sizes (mm),
75, 90, 92, 100, AISI S200).
[Depth]
125, 150 & 200
• Analysis and Design of Cold
Formed Members is according to
LRFD & ASD Method.
General Note • Cold-Formed Steel Design, Fourth
Edition by Wei-Wen Yu & Roger A.
“MGC reserves the right to update
The products should not be used LaBoube
technical parameters as per its own
for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical
please consult Mada Technical Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Light Weight Construction
• Easy & Fast Installation Material Storage &
• Good Fire Protection Handling Conditions
• Good Sound Insulation
MADA (U-TRACK) • Environment Friendly
• Products are supplied in pack and
sub–pack quantities and should be
WALL TRACK “Part of Mada Plus Drywall System:
handled in accordance with the
recommendations contained in AS
System performance warranty only
1470 – Health and Safety at Work
by using the proposed Mada plus Principles and Practice..
Product Description system products.”
• Where mechanical lifting or
Mada Wall Track fabricated from Product Characteristics moving equipment is required,
Cold rolled galvanized steel are trained and licensed operators are
used at the floor and soffit to to be used.
Technical
support the wall studs. Mada’s track Detail • Metal products should be stored
Parameters
features knurled faces which is the in an environmentally–friendly
pattern of small ridges formed on Z120, Z180 & area away from airborne
Coating
the track to prevent screws from Z275 contaminants such as acid and salt
slipping and damaging the board, Yield sprays.
without compromising the strength 240MPa - 310MPa
Strength • People with sensitive skin
or thickness of the steel
Tensile conditions should seek medical
340MPa - 420MPa advice before prolonged handling
Field of Application Strength
of metal products; hands should
Applicable for Non load bearing Material Galvanized Steel be washed before eating and for
Partition system, Liner System, personal hygiene.
Stud ceiling system and other such 32/32, 30/30,
Flanges (mm) • Non–fogging goggles (AS/NZS
applications. 29/29
1336) should be worn when
Manufacturing Standards cutting metal sections.
Length 3000 mm
Mada Metal Profile comply to Cold-Formed Steel
ASTM C645, ASTM A653,
0.50, 0.55, 0.60,
Design References
ASTM A641, ASTM C955 and Thickness
ASTM A1003 0.70, 0.80, 0.90,
(mm), [TCT]
1.0, 1.20 & 1.50. • North American Specification for
the Design of Cold-Formed Steel
42, 50, 60, 62, 70, Structural Members (AISI S100,
Sizes (mm),
75, 90, 92, 100, AISI S200).
[Depth]
125, 150 & 200
• Analysis and Design of Cold
Formed Members is according to
LRFD & ASD Method.
General Note • Cold-Formed Steel Design, Fourth
Edition by Wei-Wen Yu & Roger A.
“MGC reserves the right to update
The products should not be used LaBoube
technical parameters as per its own
for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical
please consult Mada Technical Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Light Weight Construction
• Easy & Fast Installation Material Storage &
• Good Fire Protection Handling Conditions
• Good Sound Insulation
• Products are supplied in pack and
• Environment Friendly
MADA CH-STUD sub–pack quantities and should be
handled in accordance with the
“Part of Mada Plus Drywall System:
recommendations contained in AS
System performance warranty only
1470 – Health and Safety at Work
Product Description by using the proposed Mada plus Principles and Practice..
system products.”
Mada CH-Studs are light weight steel • Where mechanical lifting or
sections roll formed using corrosion Product Characteristics moving equipment is required,
resistant Hot-Dipped Galvanised trained and licensed operators are
steel coils confirming to ASTM 653. to be used.
Technical
These Studs form the vertical Detail • Metal products should be stored
Parameters
elements of a shaft wall structure in an environmentally–friendly
braced into horizontal head and Z120, Z180 & area away from airborne
Coating
bottom J-Tracks. The CH Studs are Z275 contaminants such as acid and salt
designed to provide friction-fit sprays.
Yield
contact for 25 mm Shaft Board as 240MPa - 310MPa
Strength • People with sensitive skin
shaft liner. CH Studs normally space
at every 600 mm to suit the width of Tensile conditions should seek medical
340MPa - 420MPa advice before prolonged handling
the Shaft Board panel. Strength
of metal products; hands should
Field of Application Material Galvanized Steel be washed before eating and for
Applicable for Shaft Wall Partition, personal hygiene.
Fire rated Stud ceiling system at
Flanges (mm) 38/35 • Non–fogging goggles (AS/NZS
Staircase, lift shafts and other such
applications. 1336) should be worn when
Lip (mm) 4.5, 5.0, 5.5 & 6.0 cutting metal sections.
Manufacturing Standards
Minimum 3mtrs
Mada Metal Profile comply to and varies as per
Cold-Formed Steel
Length
ASTM C645, ASTM A653, project Design References
ASTM A641, ASTM C955 and requirement
ASTM A1003 • North American Specification for
Thickness 0.55, 0.80, 0.90, 1.0
(mm), [TCT] & 1.20 the Design of Cold-Formed Steel
Structural Members (AISI S100,
AISI S200).
Sizes (mm),
64, 100, & 150 • Analysis and Design of Cold
[Depth]
Formed Members is according to
LRFD & ASD Method.
General Note • Cold-Formed Steel Design, Fourth
Edition by Wei-Wen Yu & Roger A.
“MGC reserves the right to update
The products should not be used LaBoube
technical parameters as per its own
for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical
please consult Mada Technical Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Light Weight Construction
• Easy & Fast Installation Material Storage &
• Good Fire Protection Handling Conditions
• Good Sound Insulation
• Products are supplied in pack and
• Environment Friendly
MADA E-STUD sub–pack quantities and should be
handled in accordance with the
“Part of Mada Plus Drywall System:
recommendations contained in AS
System performance warranty only
1470 – Health and Safety at Work
by using the proposed Mada plus Principles and Practice..
Product Description system products.”
• Where mechanical lifting or
Mada E-Stud are light weight steel Product Characteristics moving equipment is required,
trained and licensed operators are
sections roll formed using corrosion
to be used.
resistant Hot-Dipped Galvanised Technical
Detail • Metal products should be stored
steel coils confirming to ASTM 653. Parameters
The E Studs are extremely light in in an environmentally–friendly
Z120, Z180 & area away from airborne
weight and are used for starter studs, Coating
Z275 contaminants such as acid and salt
intersections, door openings and end
studs. A 25 mm gaps between the Yield sprays.
flange allows friction-fit contact for 240MPa - 310MPa
Strength • People with sensitive skin
the 25 mm Shaft Board as shaft liner. conditions should seek medical
Tensile
340MPa - 420MPa advice before prolonged handling
Strength
Field of Application of metal products; hands should
Applicable for Shaft Wall Partition, Material Galvanized Steel be washed before eating and for
Fire rated Stud ceiling system at personal hygiene.
Staircase, lift shafts and other such Flanges (mm) 25/19 • Non–fogging goggles (AS/NZS
applications.
1336) should be worn when
Lip (mm) 4.5, 5.0, 5.5 & 6.0 cutting metal sections.
Manufacturing Standards
Minimum 3mtrs
Mada Metal Profile comply to and varies as per
Cold-Formed Steel
Length
ASTM C645, ASTM A653, project Design References
ASTM A641, ASTM C955 and requirement
ASTM A1003 • North American Specification for
Thickness 0.55, 0.80, 0.90, 1.0
(mm), [TCT] & 1.20 the Design of Cold-Formed Steel
Structural Members (AISI S100,
AISI S200).
Sizes (mm),
64, 100, & 150 • Analysis and Design of Cold
[Depth]
Formed Members is according to
LRFD & ASD Method.
General Note • Cold-Formed Steel Design, Fourth
Edition by Wei-Wen Yu & Roger A.
“MGC reserves the right to update
The products should not be used LaBoube
technical parameters as per its own
for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical
please consult Mada Technical Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Light Weight Construction
• Easy & Fast Installation Material Storage &
• Good Fire Protection Handling Conditions
MADA J RUNNER - • Good Sound Insulation
• Products are supplied in pack and
• Environment Friendly
DEFLECTION HEAD sub–pack quantities and should be
handled in accordance with the
“Part of Mada Plus Drywall System:
TRACK System performance warranty only
recommendations contained in AS
1470 – Health and Safety at Work
Product Description by using the proposed Mada plus Principles and Practice..
system products.”
Mada J Runner Deflection Head • Where mechanical lifting or
Tracks are light weight steel Product Characteristics moving equipment is required,
trained and licensed operators are
sections roll formed using
corrosion resistant Hot-Dipped to be used.
Technical
Galvanised steel coils confirming Detail • Metal products should be stored
Parameters
to ASTM 653. J Runner Deflection in an environmentally–friendly
Head Tracks provide a friction fit Z120, Z180 & area away from airborne
Coating
for the stud and also provide a slip Z275 contaminants such as acid and salt
joint to allow any movement of the Yield sprays.
structure.They are positioned at 240MPa - 310MPa
Strength • People with sensitive skin
Top to guide CH-Studs. And they
Tensile conditions should seek medical
are suitable for Fire & Non Fire 340MPa - 420MPa
Strength advice before prolonged handling
Rated Shaft wall Systems.
of metal products; hands should
Field of Application Material Galvanized Steel be washed before eating and for
Applicable for Shaft Wall Partition, personal hygiene.
Fire rated Stud ceiling system at Flanges (mm) 75/50 • Non–fogging goggles (AS/NZS
Staircase, lift shafts and other such 1336) should be worn when
applications. cutting metal sections.
Manufacturing Standards Length 3000 mm
Cold-Formed Steel
Mada Metal Profile comply to
ASTM C645, ASTM A653,
Design References
Thickness 0.55, 0.80, 0.90, 1.0
ASTM A641, ASTM C955 and (mm), [TCT] & 1.20
ASTM A1003 • North American Specification for
the Design of Cold-Formed Steel
Sizes (mm),
66, 102, & 152 Structural Members (AISI S100,
[Depth]
AISI S200).
• Analysis and Design of Cold
Formed Members is according to
LRFD & ASD Method.
General Note • Cold-Formed Steel Design, Fourth
Edition by Wei-Wen Yu & Roger A.
“MGC reserves the right to update
The products should not be used LaBoube
technical parameters as per its own
for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical
please consult Mada Technical Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Light Weight Construction
• Easy & Fast Installation Material Storage &
• Good Fire Protection Handling Conditions
• Good Sound Insulation
MADA J RUNNER • Environment Friendly
• Products are supplied in pack and
sub–pack quantities and should be
handled in accordance with the
“Part of Mada Plus Drywall System:
Product Description recommendations contained in AS
System performance warranty only
1470 – Health and Safety at Work
Mada J Runner Tracks are light by using the proposed Mada plus Principles and Practice..
weight steel sections roll formed system products.”
• Where mechanical lifting or
using corrosion resistant Hot-
Dipped Galvanised steel coils Product Characteristics moving equipment is required,
trained and licensed operators are
confirming to ASTM 653. J Runner
to be used.
Tracks are forming the Horizontal Technical
Detail • Metal products should be stored
element of a shaft wall structure Parameters
into which the vertical CH-Stud in an environmentally–friendly
Z120, Z180 & area away from airborne
and E-Stud are fixed. They are Coating
Z275 contaminants such as acid and salt
positioned at Floor to guide CH-
Studs, and as a wall track for the Yield sprays.
240MPa - 310MPa
bottom fixing of the Shaft wall Strength • People with sensitive skin
System. And they are suitable for conditions should seek medical
Fire & Non Fire Rated Shaft wall Tensile
340MPa - 420MPa advice before prolonged handling
Systems. Strength
of metal products; hands should
Field of Application Material Galvanized Steel be washed before eating and for
Applicable for Shaft Wall Partition, personal hygiene.
Fire rated Stud ceiling system at Flanges (mm) 57/25 • Non–fogging goggles (AS/NZS
Staircase, lift shafts and other such 1336) should be worn when
applications. cutting metal sections.
Manufacturing Standards Length 3000 mm
Cold-Formed Steel
Mada Metal Profile comply to
ASTM C645, ASTM A653,
Design References
Thickness 0.55, 0.80, 0.90, 1.0
ASTM A641, ASTM C955 and (mm), [TCT] & 1.20
ASTM A1003 • North American Specification for
the Design of Cold-Formed Steel
Sizes (mm),
66, 102, & 152 Structural Members (AISI S100,
[Depth]
AISI S200).
• Analysis and Design of Cold
Formed Members is according to
LRFD & ASD Method.
General Note • Cold-Formed Steel Design, Fourth
Edition by Wei-Wen Yu & Roger A.
“MGC reserves the right to update
The products should not be used LaBoube
technical parameters as per its own
for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical
please consult Mada Technical Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Light Weight Construction
• Easy & Fast Installation Material Storage &
• Good Fire Protection Handling Conditions
• Good Sound Insulation
MADA FIXING • Environment Friendly
• Products are supplied in pack and
sub–pack quantities and should be
CHANNEL “Part of Mada Plus Drywall System:
handled in accordance with the
recommendations contained in AS
System performance warranty only
1470 – Health and Safety at Work
by using the proposed Mada plus Principles and Practice..
Product Description system products.”
• Where mechanical lifting or
Mada Fixing Channels are Product Characteristics moving equipment is required,
produced from cold rolled trained and licensed operators are
galvanized steel coils. They are to be used.
Technical
primarily used to cover up the Detail • Metal products should be stored
Parameters
horizontal cut joints of gypsum in an environmentally–friendly
boards. They are also used for Coating Z180 & Z275 area away from airborne
brazing twin frame wall system. contaminants such as acid and salt
They are also used to support Yield sprays.
240MPa - 310MPa
medium to heavy weight fixtures. Strength
• People with sensitive skin
Tensile conditions should seek medical
340MPa - 420MPa
Strength advice before prolonged handling
Field of Application
of metal products; hands should
Applicable for Non load bearing Material Galvanized Steel
be washed before eating and for
Partition system, Liner System, personal hygiene.
Stud ceiling system and other such 12/12, 11/11,
Flanges (mm)
applications. 10/10 • Non–fogging goggles (AS/NZS
1336) should be worn when
Manufacturing Standards cutting metal sections.
Length 3000 mm
Mada Metal Profile comply to Cold-Formed Steel
ASTM C645, ASTM A653,
0.55, 0.60, 0.70, Design References
ASTM A641, ASTM C955 and Thickness
0.80, 0.90, 1.0, 1.20
ASTM A1003 (mm), [TCT]
& 1.50 • North American Specification for
the Design of Cold-Formed Steel
Sizes (mm), Structural Members (AISI S100,
72, 152
[Depth] AISI S200).
• Analysis and Design of Cold
Formed Members is according to
LRFD & ASD Method.
General Note • Cold-Formed Steel Design, Fourth
Edition by Wei-Wen Yu & Roger A.
“MGC reserves the right to update
The products should not be used LaBoube
technical parameters as per its own
for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical
please consult Mada Technical Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Exclusive design – for fast & easy
setting for quicker installation Material Storage &
• Chamfered head - To protect the Handling Conditions
threads during installation • Mechanical handling – The
• Sleeve with three legs - To dimensions of the packaging /
MADA TRUBOLT distribute the expansion stress on pallet vary depending upon the
STUD ANCHOR the whole cone product size. To avoid potentially
overloading a lift truck, it is
• Rolled thread - To increase
important that any effect on load
strength
Product Description centres is considered.
“Part of Mada Plus Drywall System:
• Manual handling – Anchors are
Trubolt Stud Anchor is a true-to- System performance warranty only
supplied in a variety of lengths
size, heavy duty, torque controlled by using the proposed Mada plus
and the weight of these varies
expansion anchor, for permanent system products.” slightly. Puncture resistant gloves
anchoring into concrete. Product Characteristics should be used when handling
The anti-rotation expansion sleeve anchors.
is designed to grip the sides of the
Technical • Storage – Store in cartons
hole, preventing anchor rotation Detail
Parameters supplied and in dry conditions.
during installation.
Fixing Method Through fixture • Fire fighting measures – The
Field of Application products do not pose a fire
Coating Galvanized hazard. However, the protective
Applicable in CMU walls, Solid
concrete walls, concrete(slab, Setting coating may be combustible and
Torque controlled emit hazardous fumes. Suitable
beams, columns, etc.) Method
extinguishing media - water, foam,
Manufacturing Material Cold Formed Steel carbon dioxide or dry powder.
Standards SPIT or other
Installation Guidelines
Supplier equivalent
approved by Mada
Body : cold formed steel, DIN 1654,
part 2 or 4 / Zinc electroplated Torque controlled expansion
Maximum 14.9 kN
Zn5C/Fe (5 μm), NFA 91102, anchor, installed by hammering the
Shear Load (C20/C25)
Sleeve : S355 MC as per NF EN 10- bolt through the fixture. Expansion
149-2, Nut : steel strength grade 6 or Maximum 9.1 kN clip profile ensures the anchor pre-
8, ISO 898-2 & Washer : steel, NF E Tensile Load (C20/C25) grips the hole surface prior to
25513, 25514 setting.
M6 x 55
M6 x 65 Tightening the anchor pulls into the
Sizes (mm) expansion sleeve expanding the clip
M8 x 65
M8 x 95 and securing the fixture against the
substrate
100Pcs/Box
Packing
50Pcs/Box

General Note
“MGC reserves the right to update
The products should not be used
technical parameters as per its own for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical
please consult Mada Technical Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
112-113_HIT_M.qxd 25/11/05 10:18 Page 112

SPIT HIT M
SPIT HIT M - A4
¬ Hammer-set anchor for light duty fixing for
concrete and all materials types
N° PX 1058
Technical data
L SPIT Embedment Maximum Minimum Drilling Drilling Drilling Cylinder Total Type
hnom HIT M depth thickness thickness depth depth diameter head anchor of
of part to of base in base forward diameter length nail
be fixed in material material the part to Code
concrete be fixed Zinc Stainless
d0 (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) - coated steel
hnom tfix (1) hmin h0 L+8 d0 dc L - steel nail A4 nail
dc 5-5/27P 5 35 27 050116
20 60 30 5 9 PZ2
h0 tfix 5-15/37P 15 45 37 050117
L+8 6-5/32P 5 40 32 050118 050157
6-12/39P 12 47 39 050119
6-25/52P 25 25 65 35 60 6 11 52 PZ2 050121 050158
6-40/67P 40 75 67 050122 050159
6-12/39V 12 47 39 050129
APPLICATION 6-25/52V 25 25 65 35 60 6 10 52 PZ2 050131
6-40/67V 40 75 67 050132
¬ Insulation cladding 6/5-M6 - - 32 M6 050141
30 65 40 6 11
6/5-M7 - - 32 M7 050142
¬ Profiles for thin coat external
8-10/42P 10 50 42 050123 050161
¬ Insulation systems 8-30/62P 30 70 62 050124 050162
¬ Drywall track 8-60/92P 30 60 65 40 100 8 13 92 PZ2 050125 050163
¬ Wood 8-80/112P 80 120 112 050126
8-100/132P 100 140 132 050127
¬ Flashing 8-30/62V 30 70 62 050134
¬ Electrical accessories 8-60/92V 60 100 92 050135
8-80/112V 30 80 65 40 120 8 11,5 112 PZ2 050136
¬ Collar (Atlas …)
8-100/132V 100 140 132 050137
¬…
(1) In masonry, the thickness of part to be fixed could be fluctuate to ± 5 mm from tfix for Ø5 et 6 mm, and to ± 10 mm for
Ø8 mm, to ensure a good contact between collar and the part to be fixed.

Ultimate loads (NRu,m, VRu,m)


MATERIAL
TENSILE IN kN SHEAR IN kN
¬ Body: polyamid 6
¬ Expansion nail: Anchor size Ø5 Ø6 Ø8 5/5 6/5 6/40 8/10 8/80
- FR 15 zinc coated steel (5 µm) Base 5/15 6/12 8/30 8/100
material 6/25 8/60
- A4, stainless steel
Concrete (C20/25)
¬ Screw head type: PZ2
NRu,m 0,9 1,5 2,1 VRu,m 2,5 3,75 3,0 5,75 4,75
Solid concrete blocks type B120 (fc = 13,5 N/mm2)
NRu,m 1,4 1,55 1,65 VRu,m 2,5 3,75 3,0 5,75 4,75
INSTALLATION Clay bricks (fc = 55 N/mm2)
NRu,m 1,6 2,6 3,6 VRu,m 2,5 3,75 3,0 5,75 4,75
Hollow concrete blocks type B40 not rendered (fc = 6,5 N/mm2)
NRu,m 0,85 0,95 1,0 VRu,m 2,5 3,0 3,0 3,75 3,75
Hollow concrete blocks type B40 rendered (fc = 6,5 N/mm2)
NRu,m 1,25 2,25 3,0 VRu,m 2,5 3,0 3,0 3,75 3,75
Hollow clay bricks type Eco-30 not rendered (fc = 4,5 N/mm2)
NRu,m 0,75 1,0 1,25 VRu,m 0,75 1,0 1,0 1,25 1,25
Hollow clay bricks type Eco-30 rendered (fc = 4,5 N/mm2)
NRu,m 1,25 1,75 2,25 VRu,m 1,25 1,5 1,75 2,25 2,25
Engineering clay bricks not rendered (fc = 14,5 N/mm2)
NRu,m 0,75 1,0 1,25 VRu,m 2,5 3,0 3,0 3,75 3,75
Engineering clay bricks rendered (fc = 14,5 N/mm2)
NRu,m 1,25 1,75 2,25 VRu,m 2,5 3,75 3,0 4,75 4,75
Aerated concrete (Mvn = 500 kg/m3)
NRu,m 0,2 0,3 0,42 VRu,m 0,2 0,3 0,3 0,42 0,42
Plasterboard type BA13
NRu,m 0,2 0,2 0,25 VRu,m 0,2 0,2 0,2 0,25 0,25
Plasterboard type BA10 + polystyren
NRu,m 0,25 0,25 0,3 VRu,m 0,25 0,25 0,25 0,3 0,3
112
112-113_HIT_M.qxd 25/11/05 10:18 Page 113

SPIT HIT M
SPIT HIT M - A4
Design loads (NRd, VRd) and Recommended loads (Nrec, Vrec)
for one anchor without edge or spacing influence

NRu,m ∗ NRu,m ∗ VRu,m ∗ VRu,m ∗


NRd = ; NRec = *Derived from test results VRec = ; VRec = *Derived from test results
3, 5 5 3, 5 5

TENSILE IN kN SHEAR IN kN

Anchor size Ø5 Ø6 Ø8 5/5 6/5 6/40 8/10 8/80


Base 5/15 6/12 8/30 8/100
material 6/25 8/60
Concrete (C20/25)
NRd 0,25 0,42 0,59 VRd 0,70 1,05 0,84 1,61 1,33
NRec 0,18 0,3 0,42 VRec 0,5 0,75 0,6 1,15 0,95
Solid concrete blocks type B120 (fc = 13,5 N/mm2)
NRd 0,39 0,43 0,46 VRd 0,70 1,05 0,84 1,61 1,33
NRec 0,28 0,31 0,33 VRec 0,5 0,75 0,6 1,15 0,95
Clay bricks (fc = 55 N/mm2)
NRd 0,45 0,73 1,01 VRd 0,70 1,05 0,84 1,05 1,33
NRec 0,32 0,52 0,72 VRec 0,5 0,75 0,6 0,75 0,95
Hollow concrete blocks type B40 not rendered (fc = 6,5 N/mm2)
NRd 0,24 0,27 0,28 VRd 0,70 0,84 0,84 0,63 1,05
NRec 0,17 0,19 0,2 VRec 0,5 0,6 0,6 0,45 0,75
Hollow concrete blocks type B40 rendered (fc = 6,5 N/mm2)
NRd 0,35 0,63 0,84 VRd 0,70 0,84 0,84 1,33 1,05
NRec 0,25 0,45 0,6 VRec 0,5 0,6 0,6 0,95 0,75
Hollow clay bricks type Eco-30 not rendered (fc = 4,5 N/mm2)
NRd 0,21 0,28 0,35 VRd 0,21 0,28 0,28 0,07 0,35
NRec 0,15 0,2 0,25 VRec 0,15 0,2 0,2 0,05 0,25
Hollow clay bricks type Eco-30 rendered (fc = 4,5 N/mm2)
NRd 0,35 0,49 0,63 VRd 0,35 0,49 0,49 0,0 0,63
NRec 0,25 0,35 0,45 VRec 0,25 0,35 0,35 0,0 0,45
Engineering clay bricks not rendered (fc = 14,5 N/mm2)
NRd 0,21 0,28 0,35 VRd 0,70 0,84 0,84 0,32 1,05
NRec 0,15 0,2 0,25 VRec 0,5 0,6 0,6 0,23 0,75
Engineering clay bricks rendered (fc = 14,5 N/mm2)
NRd 0,35 0,49 0,63 VRd 0,70 1,05 0,84 0,32 1,33
NRec 0,25 0,35 0,45 VRec 0,5 0,75 0,6 0,23 0,95
Aerated concrete (Mvn = 500 kg/m3)
NRd 0,06 0,08 0,12 VRd 0,06 0,08 0,08 0,21 0,12
NRec 0,04 0,06 0,08 VRec 0,04 0,06 0,06 0,15 0,08
Plasterboard type BA13
NRd 0,06 0,06 0,07 VRd 0,06 0,06 0,06 0,13 0,07
Light weight anchors

NRec 0,04 0,04 0,05 VRec 0,04 0,04 0,04 0,09 0,05
Plasterboard type BA10 + polystyren
NRd 0,07 0,07 0,08 VRd 0,07 0,07 0,07 0,27 0,08
NRec 0,05 0,05 0,06 VRec 0,05 0,05 0,05 0,19 0,06

Spacing data
IN CONCRETE

SPIT HIT M Minimum distance between anchors and from edges (mm)
Ccr,N mini Ccr,V mini Scr,1 mini Scr,2 mini
without edge influence near one edge
5/5 ; 5/15 25 40 25 60
6/5 ; 6/12 ; 6/25 ; 6/40 25 45 25 70
8/10 ; 8/30 ; 8/60 ; 8/80 ; 8/100 25 60 25 90

113
TECHNICAL DATA SHEET
Advantages
• The additional bearing forces
provided by a wider head mean Material Storage &
fewer screws are required
Handling Conditions
• Excellent choice for general
MADA WAFER HEAD purpose, light-to-medium-duty
• Mechanical handling – The
use
SELF DRILLING • #2 Phillips point reduces the risk
dimensions of the packaging /
pallet vary depending upon the
SCREW of cam-out product size. To avoid potentially
overloading a lift truck, it is
important that any effect on load
Product Description “Part of Mada Plus Drywall System: centres is considered.
System performance warranty only
Wafer Head self drilling screws • Manual handling – Screws are
by using the proposed Mada plus supplied in a variety of lengths
with a head diameter of 11mm are
system products.” and the weight of these varies
designed for assembling steel
framing components for up to slightly. Puncture resistant gloves
3.0mm thick. Product Characteristics should be used when handling
screws.

Technical • Storage – Store in cartons


Field of Application Detail supplied and in dry conditions.
Parameters
Designed for metal-to-metal fixing
of light gauge steel framing. • Specific end use – There is a risk
Head Type Wafer Head from sharp ends(drill point).

Yellow Zinc or • Fire fighting measures – The


Coating products do not pose a fire
White Zinc
hazard. However, the protective
Manufacturing coating may be combustible and
Thread Type Single Lead
Standards emit hazardous fumes. Suitable
Drive Type #2 Phillips extinguishing media - water, foam,
Mada Drywall Screws comply to Hardened Steel, carbon dioxide or dry powder.
ASTM C1002-98 & EN 14566 - Material AISI 1018 or
Type A1 equivalent steel
Case Minimum Installation Guidelines
Hardness Rockwell C44
M4.2 x 13 • Overdriving may result in failure of
Sizes (mm) the fastener or stripout of the work
M4.8 x 19
surface.
1000Pcs/Box
Packing • The wafer head to be fully seated
500Pcs/Box
when the head is flush with the
work surface.

General Note
“MGC reserves the right to update
The products should not be used
technical parameters as per its own
for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical
please consult Mada Technical Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Designed specifically for use in
drywall Material Storage &
• Distributes bearing stress over a Handling Conditions
wider area than flat heads

MADA SELF • Provides good control in driving• Mechanical handling – The


dimensions of the packaging /
• Fine Thread, Sharp Point Drywall
TAPPING SCREW Screw
pallet vary depending upon the
product size. To avoid potentially
“Part of Mada Plus Drywall System:
overloading a lift truck, it is
important that any effect on load
Product Description System performance warranty only
centres is considered.
by using the proposed Mada plus
Self Tapping bugle head screws is system products.” • Manual handling – Screws are
the ability of the screw to advance supplied in a variety of lengths
while creating its own thread. It is Product Characteristics and the weight of these varies
used for fastening drywall and slightly. Puncture resistant gloves
other accessories mounting on should be used when handling
Technical
steel structures below 0.8mm thick. Detail screws.
Parameters
• Storage – Store in cartons
Head Type Bulge supplied and in dry conditions.
Field of Application
Applicable for all Drywall systems Yellow Zinc, • Specific end use – There is a risk
and other such applications. Coating White Zinc or from sharp ends.
Requires less torque to drive than Black Phosphate • Fire fighting measures – The
a standard twin fast drywall screw. products do not pose a fire
Thread Type Single Lead
hazard. However, the protective
Drive Type #2 Phillips coating may be combustible and
emit hazardous fumes. Suitable
Manufacturing Hardened Steel,
extinguishing media - water, foam,
Material AISI 1018 or
Standards equivalent steel
carbon dioxide or dry powder.

Case Minimum
Mada Drywall Screws comply to
Hardness Rockwell C44
ASTM C1002 Installation Guidelines
M3.5 x 25
M3.5 x 30
• Overdriving may result in failure of
M3.5 x 35
the fastener or stripout of the work
Sizes (mm) M3.5 x 45
surface.
M3.5 x 55
M3.5 x 60 • The Bugle head to be fully seated
M4.2 x 70 when the head is flush with the
work surface.
Packing 1000Pcs/Box

General Note
“MGC reserves the right to update
The products should not be used
technical parameters as per its own
for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical
please consult Mada Technical Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Light in weight
• Easy & Fast Installation Material Storage &
• Economical Handling Conditions
MADA SLOTTED “Part of Mada Plus Drywall System:
System performance warranty only • Products are supplied in pack and
L-BRACKET WITH by using the proposed Mada plus sub–pack quantities and should be
handled in accordance with the
system products.”
MINI HOLES Product Characteristics
recommendations contained in AS
1470 – Health and Safety at Work
Product Description Principles and Practice..

Mada specially design L-bracket is • Where mechanical lifting or


Technical
typically used to transfer loads in Detail moving equipment is required,
Parameters
external wall/heavy load trained and licensed operators are
attachment/high rise partition Coating Zinc Coating Z120 to be used.
where deflection allowance is Material Galvanized Steel • Metal products should be stored
needed. The rigid structure in the in an environmentally–friendly
shape of an L, one arm fixed to a Yield area away from airborne
240MPa - 310MPa
vertical (Stud) surface, the other Strength contaminants such as acid and salt
fixed to the support such as sprays.
Wall, Ceiling, Slab, etc. Tensile
340MPa - 420MPa • People with sensitive skin
Strength
conditions should seek medical
Field of Application
Thickness advice before prolonged handling
Applicable for specially design 1.50mm & 3.0mm
[TCT] of metal products; hands should
drywall partition, ceiling & shaft
be washed before eating and for
systems
Slotted Bracket personal hygiene.
Type
With Mini Holes
• Non–fogging goggles (AS/NZS
50 x 45 x 75 1336) should be worn when
Manufacturing Standards cutting metal sections.
50 x 75 x 75
Size [mm]
Confirms ASTM C645 & 50 x 80 x 75
EN 14195. Specially engineered 50 x 125 x 75 Cold-Formed Steel
product to optimize strength & Design References
serviceability design performance Mini Hole
M5 & M5.5
on the drywall systems. Diameter
• North American Specification for
the Design of Cold-Formed Steel
Structural Members (AISI S100,
Slotted Hole AISI S200).
M8 & M10
Diameter
• Analysis and Design of Cold
Formed Members is according to
LRFD & ASD Method.
General Note • Cold-Formed Steel Design, Fourth
Edition by Wei-Wen Yu & Roger A.
“MGC reserves the right to update
The products should not be used LaBoube
technical parameters as per its own
for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical
please consult Mada Technical Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Glasswool is inorganic. Does not
encourage growth of fungi and Material Storage &
vermin. Handling Conditions
• Glasswool is chemically inert. • Handling – unpack material at
MADA GLASSWOOL Application does not cause or
accelerate corrosion. Glass wool
application site to avoid
unnecessary handling of product.
INSULATION is rot proof and odorless.
“Part of Mada Plus Drywall System:
keep work areas clean.
Avoid unnecessary handling of
Product Description System performance warranty only scrap material and debris by
by using the proposed Mada plus placing such materials in suitable
Glasswool insulation is an system products.” containers, which should be kept
insulating material which consist as close to the work area as
of fine, long, inorganic fibers Product Characteristics possible.
bonded together by high
temperature binder. It has good Ensure good ventilation. local
Technical exhaust ventilation may be
acoustic properties, light weight, Detail
Parameters required if the method of use
high tensile strength and
exceptional resilience. produces dust levels which exceed
Color Light Yellow
applicable exposure limits
Glasswool Insulation is non Rigidity Flexible
corrosive to metal and does not Avoid excessive eye and skin
support mold grow. AFICO Insulation contact with dusts and fibers.
Supplier or other equivalent Use recommended cleanup
approved by Mada procedures to avoid buildup of
Field of Application
Applicable for all Drywall Systems Water Vapor <0.2% by Volume dusts and fibers in the work area.
and all such applications. Sorption ASTM C1104 • Material Storage - keep material in
Thickness original packaging until it is to be
50, 75, 100 used. Store material to protect
Manufacturing (mm)
against adverse conditions
Standards Density
12, 16, 24 including precipitation.
(kg/m3)
Rockwool insulation complies to • Health Hazard - Inhalation:
Service inhalation of dust can cause nose,
ASTM C665, ASTM C177, 2600C
Temperature throat lungs and upper respiratory
ASTM C167, ASTM C168,
ASTM C553 & BS 476 tract irritation. persons exposed to
Thermal 0.039 – 0.040
dust may be forced to leave area
Conductivity (W/mK)
because of nuisance conditions
Thermal 1.28 – 1.35 such as coughing, sneezing and
Resistance (m2.K/W) nasal irritation. Eye Contact :
direct contact will cause some
0.8-1.0
NRC mechanical irritation. Skin
ASTM C423
Contact : may cause transitory
Flame & mechanical dermatitis.
0 ; ASTM E84
Smoke Index
General Note
“MGC reserves the right to update Fungal
Nil ASTM C665
technical parameters as per its own
Resistance The products should not be used
discretion. For official use of this TDS for purposes other than those
Packing (1.2 x 20)m / Roll
please consult Mada Technical
shown on the Mada Technical
UL Classified Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Easy to apply.
• Eliminates need for embedding Material Storage &
coat. Handling Conditions
• Fuses with Compound to create • All materials should be delivered
stronger joints. in their original, unopened
MADA FIBER JOINT • Resists mold and mildew
packages and stored off the
TAPE • Eradicates bedding coat and
ground in an enclosed shelter and
protected from weather. Damaged
provides smooth finished joints. or deteriorated materials should be
Product Description removed.
• Good housekeeping and regular
Fiber joint tape is composed of “Part of Mada Plus Drywall System: safe removal of waste materials
twisted strands of fiber glass
System performance warranty only are recommended. Avoid contact
woven at right angles to one
by using the proposed Mada plus with eyes, skin and clothing.
another for reinforcing drywall
system products.” Minimize generation of dust.
joints. It is suitable for Hand or
Mechanical application with • STACKING - Fiberglass Mesh
Mada’s jointing compound. Tape should not be stacked more
than two pallets in height.
Product Characteristics
• Store in a cool, Dry ventilated area
Field of Application away from sources of heat,
Fiber joint tape is self adhering moisture and incompatibilities.
fiber mesh tape for use with Quick Technical
Detail • Environmental Toxicity - This
Set, FasTrack and other setting Parameters
product has no known adverse
type joint compounds. Width (mm) 50 effect on ecology.
Length (m) 90

Manufacturing Mesh Size Installation Guidelines


2.85 x 2.85
(mm)
Standards Position the Mada fiber tape and
Mass (g/m²) 65
spread jointing compound along
Mada’s Fiber Joint Tape comply to Tensile each joint.
ASTM C475 & ASTM C 840. Strength 400
To minimize the risk of cracking,
(N/50mm)
ensure jointing compound is pushed
Packing 24Rolls/Cartoon through the fiber tape well into any
gaps between the plasterboards /
ement board

General Note
“MGC reserves the right to update
The products should not be used
technical parameters as per its own for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical
please consult Mada Technical Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Ready to be used directly from
the bucket Material Storage &
• Creamy and smooth consistency Handling Conditions
• Outstanding slip and bond • Keep containers closed when not
MADA MULTIUSE • Joint finishing is fast, easy, and
in use. Minimize generation of
dust. Avoid inhalation of dust and
JOINTING smooth, reducing work efforts
contact with an eyes and skin.
and improving appearance and
COMPOUND quality of the job • Wear recommended personal
protective equipment when
• Easy workability, Easy filling, Fast
Product Description drying, Easy to sand
handling..
• Use good safety and industrial
Mada Gypsum Multi use Jointing hygiene practices.
Compound is a ready mix calcium “Part of Mada Plus Drywall System:
carbonate based joint filler with System performance warranty only • Store at room temperature in a dry
vinyl binders and high value by using the proposed Mada plus location, keep product out of
additives which provides superior direct sunlight at all times.
system products.”
performance compared to ordinary • Do not freeze.
ready mixed products..
Product Characteristics • Ecotoxicological Information -
This product has no known
Field of Application adverse effect on the ecology. A
Proper concealment (joints, large discharge directly into
fasteners, trims) of drywall Technical waterways would not be expected
Detail
partition & ceiling systems.. Parameters to kill aquatic life.
Density
1.74
(kg/ltr) Installation Guidelines
Type Ready mix
Manufacturing When taping and finishing joint,
Hand or thinning with water may improve
Standards Use mechanical tool application. Add clean water in
application half-pint increments, remix and
Mada’s Multi use Jointing compound trial apply until preferred
Humidity
comply to ASTM C475 Standard 95% RH consistency is reached. Over-
Resistance
Specification for Joint Compound dilution causes abnormal
for finishing gypsum board. Light shrinkage, poor bond and other
0.75
Reflection negative effects. Do not mix with
9 Months under any other material.
Shelf life proper storage
conditions
Packing 28kg/Bucket

General Note
“MGC reserves the right to update
The products should not be used
technical parameters as per its own for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical
please consult Mada Technical Proposal.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• Odorless, Paintable
• Easy to apply. Product Specification
• Good water & Chemical resistant
Technical
MADA FIRE GUARD • Flexible and compressible
Parameters
Detail

“Part of Mada Plus Drywall System:


ACRYLIC SEALANT System performance warranty only Appearance
White &
Smooth Paste
by using the proposed Mada plus
Specific Gravity
Product Description system products.” [g/cm³]
1.65 ± 0.02

Mada Fire Guard Sealant is approved Product Characteristics Consistency


Thick
for Mada Fire and Acoustic rated gunable paste
systems. It is developed for use as a Fire Rated Drywall Partitions :
Mada Fire Guard Acrylic sealant is an
Tack Free time ≤ 15min
joint seal in fire resistant and sound
insulation Mada drywall systems. Integral component in Mada Plus Fire Working time ≤ 20min
Rated System Tested in accordance to
As an acrylic based caulk with a ASTM E119. Hardness [Shore A] 50
tenacious bond regardless of
porosity, it is easy to use on virtually Acoustic Rated Drywall Partitions : Crack Test No Cracks
any job. Mada Fire Guard Acrylic sealant is an
Elongation Approx 340%
Integral component in Mada Plus
Mada Fire Guard Sealant has a long Acoustic Rated System Tested in Young's Modulus 0.20MPa
shelf life and good open time. can be accordance to ASTM E90 &
applied with a commonly available Service Temperature +5ºC to 85ºC
ASTM 413
hand-gun equipment. Application
Mada Fire Guard Acrylic sealant is 5ºC to 45ºC
Temperature
suitable for application in medical
Field of Application environment due to property of Anti Packing - Tube [ml] 280
Sealing perimeters, voids, and irregular – microbial protection to inhibit the
growth of mold & mildew. Tested in
Shelf Life 24 months
holes in drywall partitions, ceiling
systems, Shaft walls, smokebarriers, accordance to BS ISO 22196 : 2007. Fire Rating ( Mada Tested as per
through penetration fire stop & Fungal & Algal Resistance tested In System application) ASTM E119
Acoustic systems, and other accordance to TISI 2321.
structures. For internal perimeter Acoustic Rating Tested as per
pointing of doors and window frames The products should not be used for (Mada System ASTM E90,
purposes other than those shown on application) ASTM 413
for fire & Acoutic rating.
the Mada Technical Proposal.

Material Storage & Installation Guidelines


Handling Conditions
Application surfaces should be
• STORAGE AND SHELF LIFE - clean, dry, sound, and free from all
24 months from manufacturing contaminants, i.e. dust, rust, etc.
date if kept at a temperature
below 25°c. Cut the nozzle at an angle and apply
the sealant with a hand or air
“MGC reserves the right to update • 24 tubes per Carton. operated cartridge gun.
technical parameters as per its own • Refer MSDS for Mada Fire Guard Tool immediately to spread the
discretion. For official use of this TDS Acrylic Sealant for more details on sealant against all surfaces and give a
please consult Mada Technical Handling . smooth finish.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
TECHNICAL DATA SHEET
Advantages
• For protection of drywall / plaster
edges from damage.
Material Storage &
• Light Weight Construction
Handling Conditions
• Easy & Fast Installation
MADA Corner Bead • Products are supplied in pack and
sub–pack quantities and should be
(External) handled in accordance with the
“Part of Mada Plus Drywall System: recommendations contained in AS
System performance warranty only
Product Description 1470 – Health and Safety at Work
by using the proposed Mada plus Principles and Practice..
The Corner Beads (External) are system products.”
• Metal products should be stored
ideal for a quick and easy finishing in an environmentally–friendly
for your external corners. The area away from airborne
beads are available in a variety of Product Characteristics contaminants such as acid and salt
standard and customized sizes. sprays.
They can be fixed to the sheet of • People with sensitive skin
Technical
plasterboard with an adhesive or Detail conditions should seek medical
Parameters
staples, with the finishing coats advice before prolonged handling
bonding into the plasterboard and Material Galvanized Steel of metal products; hands should
feathering up to the bead nib. be washed before eating and for
Coating Z120 personal hygiene.
Field of Application
• Non–fogging goggles (AS/NZS
Applicable in all Drywall Systems, Yield 1336) should be worn when
for establishing of exact and 240MPa - 310MPa cutting metal sections.
Strength
vertically oriented edges.
Tensile
340MPa - 420MPa
Strength
Installation Guidelines
Thickness 0.40 mm & 0.50 mm
Length 3000 mm • Hold bead firmly against corner
Manufacturing Standards and nail bead through small holes
Perforated 900 & every on each flange
Type
Mada Trim Accessories comply to Perforated 1350
ASTM C1047 • Make sure that staples penetrate
Standard 25 x 25 the plasterboard.
Size [mm] 30 x 30
• The height of staples should not
be more than the thickness of
plasterboard
• They can also be fixed with
Adhesive or screwed to pass thru
the framing at 300mm centers.
General Note
• Drive all nails below nose of
“MGC reserves the right to update corner bead and tightly into
The products should not be used
technical parameters as per its own flange.
for purposes other than those
discretion. For official use of this TDS shown on the Mada Technical • Joint compound should be
please consult Mada Technical Proposal. covered smoothly and evenly.
department”
0
Copyrights © Mada Gypsum Company. All Rights Reserved | Saudi Arabia | Tel: (00966) 14 325 3253 | Fax: +966 14 325 0420 | Technical@madagypsum.com
CERTIFICATIONS
LEED CREDIT FOR THE
PROJECT
SYSTEM TEST REPORT
[FIRE TEST REPORT]
MADA GYPSUM COMPANY
PO Box 31542, Yanbu Al Sinaiyah 51000
Saudi Arabia
Phone: +966 4 3253253
Fax +966 4 3250420
UAE: +971 50 3006813

Subject: Mada PLUS System - Fire Rating as per ASTM E119


14-Oct-18

Fire Rating
S.No Partition Description
[ASTM E119]
Double Layer Of 12.5mm Mada Plus Plasterboards On Both Sides Of
1 1 Hour
Single Stud Frame
Double Layer Of 12.5mm Mada Plus Plasterboards On Both Sides Of Single
2 2 Hour
Stud Frame
Single Layer Of 15mm Mada Plus Plasterboards On Both Sides Of Single
3 1 Hour
Stud Frame
Double Layer Of 12.5mm Mada Cement Boards On Both Sides Of Single
4 90 Minutes
Stud Frame
Single Layer Of 15mm Mada Cement Board On Both Sides Of Single Stud
5 1 Hour
Frame
Single Layer Of 15mm Mada Cement Board On Both Sides Of Single Stud
6 45 Minutes
Frame
Single Layer Of 15mm Mada Plus Plasterboards On One Side & Single
7 Layer Of 25mm Mada Plus Shaft Board On Other Side Of Single CH-Stud 1 Hour
Frame
Double Layer Of 15mm Mada Plus Plasterboards On One Side & Single
8 Layer Of 25mm Mada Plus Shaft Board On Other Side Of Single CH-Stud 2 Hour
Frame
Three Layer Of 15mm Mada Plus Plasterboards On Both Sides Of Single
9 3 Hour
Stud Frame
Single Layer Of 12.5mm Mada Plus Plasterboards On Both Sides Of Single
10 45 Minutes
Stud Frame
* Complete test report/certification will be provided on request
* Mada PLUS plasterboards are manufactured only for projects and are not available in the retail market.
* Mada PLUS plasterboard is produced with an enhanced configuration (extra fibers, special additives, higher specification of paper liners, controlled density, etc)
so that the performance is guaranteed
* Mada PLUS plasterboard is not available to purchase without purchasing a full system (Mada PLUS System) from Mada Gypsum
* Mada PLUS systems are tested & certified with Intertek for fire ratings as per ASTM E119.

* The performance of all Mada PLUS Systems rely on using the nominated MGC components. Use of non-MGC approved components will reduce a systems fire
rating, acoustic rating, appearance or other aspects of performance. This also includes invalidating any system warranty and previously submitted systems for
consultant approval

AbdulRaheem Sultan
[Technical Manager]
SYSTEM TEST REPORT
[ACOUSTIC TEST REPORT]
Acoustic Test Report Result Summerized

Acoustic STC
S.No. Mada PLUS System Cavity Insulaiton
laboratory [ASTM E90]
1 1x12.5mm Mada Plus Regular plasterboard on both sides of Mada C-stud UL 40
1x15mm Mada Plus Fire Resistant Plasterboard on one side and 1x25mm Mada Shaft board on shaft side of
2 UL 46
Mada CH-stud
3 1x15mm Mada Plus Fire Resistant Plasterboard on both sides of Mada C-stud UL 47

1x15mm Mada Plus Fire Resistant Plasterboard on both sides with resilient channel on one side of Mada C-
4 UL 49
stud
5 2x12.5mm Mada Plus Regular plasterboard on both sides of Mada C-stud UL 51

6 2x12.5mm Mada Plus Fire Resistant Plasterboard on both sides of Mada C-stud UL 52
1 Row x 50mm Mada
2x15mm Mada Plus Fire Resistant Plasterboard on one side and 1x25mm Mada Shaft board on shaft side of
8 UL 52 Approved Glasswool
Mada CH-stud
Insulation 16kg/m3
9 1x15mm Mada ProCem Cement Board on both sides of Mada C-stud UL 53

11 2x15mm Mada plus Fire Resistant plasterboard on either side of double(chase wall) C-stud UL 58
2x15mm Mada Plus Fire Resistant Plasterboard on both sides with resilient channel on one side of Mada C-
12 UL 59
stud
13 2x16mm Mada Plus Fire Resistant Plasterboard on both sides of Mada C-stud DARL 57

14 2x12.5mm Mada ProCem Cement Board on both sides of Mada C-stud UL 60

1 x 16mm Mada Plus Fire Resistant board one side and 1 x 15mm Mada ProCem Cement board on other side
15 DARL 61
of Twin Stud without Bridging (350mm total width of partition)
1x15mm Mada Plus Regular Plasterboard on one side and 1x15mm Mada Plus Impact Resistant Plasterboard
7 Exova 52 1 Row x 75mm Mada
on one side of Mada C-stud
Approved Rockwool
2x15mm Mada Plus Fire Resistant Plasterboard on one side and 1x15mm Mada Impact Resistant Plasterboard
10 Exova 56 Insulation 40kg/m3
on one side of single C-stud
2 x 16mm Mada Plus Fire Resistant board one side and 1 x 12mm Mada Fiber Cement board on other side of
16 DARL 79
Twin Stud without Bridging (350mm total width of partition)
3 x 16mm Mada Plus Fire Resistant board one side and 1 x 12mm Mada Fiber Cement board on other side of
17 DARL 78
Twin Stud without Bridging (450mm total width of partition)
2 x 16mm Mada Plus Fire Resistant plasterboards (either sides) of Twin Stud without Bridging (350mm total
18 DARL 70
width of partition)
2 x 16mm Mada Plus Fire Resistant plasterboards (either sides) of Twin Stud without Bridging (300mm total
19 DARL 68
width of partition)
2 Row x 75mm Mada
2 x 16mm Mada Plus Fire Resistant plasterboards (either sides) of Twin Stud (200mm total width of partition) -
20 DARL 63 Approved Glasswool
Without brace
Insulation 24kg/m3
2 x 16mm Mada Plus Fire Resistant plasterboards (either sides) of Twin Stud (200mm total width of partition) -
21 DARL 59
With rigid brace
1 x 16mm Mada Plus Fire Resistant board one side a+ 1 x 15mm Mada ProCem Cement board (either sides) of
22 DARL 64
Twin Stud (200mm total width of partition) - With acoustic v-brace
3 x 16mm Mada Plus Fire Resistant plasterboards (either sides) of Twin Stud without Bridging (450mm total
23 DARL 72
width of partition)
3 x 16mm Mada Plus Fire Resistant plasterboards (either sides) of Twin Stud with Bridging (450mm total width
24 DARL 72
of partition)

3 x 16mm Mada Plus Fire Resistant plasterboards (One side) of Single Stud Frame (118mm total width of Liner 1 Row x 75mm Mada
25 System) DARL 45 Approved Glasswool
Insulation 24kg/m3
MATERIAL TEST REPORT
TEST REPORTS
[JOINTING TAPE]
TEST REPORTS
[JOINTING COMPOUND]
BLUE LABEL CO.,LTD.
48/58 Moo.1 Ekachai Road, Khok-Krabue, Amphur Muang, Samutsakhon, 74000 Thailand
Tel : +66 3449 4774-5 Fax : +66 3449 4776 Website : www.bluelabelgroup.com

LABORATORY TEST REPORT

Date : September 7, 2016

Theme : Check film properties of RHINOZ Cement Plaster Base. Report No. : LTR-160222
Reported by : Phitchaya Approved by : Sombat

Specification & Film properties


RF-103
Checking item Test standard
RHINOZ Cement Plaster Base

1. Base Cement & Acrylic


2. Component 2 part
3. Mixing ratio, by wt. (A:B) 3:1
4. Pull-off adhesion (N/mm2) ASTM D4541 1.0 (a)
5. Bending, 28 days (Ø mm.) ISO 1519
5.1 Film thickness 0.5 mm. 6 mm.
5.2 Film thickness 1 mm. 8 mm.
5.3 Film thickness 2 mm. 16 mm.

Remark : 1. Failure pattern of pull-off adhesion


(a) Failure within tested sample
(b) Tested sample is a stretch, but not torn
(c) Failure between tested sample and substrate
(d) Failure within the substrate
(e) Failure between tested sample and epoxy
(f) Failure between dolly and epoxy

2. Bending test by mandrel tester, order from flexible to stiff


Rod diameter sizes : 2, 3, 4, 5, 6, 8, 10, 12, 16, 20, 25, 32 mm.

The data shown are based on laboratory tests only. Actual measured data may vary due to circumstances beyond our control
Page 1 of 1
PAGE
INSTALLATION 1/2
INSTALLATION

RF-103 CEMENT PLASTER BASE


The specialty jointing cements compound with high quality for seamless
joint and crack repairing. Suitable on concrete walls, pre-cast wall and
joints of fiber-cement board. Easy to use, fast drying, high flexible.
Workable on interior and exterior area.
TECHNICAL DATA
Base : (A) Special cement (B) Acrylic polymer
Appearance : (A) Grey powder (B) White viscous
Mixing ratio : Part-A/B = 3/1 part by weight
Bucket life : 6 hours (Depending on ambient conditions and thickness)
Surface dry : 15 - 20 minutes (Depending on ambient conditions and thickness)
Recoating dry : 1 - 2 hours (Depending on ambient conditions and thickness)
Sand able : 10 - 16 hours (Depending on ambient conditions and thickness)
WEATHER LOW VOC. Paint able : 24 hours (Depending on ambient conditions and thickness)
GUARD
(ASTM D2370) Bond strength of Pull-Off : 0.7 N/mm2 (ASTM D4541)
Coverage : 1.5 kg./ sq.m./1 mm.

1. 2.

Apply SC032 3D Concrete Bonding on the surface and Mix RF103 RHINOZ Cement Plaster Base, Part A:B by
leave it dry 30-60 min. until color of concrete bonding 3:1 of weight ratio with mixing machine tool. (speed
changed from milky white to be transparent color. 300-500 rpm.) until homogeneous compound

3. 4.

Apply RF103 RHINOZ Cement Plaster Base on the Put AB001 RHINOZ Fiberglass Mesh Tape on the joint,
jointing with trowel only 1 layer, width 10 cm. and thick- and press fiber mess tape to stick on jointing compound
ness 1 mm. while its still wet.
PAGE
INSTALLATION 2/2
5. 6.
INSTALLATION

Apply RF103 RHINOZ Cement Plaster Base to cover on Apply 2nd layer of RF103 RHINOZ Cement Plaster Base
the AB001 RHINOZ Fiberglass Mesh Tape only 1 layer, to cover 1st layer, width 20 cm., thin layer and leave dry
and leave dry 1-2 hr. 1-2 hr.
7. 8.

Apply 3rd layer of RF103 RHINOZ Cement Plaster Base Leave completely dry, at less 10-16 hr.
to cover 2nd layer, width 30 cm.

9. 10.

Sanding the surface wall with sandpaper NO.80-120 or Clean with cloth to remove all dust before painting.
sander machine.

BLUE LABEL CO.,LTD.


48/58 MOO 1 EKACHAI RD. KHOK-KRABUE, MUENG, SAMUTSAKHON, 74000 THAILAND
TEL: (+66) 34-494-774-5 FAX: (+66) 34-494-776 www.bluelabelgroup.com
TEST REPORT
[SEALANT]
WARRANTY CERTIFICATE
PROJECT LIST
APPROVED PROJECTS
S.No. PROJECT NAME CLIENT CONSULTANT CONTRACTOR CITY

1 Kingdom Tower, Jeddah Kingdom Holding Company Dar Al Handasah Shair & Partners Saudi Bin Ladin Group ABCD Jeddah

2 SANG Hospital [Taif Region] National Guard Health Affairs Dar Al Handasah Shair & Partners Nesma & Partners Contracting Company Taif

3 Sail Tower Project AMIAS Dress & Sommer Al Saad General Contracting - BESIX Saudi - JV Jeddah

4 Jeddah Gate Project EMAAAR Zuhar Fayes Partnership ACC Jeddah

Ministry of Interiors,
5 Ministry Of Interiors, KSA Saudi Oger Jeddah
KAP 1/181/Dhahban, KSA

6 Abraj kudai project Abraj kudai Dar Al Handasah Shair & Partners Saudi Bin Ladin Group ABCD Makkah

Specialist Company For Consulting


7 Refurbishment of Qatif Centeral Hospital Ministry of Health FEMCO YUKSEL Consortium Qatif
Engineering

Community Service Center For Faculty Members in University


8 KFUPM Projects Department Sraco Company Sraco Company Dhahran
Campus

9 Mental Health Hospital Dar Al Handasah Shair & Partners Saudi Bin Ladin Group KSA

10 Saudi Aviation Flight Acadimy Aviation Sciences Company Limited Dar Al Handasah Shair & Partners UCTC Riyadh

11 Procare Riaya Hospital Expansion Procare Riaya Hospital Otaishan Consulting Engineers PBC - Project Build General Contracting Co. Ltd Dammam

12 Faby Land, Deerfield Project Abdulla Al Othaim Helpdesk Technical Abu Dhabi

13 Najaf City Council Al Sabic Co Dreshak International Iraq

14 MOH Maternity and Child Hospital Ministry of Health Fourth Dimension Dreshak International Iraq

15 The Baron Hotel Mumtaz Muslim Dar Al Handasah Shair & Partners Dreshak International Iraq

16 Jumeirah Park Villas, Package 5A Jumeirah Park Dar Al Handasah Shair & Partners Arabtech Construction LLC Dubai

17 Strategic Unified Project Ministry of Interior Integrated Project Dar Al Riyadh Consultant Engineers Saudi Bin Ladin Group ABCD KSA
APPROVED PROJECTS
S.No. PROJECT NAME CLIENT CONSULTANT CONTRACTOR CITY

18 SABIC Plastics Applications Development Center SABIC Zuhair Fayez Partnership EL-SEIF SABIC KSA

19 KKU Medical City Male Campus Phase2 KKU Medical City Male Campus Phase2 Zuhair Fayez Partnership Saudi Arabian Baytur KSA

Ministry of Interior Development


20 Educational Building Saudi Consulting Services (Saud Consult) Saudi Oger Ltd KSA
Projects Center

Ministry of Interior Development


21 Correctional Facilities Dar Al Handasah Shair & Partners Saudi Bin Ladin Group KSA
Projects Center
Saudi Bin Ladin Group ABCD
Ministry of Finance / Ministry of Higher
22 Princes Nora Bint Abdurrahman University for Women Dar Al Handasah Shair & Partners Saudi Oger Ltd. Riyadh
Education
Al Saif Engineering JV CCC
Ministry of Finance / Ministry of Higher Saudi Bin Ladin Group ABCD
23 King Abdullah University for Science and Technology (KAUST) ARAMCO Jeddah/Thowal
Education Saudi Oger Ltd
Saudi Bin Ladin Group BPAD
24 King Abdullah Financial District (KAFD) Public Pension Agency (PPA) / RYADAH Dar Al Riyadh Consultant Engineers Saudi Oger Ltd Riyadh
Al Saif Engineering

Saudi Consolidated Engineering Company


25 Jabal Omar Development Jabal Omar Development Company Nesma & Partners Contracting Company Makkah
(Khatib & Alami)

26 King Saud University for Health Science National Guards Dar Al Handasah Shair & Partners Saudi Bin Ladin Group ABCD Riyadh/Jeddah

General Authority for Civil Aviation


27 King Abdul-Aziz International Airport Dar Al Handasah Shair & Partners Saudi Bin Ladin Group ABCD Jeddah
(GACA)

Drake & Scull International,Saudi Arabia


28 King Abdullah Petroleum Studies & Research Center (KAPSARC) Saudi Aramco Zaha Hadid (UK) Riyadh
SK Engineering & Construction

Guangdong Construction Group


King Khalid University, Ministry of
29 King Khalid University Zuhair Fayez Partnership Consultants Baytur Construction & Contracting Abha
Higher Education, Saudi Arabia
Al Rashid Trading & Contracting Co

30 King Saud University in Riyadh - Women's Educational Facilities King Saud University Saudi Consulting Services (Saud Consult) Saudi Bin Ladin Group PBAD Riyadh

Abdullah A.M. Al-Khodari Sons Co.


Taibah University, Ministry of Higher
31 Taibah University Zuhair Fayez Partnership Consultants Abdul Rahman Saad Al Rashid & Sons (Artar) Madina
Education
Mohamed Ali Al Swailem Co. Ltd.
APPROVED PROJECTS
S.No. PROJECT NAME CLIENT CONSULTANT CONTRACTOR CITY

Ministry of Interior project – Central Security Building Expansion


32 Ministry of Interior Dar Al Handasah Shair & Partners Saudi Bin Ladin Group ABCD KSA
Projects

AL MOWAHHAD PROJECT - Network of Security Compounds in Saudi Consolidated Engineering Company


33 Ministry of Interior Saudi Bin Ladin Group ABCD KSA
Different Areas of Saudi Area-200 center (KAP 0) (Khatib & Alami)

The High Commission For The Dev. of


34 SHAMIAH - Holy Haram Mosque Expansion-Northern Courtyard Dar Al Handasah Shair & Partners Saudi Bin Ladin Group ABCD Makkah
Makkah Province

35 The Headquarters Business Park in Jeddah Al-Dar Al-Khasa for Urban Development Dr. Jafar Al Sabbagh Office Freyssinet Saudi Arabia Co. LTD Jeddah

Al Qussi International
Seat Group for const. and Dev.
Bong Kyung Const. Co.
King Abdulazez University, Ministry of Zuhair Fayez Partnership Consultants / Al Muhaideb Contracting Co.
36 King Abdul-Aziz University – Many Projects Jeddah
Higher Education FLUOR Arabia Limited Haif Cont. Co.
Al-Saad General Contracting.
ABV Saudi.
Rafic A. Kreidie Engineers and Contractors.

Public Pension Agency (PPA),


Dar Al Riyadh Consultants, Zuhair Fayez & Al Rajhi Projects and Construction
37 Information Technology and Communication Complex ITCC Information Technology & Riyadh
Partners Al Bawani Contracting Company
Communication Complex

Al Fouzan Trading & General Construction


38 Imam Mohammed Bin Saud Islamic University Imam Islamic University TYPSA Riyadh
Company

Abdullah A.M. Al-Khodari Sons Co.


Al Arrab Contracting Company
39 King Faisal University King Faisal University/ MOHE Emmar Engineering Al Ehsa
South Star Contracting Co.
Many others

Fawaz Al Hokair Trading & Contracting


40 Najran University Najran University / MOHE Radahat Consultant Engineers Najran
Establishment

The High Commission For The


41 Al Bait Towers in Makkah Dar Al Handasah Shair & Partners Saudi Bin Ladin Group ABCD Makkah
Development of Makkah Province

42 Emergency Accommodation Center in Alshmisy Ministry of Finance Dar Al Handasah Shair & Partners Saudi Bin Ladin Group PBAD Makkah

43 King Faisal Medical City in Taif Ministry of Health Dar Al-Magd Consultant. Al Majal Al Arabi Group Taif
APPROVED PROJECTS
S.No. PROJECT NAME CLIENT CONSULTANT CONTRACTOR CITY
King Abdullah Endowment for His
44 King Abdullah Endowment for His Parents Omrania & Associates (O&A), Saudi Arabia Saudi Oger, Riyadh Madina
Parents

Al Arrab Contracting Company


Rabya Trading and Agriculture Co.
Umm al Qura University, Ministry of Waleed Al Samman for Maintenance & Contracting
45 Umm Al-Qura University Expansion – Many Projects Saudi Consulting Services (Saud Consult) Makkah
Higher Education Co
Al Samli Contracting Co.
Al Muhaideb Contracting Co.

Orascom Construction Industries (OCI), Al Muhaidib Contracting Company / BESIX Saudi /


46 King Abdullah Sport City Saudi Aramco Jeddah
Saudi Arabia / Arup, UK / Populous (UK) Six Construct Saudi

Al Osis Contracting Company


Mohammed Sabiq Consultant Engineers
47 Dammam University Dammam University Al Fouzan Trading & General Construction Dammam
Office
Company

48 King Abdul-Aziz Center for Knowledge and Culture Saudi Aramco Saudi Consulting Services (Saud Consult) Saudi Oger Ltd Dhran

Saudi Consolidated Engineering Company Saudi Oger Ltd Jeddah/Makkah


49 Haramain High Speed Railway Stations Saudi Railways Organization (SRO)
(Khatib & Alami) Saudi Bin Ladin Group ABCD /Madinah

50 Royal Commission for Jubil and Yanbu Common Approval

51 Ministry of Interior Common Approval

52 ARAMCO Common Approval

53 Ministry of Health Common Approval

54 Technical and Vocational Training Corp. Common Approval

55 Ministry of Higher Education Common Approval


PROJECT APPROVALS
APPROVALS & REFERENCES

Project: Kingdom Tower


Client: Kingdom Holding Company
Consultant: Dar Al Handasah
Contractor: Saudi Bin Ladin Group ABCD
CITY: Jeddah

Project: SANG Hospital


Client: National Guard Health Affairs
Consultant: Dar Al Handasah
Contractor: Nesma & Partners
CITY: Taif& Qassim

Project: Sail Tower Project


Client: AMIAS
Consultant: Dress & Sommer
Contractor: Al Saad General Contracting /
BESIX Saudi
CITY: Jeddah

Project: Madinah Hajj City


Client: Dar Al Hijra
Consultant: Dar Al Handasah
Contractor: Al Fouzan Contracting
CITY: Madinah
APPROVALS & REFERENCES

Project: Marriott Hotel


Client: Hokair Group
Consultant: Hokair Group
Contractor: SCC
City: Jeddah

Project: King Abdullah University Of Science


and Technology
Client: KAUST Engineering & Project Man-
agement
Consultant: Kirksey Architecture
Contractor: Nesma & Partners
CITY: Thuwal

Project: King Faisal University Campus


Client: King Faisal University
Consultant: Abdullaj Al Saif & Partners
Contractor: Azmeel
CITY: Dammam

Project: Jabal Omar Development


Client: Jabal Omar Development Company
Consultant: Saudi Consolidated Engineer-
ing Company (Khatib & Alami)
Contractor: Nesma & Partners
CITY: Makkah
APPROVALS & REFERENCES

Project: King Abdul-Aziz International


Airport
Client: General Authority for Civil Aviation
Consultant: Dar Al Handasah
Contractor:Saudi Bin Ladin Group ABCD
CITY: Jeddah

Project: King Abdullah Petroleum Studies &


Research Center
Client: Saudi Aramco
Consultant: Zaha Hadid (UK)
Contractor: Drake & Scull
International,Saudi Arabia
SK Engineering & Construction
CITY: Riyadh

Project: MAAD Towers


Client: Maad International Co.
Consultant: Zuhair Fayez Partnership
Contractor: Ashi & Bushnag Co. Ltd
CITY: Makkah

Project: King Abdullah Sport City


Client: Saudi Aramco
Consultant: Orascom Construction
Industries (OCI), Saudi Arabia / Arup, UK /
Populous (UK)
Contractor: Al Muhaidib / BESIX Saudi / Six
Construct Saudi
CITY: Jeddah
APPROVALS & REFERENCES

Project: Burj Vista


Client: EMAAR
Consultant: BHNS Engineering Consultants
Contractor: AGCCIC
CITY: Dubai

Project: DAMAC Akoya


Client: DAMAC Properties
Consultant: ATK Engineering Consultants
Contractor: Romeo Interiors LLC
CITY: Dubai

Project: Al Ain Stadium & Mixed Use


Development
Client: AAFAQ Holding LLC
Consultant: EC Harris International Ltd
Contractor: BAM International Abu Dhabi LLC
CITY: Al Ain

Project: Jumeirah Park Villas


Client: Jumeirah Park LLC
Consultant: Dar Al Handasah
Contractor: Arabtec Construction LLC
CITY: Dubai
As per attached comments.
This Submittal to replace and supersede the previous
Submittals for MADA Drywalls (SHR1-MAT-NAP-ARC-
AR-00025 Rated Gypsum Boards and SHR1-MAT-NAP-
ARC-AR-00020 Non Rated Gypsum Boards).

Carlos Zeid 09/09/2015


D
ra
ft
Scanned by CamScanner

You might also like